PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
TGL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 650.558.000
PROV/KAB/KODYA : ACEH/ACEH BARAT
SUMBER DANA : APBA - OTSUS KAB./KOTA (DOKA)
JUMLAH 1.00
JUMLAH 147.83
ZAILANI, ST IMRAN, ST F A J R I,
NIP. 19750813 200701 004 Chief Inspector General Superin
DIVISI - 3. PEKERJAAN TANAH
VOLUME
NO. STA. s/d STA. URAIAN
M3
JUMLAH 45.00
ZAILANI, ST IMRAN, ST F A J R I,
NIP. 19750813 200701 004 Chief Inspector General Superin
DIVISI - 3. PEKERJAAN TANAH
3.2(2a) TIMBUNAN PILIHAN
VOLUME
NO. STA. s/d STA. URAIAN
M3
JUMLAH 1,943.92
ZAILANI, ST IMRAN, ST F A J R I,
NIP. 19750813 200701 004 Chief Inspector General Superin
DIVISI - 3. PEKERJAAN TANAH
JUMLAH 8,626.00
ZAILANI, ST IMRAN, ST F A J R I,
NIP. 19750813 200701 004 Chief Inspector General Superin
DIVISI - 7. S T R U K T U R
JUMLAH 8.43
ZAILANI, ST IMRAN, ST F A J R I,
NIP. 19750813 200701 004 Chief Inspector General Superin
DIVISI - 7. STRUKTUR
7.1 (7) Beton mutu sedang fc’20 MPa
VOLUME
NO. STA. dan STA. URAIAN
M3
JUMLAH 50.63
ZAILANI, ST IMRAN, ST F A J R I,
NIP. 19750813 200701 004 Chief Inspector General Superin
DIVISI - 7. STRUKTUR
7.1 (8) Beton mutu rendah fc’15 MPa
VOLUME
NO. STA. s/d STA. URAIAN
M3
8.418
JUMLAH 8.418
ZAILANI, ST IMRAN, ST F A J R I,
NIP. 19750813 200701 004 Chief Inspector General Superin
DIVISI - 7. STRUKTUR
7.3 (1) Baja Tulangan U 24 Polos
VOLUME
NO. STA. s/d STA. URAIAN
Kg
JUMLAH 6,495.64
ZAILANI, ST IMRAN, ST F A J R I,
NIP. 19750813 200701 004 Chief Inspector General Superin
PEMERINTAH ACEH
AS PEKERJAAN UMUM DAN PENATAAN RUANG
D PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
a No. 24, Email : pupr.uptd4gmail.com Meulaboh 23611
AYEUK - SEKLEMEN KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
KETERANGAN
LS
Diajukan oleh,
Penyedia
CV. CHIARA UTAMA
F A J R I, S T
General Superintendent
KETERANGAN
Galian Box
Galian Gunung
Pasangan Batu
M3
Diajukan oleh,
Penyedia
CV. CHIARA UTAMA
F A J R I, S T
General Superintendent
KETERANGAN
M3
Diajukan oleh,
Penyedia
CV. CHIARA UTAMA
F A J R I, S T
General Superintendent
2a) TIMBUNAN PILIHAN
KETERANGAN
M3
Diajukan oleh,
Penyedia
CV. CHIARA UTAMA
F A J R I, S T
General Superintendent
PENYIAPAN BADAN JALAN
KETERANGAN
M2
Diajukan oleh,
Penyedia
CV. CHIARA UTAMA
F A J R I, S T
General Superintendent
7.9 PASANGAN BATU
KETERANGAN
Boxcalvert
L/R
M3
Diajukan oleh,
F A J R I, S T
General Superintendent
KETERANGAN
M3
Diajukan oleh,
Penyedia
CV. CHIARA UTAMA
F A J R I, S T
General Superintendent
KETERANGAN
Boxcalvert
M3
Diajukan oleh,
Penyedia
CV. CHIARA UTAMA
F A J R I, S T
General Superintendent
KETERANGAN
Kg
Diajukan oleh,
Penyedia
CV. CHIARA UTAMA
F A J R I, S T
General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
PAKET PEKERJAAN :
PEMBANGUNANJALAN MEUNASAH RAYEUK - SKLEMEN
KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB/KOTA)
DIVISI - I
PENYEDIA :
PENYEDIA :
PENYEDIA :
PENYEDIA :
PENYEDIA :
PENYEDIA :
PENYEDIA :
PENYEDIA :
EN
A)
DIVISI - I
UMUM
areng
DIVISI - II
DRAINASE
areng
DIVISI - III
RJAAN TANAH
areng
DIVISI - IV
N BAHU JALAN
areng
DIVISI - V
SAN BERBUTIR
areng
DIVISI - VI
RASAN ASPAL
areng
DIVISI - VII
STRUKTUR
areng
DIVISI - VIII
RJAAN MINOR
areng
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
( MONTHLY CERTIFICATE )
MC - 01
PERIODE : 30 AGUSTUS 2018
PAKET PEKERJAAN :
PEMBANGUNANJALAN MEUNASAH RAYEUK - SKLEMEN
KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB/KOTA)
FIKAT BULANAN
HLY CERTIFICATE )
MC - 01
E : 30 AGUSTUS 2018
KET PEKERJAAN :
AN MEUNASAH RAYEUK - SKLEMEN
B. ACEH BARAT (OTSUS KAB/KOTA)
KONSULTAN
S PUTIH SEJAJAR
PENYEDIA :
CHIARA UTAMA
Komp. Perkantoran Lambhuk Kec. Ulee Kareng
1 REKAP SEPTEMBER
PASWORD =* ***************** *******
. 13,137,800.00 *******
. ***************** ******* ******* ******* *******
Tiga Belas Juta Seratus Tiga Puluh Tujuh Ribu Delapan Ratus Rupiah
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000013137800 ***
******* ***************** ******* ******* ******* *******
******* 800 1 ***
******* 8 ***
******* Delapan Ratus SEPULUH ***
******* 0 ***
******* 0 ***
******* ***
******* Delapan Ratus ***
******* ***
******* ***
******* 137 2 ***
******* 1 Tiga Puluh ***
******* Seratus Tujuh Belas ***
******* 3 Tujuh ***
******* 7 Tiga Puluh Tujuh ***
******* Tiga Puluh Tujuh Tiga Puluh Tujuh ***
******* Seratus Tiga Puluh Tujuh Ribu ***
******* ***
******* ***
******* 013 3 ***
******* 0 ***
******* Tiga Belas ***
******* 1 Tiga ***
******* 3 Tiga ***
******* Tiga Belas Tiga Belas ***
******* Tiga Belas Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 66 00
== ******* Tiga Belas Juta Seratu Tiga Belas Juta Seratus Tiga Puluh Tujuh Ribu Delapan Ratus
== ******* Tiga Belas Juta Seratus Tiga Puluh Tujuh Ribu Delapan Ratus Rupiah
== ******* Tiga Belas Juta Seratus Tiga Puluh Tujuh Ribu Delapan Ratus Rupiah
******* ***************** ******* ******* ******* *******
2 REKAP OKTOBER
PASWORD =* ***************** *******
. 429,686,900.00 *******
. ***************** ******* ******* ******* *******
Empat RATUS Dua Puluh Sembilan Juta Enam Ratus Delapan Puluh Enam Ribu Semb
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000429686900 ***
******* ***************** ******* ******* ******* *******
******* 900 1 ***
******* 9 ***
******* Sembilan Ratus Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* Sembilan Ratus ***
******* ***
******* ***
******* 686 2 ***
******* 6 Delapan Puluh ***
******* Enam Ratus Enam Belas ***
******* 8 Enam ***
******* 6 Delapan Puluh Enam ***
******* Delapan Puluh Enam Delapan Puluh Enam ***
******* Enam Ratus Delapan Puluh Enam Ribu ***
******* ***
******* ***
******* 429 3 ***
******* 4 Dua Puluh ***
******* Empat RATUS Sembilan Belas ***
******* 2 Sembilan ***
******* 9 Dua Puluh Sembilan ***
******* Dua Puluh Sembilan Dua Puluh Sembilan ***
******* Empat RATUS Dua Puluh Sembilan Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 92 00
== ******* Empat RATUS Dua Puluh
Empat RATUS Dua Puluh Sembilan Juta Enam Ratus Delapan
== ******* Empat RATUS Dua Puluh Sembilan Juta Enam Ratus Delapan Puluh Enam Ribu Semb
== ******* Empat RATUS Dua Puluh Sembilan Juta Enam Ratus Delapan Puluh Enam Ribu Semb
******* ***************** ******* ******* ******* *******
3 REKAP NOVEMBER
PASWORD =* ***************** *******
. 313,417,100.00 *******
. ***************** ******* ******* ******* *******
Tiga RATUS Tiga Belas Juta Empat Ratus Tujuh Belas Ribu Seratus Rupiah
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000313417100 ***
******* ***************** ******* ******* ******* *******
******* 100 1 ***
******* 1 ***
******* Seratus Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* Seratus ***
******* ***
******* ***
******* 417 2 ***
******* 4 ***
******* Empat Ratus Tujuh Belas ***
******* 1 Tujuh ***
******* 7 Tujuh ***
******* Tujuh Belas Tujuh Belas ***
******* Empat Ratus Tujuh Belas Ribu ***
******* ***
******* ***
******* 313 3 ***
******* 3 ***
******* Tiga RATUS Tiga Belas ***
******* 1 Tiga ***
******* 3 Tiga ***
******* Tiga Belas Tiga Belas ***
******* Tiga RATUS Tiga Belas Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 70 00
== ******* Tiga RATUS Tiga Belas Tiga RATUS Tiga Belas Juta Empat Ratus Tujuh Belas Ribu Se
== ******* Tiga RATUS Tiga Belas Juta Empat Ratus Tujuh Belas Ribu Seratus Rupiah
== ******* Tiga RATUS Tiga Belas Juta Empat Ratus Tujuh Belas Ribu Seratus Rupiah
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
4 REKAP DESEMBER
PASWORD =* ***************** *******
. 1,153,734,100.00 *******
. ***************** ******* ******* ******* *******
Satu Milyar (Seratus Lima Puluh Tiga Juta Tujuh Ratus Tiga Puluh Empat Ribu Seratu
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 001153734100 ***
******* ***************** ******* ******* ******* *******
******* 100 1 ***
******* 1 ***
******* Seratus Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* Seratus ***
******* ***
******* ***
******* 734 2 ***
******* 7 Tiga Puluh ***
******* Tujuh Ratus Empat Belas ***
******* 3 Empat ***
******* 4 Tiga Puluh Empat ***
******* Tiga Puluh Empat Tiga Puluh Empat ***
******* Tujuh Ratus Tiga Puluh Empat Ribu ***
******* ***
******* ***
******* 153 3 ***
******* 1 Lima Puluh ***
******* (Seratus Tiga Belas ***
******* 5 Tiga ***
******* 3 Lima Puluh Tiga ***
******* Lima Puluh Tiga Lima Puluh Tiga ***
******* (Seratus Lima Puluh Tiga Juta ***
******* ***
******* ***
******* 001 4 ***
******* 0 ***
******* SEBELAS ***
******* 0 Satu ***
******* 1 Satu ***
******* Satu Satu ***
******* Satu Milyar ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah) 91 00
== ******* Satu Milyar (Seratus L Satu Milyar (Seratus Lima Puluh Tiga Juta Tujuh Ratus Tiga Pu
== ******* Satu Milyar (Seratus Lima Puluh Tiga Juta Tujuh Ratus Tiga Puluh Empat Ribu Seratu
== ******* Satu Milyar (Seratus Lima Puluh Tiga Juta Tujuh Ratus Tiga Puluh Empat Ribu Seratu
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
5 OKTOBER
PASWORD =* ***************** *******
. 154,099,000.00 *******
. ***************** ******* ******* ******* *******
Seratus Lima Puluh Empat Juta Sembilan Puluh Sembilan Ribu Rupiah
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000154099000 ***
******* ***************** ******* ******* ******* *******
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* ***
******* 099 2 ***
******* 0 Sembilan Puluh ***
******* Sembilan Belas ***
******* 9 Sembilan ***
******* 9 Sembilan Puluh Sembilan ***
******* Sembilan Puluh SembilSembilan Puluh Sembilan ***
******* Sembilan Puluh Sembilan Ribu ***
******* ***
******* ***
******* 154 3 ***
******* 1 Lima Puluh ***
******* Seratus Empat Belas ***
******* 5 Empat ***
******* 4 Lima Puluh Empat ***
******* Lima Puluh Empat Lima Puluh Empat ***
******* Seratus Lima Puluh Empat Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 65 00
== ******* Seratus Lima Puluh Emp
Seratus Lima Puluh Empat Juta Sembilan Puluh Sembilan Ribu
== ******* Seratus Lima Puluh Empat Juta Sembilan Puluh Sembilan Ribu Rupiah
== ******* Seratus Lima Puluh Empat Juta Sembilan Puluh Sembilan Ribu Rupiah
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
6 NOVEMBER
PASWORD =* ***************** *******
. 151,947,180.00 *******
. ***************** ******* ******* ******* *******
Seratus Lima Puluh Satu Juta Sembilan Ratus Empat Puluh Tujuh Ribu Seratus Delap
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000151947180 ***
******* ***************** ******* ******* ******* *******
******* 180 1 ***
******* 1 Delapan Puluh ***
******* Seratus Sepuluh ***
******* 8 ***
******* 0 Delapan Puluh ***
******* Delapan Puluh Delapan Puluh ***
******* Seratus Delapan Puluh ***
******* ***
******* ***
******* 947 2 ***
******* 9 Empat Puluh ***
******* Sembilan Ratus Tujuh Belas ***
******* 4 Tujuh ***
******* 7 Empat Puluh Tujuh ***
******* Empat Puluh Tujuh Empat Puluh Tujuh ***
******* Sembilan Ratus Empat Puluh Tujuh Ribu ***
******* ***
******* ***
******* 151 3 ***
******* 1 Lima Puluh ***
******* Seratus Sebelas ***
******* 5 Satu ***
******* 1 Lima Puluh Satu ***
******* Lima Puluh Satu Lima Puluh Satu ***
******* Seratus Lima Puluh Satu Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 95 00
== ******* Seratus Lima Puluh SatSeratus Lima Puluh Satu Juta Sembilan Ratus Empat Puluh Tu
== ******* Seratus Lima Puluh Satu Juta Sembilan Ratus Empat Puluh Tujuh Ribu Seratus Delap
== ******* Seratus Lima Puluh Satu Juta Sembilan Ratus Empat Puluh Tujuh Ribu Seratus Delap
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
7 DESEMBER
PASWORD =* ***************** *******
. 112,413,730.00 *******
. ***************** ******* ******* ******* *******
Seratus Dua Belas Juta Empat Ratus Tiga Belas Ribu Tujuh Ratus Tiga Puluh Rupiah
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000112413730 ***
******* ***************** ******* ******* ******* *******
******* 730 1 ***
******* 7 Tiga Puluh ***
******* Tujuh Ratus Sepuluh ***
******* 3 ***
******* 0 Tiga Puluh ***
******* Tiga Puluh Tiga Puluh ***
******* Tujuh Ratus Tiga Puluh ***
******* ***
******* ***
******* 413 2 ***
******* 4 ***
******* Empat Ratus Tiga Belas ***
******* 1 Tiga ***
******* 3 Tiga ***
******* Tiga Belas Tiga Belas ***
******* Empat Ratus Tiga Belas Ribu ***
******* ***
******* ***
******* 112 3 ***
******* 1 ***
******* Seratus Dua Belas ***
******* 1 Dua ***
******* 2 Dua ***
******* Dua Belas Dua Belas ***
******* Seratus Dua Belas Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 80 00
== ******* Seratus Dua Belas JutaSeratus Dua Belas Juta Empat Ratus Tiga Belas Ribu Tujuh Ra
== ******* Seratus Dua Belas Juta Empat Ratus Tiga Belas Ribu Tujuh Ratus Tiga Puluh Rupiah
== ******* Seratus Dua Belas Juta Empat Ratus Tiga Belas Ribu Tujuh Ratus Tiga Puluh Rupiah
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
ujuh Ribu Delapan Ratus
No. URAIAN
Divisi
1 UMUM
2 PEKERJAAN TANAH
###
3 PELEBARAN PERKERASAN DAN BAHU JALAN
4 PERKERASAN BERBUTIR
5 PERKERASAN ASPAL
6 STRUKTUR
(D) DIBULATKAN
TERBILANG : Tujuh Ratus Empat Belas Juta Tiga Ratus Dua Belas Ribu Rupiah
Diketahui Oleh :
Kuasa Pengguna Anggaran/Kuasa Pengguna Barang
UPTD Pelayanan Jalan dan Jembatan Wilayah IV
Dinas Pekerjaan Umum dan Penataan Ruang Aceh
Ir. Adriansyah, MT
Pembina Tingkat I
NIP. 19630815 199203 1 006
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
32,310,000.00 47,310,000.00
120,204,397.92 379,110,321.05
- -
- -
- -
438,902,606.68 222,954,316.16
591,417,004.60 649,374,637.21
59,141,700.46 64,937,463.72
650,558,705.06 714,312,100.93
650,558,000.00 714,312,000.00
Diajukan Oleh :
Penyedia
CV. CHIARA UTAMA
T. ZULFIKAR HF.
Direktur
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN WILAYAH IV
Jln. Merdeka No. 24, Email : pupr.uptd4gmail.com Meulaboh 2361
PEKERJAAN :
PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB.
ACEH BARAT (OTSUS KAB./KOTA)
PENYEDIA :
CV. CHIARA UTAMA
Jalan P. Nyak Makam No. 1 Komp. Perkantoran Lambhuk Kec. Ulee Kareng
ACEH BESAR
KONSULTAN SUPERVISI
PT. GARIS PUTIH SEJAJAR
Planning And Design Consultants
PEMERINTAH ACEH
DINAS BINA MARGA
JALAN JENDERAL SUDIRMAN NO. 1, TELP. 46767, 47009, 46694, 46915, FEX. 47232
JALAN JENDERAL SUDIRMAN NO. 1, TELP. 46767, 47009, 46694, 46915, FEX. 47232
BANDA ACEH KODE POS POS 23239
JALAN PROVINSI
DESA PAYONG
DESA JAMAT
DESA PAYONG
DESA PAYONG
DESA PAYONG
PHOTO (MC 0)
( P. 011 )
PEKERJAAN :
KONSULTAN SUPERVISI
PT. GARIS PUTIH SEJAJAR
Planning And Design Consultants
Jalan Yos Sudarso No. 137 Telpon : ( 0643 ) 21309 Fax. 21760 Takengon
UANG
IV
AYAH IV
ee Kareng
X. 47232
X. 47232
AN
n
DAFTAR KUANTITAS DAN HARGA PEKERJAAN MUTUAL
PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
TGL KONTRAK : 30 AGUSTUS 2018
NILAI KONTRAK : Rp. 650.558.000
KONTRAKTOR : CV. CHIARA UTAMA
PROV/KAB/KODYA : ACEH/ACEH BARAT
SUMBER DANA : APBA - OTSUS KAB./KOTA (DOKA)
PEMBA NAMA ITEM PEKERJAAN SAT. HARGA SATUAN VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA
YARAN KONTRAK (Rp) KONTRAK (Rp.) (%) TAMBAH (Rp.)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 32,310,000.00 1.00 32,310,000.00 5.46
1.8.(2) Jembatan Sementara Ls 15,000,000.00 1.00 15,000,000.00
A N W A R, ST DASRIL, ST
NIP. 19730307 200701 1 004 Site Engineer
PEKERJAAN MUTUAL CHECK (MC - 0)
47,310,000.00 7.29
714,312,100.93
714,312,000.00
Diajukan Oleh,
Kontraktor Pelaksana
CV. CHIARA UTAMA
T. ZULFIKAR HF.
Direktur
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN P
UPTD PELAYANAN JALAN DAN
Jalan Merdeka No. 24 Meulaboh
REKAPITULASI SERTIFIKAT
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAW
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-I : 12 Oktober 2018
NO. KONTRAK ADD-I : 65.1-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
NO
URAIAN
DIVISI
I UMUM
VII STRUKTUR
A JUMLAH
B PAJAK PERTAMBAHAN NILAI (PPN 10%)
C JUMLAH TERMASUK PPN 10%
D JUMLAH DIBULATKAN
E JUMLAH KOTOR SERTIFIKAT BULAN INI
POTONGAN :
F SERTIFIKAT S/D BULAN LALU (KUMULATIF)
G 5% JAMINAN PEMELIHARAAN (5% X E)
H 30 % PENGEMBALIAN UANG MUKA (30% X E)
I JUMLAH POTONGAN SERTIFIKAT BULAN INI (F+G+H)
J JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI (E-I) TERMASUK PPN
K DIBULATKAN
TERBILANG : Tiga Belas Juta Seratus Tiga Puluh Tujuh Ribu Delapan R
Mengetahui / Menyetujui : Diperiksa Oleh :
PENGGUNA ANGGARAN/KUASA PENGGUNA BARANG KONSULTAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ACEH PT. GARIS PUTIH SEJA
SELAKU PENGGUNA ANGGARAN
SERTIFIKAT NO. : 1
BULAN : SEPTEMBER
TANGGAL : 31 SEPTEMBER 2018
HALAMAN : 1 DARI 4
NILAI KONTRAK JUMLAH PEMBAYARAN
BULAN S/D BOBOT
AWAL
INI BULAN INI PEKERJAAN (%)
438,902,606.68 - - -
- -
(5% x E) 1,010,600.00
(20% x E) 6,063,600.00 BULAN INI
(F + G + H) 7,074,200.00
(E - I) 13,137,800.00 3.11
13,137,800.00
uh Tujuh Ribu Delapan Ratus Rupiah
Diperiksa Oleh : Diajukan Oleh :
KONSULTAN PENYEDIA JASA
PT. GARIS PUTIH SEJAJAR CV. CHIARA UTAMA
SERTIFIKAT BULA
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KA
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-I : 12 Oktober 2018
NO. KONTRAK ADD-I : 65.1-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
DIVISI - I UMUM
KUANTITAS
MATA PEKERJAAN HARGA
PEMBA URAIAN ITEM PEKERJAAN SATUAN KONTRAK SATUAN
YARAN (AWAL) ( RP )
1 2 3 4 6
1.2 Mobilisasi Ls 1.00 32,310,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE ( % )
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) 2 UPTD IV
KAB. ACEH BARAT PT. GARIS PUTIH SEJA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
ANWAR, ST
NIP. 19730307 200701 1 004
PEMERINTAH AC
DINAS PEKERJAAN UMUM DAN
UPTD PELAYANAN JALAN D
Jalan Merdeka No. 24 Meu
SERTIFIKAT BULA
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB.
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-I : 12 Oktober 2018
NO. KONTRAK ADD-I : 65.1-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp 714,312,000.00
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE ( % )
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) 2 UPTD IV
KAB. ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
ANWAR, ST
NIP. 19730307 200701 1 004
PEMERINTAH AC
DINAS PEKERJAAN UMUM DAN
UPTD PELAYANAN JALAN D
Jalan Merdeka No. 24 Meu
SERTIFIKAT BULA
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KA
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-I : 12 Oktober 2018
NO. KONTRAK ADD-I : 65.1-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : #REF!
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE ( % )
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) 2 UPTD IV
KAB. ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
ANWAR, ST
NIP. 19730307 200701 1 004
PEMERINTAH ACEH
N UMUM DAN PENATAAN RUANG
YANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
ERTIFIKAT BULANAN
MEN KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT : 1
BULAN : SEPTEMBER
- - - - - - -
32,310,000.00
- 9,693,000.00 9,693,000.00
- 30.00 30.00
DASRIL, ST F A J R I, S T
SITE ENGINEER GENERAL SUPERINTENDENT
PEMERINTAH ACEH
AN UMUM DAN PENATAAN RUANG
YANAN JALAN DAN JEMBATAN
deka No. 24 Meulaboh 23611
ERTIFIKAT BULANAN
EN KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT : 1
BULAN : SEPTEMBER
HALAMAN : 2 DARI 4
120,204,397.92
- 8,681,554.50 8,681,554.50
- 7.22 7.22
SERTIFIKAT : 1
BULAN : SEPTEMBER
HALAMAN : 3 dari 4
438,902,606.68
- - -
- - -
SERTIFIKAT BULAN
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB. ACEH BA
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp. 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
DIVISI - I UMUM
KUANTITAS
MATA PEKERJAAN HARGA JUMLAH HARGA
PEMBA URAIAN ITEM PEKERJAAN SATUAN KONTRAK SATUAN PELAKSANAAN
YARAN (AWAL) ( RP ) ( RP )
1 2 3 4 6 7=4x6
ANWAR, ST DASRIL, ST
NIP. 19730307 200701 1 004 SITE ENGINEER
PEMERINTAH ACE
DINAS PEKERJAAN UMUM DAN PE
UPTD PELAYANAN JALAN DA
Jalan Merdeka No. 24 Meula
SERTIFIKAT BULAN
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB. ACEH BA
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp. 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) 2 UPTD IV
KAB. ACEH BARAT PT. GARIS PUTI
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
ANWAR, ST
NIP. 19730307 200701 1 004 SITE ENG
PEMERINTAH ACE
DINAS PEKERJAAN UMUM DAN PE
UPTD PELAYANAN JALAN DA
Jalan Merdeka No. 24 Meula
SERTIFIKAT BULAN
PAKET PEKERJAAN PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB. ACEH BA
TANGGAL KONTRAK 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
7.1 (7) a Beton mutu sedang fc’20 MPa m3 106.63 2,007,032 214,009,822
7.1 (8) Beton mutu rendah fc’15 MPa m3 16.61 1,416,832 23,533,580
7.3 (1) Baja Tulangan U 24 Polos Kg 11,668.20 866,430 10,109,678,526
KAT BULANAN
XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT : 1
BULAN : SEPTEMBER
- 9,693,000.00 9,693,000.00
- 30.00 30.00
Dibuat Oleh :
PENYEDIA
H SEJAJAR CV. CHIARA UTAMA
F A J R I, S T
GENERAL SUPERINTENDENT
INTAH ACEH
MUM DAN PENATAAN RUANG
JALAN DAN JEMBATAN
o. 24 Meulaboh 23611
KAT BULANAN
XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT : 1
BULAN : SEPTEMBER
TANGGAL : 31 SEPTEMBER 2018
HALAMAN : 2 DARI 4
- - - -
- - - - -
- - - -
- 14,316.30 14,316.30
- 0.01 0.01
DASRIL, ST F A J R I, S T
SITE ENGINEER GENERAL SUPERINTENDENT
INTAH ACEH
MUM DAN PENATAAN RUANG
JALAN DAN JEMBATAN
o. 24 Meulaboh 23611
KAT BULANAN
XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT : 2
BULAN : OKTOBER
TANGGAL : 31 Oktober 2018
HALAMAN : 3 dari 4
SERTIFIKAT BU
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp. 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
DIVISI - I UMUM
KUANTITAS
MATA PEKERJAAN HARGA
PEMBA URAIAN ITEM PEKERJAAN SATUAN KONTRAK SATUAN
YARAN (AWAL) ( RP )
1 2 3 4.00 6
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE ( % )
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) 2 UPTD IV
KAB. ACEH BARAT PT. GARIS PUTIH SEJA
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
ANWAR, ST
NIP. 19730307 200701 1 004
PEMERINTAH
DINAS PEKERJAAN UMUM DA
UPTD PELAYANAN JALAN
Jalan Merdeka No. 24 M
SERTIFIKAT BU
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp. 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE ( % )
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) 2 UPTD IV
KAB. ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
ANWAR, ST
NIP. 19730307 200701 1 004
PEMERINTAH
DINAS PEKERJAAN UMUM DA
UPTD PELAYANAN JALAN
Jalan Merdeka No. 24 M
SERTIFIKAT BU
PAKET PEKERJAAN PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB
TANGGAL KONTRAK 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE ( % )
Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) 2 UPTD IV
KAB. ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
ANWAR, ST
NIP. 19730307 200701 1 004
PEMERINTAH ACEH
RJAAN UMUM DAN PENATAAN RUANG
PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
SEKLEMEN KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT : 1
BULAN : SEPTEMBER
32,310,000.00
- 9,693,000.00
- 30.00
DASRIL, ST F A J R I, S T
SITE ENGINEER GENERAL SUPERINTENDENT
PEMERINTAH ACEH
KERJAAN UMUM DAN PENATAAN RUANG
PELAYANAN JALAN DAN JEMBATAN
an Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
SEKLEMEN KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT : 1
BULAN : SEPTEMBER
HALAMAN : 2 DARI 4
4,857,757.92 - - -
105,448,200.00 - - - -
8,466,810.00 - - -
120,204,397.92
- 14,316.30
- 0.01
DASRIL, ST F A J R I, S T
SITE ENGINEER GENERAL SUPERINTENDENT
PEMERINTAH ACEH
KERJAAN UMUM DAN PENATAAN RUANG
PELAYANAN JALAN DAN JEMBATAN
an Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
SEKLEMEN KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT : 0
BULAN : 0
TANGGAL : 0
HALAMAN : 0
23,533,579.52 - - -
10,109,678,526.00 - - -
17,935,101.00 - - -
10,365,157,028.68
- 602,109.60
- 0.01
SEPTEMBER
31 SEPTEMBER 2018
2 DARI 4
9,693,000.00
-
9,693,000.00
30.00
F A J R I, S T
GENERAL SUPERINTENDENT
NG
SEPTEMBER
31 SEPTEMBER 2018
2 DARI 4
14,316.30
-
-
14,316.30
0.01
F A J R I, S T
GENERAL SUPERINTENDENT
NG
602,109.60
-
-
602,109.60
0.01
Dibuat Oleh :
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB. ACEH B
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp. 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
DIVISI - I UMUM
KUANTITAS
MATA PEKERJAAN HARGA JUMLAH HARGA
PEMBA URAIAN ITEM PEKERJAAN SATUAN KONTRAK SATUAN PELAKSANAAN
YARAN (AWAL) ( RP ) ( RP )
1 2 3 4 6 7=4x6
ANWAR, ST DASRIL, ST
NIP. 19730307 200701 1 004 SITE ENGINEER
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENAT
UPTD PELAYANAN JALAN DAN JEM
Jalan Merdeka No. 24 Meulaboh
SERTIFIKAT BULANAN
PAKET PEKERJAAN
TANGGAL #REF! : #REF!
NO. KON #REF! : #REF!
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB. ACEH B
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp. 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
0: 0
#REF! : #REF!
PAKET PEKERJAAN PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KEC. KAWAY XVI KAB. ACEH B
TANGGAL KONTRAK 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp 714,312,000
PENYEDIA JASA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
7.1 (7) a Beton mutu sedang fc’20 MPa m3 11,668.20 15,720.00 183,424,104.00
7.1 (8) Beton mutu rendah fc’15 MPa m3 20.70 866,430.00 17,935,101.00
KAT BULANAN
C. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT : 1
BULAN : SEPTEMBER
- - - - -
- 9,693,000.00 9,693,000.00
- 30.00 30.00
Dibuat Oleh :
PENYEDIA
ARIS PUTIH SEJAJAR CV. CHIARA UTAMA
F A J R I, S T
GENERAL SUPERINTENDENT
RINTAH ACEH
MUM DAN PENATAAN RUANG
N JALAN DAN JEMBATAN
No. 24 Meulaboh 23611
KAT BULANAN
SERTIFIKAT : 1
BULAN : SEPTEMBER
HALAMAN : 2 DARI 4
- - - - -
- - - -
- 602,109.60 602,109.60
- 0.14 0.14
SERTIFIKAT : 0
BULAN : 0
TANGGAL : 0
HALAMAN : 0
- - - -
- - - -
- 602,109.60 602,109.60
- 0.14 0.14
LAPORAN KEMAJUAN
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN KE
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-I : 12 Oktober 2018
NO. KONTRAK ADD-I : 65.1-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp 714,312,000
PENYEDIA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
No.
I UMUM
1.2 Mobilisasi
D Dibulatkan
ANWAR, ST DASRIL,
NIP. 19730307 200701 1 004 SITE ENGI
MENGETAHUI / M
PENGGUNA ANGGARAN/KUA
DINAS PEKERJAAN UMUM DAN
SELAKU PENGGUN
DINAS PEKERJAAN UMUM DAN
IR. FAJRI
Pembina Ti
NIP. 19640831 19
PEMERINTAH ACEH
JAAN UMUM DAN PENATAAN RUANG
PELAYANAN JALAN DAN JEMBATAN
an Merdeka No. 24 Meulaboh 23611
SERTIFIKAT : 1
BULAN / TANGGAL : 31 SEPTEMBER 2018
Ls - -
591,417,004.60
100.00
59,141,700.46
650,558,705.06
650,558,000.00
IR. FAJRI, MT
Pembina Tingkat I
NIP. 19640831 199203 1 006
MBER 2018
PRESTASI
PEKERJAAN
(%)
1.64
0.04
1.43
3.11
H:
MA
F.
MA
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN P
UPTD PELAYANAN JALAN DA
Jalan Merdeka No. 24 Meulaboh
REKAPITULASI KUAN
PAKET PEKERJAAN : PEMBANGUNAN JALAN MEUNASAH RAYEUK - SEKLEMEN K
TANGGAL KONTRAK : 30 AGUSTUS 2018
NO. KONTRAK : 65-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 650.558.000
TANGGAL KONTRAK ADD-I : 12 Oktober 2018
NO. KONTRAK ADD-I : 65.1-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 650.558.000
TANGGAL KONTRAK ADD-II : 10 Desember 2018
NO. KONTRAK ADD-II : 65.2-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. II : Rp 714,312,000.00
PENYEDIA : CV. CHIARA UTAMA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
No. KONTRAK
URAIAN PEKERJAAN SATUAN
Mata VOLUME
Pembayaran AWAL
I UMUM
VII STRUKTUR
ANWAR, ST DASRIL, ST
NIP. 19730307 200701 1 004 SITE ENGINEER
ACEH
AN PENATAAN RUANG
N DAN JEMBATAN
eulaboh 23611
KUANTITAS
LEMEN KEC. KAWAY XVI KAB. ACEH BARAT (OTSUS KAB./KOTA)
SERTIFIKAT NO. :1
TGL/BLN/THN : 31 SEPTEMBER 2018
REALISASI VOLUME
BOBOT
Bulan Bulan s/d Bulan
Lalu ini ini (%)
- - - -
- -
- - -
- -
- -
RIL, ST F A J R I, S T
NGINEER GENERAL SUPERINTENDENT