1. a) Explain the various tools & techniques to improve productivity. 8
e.c
lin
b) What is productivity and what is its relationship with production.
on
6
nu
m
OR
.rt
w
w
2. a) Define method study. What are its objectives? Differentiate between work measurement 8
w
3. a) What are allowances in work measurement study? Explain the various types of allowances 7
in work measurement.
om
e.c
OR
m
.rt
b) What is ergonomics? What are its objectives? How ergonomics is related to work place 6
design.
i) Compute the load on the weaving m/c. Using 5th moving average for the month of
December-14
ii) Compute a weighted three months moving average for December-14 where weights
are 0.5 for the latest month, 0.3,0.2 for other months respectively.
OR
KNT/KW/16/7467 1 P.T.O
www.rtmnuonline.com
www.rtmnuonline.com
6. a) What is forecasting? How is it different from prediction? What is the need for demand 6
forecasting?
b) Demand for a part is given below: The forecast for April 97 was 100 units. Forecast the 7
demand for July 1997 taking the value of 0.2
OR
8. a) Explain the various stages of failure analysis. Also explain what is bath tub curve with a 7
neat sketch.
b) Calculate the reliability of following component if all components are parallel & series. 6
R1 0.8, R 2 0.85, R 3 0.65, R 4 0.9, R 5 0.56, R 6 0.72
om
e.c
9. a) What is quality? What do you understand by quality control? What are the various 6
lin
objectives of quality control?
on
nu
m
b) What is process capability? Explain operating characteristic (OC) curve with a neat 7
.rt
sketch. w
w
w
OR
X and R after 25 subgroups are found to be 614.8 and 120.0 respectively. Compute
e.c
OR
*************
KNT/KW/16/7467 2