Anda di halaman 1dari 13
© LARSEN & TOUBRO LIMITED (OGSP Business Unit, ERC DW, ath Floor. Noth Block I, Gate No, 1, Saki Vinar Road, Powal Works, Mumbal- 400 072. ‘Phone 91-23-6705 8097, Fax 91-22-6705 1714) 105) Emi prp@lntene.com Ref: PO No. 4400000747 Date: 12.11.08 ‘Yo, M/S PIPE-TECH SERVICES PVT. LTD. 201, Benzer, Yari Road, Andheri (West) Mumbai ~ 400 061. Kind Attn: Mr, Gagan Sahni, Subject: LOI for GRE Fabrication - NQRC Project Dear Sir, We are pleased to place this LOI with you for NORC Project for GRE Piping Fabrication at Modular Fabrication Facility (MFE), Hazira as per attached Annexures. Reference: 1. Request for quotation by email dated 19" April 2008. 2. M/s Pipe-Tech Services Pvt. Ltd. proposal sent by email dated 29" April. Atiachemets: 1, Annexure I ~ Scope of work 2. Annexure [A ~ Terms and Conditions of Contract. 3. Annexure I ~ Rate Schedule for Fabrication of GRE Piping. Annexure II ES ~ MFF yard Electrical Safety ‘Annexure II GS ~ General Safety Requirements at MEF. Annexure II — List of drawings ae Request you to kindly send us duplicate copy of this LOI duly signed and stamped as an acceptance of this LOI. Bai Project Manager a Cogs, oftes : Lat House, Ballard Estate, P.O BOX 278 Mumbai~ 400 001.Ph: 6752 5856,Fax: 6752 S858 Website: www Jarsentoubre.com Pago tof! LARSEN & TOUBRO LIMITED Page : 1 of 6 70 PO No. 4400000747 1.0 DEFINITIONS: In this contract as hereinafter defined, the following terms shall have meanings hereby assigned to them unless the context otherwise requires 14 12 The ‘Contractor’ means Mis. Pipe-Tech Services Pvt. Ltd. having their Head Office at 201, Benzer, Yari Road, Andheri (West), Mumbai ~ 400 061, The ‘Purchaser’ / ‘L&T’ means M/s. Larsen & Toubro Limited, having their Registered Office at L&T House, Ballard Estate, Mumbai-400 038. ‘20 — SONTRACTOR'S SCOPE OF WORK: Ste Fabrication, erection and testing of GRE Piping as per drawings mentioned in para 3.0 at MFF, Hazira for NQ - Re Construction project. 24 22 23 24 2s 26 27 28 29 2.40 2.12 (wes) GRE Piping fabrication (Cutting, Shaving, Buffing and Bonding of pipe joints) 2s per Brawings, NARC Specification and instructions from purchaser. Manpower assistance for Inspection clearance of all activities carried out by Contractor such as fitup, assembly, testing etc. and final clearance of complete job. Identification of return balance material. Contractor to ensure retum of balance ‘material to Purchasers stores Fabrication of temporary structures, jigs, fixtures, spiders, enabling steel etc. and. scaffolding work required for completing the work. Internal transportation of material within Purchaser's premises which shall be hnandied as per job requirement. Manpower assistance for all other activities such as recelving, handling, leading, unloading, singing, shifting, material collectionireturn etc, required to complete the work satisfactorily. Loading/unloading and collection of Purchasers free issue items from stores, Manpower assistance for Stage & Final inspection clearance by Client / Cent's Representative (L&T / BVIS / NARC). Housekeeping, removal of scrape, stacking of material etc. araund work place. Contractor shall keep his working area neat & clean. In case contractor fails to do so the same shall be done by purchaser at the contractor's cost ‘Submission of dally manpower reports and progress reports to Purchasers site incharge duly certified by L&T site engineer. Handing over the site in cleaned conditions to the satisfaction of L&T’s engineer. Adherence to all EHS requirements under the ISO-14000 and OHSAS-18001 for which L&T Hazira works Is certified, (See annexure ~IIGS & Annexure -lIES for details) Bo ue LARSEN & TOUBRO LIMITED Page : 2 of 6 400000747 2.13 Any wastage of material due to negligence of contractor or not following the Cutting plans shall be charged to the contractor. Contractor shall submit monthly reconciliation statement alongwith running bil 2.44 — Machinery of tools issued on temporary basis shall be returned by contractor Immediately on expiry of the period mentioned in request, failing to do so contractor is liable for hite charges decided by L&T and shall be deducted from contractor's monthly bil. 2.18 Contractor shall full all the points mentioned in this P.O. 3.0 APPLICABLE DRAWINGS: Please find the list of drawings as per attached annexure Ill NOTE : Latest revision of the drawings shall always be referred. Contractor shall destroy or return the ABSOLETE drawings to L&T, Contractor shall not be eligible for any payment for jobs done with the obsolete drawing after issue of the revision, 4.0 SCOPE OF PURCHASER'S WORK: ‘Co-veelination with Third party Surveyor for inspection clearance at various stages. 5.0 PLACE OF WoRI ‘This work shall be cartied out at our Modular Fabrication Faclity at Hazira, 6.0 GONTRACTOR'S SCOPE OF SUPPLY: 8.1 All manpower supply including AMERON certified bonders / technicians holding valid certificate and good supervisors as per job requirement and instructions from purchaser's site incharge. 82 Contractor shall have his own planning and quality control engineers & ‘supervisors. Contractor shall submit details of key personnel for approval of L&T before starting the work. Contractor shall not make any changes without L&T's permission in manpower approved by L&T. 8.3 Contractor shall have his own personnel computers and should be able to plan and to workout detail schedule as well as manpower requirement. 64 —Alltools, tackles, equipments, welding machines, compressors, driling machines Up to 30mm, hydraulic jacks up to 60 MT Etc. Contractor shall mobilize all special tools and machines required to carry out work at his own cost. 8.5 Allconsumables except adhesive, welding electrodes and industrial gases. 6.8 Safety items like helmets, goggles, welding screens, gloves, safety shoes, work vests, ear plugs, ete for contractor personnel. Contractor shall deploy qualified safety marshals for each area of working and contractor's safety marshals will report fo L8T's safety officer.

Anda mungkin juga menyukai