1 2 3
BAHAN LISTRIK
1 Coaxial cable 5C - 75 ohm commscope m1
2 Box Panel (3 mm) Bh
3 Fiting lampu (BROCO) Bh
4 Hard Board MDF Lbr
5 Inbow dos plastik clipsal E 157 P bj
6 Instalasi dalam gedung Titik
7 Instansi listrik halaman Titik
8 Kabel NYM 2 x 1.5 mm m1
1 2 3
9 Kabel NYM 2 x 1.5 mm Warna Hitam m1
10 Kabel NYM 2 x 2.5 mm m1
11 Kabel NYM 3 x 1.5 mm Warna Hitam m1
12 Kabel NYM 3 x 2.5 mm m1
13 Kabel NYM 3 x 2.5 mm Warna Hitam m1
14 Kabel NYM 4 mm m1
15 Kabel NYY 2 x 2,5 mm m1
16 Kabel Twisteed 2 x 16 mm m1
17 Kabel telephone m1
18 Klem clipsal 20 mm bj
19 Lampu pijar 10 Watt bh
20 Lampu pijar 15 Watt Setara Philips bh
21 Lampu pijar 25 Watt Setara Philips bh
22 Lampu pijar 40 Watt Setara Philips bh
23 Lampu TL 20 Watt bh
24 Lampu TL 25 Watt Komplit (Ballast Philips) bh
25 Lampu TL 40 Watt Bh
26 Lampu LED (5 Watt) Setara Philips Bh
27 Lampu LED (7 Watt) Setara Philips Bh
28 Lampu LED (10 Watt) Setara Philips Bh
1 2 3
29 Lampu LED (13 Watt) Setara Philips Bh
30 Lampu Sorot LED (5 Watt) Setara Philips Bh
31 Lampu Sorot LED (7 Watt) Setara Philips Bh
32 Lampu Sorot LED (10 Watt) Setara Philips Bh
33 Lampu Sorot LED (13 Watt) Setara Philips Bh
34 Lampu Esensial (5 Watt) Setara Philips Bh
35 Lampu Esensial (8 Watt) Setara Philips Bh
36 Lampu Esensial (11 Watt) Setara Philips Bh
37 Lampu Esensial (14 Watt) Setara Philips Bh
38 Lampu Esensial (18 Watt) Setara Philips Bh
39 Magnet Contactor 80 A Bh
40 MCB 3 phase 40 A Bh
41 MCB 3 phase 63 A Bh
42 Pegangan Kabel Pc
43 Pipa clipsal 20 mm bt
44 Pipa flexible clipsal 20 mm m1
45 Saklar ganda BROCCO Bh
46 Saklar tunggal BROCCO Bh
47 Tee dos Clipsal 20 mm bh
48 Sock clipsal 20 mm bj
49 Steker bh
50 Stop Kontak BROCCO bh
51 Stop Kontak Khusus (Kedap Air) bh
52 cbd bh
53 Time Switch Bh
54 Terminal Penangkal Petir ttk
55 Penghantar / BC 50 mm + Pipa m1
56 Gronding Lengkap ttk
57 Penangkal petir Bh
57 T Foring Bh
L bow Bh
Las dop Bh
Klem Bh
Mongkok Bh
Saklar Bh
Fitting Bh
BATU KALI
1 Batu Gunung M3
2 Batu Kali Bulat m3
3 Batu pecah 10-15 cm m3
4 Batu pecah 7 - 10 cm m3
1 2 3
5 Batu pecah 5 - 7 cm m3
6 Batu pecah 3 - 5 cm m3
7 Batu pecah 2 - 3 cm m3
8 Batako Lubang bj
9 Batako Buntu bj
10 Batako Ringan / Bata Ringan M3
11 Bata Merah Klas I bj
12 Bata Merah Klas II bj
13 Bata Merah Klas III pasangan bj
14 Bata Merah Super (Pripian) bj
15 Bata Pres setara sejati bj
16 Batu karang m3
17 Batu Belah 10 cm / 15 cm M3
18 Batu Pecah 1 - 2 M3
19 Batu Koral Sikat lokal 10 kg zak
20 Batu Koral Sikat m2
21 Batu Koral Sikat 10 kg zak warna hitam (lokal) zak
22 krikil ayak tanpa pasir m3
23 krikil dari galian bukit m3
24 krikil koral biasa / timbunan m3
25 Krikil koral Beton m3
26 Krikil koral Beton kg
27 Krikil halus m3
28 Limestone m3
29 Kapur padam M3
30 Mill zak
31 Mill m3
1 2 3
32 Paras Pondasi biji
33 Paras Sarwagenep 18 x 9 x 35 biji
34 Paras Silakarang Tipis/Pripihan (Ukuran 15 x 30 x 4 Cm) biji
35 Paras Kelating / Kerobokan (Ukuran 3 x 20 x 40 Cm) biji
36 Paras Sarwagenep tebal 2 cmx 10 x 20 m3
37 Paras Sarwagenep tebal 3 cm x 20 x 40 m3
38 Paras Sarwagenep tebal 5 cm x 30 x 50 m3
39 Paras Krobokan 18 x 9 x 35 Biji
40 Paras Krobokan tebal 2 cm x 10 x 20 biji
41 Paras Krobokan tebal 3 cm x 20 x 40 m3
42 Paras Krobokan tebal 5 cm x 30 x 50 m3
43 Paras ukir silakarang Biji
44 Conblock HB20 Biji
45 Conblock HB15 Biji
46 Conblock HB10 Biji
47 Pasir ayak halus m3
48 Pasir Beton M3
57 Pasir Beton kg
58 Pasir Pasangan M3
59 Pasir Urug / timbunan M3
60 Tanah Urug M3
61 Sirtu m3
62 Split Kasar M3
63 Split Halus M3
64 Batu lahar karangasem tebal 2 cm x 20 x 40 m2
65 Batu lahar karangasem tebal 3 cm x 20 x 40 m2
66 Batu lahar karangasem tebal 5 cmx 20 x40 m2
67 Batu Candi Hitam (Ukuran 3 x 20 x 40 Cm) m2
68 Batu Candi Hitam (Ukuran 5 x 20 x 40 Cm) m2
69 Batu Candi Hitam (Ukuran 2 x 20 x 40 Cm) m2
70 Batu Putih Jogya / Palimanan (40 x 40 x 5 Cm) biji
71 Batu Putih Jogya / Palimanan (30 x 20 x 2 Cm) m2
72 Batu Putih Jogya / Palimanan (20 x 40 x 2 Cm) m2
73 Batu Putih Jogya / Palimanan (30 x 30 x 3 Cm) m2
74 Batu Putih Jogya / Palimanan (30 x 30 x 5 Cm) m2
75 Batu Bali Green ( 2 x 20 x 40 cm ) m2
76 Batu Bali Green ( 3 x 20 x 40 cm ) m2
77 Paras Yogya ( 5 x 20 x40 cm ) m2
78 Paras Silakarang Tipis/Pripihan (Ukuran 15 x 30 x 4 Cm) bh
79 Paras Silakarang Tebal (Ukuran 15 x 30 x 8 Cm) bh
80 Paras Kelating / Kerobokan (Ukuran 18 x 9 x 35 Cm) bh
81 Batu Tabas Karangasem m2
82 Pelinggih Cetak Beton Padma T 2-3 m Bh
1 2 3
83 Pelinggih Cetak Beton Tugu T 2.5m Bh
84 Pelinggih Paras Cetak Padma T 2-3 m Bh
85 Pelinggih Paras cetak Tugu T 1.5 m Bh
86 Pelinggih Batu Hitam Padma T 2-3m Bh
87 Pelinggih Batu Hitam Tugu T 2.5 m Bh
88 Tembok Penyengker Beton Cetak T 1.5 m m1
89 Tembok Penyengker Paras Cetak T 1.5 m m1
90 Tembok Penyengker Sarwa genep T 1.2 m m1
91 Tembok Penyengker Batu Hitam T 1.5 m m1
92 Lelengen/Pilar Beton Cetak T 1.8 - 2 m bh
93 Lelengen/Pilar Paras Cetak 1.8 - 2 m bh
94 Lelengen/Pilar Batu Hitam 1.8 - 2 m bh
95 Paduraksa Paras Kelating/sarwagenep T 1.8-2m bh
96 Paduraksa Batu Hitam T 1.8-2m bh
97 Apit Surang Beton Cetak T 2-3 m ps
98 Apit Surang Paras Cetak T 2-3 m ps
99 Apit Surang Sarwagenep/Kelating T 3m ps
100 Apit Surang Batu Hitam T 3 m ps
101 Apit Surang Sarwagenep/Kelating T 5 m ps
102 Apit Surang Batu Hitam T 5 m ps
1 2 3
103 Sendi Batu candi (25x25x30 ) Bh
104 Sendi Marmer 25x25x30) Bh
1 2 3
43 Kawat las listrik Kg
44 Dinabolt dia 12 mm (10-15cm) Bh
45 Besi hollow 50.50.3 kg
46 Hallow Alum. Rangka Plafond 4/ 4 P. 4 m Btng
47 Hallow Alum. Rangka Plafond 2/ 4 P. 4 m Btng
48 Besi scuare tube m'
49 Besi lis kaca ( 1 x 1 ) m'
50 Besi Plat Kg
51 Besi Siku 5 x 5 x 6 Bt
52 Besi plat 3 X 6 tebal 1,2 mm Bt
53 Besi plat 4 X 8 tebal 1,8 mm Bt
54 Elektrode 0,6 % Bh
55 Elektrode 2 % Bh
56 Kawat berduri kg
57 kawat duri m1
58 Kawat jaring m2
59 Kawat beton RRT kg
60 Kawat Ayak /Kuasa 5 X 5 cm M2
61 Kawat Harmonika 3 X 3 cm M2
63 Kawat ikat beton Kg
1 2 3
64 Kawat Bronjong Kg
65 Kawat Baja Bindrat (20 kg) Kg
67 Baut Baja Kg
68 Pagar BRC asli T.120 diameter 6mm m'
69 Pagar BRC asli T.150 diameter 6mm m'
70 Pagar BRC asli T.175 diameter 7mm m'
71 Pagar BRC asli T.190 diameter 7mm m'
72 Pagar BRC asli T.90 diameter 6mm m'
73 Pagar HotDip Galvanized T.120 diameter 6mm m'
74 Pagar HotDip Galvanized T.150 diameter 7mm m'
75 Pagar HotDip Galvanized T.175 diameter 7mm m'
76 Pagar HotDip Galvanized T.190 diameter 7mm m'
77 Pagar HotDip Galvanized T.90 diameter 6mm m'
78 Pagar BRC Jadi ( T. 1 M ) m'
79 Pintu Gulung Besi / Pintu Harmonika m2
80 Pintu Aluminium m
81 Profil Kaca 3/4 m
82 Profil Aluminium L 3 cm m
83 Sunscreen alluminium m2
84 Skruf Fixer 5 cm bh
85 Sealant Tube
86 Rolling Door Aluminium M2
87 Silicon Kg
88 Tiang BRC asli T. 120 diameter 1 1/2" bh
89 Tiang BRC asli T. 150 diameter 2" bh
90 Tiang BRC asli T. 175 diameter 2" bh
91 Tiang BRC asli T. 190 diameter 2" bh
92 Tiang BRC asli T. 90 diameter 1 1/2" bh
93 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh
94 Venetions blinds dan vertical Blinds (Tirai) M2
95 Tiang HotDip Galvanized T. 175 diameter 2" bh
96 Tiang HotDip Galvanized T. 190 diameter 2" bh
97 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh
98 Panel beton pracetak 5x50x213 cm lbr
99 Kolom beton pracetak 5x50x213 cm btng
100 Teralis Besi m2
101 Relling Besi m1
102 Reng kap baja lonjor
103 Rangka Aluminium C 0,75 mm P = 6 m lonjor
104 Rangka Aluminium C 0,65 mm P = 6 m Lonjor
105 Rangka Aluminium UK 0,65 mm P = 6 m Lonjor
106 Rangka Aluminium UK 0,75 mm P = 6 m Lonjor
107 Kusen Aluminium 4" c. 0.75 P = 6 m Lonjor
1 2 3
108 Kusen Aluminium 4" c. 0.75 P = 6 m m1
109 Kusen Aluminium 3" c. 0.75 P = 6 m Lonjor
110 Kusen Aluminium 3" c. 0.75 P = 6 m m1
111 Kusen Aluminium 2" c. 0.75 P = 6 m Lonjor
112 Kusen Aluminium 2" c. 0.75 P = 6 m m1
113 Nako + tralis m2
BUIS BETON
1 Buis beton 0.2 M bh
2 Buis beton 0.25 M bh
3 Buis beton 0.3 M bh
4 Buis beton 0.5 M bh
5 Buis beton 0.6 M bh
6 Buis beton 0.8 M bh
7 Buis beton 1 M bh
ROSTER
1 Roster kerawang pc 20x20 bj
2 Roster kerawang paras ukir 20/20 bj
3 Roster 12x11x24 Cm bj
1 2 3
4 Roster Bata 20/20 bj
5 Roster keramik 30 x30 bj
6 Roster palimanan ukir 20/20 bj
7 Roster palimanan ukir 30/30 bj
FINISHING
1 Amplas (Flying weel) lbr
2 Cat Baja Kg
3 Cat besi Emco kg
4 Cat Antara Kg
5 Cat dasar kg
6 Cat Penutup Kg
7 Cat emco Lux Biasa kg
8 Cat emco Lux Warna kg
9 Cat emco Lux Warna Tua kg
10 Cat Galvanis kg
11 Cat Kayu Emco kg
12 Cat Kayu Mowilek kg
13 Cat Marca Jalan kg
14 Cat menie besi kg
15 Cat menie fako kg
16 Cat menie Astek kg
17 Cat menie Altek kg
18 Cat menie Kayu kg
19 Cat tembok Decolith kg
20 Cat tembok Dulux Exterior kg
21 Cat tembok Dulux Interior kg
22 Cat tembok Paragon kg
23 Cat tembok KCA kg
24 Cat Mini A Untuk Baja Kg
25 Cat Mini B Untuk baja Kg
26 Cat tembok Vinilex kg
27 Cat Kayu Emco kg
28 Cat Kayu Mowilek kg
29 Dempul / Plamur kg
30 Dempul / Plamur Altik ltr
31 Dempul Impra ltr
32 Kuas bh
33 Lem Aica Aibon Kg
34 Lem Fox (Rajawali kuning) Gln
35 Mild tembok zak
36 Minyak cat ltr
37 Melamine Lack / Imfra ltr
1 2 3
38 Okear / Veap Kg
39 Pengencer Cat Kg
40 Plamir kayu kg
41 Plamir tembok kg
42 Politur Muda ltr
43 Politur ultra ltr
44 Politur Muda kg
45 Politur ultra kg
46 Politur vernis ltr
47 Politur Jadi ltr
48 Profan kg
49 Residu / Teer ltr
50 Sending Seaker ltr
51 Thiner Spesial ltr
52 Thiner biasa ltr
53 Teack Oil ltr
54 Wood Filler ltr
55 waterproofing kg
56 Vernis ltr
57 Cat Scotlight Ltr
1 2 3
58 Kalkarium kg
59 Kapur sirih kg
60 Soda api kg
61 Formika lbr
62 Sabun kg
63 Cat Prada setara cap macan Kg
64 Clear Glos kg
KACA
1 Bingkai Nako Silver daun
2 Bingkai Nako Coklat daun
3 Glass Block bh
4 Kaca 2 mm bening m2
5 Kaca 3 mm bening m2
6 Kaca 5 mm bening m2
7 Kaca 6 mm bening m2
8 Kaca 8 mm bening m2
9 Kaca 10 mm bening m2
10 Kaca 12 mm buram m2
11 Kaca Cermin 3 mm m2
12 Kaca Cermin 5 mm m2
13 Kaca Cermin 8 MM M2
14 Kaca Es/Kapur 3 mm m2
15 Kaca Es/Kapur 5 mm m2
16 Kaca ryben 3 mm m2
17 Kaca ryben 5 mm m2
18 Kaca patri 5 mm M2
19 Kaca Nako Daun
20 Kaca Nako Telaris Bening M2
21 Kaca wireglassed 5 mm M2
22 Sealent Kaca kg
KAYU
1 Bambu besar Ukuran 4 m btg
2 Bambu sedang Ukuran 4 m btg
3 Bambu kecil Ukuran 4 m btg
4 gedeg Bambu biasa M2
5 Gedeg kulit kelas I m2
6 Gedeg kulit kelas II m2
7 Kaso-kaso M3
8 Kayu Acuan M3
9 Kayu bekesting m3
10 Kayu bingkirai Balok m3
1 2 3
11 Kayu bingkirai papan m3
12 Kayu dolken 8"-10"/4 (lokal) btg
13 Kayu jati Balok Ex Bojonegoro m3
14 Kayu jati papan Ex. Bojonegoro m3
15 Kayu jati Usuk m3
16 Kayu kamper balok 8/12 m3
17 Kayu kamper balok 6/12 m3
18 Kayu kamper usuk m3
19 Kayu kamper reng m3
20 Kayu kamper reng ikat
21 Kayu kamper papan 3/20 m3
22 Kayu kruing balok 6/12 m3
23 Kayu kruing balok 8/12 m3
24 Kayu kruing usuk/reng m3
25 Kayu kruing papan 3/20 m3
26 Kayu meranti balok 6/12 m3
27 Kayu meranti usuk 5/7 m3
28 Kayu meranti usuk 4/6 m3
29 Kayu meranti reng m3
30 Kayu meranti papan 3/20 m3
1 2 3
31 Kayu merbau Balok 6/12 m3
32 Kayu merbau papan 3/20 m3
33 Kayu Profil 4/5 m1
34 Kayu Nangka Balok M3
35 Kayu Cempaka Balok M3
36 Kayu Profil M1
37 List kayu profil 2/4 P = 4m M1
38 List Gypsum Stdr 10 cm p = 4 m M1
39 List Gypsum Stdr 5 cm p = 4 m M1
40 Jaro Bubut biji
41 Kayu seseh balok m3
42 Lem Aibond kg
43 Lem Kayu Fox Kg
44 Minyak bekisting ltr
45 Perancah kayu Bh
46 Kayu Konstruksi Jembatan bingkirai (PHB) m3
47 Kayu Perancah jembaran (PHB) m3
48 Kayu Terentang lokal m3
49 Kayu Terentang lokal btng
50 Kayu Kaso (lokal) m3
51 Kayu Kaso (lokal) btng
MARMER / GRANIT
1 Ubin Granit (40 x 40) m2
2 Marmer Super (30 x 30) m2
3 Marmer Klas I 60x60cm M2
4 Marmer Klas I 100x100cm M2
5 Batu Granit Kg
6 Batu Traso Kg
7 Porselin m2
KERAMIK
Setara ASIA TILE
1 Keramik 20 x 20 kelas I warna muda m2
2 Keramik 20 x 20 kelas I warna tua m2
3 Keramik 20 x 25 kelas I warna tua m2
4 Keramik 30 x 30 kelas I warna muda m2
5 Keramik 30 x 30 kelas I warna tua m2
6 Keramik 40 x 40 kelas I warna muda m2
7 Keramik 10 x 20 kelas II m2
8 Keramik 20 x 20 kelas II m2
9 Keramik 20 x 30 kelas II m2
10 Keramik 30 x 30 kelas II m2
1 2 3
11 Keramik 40 x 40 kelas II m2
Setara ARWANA
1 Keramik ARWANA ( warna putih) M2
2 Keramik ARWANA ( warna tua) M2
Setara ESSENZA
3 Keramik 40 x 40 m2
4 Keramik 60 x 60 m2
5 Keramik 40 x 40 (Domus) m2
6 Keramik 30 x 60 (Lavagna) m2
Setara GRANITO
1 Granito 40 x 40 cm m2
2 Granit 20 / 20 Cm M2
3 Granit 20 / 30 Cm M2
4 Nero Granito 30 x 60 cm m2
5 Nero Granito 40 x 40 cm m2
1 2 3
6 Nero Granito 60 x 60 cm m2
Setara IKAD
1 Ikad (Keramik) Kw. I 20 x 20 cm m2
2 Ikad (Keramik) Kw. I 30 x 30 cm m2
3 Ikad (Keramik) Kw. I 40 x 40 cm m2
4 Ikad (Keramik) Kw. I 40 x 40 cm m2
5 Ikad (Keramik) Kw. I 40 x 40 cm m2
6 Ikad (Keramik) Kw. I 40 x 40 cm m2
7 Ikad (Keramik) Kw. I 40 x 40 cm m2
8 Ikad (Keramik) Kw. I 40 x 40 cm m2
4 Ikad (Keramik) Kw. I 50 x 50 cm M2
Setara KIA
1 Keramik KIA 30/30 cm warna muda M2
2 Keramik KIA 20/20 cm warna muda M2
3 Keramik KIA 20/20 cm warna tua M2
4 Keramik KIA 30/30 cm warna tua M2
Setara MULIA
1 Keramik 20 x 20 cm Warna Tua m2
2 Keramik 20 x 20 cm Warna Muda m2
3 Keramik 30 x 30 cm Warna Putih m2
4 Keramik 30 x 30 Warna Marbel m2
5 Keramik 30 x 30 Warna Impresso m2
6 Keramik 40 x 40 cm kelas I m2
7 Keramik 10 x 20 cm kelas II m2
8 Keramik 20 x 20 cm kelas II m2
9 Keramik 20 x 30 cm kelas II m2
10 Keramik 30 x 30 cm kelas II m2
11 Keramik 40 x 40 cm kelas II m2
Setara ROMAN
1 Keramik ROMAN 20/20 cm M2
2 Keramik ROMAN 30/30 cm M2
1 2 3
7 Keramik Platinum 40/40 cm m2
8 Keramik Platinum 40/40 cm bh
1 2 3
7 list 5/20 Cm m2
8 keramik Dinding artistik 10 cm x 20 cm M2
9 keramik Dinding artistik 5 cm x 20 cm M2
10 keramik Dinding artistik 10 cm x 20 cm M2
11 keramik Dinding artistik 20 cm x 20 cm M2
12 Tegel Bata 20 x 20 Pc M2
13 Tegel B/TB 20 x 20 Kuning M2
14 Tegel 20 x 20 TB Merah M2
15 Tegel 30 x 30 TB PC M2
16 Tegel 30 x 30 TB PC Kuning M2
17 Tegel 30 x 30 Warna Merah M2
18 Tegel PC Abu - Abu 40/40 cm M2
19 Tegel PC Warna 20/20 cm M2
20 Tegel PC Abu - Abu 20/20 cm M2
21 Tegel PC Warna 30/30 cm M2
22 Tegel PC Warna 40/40 cm M2
23 Ubin Teraso m2
1 2 3
25 Kunci Union 1 x putar Bh
26 Kunci Union 2 x putar Bh
27 Kunci pintu Vanesa (DEXXON) bh
28 Kunci pintu Yale bh
29 Kunci Pintu Yale 2 x putar (SES) Bh
30 Kunci pintu YURI (DELWIN) bh
31 Kunci shang hae 2 x putar Bh
32 Kunci slot bh
33 Kunci tanam 2 slag (Dexon) bh
34 Rolling door plaat M2
35 Kunci Tanam 2 Slaag biasa Bh
36 Kunci tanam kamar mandi Bh
37 Kunci Slot Bh
38 Kunci lemari Bh
40 Door closer bh
41 Door stop bh
42 Door holder bh
43 Pasang Rel Pintu Sorong m1
1 2 3
PAKU
1 Paku 10 cm kg
2 Paku Beton 5 - 7 cm dos
3 Paku Beton 3 cm dos
4 Paku Jembatan kg
5 Paku kalsiboard kg
6 Paku Triplek kg
7 Paku List Kg
8 Paku Reng kg
9 Paku Usuk kg
10 Paku Pancing 60 x 230 Kg
11 Paku reng/usuk SQ kg
12 Paku seng kg
13 Sekrup Kalisiboard buah
14 Paku Sekrup 1/2 " ktk
15 Paku Sekrup 2 " ktk
16 Paku Peluru bh
17 Screw bh
18 Baut baja kg
PAVING
1 Paving 10 x 20 cm tebal 6 cm K225 (Polos) m2
2 Paving 10 x 20 cm tebal 6 cm K175 (Polos) m3
3 Paving 10 x 20 cm tebal 6 cm K225 (Warna) m2
4 Paving 10 x 20 cm tebal 6 cm K350 (Polos) m2
5 Paving 10 x 20 cm tebal 6 cm K350 (Warna) m2
6 Paving 20 x 20 cm tebal 6 cm K350 (Polos) m2
7 Paving 20 x 20 cm tebal 6 cm K350 (Warna) m2
8 Paving 10 x 20 cm tebal 8 cm K175 (Polos) m2
9 Paving 10 x 20 cm tebal 8 cm K225 (Polos) m2
10 Paving 10 x 20 cm tebal 8 cm K225 (Warna)) m2
11 Paving 20 x 20 cm tebal 8 cm K175 (Polos) m2
12 Paving 20 x 20 cm tebal 8 cm K225 (Polos) m2
13 Paving 20 x 20 cm tebal 8 cm K225 (Warna) m2
14 Paving 10 x 20 cm tebal 8 cm K350 (Polos) m2
15 Paving 10 x 20 cm tebal 8 cm K350 (Warna)) m2
16 Paving 20 x 20 cm tebal 8 cm K350 (Polos) m2
17 Paving 20 x 20 cm tebal 8 cm K350 (Warna)) m2
18 Paving 10 x 20 cm tebal 8 cm K425 (Polos) m2
19 Paving 10 x 20 cm tebal 8 cm K425 (Warna) m2
20 Paving 20 x 20 cm tebal 8 cm K425 (Polos) m2
21 Paving 20 x 20 cm tebal 8 cm K425 (Warna) m2
22 Paving 20 x 20 cm tebal 10 cm K225 (Polos) m2
1 2 3
23 Paving 20 x 20 cm tebal 10 cm K225 (Warna) m2
24 Paving 20 x 20 cm tebal 10 cm K350 (Polos) m2
25 Paving 20 x 20 cm tebal 10 cm K350 (Warna) m2
26 Paving 20 x 20 cm tebal 10 cm K425 (Polos) m2
27 Paving 20 x 20 cm tebal 10 cm K425 (Warna) m2
28 Paving Tiga Berlian tebal 6 cm K225 (Polos) m2
29 Paving Tiga Berlian tebal 6 cm K225 (Warna) m2
30 Bentala Exs Kapal (Paras) bh
31 Bentala Exs Kapal (Terakota) bh
32 Karung Plastik Bh
33 Besi strip kg
34 Kanstein (Polos) Buah
35 Kanstein (Warna) Buah
36 Kanstein Segi Lima P40 K 350 Buah
37 Kanstein Segi Lima P50 K 350 Buah
38 Grass Block 36 X 54 cm tebal 9 cm K 225 m2
39 Koral cetak batu Sikat (40x40) m2
ATAP
1 Atap Ondulin Gelombang 1,8 x 0,8 m lbr
2 Alang-alang panjang 2,4 meter lbr
3 Alluminium foil M2 Double Roll
1 2 3
4 Aluminium Foil m2
5 Akustik 60 cm x 120 cm Lembar
6 Asbes Bubungan lbr
7 Asbes Gelombang 1,80 m x 0,80 m/ 4 mm lbr
8 Asbes Gelombang 1,80 m x 1,05 m lbr
9 Asbes Gelombang 2,10 m x 1,05 m lbr
10 Asbes Gelombang 2,4 m x 1,05 m lbr
11 Bubungan asbes cement set
12 Eternit/eternit lbr
13 Bentala tanah liat bh
14 Bentala Besar polos Lubang 90 cm bj
15 Bentala Besar Warna Lubang 90 cm bj
16 Bentala Besar polos Lubang 25 cm bj
17 Bentala Besar Warna Lubang 25 cm bj
18 Bentala paras bj
19 bubungan biasa/press mini bj
20 Bubungan Besar Bambe bj
21 Bubungan Kecil bj
22 Bubungan stel gelombang lbr
23 Bubungan Bambe Kecil bj
24 Bubungan Bulat Karang Pilang bj
25 Bubungan Beton Duco Munir bj
26 Bubungan Karang Pilang kwalitas 1 bj
27 Bubungan Bulat Jati Wangi bj
28 Bubungan Bulat Ngalayur isi 3,5/m bj
29 Bubungan Besar good Year bj
30 Bubungan Beton Cisangkan bj
31 Bubungan Karang pilang bj
32 Bubungan Karang Pilang isi 3,5/m bj
33 Bubungan Pletong Jatiwangi bj
34 Bubungan SL Utama Bj
35 Bubungan SL Ngalayur bj
36 Bubungan Segi Tiga Karang Pilang bj
37 Bubungan Utama isi 3,5/m bj
38 Bubungan Plentong Besar bj
39 Genteng biasa / press mini bj
40 Genteng Bambe bj
41 Genteng Bambe Karang Pilang bj
42 Genteng Bambe Kecil bj
43 Genteng Beton Cisangkan bj
44 Genteng Beton Duco Munir bj
45 Genteng Gemini bj
46 Genteng Good Year bj
1 2 3
47 Genteng Kanmuri (glazur) isi 14/m2 bj
48 Genteng Kodok Lokal/glasuur bj
49 Genteng Kodok Kamulan bj
50 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj
51 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj
52 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj
53 Genteng Karang pilang bj
54 Genteng Kodok Soka bj
55 Genteng Lestari bj
56 Genteng Metal 80 x 77,6 (Polos) Lembar
57 Genteng Metal 0,4 mm 2x5 (Pasir) m2/tipis
58 Genteng Metal 0,4mm 2 x 5 (Pasir) m2/tipis
59 Genteng Metal 80 x 77,6 biasa Lembar
60 Genteng Metal 80 x 77,6 ( pasir) Lembar
61 Genteng Morando Abadi isi 18/m2 bj
62 Genteng Morando Jatiwangi isi 18/m2 bj
63 Genteng Morando Ngalayur isi 20/m2 bj
64 Genteng Morando Metal bj
65 Genteng Pejaten Mini bj
66 Genteng Press mini bj
67 Genteng Plentong bj
1 2 3
68 Genteng plentong dicat bj
69 Genteng Plentong Mantili bj
70 nok metal polos m1
71 Nok genteng metal m1
72 Nok standart bh
73 Genteng Plentong Jatiwangi isi 24/m2 bj
74 Genteng Jatiwangi bj
75 Genteng Pres Besar bj
76 Genteng Pres Besar Cat bj
77 Genteng Pres Mini bj
78 Genteng Pres Mini Cat bj
79 Genteng Besar polos Lubang 35 cm bj
80 Genteng Besar Warna Lubang 35 cm bj
81 Fiberglas (1.80 x 0.80) M2 lbr
82 Fiberglass Gelombang (1,80 x 0,8 ) lbr
83 Ijuk kg
84 Ikut Celedu Besar Polos bh
85 Ikut Celedu Besar Warna bh
86 Ikut Celedu Kecil Polos bh
87 Ikut Celedu Kecil Warna bh
90 Ikut Celedu paras bh
91 Murda tanah liat / genteng set
92 Murda Kecil Polos Lubang 25 cm bh
93 Murda Kecil Warna Lubang 25 cm bh
94 Menur Paras Ukir bh
95 Profil Aluminium "T" m3
96 Ramset buah
97 Seng BJLS 0,20 gelombang lbr
98 Seng BJLS 0,28 gelombang lbr
99 Seng BJLS 0,32 gelombang lbr
100 Seng Plat Lebar 0,90 M lbr
101 Seng Plat 3" x 6" BJLS 28 lbr
102 Seng Plat Aluminium lbr
103 Bubungan seng gelombang lbr
104 Alluminium gelombang tebal 0,55 lbr
105 Sirap bh
106 Sirap ikat
107 Sirap m2/tps
108 Subeng Besar Polos lbr
109 Subeng Besar Warna lbr
110 Subeng Kecil Polos lbr
111 Subeng Kecil Warna bh
112 Tali Ijuk kg
1 2 3
113 Tali pengikat alang-alang glg
114 Spandeck 0.25 m'
115 Spandeck 0.3 m'
116 Spandeck 3.5 mm m1
117 Spandeck 4 mm m'
118 Listplank texture / plain 2 x 25 , 3m m'
119 Listplank texture / plain 2 x 25 (2 in 1) double, 3m m'
120 Listplank Klasiblank m'
PIPA
1 Pipa Galvanis 1" BSA ljr
2 Pipa Galvanis 1,5 BSA ljr
3 Pipa Galvanis 2" BSA ljr
4 Pipa Galvanis 3" BSA ljr
5 Pipa Galvanis /GSP S12.5 p = 6 m diameter 25 mm btng
6 Pipa Galvanis /GSP S12.5 p = 6 m diameter 40 mm = 1.5" btng
7 Pipa Galvanis /GSP S12.5 p = 6 m diameter 50 mm = 2" btng
8 Pipa Galvanis /GSP S12.5 p = 6 m diameter 75 mm = 3" btng
9 Pipa Galvanis /GSP S12.5 p = 6 m diameter 100 mm = 4" btng
10 Pipa Galvanis /GSP S12.5 p = 6 m diameter 150 mm = 6" btng
1 2 3
11 Pipa Galvanis /GSP S12.5 p = 6 m diameter 200 mm = 8" m1
12 Pipa PVC ( AW P = 4 m ) 1/2" m1
13 Pipa PVC ( AW P = 4 m ) 3/4" m1
14 Pipa PVC ( AW P = 4 m ) 1" = 25 mm m1
15 Pipa PVC ( AW P = 4 m ) 1,5" = 40 mm m1
16 Pipa PVC ( AW P = 4 m ) 50mm = 2" m1
17 Pipa PVC ( AW P = 4 m ) 75mm = 3" m1
18 Pipa PVC ( AW P = 4 m ) 100mm = 4" m1
19 Pipa PVC ( AW P = 4 m ) 150mm = 6" m1
20 Pipa PVC ( AW P = 4 m ) 200mm = 8" m1
21 Pipa Maspion AW 1/2 ( 4 m' ) ljr
22 Pipa Maspion AW 3/4 ( 4m') ljr
23 Pipa Maspion AW 1 ( 4 m' ) ljr
24 Pipa Maspion AW 1-1/2 ( 4 m' ) ljr
25 Pipa Maspion AW 1-1/4 ( 4 m' ) ljr
26 Pipa Maspion AW 2 ( 4 m' ) ljr
27 Pipa Maspion AW 2-1/2 ( 4 m' ) ljr
28 Pipa Maspion AW 3 ( 4 m' ) ljr
29 Pipa Maspion AW 4 ( 4 m' ) ljr
30 Pipa Maspion AW 5 ( 4 m' ) ljr
31 Pipa Maspion AW 6 ( 4 m' ) ljr
32 Pipa Maspion AW 8 ( 4 m' ) ljr
33 Pipa Maspion AW 10 ( 4 m' ) ljr
34 Pipa Maspion AW 12 ( 4 m' ) ljr
35 Pipa Maspion AW 14 ( 4 m' ) ljr
36 Pipa Maspion AW 16 ( 4 m' ) ljr
37 Pipa Maspion C 3/4 ( 4 m' ) ljr
38 Pipa Maspion C 5/8 ( 4 m' ) ljr
39 Pipa Maspion C 1 ( 4 m' ) ljr
40 Pipa Maspion C 1-1/2 ( 4 m' ) ljr
41 Pipa Maspion C 1-1/4 ( 4 m' ) ljr
42 Pipa Maspion C 2 ( 4 m' ) ljr
43 Pipa Maspion C 2-1/2 ( 4 m' ) ljr
44 Pipa Maspion C 3 ( 4 m' )) ljr
45 Pipa Maspion C 4 ( 4 m' ) ljr
46 Pipa Maspion D 1/2 ( 4 m' ) ljr
47 Pipa Maspion D 1-1/2 ( 4 m' ) ljr
48 Pipa Maspion D 1-1/4 ( 4 m' ) ljr
49 Pipa Maspion D 2 ( 4 m' ) ljr
50 Pipa Maspion D 2-1/2 ( 4 m' ) ljr
51 Pipa Maspion D 3 ( 4 m' ) ljr
52 Pipa Maspion D 4 ( 4 m' ) ljr
53 Pipa Maspion D 5 ( 4 m' ) ljr
1 2 3
54 Pipa Maspion D 6 ( 4 m' ) ljr
55 Pipa Maspion D 8 ( 4 m' ) ljr
56 Pipa Maspion D 10 ( 4 m' ) ljr
57 Pipa Maspion D 12 ( 4 m' ) ljr
58 Pipa Maspion D 14 ( 4 m' ) ljr
59 Pipa Maspion D 16 ( 4 m' ) ljr
60 Pipa Listrik Besi 5/8 " ljr
61 Pipa Listrik Paralon 5/8" ljr
PLAFOND
1 Acustik 30/30 lbr
2 Eternit 100 x100 lbr
3 Asbes/etrnit lbr
4 Celling teak (0,62 x 2,40) m2 lbr
5 Eternit lbr
6 Plywood 3 mm lbr
7 Plywood 4 mm lbr
8 Plywood 6 mm lbr
9 Plywood aluminium lbr
10 Teakwood jati 2.7 - 3 mm lbr
1 2 3
11 Gypsum Board (120x240x9) lbr
12 Kalsiboard (4,5 x 1220 x 2420) mm lbr
13 Kalsiboard (3,5 x 1220 x 2420) mm lbr
14 Kalsiboard 100 x 100 lbr
15 Hard board MDF lbr
16 Multiplek 9 mm lbr
17 Multiplek 12 mm lbr
18 Multiplek 18 mm lbr
19 Rangka Aluminium m1
20 Rangka Holo 4/4 Batang
20 Teak wood (0,90x2,00 x Tebal) lbr
21 Rangka Holo 4/2 Batang
22 Cornice Adhesive kg
23 Plaster Board roll
24 siku (angle) m1
SANITAIR
1 Bak mandi fibre glass bh
2 Bak mandi keramik Terasso bh
3 Cuci piring Stainless steal bh
4 Cuci piring terasso bh
5 Floor drain standart bh
6 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh
7 Floor drain plastik bh
8 Floor drain stainless bh
9 Kloset duduk standart bh
10 Kloset duduk ina komplit bh
11 Kloset duduk American Standart bh
12 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh
13 Kloset jongkok " TOTO Type CE 6 COMPLIT bh
14 Kloset jongkok " TOTO Type CE 7 COMPLIT bh
15 Kloset porselin jongkok Toto (standar) bh
16 Kloset jongkok standar bh
17 Kran biasa bh
18 Kran SanEi bh
19 Kran TOTO T 205 QN bh
20 Kran TOTO T 205 MB bh
21 Kran TOTO T 23 B13 bh
22 Kran TOTO T 23 B13V7NB bh
23 Kran TOTO T 26 - 13 bh
24 Kran TOTO TX 109 LH bh
25 Penyekat Urinoir " TOTO " Type A 100 " bh
26 Shower Spray " TOTO Tx 403SB bh
1 2 3
27 Soap holder " TOTO " Type TX2BV1B bh
28 Seal tape bh
29 Tempat sabun bh
30 Urinoir " KIA bh
31 Urinoir " TOTO U 57 M bh
32 Urinoir " TOTO U 57 M BODI bh
33 Urinoir " TOTO UW 447 JT 1 " bh
34 Urinoir " TOTO UW 447 JT 1 BODI bh
35 Urinoir " TOTO UW 447 JT 1,M " bh
36 Urinoir " TOTO UW 447 JT 1,M "BODI bh
37 Wastafel KIA bh
38 Wastafel KIA Standard tempel bh
39 Wastafel KIA Warna tempel bh
40 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh
41 Wastafel Komplit top Counter" TOTO " Type CERABO LW bh
SEMEN PC Setara
1 Semen PC Gresik 40 kg zak
2 Semen PC Gresik 50 kg zak
3 Semen Tiga Roda 40 kg zak
1 2 3
4 Semen Tiga Roda 50 kg zak
5 Semen Tonasa 40 kg zak
6 Semen Tonasa 50 kg zak
7 Semen Bosowa 40 kg zak
8 Semen Holsim 40 kg zak
9 Semen warna/semen grouting kg
10 Semen Portland kg
TALANG
1 Talang Karet L = 0.60 m2
2 Talang Karet L = 0.90 m2
POMPA AIR
1 150 Watt bh
2 250 Watt bh
3 Selang air 1/2" Figo m
4 Selang air 5/8" Figo m
BETON READYMIX
3 Beton B-0 M3
4 Beton K-125 M3
5 Beton K-175 M3
6 Beton K-200 M3
7 Beton K-225 M3
8 Beton K-250 M3
9 Beton K-275 M3
10 Beton K-300 M3
11 Beton K-350 M3
12 Beton K-400 M3
13 Beton K-450 M3
14 Beton K-500 M3
BETON PRECAST
1 Unditch 600x600x1200 pcs
2 Unditch 600x700x1200 pcs
3 Unditch 800x800x1200 pcs
4 Unditch 800x1000x1200 pcs
5 Unditch 1000x1000x1200 pcs
6 Unditch 1000x1200x1200 pcs
7 Cover 750x1200x150 Beban gandar 10 ton pcs
8 Cover 1040x1200x150 Beban gandar 10 ton pcs
9 Cover 1220x1200x150 Beban gandar 10 ton pcs
10 Cover 750x1200x150 Beban gandar 20 ton pcs
1 2 3
11 Cover 1040x1200x150 Beban gandar 20 ton pcs
12 Cover 1220x1200x150 Beban gandar 20 ton pcs
13 Box Culvert 800x800x1200 pcs
14 Box Culvert 1000x1000x1200 pcs
15 Box Culvert 1200x1200x1200 pcs
16 Box Culvert 1500x1500x1200 pcs
17 Box Culvert 2000x2000x1200 pcs
18 Box Culvert 2400x1500x2400 pcs
19 Box Culvert 3000x3000x1200 pcs
LAIN-LAIN
1 Air Bersih Ltr
2 Cangkul Bh
3 Cangkul Gigi Bh
4 Ember Bh
5 Gerinding bh
6 Helm Proyek Bh
7 Hammer 3 kg Bh
8 Instalasi Tata Suara Titik
1 2 3
9 Keni 2" Bh
10 Keranjang Sampah Bh
11 Linggis bh
12 Masker Bh
13 Ompreng Bh
14 Panyong Bh
15 Pengelasan/ patri cm
16 Pisau Mesin Potong Rumput Bh
17 Sabit Bh
18 Sapu lidi Ikat
19 Sepatu Karet Bh
20 Sikat baja Bh
21 Siffon wasser bh
22 Skop Bh
23 Speaker 10.000 watt pmpo Bh
24 Tanaman Rumput m2
25 T.B.A Rol
27 Pipa Tremi dan Casing pelindung Ls
28 Karpet m2
29 Parquet m2
30 Wallpaper m2
31 Strorox kg
32 Venetions blinds dan vertical blinds (tirai) m'
TANAMAN HIAS
1 Lantana polybag
2 Pucuk Merah 50 cm phn
3 Sikas Tinggi 50 cm phn
4 Taiwan polybag
5 Bayam -Bayaman polybag
6 Kucai phn
7 Melati Prancis phn
8 Carembosa phn
9 Brokoli phn
10 Agave phn
11 Jempiring phn
12 Rumput Jepang/mutiara m2
13 Leikwanyou polybag
`
ATUAN BAHAN
2018
KET
HARGA SATUAN
2018
67,000.00
CBD
6,400.00
KET
HARGA SATUAN
2018
12,100.00 ### 14,840.00
14,000.00 ### 12,000.00 15,000.00
15,300.00 ### 18,300.00
16,600.00 ### 13,500.00 19,200.00
18,400.00 ### 24,600.00
22,900.00
6,500.00
5,000.00 ###
10,000.00 800.00
10,000.00
10,000.00 ###
10,000.00 ###
20,000.00 ###
###
30,000.00
20,000.00 ###
25,000.00 ### 60,000.00
30,000.00 79,500.00
105,000.00
KET
HARGA SATUAN
2018
### 135,000.00
50,000.00
50,000.00
25,000.00
26,000.00 ### 30,000.00
27,000.00 ### 33,000.00
30,000.00 ### 40,000.00
35,000.00 ### 38,000.00
61,000.00 ### 39,000.00
101,600.00 ###
111,700.00 ###
### 11,000.00
20,000.00 ###
15,000.00 ###
###
14,300.00 ### 9,500.00
20,000.00 ### 30,000.00
50,000.00 ###
### 6,500.00
270,000.00 250
158,600.00
215,000.00
KET
HARGA SATUAN
2018
2,900.00
2,000.00
900,000.00
1,500.00
1,200.00
215,000.00
75,900.00
211,300.00
124,400.00
175,000.00
211,300.00
117.39
84,900.00
10,000.00
15,000.00
135,100.00
KET
HARGA SATUAN
2018
9,000.00
203,600.00
139,000.00
99.29
170,000.00
75,000.00
100,000.00
105,000.00
###
###
###
###
###
###
KET
HARGA SATUAN
2018
###
###
###
###
KET
HARGA SATUAN
2018
25,700.00
25,700.00
9,100.00 8,500.00
10,000.00 8,800.00
165,000.00
110,000.00
###
95,000.00
70,000.00
45,000.00
###
22,000.00
21,000.00
16,300.00
11,500.00
11,500.00
183,500.00
105,000.00
KET
HARGA SATUAN
2018
25,000.00
17,000.00
22,000.00
389,000.00 194,500.00 80,000.00
410,000.00 440,000.00
75,000.00
1,200.00
22,800.00
25,000.00
16,500.00
KET
HARGA SATUAN
2018
30,100.00
19,200.00 215,000.00
20,000.00
206,000.00
58,400.00
51,400.00
321,000.00
700,100.00
KET
HARGA SATUAN
2018
154,700.00
40,000.00
###
###
KET
HARGA SATUAN
2018
10,000.00 ###
55,000.00
###
3,000.00
84,800.00
64,200.00
29,200.00
88,400.00 53,000.00
77,000.00
30,100.00
35,000.00
29,200.00
70,000.00 100,000.00
25,000.00
75,000.00
25,000.00 ###
60,000.00
70,000.00
35,000.00
45,000.00
5,000.00
15,000.00
10,000.00
10,000.00
46,700.00
KET
HARGA SATUAN
2018
35,000.00
35,000.00
20,000.00
77,700.00
55,000.00
65,000.00
3,300.00
30,000.00
20,000.00
KET
HARGA SATUAN
2018
20,000.00
65,000.00
100,000.00 ###
125,000.00 ###
136,000.00 ###
###
###
###
###
150,000.00 ###
200,000.00 ###
299,700.00
125,000.00 ###
140,000.00 ###
###
187,900.00
20,000.00
8,000.00
30,000.00
35,000.00
20,000.00
2,500,000.00
2,000,000.00
13,500,000.00 ###
KET
HARGA SATUAN
2018
16,500,000.00 ###
45,000.00
35,451,700.00
39,013,700.00
9,000,000.00
8,500,000.00 ### 5,500,000.00
7,800,000.00 ###
7,500,000.00
7,500,000.00
10,000,000.00 ###
7,587,200.00 ###
7,700,000.00
7,003,600.00 ### 4,100,000.00
7,762,300.00 ###
5,136,000.00
5,136,000.00
5,136,000.00
5,544,500.00
KET
HARGA SATUAN
2018
###
###
20,500.00
5,500,000.00
31,900.00
2,568,000.00
2,500,000.00
27,500.00
CBD
50,000.00
55,000.00
55,000.00 ###
45,000.00 ###
50,000.00 ### 60,000.00
45,000.00 ### 60,000.00
KET
HARGA SATUAN
2018
###
###
KET
HARGA SATUAN
2018
58,000.00
69,500.00
79,000.00
###
### 84,500.00
45,000.00
55,000.00
45,000.00
110,000.00
150,000.00
KET
HARGA SATUAN
2018
60,000.00
60,000.00
75,000.00
11,700.00
KET
HARGA SATUAN
2018
14,600.00
20,000.00
20,000.00
15,000.00
106,000.00
75,000.00
15,000.00
5,900.00
6,000.00
75,000.00
85,000.00
KET
HARGA SATUAN
2018
324,900.00
875,500.00
87,600.00
324,900.00
20,000.00
20,000.00
KET
HARGA SATUAN
2018
17,000.00 10500
20,000.00
30,000.00
20,000.00
20,000.00
18,000.00
17,000.00
17,000.00
18,000.00
17,000.00
40,000.00
500.00
1,000.00
17,500.00
90,000.00
100,000.00
65,000.00 ###
###
110,000.00
125,000.00
###
###
KET
HARGA SATUAN
2018
###
###
25,700.00
52,300.00
KET
HARGA SATUAN
2018
5,000.00
36,000.00
21,000.00
85,000.00
75,000.00
90,000.00
55,000.00
70,000.00
3,000.00
19,000.00 14,000.00
5,200.00 12,000.00
###
###
###
### 9,000.00
18,000.00
###
21,300.00
###
###
###
### 9,000.00
###
###
1,450.00
### 4,900.00
4,900.00
###
KET
HARGA SATUAN
2018
###
###
###
###
### 2,300.00
### 2,800.00
###
###
1,450.00
1,450.00
2,000.00
KET
HARGA SATUAN
2018
2,200.00
###
15,000.00
45,000.00 45,000.00
60,000.00
30,000.00 35,000.00
50,000.00
60,000.00
51,400.00
60,000.00
80,000.00
80,000.00
58,400.00
55,000.00
48,000.00
30,000.00
29,700.00
15,000.00
KET
HARGA SATUAN
2018
30,000.00
32,000.00
50,000.00
190,000.00
350,000.00
KET
HARGA SATUAN
2018
5,000.00
7,500.00
9,500.00
26,600.00
21,250.00
76,650.00
70,000.00
182,042.50
302,500.00
###
###
### 31250
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
KET
HARGA SATUAN
2018
24,100.00
18,000.00
32,600.00
105,100.00
32,600.00
64,200.00
65,000.00
80,000.00
95,000.00
90,000.00
KET
HARGA SATUAN
2018
81,800.00
62,000.00
21,000.00
162,000.00
105,100.00
10,000.00
15,000.00
CBD
250,000.00
300,000.00
150,000.00
15,000.00
###
5,000.00
15,000.00
1,000,000.00
725,000.00
800,000.00 1,200,000.00
1,600,000.00 ### 2,400,000.00
350,000.00 ###
100,000.00 ###
25,000.00
###
KET
HARGA SATUAN
2018
2,400.00
50,000.00
400,000.00
KET
HARGA SATUAN
2018
60,000.00
55,000.00 55,000.00
93,400.00
15,000.00 17,500.00
1,240.00
10,000.00 ###
15,000.00 ###
2,754,200.00
4,025,300.00
14,200.00
SB
harapan jaya
### 525,000.00
### 565,000.00
1,106,000.00 ### 610,000.00
###
### 650,000.00
1,425,600.00 ### 685,000.00
1,625,100.00 ### 698,000.00
1,820,100.00 ### 730,000.00
### 750,000.00
### 790,000.00
### 860,000.00
### 945,000.00
###
###
###
###
###
###
###
###
###
###
KET
HARGA SATUAN
2018
###
###
###
###
###
###
###
###
###
CBD
120.00
90,000.00 ###
45,000.00
10,000.00
KET
HARGA SATUAN
2018
7,000.00
70,000.00
1,000.00
20,000.00
45,000.00
50,000.00
45,000.00
94,300.00
95,000.00
20,000.00
10,000.00 ###
35,000.00
69,300.00 ###
75,000.00
36,100.00
80
17,600.00
7,100.00
17,600.00
233,500.00
36,100.00
UD. Toya
7,000
UD. Toya
UD. Toya
UD. Toya
3,500
900,000
1,500
1,200
15,000
UD. Toya
UD. Toya
10,000
UD. Toya
1,200
25,000
UD. Toya
25,000
20,000
UD. Toya
40,000
45,000
55,000
60,000
120,000
225,000
UD. Toya
60,000
6,000
65,000
75,000
80,000
77,000
35,000
35,000
25,000
25,000
45,000
48,000
10,000
UD. Toya
35,000
20,000
35,000
33,000
65,000
UD. Toya
27,500
8,000
35,000
35,000
20,000
2,500,000
1,850,000
13,500,000
UD. Toya
16,500,000
9,000,000
8,500,000
8,000,000
7,500,000
7,500,000
10,000,000
8,000,000
8,000,000
7,500,000
9,000,000
8,000,000
7,500,000
7,500,000
UD. Toya
5,500,000
200,000
2,568,000
2,500,000
27,500
UD. Toya
57,500
67,500
UD. Toya
UD. Toya
UD. Toya
5,000
20,000
20,000
15,000
25,000
15,000
6,000
100,000
125,000
UD. Toya
25,000
UD. Toya
17,000
20,000
35,000
25,000
20,000
17,000
17,000
48,500
500
15,000
17,500
90,000
100,000
110,000
125,000
UD. Toya
5,000
38,500
UD. Toya
55,000
32,500
UD. Toya
30,000
32,000
UD. Toya
5,875
7,925
10,650
18,600
23,790
48,900
81,250
182,043
302,500
UD. Toya
18,000
UD. Toya
725,000
800,000
350,000
UD. Toya
55,000
UD. Toya
15,000
22,500
Underlayer
UD. Toya
Parquet
UD. Toya
UD. Toya
1 2 3 4
1 Mandor Hari
2 Kepala Tukang Lapangan Hari
Kepala Tukang kayu Hari
3 Kepala Tukang Besi Hari
4 Kepala Tukang batu Hari
5 Kepala Tukang Hari
6 Kepala Tukang Cat Hari
7 Kepala Tukang Style Bali Hari
8 Mandor Style Bali Hari
9 Tukang Aluminium Hari
10 Tukang Politur Hari
11 Tukang Batu Hari
12 Tukang kayu Hari
13 Tukang Besi Hari
14 Tukang cat Hari
15 Tukang Politur Hari
16 Tukang Style Bali Hari
17 Pekerja Style Bali Hari
Pekerja Hari
18 Tukang Listrik Hari
19 Pekerja Terlatih Hari
20 Pekerja Semi Terlatih Hari
21 Pekerja Tidak Terlatih Hari
22 Laden /Pembantu Tukang Batu Hari
23 Laden / Pembantu Tukang Besi Hari
24 Laden / Pembantu Tukang Kayu Hari
25 Laden / Pembantu Tukang Cat Hari
26 Pekerja Galian/Urug Hari
27 Tukang Pipa/ Tukang Ledeng Hari
28 Tukang Aspal Hari
29 Tukang masak Aspal Hari
30 Operator Hari (8 Jam)
31 Pembantu Operator Hari (8 Jam)
32 Mekanik Hari (8 Jam)
33 Pembantu Mekanik Hari (8 Jam)
34 Sopir SIM A Hari (8 Jam)
35 Sopir SIM B1 Hari (8 Jam)
36 Sopir SIM B2 Hari (8 Jam)
37 Pekerja Gali Trowongan Hari
38 Kepala Tukang Las Hari
39 Juru Bor Hari
40 Driller Hari
41 Pembantu Driller Hari
42 Tukang Las Biasa Hari
43 Tukang Las Konstruksi Hari
44 Tukang Bongkar Begesting Hari
45 Sewa Alat Bantu Set
46 Sewa Mesin Bor Jam
47 Alat Bantu ngebor Ls
48 Ongkos Ngebor O 30 cm utk sumur m'
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 11 / PRT / M / 2016
Perdoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2016
HARGA
2018 Tahun 2010
5 Kepala Tukang Lapangan
Kepala Tukang Besi
160,000.00 ###
Kepala Tukang Kayu
165,000.00
150,000.00 ###
150,000.00 ###
150,000.00 ###
150,000.00 ###
165,000.00 ###
Tukang Besi
Tukang Kayu
120,000.00 ###
120,000.00 ###
135,000.00 ###
120,000.00 ###
120,000.00 ###
120,000.00 ###
150,000.00 ###
85,000.00 ###
85,000.00 ###
###
Tukang Las
Tukang Masak Aspal
###
85,000.00
85,000.00
85,000.00
85,000.00
85,000.00
120,000.00 ###
###
###
240,000.00 ###
160,000.00 ###
320,000.00 ###
240,000.00 ###
200,000.00 ###
200,000.00 ###
200,000.00 ###
###
###
###
###
###
###
###
###
###
###
Pasang Bata Gosok Satu Muka
Pasang Batu Paras Diukir
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 11 / PRT / M / 2016
Perdoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2016
###
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang Kayu L.02 OH 0.2000 135,000.00
Kepala Tukang L.03 OH 0.0200 165,000.00
Mandor L.04 OH 0.0200 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Dolken kayu f 8-10/400 cm batang 1.250 45,000.000
Semen portland kg 5.000 1,240.00
Pasir Beton m3 0.005 139,000.000
Koral beton m3 0.009 211,300.000
Kayu lokal 5/7 m3 0.072 2,568,000.000
Paku biasa 2"-5" kg 0.075 17,000.000
Residu liter 0.400 3,300.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 85,000.00
Tukang Kayu L.02 OH 0.4000 135,000.00
Kepala Tukang L.03 OH 0.0200 165,000.00
Mandor L.04 OH 0.0200 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Dolken kayu f 8-10/400 cm batang 1.250 45,000.000
Semen portland kg 2.500 1,240.00
Seng gelombang lbr 1.200 55,000.000
Pasir Beton m3 0.005 139,000.000
Koral beton m3 0.009 211,300.000
Kayu 5/7 m3 0.072 2,568,000.000
Paku biasa 2"-5" kg 0.075 17,000.000
Meni besi liter 0.075 35,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 102 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 103 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 85,000.00
Tukang Kayu L.02 OH 0.3000 135,000.00
Kepala Tukang L.03 OH 0.0200 165,000.00
Mandor L.04 OH 0.0200 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Dolken kayu f 8-10/400 cm batang 1.000 45,000.000
Semen portland kg 2.000 1,240.00
Kawat duri m1 25.000 1,200.000
Pasir Beton m3 0.005 139,000.000
Koral beton m3 0.009 211,300.000
Paku biasa 2"-5" kg 0.009 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang Kayu L.02 OH 0.1000 135,000.00
Kepala Tukang L.03 OH 0.0100 165,000.00
Mandor L.04 OH 0.0050 160,000.00
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 104 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 105 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
5 Pembuatan 1 m2 kantor sementara lantai plesteran
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 2.0000 85,000.00
Tukang Kayu L.02 OH 2.0000 135,000.00
Tukang batu L.02 OH 1.0000 120,000.00
Kepala Tukang L.03 OH 0.3000 150,000.00
Mandor L.04 OH 0.0500 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Dolken kayu f 8-10/400 cm batang 1.250 45,000.000
Kayu m3 0.180 2,000,000.000
Paku biasa Kg 0.080 17,000.000
Besi strip Kg 1.100 25,700.000
Semen portland Kg 35.000 1,240.00
Pasir pasang m3 0.150 170,000.00
Pasir beton M3 0.100 139,000.000
Koral beton M3 0.150 211,300.000
Bata merah bh 30.000 1,200.000
Seng plat Lbr 0.250 30,000.000
Jendela nako Bh 0.200 187,900.000
Kaca polos M2 0.080 100,000.000
Kunci tanam Bh 0.150 87,600.000
Plywood 4 mm Lbr 0.075 64,200.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Tukang Kayu L.02 OH 1.5000 135,000.00
Kepala Tukang L.03 OH 0.1500 165,000.00
Mandor L.04 OH 0.0500 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Dolken kayu f 8-10/400 cm batang 3.000 45,000.000
Kayu begisting m3 0.276 2,000,000.000
Paku biasa Kg 0.700 17,000.000
Seng gelombang bh 1.500 55,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 106 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Tukang Kayu L.02 OH 2.0000 135,000.00
Kepala Tukang L.03 OH 0.2000 165,000.00
Mandor L.04 OH 0.0500 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Dolken kayu f 8-10/400 cm batang 1.700 45,000.000
Kayu lokal m3 0.210 2,000,000.000
Paku biasa Kg 0.300 17,000.000
Semen portland Kg 10.500 1,240.00
Pasir beton M3 0.030 139,000.000
Koral beton M3 0.075 211,300.000
Seng gelombang Lbr 1.500 55,000.000
Seng plat Lbr 0.250 30,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Tukang Kayu L.02 OH 2.0000 135,000.00
Kepala Tukang L.03 OH 0.2000 165,000.00
Mandor L.04 OH 0.0500 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Dolken kayu f 8-10/400 cm batang 1.700 45,000.000
Kayu lokal m3 0.210 2,000,000.000
Paku biasa Kg 0.300 17,000.000
Semen portland Kg 10.500 1,240.00
Pasir beton M3 0.030 139,000.000
Koral beton M3 0.075 211,300.000
Seng gelombang Lbr 1.500 55,000.000
playwood 4 mm Lbr 0.250 65,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 107 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 108 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Tukang Kayu L.02 OH 2.0000 135,000.00
Kepala Tukang L.03 OH 0.2000 165,000.00
Mandor L.04 OH 0.0500 160,000.00
B. BAHAN
Bambu kayu f 8-10/400 cm batang 1.250 8,000.000
Tali ijuk m3 0.186 15,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 109 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
11 Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Tukang Kayu L.02 OH 0.3000 135,000.00
Kepala Tukang L.03 OH 0.0300 165,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu papan kelas III m3 0.036 5,544,500.000
Kayu balok 5/7 kelas III/kaso m3 0.014 2,500,000.000
Paku biasa kg 0.080 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Mandor L.04 OH 0.0500 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 0.150 215,000.000
Batu pecah m3 0.090 215,000.000
Pasir pasang m3 0.010 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 110 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 13.334 85,000.00
Mandor L.04 OH 0.666 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 6.6670 85,000.00
Mandor L.04 OH 0.3330 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 111 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
15 Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0752 85,000.00
Tukang L.02 OH 0.0040 135,000.00
Kepala Tukang L.03 OH 0.0020 150,000.00
Mandor L.04 OH 0.0752 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kawat jaring m2 0.143 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3750 85,000.00
Tukang L.02 OH 0.1250 135,000.00
Kepala Tukang L.03 OH 0.0120 150,000.00
Mandor L.04 OH 0.0190 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Panel beton pracetak Lbr 0.986 -
Kolom beton pracetak Batang 0.525 -
Semen PC Kg 45.000 1,240.00
Pasir beton m3 0.074 139,000.000
Koral m3 0.146 211,300.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 112 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 113 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7500 85,000.00
Mandor L.04 OH 0.0250 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.9000 85,000.00
Mandor L.04 OH 0.0450 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 114 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
3 Penggalian 1 m3 tanah biasa sedalam 3 m
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0500 85,000.00
Mandor L.04 OH 0.0670 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Mandor L.04 OH 0.0320 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 115 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
5 Menggali 1 m3 tanah cadas sedalam 1 m
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Mandor L.04 OH 0.0320 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.2000 85,000.00
Mandor L.04 OH 0.0450 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 116 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
7 Pengerjaan stripping 1 m2 tebing setinggi 1 meter
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0500 85,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3300 85,000.00
Mandor L.04 OH 0.0100 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 117 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 118 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.5200 85,000.00
Mandor L.04 OH 0.0492 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Pengurugan kembali 1 m3 galian di hitung dari 1/3 kali dari koefisien pekerjaan galian
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.5000 85,000.00
Mandor L.04 OH 0.0500 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 119 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
11 Pemadatan tanah 1 m3 tanah ( per 20 cm )
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.5000 85,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Mandor L.04 OH 0.0100 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pasir Urug m3 1.200 75,000.000
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 120 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ijuk kg 6.000 15,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 121 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Mandor L.04 OH 0.0250 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Sirtu m3 1.200 105,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Mandor L.04 OH 0.0250 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
lime stone m3 1.200 84,900.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 122 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 1.5000 85,000.00
Tukang Batu L.02 OH 0.7500 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 1.200 215,000.000
Semen Portland Kg 202.000 1,240.00
Pasir Pasang m3 0.485 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.5000 85,000.00
Tukang Batu L.02 OH 0.7500 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 1.200 215,000.000
Semen Portlan Kg 163.000 1,240.00
Pasir Pasang m3 0.520 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 123 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
3 Pemasangan 1 m3 pondasi batu belah/batu kali campuran 1SP : 5PP
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.5000 85,000.00
Tukang Batu L.02 OH 0.7500 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 1.200 215,000.000
Semen Portlan Kg 136.000 1,240.00
Pasir Pasang m3 0.544 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 1.5000 85,000.00
Tukang Batu L.02 OH 0.7500 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 1.200 215,000.00
Semen Portlan Kg 117.000 1,240.00
Pasir Pasang m3 0.561 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 124 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
5 Pemasangan 1 m3 Pas.pondasi siklop 60% beton campuran 1 sp : 2 ps : 3 Kr dan 40 % batu kali
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 3.4000 85,000.00
Tukang Batu L.02 OH 0.8500 120,000.00
Kepala Tukang L.03 OH 0.0850 150,000.00
Mandor L.04 OH 0.1700 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 0.480 215,000.00
Semen portland kg 194.000 1,240.00
Pasir beton m3 0.312 139,000.00
Kerikil m3 0.468 211,300.00
besi beton kg 126.000 9,100.00
Kawat Beton kg 1.800 16,500.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.5000 85,000.00
Tukang Batu L.02 OH 0.7500 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 1.200 215,000.000
Kapur m3 0.170 10,000.000
Semen Portlan Kg 0.170 1,240.00
Pasir Pasang m3 0.340 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 125 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 1.5000 85,000.00
Tukang Batu L.02 OH 0.7500 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 1.200 215,000.000
Semen Portlan Kg 61.000 1,240.00
Kapur m3 0.147 10,000.000
Pasir Pasang m3 0.492 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.5000 85,000.00
Tukang Batu L.02 OH 0.7500 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 1.200 215,000.000
Semen Portlan Kg 41.000 1,240.00
Kapur m3 0.131 10,000.000
Pasir Pasang m3 0.523 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 126 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
9 Pemasangan 1 m3 pondasi batu kosong (anstamping)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7800 85,000.00
Tukang Batu L.02 OH 0.3900 120,000.00
Kepala Tukang L.03 OH 0.0390 150,000.00
Mandor L.04 OH 0.0390 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 1.200 215,000.00
Pasir Urug m3 0.432 75,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3Kr dan 40% batu belah
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 3.0000 85,000.00
Tukang Batu L.02 OH 0.5300 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0100 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 0.400 215,000.000
Semen Portlan Kg 200.00 1,240.00
Pasir Beton m3 0.300 139,000.000
Kerikil m3 0.400 211,300.000
Besi beton Kg 70.000 9,100.000
Kawat beton Kg 1.800 22,800.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 127 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 2.4000 85,000.00
Tukang Batu L.02 OH 0.8000 120,000.00
Kepala Tukang L.03 OH 0.0800 150,000.00
Mandor L.04 OH 0.1190 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu belah m3 0.450 215,000.000
Semen Portlan Kg 194.000 1,240.00
Pasir Beton m3 0.312 139,000.000
Kerikil m3 0.468 211,300.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 128 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 1.6500 85,000.00
Tukang Batu L.02 OH 0.2750 120,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 247.000 1,240.00
Pasir Beton Kg 869.000 99.286
Kerikil (Maks 30mm) Kg 999.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6500 85,000.00
Tukang Batu L.02 OH 0.2750 120,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 276.000 1,240.00
Pasir Beton kg 828.000 99.286
Kerikil (Maks 30mm) kg 1,012.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 129 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6500 85,000.00
Tukang Batu L.02 OH 0.2750 120,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 299.000 1,240.00
Pasir Beton kg 799.000 99.286
Kerikil (Maks 30mm) kg 1,017.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
CATATAN
Bobot isi pasir = 1.400 kg/m3, bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa , slump (3-6) cm, w/c = 0.87
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.2000 85,000.00
Tukang Batu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 230.000 1,240.00
Pasir Beton kg 893.000 99.286
Kerikil (Maks 30mm) kg 1,027.000 117.389
Air Liter 200.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 130 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
5 Membuat 1 m3 lantai kerja beton mutu f'c = 14,5 Mpa , slump (12 ± 2) cm, w/c = 0.66
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6500 85,000.00
Tukang Batu L.02 OH 0.2750 120,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 326.000 1,240.00
Pasir Beton kg 760.000 99.286
Kerikil (Maks 30mm) kg 1,029.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
6 Membuat 1 m3 lantai kerja beton mutu f'c = 16,9 Mpa, slump (12 ± 2) cm, w/c = 0.61
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6500 85,000.00
Tukang Batu L.02 OH 0.2750 120,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 352.000 1,240.00
Pasir Beton m3 731.000 99.286
Kerikil (Maks 30mm) m3 1,031.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 131 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
7 Membuat 1 m3 lantai kerja beton mutu f'c = 19,3 Mpa, slump (12 ± 2) cm, w/c = 0.58
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6500 85,000.00
Tukang Batu L.02 OH 0.2750 120,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 371.000 1,240.00
Pasir Beton kg 698.000 99.286
Kerikil (Maks 30mm) kg 1,047.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
8 Membuat 1 m3 lantai kerja beton mutu f'c = 21,7 Mpa , slump (12 ± 2) cm, w/c = 0.56
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6500 85,000.00
Tukang Batu L.02 OH 0.2750 120,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 384.000 1,240.00
Pasir Beton m3 692.000 99.286
Kerikil (Maks 30mm) m3 1,039.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 132 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
9 Membuat 1 m3 lantai kerja beton mutu f'c = 24,0 Mpa
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6500 85,000.00
Tukang Batu L.02 OH 0.2750 120,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 406.000 1,240.00
Pasir Beton Kg 684.000 99.286
Kerikil (Maks 30mm) Kg 1,026.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6500 85,000.00
Tukang Batu L.02 OH 0.2750 120,000.00
Kepala Tukang L.03 OH 0.0280 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 413.000 1,240.00
Pasir Beton Kg 681.000 99.286
Kerikil (Maks 30mm) Kg 1,021.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 133 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 2.1000 85,000.00
Tukang Batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.1050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 439.00 1,240.00
Pasir Beton Kg 670.000 99.286
Kerikil (Maks 30mm) Kg 1,006.000 117.389
Air Liter 215.00 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 2.1000 85,000.00
Tukang Batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.1050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 448.000 1,240.00
Pasir Beton Kg 667.000 99.286
Kerikil (Maks 30mm) Kg 1,000.000 117.389
Air Liter 215.000 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 134 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 2.1000 85,000.00
Tukang Batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.1050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portlan Kg 400.000 1,240.00
Pasir Beton m3 0.480 139,000.000
Kerikil (2cm/3cm) m3 0.800 211,300.000
Strorox kg 1.200 -
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0700 85,000.00
Tukang Besi L.02 OH 0.0700 120,000.00
Kepala Tukang L.03 OH 0.0070 150,000.00
Mandor L.04 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Besi beton (polos/ulir) kg 10.5000 9,100.000
Kawat beton kg 0.1500 16,500.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
pembesian 1 kg dengan besi polos atau ulir
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 135 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0750 85,000.00
Tukang Besi L.02 OH 0.0750 120,000.00
Kepala Tukang L.03 OH 0.0050 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Besi beton (polos/ulir) kg 10.500 9,100.000
Kawat beton kg 0.100 16,500.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.0250 85,000.00
Tukang Besi L.02 OH 0.0250 120,000.00
Kepala Tukang L.03 OH 0.0250 150,000.00
Mandor L.04 OH 0.0010 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Jaring kawat baja dilas kg 10.500 19,200.000
Kawat beton kg 0.100 16,500.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 136 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.5200 85,000.00
Tukang Kayu L.02 OH 0.2600 120,000.00
Kepala Tukang L.03 OH 0.0260 150,000.00
Mandor L.04 OH 0.0260 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu begisting m3 0.075 2,000,000.00
Paku 5 - 10 cm kg 0.300 17,000.00
Minyak bekisting Liter 0.100 -
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.5200 85,000.00
Tukang Kayu L.02 OH 0.2600 120,000.00
Kepala Tukang L.03 OH 0.0260 150,000.00
Mandor L.04 OH 0.0260 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu begisting m3 0.076 2,000,000.00
Paku 5 - 10 cm kg 0.300 17,000.00
Minyak bekisting Liter 0.100 -
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 137 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6600 85,000.00
Tukang Kayu L.02 OH 0.3300 120,000.00
Kepala Tukang L.03 OH 0.0330 150,000.00
Mandor L.04 OH 0.0330 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu begisting m3 0.075 2,000,000.00
Paku 5 - 12 cm kg 0.400 17,000.00
Minyak bekisting Liter 0.200 -
kayu meranti usuk m3 0.015 -
Plywood tebal 9 mm Lbr 0.350 80,000.00
Dolken kayu ø 8 - 10cm - panjang 4 m Batang 2.000 45,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6600 85,000.00
Tukang Kayu L.02 OH 0.3300 120,000.00
Kepala Tukang L.03 OH 0.0330 150,000.00
Mandor L.04 OH 0.0330 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu kelas III m3 0.075 2,000,000.00
Paku 5 - 12 cm kg 0.400 17,000.00
Minyak bekisting Liter 0.200 -
kayu meranti usuk m3 0.018 -
Plywood tebal 9 mm Lbr 0.350 80,000.00
Dolken kayu ø 8 - 10cm - panjang 4 m Batang 2.000 45,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 138 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 139 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
21 Pemasangan 1 m2 bekisting untuk lantai
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6600 85,000.00
Tukang Kayu L.02 OH 0.3300 120,000.00
Kepala Tukang L.03 OH 0.0330 150,000.00
Mandor L.04 OH 0.0330 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
kayu begisting m3 0.075 2,000,000.00
Paku 5 - 12 cm kg 0.400 17,000.00
Minyak bekisting Liter 0.200 -
kayu meranti usuk m3 0.015 5,136,000.00
Plywood tebal 9 mm Lbr 0.350 80,000.00
Dolken kayu ø 8 - 10cm - panjang 4 m Batang 6.000 45,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.6600 -
Tukang Kayu L.02 OH 0.3300 120,000.00
Kepala Tukang L.03 OH 0.0330 150,000.00
Mandor L.04 OH 0.0330 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu begisting m3 0.030 2,000,000.00
Paku 5 - 12 cm kg 0.400 17,000.00
Minyak bekisting Liter 0.200 -
kayu meranti usuk m3 0.020 5,136,000.00
Plywood tebal 9 mm Lbr 0.350 80,000.00
Dolken kayu ø 8 - 10cm - panjang 4 m Batang 3.000 45,000.00
Penjaga jarak bekisting/ spacer Buah 4.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 140 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6600 85,000.00
Tukang Kayu L.02 OH 0.3300 120,000.00
Kepala Tukang L.03 OH 0.0330 165,000.00
Mandor L.04 OH 0.0330 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu begisting m3 0.030 2,000,000.00
Paku 5 - 12 cm kg 0.400 17,000.00
Minyak bekisting Liter 0.150 -
kayu kruing balok m3 0.015 5,136,000.00
Plywood tebal 9 mm Lbr 0.350 80,000.00
Dolken kayu ø 8 - 10cm - panjang 4 m Batang 2.000 45,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 85,000.00
Tukang Kayu L.02 OH 0.250 120,000.00
Kepala Tukang L.03 OH 0.025 150,000.00
Mandor L.04 OH 0.080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Sement portland kg 218.0000 1,240.00
Sement potland kg 230.4000 1,240.00
Pasir beton m3 0.520 139,000.00
koral beton m3 0.780 211,300.00
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 141 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 1.650 85,000.00
Tukang Kayu L.02 OH 0.250 120,000.00
Kepala Tukang L.03 OH 0.025 150,000.00
Mandor L.04 OH 0.080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen portland kg 386.0000 1,240.00
Pasir beton m3 0.470 139,000.00
koral beton m3 0.780 211,300.00
JUMLAH HARGA BAHAN
C. PERALATAN
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.180 85,000.00
Tukang Batu L.02 OH 0.020 120,000.00
Tukang Kayu L.02 OH 0.020 120,000.00
Tukang Besi L.02 OH 0.020 120,000.00
Kepala Tukang L.03 OH 0.006 150,000.00
Mandor L.04 OH 0.009 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu begisting m3 0.0020 2,000,000.000
Paku 5 - 12 cm kg 0.010 17,000.000
Minyak bekisting Liter -
Besi beton polos kg 3.000 9,100.000
Kawat beton kg 0.450 16,500.000
Semen Portland kg 4.000 1,240.00
Pasir beton m3 0.006 139,000.000
Kerikil koral beton m3 0.009 211,300.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 142 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
26 Membuat 1 m' ring balok beton bertulang (10 x 15) cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.297 -
Tukang Batu L.02 OH 0.033 120,000.00
Tukang Kayu L.02 OH 0.033 120,000.00
Tukang Besi L.02 OH 0.033 120,000.00
Kepala Tukang L.03 OH 0.010 150,000.00
Mandor L.04 OH 0.015 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu begisting m3 0.003
2,000,000.000
Paku 5 - 12 cm kg 0.020 17,000.000
Minyak bekisting Liter -
Besi beton polos kg 3.600 9,100.000
Kawat ikat beton kg 0.075 16,500.000
Semen Portland kg 5.500 1,240.000
Pasir beton m3 0.009 139,000.000
Kerikil m3 0.015 211,300.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.1700 85,000.00
Pekerja Terlatih OH 769.0000 -
Tukang Kayu L.02 OH 0.1026 120,000.00
Mandor L.04 OH 0.0256 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Dolken Kayu 8" - 10"/4 m ls 0.2500 211,300.000
Kayu Perancah m3 0.010 -
Paku Kg 0.500 17,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Bekisting m2 - -
Besi Beton Kg 150.000 12,547.150
Beton K 300 m3 1.000 1,007,729.39
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 143 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Bekisting m2 5.0000 262,416.000
Besi Beton Kg 125.000 12,547.150
Penempatan besi Kg
Beton K 100 m3 1.000 798,996.86
Beton K 125 m3 1.000 835,753.74
Beton K 150 m3 1.000 864,604.16
Beton K 175 m3 1.000 898,722.34
Beton K 200 m3 1.000 931,277.38
Beton K 225 m3 1.000 955,655.35
Beton K 250 m3 1.000 971,699.05
Beton K 275 m3 1.000 999,154.67
Beton K 300 m3 1.000 1,007,729.39
Beton K 325 m3 1.000 1,097,057.12
Beton K 350 m3 1.000 1,108,230.71
C. PERALATAN
Jumlah (A + B + C)
D. Harga Satuan Pekerjaan (D+E) (k 100) Fe 125
E. Harga satuan pekerjaan Beton ( K 125 ) FE 125
F. Harga Satuan Pekerjaan Beton ( K 150 ) FE 125
g. Harga Satuan Pekerjaan Beton ( K 175 ) FE 125
h. Harga Satuan Pekerjaan Beton ( K 200 ) FE 125
I. Harga Satuan Pekerjaan Beton ( K 225 ) FE 125
J. Harga Satuan Pekerjaan Beton ( K 250 ) FE 125
K. Harga Satuan Pekerjaan Beton ( K 275 ) FE 125 `
L. Harga Satuan Pekerjaan Beton ( K 300 ) FE 125
M. Harga Satuan Pekerjaan Beton ( K 325 ) FE 125
N. Harga Satuan Pekerjaan Beton ( K 350) FE 125
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 144 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Bekisting m2 8.0000 420,585.000
Besi Beton Kg 150.000 12,547.150
Penempatan besi Kg -
Beton K 100 m3 1.000 798,996.86
Beton K 125 m3 1.000 835,753.74
Beton K 150 m3 1.000 864,604.16
Beton K 175 m3 1.000 898,722.34
Beton K 200 m3 1.000 931,277.38
Beton K 225 m3 1.000 955,655.35
Beton K 250 m3 1.000 971,699.05
Beton K 275 m3 1.000 999,154.67
Beton K 300 m3 1.000 1,007,729.39
Beton K 325 m3 1.000 1,097,057.12
Beton K 350 m3 1.000 1,108,230.71
JUMLAH HARGA BAHAN
C. PERALATAN
Jumlah (A + B + C)
D. Harga Satuan Pekerjaan (D+E) (k 100) Fe 150
E. Harga satuan pekerjaan Beton ( K 125 ) FE 150
F. Harga satuan pekerjaan Beton ( K 150 ) FE 150
G. Harga Satuan Pekerjaan Beton ( K 175 ) FE 150
H. Harga Satuan Pekerjaan Beton ( K 200 ) FE 150
I. Harga Satuan Pekerjaan Beton ( K 225 ) FE 150
J. Harga Satuan Pekerjaan Beton ( K 250 ) FE 150
K. Harga Satuan Pekerjaan Beton ( K 275 ) FE 150
L. Harga Satuan Pekerjaan Beton ( K 300 ) FE 150
M. Harga Satuan Pekerjaan Beton ( K 325 ) FE 150
N. Harga Satuan Pekerjaan Beton ( K 350) FE 150
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 145 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Bekisting m2 6.0000 263,516.000
Besi Beton Kg 150.000 12,547.150
Penempatan besi Kg 2,500.000
Beton K 100 m3 1.000 798,996.86
Beton K 125 m3 1.000 835,753.74
Beton K 150 m3 1.000 864,604.16
Beton K 175 m3 1.000 898,722.34
Beton K 200 m3 1.000 931,277.38
Beton K 225 m3 1.000 955,655.35
Beton K 250 m3 1.000 971,699.05
Beton K 275 m3 1.000 999,154.67
Beton K 300 m3 1.000 1,007,729.39
Beton K 325 m3 1.000 1,097,057.12
Beton K 350 m3 1.000 1,108,230.71
JUMLAH HARGA BAHAN
C. PERALATAN
Jumlah (A + B + C)
D. Harga Satuan Pekerjaan (D+E) (k 100) Fe 150
E Harga satuan pekerjaan Beton ( K 125 ) FE 150
F. Harga satuan pekerjaan Beton ( K 150 ) FE 150
G. Harga Satuan Pekerjaan Beton ( K 175 ) FE 150
H. Harga Satuan Pekerjaan Beton ( K 200 ) FE 150
I. Harga Satuan Pekerjaan Beton ( K 225 ) FE 150
J. Harga Satuan Pekerjaan Beton ( K 250 ) FE 150
K. Harga Satuan Pekerjaan Beton ( K 275 ) FE 150
L. Harga Satuan Pekerjaan Beton ( K 300 ) FE 150
M. Harga Satuan Pekerjaan Beton ( K 325 ) FE 150
N. Harga Satuan Pekerjaan Beton ( K 350) FE 150
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 146 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Bekisting m2 6.7880 701,547.000
Pekerjaan Steger / bambu m2 1.0000 449,669.000
Besi Beton Kg 110.000 12,547.150
Penempatan besi Kg 2,500.000
Beton K 100 m3 1.000 798,996.86
Beton K 125 m3 1.000 835,753.74
Beton K 150 m3 1.000 864,604.16
Beton K 175 m3 1.000 898,722.34
Beton K 200 m3 1.000 931,277.38
Beton K 225 m3 1.000 955,655.35
Beton K 250 m3 1.000 971,699.05
Beton K 275 m3 1.000 999,154.67
Beton K 300 m3 1.000 1,007,729.39
Beton K 325 m3 1.000 1,097,057.12
Beton K 350 m3 1.000 1,108,230.71
C. PERALATAN
Jumlah (A + B + C)
D. Harga Satuan Pekerjaan (D+E) (k 100) Fe 110
E Harga satuan pekerjaan Beton ( K 125 ) FE 110
F. Harga satuan pekerjaan Beton ( K 150 ) FE 110
G. Harga Satuan Pekerjaan Beton ( K 175 ) FE 110
H. Harga Satuan Pekerjaan Beton ( K 200 ) FE 110
I. Harga Satuan Pekerjaan Beton ( K 225 ) FE 110
J. Harga Satuan Pekerjaan Beton ( K 250 ) FE 110
K. Harga Satuan Pekerjaan Beton ( K 275 ) FE 110
L. Harga Satuan Pekerjaan Beton ( K 300 ) FE 110
M. Harga Satuan Pekerjaan Beton ( K 325 ) FE 110
N. Harga Satuan Pekerjaan Beton ( K 350) FE 110
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 147 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Bekisting m2 10.0000 418,803.000
Besi Beton Kg 175.000 12,547.150
Penempatan besi Kg 2,500.000
Beton K 100 m3 1.000 798,996.86
Beton K 125 m3 1.000 835,753.74
Beton K 150 m3 1.000 864,604.16
Beton K 175 m3 1.000 898,722.34
Beton K 200 m3 1.000 931,277.38
Beton K 225 m3 1.000 955,655.35
Beton K 250 m3 1.000 971,699.05
Beton K 275 m3 1.000 999,154.67
Beton K 300 m3 1.000 1,007,729.39
Beton K 325 m3 1.000 1,097,057.12
Beton K 350 m3 1.000 1,108,230.71
C. PERALATAN
Jumlah (A + B + C)
D. Harga Satuan Pekerjaan (D+E) (k 100) Fe 175
E Harga satuan pekerjaan Beton ( K 125 ) FE 175
F. Harga satuan pekerjaan Beton ( K 150 ) FE 175
G. Harga Satuan Pekerjaan Beton ( K 175 ) FE 175
H. Harga Satuan Pekerjaan Beton ( K 200 ) FE 175
I. Harga Satuan Pekerjaan Beton ( K 225 ) FE 175
J. Harga Satuan Pekerjaan Beton ( K 250 ) FE 175
K. Harga Satuan Pekerjaan Beton ( K 275 ) FE 175
L. Harga Satuan Pekerjaan Beton ( K 300 ) FE 175
M. Harga Satuan Pekerjaan Beton ( K 325 ) FE 175
N. Harga Satuan Pekerjaan Beton ( K 350) FE 175
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 148 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Bekisting m2 7.8790 418,803.000
Pekerjaan Steger / bambu m2 0.4500 449,669.000
Besi Beton Kg 200.000 12,547.150
Penempatan besi Kg 2,500.000
Beton K 100 m3 1.000 798,996.86
Beton K 125 m3 1.000 835,753.74
Beton K 150 m3 1.000 864,604.16
Beton K 175 m3 1.000 898,722.34
Beton K 200 m3 1.000 931,277.38
Beton K 225 m3 1.000 955,655.35
Beton K 250 m3 1.000 971,699.05
Beton K 275 m3 1.000 999,154.67
Beton K 300 m3 1.000 1,007,729.39
Beton K 325 m3 1.000 1,097,057.12
Beton K 350 m3 1.000 1,108,230.71
C. PERALATAN
Jumlah (A + B + C)
D. Harga Satuan Pekerjaan (D+E) (k 100) Fe 200
E Harga satuan pekerjaan Beton ( K 125 ) FE 200
F. Harga satuan pekerjaan Beton ( K 150 ) FE 200
G. Harga Satuan Pekerjaan Beton ( K 175 ) FE 200
H. Harga Satuan Pekerjaan Beton ( K 200 ) FE 200
I. Harga Satuan Pekerjaan Beton ( K 225 ) FE 200
J. Harga Satuan Pekerjaan Beton ( K 250 ) FE 200
K. Harga Satuan Pekerjaan Beton ( K 275 ) FE 200
L. Harga Satuan Pekerjaan Beton ( K 300 ) FE 200
M. Harga Satuan Pekerjaan Beton ( K 325 ) FE 200
N. Harga Satuan Pekerjaan Beton ( K 350) FE 200
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 149 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Bekisting m2 7.0000 405,091.500
Besi Beton Kg 110.000 12,547.150
Penempatan besi Kg 2,500.000
Beton K 100 m3 1.000 798,996.86
Beton K 125 m3 1.000 835,753.74
Beton K 150 m3 1.000 864,604.16
Beton K 175 m3 1.000 898,722.34
Beton K 200 m3 1.000 931,277.38
Beton K 225 m3 1.000 955,655.35
Beton K 250 m3 1.000 971,699.05
Beton K 275 m3 1.000 999,154.67
Beton K 300 m3 1.000 1,007,729.39
Beton K 325 m3 1.000 1,097,057.12
Beton K 350 m3 1.000 1,108,230.71
C. PERALATAN
Jumlah (A + B + C)
D. Harga Satuan Pekerjaan (D+E) (k 100) Fe 110
E Harga satuan pekerjaan Beton ( K 125 ) FE 110
F. Harga satuan pekerjaan Beton ( K 150 ) FE 110
G. Harga Satuan Pekerjaan Beton ( K 175 ) FE 110
H. Harga Satuan Pekerjaan Beton ( K 200 ) FE 110
I. Harga Satuan Pekerjaan Beton ( K 225 ) FE 110
J. Harga Satuan Pekerjaan Beton ( K 250 ) FE 110
K. Harga Satuan Pekerjaan Beton ( K 275 ) FE 110
L. Harga Satuan Pekerjaan Beton ( K 300 ) FE 110
M. Harga Satuan Pekerjaan Beton ( K 325 ) FE 110
N. Harga Satuan Pekerjaan Beton ( K 350) FE 110
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 150 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
1 Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c 14,5 Mpa slump (12 ± 2) cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1320 85,000.00
Tukang Batu L.02 OH 0.0220 120,000.00
Kepala Tukang L.03 OH 0.0020 150,000.00
Mandor L.04 OH 0.0070 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portland kg 26.080 1,240.00
Pasir beton kg 60.800 99.286
Kerikil (maks 30 mm) kg 82.320 117.389
Air L 17.200 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
2 Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c 14,5 Mpa slump (12 ± 2) cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang Batu L.02 OH 0.0100 120,000.00
Kepala Tukang L.03 OH 0.0030 150,000.00
Mandor L.04 OH 0.0070 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portland kg 28.000 1,240.00
Pasir beton kg 0.054 99.286
Kerikil (maks 30 mm) kg 0.076 117.389
Air L 21.500 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 151 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
3 Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c 14,5 Mpa slump (12 ± 2) cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1980 85,000.00
Tukang Batu L.02 OH 0.0330 120,000.00
Kepala Tukang L.03 OH 0.0030 150,000.00
Mandor L.04 OH 0.0100 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portland kg 32.120 1,240.00
Pasir beton kg 91.200 99.286
Kerikil (maks 30 mm) m3 123.480 117.389
Air L 25.800 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
4 Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c 14,5 Mpa slump (12 ± 2) cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2480 85,000.00
Tukang Batu L.02 OH 0.0751 120,000.00
Kepala Tukang L.03 OH 0.0040 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen Portland kg 48.900 1,240.00
Pasir beton kg 114.000 99.286
Kerikil (maks 30 mm) kg 154.350 117.389
Air L 32.250 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 152 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0070 85,000.00
Tukang Batu L.02 OH 0.0760 120,000.00
Kepala Tukang L.03 OH 0.0080 150,000.00
Mandor L.04 OH 0.0010 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Lantai kerja tebal 10 cm m3 0.080 2,000,000.000
Besi hollow 50.50.3 Kg 9.394 -
Kayu kaso 5/7 m3 0.005 2,500,000.000
Phenol film 12 mm Lbr 0.080 120,000.000
Minyak bekisting L 0.200 31,900.00
Dinabolt dia 12 mm (10-15cm) Bh 3.882 -
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0040 85,000.00
Tukang Batu L.02 OH 0.0380 120,000.00
Kepala Tukang L.03 OH 0.0040 150,000.00
Mandor L.04 OH 0.0010 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu kaso 5/7 m3 0.005 2,500,000.000
Phenol film 12 mm Lbr 0.075 120,000.000
Minyak bekisting L 0.200 31,900.00
Dinabolt dia 12 mm (10-15cm) Bh 0.693 -
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 153 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0754 85,000.00
Tukang Batu L.02 OH 0.2440 120,000.00
Tukang vibrator L.02 OH 0.1280 120,000.00
Kepala Tukang L.03 OH 0.0340 150,000.00
Mandor L.04 OH 0.0730 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0759 85,000.00
Tukang Batu L.02 OH 0.2420 120,000.00
Tukang vibrator L.02 OH 0.1380 120,000.00
Kepala Tukang L.03 OH 0.0370 150,000.00
Mandor L.04 OH 0.0730 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 154 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0751 85,000.00
Tukang Batu L.02 OH 0.2130 120,000.00
Tukang vibrator L.02 OH 0.1220 120,000.00
Kepala Tukang L.03 OH 0.0330 150,000.00
Mandor L.04 OH 0.0730 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0757 85,000.00
Tukang Batu L.02 OH 0.0757 120,000.00
Tukang vibrator L.02 OH 0.1340 120,000.00
Kepala Tukang L.03 OH 0.0757 150,000.00
Mandor L.04 OH 0.0757 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Solar L 6.676 -
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.0757 -
Sewa pipe support UH 1.1000
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 155 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0751 -
Tukang Batu L.02 OH 0.0751 120,000.00
Tukang erection L.02 OH 0.1220 120,000.00
Operator crane L.08 OH 0.0751 240,000.00
Pembantu operator crane L.09 OH 0.0751 240,000.00
Kepala Tukang L.03 OH 0.0751 150,000.00
Mandor L.04 OH 0.0751 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Solar L 6.11 -
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.0751 -
Sewa pipe support UH 1.1000
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.0830 85,000.00
Tukang Batu L.02 OH 0.0830 120,000.00
Tukang erection L.02 OH 0.1660
Operator crane OH 0.0830 240,000.00
Pembantu operator crane OH 0.0830 240,000.00
Kepala Tukang L.03 OH 0.0830 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Solar L 8.277 -
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.0830 -
Sewa pipe support UH 2.2000
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 156 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0190 85,000.00
Tukang Batu L.02 OH 0.0380 120,000.00
Operator crane OH 0.0190 240,000.00
Pembantu operator crane OH 0.0190 240,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Solar L 1.897 -
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.0190 0
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0190 85,000.00
Tukang Batu L.02 OH 0.0380 120,000.00
Operator crane OH 0.0190 240,000.00
Pembantu operator crane OH 0.0190 240,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Solar L 1.897 -
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.0190 0
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 157 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0190 85,000.00
Tukang Batu L.02 OH 0.0380 120,000.00
Operator crane OH 0.0190 240,000.00
Pembantu operator crane OH 0.0190 240,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Solar L 1.897 -
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa crane UH 0.0190 0
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Semen grout Kg 1200.00 15,000.00
Screening Kg 650.00
Air L 350.00 120.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 158 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
18 Pemasangan 1 titik bekisting join pracetak
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1470 85,000.00
Tukang Kayu L.02 OH 0.1470 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu kaso 5/7 m3 0.0120 2,500,000.000
Papan cor m3 0.0040 7,762,300.00
Paku 5-7 cm Kg 0.2640 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.2200 85,000.00
Tukang Kayu L.02 OH 0.2200 120,000.00
Kepala Tukang L.03 OH 0.2200 150,000.00
Mandor L.04 OH 0.0110 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 159 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 0.0750 85,000.00
Tukang Las Konstruksi L.03 OH 0.0750 120,000.00
Kepala Tukang L.03 OH 0.0060 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Besi Profil Kg 1.0500 16,300.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.0750 85,000.00
Tukang Las Konstruksi L.03 OH 0.0750 120,000.00
Kepala Tukang L.03 OH 0.0060 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Baja IWF 250 Kg 1.1500 -
Baja IWF 200 Kg 1.1500 -
Baja IWF 150 Kg 1.1500 -
Baja IWF 100 Kg 1.1500 -
Cat Menie besi Kg 0.1800 35,000.00
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Jumlah (A + B + C)
F. Jumlah (A + B + C)
G. Jumlah (A + B + C)
K. Overhead & Profit 10 % x D
L. Overhead & Profit 7.5 % x E
M. Overhead & Profit 7.5 % x F
N. Overhead & Profit 7.5 % x G
O. Harga Satuan Pekerjaan (D+K)
P. Harga Satuan Pekerjaan (E + L)
G. Harga Satuan Pekerjaan (F + M)
H. Harga Satuan Pekerjaan (G+N)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 160 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang Las Konstruksi L.03 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0010 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Solar Liter 1.0000 -
Minyak pelumas Liter 0.1000 -
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa alat Jam 0.8000 -
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0500 85,000.00
Tukang Las Biasa L.03 OH 1.0500 120,000.00
Kepala Tukang L.03 OH 0.1050 150,000.00
Mandor L.04 OH 0.0752 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Besi siku L 30.30.3 Kg 15.0000 157,900.00
Besi plat baja Kg 32.8000 -
Kawat las Kg 0.0750 -
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa alat Jam 0.8000 -
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 161 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0750 85,000.00
Tukang Las Biasa L.03 OH 0.0200 120,000.00
Kepala Tukang L.03 OH 0.0020 150,000.00
Mandor L.04 OH 0.0020 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kawat las listrik Kg 0.4000 -
Solar Kg 0.3000 -
Minyak pelumas Kg 0.0750 -
JUMLAH HARGA BAHAN
C. PERALATAN
Sewa alat Jam 0.1700 -
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.6500 85,000.00
Tukang Las Biasa L.03 OH 0.6500 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0320 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Besi scuare tube m 4.7600 -
Besi lis kaca ( 1 x 1 ) m 4.5220 -
Pengelasan cm 20.0000 1,033.45
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 162 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.2000 85,000.00
Tukang Las Biasa L.03 OH 1.2000 120,000.00
Kepala Tukang L.03 OH 0.1200 150,000.00
Mandor L.04 OH 0.0060 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pintu gulung besi m2 1.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Tukang Las Biasa L.03 OH 1.0000 120,000.00
Kepala Tukang L.03 OH 0.1000 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pintu lipat m2 1.0000 321,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 163 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 0.0800 85,000.00
Tukang Las Biasa L.03 OH 0.8000 120,000.00
Kepala Tukang L.03 OH 0.0800 150,000.00
Mandor L.04 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Sunscreen alluminium m2 1.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
laden tukang besi L.01 OH 0.0750 85,000.00
Tukang Las Biasa L.03 OH 0.2250 85,000.00
Kepala Tukang L.03 OH 0.0043 150,000.00
Mandor L.04 OH 0.0380 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Profil alluminium 4 " m1 1.1000 -
Profil alluminium 3" m1 1.1000 -
Skrup fixer kg 0.2200 17,500.00
Sealent tube 0.0750 51,400.00
JUMLAH HARGA BAHAN 4"
JUMLAH HARGA BAHAN 3"
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E) 4" (frofil aluminium 4)
G. Harga Satuan Pekerjaan 3" ( profil aluminium 3)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 164 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0850 120,000.00
Tukang Khusus Aluminium L.03 OH 0.0850 135,000.00
Kepala Tukang L.03 OH 0.0085 150,000.00
Mandor L.04 OH 0.0042 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Profil alluminium m1 4.4000 58,400.00
Alluminium strip m1 14.6000 25,700.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.0850 120,000.00
Tukang Aluminium/kaca L.03 OH 0.0850 135,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pintu Aluminium m 4.4000 120,000.00
Profil Kaca m 4.5000 58,400.00
Sealent Tube 1.0000 51,400.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 165 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 -
Tukang L.03 OH 0.3500
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. Venetions blinds dan certical blinds
m 1.0000 -
(tirai)
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.6700 -
Tukang Las L.03 OH 1.6700 85,000.00
Kepala Tukang L.03 OH 0.1670 150,000.00
Mandor L.04 OH 0.0830 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Besi strip kg 6.1770 25,700.00
Pengelasan cm 27.0800 50,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 166 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang L.03 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kawat nyamuk m² 1.1000 -
Pengelasan cm 11.1100 50,000.00
Baja strip (0,2x2) cm kg 1.7160 25,700.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 85,000.00
Tukang L.03 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0010 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Jendela nako (rangka+kaca 5 mm) m² 1.1000 187,900.00
Paku skrup 1cm-2,5 cm buah 10.0000 -
Baja strip m 7.0000 25,700.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 167 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 85,000.00
Tukang L.03 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0010 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Seng plat 3'x6', seng BJLS 28 m' 1.0500 -
Paku skrup 1cm-2,5 cm kg 0.0150 17,000.000
Papan kayu kruing m3 0.0190 7,762,300.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang L.03 OH 0.3000 120,000.00
Kepala Tukang L.03 OH 0.0300 150,000.00
Mandor L.04 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Seng plat 3'x6' BJLS 28 m' 1.0500 -
Paku skrup 1cm-2,5 cm kg 0.0100 17,000.000
besi strip kg 0.5000 25,700.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 168 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 0.075 85,000.00
Tukang kayu L.03 OH 0.400 135,000.00
Kepala Tukang L.03 OH 0.025 150,000.00
Mandor L.04 OH 0.001 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Talang karet lbr 0.6 m' 1.0000 10,000.00
Paku biasa 0.5" - 1 " kg 0.0150 17,000.000
kayu papan kelas 3 m3 0.0190 5,544,500.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Harga Satuan Pekerjaan (D+E)
21 Pemasangan 1 m² rangka besi hollow 1x40.40.2 mm, modul 60x120 cm dinding partisi
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang besi L.02 OH 0.2500 120,000.00
Kepala Tukang L.03 OH 0.0250 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Rangka metal hollow 40.40.2 mm m' 4.0000 6,250.00
Assesories (perkuatan, las dll) Ls 100% x rangka
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 169 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
22 Pemasangan 1 m² atap pelana rangka atap baja ringan canai dingin profil C 75
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7340 85,000.00
Tukang besi L.02 OH 0.7340 120,000.00
Kepala Tukang L.03 OH 0.0730 150,000.00
Mandor L.04 OH 0.0370 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Baja ringan canai dingin C 75 kg 4.2000 -
JUMLAH HARGA BAHAN
C. PERALATAN
Peralatan % 10.0000
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
23 Pemasangan 1 m² atap jurai rangka atap baja ringan canai dingin profil C 75
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7604 85,000.00
Tukang besi L.02 OH 0.7604 120,000.00
Kepala Tukang L.03 OH 0.0760 150,000.00
Mandor L.04 OH 0.0380 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Baja ringan canai dingin C 75 kg 4.2000 -
JUMLAH HARGA BAHAN
C. PERALATAN
Peralatan % 10.0000
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 170 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
VII. HARGA SATUAN PEKERJAAN PASANGAN DINDING
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6000 85,000.00
Tukang batu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 140.0000 1,500.00
Semen portland kg 43.5000 1,240.00
Pasir pasang m³ 0.0800 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6600 85,000.00
Tukang batu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0300 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 140.0000 1,500.00
Semen portland kg 32.9500 1,240.00
Pasir pasang m³ 0.0910 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 171 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6600 85,000.00
Tukang batu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0300 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 140.0000 1,500.00
Semen portland kg 26.5500 1,240.00
Pasir pasang m³ 0.0930 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6000 85,000.00
Tukang batu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0300 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 140.0000 1,500.00
Semen portland kg 22.2000 1,240.00
Pasir pasang m³ 0.1020 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 172 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6600 85,000.00
Tukang batu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0300 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 140.0000 1,500.00
Semen portland kg 18.5000 1,240.00
Pasir pasang m³ 0.1220 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6000 85,000.00
Tukang batu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0300 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 140.0000 1,500.00
Semen portland kg 10.0800 1,240.00
Pasir pasang m³ 0.0925 170,000.00
Kapur padam m3 0.0275 10,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 173 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 70.0000 1,500.00
Semen portland kg 18.9500 1,240.00
Pasir pasang m³ 0.0380 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 70.0000 1,500.00
Semen portland kg 14.3700 1,240.00
Pasir pasang m³ 0.0750 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 174 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 70.0000 1,500.00
Semen portland kg 11.5000 1,240.00
Pasir pasang m³ 0.0753 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 70.0000 1,500.00
Semen portland kg 9.5000 1,240.00
Pasir pasang m³ 0.0750 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 175 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
11 Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ bata campuran 1 SP : 6 PP
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 70.0000 1,500.00
Semen portland kg 8.3200 1,240.00
Pasir pasang m³ 0.0758 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 70.0000 1,500.00
Semen portland kg 6.5000 1,240.00
Pasir pasang m³ 0.0750 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 176 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
13 Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ bata campuran 1 SM : 1 KP : 1 PP
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 70.0000 1,500.00
Semen portland kg 0.0180 1,240.00
Kapur padam m³ 0.0180 10,000.00
Pasir pasang m³ 0.0180 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah biji 70.0000 1,500.00
Semen merah kg 0.0140 15,000.00
Kapur padam m³ 0.0140 10,000.00
Pasir pasang m³ 0.0280 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 177 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 178 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
16 Pemasangan 1 m² dinding conblock HB20 campuran 1 SP : 3 PP
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 85,000.00
Tukang batu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
HB-20 biji 12.5000 -
Semen portland kg 30.3200 1,240.00
Pasir pasang m³ 0.7280 170,000.00
Besi angker diameter 8 kg 0.2800 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 85,000.00
Tukang batu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
HB-20 biji 12.5000 -
Semen portland kg 24.2600 1,240.00
Pasir pasang m³ 0.7720 170,000.00
Besi angker diameter 8 kg 0.2800 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 179 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 180 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
18 Pemasangan 1 m² dinding conblock HB15 campuran 1 SP : 3 PP
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3200 85,000.00
Tukang batu L.02 OH 0.1200 120,000.00
Kepala Tukang L.03 OH 0.0120 150,000.00
Mandor L.04 OH 0.0160 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
HB-15 biji 12.5000 -
Semen portland kg 22.7400 1,240.00
Pasir pasang m³ 0.5500 170,000.00
Besi angker diameter 8 kg 0.2800 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3200 85,000.00
Tukang batu L.02 OH 0.1200 120,000.00
Kepala Tukang L.03 OH 0.0120 150,000.00
Mandor L.04 OH 0.0160 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
HB-15 biji 12.5000 -
Semen portland kg 18.2000 1,240.00
Pasir pasang m³ 0.5820 170,000.00
Besi angker diameter 8 kg 0.2800 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 181 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
HB-10 biji 12.5000 -
Semen portland kg 15.1600 1,240.00
Pasir pasang m³ 0.3640 170,000.00
Besi angker diameter 8 kg 0.2800 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 -
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
HB-10 biji 12.5000 -
Semen portland kg 12.1300 1,240.00
Pasir pasang m³ 0.3880 170,000.00
Besi angker diameter 8 kg 0.2800 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 182 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
22 Pemasangan 1 m² dinding Batako buntu dan batako berlubang 1 SP : 4 PP
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 85,000.00
Tukang batu L.02 OH 0.100 120,000.00
Kepala Tukang L.03 OH 0.010 150,000.00
Mandor L.04 OH 0.015 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batako buntu biji 12.500 2,000.00
Batako lubang biji 12.500 2,900.00
Semen portland kg 7.5000 1,240.00
Pasir pasang m³ 0.0286 170,000.00
Besi angker diameter 8 kg 1.9500 -
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Jumlah (A + B + C)
F. Harga Satuan Pekerjaan (D+E) batako buntu
G Harga Satuan Pekerjaan ( D+E)batako lubang
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata rooster biji 36.0000 10,000.00
Semen portland kg 14.0000 1,240.00
Pasir pasang m³ 0.0350 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 183 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
23 Pemasangan 1 m² dinding kerawang (rooster) 12x11x24 campuran 1 SP : 4 PP
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata berongga biji 36.0000 10,000.00
Semen portland kg 12.8000 1,240.00
Pasir pasang m³ 0.0350 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0750 85,000.00
Tukang batu L.02 OH 0.0750 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0100 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Roster kerawang pc 20x20 biji 25.0000 -
Semen portland kg 14.0000 1,240.00
Pasir pasang m³ 0.0320 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 184 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 15.5040 1,240.00
2.PP m³ 0.0160 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 10.2240 1,240.00
2.PP m³ 0.0200 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 185 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.03 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 7.7760 1,240.00
2.PP m³ 0.0230 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.03 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 6.2400 1,240.00
2.PP m³ 0.0240 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 186 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.03 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 5.1840 1,240.00
2.PP m³ 0.0260 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.03 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 4.4160 1,240.00
2.PP m³ 0.0270 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 187 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.03 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 3.9000 1,240.00
2.PP m³ 0.0260 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.03 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 3.4560 1,240.00
2.PP m³ 0.0200 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 188 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3600 85,000.00
Tukang batu L.03 OH 0.1200 120,000.00
Kepala Tukang L.03 OH 0.0120 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 5.7600 1,240.00
2.KP m³ 0.0030 10,000.00
2.PP m³ 0.0130 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3600 85,000.00
Tukang batu L.03 OH 0.1200 120,000.00
Kepala Tukang L.03 OH 0.0120 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 3.0000 1,240.00
2.KP m³ 0.0050 10,000.00
2.PP m³ 0.0200 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 189 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3600 85,000.00
Tukang batu L.03 OH 0.1200 120,000.00
Kepala Tukang L.03 OH 0.0120 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1.SM kg 0.0090 15,000.00
2.KP m³ 0.0090 10,000.00
2.PP m³ 0.0090 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3600 85,000.00
Tukang batu L.03 OH 0.1200 120,000.00
Kepala Tukang L.03 OH 0.0120 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1.SM kg 0.0070 15,000.00
2.Mill m³ 0.0070 10,000.00
2.PP m³ 0.0150 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 190 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
13 Pemasangan 1 m² plesteran 1 SP : 1 PP tebal 20 mm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang batu L.03 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0220 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1.PC Kg 13.6320 1,240.00
2.PP m³ 0.0270 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2600 85,000.00
Tukang batu L.03 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1.PC Kg 10.3680 1,240.00
2.PP m³ 0.0310 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 191 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang batu L.03 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0220 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1.PC Kg 8.3200 1,240.00
2.PP m³ 0.0320 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang batu L.03 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0220 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1.PC Kg 6.9120 1,240.00
2.PP m³ 0.0350 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 192 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang batu L.03 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0220 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1.PC Kg 5.8880 1,240.00
2.PP m³ 0.0360 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4400 85,000.00
Tukang batu L.03 OH 0.2200 120,000.00
Kepala Tukang L.03 OH 0.0220 150,000.00
Mandor L.04 OH 0.0220 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1.SM kg 0.0090 15,000.00
2.Mill m³ 0.0090 10,000.00
3.PP m³ 0.0180 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 193 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.03 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
1. PC kg 5.1840 1,240.00
2.PP m³ 0.0260 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0800 85,000.00
Tukang batu L.03 OH 0.4000 120,000.00
Kepala Tukang L.03 OH 0.0400 150,000.00
Mandor L.04 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen PC Kg 0.5000 1,240.00
Pasir pasang m³ 0.0013 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 194 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4500 85,000.00
Tukang batu L.03 OH 0.2250 120,000.00
Kepala Tukang L.03 OH 0.0230 150,000.00
Mandor L.04 OH 0.0230 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen PC Kg 10.0000 1,240.00
Batu granit Kg 15.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4500 85,000.00
Tukang batu L.03 OH 0.2250 120,000.00
Kepala Tukang L.03 OH 0.0230 150,000.00
Mandor L.04 OH 0.0230 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen PC Kg 10.0000 1,240.00
Batu traso Kg 15.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 195 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
23 Pemasangan 1 m² plesteran ciprat 1SP : 2PP
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.03 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen PC Kg 4.3200 1,240.00
PP kg 0.0060 238,000,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan SNI
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang batu L.03 OH 0.0750 120,000.00
Kepala Tukang L.03 OH 0.0080 150,000.00
Mandor L.04 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen PC Kg 3.1080 1,240.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 196 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 0.0700 85,000.00
Tukang batu L.03 OH 0.0350 120,000.00
Kepala Tukang L.03 OH 0.0040 150,000.00
Mandor L.04 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen PC Kg 1.6000 1,240.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.3000 85,000.00
Tukang batu L.03 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen PC Kg 6.3400 1,240.00
Pasir pasang m³ 0.0120 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 85,000.00
Tukang batu L.03 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0100 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Semen PC Kg 3.2500 1,240.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E) Semen
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 197 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
IX HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.1250 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin abu-abu Bh 6.6300 -
Semen Portland Kg 9.8000 1,240.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.1250 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin abu-abu Bh 11.8700 -
Semen Portland Kg 10.0000 1,240.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 198 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2700 85,000.00
Tukang batu L.02 OH 0.1350 120,000.00
Kepala Tukang L.03 OH 0.0140 150,000.00
Mandor L.04 OH 0.0140 160,000.00
JUMLAH TENAGA KERJA
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.1250 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin warna Bh 6.6300 -
Semen Portland Kg 9.8000 1,240.00
Semen warna Kg 1.3000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 199 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
5 Pemasangan 1 m² lantai ubin warna ukuran 30 cmx 30 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2600 85,000.00
Tukang batu L.02 OH 0.1300 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin warna Bh 11.8700 -
Semen Portland Kg 10.0000 1,240.00
Semen warna Kg 1.5000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2700 85,000.00
Tukang batu L.02 OH 0.1350 120,000.00
Kepala Tukang L.03 OH 0.0140 150,000.00
Mandor L.04 OH 0.0140 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin warna Bh 26.5000 -
Semen Portland Kg 10.4000 1,240.00
Semen warna Kg 1.6200 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 200 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 201 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
7 Pemasangan 1 m² lantai ubin teraso ukuran 40 cmx 40 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.1250 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin teraso Bh 6.6300 -
Semen Portland Kg 9.8000 1,240.00
Semen warna Kg 1.3000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2600 85,000.00
Tukang batu L.02 OH 0.1300 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin teraso Bh 11.8700 -
Semen Portland Kg 10.0000 1,240.00
Semen warna Kg 1.5000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 202 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
9 Pemasangan 1 m² lantai ubin granit ukuran 40 cmx 40 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.1250 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin granit m2 6.6300 -
Semen Portland Kg 9.8000 1,240.00
Semen warna Kg 1.3000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2600 85,000.00
Tukang batu L.02 OH 0.1300 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin granit Bh 11.8700 -
Semen Portland Kg 10.0000 1,240.00
Semen warna Kg 1.5000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 203 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
11 Pemasangan 1 m² lantai ubin teralux marmer ukuran 40 cmx 40 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.1250 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin teralux Bh 6.6300 -
Semen Portland Kg 9.8000 1,240.00
Semen warna Kg 1.3000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2600 85,000.00
Tukang batu L.02 OH 0.1300 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin teralux Bh 11.8700 -
Semen Portland Kg 10.0000 1,240.00
Semen warna Kg 1.5000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 204 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
13 Pemasangan 1 m² lantai ubin teralux marmer ukuran 60 cmx 60 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2400 85,000.00
Tukang batu L.02 OH 0.1200 120,000.00
Kepala Tukang L.03 OH 0.0120 150,000.00
Mandor L.04 OH 0.0120 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin teralux Bh 3.1000 -
Semen Portland Kg 9.6000 1,240.00
Semen warna Kg 1.5000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.1250 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin teralux Bh 9.6300 -
Semen Portland Kg 9.8000 1,240.00
Semen warna Kg 1.3000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 205 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2600 85,000.00
Tukang batu L.02 OH 0.1300 120,000.00
Kepala Tukang L.03 OH 0.0130 150,000.00
Mandor L.04 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin teralux Bh 11.8700 -
Semen Portland Kg 10.0000 1,240.00
Semen warna Kg 1.5000 15,000.00
Pasir pasang M³ 0.0755 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 1%xD
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint ubin PC Bh 5.3000 -
Semen Portland Kg 1.5500 1,240.00
Pasir pasang M³ 0.0035 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 206 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint ubin PC Bh 3.5300 -
Semen Portland Kg 1.2400 1,240.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint ubin PC Bh 2.6500 -
Semen Portland Kg 1.2400 1,240.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 207 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
19 Pemasangan 1 m' plint ubin warna ukuran 10 cmx 20 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint ubin warna Bh 2.6500 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0750 85,000.00
Tukang batu L.02 OH 0.0300 120,000.00
Kepala Tukang L.03 OH 0.0030 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint ubin warna m1 1.1000 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 208 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 209 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
21 Pemasangan 1 m' plint ubin warna ukuran 10 cmx 40 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint ubin warna Bh 2.6500 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint ubin teraso Bh 3.5300 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 210 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
23 Pemasangan 1 m' plint ubin teraso ukuran 10 cmx 40 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint ubin teraso Bh 2.6500 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint ubin granit Bh 2.6500 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 211 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
25 Pemasangan 1 m' plint ubin granit ukuran 10 cmx 30 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plin Ubin Granit bh 3.5300 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint teralux kerang Bh 2.6300 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 212 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint teralux kerang Bh 3.5300 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint teralux kerang Bh 1.7000 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 213 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint teralux marmer Bh 2.6500 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint teralux marmer Bh 3.5300 -
Semen Portlan Kg 1.1400 1,240.00
Semen warna Kg 0.1000 15,000.00
Pasir pasang M³ 0.0030 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 214 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3600 85,000.00
Tukang batu L.02 OH 0.1800 120,000.00
Kepala Tukang L.03 OH 0.0180 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Teraso cor kg 0.3600 -
Semen warna Kg 0.1000 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin keramik Bh 53.0000 -
Semen Portlan Kg 8.1900 1,240.00
Pasir pasang M³ 0.0755 170,000.00
Semen warna Kg 2.7500 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 215 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin keramik Bh 106.0000 -
Semen Portlan Kg 8.1900 1,240.00
Pasir pasang M³ 0.0755 170,000.00
Semen warna Kg 3.2000 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Ubin keramik Doos 1.0500 60,000.00
Semen Portlan Kg 10.0000 1,240.00
Pasir pasang M³ 0.0450 170,000.00
Semen warna Kg 0.5000 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 216 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Keramik 30 x30 Doos 1.0500 50,000.00
Semen Portlan Kg 10.0000 1,240.00
Pasir pasang M³ 0.0450 170,000.00
Semen warna Kg 0.5000 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Overhead & Profit 10 % x D
H. Harga Satuan Pekerjaan (D+F) Keramik 40 x 40 Keramik
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Keramik 20 x 20 cm Doos 1.0500 55,000.00
Semen Portlan Kg 10.4000 1,240.00
Pasir pasang M³ 0.0450 170,000.00
Semen warna Kg 0.5000 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Overhead & Profit 10 % x D
H. Harga Satuan Pekerjaan (D+F) Keramik
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 217 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0600 85,000.00
Tukang batu L.02 OH 0.5250 120,000.00
Kepala Tukang L.03 OH 0.0753 150,000.00
Mandor L.04 OH 0.0753 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Keramik 10 x 40 cm Bh 33.0000 -
Semen Portlan Kg 9.8000 1,240.00
Pasir pasang M³ 0.0450 170,000.00
Semen warna Kg 4.3700 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 218 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint keramik 10 x 20 Bh 5.3000 1,100.00
Semen Portlan Kg 1.1400 1,240.00
Pasir pasang M³ 0.0030 170,000.00
Semen warna Kg 0.0250 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Overhead & Profit 10 % x D
I Harga Satuan Pekerjaan (E+G) plint keramik 10 x 20
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 219 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
41 Pemasangan 1 m' plint keramik ukuran 5 cm x 20 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0900 85,000.00
Tukang batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plint keramik Bh 5.3000 550.00
Semen Portlan Kg 0.5700 1,240.00
Pasir pasang M³ 0.0015 170,000.00
Semen warna Kg 0.0130 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Marmer Bh 1.0600 -
Semen Portlan Kg 8.1900 1,240.00
Pasir pasang M³ 0.0755 170,000.00
Semen warna Kg 0.6500 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 220 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1700 85,000.00
Tukang kayu L.02 OH 0.1700 120,000.00
Kepala Tukang L.03 OH 0.0170 150,000.00
Mandor L.04 OH 0.0090 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Karpet m² 1.0500 -
Lem Kg 0.3500 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang kayu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Parquet m² 1.0500 -
Lem Kg 0.6000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 221 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
45 Pemasangan 1 m² lantai kayu gymfloor
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang kayu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Parquet m² 1.0500 -
Lem Kg 0.6000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Tukang batu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Porselin Bh 86.0000 -
Semen portlan Kg 9.3000 1,240.00
Pasir pasang M³ 0.0180 170,000.00
Semen warna Kg 1.5000 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 222 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 223 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
47 Pemasangan 1 m² dinding porselin 10 cm x 20 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.9000 85,000.00
Tukang batu L.02 OH 0.4500 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0755 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Porselin Bh 53.0000 -
Semen portlan Kg 9.3000 1,240.00
Pasir pasang M³ 0.0180 170,000.00
Semen warna Kg 2.7500 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.9000 85,000.00
Tukang batu L.02 OH 0.4500 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0755 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Porselin Bh 26.0000 -
Semen portlan Kg 9.3000 1,240.00
Pasir pasang M³ 0.0180 170,000.00
Semen warna Kg 1.9400 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 224 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
49 Pemasangan 1 m² dinding keramik artistik 10 cm x 20 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.9000 85,000.00
Tukang batu L.02 OH 0.4500 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0755 160,000.00
Mandor L.05 OH 0.0755 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Keramik artistik bh 54.0000 -
Semen portlan Kg 9.3000 1,240.00
Pasir pasang M³ 0.0180 170,000.00
Semen warna Kg 2.7500 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.9000 85,000.00
Tukang batu L.02 OH 0.4500 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0755 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Keramik artistik Bh 106.0000 -
Semen portlan Kg 9.3000 1,240.00
Pasir pasang M³ 0.0180 170,000.00
Semen warna Kg 2.9000 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 225 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.9000 85,000.00
Tukang batu L.02 OH 0.4500 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0755 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Keramik artistik Bh 53.0000 -
Semen portlan Kg 9.3000 1,240.00
Pasir pasang M³ 0.0180 170,000.00
Semen warna Kg 2.7500 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.9000 85,000.00
Tukang batu L.02 OH 0.4500 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0755 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Keramik artistik Bh 26.5000 -
Semen portlan Kg 10.0000 1,240.00
Pasir pasang M³ 0.0180 170,000.00
Semen warna Kg 1.9400 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 226 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 1.3000 85,000.00
Tukang batu L.02 OH 0.6500 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0755 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Marmer Bh 1.0600 -
Semen portlan Kg 12.4400 1,240.00
Pasir pasang M³ 0.0250 170,000.00
Semen warna Kg 0.6500 15,000.00
Paku 12 cm Bh 3.0300 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Tukang batu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata pelapis kelas 2 Bh 63.0000 1,200.00
Semen portlan Kg 12.4400 1,240.00
Pasir pasang M³ 0.0250 170,000.00
Semen warna Kg 2.7500 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 227 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
55 Pemasangan 1 m² dinding batu paras
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu paras Bh 1.1000 -
Semen portlan Kg 11.7500 1,240.00
Pasir pasang M³ 0.0350 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.7000 85,000.00
Tukang batu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Batu tempel hitam m3 1.1000 -
Semen portlan Kg 11.7500 1,240.00
Pasir pasang M³ 0.0350 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0013 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Paving block 6 cm m2 1.0100 90,000.00
Pasir Beton m3 0.0500 139,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0013 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Paving block 6 cm m2 1.0100 100,000.00
Pasir Beton m3 0.0500 139,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0013 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Paving block 8 cm m2 1.0100 110,000.00
Pasir Beton m3 2.0700 139,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang batu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0013 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Paving block 8 cm m2 1.0100 125,000.00
Pasir Beton m3 2.0700 139,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 229 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
1 Pemasangan 1 m² langit-langit asbes 1 x 1 m/3.2 ( tanpa rangka ) semen tebal 4 mm, 5 mm, 6 mm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0300 85,000.00
Tukang kayu L.02 OH 0.0700 135,000.00
Kepala Tukang L.03 OH 0.0070 150,000.00
Mandor L.04 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Asbes semen 1,8 x 0,8 tebal 4 mm M² 1.1000 36,000.00
Paku tripleks Kg 0.0100 20,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 230 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang kayu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Akustik 60 X 60 Lembar 1.5000 -
Paku tripleks Kg 0.0750 20,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E) Akustik 60 x 120
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 231 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
3 Pemasangan 1 m² langit-langit gypsum board ukuran (120 x 240 x 9 )mm, tebal 9 mm tanpa rangka
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang kayu L.02 OH 0.0750 135,000.00
Kepala Tukang L.03 OH 0.0050 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
gypsum board M³ 0.3640 81,800.00
Paku skrup Kg 0.1100 17,500.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 232 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
4 Pemasangan 1 m² langit-langit lambrisering kayu , tebal 9 mm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.8000 85,000.00
Tukang kayu L.02 OH 0.8000 135,000.00
Kepala Tukang L.03 OH 0.0800 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu papan M³ 0.0150 5,544,500.00
Paku tripleks Kg 0.0100 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 85,000.00
Tukang kayu L.02 OH 0.3500 120,000.00
Kepala Tukang L.03 OH 0.0350 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
rangka metal hallow 40.40.2mm m1 4.0000 6,250.00
assesoris (perkutatan, las dll ) Ls 0.1100 25,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
E. Jumlah (A + B + C)
F. Overhead & Profit 10 % x D
G. Harga Satuan Pekerjaan rangka hallow
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 233 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
8 Pemasangan 1 m² langit-langit akustik ukuran (60 x 120) cm, berikut rangka alluminium
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.5000 85,000.00
Tukang besi L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0250 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Profil allum " T " m 3.6000 -
Kawat diameter 4 mm Kg 0.1500 -
Ramset Buah 1.0500 -
Akustik 60 x 120 Lembar 1.5000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0750 85,000.00
Tukang kayu L.02 OH 0.0750 135,000.00
Kepala Tukang L.03 OH 0.0050 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
List kayu m1 1.0500 5,125.00
Paku Kg 0.0100 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Overhead & Profit 10 % x D
H. Harga Satuan Pekerjaan (D+E) list kayu
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 234 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang kayu L.03 OH 0.0750 120,000.00
Kepala Tukang L.11 OH 0.0075 150,000.00
Mandor L.15 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Genteng kodok Bh 25.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Overhead & Profit 10 % x D
H. Harga Satuan Pekerjaan (D+F) Pas. Genteng Kodok
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 235 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang kayu L.03 OH 0.0750 120,000.00
Kepala Tukang L.11 OH 0.0080 150,000.00
Mandor L.15 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Genteng plentong Bh 25.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang kayu L.03 OH 0.2000 135,000.00
Kepala Tukang L.11 OH 0.0200 150,000.00
Mandor L.15 OH 0.0020 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Genteng bubung Bh 5.0000 -
Semen portlan Kg 8.0000 1,240.00
Pasir pasang M³ 0.0320 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 236 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang kayu L.03 OH 0.2000 120,000.00
Kepala Tukang L.11 OH 0.0200 150,000.00
Mandor L.15 OH 0.0020 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bubungan Genteng Kodok Bh 5.0000 5,200.00
Semen portland Kg 8.0000 1,240.00
Pasir pasang M³ 0.0320 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Overhead & Profit 10 % x D
H. Harga Satuan Pekerjaan (D+F) Bubungan Kodok
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang kayu L.03 OH 0.2000 120,000.00
Kepala Tukang L.11 OH 0.0200 150,000.00
Mandor L.15 OH 0.0020 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Genteng bubung Bh 5.0000 3,000.00
Semen portlan Kg 8.0000 1,240.00
Pasir pasang M³ 0.0320 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 237 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1400 85,000.00
Tukang kayu L.03 OH 0.0757 120,000.00
Kepala Tukang L.11 OH 0.0070 150,000.00
Mandor L.15 OH 0.0070 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Roof light 90 x 180 Lbr 0.6000 -
Paku biasa ½" - 1" Kg 0.0750 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1400 85,000.00
Tukang kayu L.03 OH 0.0700 120,000.00
Kepala Tukang L.11 OH 0.0070 150,000.00
Mandor L.15 OH 0.0070 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Asbes gelombang Lbr 0.7500 36,000.00
Paku pancing 6x23 Kg 0.1200 18,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 238 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0840 85,000.00
Tukang kayu L.03 OH 0.1250 135,000.00
Kepala Tukang L.11 OH 0.0130 150,000.00
Mandor L.15 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bubung steel gelombang Lbr 2.4000 -
Paku skrup 3,5 " Bh 6.0000 500.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0840 85,000.00
Tukang kayu L.03 OH 0.1250 120,000.00
Kepala Tukang L.11 OH 0.0130 150,000.00
Mandor L.15 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Seng Plat Lebar 0,90 M lbr 1.2000 30,000.00
Sekrup Kalisiboard Bh 6.0000 500.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 239 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
11 Pemasangan 1 m' nok genteng metal polos
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 85,000.00
Tukang kayu L.03 OH 0.1000 120,000.00
Kepala Tukang L.11 OH 0.0010 150,000.00
Mandor L.15 OH 0.0010 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Nok genteng metal Lbr 1.0200 -
Paku Reng kg 0.2000 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1660 85,000.00
Tukang kayu L.03 OH 0.2500 135,000.00
Kepala Tukang L.11 OH 0.0250 150,000.00
Mandor L.15 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Sirap kayu Bh 30.0000 -
Paku biasa ½"- 1 " Kg 0.2000 #REF!
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang kayu L.03 OH 0.2000 120,000.00
Kepala Tukang L.11 OH 0.0200 150,000.00
Mandor L.15 OH 0.0200 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Nok genteng beton Bh 3.5000
Paku biasa ½"- 1 " Kg 0.0750
Sirap kayu bh 60.0000 -
Paku biasa ½"- 1 " kg 0.2000 17,000.000
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 240 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 241 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
13 Pemasangan 1 m' nok atap sirap
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1250 85,000.00
Tukang kayu L.03 OH 0.2500 120,000.00
Kepala Tukang L.11 OH 0.0250 150,000.00
Mandor L.15 OH 0.0060 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Seng plat 3 x 6 BJLS 28 lbr 0.4000 -
Paku biasa 2 - 5 kg 0.0750 17,000.00
kayu papan 3cm M3 0.0040 10,000,000.00
Paku biasa ½"- 1 " Kg 0.0750 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang kayu L.03 OH 0.1500 120,000.00
Kepala Tukang L.11 OH 0.0150 150,000.00
Mandor L.15 OH 0.0130 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Genteng Metal 80 x 77,6 ( pasir) Bh 1.6100 -
Paku biasa ½"- 1 " Kg 0.0750 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 242 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Peladen tukang batu L.01 OH 0.2000 85,000.00
Tukang batu L.03 OH 0.1000 120,000.00
Kepala Tukang L.11 OH 0.0100 150,000.00
Mandor L.15 OH 0.0100 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Genteng Beton Duco Munir bh 11.0000 -
Paku Reng Kg 0.0300 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Peladen tukang batu L.01 OH 0.4000 85,000.00
Tukang batu L.03 OH 0.2000 120,000.00
Kepala Tukang L.11 OH 0.0200 150,000.00
Mandor L.15 OH 0.0200 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Nok Genteng beton bh 3.5000 -
Paku biasa ½"- 1 " kg 0.0750 17,000.00
semen pc kg 10.8000 1,240.00
Pasir pasang m3 0.0320 170,000.00
Semen warna Kg 1.0000 15,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 243 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 244 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1200 85,000.00
Tukang kayu L.03 OH 0.0600 120,000.00
Kepala Tukang L.11 OH 0.0060 150,000.00
Mandor L.15 OH 0.0060 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Seng gelombang 3" x 6" bjls 28 Lbr 0.7000 -
Paku biasa ½"- 1 " Kg 0.0200 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang kayu L.03 OH 0.0700 120,000.00
Kepala Tukang L.11 OH 0.0070 150,000.00
Mandor L.15 OH 0.0060 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Seng gelombang 3" x 6" bjls 28 Lbr 0.3000 -
Paku biasa ½"- 1 " Kg 0.0750 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 245 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
18 Pemasangan 1 m' atap aluminium/spandek 3mm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang kayu L.03 OH 0.7500 120,000.00
Kepala Tukang L.11 OH 0.0800 150,000.00
Mandor L.15 OH 0.0060 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
spandek 3mm Lbr 1.0500 32,000.00
paku pancing Kg 0.0200 18,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang kayu L.03 OH 1.0000 120,000.00
Kepala Tukang L.11 OH 0.0100 150,000.00
Mandor L.15 OH 0.0500 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Nok standard 40x18 Bh 1.2000 48,000.00
Paku hak panjang 15 cm Kg 0.0400 18,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang kayu L.03 OH 0.0500 120,000.00
Kepala Tukang L.11 OH 0.0050 150,000.00
Mandor L.15 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Aluminium foil M² 1.0500 5,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 246 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
XII. HARGA SATUAN PEKERJAAN KAYU
1 Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela , kayu klas I.
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 7.0000 85,000.00
Tukang kayu L.03 OH 21.0000 120,000.00
Kepala Tukang L.03 OH 2.1000 150,000.00
Mandor L.04 OH 0.3500 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Balok kayu M3 1.1000 9,000,000.00
paku 10 cm Kg 1.2500 17,000.000
Lem kayu Kg 1.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
2 Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela , kayu klas II
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 6.0000 85,000.00
Tukang kayu L.03 OH 18.0000 120,000.00
Kepala Tukang L.03 OH 1.8000 150,000.00
Mandor L.04 OH 0.3000 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Balok kayu M3 1.2000 7,762,300.00
paku 10 cm Kg 1.2500 17,000.000
Lem kayu Kg 1.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 247 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3500 85,000.00
Tukang kayu L.03 OH 1.0500 120,000.00
Kepala Tukang L.03 OH 0.1050 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu kelas 2 M³ 0.0400 7,762,300.00
Paku 5 - 7 cm Kg 0.0500 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
4 Pembuatan dan pemasangan 1 m² daun pintu panel, kayu klas I atau kelas II
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 85,000.00
Tukang kayu L.03 OH 3.0000 120,000.00
Kepala Tukang L.03 OH 0.3000 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu kelas 1 M³ 0.0400 10,000,000.00
Lem kayu Kg 0.5000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 248 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
5 Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu klas I atau klas II
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.8000 85,000.00
Tukang kayu L.03 OH 2.4000 120,000.00
Kepala Tukang L.03 OH 0.2400 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu M³ 0.0300 10,000,000.00
Lem kayu Kg 0.3000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 249 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
6 Pembuatan 1 m² daun pintu teakwood rangkap , rangka kayu klas I atau klas 2
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.8000 85,000.00
Tukang kayu L.03 OH 2.4000 120,000.00
Kepala Tukang L.03 OH 0.2400 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu kelas 1 M³ 0.0250 10,000,000.00
Paku 1 cm - 2,5 cm Kg 0.0300 18,000.000
Lem kayu Kg 0.3000 -
teakwood tebal 2.7 mm ukuran (90x220) cm Lbr 1.0000 90,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
7 Pembuatan 1 m² daun pintu plywood rangkap , rangka expose kayu klas I atau II
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6000 85,000.00
Tukang kayu L.03 OH 2.0000 120,000.00
Kepala Tukang L.03 OH 0.2000 150,000.00
Mandor L.04 OH 0.0300 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu klas 1 M³ 0.0256 10,000,000.00
Paku 1 cm - 2,5 cm Kg 0.0300 18,000.000
Lem kayu Kg 0.5000 -
Playwood tebal 4 mm ukuran (90x220) cm Lbr 1.0000 65,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 250 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 12.5% x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 251 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
11 Pemasangan 1 m² teakwood rangkap, rangka expose kayu klas I atau klas 2
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.8000 85,000.00
Tukang kayu L.03 OH 2.4000 120,000.00
Kepala Tukang L.03 OH 0.2400 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu klas 1 M³ 0.0250 10,000,000.00
Paku 1 cm - 2,5 cm Kg 0.0300 18,000.000
Lem kayu Kg 0.3000 -
Teakwood 4 mm 90 x 220 Lbr 1.0000 105,100.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.8500 85,000.00
Tukang kayu L.03 OH 2.5500 120,000.00
Kepala Tukang L.03 OH 0.2550 150,000.00
Mandor L.04 OH 0.0753 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu klas 2 M³ 0.0250 7,762,300.00
Paku 1 cm - 2,5 cm Kg 0.0300 18,000.000
Lem kayu Kg 0.8000 -
Teakwood 4 mm 90 x 220 Lbr 1.0000 90,000.00
Formika Lbr 0.5000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 252 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
13 Pemasangan 1 m³ konstruksi kuda-kuda konvensional, kayu klas I , II , dan III
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 4.0000 85,000.00
Tukang kayu L.03 OH 12.0000 120,000.00
Kepala Tukang L.03 OH 1.2000 150,000.00
Mandor L.04 OH 0.2000 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Balok kayu kelas I M³ 1.1000 8,500,000.00
Balok Kayu kelas II M3 1.1000 7,587,200.00
Balok Kayu kelas III m3 1.1000 5,136,000.00
Besi strip tebal 5 mm Kg 15.0000 25,700.00
Paku 12 cm Kg 5.6000 17,000.000
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Jumlah (A + B + C)
F. Jumlah (A + B + C)
G. Overhead & Profit 10 % x D
H. Overhead & Profit 10 % x D
I. Overhead & Profit 10 % x D
J. Harga Satuan Pekerjaan (D) kayu kamper
K. Harga Satuan Pekerjaan (E) kayu kruing
L. Harga Satuan Pekerjaan ( F ) kayu meranti
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 6.7000 85,000.00
Tukang kayu L.03 OH 20.1000 120,000.00
Kepala Tukang L.03 OH 2.0100 150,000.00
Mandor L.04 OH 0.3350 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Balok kayu kelas 1 M³ 1.2000 8,500,000.00
Balok Kayu kelas II M3 1.2000 7,587,200.00
Balok Kayu Kelas III M3 1.2000 5,136,000.00
Besi strip tebal 5 mm Kg 15.0000 25,700.00
Paku 12 cm Kg 5.6000 17,000.000
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 253 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
E. Jumlah (A + B + C)
F. Jumlah (A + B + C)
G. Overhead & Profit 10 % x D
H. Overhead & Profit 10 % x D
I. Overhead & Profit 10 % x D
J. Harga Satuan Pekerjaan (D) kayu kamper
K. Harga Satuan Pekerjaan ( E) kayu kruing
L. Harga Satuan Pekerjaan (F) kayu meranti
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 254 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
15 Pemasangan 1 m2 rangka atap genteng keramik kayu klas II
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang kayu L.03 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Reng Kayu Kruing M³ 0.0140 7,003,600.00
Reng kayu kruing m3 0.0360 7,003,600.00
Paku biasa "2 - 5 " Kg 0.2500 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang kayu L.03 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu Kamper M³ 0.0140 7,800,000.00
Reng kayu kamper m3 0.0570 7,500,000.00
Paku biasa "2 - 5 " kg 0.2500 17,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 255 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1200 85,000.00
Tukang kayu L.03 OH 0.1200 120,000.00
Kepala Tukang L.03 OH 0.0120 150,000.00
Mandor L.04 OH 0.0060 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu klas II M³ 0.0140 7,003,600.00
Paku 5 - 10 cm Kg 0.0570 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 256 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang kayu L.03 OH 0.3000 120,000.00
Kepala Tukang L.03 OH 0.0300 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
kayu usuk kelas 2 M³ 0.0154 7,003,600.00
Paku 7 cm - 10 cm Kg 0.2000 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 85,000.00
Tukang kayu L.03 OH 0.3000 120,000.00
Kepala Tukang L.03 OH 0.0300 150,000.00
Mandor L.04 OH 0.0100 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kayu usuk kelas 2 M³ 0.0163 7,003,600.00
Paku 7 cm - 10 cm Kg 0.2500 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 257 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang kayu L.03 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu M³ 0.0108 10,000,000.00
Paku 5 cm dan 7 cm Kg 0.0500 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang kayu L.03 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu M³ 0.0110 -
Paku 5 cm dan 7 cm Kg 0.0500 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 0
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 258 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
22 Pemasangan 1 m² rangka dinding pemisah , kayu kelas II atau III
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang kayu L.03 OH 0.4500 120,000.00
Kepala Tukang L.03 OH 0.0755 150,000.00
Mandor L.04 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Balok kayu 6 x 12 kamper M³ 0.0280 7,587,200.00
Paku 5 dan 10 cm Kg 0.1500 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 85,000.00
Tukang kayu L.03 OH 0.6000 120,000.00
Kepala Tukang L.03 OH 0.0600 150,000.00
Mandor L.04 OH 0.0100 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Balok kayu 6 x 12 kamper M³ 0.0200 7,587,200.00
Paku 5 dan 10 cm Kg 0.1500 17,000.000
Plywood 4 mm Lbr 0.8600 65,000.00
Lem kayu Kg 0.5600 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 259 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
24 Pemasangan 1 m² dinding lambrisering dari papan kayu kelas I atau kelas 2
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.6000 85,000.00
Tukang kayu L.03 OH 1.8000 120,000.00
Kepala Tukang L.03 OH 0.1800 150,000.00
Mandor L.04 OH 0.0300 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Papan kayu M³ 0.0070 10,000,000.00
Paku 5 dan 10 cm Kg 0.1000 17,000.000
Paku skrup 10 cm Kg 0.1500 17,500.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0250 85,000.00
Tukang kayu L.03 OH 0.0750 120,000.00
Kepala Tukang L.03 OH 0.0080 150,000.00
Mandor L.04 OH 0.0010 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plywood 4mm Lbr 0.4000 65,000.00
Paku 1 dan 2,5 Kg 0.0500 17,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 260 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Tukang kayu L.03 OH 0.0750 120,000.00
Kepala Tukang L.03 OH 0.0050 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bilik bambu M² 1.5000 30,000.00
Kayu bekisting M³ 0.0140 2,000,000.00
Paku 1 dan 2,5 Kg 0.0120 17,000.000
List kayu 2/4 M² 0.0030 20,500.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 261 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
XIII. HARGA SATUAN PEKERJAAN KUNCI DAN KACA
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0100 85,000.00
Tukang kayu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kunci Tanam 2 Slaag biasa Bh 1.0000 87,600.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0050 85,000.00
Tukang kayu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kunci tanam kamar mandi Bh 1.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 262 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 263 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
3 Pemasangan 1 buah kunci lemari
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0250 85,000.00
Tukang kayu L.02 OH 0.2500 120,000.00
Kepala Tukang L.03 OH 0.0250 150,000.00
Mandor L.04 OH 0.0013 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kunci lemari SET 1.0000 20,000.00
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0050 85,000.00
Tukang kayu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kunci silinder Bh 1.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 264 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 265 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0150 85,000.00
Tukang kayu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0008 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Engsel pintu Kupu - Kupu ps 1.0000 20,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0100 85,000.00
Tukang kayu L.02 OH 0.0752 120,000.00
Kepala Tukang L.03 OH 0.0010 150,000.00
Mandor L.04 OH 0.0005 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Engsel kupu-kupu ps 1.0000 14,600.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 266 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
7 Pemasangan 1 buah engsel angin
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0100 85,000.00
Tukang kayu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0005 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Engsel Angin ps 1.0000 20,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0200 85,000.00
Tukang kayu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0010 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
kuci slot bh 1.0000 324,900.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 267 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 268 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
9 Pemasangan 1 buah kait angin
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0150 85,000.00
Tukang kayu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0008 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kait angin ps 1.0000 6,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0150 85,000.00
Tukang kayu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Spring knip bh 1.0000 106,000.00
JUMLAH HARGA BAHAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0200 85,000.00
Tukang kayu L.02 OH 0.2000 120,000.00
Kepala Tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0010 160,000.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 269 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 270 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0500 85,000.00
Tukang kayu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Door holder Bh 1.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0500 85,000.00
Tukang kayu L.02 OH 0.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0003 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Door closer Bh 1.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 271 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
13 Pemasangan 1 buah rel pintu sorong
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0600 85,000.00
Tukang kayu L.02 OH 0.5500 120,000.00
Kepala Tukang L.03 OH 0.0600 150,000.00
Mandor L.04 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Rel pintu sorong Bh 1.0000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10% x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0250 85,000.00
Tukang kayu L.02 OH 0.2500 120,000.00
Kepala Tukang L.03 OH 0.0250 150,000.00
Mandor L.04 OH 0.0013 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kunci lemari Bh 1.0000 20,000.00
JUMLAH HARGA BAHAN
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0150 85,000.00
Tukang kayu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0008 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kaca tebal 3mm Bh 1.1000 125,000.00
Sealant Kg 0.0500 20,000.00
JUMLAH HARGA BAHAN
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 272 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 273 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0150 85,000.00
Tukang kayu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0008 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kaca tebal 5 mm m2 1.1000 136,000.00
Sealant Kg 0.0500 20,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0170 85,000.00
Tukang kayu L.02 OH 0.1700 120,000.00
Kepala Tukang L.03 OH 0.0170 150,000.00
Mandor L.04 OH 0.0009 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kaca tebal 8 mm Bh 1.1000 -
Sealant Kg 0.0700 20,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 274 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0250 85,000.00
Tukang kayu L.02 OH 0.2500 120,000.00
Kepala Tukang L.03 OH 0.0250 150,000.00
Mandor L.04 OH 0.0013 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kaca buram 12 mm m2 1.1000 -
Sealant Kg 0.0700 20,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0150 85,000.00
Tukang kayu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kaca cermin 5 mm M² 1.1000 200,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 275 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0170 85,000.00
Tukang kayu L.02 OH 0.1700 120,000.00
Kepala Tukang L.03 OH 0.0170 150,000.00
Mandor L.04 OH 0.0090 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kaca cermin 8 mm M² 1.1000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0150 85,000.00
Tukang kayu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kaca wireglassed 5 mm M² 1.1000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 276 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0750 85,000.00
Tukang kayu L.02 OH 0.1500 120,000.00
Kepala Tukang L.03 OH 0.0150 150,000.00
Mandor L.04 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kaca patri 5 mm M² 1.1000 -
Sealant Kg 0.0750 20,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0250 85,000.00
Tukang kayu L.02 OH 0.2500 120,000.00
Kepala Tukang L.03 OH 0.0250 150,000.00
Mandor L.04 OH 0.0013 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kaca buram 12 mm M² 1.0000 -
Sealant Kg 0.0750 20,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 277 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Soda api Kg 0.0500 20,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Sabun Kg 0.0500 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 278 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Mandor L.04 OH 0.0080 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Sabun Kg 0.0500 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
4 1 M² Pengecatan bidang kayu baru (1 lapis plamier, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0700 85,000.00
Tukang cat L.02 OH 0.0090 120,000.00
Kepala tukang L.03 OH 0.0060 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Cat menie Astek Kg 0.2000 -
Plamir kayu Kg 0.1500 35,000.00
Cat dasar / cat kayu emco Kg 0.1700 60,000.00
Cat penutup 2 x / cat kayu emco Kg 0.2600 60,000.00
Kuas bh 0.0100 5,000.00
Pengencer/thiner Kg 0.0300 20,000.00
Amplas Lbr 0.2000 3,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F Overhead & Profit 10 % x D
G. Harga Satuan Pekerjaan (D+F) Kayu Baru
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 279 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
5 Pengecatan 1 M² bidang kayu baru (1 lapis plamier, 1 lapis cat dasar, 3 lapis cat penutup)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0280 85,000.00
Tukang cat L.02 OH 0.0752 120,000.00
Kepala tukang L.03 OH 0.0040 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Cat menie Kg 0.2000 -
Plamier Kg 0.1500 35,000.00
Cat dasar Kg 0.1700 60,000.00
Cat penutup 3x Kg 0.3500 60,000.00
Kuas Kg 0.0100 5,000.00
Pengencer Kg 0.0300 20,000.00
Amplas Lbr 0.2000 3,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E) kayu baru
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0400 85,000.00
Tukang cat L.02 OH 0.0630 120,000.00
Kepala tukang L.03 OH 0.0630 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Teak oil Ltr 0.3600 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 280 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0400 85,000.00
Tukang cat L.02 OH 0.0600 120,000.00
Kepala tukang L.03 OH 0.0160 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Politur Muda Ltr 0.1500 77,700.00
Politur Ultra / jadi Ltr 0.3720 -
Amplas Lbr 2.0000 3,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 85,000.00
Mandor L.04 OH 0.0060 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Residu atau tear Ltr 0.3500 3,300.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 281 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1600 85,000.00
Tukang cat L.02 OH 0.1600 120,000.00
Kepala tukang L.03 OH 0.0160 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Vernis Ltr 0.1500 45,000.00
Dempul Kg 0.0500 35,000.00
Amplas Lbr 0.1000 3,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
10 Pengecatan 1 M² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0200 85,000.00
Tukang cat L.02 OH 0.0063 120,000.00
Kepala tukang L.03 OH 0.0063 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Plamir tembok Kg 0.1000 20,000.00
Cat tembok Vinilex Kg 0.1000 25,000.00
Cat penutup (vinilex) 2 x Kg 0.2600 25,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 282 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0280 85,000.00
Tukang cat L.02 OH 0.0420 120,000.00
Kepala tukang L.03 OH 0.0042 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Cat dasar/ cat vinilek Kg 0.1200 25,000.00
Cat penutup / cat vinilek Kg 0.1800 25,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0280 85,000.00
Tukang cat L.02 OH 0.0420 120,000.00
Kepala tukang L.03 OH 0.0042 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kalkarium Kg 0.1000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 283 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1500 85,000.00
Tukang cat L.02 OH 0.0010 120,000.00
Kepala tukang L.03 OH 0.0001 150,000.00
Mandor L.04 OH 0.0025 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kapur sirih Kg 0.1500
Amplas Lbr 0.1000 3,000.00
Alang-alang ikat 0.2500 52,300.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0400 85,000.00
Tukang cat L.02 OH 0.0050 120,000.00
Kepala tukang L.03 OH 0.0005 150,000.00
Mandor L.04 OH 0.0025 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kapur sirih Kg 0.3000 -
Amplas Lbr 0.2000 3,000.00
Alang-alang ikat 0.2500 52,300.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 284 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
15 Pemasangan 1 M² wallpaper
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0200 85,000.00
Tukang cat L.02 OH 0.2000 120,000.00
Kepala tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0025 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Wallpaper M² 1.2000 -
Lem Kg 0.2000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2000 85,000.00
Tukang cat L.02 OH 0.2000 120,000.00
Kepala tukang L.03 OH 0.0200 150,000.00
Mandor L.04 OH 0.0025 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Cat menie besi Kg 0.1000 35,000.00
Kuas Bh 0.0100 5,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.2500 85,000.00
Tukang cat L.02 OH 0.2500 120,000.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 285 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
B. BAHAN
Cat besi dasar/menie besi Kg 0.1000 35,000.00
Cat menie b Kg 0.1000 35,000.00
Cat besi emco Kg 0.0800 64,200.00
pengencer ltr 0.0100 20,000.00
kuas bh 0.0100 5,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
18 Pengecatan 1 M² permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
HARGA SATUAN
NO. URAIAN KODE KOEFISIEN
(Rp.)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 286 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
A. TENAGA
Pekerja L.01 OH 0.4000 85,000.00
Tukang cat L.02 OH 0.7000 120,000.00
Kepala tukang L.03 OH 0.0700 150,000.00
Mandor L.04 OH 0.0200 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Cat dasar Kg 0.3000 29,200.00
Pengencer Kg 0.0100 20,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 3.3000 85,000.00
Tukang Batu L.02 OH 1.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.1600 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Wastafel KIA Standard tempel Unit 1.000 400,000.000
Perlengkapan Ls 6 % x Closet 24,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 -
Tukang Batu L.02 OH 1.5000 120,000.00
Kepala Tukang L.03 OH 0.1500 150,000.00
Mandor L.04 OH 0.1600 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Closet jongkok standart Unit 1.000 100,000.000
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 287 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 288 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.0000 -
Tukang Batu L.02 OH 1.5000 120,000.00
Kepala Tukang L.03 OH 0.1500 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kloset jongkok " TOTO Type CE 6 COMPLIT Unit 1.000 -
Semen portland Kg 6.000 1,240.00
Pasir pasang M3 0.010 170,000.00
Bata merah Bh 7.000 1,200.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1000 -
Tukang Batu L.02 OH 1.0000 120,000.00
Kepala Tukang L.03 OH 0.1000 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Urinoir " KIA Unit 1.000 -
Semen portland Kg 6.000 1,240.00
Pasir pasang M3 0.010 170,000.00
Perlengkapan % 30.000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 289 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 1.2000 -
Tukang Batu L.02 OH 1.4500 120,000.00
Kepala Tukang L.03 OH 0.1500 150,000.00
Mandor L.04 OH 0.0750 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Wastafel KIA Unit 1.000 -
Semen portland Kg 0.600 1,240.00
Pasir pasang M3 0.010 170,000.00
Perlengkapan % 0.120 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0750 -
Tukang Batu L.02 OH 0.0750 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
tempat sabun Unit 1.000 50,000.000
semen portland kg 1.000 1,240.000
pasir pasang m3 0.005 170,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 290 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.3000 -
Tukang Batu L.02 OH 0.4500 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.9000 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bak mandi fibre glass Unit 1.000 250,000.000
Perlengkapan Ls 0.120 30,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 6.0000 -
Tukang Batu L.02 OH 3.0000 120,000.00
Kepala Tukang L.03 OH 0.3000 150,000.00
Mandor L.04 OH 0.0300 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah M3 150.000 1,200.000
Semen portland Kg 120.000 1,240.00
Pasir pasang M3 0.300 170,000.00
Porselin 11 x 11 Bh 360.000 -
Semen warna Kg 6.000 15,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 291 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 3.0000 -
Tukang Batu L.02 OH 4.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.9000 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bak fibreglass Unit 1.000 300,000.000
Perlengkapan Ls 12 % x bak 36,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 3.5000 -
Tukang Batu L.02 OH 4.5000 120,000.00
Kepala Tukang L.03 OH 0.0500 150,000.00
Mandor L.04 OH 0.0180 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Beton 1:2:3 M3 0.850 798,996.864
Baja tulangan Kg 180.000 9,100.000
Kayu bekisting M2 8.000 20,000.000
Ubin porselin Bh 500.000 1,886.792
Perlengkapan 10% 10.000 82,998.366
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 292 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0300 -
Tukang Batu L.02 OH 0.3000 120,000.00
Kepala Tukang L.03 OH 0.0300 150,000.00
Mandor L.04 OH 0.0150 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bak cuci piring Stenless steal Unit 1.000 150,000.000
Water drain Bh 1.000 5,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0750 -
Tukang Batu L.02 OH 0.3000 120,000.00
Kepala Tukang L.03 OH 0.0750 150,000.00
Mandor L.04 OH 0.0250 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bak cuci piring Unit 1.000 -
Water drain Bh 1.000 5,000.000
Semen portland Kg 20.000 1,240.00
Pasir pasang M3 0.075 170,000.00
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 293 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0100 -
Tukang Batu L.02 OH 0.1000 120,000.00
Kepala Tukang L.03 OH 0.0100 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Floor drain standart Unit 1.000 15,000.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 2.1600 -
Tukang Batu L.02 OH 0.7200 120,000.00
Kepala Tukang L.03 OH 0.0720 150,000.00
Mandor L.04 OH 0.0110 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah Bh 40.000 1,200.000
Semen portland Kg 44.000 1,240.00
Pasir pasang M3 0.070 170,000.00
Pasir beton M3 0.060 139,000.00
Kerikil M 3
0.070 211,300.00
Baja tulangan Kg 1.600
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 294 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
15 Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 3.2000 -
Tukang Batu L.02 OH 1.1500 120,000.00
Kepala Tukang L.03 OH 0.0110 150,000.00
Mandor L.04 OH 0.0160 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah Bh 70.000 1,200.000
Semen portland Kg 77.000 1,240.000
Pasir pasang M3 0.130 170,000.000
Pasir beton M3 0.090 139,000.000
Kerikil M 3
0.020 211,300.000
Baja tulangan Kg 2.600 9,100.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 3.2000 -
Tukang Batu L.02 OH 1.1500 120,000.00
Kepala Tukang L.03 OH 0.0110 150,000.00
Mandor L.04 OH 0.0160 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Bata merah Bh 123.000 1,200.000
Semen portland Kg 114.000 1,240.000
Pasir pasang M3 0.184 170,000.000
Pasir beton M3 0.120 139,000.000
Kerikil M 3
0.033 211,300.000
Baja tulangan Kg 4.850 9,100.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 295 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0540 -
Tukang Batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0270 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa galvanis ½ " M' 1.200 -
Perlengkapan 35% pipa Ls 35% x pipa -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0100 85,000.00
Tukang Batu L.02 OH 0.4000 120,000.00
Kepala Tukang L.03 OH 0.0400 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Kran air biasa Bh 1.000 25,000.000
Seal tape Bh 0.025 2,400.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 296 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0540 85,000.00
Tukang Batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0270 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa galvanis 3/4" M' 1.200 -
Perlengkapan 35% pipa ls 0.350 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0540 85,000.00
Tukang Batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0270 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa galvanis ¾" M' 1.200 47,500.000
Perlengkapan % 0.350 16,625.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 297 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1080 85,000.00
Tukang Batu L.02 OH 0.1800 120,000.00
Kepala Tukang L.03 OH 0.0180 150,000.00
Mandor L.04 OH 0.0050 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa galvanis 1½ " M' 1.200 87,500.000
Perlengkapan % 0.350 30,625.000
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1350 85,000.00
Tukang Batu L.02 OH 0.2250 120,000.00
Kepala Tukang L.03 OH 0.0230 150,000.00
Mandor L.04 OH 0.0070 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa galvanis 3" M' 1.200 -
Perlengkapan % 0.350 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 298 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.1350 85,000.00
Tukang Batu L.02 OH 0.2250 120,000.00
Kepala Tukang L.03 OH 0.0230 150,000.00
Mandor L.04 OH 0.0070 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa galvanis 4" M' 1.200 -
Perlengkapan 35% % 0.350 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0360 85,000.00
Tukang Batu L.02 OH 0.0600 120,000.00
Kepala Tukang L.03 OH 0.0060 150,000.00
Mandor L.04 OH 0.0020 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa PVC ½" M' 1.200 1,250.000
Perlengkapan % 0.350 437.500
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 299 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0360 85,000.00
Tukang Batu L.02 OH 0.0600 120,000.00
Kepala Tukang L.03 OH 0.0060 150,000.00
Mandor L.04 OH 0.0020 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa PVC ¾" M' 1.200 1,875.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0360 85,000.00
Tukang Batu L.02 OH 0.0600 120,000.00
Kepala Tukang L.03 OH 0.0060 150,000.00
Mandor L.04 OH 0.0020 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa PVC 1" M' 1.200 2,375.000
Perlengkapan % 0.350 831.250
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 300 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0540 85,000.00
Tukang Batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa PVC 1½" M' 1.200 6,650.000
Perlengkapan % 0.350 2,327.500
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0540 85,000.00
Tukang Batu L.02 OH 0.0900 120,000.00
Kepala Tukang L.03 OH 0.0090 150,000.00
Mandor L.04 OH 0.0030 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa PVC 2" M' 1.200 7,083.333
Perlengkapan % 0.350 2,479.167
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 301 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0810 85,000.00
Tukang Batu L.02 OH 0.1350 120,000.00
Kepala Tukang L.03 OH 0.0135 150,000.00
Mandor L.04 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa PVC 2½" M' 1.200 5,312.500
Perlengkapan % 0.350 1,859.375
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Pekerja L.01 OH 0.0810 85,000.00
Tukang Batu L.02 OH 0.1350 120,000.00
Kepala Tukang L.03 OH 0.0135 150,000.00
Mandor L.04 OH 0.0040 160,000.00
JUMLAH TENAGA KERJA
B. BAHAN
Pipa PVC 3" M' 1.200 -
Perlengkapan % 0.350 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
E. Overhead & Profit 10 % x D
F. Harga Satuan Pekerjaan (D+E)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 302 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
XVI. HARGA SATUAN PEKERJAAN LISTRIK
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Upah % 100.0000 -
JUMLAH TENAGA KERJA
B. BAHAN
Pipa listrik 5/8" btg 3.000 24,100.000
Kabel m1 24.000 9,000.000
T Dus bh 3.000 -
L bow bh 4.000 -
Las dop bh 3.000 -
Klem bh 24.000 -
Mongkok bh 1.000 -
Saklar bh 1.000 -
Fitting bh 1.000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Harga Satuan Pekerjaan
HARGA SATUAN
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.)
A. TENAGA
Upah % 100.0000 -
JUMLAH TENAGA KERJA
B. BAHAN
Pipa listrik 5/8" btg 3.000 -
Kabel m1 15.000 -
T Dus bh 1.000 -
L bow bh 2.000 -
Klem bh 24.000 -
MCB bh 1.000 -
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C)
F. Harga Satuan Pekerjaan
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 303 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
34,000.00
27,000.00
3,300.00
3,200.00
67,500.00
56,250.00
6,200.00
695.00
1,901.70
184,896.00
1,275.00
1,320.00
252,537.70
320,037.70
32,003.77
352,041.47
JUMLAH HARGA
(Rp.)
17,000.00
54,000.00
3,300.00
3,200.00
77,500.00
56,250.00
3,100.00
66,000.00
695.00
1,901.70
184,896.00
1,275.00
2,625.00
316,742.70
-
-
394,242.70
39,424.27
433,666.97
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 304 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 305 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
17,000.00
40,500.00
3,300.00
3,200.00
64,000.00
45,000.00
2,480.00
30,000.00
695.00
1,901.70
153.00
80,229.70
-
-
144,229.70
14,422.97
158,652.67
JUMLAH HARGA
(Rp.)
8,500.00
13,500.00
1,650.00
800.00
24,450.00
24,000.00
340.00
38,811.50
63,151.50
-
-
87,601.50
8,760.15
96,361.65
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 306 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 307 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
170,000.00
270,000.00
120,000.00
45,000.00
8,000.00
613,000.00
56,250.00
360,000.00
1,360.00
28,270.00
43,400.00
25,500.00
13,900.00
31,695.00
36,000.00
7,500.00
37,580.00
8,000.00
13,140.00
4,815.00
667,410.00
-
-
1,280,410.00
128,041.00
1,408,451.00
JUMLAH HARGA
(Rp.)
85,000.00
202,500.00
24,750.00
8,000.00
320,250.00
135,000.00
552,000.00
11,900.00
82,500.00
781,400.00
1,101,650.00
110,165.00
1,211,815.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 308 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
85,000.00
270,000.00
33,000.00
8,000.00
396,000.00
76,500.00
420,000.00
5,100.00
13,020.00
4,170.00
15,847.50
82,500.00
7,500.00
624,637.50
1,020,637.50
102,063.75
1,122,701.25
JUMLAH HARGA
(Rp.)
85,000.00
270,000.00
33,000.00
8,000.00
396,000.00
76,500.00
420,000.00
5,100.00
13,020.00
4,170.00
15,847.50
82,500.00
16,250.00
633,387.50
1,029,387.50
102,938.75
1,132,326.25
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 309 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 310 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
85,000.00
12,000.00
97,000.00
-
-
-
97,000.00
9,700.00
106,700.00
JUMLAH HARGA
(Rp.)
85,000.00
270,000.00
33,000.00
8,000.00
396,000.00
10,000.00
2,790.00
12,790.00
408,790.00
40,879.00
449,669.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 311 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
40,500.00
4,950.00
45,450.00
199,602.00
35,000.00
1,360.00
235,962.00
281,412.00
28,141.20
309,553.20
JUMLAH HARGA
(Rp.)
85,000.00
8,000.00
93,000.00
32,250.00
19,350.00
1,700.00
53,300.00
-
-
146,300.00
14,630.00
160,930.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 312 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,133,390.00
106,560.00
1,239,950.00
-
-
1,239,950.00
123,995.00
1,363,945.00
JUMLAH HARGA
(Rp.)
566,695.00
53,280.00
619,975.00
619,975.00
61,997.50
681,972.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 313 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,392.00
540.00
300.00
12,032.00
19,264.00
-
-
-
-
19,264.00
1,926.40
21,190.40
JUMLAH HARGA
(Rp.)
31,875.00
16,875.00
1,800.00
3,040.00
53,590.00
-
-
55,800.00
10,286.00
30,849.80
96,935.80
150,525.80
15,052.58
165,578.38
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 314 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 315 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
63,750.00
4,000.00
67,750.00
67,750.00
6,775.00
74,525.00
JUMLAH HARGA
(Rp.)
76,500.00
7,200.00
83,700.00
83,700.00
8,370.00
92,070.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 316 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
89,250.00
10,720.00
99,970.00
99,970.00
9,997.00
109,967.00
JUMLAH HARGA
(Rp.)
85,000.00
5,120.00
90,120.00
-
-
90,120.00
9,012.00
99,132.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 317 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
85,000.00
5,120.00
90,120.00
-
-
90,120.00
9,012.00
99,132.00
JUMLAH HARGA
(Rp.)
102,000.00
7,200.00
109,200.00
109,200.00
10,920.00
120,120.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 318 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
4,250.00
800.00
5,050.00
5,050.00
505.00
5,555.00
JUMLAH HARGA
(Rp.)
28,050.00
1,600.00
29,650.00
29,650.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 319 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 320 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
44,200.00
7,872.00
52,072.00
52,072.00
5,207.20
57,279.20
JUMLAH HARGA
(Rp.)
42,500.00
8,000.00
50,500.00
50,500.00
5,050.00
55,550.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 321 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
42,500.00
12,000.00
54,500.00
54,500.00
5,450.00
59,950.00
JUMLAH HARGA
(Rp.)
25,500.00
1,600.00
27,100.00
90,000.00
90,000.00
117,100.00
11,710.00
128,810.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 322 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
12,750.00
2,400.00
15,150.00
90,000.00
90,000.00
105,150.00
10,515.00
115,665.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 323 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
21,250.00
4,000.00
25,250.00
126,000.00
126,000.00
151,250.00
15,125.00
166,375.00
JUMLAH HARGA
(Rp.)
21,250.00
4,000.00
25,250.00
101,880.00
101,880.00
127,130.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 324 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
127,500.00
90,000.00
11,250.00
12,000.00
240,750.00
258,000.00
250,480.00
82,450.00
590,930.00
831,680.00
83,168.00
914,848.00
JUMLAH HARGA
(Rp.)
127,500.00
90,000.00
11,250.00
12,000.00
240,750.00
258,000.00
202,120.00
88,400.00
548,520.00
789,270.00
78,927.00
868,197.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 325 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
127,500.00
90,000.00
11,250.00
12,000.00
240,750.00
258,000.00
168,640.00
92,480.00
519,120.00
759,870.00
75,987.00
835,857.00
JUMLAH HARGA
(Rp.)
127,500.00
90,000.00
11,250.00
12,000.00
240,750.00
258,000.00
145,080.00
95,370.00
498,450.00
739,200.00
73,920.00
813,120.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 326 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
60% beton campuran 1 sp : 2 ps : 3 Kr dan 40 % batu kali
JUMLAH HARGA
(Rp.)
289,000.00
102,000.00
12,750.00
27,200.00
430,950.00
103,200.00
240,560.00
43,368.00
98,888.40
1,146,600.00
29,700.00
1,662,316.40
2,093,266.40
209,326.64
2,302,593.04
JUMLAH HARGA
(Rp.)
127,500.00
90,000.00
11,250.00
12,000.00
240,750.00
258,000.00
1,700.00
210.80
57,800.00
317,710.80
558,460.80
55,846.08
614,306.88
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 327 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
127,500.00
90,000.00
11,250.00
12,000.00
240,750.00
258,000.00
75,640.00
1,470.00
83,640.00
418,750.00
659,500.00
65,950.00
725,450.00
JUMLAH HARGA
(Rp.)
127,500.00
90,000.00
11,250.00
12,000.00
240,750.00
258,000.00
50,840.00
1,310.00
88,910.00
399,060.00
-
-
639,810.00
63,981.00
703,791.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 328 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
66,300.00
46,800.00
5,850.00
6,240.00
125,190.00
258,000.00
32,400.00
290,400.00
-
-
415,590.00
41,559.00
457,149.00
JUMLAH HARGA
(Rp.)
255,000.00
63,600.00
11,325.00
1,600.00
331,525.00
86,000.00
248,000.00
41,700.00
84,520.00
637,000.00
41,040.00
1,138,260.00
1,469,785.00
146,978.50
1,616,763.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 329 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
204,000.00
96,000.00
12,000.00
19,040.00
331,040.00
96,750.00
240,560.00
43,368.00
98,888.40
479,566.40
810,606.40
81,060.64
891,667.04
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 330 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
140,250.00
33,000.00
4,200.00
13,280.00
190,730.00
306,280.00
86,279.29
117,271.50
25,800.00
535,630.79
726,360.79
72,636.08
798,996.86
JUMLAH HARGA
(Rp.)
140,250.00
33,000.00
4,200.00
13,280.00
190,730.00
342,240.00
82,208.57
118,797.56
25,800.00
569,046.13
759,776.13
75,977.61
835,753.74
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 331 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
140,250.00
33,000.00
4,200.00
13,280.00
190,730.00
370,760.00
79,329.29
119,384.50
25,800.00
595,273.79
786,003.79
78,600.38
864,604.16
JUMLAH HARGA
(Rp.)
102,000.00
24,000.00
3,000.00
12,000.00
141,000.00
285,200.00
88,662.14
120,558.39
24,000.00
518,420.53
659,420.53
65,942.05
725,362.58
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 332 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
140,250.00
33,000.00
4,200.00
13,280.00
190,730.00
404,240.00
75,457.14
120,793.17
25,800.00
626,290.31
817,020.31
81,702.03
898,722.34
JUMLAH HARGA
(Rp.)
140,250.00
33,000.00
4,200.00
13,280.00
190,730.00
436,480.00
72,577.86
121,027.94
25,800.00
655,885.80
846,615.80
84,661.58
931,277.38
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 333 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
140,250.00
33,000.00
4,200.00
13,280.00
190,730.00
460,040.00
69,301.43
122,906.17
25,800.00
678,047.60
868,777.60
86,877.76
955,655.35
JUMLAH HARGA
(Rp.)
140,250.00
33,000.00
4,200.00
13,280.00
190,730.00
476,160.00
68,705.71
121,967.06
25,800.00
692,632.77
883,362.77
88,336.28
971,699.05
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 334 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
140,250.00
33,000.00
4,200.00
13,280.00
190,730.00
503,440.00
67,911.43
120,441.00
25,800.00
717,592.43
908,322.43
90,832.24
999,154.67
JUMLAH HARGA
(Rp.)
140,250.00
33,000.00
4,200.00
13,280.00
190,730.00
512,120.00
67,613.57
119,854.06
25,800.00
725,387.63
916,117.63
91,611.76
1,007,729.39
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 335 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
178,500.00
42,000.00
5,250.00
16,800.00
242,550.00
544,360.00
66,521.43
118,093.22
25,800.00
754,774.65
997,324.65
99,732.47
1,097,057.12
JUMLAH HARGA
(Rp.)
178,500.00
42,000.00
5,250.00
16,800.00
242,550.00
555,520.00
66,223.57
117,388.89
25,800.00
764,932.46
1,007,482.46
100,748.25
1,108,230.71
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 336 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
178,500.00
42,000.00
5,250.00
16,800.00
242,550.00
496,000.00
66,720.00
169,040.00
-
731,760.00
974,310.00
97,431.00
1,071,741.00
JUMLAH HARGA
(Rp.)
5,950.00
8,400.00
1,050.00
640.00
16,040.00
95,550.00
2,475.00
98,025.00
114,065.00
11,406.50
125,471.50
12,547.15
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 337 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,375.00
9,000.00
750.00
480.00
16,605.00
95,550.00
1,650.00
97,200.00
113,805.00
11,380.50
125,185.50
JUMLAH HARGA
(Rp.)
2,125.00
3,000.00
3,750.00
160.00
9,035.00
201,600.00
1,650.00
203,250.00
212,285.00
21,228.50
233,513.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 338 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
44,200.00
31,200.00
3,900.00
4,160.00
83,460.00
150,000.00
5,100.00
-
155,100.00
238,560.00
23,856.00
262,416.00
JUMLAH HARGA
(Rp.)
44,200.00
31,200.00
3,900.00
4,160.00
83,460.00
151,000.00
5,100.00
-
156,100.00
239,560.00
23,956.00
263,516.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 339 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
56,100.00
39,600.00
4,950.00
5,280.00
105,930.00
150,000.00
6,800.00
-
-
28,000.00
90,000.00
274,800.00
380,730.00
38,073.00
418,803.00
JUMLAH HARGA
(Rp.)
56,100.00
39,600.00
4,950.00
5,280.00
105,930.00
150,000.00
6,800.00
-
-
28,000.00
90,000.00
274,800.00
380,730.00
38,073.00
418,803.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 340 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 341 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
56,100.00
39,600.00
4,950.00
5,280.00
105,930.00
150,000.00
6,800.00
-
77,040.00
28,000.00
270,000.00
531,840.00
637,770.00
63,777.00
701,547.00
JUMLAH HARGA
(Rp.)
-
39,600.00
4,950.00
5,280.00
49,830.00
60,000.00
6,800.00
-
102,720.00
28,000.00
135,000.00
-
332,520.00
382,350.00
38,235.00
420,585.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 342 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
56,100.00
39,600.00
5,445.00
5,280.00
106,425.00
60,000.00
6,800.00
-
77,040.00
28,000.00
90,000.00
261,840.00
368,265.00
36,826.50
405,091.50
JUMLAH HARGA
(Rp.)
140,250.00
30,000.00
3,750.00
12,800.00
186,800.00
270,320.00
285,696.00
72,280.00
164,814.00
507,414.00
522,790.00
694,214.00
709,590.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 343 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
140,250.00
30,000.00
3,750.00
12,800.00
186,800.00
478,640.00
65,330.00
164,814.00
708,784.00
895,584.00
JUMLAH HARGA
(Rp.)
15,300.00
2,400.00
2,400.00
2,400.00
900.00
1,440.00
24,840.00
4,000.00
170.00
-
27,300.00
7,425.00
4,960.00
834.00
1,901.70
46,590.70
71,430.70
7,143.07
78,573.77
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 344 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
3,960.00
3,960.00
3,960.00
1,500.00
2,400.00
15,780.00
6,000.00
340.00
-
32,760.00
1,237.50
6,820.00
1,251.00
3,169.50
51,578.00
-
-
67,358.00
6,735.80
74,093.80
JUMLAH HARGA
(Rp.)
14,450.00
12,312.00
4,096.00
30,858.00
52,825.00
-
8,500.00
61,325.00
-
-
92,183.00
9,218.30
101,401.30
JUMLAH HARGA
(Rp.)
-
1,882,072.50
1,007,729.39
2,889,801.89
-
-
2,889,801.89
288,980.19
3,178,782.08
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 345 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,312,080.00
1,568,393.75
-
798,996.86
835,753.74
864,604.16
898,722.34
931,277.38
955,655.35
971,699.05
999,154.67
1,007,729.39
1,097,057.12
1,108,230.71
3,679,470.61
3,716,227.49
3,745,077.91
3,779,196.09
3,811,751.13
3,836,129.10
3,852,172.80
3,879,628.42
3,888,203.14
3,977,530.87
3,988,704.46
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 346 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
3,364,680.00
1,882,072.50
-
798,996.86
835,753.74
864,604.16
898,722.34
931,277.38
955,655.35
971,699.05
999,154.67
1,007,729.39
1,097,057.12
1,108,230.71
6,045,749.36
6,082,506.24
6,111,356.66
6,145,474.84
6,178,029.88
6,202,407.85
6,218,451.55
6,245,907.17
6,254,481.89
6,343,809.62
6,354,983.21
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 347 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,581,096.00
1,882,072.50
-
798,996.86
835,753.74
864,604.16
898,722.34
931,277.38
955,655.35
971,699.05
999,154.67
1,007,729.39
1,097,057.12
1,108,230.71
4,262,165.36
4,298,922.24
4,327,772.66
4,361,890.84
4,394,445.88
4,418,823.85
4,434,867.55
4,462,323.17
4,470,897.89
4,560,225.62
4,571,399.21
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 348 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
4,762,082.80
449,669.00
1,380,186.50
-
798,996.86
835,753.74
864,604.16
898,722.34
931,277.38
955,655.35
971,699.05
999,154.67
1,007,729.39
1,097,057.12
1,108,230.71
7,390,935.16
7,427,692.04
7,456,542.46
7,490,660.64
7,523,215.68
7,547,593.65
7,563,637.34
7,591,092.97
7,599,667.69
7,688,995.41
7,700,169.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 349 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
4,188,030.00
2,195,751.25
-
798,996.86
835,753.74
864,604.16
898,722.34
931,277.38
955,655.35
971,699.05
999,154.67
1,007,729.39
1,097,057.12
1,108,230.71
7,182,778.11
7,219,534.99
7,248,385.41
7,282,503.59
7,315,058.63
7,339,436.60
7,355,480.30
7,382,935.92
7,391,510.64
7,480,838.37
7,492,011.96
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 350 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
3,299,744.65
202,351.05
2,509,430.00
-
798,996.86
835,753.74
864,604.16
898,722.34
931,277.38
955,655.35
971,699.05
999,154.67
1,007,729.39
1,097,057.12
1,108,230.71
6,810,522.56
6,847,279.44
6,876,129.86
6,910,248.04
6,942,803.08
6,967,181.05
6,983,224.75
7,010,680.37
7,019,255.09
7,108,582.81
7,119,756.41
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 351 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
2,835,640.50
1,380,186.50
-
798,996.86
835,753.74
864,604.16
898,722.34
931,277.38
955,655.35
971,699.05
999,154.67
1,007,729.39
1,097,057.12
1,108,230.71
5,014,823.86
5,051,580.74
5,080,431.16
5,114,549.34
5,147,104.38
5,171,482.35
5,187,526.05
5,214,981.67
5,223,556.39
5,312,884.12
5,324,057.71
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 352 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
11,220.00
2,640.00
300.00
1,120.00
15,280.00
32,339.20
6,036.57
9,663.45
2,064.00
50,103.22
65,383.22
6,538.32
71,921.55
JUMLAH HARGA
(Rp.)
8,500.00
1,200.00
450.00
1,120.00
11,270.00
34,720.00
5.39
8.95
2,580.00
37,314.34
48,584.34
4,858.43
53,442.77
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 353 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
16,830.00
3,960.00
450.00
1,600.00
22,840.00
39,828.80
9,054.86
14,495.18
3,096.00
66,474.84
89,314.84
8,931.48
98,246.32
JUMLAH HARGA
(Rp.)
21,080.00
9,012.00
600.00
2,080.00
32,772.00
60,636.00
11,318.57
18,118.98
3,870.00
93,943.55
126,715.55
12,671.55
139,387.10
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 354 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
595.00
9,120.00
1,200.00
160.00
11,075.00
160,000.00
-
12,500.00
9,600.00
6,380.00
-
188,480.00
199,555.00
19,955.50
219,510.50
JUMLAH HARGA
(Rp.)
340.00
4,560.00
600.00
160.00
5,660.00
12,500.00
9,036.00
6,380.00
-
27,916.00
33,576.00
3,357.60
36,933.60
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 355 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,409.00
29,280.00
15,360.00
5,100.00
11,680.00
67,829.00
67,829.00
6,782.90
74,611.90
JUMLAH HARGA
(Rp.)
6,451.50
29,040.00
16,560.00
5,550.00
11,680.00
69,281.50
69,281.50
6,928.15
76,209.65
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 356 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,383.50
25,560.00
14,640.00
4,950.00
11,680.00
63,213.50
63,213.50
6,321.35
69,534.85
JUMLAH HARGA
(Rp.)
6,434.50
9,084.00
16,080.00
11,355.00
12,112.00
55,065.50
-
-
-
-
-
55,065.50
5,506.55
60,572.05
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 357 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
9,012.00
14,640.00
18,024.00
18,024.00
11,265.00
12,016.00
82,981.00
-
-
-
-
-
82,981.00
8,298.10
91,279.10
JUMLAH HARGA
(Rp.)
7,055.00
9,960.00
-
19,920.00
19,920.00
12,450.00
13,280.00
82,585.00
-
-
-
-
-
82,585.00
8,258.50
90,843.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 358 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,615.00
4,560.00
4,560.00
4,560.00
15,295.00
-
-
-
-
15,295.00
1,529.50
16,824.50
JUMLAH HARGA
(Rp.)
1,615.00
4,560.00
4,560.00
4,560.00
15,295.00
-
-
-
-
15,295.00
1,529.50
16,824.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 359 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,615.00
4,560.00
4,560.00
4,560.00
15,295.00
-
-
-
-
15,295.00
1,529.50
16,824.50
JUMLAH HARGA
(Rp.)
18,000,000.00
42,000.00
18,000,000.00
18,000,000.00
1,800,000.00
19,800,000.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 360 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
44,040.00
11,100.00
5,920.00
61,060.00
61,060.00
6,106.00
67,166.00
JUMLAH HARGA
(Rp.)
12,495.00
17,640.00
2,250.00
800.00
20,690.00
30,000.00
31,049.20
4,488.00
65,537.20
86,227.20
8,622.72
94,849.92
JUMLAH HARGA
(Rp.)
18,700.00
26,400.00
33,000.00
1,760.00
61,160.00
61,160.00
6,116.00
67,276.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 361 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,375.00
9,000.00
900.00
480.00
10,380.00
17,115.00
17,115.00
27,495.00
2,749.50
30,244.50
JUMLAH HARGA
(Rp.)
6,375.00
9,000.00
900.00
480.00
16,755.00
-
-
-
-
6,300.00
6,300.00
6,300.00
6,300.00
6,300.00
23,055.00
23,055.00
23,055.00
23,055.00
2,305.50
230.55
23.06
2.31
25,360.50
23,285.55
23,078.06
23,057.31
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 362 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
8,500.00
12,000.00
150.00
800.00
12,950.00
-
-
-
-
-
12,950.00
1,295.00
14,245.00
JUMLAH HARGA
(Rp.)
89,250.00
126,000.00
15,750.00
12,032.00
243,032.00
2,368,500.00
-
-
2,368,500.00
-
-
2,611,532.00
261,153.20
2,872,685.20
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 363 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,375.00
2,400.00
300.00
320.00
9,395.00
-
-
-
-
-
-
9,395.00
939.50
10,334.50
JUMLAH HARGA
(Rp.)
55,250.00
78,000.00
11,325.00
5,120.00
149,695.00
-
-
20,669.00
20,669.00
170,364.00
17,036.40
187,400.40
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 364 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
102,000.00
144,000.00
18,000.00
960.00
264,960.00
-
-
264,960.00
26,496.00
291,456.00
JUMLAH HARGA
(Rp.)
85,000.00
120,000.00
15,000.00
12,000.00
232,000.00
321,000.00
321,000.00
553,000.00
55,300.00
608,300.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 365 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,800.00
96,000.00
12,000.00
640.00
115,440.00
-
-
115,440.00
11,544.00
126,984.00
JUMLAH HARGA
(Rp.)
6,375.00
19,125.00
645.00
6,080.00
32,225.00
-
-
3,850.00
3,855.00
7,705.00
7,705.00
39,930.00
3,993.00
43,923.00
43,923.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 366 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
10,200.00
11,475.00
1,275.00
672.00
23,622.00
256,960.00
375,220.00
632,180.00
655,802.00
65,580.20
721,382.20
JUMLAH HARGA
(Rp.)
10,200.00
11,475.00
1,350.00
800.00
23,825.00
528,000.00
262,800.00
51,400.00
842,200.00
866,025.00
86,602.50
952,627.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 367 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
-
5,250.00
2,880.00
8,130.00
-
-
8,130.00
813.00
8,943.00
JUMLAH HARGA
(Rp.)
-
141,950.00
25,050.00
13,280.00
180,280.00
158,748.90
1,354,000.00
1,512,748.90
1,693,028.90
169,302.89
1,862,331.79
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 368 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
8,500.00
12,000.00
1,500.00
800.00
22,800.00
-
555,500.00
44,101.20
599,601.20
622,401.20
62,240.12
684,641.32
JUMLAH HARGA
(Rp.)
17,000.00
24,000.00
3,000.00
160.00
44,160.00
206,690.00
-
179,900.00
386,590.00
430,750.00
43,075.00
473,825.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 369 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
17,000.00
24,000.00
3,000.00
160.00
44,160.00
-
255.00
147,483.70
147,738.70
191,898.70
19,189.87
211,088.57
JUMLAH HARGA
(Rp.)
12,750.00
36,000.00
4,500.00
1,280.00
54,530.00
-
170.00
12,850.00
13,020.00
67,550.00
6,755.00
74,305.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 370 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,375.00
54,000.00
3,750.00
208.00
64,333.00
10,000.00
255.00
105,345.50
115,600.50
179,933.50
179,933.50
JUMLAH HARGA
(Rp.)
21,250.00
30,000.00
3,750.00
2,080.00
57,080.00
25,000.00
25,000.00
50,000.00
107,080.00
10,708.00
117,788.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 371 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
62,390.00
88,080.00
10,950.00
5,920.00
167,340.00
-
-
167,340.00
16,734.00
184,074.00
JUMLAH HARGA
(Rp.)
64,634.00
91,248.00
11,400.00
6,080.00
173,362.00
-
-
173,362.00
17,336.20
190,698.20
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 372 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
51,000.00
24,000.00
3,000.00
480.00
78,480.00
210,000.00
53,940.00
13,600.00
277,540.00
356,020.00
35,602.00
391,622.00
JUMLAH HARGA
(Rp.)
56,100.00
24,000.00
3,000.00
4,800.00
87,900.00
210,000.00
40,858.00
15,470.00
266,328.00
354,228.00
35,422.80
389,650.80
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 373 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
56,100.00
24,000.00
3,000.00
4,800.00
87,900.00
210,000.00
32,922.00
15,810.00
258,732.00
346,632.00
34,663.20
381,295.20
JUMLAH HARGA
(Rp.)
51,000.00
24,000.00
3,000.00
4,800.00
82,800.00
210,000.00
27,528.00
17,340.00
254,868.00
337,668.00
33,766.80
371,434.80
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 374 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
56,100.00
24,000.00
3,000.00
4,800.00
87,900.00
210,000.00
22,940.00
20,740.00
253,680.00
341,580.00
34,158.00
375,738.00
JUMLAH HARGA
(Rp.)
51,000.00
24,000.00
3,000.00
4,800.00
82,800.00
210,000.00
12,499.20
15,725.00
275.00
238,499.20
321,299.20
32,129.92
353,429.12
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 375 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
105,000.00
23,498.00
6,460.00
134,958.00
176,358.00
17,635.80
193,993.80
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
105,000.00
17,818.80
12,750.00
135,568.80
176,968.80
17,696.88
194,665.68
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 376 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
105,000.00
14,260.00
12,801.00
132,061.00
173,461.00
17,346.10
190,807.10
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
105,000.00
11,780.00
12,750.00
129,530.00
170,930.00
17,093.00
188,023.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 377 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
105,000.00
10,316.80
12,886.00
128,202.80
169,602.80
16,960.28
186,563.08
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
105,000.00
8,060.00
12,750.00
125,810.00
167,210.00
16,721.00
183,931.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 378 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
(5x11x22) cm tebal ½ bata campuran 1 SM : 1 KP : 1 PP
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
105,000.00
22.32
180.00
3,060.00
108,262.32
149,662.32
14,966.23
164,628.55
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
105,000.00
210.00
140.00
4,760.00
110,110.00
151,510.00
15,151.00
166,661.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 379 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 380 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
29,750.00
18,000.00
2,250.00
2,880.00
52,880.00
-
37,596.80
123,760.00
-
161,356.80
214,236.80
21,423.68
235,660.48
JUMLAH HARGA
(Rp.)
29,750.00
18,000.00
2,250.00
2,880.00
52,880.00
-
30,082.40
131,240.00
-
161,322.40
214,202.40
21,420.24
235,622.64
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 381 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 382 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
27,200.00
14,400.00
1,800.00
2,560.00
45,960.00
-
28,197.60
93,500.00
-
121,697.60
167,657.60
16,765.76
184,423.36
JUMLAH HARGA
(Rp.)
27,200.00
14,400.00
1,800.00
2,560.00
45,960.00
-
22,568.00
98,940.00
-
121,508.00
167,468.00
16,746.80
184,214.80
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 383 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
-
18,798.40
61,880.00
-
80,678.40
122,078.40
12,207.84
134,286.24
JUMLAH HARGA
(Rp.)
-
12,000.00
1,500.00
2,400.00
15,900.00
-
15,041.20
65,960.00
-
81,001.20
96,901.20
9,690.12
106,591.32
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 384 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
25,000.00
36,250.00
9,300.00
4,862.00
-
39,162.00
50,412.00
80,562.00
91,812.00
80,562.00
91,812.00
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
360,000.00
17,360.00
5,950.00
383,310.00
424,710.00
42,471.00
467,181.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 385 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
360,000.00
15,872.00
5,950.00
381,822.00
423,222.00
42,322.20
465,544.20
JUMLAH HARGA
(Rp.)
6,375.00
9,000.00
1,500.00
1,600.00
18,475.00
-
17,360.00
5,440.00
22,800.00
41,275.00
4,127.50
45,402.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 386 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
19,224.96
2,720.00
21,944.96
70,094.96
7,009.50
77,104.46
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
12,677.76
3,400.00
16,077.76
64,227.76
6,422.78
70,650.54
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 387 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
9,642.24
3,910.00
13,552.24
61,702.24
6,170.22
67,872.46
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
7,737.60
4,080.00
11,817.60
59,967.60
5,996.76
65,964.36
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 388 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
6,428.16
4,420.00
10,848.16
58,998.16
5,899.82
64,897.98
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
5,475.84
4,590.00
10,065.84
58,215.84
5,821.58
64,037.42
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 389 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
4,836.00
4,420.00
9,256.00
57,406.00
5,740.60
63,146.60
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
4,285.44
3,400.00
7,685.44
55,835.44
5,583.54
61,418.98
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 390 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
30,600.00
14,400.00
1,800.00
2,880.00
49,680.00
7,142.40
30.00
2,210.00
9,382.40
59,062.40
5,906.24
64,968.64
JUMLAH HARGA
(Rp.)
30,600.00
14,400.00
1,800.00
2,880.00
49,680.00
3,720.00
50.00
3,400.00
7,170.00
56,850.00
5,685.00
62,535.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 391 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
30,600.00
14,400.00
1,800.00
2,880.00
49,680.00
135.00
90.00
1,530.00
1,755.00
51,435.00
5,143.50
56,578.50
JUMLAH HARGA
(Rp.)
30,600.00
14,400.00
1,800.00
2,880.00
49,680.00
105.00
70.00
2,550.00
2,725.00
52,405.00
5,240.50
57,645.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 392 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
34,000.00
24,000.00
3,000.00
3,520.00
64,520.00
16,903.68
4,590.00
21,493.68
86,013.68
8,601.37
94,615.05
JUMLAH HARGA
(Rp.)
22,100.00
24,000.00
3,000.00
2,080.00
51,180.00
12,856.32
5,270.00
18,126.32
69,306.32
6,930.63
76,236.95
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 393 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
34,000.00
24,000.00
3,000.00
3,520.00
64,520.00
10,316.80
5,440.00
15,756.80
80,276.80
8,027.68
88,304.48
JUMLAH HARGA
(Rp.)
34,000.00
24,000.00
3,000.00
3,520.00
64,520.00
8,570.88
5,950.00
14,520.88
79,040.88
7,904.09
86,944.97
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 394 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
34,000.00
24,000.00
3,000.00
3,520.00
64,520.00
7,301.12
6,120.00
13,421.12
77,941.12
7,794.11
85,735.23
JUMLAH HARGA
(Rp.)
37,400.00
26,400.00
3,300.00
3,520.00
70,620.00
135.00
90.00
3,060.00
3,285.00
73,905.00
7,390.50
81,295.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 395 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
6,428.16
4,420.00
10,848.16
58,998.16
5,899.82
64,897.98
JUMLAH HARGA
(Rp.)
6,800.00
48,000.00
6,000.00
640.00
61,440.00
620.00
221.00
841.00
62,281.00
6,228.10
68,509.10
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 396 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
38,250.00
27,000.00
3,450.00
3,680.00
72,380.00
12,400.00
-
12,400.00
84,780.00
8,478.00
93,258.00
JUMLAH HARGA
(Rp.)
38,250.00
27,000.00
3,450.00
3,680.00
72,380.00
12,400.00
-
12,400.00
84,780.00
8,478.00
93,258.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 397 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
25,500.00
12,000.00
1,500.00
2,400.00
41,400.00
5,356.80
1,428,000.00
1,433,356.80
1,474,756.80
1,474,756.80
Berdasarkan SNI
JUMLAH HARGA
(Rp.)
12,750.00
9,000.00
1,200.00
1,280.00
24,230.00
3,853.92
3,853.92
28,083.92
2,808.39
30,892.31
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 398 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
5,950.00
4,200.00
600.00
640.00
11,390.00
1,984.00
1,984.00
13,374.00
1,337.40
14,711.40
JUMLAH HARGA
(Rp.)
25,500.00
18,000.00
2,250.00
2,400.00
48,150.00
7,861.60
2,040.00
9,901.60
58,051.60
5,805.16
63,856.76
JUMLAH HARGA
(Rp.)
17,000.00
12,000.00
1,500.00
1,600.00
32,100.00
4,030.00
4,030.00
36,130.00
3,613.00
39,743.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 399 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
21,250.00
15,000.00
1,950.00
2,080.00
40,280.00
-
12,152.00
12,835.00
24,987.00
65,267.00
6,526.70
71,793.70
JUMLAH HARGA
(Rp.)
21,250.00
15,000.00
1,950.00
2,080.00
40,280.00
-
12,400.00
12,835.00
25,235.00
65,515.00
6,551.50
72,066.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 400 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
22,950.00
16,200.00
2,100.00
2,240.00
43,490.00
-
12,835.00
12,896.00
25,731.00
69,221.00
6,922.10
76,143.10
JUMLAH HARGA
(Rp.)
21,250.00
15,000.00
1,950.00
2,080.00
40,280.00
-
12,152.00
19,500.00
12,835.00
44,487.00
84,767.00
8,476.70
93,243.70
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 401 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
22,100.00
15,600.00
1,950.00
2,080.00
41,730.00
-
12,400.00
22,500.00
12,835.00
47,735.00
89,465.00
8,946.50
98,411.50
JUMLAH HARGA
(Rp.)
22,950.00
16,200.00
2,100.00
2,240.00
43,490.00
-
12,896.00
24,300.00
12,835.00
50,031.00
93,521.00
9,352.10
102,873.10
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 402 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 403 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
21,250.00
15,000.00
1,950.00
2,080.00
40,280.00
-
12,152.00
19,500.00
12,835.00
44,487.00
84,767.00
8,476.70
93,243.70
JUMLAH HARGA
(Rp.)
22,100.00
15,600.00
1,950.00
2,080.00
41,730.00
-
12,400.00
22,500.00
12,835.00
47,735.00
89,465.00
8,946.50
98,411.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 404 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
21,250.00
15,000.00
1,950.00
2,080.00
40,280.00
-
12,152.00
19,500.00
12,835.00
44,487.00
84,767.00
8,476.70
93,243.70
JUMLAH HARGA
(Rp.)
22,100.00
15,600.00
1,950.00
2,080.00
41,730.00
-
12,400.00
22,500.00
12,835.00
47,735.00
89,465.00
8,946.50
98,411.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 405 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
21,250.00
15,000.00
1,950.00
2,080.00
40,280.00
-
12,152.00
19,500.00
12,835.00
44,487.00
84,767.00
8,476.70
93,243.70
JUMLAH HARGA
(Rp.)
22,100.00
15,600.00
1,950.00
2,080.00
41,730.00
-
12,400.00
22,500.00
12,835.00
47,735.00
89,465.00
8,946.50
98,411.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 406 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
20,400.00
14,400.00
1,800.00
1,920.00
38,520.00
-
11,904.00
22,500.00
12,835.00
47,239.00
85,759.00
8,575.90
94,334.90
JUMLAH HARGA
(Rp.)
21,250.00
15,000.00
1,950.00
2,080.00
40,280.00
-
12,152.00
19,500.00
12,835.00
44,487.00
84,767.00
8,476.70
93,243.70
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 407 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
22,100.00
15,600.00
1,950.00
2,080.00
41,730.00
-
12,400.00
22,500.00
12,835.00
47,735.00
89,465.00
8,946.50
98,411.50
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,922.00
595.00
2,517.00
23,117.00
2,311.70
25,428.70
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 408 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,537.60
510.00
2,047.60
22,647.60
2,264.76
24,912.36
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,537.60
510.00
2,047.60
22,647.60
2,264.76
24,912.36
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 409 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
JUMLAH HARGA
(Rp.)
6,375.00
3,600.00
450.00
480.00
10,905.00
-
1,413.60
-
510.00
1,923.60
12,828.60
1,282.86
14,111.46
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 410 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 411 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 412 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 413 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 414 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 415 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
1,350.00
800.00
20,600.00
-
1,413.60
1,500.00
510.00
3,423.60
24,023.60
2,402.36
26,425.96
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 416 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
30,600.00
21,600.00
2,700.00
2,880.00
57,780.00
-
1,500.00
1,500.00
59,280.00
5,928.00
65,208.00
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
-
10,155.60
12,835.00
41,250.00
64,240.60
176,590.60
17,659.06
194,249.66
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 417 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
-
10,155.60
12,835.00
48,000.00
70,990.60
183,340.60
18,334.06
201,674.66
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
63,000.00
12,400.00
7,650.00
7,500.00
90,550.00
202,900.00
20,290.00
223,190.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 418 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
52,500.00
12,400.00
7,650.00
7,500.00
80,050.00
192,400.00
19,240.00
211,640.00
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
57,750.00
12,896.00
7,650.00
7,500.00
85,796.00
198,146.00
19,814.60
217,960.60
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 419 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
90,100.00
63,000.00
11,295.00
12,048.00
176,443.00
-
12,152.00
7,650.00
65,550.00
85,352.00
261,795.00
26,179.50
287,974.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 420 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
5,250.00
800.00
24,500.00
5,830.00
1,413.60
510.00
375.00
8,128.60
32,628.60
3,262.86
35,891.46
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 421 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,650.00
10,800.00
5,250.00
800.00
24,500.00
2,915.00
706.80
255.00
195.00
4,071.80
28,571.80
2,857.18
31,428.98
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
-
10,155.60
12,835.00
9,750.00
32,740.60
145,090.60
14,509.06
159,599.66
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 422 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
14,450.00
20,400.00
2,550.00
1,440.00
38,840.00
-
-
-
38,840.00
3,884.00
42,724.00
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
-
-
-
112,350.00
11,235.00
123,585.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 423 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
-
-
-
112,350.00
11,235.00
123,585.00
JUMLAH HARGA
(Rp.)
85,000.00
60,000.00
11,250.00
12,000.00
168,250.00
-
11,532.00
3,060.00
22,500.00
37,092.00
205,342.00
20,534.20
225,876.20
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 424 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 425 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
76,500.00
54,000.00
11,325.00
12,080.00
153,905.00
-
11,532.00
3,060.00
41,250.00
55,842.00
209,747.00
20,974.70
230,721.70
JUMLAH HARGA
(Rp.)
76,500.00
54,000.00
11,325.00
12,080.00
153,905.00
-
11,532.00
3,060.00
29,100.00
43,692.00
197,597.00
19,759.70
217,356.70
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 426 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
76,500.00
54,000.00
11,325.00
12,080.00
12,080.00
165,985.00
-
11,532.00
3,060.00
41,250.00
55,842.00
221,827.00
22,182.70
244,009.70
JUMLAH HARGA
(Rp.)
76,500.00
54,000.00
11,325.00
12,080.00
153,905.00
-
11,532.00
3,060.00
43,500.00
58,092.00
211,997.00
21,199.70
233,196.70
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 427 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
76,500.00
54,000.00
11,325.00
12,080.00
153,905.00
-
11,532.00
3,060.00
41,250.00
55,842.00
209,747.00
20,974.70
230,721.70
JUMLAH HARGA
(Rp.)
76,500.00
54,000.00
11,325.00
12,080.00
153,905.00
-
12,400.00
3,060.00
29,100.00
44,560.00
198,465.00
19,846.50
218,311.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 428 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
110,500.00
78,000.00
11,325.00
12,080.00
211,905.00
-
15,425.60
4,250.00
9,750.00
51,510.00
80,935.60
292,840.60
29,284.06
322,124.66
JUMLAH HARGA
(Rp.)
85,000.00
60,000.00
11,250.00
12,000.00
168,250.00
75,600.00
15,425.60
4,250.00
41,250.00
136,525.60
304,775.60
30,477.56
335,253.16
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 429 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
-
14,570.00
5,950.00
20,520.00
132,870.00
13,287.00
146,157.00
JUMLAH HARGA
(Rp.)
59,500.00
42,000.00
5,250.00
5,600.00
112,350.00
-
14,570.00
5,950.00
20,520.00
132,870.00
13,287.00
146,157.00
JUMLAH HARGA
(Rp.)
21,250.00
60,000.00
7,500.00
208.00
88,958.00
90,900.00
6,950.00
97,850.00
186,808.00
18,680.80
205,488.80
JUMLAH HARGA
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 430 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
(Rp.)
21,250.00
60,000.00
7,500.00
208.00
88,958.00
101,000.00
6,950.00
107,950.00
196,908.00
19,690.80
216,598.80
JUMLAH HARGA
(Rp.)
21,250.00
60,000.00
7,500.00
208.00
88,958.00
111,100.00
287,730.00
398,830.00
487,788.00
48,778.80
536,566.80
JUMLAH HARGA
(Rp.)
21,250.00
60,000.00
7,500.00
208.00
88,958.00
126,250.00
287,730.00
413,980.00
502,938.00
50,293.80
553,231.80
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 431 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
2,550.00
9,450.00
1,050.00
640.00
13,690.00
39,600.00
200.00
39,600.00
53,290.00
5,329.00
58,619.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 432 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
8,500.00
12,000.00
1,500.00
800.00
22,800.00
-
1,500.00
1,500.00
24,300.00
2,430.00
26,730.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 433 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
8,500.00
10,125.00
750.00
800.00
20,175.00
29,775.20
1,925.00
31,700.20
51,875.20
5,187.52
57,062.72
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 434 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
68,000.00
108,000.00
12,000.00
12,000.00
200,000.00
83,167.50
170.00
83,337.50
283,337.50
28,333.75
311,671.25
JUMLAH HARGA
(Rp.)
29,750.00
42,000.00
5,250.00
2,880.00
79,880.00
25,000.00
2,750.00
27,750.00
107,630.00
10,763.00
118,393.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 435 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
42,500.00
60,000.00
11,250.00
4,000.00
117,750.00
-
-
-
-
-
117,750.00
11,775.00
129,525.00
JUMLAH HARGA
(Rp.)
6,375.00
10,125.00
750.00
480.00
17,730.00
5,381.25
170.00
5,551.25
23,281.25
2,328.13
25,609.38
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 436 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
12,750.00
9,000.00
1,125.00
1,280.00
24,155.00
-
-
24,155.00
2,415.50
26,570.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 437 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
12,750.00
9,000.00
1,200.00
1,280.00
24,230.00
-
-
24,230.00
2,423.00
26,653.00
JUMLAH HARGA
(Rp.)
34,000.00
27,000.00
3,000.00
320.00
64,320.00
-
9,920.00
5,440.00
15,360.00
79,680.00
7,968.00
87,648.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 438 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
34,000.00
24,000.00
3,000.00
320.00
61,320.00
26,000.00
9,920.00
5,440.00
41,360.00
102,680.00
10,268.00
112,948.00
JUMLAH HARGA
(Rp.)
34,000.00
24,000.00
3,000.00
320.00
61,320.00
15,000.00
9,920.00
5,440.00
15,000.00
76,320.00
7,632.00
83,952.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 439 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
11,900.00
9,084.00
1,050.00
1,120.00
23,154.00
-
1,275.00
-
23,154.00
2,315.40
25,469.40
JUMLAH HARGA
(Rp.)
11,900.00
8,400.00
1,050.00
1,120.00
22,470.00
27,000.00
2,160.00
27,000.00
49,470.00
4,947.00
54,417.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 440 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
7,140.00
16,875.00
1,950.00
640.00
26,605.00
-
3,000.00
-
26,605.00
2,660.50
29,265.50
JUMLAH HARGA
(Rp.)
7,140.00
15,000.00
1,950.00
640.00
24,730.00
36,000.00
3,000.00
39,000.00
63,730.00
6,373.00
70,103.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 441 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
17,000.00
12,000.00
150.00
160.00
29,310.00
-
3,400.00
-
29,310.00
2,931.00
32,241.00
JUMLAH HARGA
(Rp.)
14,110.00
33,750.00
3,750.00
1,280.00
52,890.00
-
#REF!
#REF!
#REF!
#REF!
#REF!
JUMLAH HARGA
(Rp.)
34,000.00
24,000.00
3,000.00
3,200.00
64,200.00
-
-
-
3,400.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 442 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
3,400.00
56,290.00
5,629.00
61,919.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 443 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
10,625.00
30,000.00
3,750.00
960.00
45,335.00
-
1,275.00
40,000.00
1,275.00
42,550.00
87,885.00
8,788.50
96,673.50
JUMLAH HARGA
(Rp.)
21,250.00
18,000.00
2,250.00
2,080.00
43,580.00
-
1,275.00
-
43,580.00
4,358.00
47,938.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 444 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
17,000.00
12,000.00
1,500.00
1,600.00
32,100.00
-
510.00
510.00
32,610.00
3,261.00
35,871.00
JUMLAH HARGA
(Rp.)
34,000.00
24,000.00
3,000.00
3,200.00
64,200.00
-
1,275.00
13,392.00
5,440.00
15,000.00
35,107.00
99,307.00
9,930.70
109,237.70
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 445 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 446 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
10,200.00
7,200.00
900.00
960.00
19,260.00
-
340.00
340.00
19,600.00
1,960.00
21,560.00
JUMLAH HARGA
(Rp.)
12,750.00
8,400.00
1,050.00
960.00
23,160.00
-
1,275.00
-
23,160.00
2,316.00
25,476.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 447 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
12,750.00
90,000.00
12,000.00
960.00
115,710.00
33,600.00
360.00
33,600.00
149,310.00
14,931.00
164,241.00
JUMLAH HARGA
(Rp.)
8,500.00
120,000.00
1,500.00
8,000.00
138,000.00
57,600.00
720.00
57,600.00
195,600.00
19,560.00
215,160.00
JUMLAH HARGA
(Rp.)
12,750.00
6,000.00
750.00
1,280.00
20,780.00
5,250.00
5,250.00
26,030.00
2,603.00
28,633.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 448 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
595,000.00
2,520,000.00
315,000.00
56,000.00
3,486,000.00
9,900,000.00
21,250.00
-
9,921,250.00
13,407,250.00
1,340,725.00
14,747,975.00
JUMLAH HARGA
(Rp.)
510,000.00
2,160,000.00
270,000.00
48,000.00
2,988,000.00
9,314,760.00
21,250.00
-
9,336,010.00
12,324,010.00
1,232,401.00
13,556,411.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 449 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
29,750.00
126,000.00
15,750.00
2,880.00
174,380.00
310,492.00
850.00
311,342.00
485,722.00
48,572.20
534,294.20
JUMLAH HARGA
(Rp.)
85,000.00
360,000.00
45,000.00
12,000.00
502,000.00
400,000.00
-
400,000.00
902,000.00
90,200.00
992,200.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 450 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
68,000.00
288,000.00
36,000.00
12,000.00
404,000.00
300,000.00
-
300,000.00
704,000.00
70,400.00
774,400.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 451 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
68,000.00
288,000.00
36,000.00
12,000.00
404,000.00
250,000.00
540.00
-
90,000.00
340,540.00
744,540.00
74,454.00
818,994.00
JUMLAH HARGA
(Rp.)
51,000.00
240,000.00
30,000.00
4,800.00
325,800.00
256,000.00
540.00
-
65,000.00
321,540.00
647,340.00
64,734.00
712,074.00
JUMLAH HARGA
(Rp.)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 452 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
42,500.00
150,000.00
22,500.00
53,600.00
268,600.00
750,000.00
2,700.00
752,700.00
1,021,300.00
102,130.00
1,123,430.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 453 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
68,000.00
288,000.00
36,000.00
12,000.00
404,000.00
250,000.00
540.00
-
105,100.00
355,640.00
759,640.00
75,964.00
835,604.00
JUMLAH HARGA
(Rp.)
72,250.00
306,000.00
38,250.00
12,048.00
428,548.00
194,057.50
540.00
-
90,000.00
-
284,597.50
713,145.50
71,314.55
784,460.05
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 454 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
340,000.00
1,440,000.00
180,000.00
32,000.00
1,992,000.00
9,350,000.00
8,345,920.00
5,649,600.00
385,500.00
95,200.00
9,830,700.00
8,826,620.00
6,130,300.00
11,822,700.00
10,818,620.00
8,122,300.00
1,182,270.00
1,081,862.00
812,230.00
13,004,970.00
11,900,482.00
8,934,530.00
JUMLAH HARGA
(Rp.)
569,500.00
2,412,000.00
301,500.00
53,600.00
3,336,600.00
10,200,000.00
9,104,640.00
6,163,200.00
385,500.00
95,200.00
10,680,700.00
9,585,340.00
6,643,900.00
14,017,300.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 455 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
12,921,940.00
9,980,500.00
1,401,730.00
1,292,194.00
998,050.00
15,419,030.00
14,214,134.00
10,978,550.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 456 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
8,500.00
12,000.00
1,500.00
800.00
22,800.00
98,050.40
252,129.60
4,250.00
98,050.40
120,850.40
12,085.04
132,935.44
JUMLAH HARGA
(Rp.)
8,500.00
12,000.00
1,500.00
800.00
22,800.00
109,200.00
427,500.00
4,250.00
540,950.00
563,750.00
56,375.00
620,125.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 457 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
10,200.00
14,400.00
1,800.00
960.00
27,360.00
98,050.40
969.00
99,019.40
126,379.40
12,637.94
139,017.34
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 458 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
12,750.00
36,000.00
4,500.00
12,000.00
65,250.00
107,855.44
3,400.00
107,855.44
173,105.44
17,310.54
190,415.98
JUMLAH HARGA
(Rp.)
17,000.00
36,000.00
4,500.00
1,600.00
59,100.00
114,158.68
4,250.00
114,158.68
173,258.68
17,325.87
190,584.55
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 459 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
8,500.00
24,000.00
3,000.00
800.00
36,300.00
108,000.00
850.00
108,850.00
145,150.00
14,515.00
159,665.00
JUMLAH HARGA
(Rp.)
8,500.00
24,000.00
3,000.00
800.00
36,300.00
-
850.00
850.00
37,150.00
3,715.00
40,865.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 460 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
12,750.00
54,000.00
11,325.00
1,280.00
79,355.00
212,441.60
2,550.00
214,991.60
294,346.60
29,434.66
323,781.26
JUMLAH HARGA
(Rp.)
17,000.00
72,000.00
9,000.00
1,600.00
99,600.00
151,744.00
2,550.00
55,900.00
-
210,194.00
309,794.00
30,979.40
340,773.40
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 461 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
51,000.00
216,000.00
27,000.00
4,800.00
298,800.00
70,000.00
1,700.00
2,625.00
74,325.00
373,125.00
37,312.50
410,437.50
JUMLAH HARGA
(Rp.)
2,125.00
9,000.00
1,200.00
160.00
12,485.00
26,000.00
850.00
26,850.00
39,335.00
3,933.50
43,268.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 462 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
8,500.00
9,000.00
750.00
800.00
19,050.00
45,000.00
28,000.00
204.00
61.50
45,000.00
64,050.00
6,405.00
70,455.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 463 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
850.00
60,000.00
7,500.00
800.00
69,150.00
87,600.00
87,600.00
156,750.00
15,675.00
172,425.00
JUMLAH HARGA
(Rp.)
425.00
60,000.00
7,500.00
480.00
68,405.00
-
-
68,405.00
6,840.50
75,245.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 464 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 465 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
2,125.00
30,000.00
3,750.00
208.00
36,083.00
20,000.00
20,000.00
56,083.00
5,608.30
61,691.30
JUMLAH HARGA
(Rp.)
425.00
60,000.00
7,500.00
480.00
68,405.00
-
-
68,405.00
6,840.50
75,245.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 466 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 467 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,275.00
18,000.00
2,250.00
128.00
21,653.00
20,000.00
20,000.00
41,653.00
4,165.30
45,818.30
JUMLAH HARGA
(Rp.)
850.00
9,018.00
150.00
80.00
10,098.00
14,600.00
14,600.00
24,698.00
2,469.80
27,167.80
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 468 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
850.00
24,000.00
3,000.00
80.00
27,930.00
20,000.00
20,000.00
47,930.00
4,793.00
52,723.00
JUMLAH HARGA
(Rp.)
1,700.00
24,000.00
3,000.00
160.00
28,860.00
324,900.00
324,900.00
353,760.00
35,376.00
389,136.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 469 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 470 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,275.00
18,000.00
2,250.00
128.00
21,653.00
6,000.00
6,000.00
27,653.00
2,765.30
30,418.30
JUMLAH HARGA
(Rp.)
1,275.00
18,000.00
2,250.00
1,280.00
22,805.00
106,000.00
106,000.00
128,805.00
12,880.50
141,685.50
JUMLAH HARGA
(Rp.)
1,700.00
24,000.00
3,000.00
160.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 471 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
28,860.00
324,900.00
324,900.00
128,805.00
12,880.50
141,685.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 472 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
4,250.00
60,000.00
7,500.00
480.00
72,230.00
-
-
72,230.00
7,223.00
79,453.00
JUMLAH HARGA
(Rp.)
4,250.00
60,000.00
7,500.00
48.00
71,798.00
-
-
71,798.00
7,179.80
78,977.80
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 473 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
5,100.00
66,000.00
9,000.00
640.00
80,740.00
-
-
80,740.00
8,074.00
88,814.00
JUMLAH HARGA
(Rp.)
2,125.00
30,000.00
3,750.00
208.00
36,083.00
20,000.00
20,000.00
80,740.00
8,074.00
88,814.00
JUMLAH HARGA
(Rp.)
1,275.00
18,000.00
2,250.00
128.00
21,653.00
137,500.00
1,000.00
138,500.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 474 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
160,153.00
16,015.30
176,168.30
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 475 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,275.00
18,000.00
2,250.00
128.00
21,653.00
149,600.00
1,000.00
150,600.00
172,253.00
17,225.30
189,478.30
JUMLAH HARGA
(Rp.)
1,445.00
20,400.00
2,550.00
144.00
24,539.00
-
1,400.00
1,400.00
25,939.00
2,593.90
28,532.90
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 476 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
2,125.00
30,000.00
3,750.00
208.00
36,083.00
-
1,400.00
-
36,083.00
3,608.30
39,691.30
JUMLAH HARGA
(Rp.)
1,275.00
18,000.00
2,250.00
1,280.00
22,805.00
220,000.00
220,000.00
242,805.00
24,280.50
267,085.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 477 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,445.00
20,400.00
2,550.00
1,440.00
25,835.00
-
-
25,835.00
2,583.50
28,418.50
JUMLAH HARGA
(Rp.)
1,275.00
18,000.00
2,250.00
1,280.00
22,805.00
-
-
22,805.00
2,280.50
25,085.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 478 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,375.00
18,000.00
2,250.00
640.00
27,265.00
-
1,500.00
-
27,265.00
2,726.50
29,991.50
JUMLAH HARGA
(Rp.)
2,125.00
30,000.00
3,750.00
208.00
36,083.00
-
1,500.00
-
36,083.00
3,608.30
39,691.30
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 479 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
12,750.00
480.00
13,230.00
1,000.00
1,000.00
14,230.00
1,423.00
15,653.00
JUMLAH HARGA
(Rp.)
12,750.00
480.00
13,230.00
-
-
13,230.00
1,323.00
14,553.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 480 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
12,750.00
1,280.00
14,030.00
-
-
14,030.00
1,403.00
15,433.00
JUMLAH HARGA
(Rp.)
5,950.00
1,080.00
900.00
480.00
8,410.00
-
5,250.00
10,200.00
15,600.00
50.00
600.00
600.00
32,300.00
40,710.00
4,071.00
44,781.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 481 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
2,380.00
9,024.00
600.00
480.00
12,484.00
-
5,250.00
10,200.00
21,000.00
50.00
600.00
600.00
37,700.00
50,184.00
5,018.40
55,202.40
JUMLAH HARGA
(Rp.)
3,400.00
7,560.00
9,450.00
480.00
20,890.00
-
-
20,890.00
2,089.00
22,979.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 482 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
3,400.00
7,200.00
2,400.00
480.00
13,480.00
11,655.00
-
6,000.00
17,655.00
31,135.00
3,113.50
34,248.50
JUMLAH HARGA
(Rp.)
8,500.00
960.00
9,460.00
1,155.00
1,155.00
10,615.00
1,061.50
11,676.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 483 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
13,600.00
19,200.00
2,400.00
480.00
35,680.00
6,750.00
1,750.00
300.00
8,800.00
44,480.00
4,448.00
48,928.00
JUMLAH HARGA
(Rp.)
1,700.00
756.00
945.00
480.00
3,881.00
2,000.00
2,500.00
6,500.00
11,000.00
14,881.00
1,488.10
16,369.10
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 484 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
2,380.00
5,040.00
630.00
480.00
8,530.00
3,000.00
4,500.00
7,500.00
16,030.00
1,603.00
17,633.00
JUMLAH HARGA
(Rp.)
2,380.00
5,040.00
630.00
480.00
8,530.00
-
-
8,530.00
853.00
9,383.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 485 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
12,750.00
120.00
15.00
400.00
13,285.00
-
300.00
13,075.00
13,375.00
26,660.00
2,666.00
29,326.00
JUMLAH HARGA
(Rp.)
3,400.00
600.00
75.00
400.00
4,475.00
-
600.00
13,075.00
13,675.00
18,150.00
1,815.00
19,965.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 486 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
1,700.00
24,000.00
3,000.00
400.00
29,100.00
-
-
-
29,100.00
2,910.00
32,010.00
JUMLAH HARGA
(Rp.)
17,000.00
24,000.00
3,000.00
400.00
44,400.00
3,500.00
50.00
3,550.00
47,950.00
4,795.00
52,745.00
JUMLAH HARGA
(Rp.)
21,250.00
30,000.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 487 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
3,750.00
208.00
55,208.00
3,500.00
3,500.00
5,136.00
200.00
50.00
12,386.00
67,594.00
6,759.40
74,353.40
JUMLAH HARGA
(Rp.)
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 488 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
34,000.00
84,000.00
10,500.00
3,200.00
131,700.00
8,760.00
200.00
8,960.00
140,660.00
14,066.00
154,726.00
JUMLAH HARGA
(Rp.)
280,500.00
132,000.00
1,500.00
25,600.00
439,600.00
400,000.00
1,440.00
401,440.00
-
-
841,040.00
84,104.00
925,144.00
JUMLAH HARGA
(Rp.)
-
180,000.00
22,500.00
25,600.00
228,100.00
100,000.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 489 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
7,440.00
1,700.00
109,140.00
-
-
337,240.00
33,724.00
370,964.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 490 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
180,000.00
22,500.00
12,000.00
214,500.00
-
7,440.00
1,700.00
8,400.00
17,540.00
-
-
232,040.00
23,204.00
255,244.00
JUMLAH HARGA
(Rp.)
-
120,000.00
15,000.00
12,000.00
147,000.00
-
7,440.00
1,700.00
-
9,140.00
-
-
156,140.00
15,614.00
171,754.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 491 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
174,000.00
22,500.00
12,000.00
208,500.00
-
744.00
1,700.00
-
2,444.00
-
-
210,944.00
21,094.40
232,038.40
JUMLAH HARGA
(Rp.)
-
9,000.00
11,250.00
480.00
20,730.00
50,000.00
1,240.00
850.00
52,090.00
-
-
72,820.00
7,282.00
80,102.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 492 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
54,000.00
7,500.00
144,000.00
205,500.00
250,000.00
3,600.00
253,600.00
-
-
459,100.00
45,910.00
505,010.00
JUMLAH HARGA
(Rp.)
-
360,000.00
45,000.00
4,800.00
409,800.00
180,000.00
148,800.00
51,000.00
-
90,000.00
469,800.00
-
-
879,600.00
87,960.00
967,560.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 493 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
540,000.00
7,500.00
144,000.00
691,500.00
300,000.00
4,320.00
304,320.00
-
-
995,820.00
99,582.00
1,095,402.00
JUMLAH HARGA
(Rp.)
-
540,000.00
7,500.00
2,880.00
550,380.00
679,147.33
1,638,000.00
160,000.00
943,396.23
8,299.84
3,428,843.40
-
-
3,979,223.40
397,922.34
4,377,145.74
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 494 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
36,000.00
4,500.00
2,400.00
42,900.00
150,000.00
5,000.00
155,000.00
-
-
197,900.00
19,790.00
217,690.00
JUMLAH HARGA
(Rp.)
-
36,000.00
11,250.00
4,000.00
51,250.00
-
5,000.00
24,800.00
12,750.00
42,550.00
-
-
93,800.00
9,380.00
103,180.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 495 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
12,000.00
1,500.00
800.00
14,300.00
15,000.00
15,000.00
-
-
29,300.00
2,930.00
32,230.00
JUMLAH HARGA
(Rp.)
-
86,400.00
10,800.00
1,760.00
98,960.00
48,000.00
54,560.00
11,900.00
8,340.00
14,791.00
-
137,591.00
-
-
236,551.00
23,655.10
260,206.10
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 496 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
138,000.00
1,650.00
2,560.00
142,210.00
84,000.00
95,480.00
22,100.00
12,510.00
4,226.00
23,660.00
241,976.00
-
-
384,186.00
38,418.60
422,604.60
JUMLAH HARGA
(Rp.)
-
138,000.00
1,650.00
2,560.00
142,210.00
147,600.00
141,360.00
31,280.00
16,680.00
6,972.90
44,135.00
388,027.90
-
-
530,237.90
53,023.79
583,261.69
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 497 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
10,800.00
1,350.00
4,320.00
16,470.00
-
-
-
-
-
16,470.00
1,647.00
18,117.00
JUMLAH HARGA
(Rp.)
850.00
48,000.00
6,000.00
800.00
55,650.00
25,000.00
840.00
25,840.00
-
-
81,490.00
8,149.00
89,639.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 498 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
4,590.00
10,800.00
1,350.00
4,320.00
21,060.00
-
-
-
-
-
21,060.00
2,106.00
23,166.00
JUMLAH HARGA
(Rp.)
4,590.00
10,800.00
1,350.00
4,320.00
21,060.00
57,000.00
5,818.75
62,818.75
-
-
83,878.75
8,387.88
92,266.63
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 499 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
9,180.00
21,600.00
2,700.00
800.00
34,280.00
105,000.00
10,718.75
115,718.75
-
-
149,998.75
14,999.88
164,998.63
JUMLAH HARGA
(Rp.)
11,475.00
27,000.00
3,450.00
1,120.00
43,045.00
-
-
-
-
-
43,045.00
4,304.50
47,349.50
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 500 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
11,475.00
27,000.00
3,450.00
1,120.00
43,045.00
-
-
-
-
-
43,045.00
4,304.50
47,349.50
JUMLAH HARGA
(Rp.)
3,060.00
7,200.00
900.00
320.00
11,480.00
1,500.00
153.13
1,653.13
-
-
13,133.13
1,313.31
14,446.44
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 501 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
3,060.00
7,200.00
900.00
320.00
11,480.00
2,250.00
656.25
2,906.25
-
-
14,386.25
1,438.63
15,824.88
JUMLAH HARGA
(Rp.)
3,060.00
7,200.00
900.00
320.00
11,480.00
2,850.00
831.25
3,681.25
-
-
15,161.25
1,516.13
16,677.38
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 502 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
4,590.00
10,800.00
1,350.00
480.00
17,220.00
7,980.00
2,327.50
10,307.50
-
-
27,527.50
2,752.75
30,280.25
JUMLAH HARGA
(Rp.)
4,590.00
10,800.00
1,350.00
480.00
17,220.00
8,500.00
2,479.17
10,979.17
-
-
28,199.17
2,819.92
31,019.08
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 503 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
6,885.00
16,200.00
2,025.00
640.00
25,750.00
6,375.00
1,859.38
8,234.38
-
-
33,984.38
3,398.44
37,382.81
JUMLAH HARGA
(Rp.)
6,885.00
16,200.00
2,025.00
640.00
25,750.00
-
-
-
-
-
25,750.00
2,575.00
28,325.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 504 of 509
Pedoman Analisa Harga Satuan Pekerjaan Bidang Pekerjaan Umum 2017
JUMLAH HARGA
(Rp.)
-
-
72,300.00
216,000.00
-
-
-
-
-
-
-
288,300.00
-
-
288,300.00
288,300.00
JUMLAH HARGA
(Rp.)
-
-
-
-
-
-
-
-
-
-
-
-
-
Berdasarkan Peraturan Menteri Pekerjaan Umum No. 28/ PRT/ M/ 2016 505 of 509
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2017
Berdasarkan Peraturan Menteri Pekerjaan Umum No.28/ PRT /M/ 2016 506 of 509
12 Pemasangan 1 m² pintu kaca rangka alluminium 2'. 0,75 mm Rp. 721,382.20
13 Pemasangan 1 m² venetions blinds dan vertical blinds Rp. 8,943.00
14 Pemasangan 1 m² terali besi strip (2x3) mm Rp. 1,862,331.79
15 Pemasangan 1 m² kawat nyamuk Rp. 684,641.32
16 Pemasangan 1 m² jendela nako & tralis Rp. 473,825.00
17 Pemasangan 1 m' talang datar ,seng BJLS 28 lebar 90 Rp. 211,088.57
18 Pemasangan 1 m talang 1/2 lingkaran dia. 15 cm, Seng BJLS 20 Rp. 74,305.00
19 Pemasangan 1 m² rangka besi hollow 1x40.40.2 mm, modul 60x120 cm dinding partisi Rp. 117,788.00
Berdasarkan Peraturan Menteri Pekerjaan Umum No.28/ PRT /M/ 2016 507 of 509
X. SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pemasangan 1 m² langit-langit asbes 1 x 1 m/3.2 ( tanpa rangka ) semen tebal 4 mm, 5 mm, 6 mm Rp. 58,619.00
2 Err:509 Rp. Err:509
3 Pemasangan 1 m² langit-langit akustik ukuran 60 x 120cm Rp. 26,730.00
4 Err:509 Rp. Err:509
5 Err:509 Rp. Err:509
6 Pemasangan 1 m² langit-langit lambrisering kayu , tebal 9 mm Rp. 311,671.25
7 Pas. 1 m² langit-langit rangka besi hollow 1 x 40.40.2mm, modul 60 x 60 cm Rp. 118,393.00
8 Pemasangan 1 m² langit-langit akustik ukuran (60 x 120) cm, berikut rangka alluminium Rp. 129,525.00
9 Pemasangan 1 m' list langit-langit kayu profil Rp. 25,609.38
10 Err:509 Rp. Err:509
11 Err:509 Rp. Err:509
Berdasarkan Peraturan Menteri Pekerjaan Umum No.28/ PRT /M/ 2016 508 of 509
1 1 M² Pengikisan / pengerokan permukaan cat lama Rp. 15,653.00
2 1 M² Pencucian bidang permukaan tembok yang pernah di cat Rp. 14,553.00
3 1 M² Pengerokan karat pada permukaan baja secara manual Rp. 15,433.00
4 1 M² Pengecatan bidang kayu baru (1 lapis plamier, 1 lapis cat dasar, 2 lapis cat penutup) Rp. 44,781.00
5 Pengecatan 1 M² bidang kayu baru (1 lapis plamier, 1 lapis cat dasar, 3 lapis cat penutup) Rp. 55,202.40
6 Pelaburan 1 M² bidang kayu dengan teak oil Rp. 22,979.00
7 Pelaburan 1 M² bidang kayu dengan politur Rp. 34,248.50
8 Pelaburan 1 M² bidang kayu dengan cat residu dan ter Rp. 11,676.50
9 Pelaburan 1 M² bidang kayu dengan vernis Rp. 48,928.00
10 Pengecatan 1 M² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Rp. 16,369.10
11 Pengecatan 1 M² tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Rp. 17,633.00
12 Pelaburan 1 M² tembok dengan kalkarium Rp. 9,383.00
13 Pelaburan 1 M² tembok dengan kapur sirih Rp. 29,326.00
14 Pelaburan 1 M² tembok lama dengan kapur sirih (pemeliharaan) Rp. 19,965.00
15 Pemasangan 1 M² wallpaper Rp. 32,010.00
16 Pengecatan 1 M² permukaan baja dengan menie besi Rp. 52,745.00
17 Err:509 Rp. Err:509
18 Err:509 Rp. Err:509
19 Err:509 Rp. Err:509
20 Err:509 Rp. Err:509
21 Err:509 Rp. Err:509
XV. TENAGA
1 Tukang cat Rp. -
2 Pengerjaan 1 buah closet jongkok porselin Rp. 370,964.00
3 Pemasangan 1 buah closet jongkok setara toto Rp. 255,244.00
4 Pemasangan 1 buah urinoir setara KIA Rp. 171,754.00
5 Pemasangan 1 buah wastafel seatara KIA Rp. 232,038.40
6 Pemasangan 1 buah tempat sabun Rp. 80,102.00
7 Pemasangan 1 buah bak fibreglass vol 1 m3 Rp. 505,010.00
8 Pemasangan 1 buah bak mandi batu bata vol.0,3 m3 Rp. 967,560.00
9 Pemasangan 1 buah bak mandi teraso Rp. 1,095,402.00
10 Pemasangan 1 buah bak beton vol 1 m3 Rp. 4,377,145.74
11 Pemasangan 1 buah bak cuci piring stainless steel Rp. 217,690.00
12 Pemasangan 1 buah bak cuci piring teraso Rp. 103,180.00
13 Pemasangan 1 buah floor drain Rp. 32,230.00
14 Pemasangan 1 buah bak kontrol pasangan bata 30 x 30 tinggi 35 cm Rp. 260,206.10
15 Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm Rp. 422,604.60
16 Pemasangan 1 buah bak kontrol pasangan bata 60cm x 60cm tinggi 65 cm Rp. 583,261.69
17 Pemasangan 1 m' pipa galvanis diameter 1/2 " Rp. 18,117.00
18 Pemasangan 1 buah kran diameter ½ " atau ¾ " Rp. 89,639.00
19 Pemasangan 1 m' pipa galvanis diameter 3/4" Rp. 23,166.00
20 Pemasangan 1 m' pipa galvanis diameter 1 " Rp. 92,266.63
21 Pemasangan 1 m' pipa galvanis diameter 1½ " Rp. 164,998.63
22 Pemasangan 1 m' pipa galvanis diameter 3 " Rp. 47,349.50
23 Pemasangan 1 m' pipa galvanis diameter 4 " Rp. 47,349.50
24 Pemasangan 1 m' pipa PVC tipe AW diameter ½ " Rp. 14,446.44
25 Pemasangan 1 m' pipa PVC tipe AW diameter ¾ " Rp. 15,824.88
26 Pemasangan 1 m' pipa PVC tipe AW diameter 1 " Rp. 16,677.38
27 Pemasangan 1 m' pipa PVC tipe AW diameter 1½ " Rp. 30,280.25
28 Pemasangan 1 m' pipa PVC tipe AW diameter 2 " Rp. 31,019.08
29 Pemasangan 1 m' pipa PVC tipe AW diameter 2 1/2" Rp. 37,382.81
30 Pemasangan 1 m' pipa PVC tipe AW diameter 3 " Rp. 28,325.00
XVII. Err:509
1 Err:509 Rp. Err:509
2 Err:509 Rp. Err:509
3 Err:509 Rp. Err:509
4 Err:509 Rp. Err:509
5 Err:509 Rp. Err:509
XVIII. Err:509
1 Err:509 Rp. Err:509
2 Err:509 Rp. Err:509
3 Err:509 Rp. Err:509
4 Err:509 Rp. Err:509
5 Err:509 Rp. Err:509
6 Err:509 Rp. Err:509
7 Err:509 Rp. Err:509
8 Err:509 Rp. Err:509
9 Err:509 Rp. Err:509
10 Err:509 Rp. Err:509
Berdasarkan Peraturan Menteri Pekerjaan Umum No.28/ PRT /M/ 2016 509 of 509