BAB VI Perencanaan Pondasi
BAB VI Perencanaan Pondasi
PERENCANAAN PONDASI
128
6.1.3 Pembebanan Kolom Tepi AS 4
- Pu = 138.260 kg
- Mu = 5.199 kgm
129
Lokasi kritis perhitungan
dua arah di sekitar kolom
-
Gambar 4.41 Geser Dua Arah Disekitar Kolom
130
Reaksi Tiang :
n1 = jumlah tiang dalam 1 baris berisi 2 buah
Pu ∑M.d1
R1 = 𝑛 -
1 ∑d2
138.260 5.199 . 0,500
= –
2 0,500 2 + 0,500 2
= 69130 – 5199
= 63.931 kg/baris
Pu ∑M.d2
R2 = n +
1 ∑d2
138.260 5.199 . 0,500
= +
2 0,500 2 + 0,500 2
= 69130 + 5199
= 74.329 kg/baris
Beban Geser :
Vu = R1 + R2
= 63.931 + 74.329
= 138.260 kg
= 1.382.600 N
Vu < Vc
1.382.600 N < 1.780.995 N ( OK! )
Maka tebal pelat memenuhi tanpa tulangan geser
131
Vc = x 1/6 fc' x bw x d
Vc = x 1/6 fc' x bw x d
Keliling :
bo = π . ( Ø pile + d )
= π . ( 300 + 350 )
= 2041 mm
132
74.329
= 2
= 37.165 kg = 371.650 N
Gaya geser nominal
Vc = x 1/3 fc' x bo x d
Vu < Vc
371.650 N < 1.129.487 N OK !
Maka tebal pelat memenuhi tanpa tulangan geser
= 0,007
= 0,073
133
fy
m = 0,85 fc′
200
= 0,85 x 40
= 5,882
Mu
Rn = Ø b d²
185.820.000
= 0,9 x 2.000 x 350²
= 0,843
1 2m x Rn
ρperlu = x (1 − √1 − )
m fy
1 2 x 5,882 x 0,843
= x (1 − √1 − )
5,882 200
As = ρ . b .d
= 0,0028 . 2000 . 350
= 1960 mm²
As’ = 0,5 . As
= 0,5 . 1960
= 980 mm²
Dipakai tulangan bawah untuk kedua arah sama D19–125 (2269 mm2
> 1960 mm2)
Dipakai tulangan atas untuk kedua arah sama D19–250 (1135 mm2
>980 mm2)
134
135