Anda di halaman 1dari 1

4th Addenda &Corrigenda to PIVD (AQ, SOR: 2018 Volume III: Road & Bridge lYorks

4th. ADDENDA & CORRIGENDA


TO THE PWD (WB), SCHEDULE OF RATES- 2018
Votume tU: noaa O g
Dated: lStt April 2019.
A, CORRIGENDA OF SCHEDULE OF NETES - 2078
1. TABLE NO. I-2 EX-OUTLET PRICES OF BITUMEN (Page 2L9 of SOR 2O18f, Has
Been Revised And To Be Read As Follows :

Page Sl. No, / In place of To be read as


Description of item Unit
No. Item Rates at outlets (?) Rates at outlets (t)
4
I I ? 4 5 0

TABLE At Haldia At Dhulagarh At Haldia At Dhulagarh


EX.OUTLET PRICES OF BITUMEN :
Jn.(on NH-6) Jn.(on NH-6)
a-2
1 Bitumen (Bulk) :VG-10 MT 29490.00 27820.00
MT 32790.00 31120,00
Bitumen (facked),VQl0
2.
MT
-
s0290.00
- ;;; is6io.oo
***
Bitgmen (pu!k),VQ30
-- MT
-33590.00 i.. 33590.00
***
i:.- Bitumen (Packed) :VG-30
- "6 Bitumen (Bulk) :VG-40 MT 31140,00
***
igldo,oo
***
-
Bitumen (Packed) :VG40) MT
219 *^ o.
;;; **i
i.-* Penetration or. Bitumen 10/20 (Packed)
:L
Mi laTso.oo
-
i** i491o.oo
34750.00
Ritrrminnrrq Fmrrlsion (Bulk) MS Tvoe Mt i4Oi b bo
U.
-.- -9.'- - rr ocn nh t;; 31950.00
Bituminous Emulsion (Packed) MS Type MT ' ii*- *ir
- Mi Ir abb.oo 3i8e0.00
.__-:td. CRMB - 55 Bulk) ;*; -' i**
CRMB _ 55 'Packed) Mi ls4lb o0
'' 35430.00
^*-lL.- * ;;;
11. -
-
ri*
Mi 32i'5o.oo 3ti50.oo - r**
CRMB - 60 Bulk) ;t; -
Mi 356e0.00 35690.00
tJ. CRMB - 60 --
---i4:--- Onlrrmor {ified emr rlqion (Packet Mi -- ;;; - - i4ooo.oo - #'-
s?ooo.oo
*--i (Bulk) Mt 555oo.oo +oioo.oo
5.-"- Potvmer modified Bitumen (PMB-!!

2. eorrectlon is to be made to the item as shown below:


Page Item / In place of To be read as
No. Sl. No.
Wet Mix Macadam Base Gourse W6mixTacaaam Base Gourse
Providing, loying, spreoding ond compocling
Providing, loying, spreoding ond compocling
groded ilone oggregote lo Wel Mix Mocodom groded stone oggregole to Wet Mix Mocodom
ipecificotion including screening of oggregotes ipecificotion including screening of oggregoles
ond gronulor moteriols, premixing the moteriol ond gronulor moteriols, premixing the moteriol with
in Wet Mix Plont, corrioge of mixed
with ioter ot OMC in Wet Mix Plont, corrioge of wqtei ot OMC
moteriql by lipper to site. loying in uniform loyers
mixed moteriol by tipper io site, loying in uniform bose / Bose course on well
loyers with Pover in Sub- bose / Bose course on wilh Pover in Sub-
prepored surfoce ond compocting wilh Vibrotory
wetl prepored surfoce ond compocting with qchieve the
vilioiory Roller to ochieve the desired densiiy' Roller to desired density, including
249 4.12 in-tuOing supply of oll moteriols, mochinery' fuel supply
of oll moteriols, mochinery, fuel ond
including incidentol costs for lighting'
onJ fuOti"onts, including incidentol costs for lubriconts,
guording, borricoding, moking eorthen bundh to
lighting, guording, bonicoding, moking eorthen
including cost of quolity.control
f-r"ori tJ prote-t the edges including cost of f,rotect tneosedges per Clouse 406 of Speclficolions for
qr"lity control complete os per Clouse 406 of complete Works of MoRT&H (5th Revision)'
Rood & Bridge Works of MoRT&H Rood & Bridge
Specificotions for
(5th Revision). Nole: Add cosl & Corrioge of molerlqls os pel
requiremenl vide Toble 3.3-l of seclion'3 under
ilem no. 4.12.

(,.1 A rt^-!4
,4,* (Jl'J,n-irl"rl,,
)F,r[A@ttt
Superintending Engineer
- rcla\11
(GAUTAM ADAK)
Superintending Engineer
Xffitr"
Superintending Engineer
(TAPAS MUKHOPADHYAY)
Engineer.in'Chief
Planning & Monitoring Circle Public Works DePartment
Bridge Planning Circle Survey& Design Circle
Member Convener of the Chairman of the Combined
Member of the Combined Member of the Combined
Combined Schedule Gommittee ScheduleCommittee
Schedule Committee Schedule Committee
PW Dte. & PW (Roads) Dte. PW Dte. & PW (Roads) Dte'
PW Dte. & PW (Roads) Dte.
PW Dte. & PW (Roads) Dte.

Anda mungkin juga menyukai