RECREATIONAL
COMMERCIAL
TOD Project
DDA Site
Trilokpuri METRO
STATION
`
`
2
Vinod Nagar West
Kalyanpuri
10.26 Ha
Sanjay Lake DDA land
Trilokpuri
SANJAY LAKE, DELHI
• Lake edge/ water interface
Metro station
under construction
On site
• Lake view from DDA site
SANJAY LAKE
Petrol
Pump TOWARDS KANDOLI
TOWARDS
PATPARGANJ
TOWARDS INDIRAPURAM PARK
TRILOKPURI
Annexure-6
Fire Sites handed over
Station
SANJAY LAKE
KALYANPURI
PROPOSED
METRO STATION
Police
Petrol Post
TOWARDS Pump
PATPARGANJ
INDIRAPURAM PARK
2.0 EXAMINATION:
2.2 LAND AREA, STATUS AND PREVIOUS ALLOTMENTS:
Out of the designated site area of 10.26 Ha., 4(nos.) land parcels have already been allotted/
handed over to Delhi Fire Services, a Petrol Pump, Police post and land for the Metro Station
building (subject to verification by LD wing, DDA), all of which have to be integrated with the
overall project scheme. The details of the allotment sites/ areas are as follows:
MAYUR VIHAR PH II
Annexure-1
• Site Area = approx.
10.26 ha Fire
EXISTING SURVEY
Station DRAWING WITH
• More than 50% of
the site area falls
METRO PROPOSAL
within the 300m LAND AVAILABLE FOR
influence zone of SANJAY LAKE TOD SCHEME = 8.82 Ha
MRTS stations at
TRILOKPURI,
therefore the norms KALYANPURI
for ‘Influence Zone
along MRTS
Corridors’ as per
MPD-2021 shall be
applicable.
Petrol Police
TOWARDS Pump Post
PATPARGANJ TOWARDS KANDOLI
TOWARDS INDIRAPURAM PARK TOWARDS
TRILOKPURI VASUNDHARA
PROPOSAL: ENABLING FLEXIBILITY – context sensitive uses
Due to this, it was felt that introducing residential uses within the
scheme in the form of service apartments, old age homes, hostels,
etc. would allow better utilization of this site.
Site Location on Zonal Plan:
Site falls under ‘COMMERCIAL’ Use
Annexure-5
One of the major issues highlighted by stakeholders during the core group meetings of
UTTIPEC is the issue of crime in the area. It was pointed out that the area within and
outside the site, including the Sanjay Lake Area is extremely unsafe at night, and most
often occupied/ frequented by anti-social elements.
Given this context, it is essential that some city level attractions are introduced in the
area so that footfalls of visitors makes the site area, the Lake and its surroundings
better used, better watched and more active round the clock.
Accordingly, the scheme for the 10.26 ha DDA land has been prepared in such a way
that most of the residential, hospitality and public-oriented uses are facing the Sanjay
Lake, in order to provide passive visual surveillance to the lake at all times.
Facing the beautiful and well-maintained Sanjay Lake on the west side, would also
increase the value and marketability of the development on the 10.26 Ha DDA site,
and maximize revenue for DDA in addition to providing public benefit.
DDA site
IMPROVED ACCESS Annexure-4
Proposed Strategy Approved by Governing Body of UTTIPEC for
Multi-Modal Integration at Trilokpuri Metro Station
• Bridge connecting across Lake
IMPROVED ACCESS Annexure-4
B
S
H
H
C
T
B C
S B BUS STAND
T
S
R RIKSHAW STAND
S
A AUTO STAND
S
DO DROP OFF
T TAXI STAND
S
C CYCLE TRACK
T
Proposed Strategy Approved by Governing Body of UTTIPEC for H HAWKERS
PUBLIC WALKWAY
CONNECTION AT CONCOURSE
LEVEL @ 10.26 MTS
PROMENADE AT GROUND
FLOOR LEVEL
3.Enhancing Environmental Value & Usability of Sanjay Lake
The Sanjay Lake catchment area will not be affected by the project in any
way. In fact, the environmental quality of the lake and ground water in
the area shall be enhanced along with increased usability and safety
within this environmental asset for the neighbourhood.
PROPOSAL: Enhance Environmental Quality of Lake.
1. The scheme will not affect the catchment area of the Sanjay lake.
2. No permanent construction work will be undertaken within the park. Only the
following interventions are proposed which will enhance the water quality and
recharge of the Sanjay Lake and making at a safer and more usable park for the
public:
• Increase in ground water recharge and infiltration by improvement of intake
channels and detention/retention capacity of the lake.
• Creation of attractions like promenades, arboretums, conservatories, etc. along
the edge of the park (outside the park boundary wall), to make the edges active,
more vibrant and safe.
• Creation of floating plant beds within the lake would impart oxygen inside and
take unwanted/ excess algae formation elements out of the lake (Nitrogen,
Phosphorus, etc)
• Scientific plantation strategy will be undertaken along the edges of the Lake Park
in the form of bioswales, etc. to treat and prevent any polluted storm water from
directly entering the lake or polluting the ground water.
• No permanent constructions will be undertaken. Only fully permeable/ organic
materials like geo-textiles, gravel, etc may be used, if required.
Bio-swales Natural Treatment beds
55
Bio-swales Natural Treatment beds
56
3.0 PROPOSAL:
3.1 AREA STATEMENT OF PROPOSED PLAN (refer Annexure-6 and Annexure-7):
3.0 PROPOSAL SUMMARY:
The final TOD norms shall be applicable to the scheme only after final notification
of MPD-2021 revisions by the Ministry of Urban Development.
i) The proposal aims to capitalize on the beautiful views to the existing Sanjay Lake on
the western side of the site, therefore, it is proposed that the project may be named
as “Lake View Complex” for marketing purposes.
ii)The proposal will be self sustainable project and it will in no way affect the
catchment area of the Sanjay Lake and will in fact, enhance environmental quality of
the area.
iii)The Trilokpuri Metro station currently under construction within the site is
scheduled to be opened to public soon. It is proposed that the “Trilokpuri” Metro
station may be renamed as “Sanjay Lake station”. If agreed by the Authority, the
same may be conveyed to DMRC for necessary action.
3.0 PROPOSAL SUMMARY:
iv) The layout plan for the scheme showing the road network, common public
green area, urban design guidelines/envelop controls as well as the actions
for implementing agency and other details agreed by the Technical
Committee of DDA dt. 22.01.15 shall be followed by NBCC/ implementing agency
for development of the project along with the following recommendations of the
Technical Committee [refer Annexures-7,8,9; pages 1232/C, 1233/C, 1263 to
1266/C]:
a. The project will be taken up for implementation on similar model as the TOD
project at Kadkadooma.
b. NBCC will work out the detailed program for the project based on Market
viability.
c. Additional proper approach to the site is to be provided from the NH-24 side.
d. The scheme will not affect the catchment area of the Sanjay lake.
3.0 PROPOSAL SUMMARY: