Tumpuan Lapangan
Dik :
Lebar , (b) = 1000 mm
Tebal plat (h) = 240 mm
Selimut beton (d’) = 50 mm
Tinggi efektif, (d) = 190 mm
Mutu Baja BJTD-40, Fy = 392.27 MPa
Mutu Beton K250, F’c = 24.52 Mpa
Momen Terbesar
Tumpuan (Mx-) = 50.06 KNm
Lapangan (Mx+) = 64.40 KNm
Untuk Plat
ρmin = 0.0025
0.85 ∙ f ′ c ∙ β 600
ρb = ( )
fy 600 + fy
fy 392.27
M= = = 18.084
0.85 ∙ f′c 0.85 ∙ 25.52
Kontrol Tulangan Tumpu :
Mu 50.06
Mn = = = 62.575 KNm
∅ 0.8
Mn 62.575
Rn = 2
= 2
= 1733.38 KN/𝑚2 = 1.733 𝑀𝑃𝑎
b ∙ d 1 ∙ 0.19
1 2 ∙ Rn ∙ M
ρ = (1 − √1 − )
M fy
1 2 ∙ 1.733 ∙ 18.084
ρ = (1 − √1 − )
18.084 392.27
ρ = 0.0046
ρmin < ρ < ρmax , OK.
As = ρ ∙ b ∙ d = 0.0046 ∙ 1000 ∙ 190 = 876 mm2
Mu 64.40
Mn = = = 80.50 KNm
∅ 0.8
Mn 80.50
Rn = = = 2229.92 KN/𝑚2 = 2.229 𝑀𝑃𝑎
b ∙ d2 1 ∙ 0.192
1 2 ∙ Rn ∙ M
ρ = (1 − √1 − )
M fy
1 2 ∙ 2.229 ∙ 18.084
ρ = (1 − √1 − )
18.084 392.27
ρ = 0.006
ρmin < ρ < ρmax , OK.
As = ρ ∙ b ∙ d = 0.006 ∙ 1000 ∙ 190 = 1142.16 mm2