Ta nah
Trase 1 El veas i
Ja l an
90.00
80.00
70.00
60.00
50.00
Elevasi (m)
40.00
30.00
20.00
10.00
0.00
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800
Jarak (m)
Tanah
Trase 2 Ja l an
90.00
80.00
70.00
60.00
Elevasi (m)
50.00
40.00
30.00
20.00
10.00
0.00
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500 1550 1600 1650 1700 1750 1800
Jarak (m)
Trase jalan dari titik C ke tititk 2 seperti di peta transit
Titik x (m) y (m) d Sudut azimuth (Δ) Elevasi (m) Kelerengan (%)
C 4800 5000.00 - 597.00 379 130
400.549 -0.749
299.9690 52.7300
PI11 5178.73 5130.40 -17 594.00
353.2060 -77.6664
304.568 0.657
368.0950 494.5400
PI12 5478.70 5183.13 222 596.00
361.644 0.553
PI13 5831.91 5105.46 209 598.00
1683.2548
616.493 0.892
2 6200 5600.00 - 603.50
Titik x (m) y (m) d Sudut azimuth (Δ) Elevasi (m) Kelerengan (%)
C 4800 5000.00 - 597.00 853.1750 166.2528
869.222 0.2
338.3170 16.8736
PI21 5653.18 5166.25 18 599.00
119.1740 416.8736
338.738 -0.6
89.3340 0.0000
PI22 5991.49 5183.13 198 597.00
433.574 0.7
1730.8675
PI23 6110.7 5600.00 206 600.00
89.334 3.9
2 6200 5600.00 - 603.50
Titik x (m) y (m) d Sudut azimuth (Δ) Elevasi (m) Kelerengan (%)
C 4800 5000.00 - 597.00 429.7780 216.8738
481.397 -0.208
25.5240 383.1262
PI31 5229.78 5216.87 -49 596.00
63.8720 256.9484
383.975 0.781
880.8260 -256.9484
PI32 5255.30 5600.00 42 599.00
264.768 -1.133
2047.6793
PI33 5319.17 5856.95 131 596.00
917.539 0.817
917.539 0.817
2 6200 5600.00 - 603.50
2047.679
Rekapitulasi trase 3
Jarak Elevasi (m) Kedalaman (m)
Pias Titik Kritis Kemiringan Kumulatif
cm m Tanah Jalan Galian Timbunan
A - PI1 K1 1.5 32 -0.0021 594.000 596.934 0.000 2.934 0.000
K2 3 63 -0.0021 593.000 596.869 0.000 3.869 94.739
K3 2.1 44 -0.0021 592.000 596.908 0.000 4.908 138.950
K4 2 42 -0.0021 591.000 596.913 0.000 5.913 181.056
K5 0.6 13 -0.0021 591.000 596.974 0.000 5.974 193.688
K6 1.2 25 -0.0021 592.000 596.948 0.000 4.948 218.951
K7 1.2 25 -0.0021 593.000 596.948 0.000 3.948 244.215
K8 1.2 25 -0.0021 594.000 596.948 0.000 2.948 269.478
K9 2.3 48 -0.0021 595.000 596.899 0.000 1.899 317.900
PI1 - PI2 K10 1.3 27 0.0078 597.000 596.214 0.786 0.000 345.269
K11 2.6 55 0.0078 598.000 596.428 1.572 0.000 400.007
K12 3.1 65 0.0078 599.000 596.510 2.490 0.000 465.271
K13 3.3 69 0.0078 600.000 596.543 3.457 0.000 534.746
K14 8 168 0.0078 600.000 597.316 2.684 0.000 703.170
PI2 - PI3 K15 3.1 65 -0.0113 599.000 598.261 0.739 0.000 768.435
K16 14.2 299 -0.0113 598.000 595.613 2.387 0.000 1067.387
PI3 - P K17 6.7 141 0.0082 596.000 597.153 0.000 1.153 1208.442
K18 2.2 46 0.0082 597.000 596.379 0.621 0.000 1254.759
K19 1.9 40 0.0082 598.000 596.327 1.673 0.000 1294.760
K20 2 42 0.0082 599.000 596.344 2.656 0.000 1336.866
K21 7.9 166 0.0082 600.000 597.359 2.641 0.000 1503.184
Sudut Azimut
Trase 1 Trase 2 Trase 3
β PI1 = 32.000 = 19.000 = 15.000
β PI2 = 28.000 = 48.000 228.000 = 36.000
β PI3 = 12.00 = 15.000 = 16.000
Kemiringan Lintasan
Trase 1 Trase 2 Trase 3
i (F - PI1) = -0.749% = 0.230% = -0.208%
i (PI1 - PI2) = 0.657% = -0.590% = 0.781%
i (PI2 - PI3) = 0.553% = 0.692% = -1.133%
i (PI3 - D) = 0.892% = 3.918% = 0.817%
602.000
600.000
600.000 13; 600.000
599.000
15; 599.000
10; 597.000
596.000
9; 595.000
594.000
594.000 8; 594.000
2; 593.000 7; 593.000
4;5;
591.000
591.000
590.000
588.000
586.000
0.000 100.000 200.000 300.000 400.000 500.000 600.000 700.000 800.000 900.000 1000.000 1100.000 1200
588.000
586.000
0.000 100.000 200.000 300.000 400.000 500.000 600.000 700.000 800.000 900.000 1000.000 1100.000 1200
728
726
710
0 200 400 600 800 1000 1200 1400 1600
450 719.00 719.41
804 718.00 718.91
850 717.00 718.43
896 716.93 717.44
600.000
20; 599.000
18; 597.000
17; 596.000
Muka
Tanah
1400 1600
1400 1600
Alternatif 1
Trase jalan dari titik B ke titik 11 Jarak antar titik potong Sudut azimut jalan Kemiringan jalan
Titik Sb-x Sb-y elevasi Titik d (m) Titik β Titik g (%)
B 779067.386 588856.192 53.000 B-B11 580.62 β B-B11 B11-B12 -16.518 B-B11 2.583%
B11 779567.386 588561.030 68.000 B11-B12 412.31 β B11-B12 B12-B13 42.274 B11-B12 1.213%
B12 779967.386 588461.030 73.000 B12-B13 360.56 β B12-B13 B13-11' -28.923 B12-B13 -5.547%
B13 780167.386 588161.030 53.000 B13-11' 434.78 B13-11' 0.920%
11' 780553.437 587961.030 57.000 total panjang 1788.27
77.620001219
Alternatif 2 -0.000001
Trase jalan dari titik B ke titik 11 Jarak antar titik potong Sudut azimut jalan Kemiringan jalan
Titik Sb-x Sb-y elevasi Titik d (m) Titik β Titik g (%)
B 779067.386 588856.192 53.000 B-B21 420.86 β B-B21B21-B22 -17.969 B-B21 4.990%
B21 779367.386 588561.030 74.000 B21-B22 447.21 β B21-B22B22-B23 18.435 B21-B22 0.894%
B22 779767.386 588361.030 78.000 B22-B23 282.84 β B22-B23B23-11' -26.157 B22-B23 -2.828%
B23 779967.386 588161.030 70.000 B23-11' 619.24 B23-11' -2.099%
11' 780553.437 587961.030 57.000 total panjang 1770.15
Alternatif 3
Trase jalan dari titik B ke titik 11 Jarak antar titik potong Sudut azimut jalan Kemiringan jalan
Titik Sb-x Sb-y elevasi Titik d (m) Titik β Titik g (%)
B 779067.386 588856.192 53.000 B-B31 311.64 β B-B31B31-B32 -49.482 B-B31 3.594%
B31 779167.386 588561.030 64.20 B31-B32 538.52 β B31-B32B32-B33 41.634 B31-B32 1.170%
B32 779667.386 588361.030 70.50 B32-B33 223.61 β B32-B33B33-11' -49.160 B32-B33 -1.207%
B33 779767.386 588161.030 67.80 B33-11' 811.10 B33-11' -1.332%
11' 780553.437 587961.030 57.00 total panjang 1884.86
Alternatif 1 578.273
Titik Jarak Elevasi (m) Kedalaman (m)
Pias Kemiringan
Kritis cm m Tanah Jalan Galian Timbunan
B 0 0.000 0.000 2.583% 53.000 53.0000 0.000 0.0000
K1 1.300 29.950 2.583% 52.000 53.7738 0.000 1.7738
K2 16.400 377.836 2.583% 78.000 63.5349 14.465 0.0000
K3 5.700 131.321 2.583% 68.000 66.9275 1.072 0.0000
B11 K4 1.700 39.166 2.583% 68.000 67.9393 0.061 0.0000
K5 1.400 32.254 1.213% 68.000 68.3305 0.000 0.3305
K6 4.200 96.763 1.213% 76.000 69.5039 6.496 0.0000
K7 2.600 59.901 1.213% 64.000 70.2303 0.000 6.2303
K8 1.300 29.950 1.213% 64.000 70.5935 0.000 6.5935
K9 5.750 132.473 1.213% 76.000 72.2000 3.800 0.0000
B12 K10 2.150 49.533 1.213% 73.000 72.8007 0.199 0.0000
K11 0.600 13.823 -5.547% 74.000 72.0339 1.966 0.0000
K12 13.600 313.327 -5.547% 50.000 54.6536 0.000 4.6536
K13 1.050 24.191 -5.547% 50.000 53.3118 0.000 3.3118
K14 0.500 11.519 -5.547% 52.000 52.6728 0.000 0.6728
B13 K15 0.500 11.519 -5.547% 53.000 52.0338 0.966 0.0000
K16 0.300 6.912 0.920% 54.000 52.0974 1.903 0.0000
K17 1.420 32.715 0.920% 62.000 52.3984 9.602 0.0000
K18 3.900 89.851 0.920% 76.000 53.2250 22.775 0.0000
K19 1.850 42.622 0.920% 76.000 53.6171 22.383 0.0000
K20 4.200 96.763 0.920% 56.000 54.5073 1.493 0.0000
K21 6.200 142.840 0.920% 56.000 55.8215 0.179 0.0000
11' 1.000 23.039 0.920% 57.000 57.0000 0.000 0.0000
Total 77.620 1788.27 87.359 23.5662
Alternatif 2
Titik Jarak Elevasi Kedalaman (m)
Pias Kritis kemiringan
cm m Tanah Jalan Galian Timbunan
B 0 0.00 0.000 4.990% 53.000 53.000 0.000 0.0000
K1 0.60 13.823 4.990% 52.000 53.690 0.000 1.6898
K2 0.60 13.823 4.990% 52.000 54.380 0.000 2.3795
K3 1.30 29.950 4.990% 54.000 55.874 0.000 1.8740
K4 14.50 334.062 4.990% 74.000 72.543 1.457 0.0000
B21 K5 1.25 28.798 4.990% 74.000 73.980 0.020 0.0000
K6 0.25 5.760 0.894% 74.000 74.032 0.000 0.0316
K7 5.75 132.473 0.894% 60.000 75.216 0.000 15.2164
K8 0.90 20.735 0.894% 60.000 75.402 0.000 15.4019
K9 10.20 234.995 0.894% 78.000 77.504 0.496 0.0000
K10 2.20 50.685 0.894% 78.000 77.957 0.043 0.0000
B22 K11 0.10 2.304 0.894% 78.000 77.978 0.022 0.0000
K12 3.60 82.940 -2.828% 66.000 75.632 0.000 9.6318
K13 1.80 41.470 -2.828% 66.000 74.459 0.000 8.4589
K14 3.60 82.940 -2.828% 70.000 72.113 0.000 2.1130
B23 K15 3.35 77.180 -2.828% 70.000 69.930 0.070 0.0000
K16 4.20 96.763 -2.099% 58.000 67.899 0.000 9.8986
K17 1.00 23.039 -2.099% 58.000 67.415 0.000 9.4150
K18 6.80 156.664 -2.099% 72.000 64.126 7.874 0.0000
K19 0.50 11.519 -2.099% 72.000 63.884 8.116 0.0000
K20 1.50 34.558 -2.099% 72.000 63.159 8.841 0.0000
11' 12.83 295.587 -2.099% 57.000 57.000 0.000 0.0000
Total 76.83 1770.07 26.939 76.1105
Alternatif 3
Titik Jarak Elevasi (m) Kedalaman (m)
Pias Kemiringan
Kritis cm m Tanah Jalan Galian Timbunan
B 0 0 0.000 3.594% 53.00 53.0000 0.000 0.000
K1 6.7 154.360 3.594% 64.00 58.5475 5.453 0.000
B31 K2 6.8 156.664 3.594% 64.00 64.1778 0.000 0.178
K3 1.9 43.774 1.170% 64.00 64.6899 0.000 0.690
K4 5 115.194 1.170% 84.00 66.0375 17.963 0.000
K5 6.3 145.144 1.170% 54.00 67.7355 0.000 13.736
K6 0.7 16.127 1.170% 54.00 67.9242 0.000 13.924
K7 6.3 145.144 1.170% 72.00 69.6222 2.378 0.000
K8 2.9 66.812 1.170% 72.00 70.4038 1.596 0.000
B32 K9 0.3 6.912 1.170% 73.00 70.4847 2.515 0.000
K10 2 46.078 -1.207% 74.00 69.9283 4.072 0.000
B33 K11 7.6 175.095 -1.207% 68.00 67.8141 0.186 0.000
K12 3 69.116 -1.332% 72.00 66.8938 5.106 0.000
K13 1.4 32.254 -1.332% 72.00 66.4643 5.536 0.000
K14 5.5 126.713 -1.332% 60.00 64.7771 0.000 4.777
K15 1 23.039 -1.332% 62.00 64.4703 0.000 2.470
K16 1.6 36.862 -1.332% 62.00 63.9795 0.000 1.979
K17 5.5 126.713 -1.332% 72.00 62.2922 9.708 0.000
K18 1.8 41.470 -1.332% 72.00 61.7401 10.260 0.000
K19 3.2 73.724 -1.332% 68.00 60.7584 7.242 0.000
K20 3 69.116 -1.332% 68.00 59.8381 8.162 0.000
11' 9.1 209.653 -1.332% 56.00 57.0465 0.000 1.0465
Total 81.6 1879.96 80.175 38.8007
318.892
D R e Ls β Tc Ec Lc
2.000 716 0.029 50 ### 7.504 ### -5.19654
2.500 573 0.036 50 -83.174 6.005 -165.162 -4.15868
3.000 477 0.042 50 -69.239 4.999 -137.491 -3.46194
3.500 409 0.048 50 -59.368 4.286 -117.891 -2.96841
4.000 358 0.054 50 -51.965 3.752 -103.190 -2.59827
4.500 318 0.059 50 -46.159 3.333 -91.661 -2.30796
5.000 286 0.064 50 -41.514 2.997 -82.437 -2.07571
-16.518
6.000 239 0.073 50 -34.692 2.505 -68.890 -1.7346
7.000 205 0.080 50 -29.757 2.148 -59.089 -1.48784
8.000 179 0.086 50 -25.983 1.876 -51.595 -1.29913
9.000 159 0.091 50 -23.080 1.666 -45.830 -1.15398
10.000 143 0.095 60 -20.757 1.499 -41.219 -1.03786
11.000 130 0.098 60 -18.870 1.362 -37.471 -0.94351
12.000 119 0.100 60 -17.273 1.247 -34.301 -0.86367
21.05263 -9.80309 34.01 2.375 0.59375
-4.93671 -4.90154 1.1875
-2.45077
34.01
Sudut SpiraPusat Busur
D R e Ls β θs θc Lc L
0.250 5730 0.020 0 0.000 0.000 0.000 0.000
6.000 239 0.073 50 5.993 -11.987 -50.000 50.000
7.000 205 0.080 50 6.987 -13.975 -50.000 50.000
8.000 179 0.086 50 8.002 206.269 644.414 744.414
222.274
9.000 358 0.054 50 4.001 214.271 1338.828 1438.828
10.000 143 0.095 60 12.020 -24.040 -60.000 60.000
11.000 130 0.098 60 13.222 -26.444 -60.000 60.000
12.000 119 0.100 60 14.444 -28.889 -60.000 60.000
358 50 4.001 -8.002 -50.000 50.000
358
63.59433
68.34433
17.005 21.05263
-42.8337
2.375 2.375
63.59433 0.59375
31.79716 1.1875
Sudut Spiral Pusat Busur
D R e Ls β θs θc Lc L
5.000 286 0.064 50 5.008 198.906 992.868 1092.868
6.000 239 0.073 50 5.993 196.936 821.487 921.487
7.000 205 0.080 50 6.987 194.948 697.510 797.510
8.000 179 0.086 50 8.002 192.918 602.704 702.704
208.923
9.000 358 0.054 50 4.001 200.921 1255.408 1355.408
### 143 0.095 60 12.020 184.883 461.434 581.434
11.000 130 0.098 60 13.222 182.479 414.031 534.031
12.000 119 0.100 60 14.444 180.034 373.920 493.920
358 50 4.001 200.921 1255.408 1355.408
358
R 11.3525
Lc 39.02064742
Lc/2 19.51032371
Ls 2.375
Ls/4 0.59375
Ls/2 1.1875
2Ts p K Ts Es
### 0.365 24.994 -1085.383 ### -54.2692
### 0.437 24.991 -903.424 ### -45.1712
### 0.510 24.988 -771.875 ### -38.5938
### 0.585 24.984 -671.355 -898.123 -33.5677
### 0.291 24.996 -1364.275 ### -68.2138
### 1.060 29.956 -528.638 -719.871 -26.4319
-957.322 1.169 29.946 -478.661 -655.249 -23.9331
-872.902 1.280 29.935 -436.451 -600.647 -21.8225
### 0.291 24.996 -1364.275 ### -68.2138
21.053
-64.803
Jarak Interpolasi Elevasi
No Titik X Y
cm m STA
X1 X2 Y Y1 Y2
1 C 0.000 0 0 + 000
2 k1 2.375 50 0 + 050 597 596 2.4 0 3.2
3 k2 4.750 100 0 + 100 596 595 1.55 0 2.65
4 k3 7.125 150 0 + 150 595 594 1.25 0 13.1
5 k4 9.500 200 0 + 200 595 594 0.35 0 4.1
6 k5 11.875 250 0 + 250 595 594 0.6 0 3.95
7 k6 14.250 300 0 + 300 595 594 1.5 0 3.4
8 k7 16.341 344.019 0 + 344,019 595 594 2.25 0 3.4
9 k8 19.026 400.55 0 + 400,550 594 593 0.1 0 2.9
10 k9 21.711 457.081 0+457,081 593 592 0.55 0 1.4
11 k10 24.086 507.081 0+507,081 593 592 0.45 0 0.8
12 k11 26.461 557.081 0+557,081 594 593 0.4 0 0.8
13 k12 28.941 609.274 0+609,274 595 594 0 1.6
14 k13 33.493 705.12 0+705,120 596 595 0.4 0 0.85
15 k14 38.046 800.966 0+800,966 597 596 0.7 0 1.1
16 k15 40.421 850.966 0+850,966 598 597 0.6 0 1
17 k16 42.135 887.047 0+887,047 599 598 0.35 0 1
18 k17 50.671 1066.76 1+066,760 599 599
19 k18 59.207 1246.473 1+246,473 598 597 0.4 0 1.75
20 k19 61.582 1296.473 1+296,473 597 597
21 k20 63.957 1346.473 1+346,473 597 597
22 k21 66.332 1396.473 1+396,473 598 599 0.35 0 1
23 k22 68.707 1446.473 1+446,473 599 600 0.7 0 1
24 k23 71.082 1496.473 1+496,473 600 601 0.85 0 1.1
25 k24 73.457 1546.473 1+546,473 601 602 0 1.1
26 k25 75.832 1596.473 1+596,473 602 603 0.15 0 1.1
27 k26 78.207 1646.473 1+646,473 602 603 0.95 0 1.1
28 2 79.954 1683.25 1+683,250 603.5 603.5
Elevasi
y-y1 y2-y1 x2-x1 di kertas mm
597 14.00
596.250 2.4 3.2 -1 12.50
595.415 1.55 2.65 -1 10.83
594.905 1.25 13.1 -1 9.81
594.915 0.35 4.1 -1 9.83
594.848 0.6 3.95 -1 9.70
594.559 1.5 3.4 -1 9.12
594.338 2.25 3.4 -1 8.68
594.000 0.1 2.9 -1 8.00
592.607 0.55 1.4 -1 5.21
592.500 0.45 0.8 -1 5.00
593.500 0.4 0.8 -1 7.00
594.500 0 1.6 -1 9.00
596.000 0.4 0.85 -1 12.00
596.364 0.7 1.1 -1 12.73
597.400 0.6 1 -1 14.80
598.650 0.35 1 -1 17.30
598.000 0 0 0 16.00
597.771 0.4 1.75 -1 15.54
597.000 0 0 0 14.00
597.000 0 0 0 14.00
598.350 0.35 1 1 16.70
599.700 0.7 1 1 19.40
600.773 0.85 1.1 1 21.55
601.500 0 1.1 1 23.00
602.136 0.15 1.1 1 24.27
602.864 0.95 1.1 1 25.73
603.500 0 0 0 27.00
Jarak Interpolasi Elevasi
Titik X Y
cm m STA
X1 X2 Y Y1 Y2
C 0 0 0 + 000 0 0
k1 2.375 50 0 + 050 597 596 2.4 0 3.1
k2 4.75 100 0 + 100 596 595 1.65 0 2.65
k3 7.125 150 0 + 150 595 594 1.3 0 13.5
k4 9.5 200 0 + 200 595 594 0.1 0 4.9
k5 11.875 250 0 + 250 595 594 0.6 0 3.3
k6 14.25 300 0 + 300 595 594 1.2 0 3.25
k7 16.3409 344.019 0 + 344,019 595 594 1.83 0 3.05
k8 19.02613 400.55 0 + 400,550 595 594 2.8 0 3
k9 21.71135 457.081 0+457,081 593 592 0.45 0 1.45
k10 24.08635 507.081 0+507,081 593 592 0.2 0 0.8
k11 26.46135 557.081 0+557,081 594 593 0.2 0 0.8
k12 28.94052 609.274 0+609,274 595 594 0.2 0 0.8
k13 33.4932 705.12 0+705,120 597 596 0.6 0 0.8
k14 38.04589 800.966 0+800,966 597 596 0.5 0 1
k15 40.42089 850.966 0+850,966 598 597 0.4 0 1
k16 42.13473 887.047 0+887,047 599 598 0.15 0 1
k17 50.6711 1066.76 1+066,760 599 598 1.7 0 1.9
k18 59.20747 1246.473 1+246,473 598 597 0.2 0 1.7
k19 61.58247 1296.473 1+296,473 597 597
k20 63.95747 1346.473 1+346,473 597 597 0.2 0 1
k21 66.33247 1396.473 1+396,473 598 599 0.2 0 1
k22 68.70747 1446.473 1+446,473 599 600 0.55 0 1.05
k23 71.08247 1496.473 1+496,473 600 601 0.65 0 1.1
k24 73.45747 1546.473 1+546,473 601 602 0.35 0 1.1
k25 75.83247 1596.473 1+596,473 602 602 0.4 0 1.1
k26 78.20747 1646.473 1+646,473 602 603 0.8 0 1.15
2 79.95438 1683.25 1+683,250 603 604 0.4 0 1.2
Elevasi
y-y1 y2-y1 x2-x1 di kertas mm
597.097 14.19
596.226 2.4 3.1 -1 12.45
595.377 1.65 2.65 -1 10.75
594.904 1.3 13.5 -1 9.81
594.980 0.1 4.9 -1 9.96
594.818 0.6 3.3 -1 9.64
594.631 1.2 3.25 -1 9.26
594.400 1.83 3.05 -1 8.80
594.067 2.8 3 -1 8.13
592.690 0.45 1.45 -1 5.38
592.750 0.2 0.8 -1 5.50
593.750 0.2 0.8 -1 7.50
594.750 0.2 0.8 -1 9.50
596.250 0.6 0.8 -1 12.50
596.500 0.5 1 -1 13.00
597.600 0.4 1 -1 15.20
598.850 0.15 1 -1 17.70
598.105 1.7 1.9 -1 16.21
597.882 0.2 1.7 -1 15.76
597.000 0 0 0 14.00
597.000 0.2 1 0 14.00
598.200 0.2 1 1 16.40
599.524 0.55 1.05 1 19.05
600.591 0.65 1.1 1 21.18
601.318 0.35 1.1 1 22.64
602.000 0.4 1.1 0 24.00
602.696 0.8 1.15 1 25.39
603.465 0.4 1.2 1 26.93
Jarak Interpolasi Elevasi
Titik X Y
cm m STA
X1 X2 Y Y1 Y2
C 0 0 0 + 000 0 0
k1 2.375 50 0 + 050 597 596 2.4 0 3.25
k2 4.75 100 0 + 100 596 595 1.45 0 2.15
k3 7.125 150 0 + 150 595 594 1.1 0 12.5
k4 9.5 200 0 + 200 595 594 0.6 0 4.05
k5 11.875 250 0 + 250 595 594 0.8 0 3.2
k6 14.25 300 0 + 300 595 594 1.6 0 3.1
k7 16.3409 344.019 0 + 344,019 595 594 2.25 0 3.05
k8 19.02613 400.55 0 + 400,550 594 593 0.15 0 1.7
k9 21.71135 457.081 0+457,081 593 592 0.65 0 1.4
k10 24.08635 507.081 0+507,081 593 592 0.6 0 0.8
k11 26.46135 557.081 0+557,081 594 593 0.6 0 0.8
k12 28.94052 609.274 0+609,274 595 594 0.6 0 0.8
k13 33.4932 705.12 0+705,120 596 595 0.3 0 0.8
k14 38.04589 800.966 0+800,966 597 596 0.85 0 1
k15 40.42089 850.966 0+850,966 598 597 0.7 0 0.9
k16 42.13473 887.047 0+887,047 599 598 0.6 0 1
k17 50.6711 1066.76 1+066,760 598 597 0.15 0 1.9
k18 59.20747 1246.473 1+246,473 598 597 0.55 0 1.75
k19 61.58247 1296.473 1+296,473 597 597
k20 63.95747 1346.473 1+346,473 597 598 0.2 0 1
k21 66.33247 1396.473 1+396,473 598 599 0.55 0 1
k22 68.70747 1446.473 1+446,473 599 600 0.9 0 1
k23 71.08247 1496.473 1+496,473 600 601 1.05 0 1.1
k24 73.45747 1546.473 1+546,473 601 602 0.7 0 1.1
k25 75.83247 1596.473 1+596,473 602 603 0.4 0 1.1
k26 78.20747 1646.473 1+646,473 602 603 0.8 0 1.1
2 79.95438 1683.25 1+683,250 603 603.5 0.4 0 0.6
Elevasi
y-y1 y2-y1 x2-x1 di kertas mm
596.903 13.81
596.262 2.4 3.25 -1 12.52
595.326 1.45 2.15 -1 10.65
594.912 1.1 12.5 -1 9.82
594.852 0.6 4.05 -1 9.70
594.750 0.8 3.2 -1 9.50
594.484 1.6 3.1 -1 8.97
594.262 2.25 3.05 -1 8.52
593.912 0.15 1.7 -1 7.82
592.536 0.65 1.4 -1 5.07
592.250 0.6 0.8 -1 4.50
593.250 0.6 0.8 -1 6.50
594.250 0.6 0.8 -1 8.50
595.625 0.3 0.8 -1 11.25
596.150 0.85 1 -1 12.30
597.222 0.7 0.9 -1 14.44
598.400 0.6 1 -1 16.80
597.921 0.15 1.9 -1 15.84
597.686 0.55 1.75 -1 15.37
597.000 0 0 0 14.00
597.200 0.2 1 1 14.40
598.550 0.55 1 1 17.10
599.900 0.9 1 1 19.80
600.955 1.05 1.1 1 21.91
601.636 0.7 1.1 1 23.27
602.364 0.4 1.1 1 24.73
603.000 0.8 1.1 1 26.00
603.333 0.4 0.6 0.5 26.67
Elevasi Muka Tanah
Bahu Bahu
Drainase Drainase Drainase Pinggir Sumbu Pinggir Drainase
Kontur Jalan Jalan
I II III Kiri Utama Kanan IV
Kiri Kanan
C 597.174 597.161 597.149 597.136 597.097 597.000 596.903 596.864 596.851
1 596.195 596.205 596.208 596.218 596.226 596.250 596.262 596.269 596.279
2 595.422 595.407 595.403 595.388 595.377 595.415 595.326 595.314 595.300
3 594.897 594.899 594.900 594.902 594.904 594.905 594.912
594.914 594.916
4 595.089 595.053 595.043 595.007 594.980 594.915 594.852
594.824 594.788
5 594.877 594.857 594.852 594.833 594.818 594.848 594.750
594.735 594.716
6 594.757 594.715 594.704 594.662 594.631 594.559 594.484
594.452 594.410
7(TC) 594.518 594.479 594.469 594.430 594.400 594.338 594.262
594.233 594.193
(PI) 594.199 594.155 594.144 594.100 594.067 594.000 593.912
593.879 593.834
9(CT) 592.822 592.778 592.767 592.723 592.690 592.607 592.536
592.503 592.459
10 593.179 593.036 593.000 592.857 592.750 592.500 592.250
592.143 592.000
11 594.179 594.036 594.000 593.857 593.750 593.500 593.250
593.143 593.000
12(TS) 595.179 595.036 595.000 594.857 594.750 594.500 594.250
594.143 594.000
13(PI) 596.786 596.607 596.563 596.384 596.250 596.000 595.625
595.491 595.313
14(ST) 596.800 596.700 596.675 596.575 596.500 596.364 596.150
596.075 595.975
15 597.924 597.816 597.789 597.681 597.600 597.400 597.222
597.141 597.033
16(TS) 599.236 599.107 599.075 598.946 598.850 598.650 598.400
598.304 598.175
17(PI) 598.263 598.211 598.197 598.145 598.105 598.000 597.921
597.882 597.829
18(ST) 598.051 597.995 597.981 597.924 597.882 597.771 597.686
597.644 597.587
19 597.000 597.000 597.000 597.000 597.000 597.000 597.000
597.000 597.000
20 596.829 596.886 596.900 596.957 597.000 597.000 597.200
597.243 597.300
21 597.900 598.000 598.025 598.125 598.200 598.350 598.550
598.625 598.725
22 599.201 599.309 599.336 599.443 599.524 599.700 599.900
599.981 600.088
23 600.279 600.383 600.409 600.513 600.591 600.773 600.955
601.032 601.136
24 601.045 601.136 601.159 601.250 601.318 601.500 601.636
601.705 601.795
25 601.688 601.792 601.818 601.922 602.000 602.136 602.364
602.442 602.545
26 602.435 602.522 602.543 602.630 602.696 602.864 603.000 603.065 603.152
3 603.438 603.442 603.447 603.452 603.465 603.500 603.333 603.347 603.352
82738.47
Drasinas Drainase
STA
eV VI
596.839 596.826 0
596.282 596.292 50 0.02583 0.02583 3.75 1.5
595.296 595.281 100 0.096879 0.038752
594.917 594.919 150
594.779 594.742 200
594.711 594.692 250
594.400 594.358 300
594.184 594.144 344.019
593.823 593.779 400.550
592.448 592.404 457.081
591.964 591.821 507.081
592.964 592.821 557.081
593.964 593.821 609.274
595.268 595.089 705.120
595.950 595.850 800.966
597.006 596.898 850.966
598.143 598.014 887.047
597.816 597.763 1066.760
597.573 597.517 1246.473
597.000 597.000 1296.473
597.314 597.371 1346.473
598.750 598.850 1396.473
600.115 600.222 1446.473
601.162 601.266 1496.473
601.818 601.909 1546.473
602.571 602.675 1596.473
603.174 603.261 1646.473 0.0092 0.0092 3.75 1.5
603.356 603.361 1683.250 0.0345 0.0138
Drainase Drasinas
Drainase VI Jarak
IV eV
V VI VII VIII IX
+ - + - + - + - +
0.041 0.017 -0.246 -0.490
7.494 2.882 0.691 0.438
15.659 6.238 1.821 1.575
22.235 8.786 2.663 2.412
27.173 10.836 3.363 3.124
32.333 12.916 4.049 3.805
38.218 15.266 4.842 4.605
21.593 17.264 1.107 1.668 5.273
25.106 24.989 19.983 6.420 6.183
28.974 28.854 23.076 7.450 7.214
29.653 30.590 24.508 7.967 7.761
28.915 29.852 23.917 7.770 7.565
28.747 28.925 23.160 7.512 7.307
28.114 28.526 22.861 7.428 7.234
8.800 0.065 14.054 1.863 0.281 4.239
10.601 8.497 2.615 2.398
5.294 4.353 1.272 1.062
-12.499 -9.924 -3.520 -3.754
-8.958 -7.089 -2.574 -2.806
-7.463 -6.016 -2.270 -2.520
-6.976 -5.658 -2.176 -2.444
-8.644 -7.017 -2.648 -2.929
-10.313 -8.356 -3.097 -3.381
-11.428 -9.246 -3.392 -3.675
-11.247 -11.844 -9.571 -3.495 -3.774
timbunan
113.43
1933.03
3046.98
9304.59
24697.51
24991.83
44733.78
8554.63
32.21
90.17
###
###
-4941.7 -4941.6 -4941.5 -4941.4 -4941.0 -4940.0 -4939.0 -4938.6 -4938.5 -4938.4
-5110.5 -5111.4 -5111.6 -5112.5 -5113.2 -5115.0 -5116.4 -5117.0 -5118.0 -5118.2
Bahu Bahu
Drainase Pinggir Sumbu Pinggir Drainase Drasinas Drainase
Jalan Jalan
III Kiri Utama Kanan IV eV VI
Kiri Kanan
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
0.85 -0.15 -0.11 0.00 0.11 0.15 1.15 1.15 1.15
0.85 -0.15 -0.11 0.00 0.11 0.15 1.15 1.15 1.15
0.85 -0.15 -0.11 0.00 0.11 0.15 1.15 1.15 1.15
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
0.72 -0.28 -0.20 0.00 0.20 0.28 1.28 1.28 1.28
0.72 -0.28 -0.20 0.00 0.20 0.28 1.28 1.28 1.28
0.72 -0.28 -0.20 0.00 0.20 0.28 1.28 1.28 1.28
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.38 0.38 0.27 0.00 -0.27 -0.33 0.67 0.67 0.67
1.38 0.38 0.27 0.00 -0.27 -0.33 0.67 0.67 0.67
1.38 0.38 0.27 0.00 -0.27 -0.33 0.67 0.67 0.67
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
1.13 0.13 0.08 0.00 0.08 0.13 1.13 1.13 1.13
X
- +
-0.234 -3.024 0.000
0.189 23.628 0.000
2.496 55.092 0.000
5.813 83.913 0.000
9.832 106.993 0.000
14.525 134.251 0.000
21.328 166.080 0.000
27.938 112.075 40.526
38.406 45.189 143.392
52.240 60.317 173.392
60.932 0.000 251.612
57.898 0.000 242.338
54.042 0.000 236.497
53.137 0.000 230.229
18.238 90.613 14.400
5.914 55.918 0.000
1.215 20.009 0.000
-13.967 -95.740 0.000
-7.775 -65.882 0.000
-6.351 -49.241 0.000
-6.059 -44.370 0.000
-8.762 -55.708 0.000
-11.658 -68.598 0.000
-13.744 -77.858 0.000
-14.455 -59.629 -20.539
-4938.3
-5119.1
Kontur MUKA TANAH MUKA JALAN KEMIRINGAN STA
C 597.000 597.000 0.02583 0
1 596.250 598.292 0.02583 50
2 595.415 599.583 0.02583 100
3 594.905 600.875 0.02583 150
4 594.915 602.167 0.02583 200
5 594.848 603.459 0.02583 250
6 594.559 604.750 0.02583 300
7(TC) 594.338 605.888 0.02583 344.019
(PI) 594.000 607.348 0.02583 400.55
9(CT) 592.607 608.034 0.01213 457.081
10 592.500 608.640 0.01213 507.081
11 593.500 609.246 0.01213 557.081
12(TS) 594.500 609.879 0.01213 609.274
13(PI) 596.000 611.041 0.01213 705.12
14(ST) 596.364 605.725 -0.05547 800.966
15 597.400 602.951 -0.05547 850.966
16(TS) 598.650 600.950 -0.05547 887.047
17(PI) 598.000 590.981 -0.05547 1066.76
18(ST) 597.771 592.635 0.00920 1246.473
19 597.000 593.095 0.00920 1296.473
20 597.000 593.555 0.00920 1346.473
21 598.350 594.015 0.00920 1396.473
22 599.700 594.475 0.00920 1446.473
23 600.773 594.935 0.00920 1496.473
24 601.500 595.395 0.00920 1546.473
25 602.136 595.855 0.00920 1596.473
26 602.864 596.315 0.00920 1646.473
3 603.500 596.653 0.00920 1683.25
STA 0 + 0000 a b t Luas
Pias Tipe
(m) (m) (m) (m²)
I Segitiga 0.540 - 1.088 0.294
II Trapesium 1.088 1.092 0.500 0.545
III Trapesium 1.092 0.096 0.500 0.297
IV Trapesium 0.096 0.047 1.500 0.107
V Segitiga 0.047 - 3.750 0.088
VI Segitiga 0.103 - 3.750 0.193
VII Trapesium 0.103 0.174 1.500 0.208
VIII Trapesium 0.174 1.178 0.500 0.338
IX Trapesium 1.178 1.182 0.500 0.590
X Segitiga 0.590 1.182 0.349
Luas Total Cut 3.009
I - IV Fill 1.078975
Keterangan
V Fill 1.3144
CUT VI Fill 1.2469
CUT VII - VIII Fill 0.5485
CUT
FILL IX Cut 0.3950
FILL X Fill 0.1582
FILL
FILL I -VIII Fill 4.188735
FILL IX Cut 0.5
FILL
CUT X Fill 0.1582
CUT
CUT
CUT
CUT
Fill
cut
cut
cut
Fill
Fill I-X Fill 10.1540
Fill
Fill
Fill
Fill
cut
cut
cut
Fill
m²
m²
Fill
cut
cut
cut
Fill I-X Fill 5.7828
Fill
Fill
Fill
Fill
Fill
cut
cut
cut
Fill
m²
m²
cut
cut I-X Fill 2.2706
cut
Fill
Fill
Fill
Fill
Fill
Fill
cut
cut
cut
m²
m²
cut
cut
cut I-X Fill 1.4763
cut
Fill
Fill
Fill
Fill
Fill
cut
cut
cut
m²
m²
cut
cut
cut
Fill
Fill I-X Fill 0.9454
Fill
Fill
Fill
Fill
cut
cut
cut
m²
m²
Cut
Cut I-X Cut 2.0532
Cut
Fill
Fill
Fill
Cut
Cut
Cut
Cut
Cut
m²
m²
I-X Cut -
Keterangan
fill
fill I-X Cut -
fill
fill
fill
fill
fill
fill
fill
fill
m²
m²
I-X Cut -
Keterangan
fill
fill
fill I-X Cut -
fill
fill
fill
fill
fill
fill
fill
m²
m²
fill
Cut
Cut
Cut
fill I-X Cut 0.0708
fill
fill
fill
fill
fill
fill
fill
m²
m²
fill
Cut
Cut
Cut
fill
fill
fill
fill
fill
fill
fill
fill
m²
m²
Keterangan
Cut
Cut
Cut
Cut
Cut
Fill
Fill
Fill
Cut
Cut
Cut
Cut
m²
m²
Keterangan
I FILL 0.2215
Cut II CUT 0.6050755
Cut III -VII FILL 2.0307345
Cut
Fill
Fill
Fill
Fill
Fill
Fill
Cut
Cut
Cut
Fill
m²
m²
I FILL 0.849
Keterangan
II CUT 3.2545
Cut III -VII FILL 6.624875
Cut VIII - X CUT 0.39025
Cut
Cut
Cut
Cut
Cut
Cut
Cut
Cut
m²
m²
I CUT 1.52425
Keterangan
II CUT 1.734
Cut III -VII CUT 18.57475
Cut VIII - X CUT 2.2285
Cut
Cut
Cut
Cut I-X Cut 24.0615
Cut
Cut
Cut
Cut
m²
m²
Keterangan
1-X Cut 5.032964
Cut
Cut
Cut
Cut
Cut
fill
fill
fill
Cut
Cut
Cut
fill
m²
m²
Keterangan
I-X cut 22.495
fill
fill
fill I Cut 0.3485
fill II Cut 0.116
fill III - VII Cut 19.49525
fill VIII - X Cut 2.5353
fill
fill
fill
fill
m²
m²
I Fill 1.207
Keterangan
II CUT 0.957
Fill III - VII FILL 33.83225
Fill VIII - X CUT 2.164
Fill
Fill
Fill
Fill
Fill
Fill
Fill
Fill
m²
m²
I Fill 1.5015
Keterangan
II Fill 1.23375
Fill III - VII Fill 36.89275
Fill VIII - X Fill 3.5798
Fill
Fill
Fill
Fill I-X FIILL 43.20775
Fill
Fill
Fill
Fill
m²
m²
Fill
Fill
Fill
Fill
Fill
Fill
Fill
Fill
Fill
Fill
m²
m²
Fill
Fill
Fill
Fill
Fill
Fill
Fill
Fill
Fill
Fill
m²
m²
Fill
Fill
Fill
Fill
Fill
Fill
Fill
Fill
cut
cut
cut
Fill
m²
m²
fill
fill
Cut
Cut
fill
fill
fill
fill
fill
fill
Cut
Cut
Cut
fill
m²
m²
fill
cut
cut
cut
fill
fill
fill
fill
fill
fill
Cut
Cut
Cut
m²
m²
fill
cut
cut
cut
fill
fill
fill
fill
fill
Cut
Cut
Cut
Cut
m²
m²
Keterangan
I - VI CUT 6.823785
Cut VII FILL 0.0861
Cut
Cut
Cut
Cut
Cut
Fill
Cut
Cut
Cut
Fill
m²
m²
Elevasi Jarak antar Luasan (m2)
Pias STA Tanah Jalan STA Kedalaman Kemiringan Galian
1 0 + 000 597.00 597.00 0.00 0.00 0.02583 3.009
2 0 + 050 596.25 598.29 50.00 2.04 0.02583 1.319
3 0 + 100 595.42 599.58 50.00 4.17 0.02583 0.294
4 0 + 150 594.90 600.88 50.00 5.97 0.02583 0.229
5 0 + 200 594.91 602.17 50.00 7.25 0.02583 0.868
6 0 + 250 594.85 603.46 50.00 8.61 0.02583 0.976
7 0 + 300 594.56 604.75 50.00 10.19 0.02583 1.035
8 0 + 344,019 594.34 605.89 44.02 11.55 0.02583 1.509
9 0 + 400,550 594.00 607.35 56.53 13.35 0.02583 -
10 0+457,081 592.61 608.03 56.53 15.43 0.01213 0.000
11 0+507,081 592.50 608.64 50.00 16.14 0.01213 0.000
12 0+557,081 593.50 609.25 50.00 15.75 0.01213 0.071
13 0+609,274 594.50 609.88 52.19 15.38 0.01213 0.251
14 0+705,120 596.00 611.04 95.85 15.04 0.01213 -
15 0+800,966 596.36 605.72 95.85 9.36 -0.05547 1.444
16 0+850,966 597.40 602.95 50.00 5.55 -0.05547 11.119
17 0+887,047 598.65 600.95 36.08 2.30 -0.05547 24.062
18 1+066,760 598.00 590.98 179.71 -7.02 -0.05547 -
19 1+246,473 597.77 592.63 179.71 -5.14 0.00920 0.000
20 1+296,473 597.00 593.09 50.00 -3.91 0.00920 0.000
21 1+346,473 597.00 593.55 50.00 -3.45 0.00920 0.000
22 1+396,473 598.35 594.01 50.00 -4.34 0.00920 0.000
23 1+446,473 599.70 594.47 50.00 -5.23 0.00920 0.000
24 1+496,473 600.77 594.93 50.00 -5.84 0.00920 0.329
25 1+546,473 601.50 595.39 50.00 -6.11 0.00920 0.554
26 1+596,473 602.14 595.85 50.00 -6.28 0.00920 1.087
27 1+646,473 602.86 596.31 50.00 -6.55 0.00920 1.566
28 1+683,250 603.50 596.65 36.78 -6.85 0.00920 2.263
Total -51.983
Luasan (m2) Volume (m3)
STA
Timbunan Galian Timbunan
0.000
3.392 0 + 000 - 0 + 050 60.659 37.259
9.199 0 + 050 - 0 + 100 4.603 272.252
10.154 0 + 100 - 0 + 150 0.232 471.091
5.783 0 + 150 - 0 + 200 1.754 372.854
2.271 0 + 200 - 0 + 250 12.820 167.971
1.476 0 + 250 - 0 + 300 23.630 66.931
0.945 0 + 300 - 0 + 344,019 33.188 24.671
- - - - - -
21.646 0 + 344,019 - 0+457,081 7.260 1190.571
26.700 0+457,081 - 0+507,081 - 1211.500
17.699 0+507,081 - 0+557,081 0.003 1108.199
9.866 0+557,081 - 0+609,274 0.097 711.039
- - - - - -
2.067 0+609,274 - 0+800,966 20.206 1001.477
0.000 0+800,966 - 0+850,966 269.702 7.301
0.000 0+850,966 - 0+887,047 634.683 -
- - - - - -
22.495 0+887,047 - 1+246,473 2234.903 1953.286
38.160 1+246,473 - 1+296,473 - 1516.375
43.208 1+296,473 - 1+346,473 - 2034.200
31.734 1+346,473 - 1+396,473 - 1873.550
19.666 1+396,473 - 1+446,473 - 1285.000
11.652 1+446,473 - 1+496,473 0.086 774.807
8.305 1+496,473 - 1+546,473 0.936 477.781
5.611 1+546,473 - 1+596,473 4.327 311.204
2.879 1+596,473 - 1+646,473 15.791 161.718
0.255 1+646,473 - 1+683,250 38.719 25.939
295.160 3363.599 17056.976