Anda di halaman 1dari 36

LAPORAN

SOIL INVESTIGASI
(SONDIR)
PAKET 11
JEMBATAN APBN
1. JEMBATAN BENTENG 7
2. JEMBATAN PENATOI
3. JEMBATAN LALAR 2
4. JEMBATAN PADAT
ALAS

PT. ARIA JASA REKSATAMA


DAFTAR ISI

Daftar Isi.............................................................................................................. 1

Bab.1. Pendahuluan ...................................................................................................... 2

1.1 Maksud dan Tujuan ........................................................................................... 2

1.2 Lokasi Proyek .................................................................................................... 2

1.3 Lingkup Pekerjaan ............................................................................................. 3

Bab. II. Metodologi......................................................................................................... 4

2.1 Pengujian Lapangan dengan penetrasi sondir ................................................... 4


2.2 Analisa Data ...................................................................................................... 5

Bab. III. Penutup........................................................................................................... 8

Lampiran :

1. Hasil Pengujian Lapangan

2. Dokumentasi

1
BAB 1

PENDAHULUAN

1.1 MAKSUD DAN TUJUAN

Penyelidikan Geoteknik dimaksudkan untuk mengetahui memperoleh data teknis


yang akurat untuk dianalisis, sehingga dapat dijadikan pedoman perencanaan

desain. Dari hasil penyelidikan ini diharapkan diperoleh pilihan pondasi yang
aman, efisien, dan dimungkinkan pelaksanaannya dengan pilihan yang tersedia
dipasar konstruksi lokal.

1.2 LOKASI PROYEK


PERENCANAAN PEMBANGUNAN JEMBATAN BENTENG 7, JEMBATAN
PADAK TALAS, JEMBATAN PENATOI, JEMBATAN LALAR 2 yakni:

Koordinat
NamaJembatan Lokasi
S-1 S–2

Hodo, Kab.
Benteng 7 609630;9065357 613355;9241830
Dompu, NTB

PadakTalas Plampang, Kab. 600088; 903353


Sumbawa, NTB

Penatoi Kota Bima


693028; 9063913

Lalar 2 Sumbawa Barat 442541;9029906

2
1.3 LINGKUP PEKERJAAN
Penyelidikan Geoteknik dilokasi rencana meliputi :
a. Penyelidikan lapangan.

Penyelidikan Lapangan bertujuan untuk mengevaluasi kekuatan dan kondisi


pelapisan tanah bawah lokasi setempat. Pengujian dilakukan menggunakan
alat sondir.

3
BAB II

METODOLOGI

2.1 Pengujian Lapangan dengan penetrasi sondir


Pengujian ini untuk mengevaluasi kekuatan tanah. Titik pengujian berada

disekitar letak pondasi. Pengujian penetrasi sondir dilakukan dengan

penetrometer mekanis model GMF, Holland, kapasitas alat ± 2.5 ton,


pelaksanaanya sesuai ASTM D-3441. Hasil-hasil yang diperoleh dari

penyelidikan ini, disajikan berupa grafik-grafik sondir yang menyatakan


hubungan antara qc (tahanan ujung), qf (jumlah hambatan pelekat), fs (gesekan

lokal) dan FR (rasio gesek), kesemuanya vs kedalaman; disajikan dalam


lampiran uji penetrasi konus. Perkiraan struktur lapisan stratigrafi lokasi tapak
bangunan berdasarkan hasil sondir (menurut Robertson dan Campanella, 1983)

gambar 1.1, dan disajikan dalam tabel berikut :

Gambar 1.1 Klasifikasi tanah


didasarkan pada hasil uji
kerucut statis (sondir)

(Robertson dan Campanella,


1983).

4
2.2 Analisa Data

a. Daya Dukung Pondasi Dangkal

1. Rumus Bowles
Daya dukung tanah berdasarkan data sondir(Bowles, 1997) :

Untuk tanah pasir

Pondasi Strip qult = 28 – 0.0052 (300 – qc)1,5 (kg/cm2)


Pondasi Square qult = 48 – 0.009 (300 – qc)1,5 (kg/cm2)

dengan syarat D/B  1,5 ; qc adalah nilai rata-rata pada B/2 di atas

dasar pondasi dan 1,1B di bawah dasar pondasi.


Untuk tanah lempung :

Pondasi Strip qult = 2 + 0,28 qc (kg/cm2)

Pondasi Square qult = 5 + 0,34 qc (kg/cm2)

2. Rumus Meyerhof
Apabila data yang tersediaberupa data langsungdarinilaisondir,
dengananggapanbahwapondasi yang

akandibuatnantinyaadalahpondasidangkal (Shallow Foundation),


makarumus yang dipakaiadalah :

a.  all = Qc / 50 (1+0.3/B)2 ( Untukpondasidangkal B > 1.20 m)


b.  all = Qc / 30 ( Untukpondasidangkal, B < 1.20 m ).
c.  all = Qc / 40 ( Untukbesarnya B yang sembarang ).

dimana :

Qc = nilaikonus

B = LebarPondasi
D = Kedalamanpondasi
ult =Tegangantanahultimit/batas.

all =Teganganijintanah .
Sf = factor keamanan (diambil 3)
5
3. Rumus Terzaghi

Rumus Terzaghi (1943) dapat digunakan apabila data

laboratorium tersedia yaitu dari nilai kohesi ( c ) dan sudut geser dalam
().

qu = 1,3 c Nc + po Nq + 0,4  B N ( bujur sangkar )

qu = cNc (1+0,3B/L) + poNq + 0.5  BN (1-0,2B/L) (empat persegi


panjang)

Dengan :

qu = kapasitas dukung ultimit ( kg/cm2), B = lebar fondasi (cm)


c = kohesi tanah (kg/cm2), L = panjang fondasi (cm)

po = tekanan overburden, = berat volume tanah (gram/cm3)

b. Daya Dukung Pondasi dalam


Qu = Abqc + Asfs, Qa = Qu / FK
Dengan :
Ab = luas ujung bawah tiang

As = luas selimut tiang


qc = tahanan ujung kerucut statis
( 8d di atas ujung konus dan 4d di bawah konus)

fs = tahanan gesek dinding satuan


FK = 2.5 – 3

c. PerkiraanKapasitasDukungPondasi
Untuk memberikan gambaran kekuatan lapisan tanah dekat

permukaan, dikaji kapasitas dukung pondasi dangkal tipe lajur dengan

lebar dasar 1 m, yang diletakkan pada kedalaman -1 m. Kapasitas


dukung ijin pondasi dangkal diperkirakan berdasarkan metode

Bowles, Terzaghi maupun Meyerhoff dengan angka keamanan (SF) =

6
3. Kapasitas dukung ijin yang diberikan diberikantanah pendukung

denganpenurunan konsolidasinya dibatasi maksimal 2.5 cm.

Dalam perencanaan pondasi harus memenuhi 2 kriteria


penting, yaitu kapasitas dukung ijin pondasi terpasang ≥ beban kerja

di bawah setiap kemungkinan beban yang dipikulnya, dan

kestabilannya (a.I. terhadap penurunan konsolidasi, geser, guling, dll)


harus aman dan terjamin serta deformasinya masih dalam batas-

batas yang dapat diterima.

Untuk menjamin meratanya beban terhadap pondasi serta

untuk mengantisipasi beda penurunan, maka pondasi sebaiknya


diikat dengan sloof-sloof yang kaku. Sloof-sloof kaku tidak saja
menjamin struktur terhadap deformasi yang diakibatkan oleh beda

penurunan, namun juga dapat dimanfaatkan untuk menahan gaya


reaksi horisontal pada pondasi dangkal.

7
BAB III

PENUTUP

Demikian buku laporan hasil penyelidikan tanah pada untuk kegiatan PERENCANAAN
PEMBANGUNAN JEMBATAN BENTENG 7, JEMBATAN PADAK TALAS, JEMBATAN
LALAR 2, JEMBATAN PADAT ALAS yang berlokasi di Nusa Tenggara Barat yang telah
kami susun berdasarkan pada hasil penyelidikan lapangan.

Adapun segala keputusan yang berkaitan dengan design serta alternatif pemilihan fondasi

menjadi wewenang dan tanggung jawab perencana.

8
LAMPIRAN

DATA SONDIR & DOKUMENTASI


Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 18 Mei 2017
Proyek : Perencanaan Pembangunan Jembatan Penatoi Dikerjakan Tim Geo 2017
Lokasi : Kota Bima, NTB Coordinate : 693028; 9063913
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

0.00 0.00 0.00 0.00 0.00 0.0 0.00


0.20 60.00 75.00 1.50 30.00 30.0 2.50
0.40 60.00 75.00 1.50 30.00 60.0 2.50
0.60 60.00 62.50 75.00 1.50 30.00 90.0 2.50
0.80 60.00 61.25 75.00 1.50 30.00 120.0 2.50
1.00 70.00 57.50 80.00 1.00 20.00 140.0 1.43
1.20 70.00 53.75 80.00 1.00 20.00 160.0 1.43
1.40 70.00 50.00 80.00 1.00 20.00 180.0 1.43
1.60 50.00 43.75 60.00 1.00 20.00 200.0 2.00
1.80 50.00 37.50 60.00 1.00 20.00 220.0 2.00
2.00 30.00 30.63 40.00 1.00 20.00 240.0 3.33
2.20 30.00 26.25 40.00 1.00 20.00 260.0 3.33
2.40 30.00 21.88 40.00 1.00 20.00 280.0 3.33
2.60 20.00 20.00 30.00 1.00 20.00 300.0 5.00
2.80 20.00 18.13 30.00 1.00 20.00 320.0 5.00
3.00 15.00 16.25 20.00 0.50 10.00 330.0 3.33
3.20 15.00 15.63 20.00 0.50 10.00 340.0 3.33
3.40 15.00 15.00 20.00 0.50 10.00 350.0 3.33
3.60 15.00 15.00 20.00 0.50 10.00 360.0 3.33
3.80 15.00 15.00 20.00 0.50 10.00 370.0 3.33
4.00 15.00 16.25 20.00 0.50 10.00 380.0 3.33
4.20 15.00 17.50 20.00 0.50 10.00 390.0 3.33
4.40 15.00 18.75 20.00 0.50 10.00 400.0 3.33
4.60 15.00 21.25 20.00 0.50 10.00 410.0 3.33
4.80 15.00 23.75 20.00 0.50 10.00 420.0 3.33
5.00 25.00 26.25 35.00 1.00 20.00 440.0 4.00
5.20 25.00 28.75 35.00 1.00 20.00 460.0 4.00
5.40 25.00 31.25 35.00 1.00 20.00 480.0 4.00
5.60 35.00 34.38 50.00 1.50 30.00 510.0 4.29
5.80 35.00 37.50 50.00 1.50 30.00 540.0 4.29
6.00 35.00 40.63 50.00 1.50 30.00 570.0 4.29
Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 18 Mei 2017
Proyek : Perencanaan Pembangunan Jembatan Penatoi Dikerjakan Tim Geo 2017
Lokasi : Kota Bima, NTB Coordinate : 693028; 9063913
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

6.20 35.00 42.50 50.00 1.50 30.00 600.0 4.29


6.40 35.00 42.50 50.00 1.50 30.00 630.0 4.29
6.60 50.00 42.50 55.00 0.50 10.00 640.0 1.00
6.80 50.00 40.63 55.00 0.50 10.00 650.0 1.00
7.00 50.00 40.00 55.00 0.50 10.00 660.0 1.00
7.20 50.00 37.75 55.00 0.50 10.00 670.0 1.00
7.40 35.00 35.88 50.00 1.50 30.00 700.0 4.29
7.60 35.00 34.00 50.00 1.50 30.00 730.0 4.29
7.80 20.00 32.38 30.00 1.00 20.00 750.0 5.00
8.00 30.00 32.75 40.00 1.00 20.00 770.0 3.33
8.20 32.00 31.50 48.00 1.60 32.00 802.0 5.00
8.40 35.00 32.13 42.00 0.70 14.00 816.0 2.00
8.60 35.00 30.88 42.00 0.70 14.00 830.0 2.00
8.80 37.00 29.38 45.00 0.80 16.00 846.0 2.16
9.00 38.00 28.50 45.00 0.70 14.00 860.0 1.84
9.20 25.00 25.63 30.00 0.50 10.00 870.0 2.00
9.40 25.00 22.50 30.00 0.50 10.00 880.0 2.00
9.60 20.00 20.25 34.00 1.40 28.00 908.0 7.00
9.80 20.00 19.63 35.00 1.50 30.00 938.0 7.50
10.00 28.00 18.38 35.00 0.70 14.00 952.0 2.50
10.20 12.00 18.13 15 0.30 6.00 958.0 2.50
10.40 12.00 17.88 15.00 0.30 6.00 964.0 2.50
10.60 20.00 16.63 25.00 0.50 10.00 974.0 2.50
10.80 20.00 19.50 25.00 0.50 10.00 984.0 2.50
11.00 15.00 22.75 20.00 0.50 10.00 994.0 3.33
11.20 18.00 25.00 28.00 1.00 20.00 1014.0 5.56
11.40 18.00 24.38 28.00 1.00 20.00 1034.0 5.56
11.60 18.00 24.38 28.00 1.00 20.00 1054.0 5.56
11.80 35.00 24.00 42.00 0.70 14.00 1068.0 2.00
12.00 38.00 23.63 52.00 1.40 28.00 1096.0 3.68
12.20 38.00 23.25 52.00 1.40 28.00 1124.0 3.68
12.40 15.00 22.00 18.00 0.30 6.00 1130.0 2.00
12.60 15.00 20.38 18.00 0.30 6.00 1136.0 2.00
12.80 15.00 17.50 23.00 0.80 16.00 1152.0 5.33
13.00 15.00 21.00 24.00 0.90 18.00 1170.0 6.00
Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 18 Mei 2017
Proyek : Perencanaan Pembangunan Jembatan Penatoi Dikerjakan Tim Geo 2017
Lokasi : Kota Bima, NTB Coordinate : 693028; 9063913
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

13.20 15.00 24.50 24.00 0.90 18.00 1188.0 6.00


13.40 25.00 24.50 30.00 0.50 10.00 1198.0 2.00
13.60 25.00 24.50 30.00 0.50 10.00 1208.0 2.00
13.80 15.00 24.13 23.00 0.80 16.00 1224.0 5.33
14.00 43.00 22.88 52.00 0.90 18.00 1242.0 2.09
14.20 43.00 20.75 52.00 0.90 18.00 1260.0 2.09
14.40 15.00 19.88 25.00 1.00 20.00 1280.0 6.67
14.60 15.00 16.13 25.00 1.00 20.00 1300.0 6.67
14.80 12.00 12.38 20.00 0.80 16.00 1316.0 6.67
15.00 15.00 12.00 25.00 1.00 20.00 1336.0 6.67
15.20 8.00 11.13 15.00 0.70 14.00 1350.0 8.75
15.40 8.00 10.50 15.00 0.70 14.00 1364.0 8.75
15.60 13.00 9.63 15.00 0.20 4.00 1368.0 1.54
15.80 13.00 10.13 15.00 0.20 4.00 1372.0 1.54
16.00 12.00 11.00 15.00 0.30 6.00 1378.0 2.50
16.20 8.00 13.13 12.00 0.40 8.00 1386.0 5.00
16.40 7.00 20.88 12.00 0.50 10.00 1396.0 7.14
16.60 8.00 22.13 12.00 0.40 8.00 1404.0 5.00
16.80 12.00 23.63 22.00 1.00 20.00 1424.0 8.33
17.00 15.00 25.25 20.00 0.50 10.00 1434.0 3.33
17.20 30.00 26.75 40.00 1.00 20.00 1454.0 3.33
17.40 75.00 27.75 90.00 1.50 30.00 1484.0 2.00
17.60 22.00 27.75 35.00 1.30 26.00 1510.0 5.91
17.80 20.00 25.88 35.00 1.50 30.00 1540.0 7.50
18.00 20.00 18.38 35.00 1.50 30.00 1570.0 7.50
18.20 20.00 18.13 35.00 1.50 30.00 1600.0 7.50
18.40 20.00 18.38 35.00 1.50 30.00 1630.0 7.50
18.60 15.00 19.63 25.00 1.00 20.00 1650.0 6.67
18.80 15.00 22.38 25.00 1.00 20.00 1670.0 6.67
19.00 15.00 21.75 25.00 1.00 20.00 1690.0 6.67
19.20 20.00 22.38 25.00 0.50 10.00 1700.0 2.50
19.40 22.00 23.00 30.00 0.80 16.00 1716.0 3.64
19.60 30.00 22.75 45.00 1.50 30.00 1746.0 5.00
19.80 42.00 21.88 52.00 1.00 20.00 1766.0 2.38
20.00 15.00 21.00 32.00 1.70 34.00 1800.0 11.33
Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 18 Mei 2017
Proyek : Perencanaan Pembangunan Jembatan Penatoi Dikerjakan Tim Geo 2017
Lokasi : Kota Bima, NTB Coordinate : 693028; 9063913
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

20.20 20.00 19.13 35.00 1.50 30.00 1830.0 7.50


20.40 20.00 15.75 35 1.50 30.00 1860.0 7.50
20.60 13.00 15.75 18.00 0.50 10.00 1870.0 3.85
20.80 13.00 16.25 18.00 0.50 10.00 1880.0 3.85
21.00 15.00 20.00 22.00 0.70 14.00 1894.0 4.67
21.20 15.00 20.25 22.00 0.70 14.00 1908.0 4.67
21.40 15.00 20.50 22.00 0.70 14.00 1922.0 4.67
21.60 15.00 32.25 22.00 0.70 14.00 1936.0 4.67
21.80 24.00 50.38 48.00 2.40 48.00 1984.0 10.00
22.00 50.00 54.75 62.00 1.20 24.00 2008.0 2.40
22.20 15.00 59.88 32.00 1.70 34.00 2042.0 11.33
22.40 15.00 65.63 32.00 1.70 34.00 2076.0 11.33
22.60 109.00 66.88 120.00 1.10 22.00 2098.0 1.01
22.80 160.00 72.50 175.00 1.50 30.00 2128.0 0.94
23.00 50.00 89.38 60.00 1.00 20.00 2148.0 2.00
23.20 56.00 92.00 70.00 1.40 28.00 2176.0 2.50
23.40 70.00 88.25 85.00 1.50 30.00 2206.0 2.14
23.60 60.00 94.50 75.00 1.50 30.00 2236.0 2.50
23.80 60.00 95.00 75.00 1.50 30.00 2266.0 2.50
24.00 150.00 90.63 160.00 1.00 20.00 2286.0 0.67
24.20 130.00 87.50 140.00 1.00 20.00 2306.0 0.77
24.40 130.00 86.00 140.00 1.00 20.00 2326.0 0.77
24.60 100.00 92.25 115.00 1.50 30.00 2356.0 1.50
24.80 60.00 97.25 70.00 1.00 20.00 2376.0 1.67
25.00 35.00 110.38 50.00 1.50 30.00 2406.0 4.29
25.20 35.00 111.86 50.00 1.50 30.00 2436.0 4.29
25.40 48.00 120.50 62.00 1.40 28.00 2464.0 2.92
25.60 200.00 137.60 215.00 1.50 30.00 2494.0 0.75
25.80 170.00 163.25 180.00 1.00 20.00 2514.0 0.59
26.00 235.00 201.67 250.00 1.50 30.00 2544.0 0.64
26.20 >250
26.40
26.60
26.80
27.00
Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 18 Mei 2017
Proyek : Perencanaan Pembangunan Jembatan Penatoi Dikerjakan Tim Geo 2017
Lokasi : Kota Bima, NTB Coordinate : 693028; 9063913
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya
gku

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Ujung Konus (kg/cm2) Rasio Gesekan (%)

0 50 100 150 200 250 0 2 4 6 8 10


0.00 0.00

2.00 2.00

4.00 4.00

6.00 6.00

8.00 8.00
Kedalaman penetrasi (m)

Kedalaman penetrasi (m)


10.00 10.00

12.00 12.00

14.00 14.00

16.00 16.00

18.00
18.00

20.00
20.00

22.00
22.00
Perlawanan Konus (PK)
24.00
JHL 24.00

26.00
0 600 1200 1800 2400 3000 26.00

Jumlah Hambatan Lekat (kg/cm)

Catatan: Titik 0 m dari permukaan tanah dasar ( tempat lokasi sondir )


: MUKA AIR TANAH kedalaman - m
Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 11 Juli 2017
Proyek : Perencanaan Pembangunan Jembatan Lalar 2 Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Barat, NTB Coordinate : 442541;9029906
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

0.00 0.00 0.00 0.00 0.00 0.0 0.00


0.20 3.00 5.00 0.20 4.00 4.0 6.67
0.40 3.00 5.00 0.20 4.00 8.0 6.67
0.60 3.00 3.00 5.00 0.20 4.00 12.0 6.67
0.80 3.00 3.00 5.00 0.20 4.00 16.0 6.67
1.00 3.00 3.00 5.00 0.20 4.00 20.0 6.67
1.20 3.00 3.00 5.00 0.20 4.00 24.0 6.67
1.40 3.00 3.00 5.00 0.20 4.00 28.0 6.67
1.60 3.00 3.00 5.00 0.20 4.00 32.0 6.67
1.80 3.00 3.88 5.00 0.20 4.00 36.0 6.67
2.00 3.00 4.75 5.00 0.20 4.00 40.0 6.67
2.20 3.00 5.63 5.00 0.20 4.00 44.0 6.67
2.40 3.00 5.63 5.00 0.20 4.00 48.0 6.67
2.60 3.00 11.50 5.00 0.20 4.00 52.0 6.67
2.80 10.00 15.50 15.00 0.50 10.00 62.0 5.00
3.00 10.00 17.00 15.00 0.50 10.00 72.0 5.00
3.20 10.00 18.50 15.00 0.50 10.00 82.0 5.00
3.40 3.00 19.13 5.00 0.20 4.00 86.0 6.67
3.60 50.00 19.75 70.00 2.00 40.00 126.0 4.00
3.80 35.00 20.38 40.00 0.50 10.00 136.0 1.43
4.00 15.00 21.25 20.00 0.50 10.00 146.0 3.33
4.20 15.00 17.13 20.00 0.50 10.00 156.0 3.33
4.40 15.00 15.25 20.00 0.50 10.00 166.0 3.33
4.60 15.00 15.88 20.00 0.50 10.00 176.0 3.33
4.80 15.00 16.50 20.00 0.50 10.00 186.0 3.33
5.00 10.00 15.88 20.00 1.00 20.00 206.0 10.00
5.20 17.00 15.25 32.00 1.50 30.00 236.0 8.82
5.40 20.00 14.63 32.00 1.20 24.00 260.0 6.00
5.60 20.00 14.63 32.00 1.20 24.00 284.0 6.00
5.80 20.00 13.75 32.00 1.20 24.00 308.0 6.00
6.00 10.00 12.50 20.00 1.00 20.00 328.0 10.00
Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 11 Juli 2017
Proyek : Perencanaan Pembangunan Jembatan Lalar 2 Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Barat, NTB Coordinate : 442541;9029906
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

6.20 10.00 12.13 20.00 1.00 20.00 348.0 10.00


6.40 10.00 11.75 20.00 1.00 20.00 368.0 10.00
6.60 10.00 12.63 20.00 1.00 20.00 388.0 10.00
6.80 10.00 13.50 20.00 1.00 20.00 408.0 10.00
7.00 10.00 14.75 20.00 1.00 20.00 428.0 10.00
7.20 17.00 15.38 22.00 0.50 10.00 438.0 2.94
7.40 17.00 16.88 22.00 0.50 10.00 448.0 2.94
7.60 17.00 18.13 22.00 0.50 10.00 458.0 2.94
7.80 17.00 18.50 22.00 0.50 10.00 468.0 2.94
8.00 20.00 22.00 32.00 1.20 24.00 492.0 6.00
8.20 15.00 23.00 25.00 1.00 20.00 512.0 6.67
8.40 22.00 24.00 35.00 1.30 26.00 538.0 5.91
8.60 20.00 25.88 22.00 0.20 4.00 542.0 1.00
8.80 20.00 28.38 32.00 1.20 24.00 566.0 6.00
9.00 45.00 28.75 50.00 0.50 10.00 576.0 1.11
9.20 25.00 29.38 42.00 1.70 34.00 610.0 6.80
9.40 25.00 30.00 42.00 1.70 34.00 644.0 6.80
9.60 35.00 26.25 53.00 1.80 36.00 680.0 5.14
9.80 35.00 25.00 53.00 1.80 36.00 716.0 5.14
10.00 25.00 24.38 45.00 2.00 40.00 756.0 8.00
10.20 25.00 23.13 45.00 2.00 40.00 796.0 8.00
10.40 25.00 21.88 45.00 2.00 40.00 836.0 8.00
10.60 15.00 21.88 27.00 1.20 24.00 860.0 8.00
10.80 15.00 21.88 27.00 1.20 24.00 884.0 8.00
11.00 20.00 21.25 35.00 1.50 30.00 914.0 7.50
11.20 25.00 21.88 40.00 1.50 30.00 944.0 6.00
11.40 25.00 22.50 40.00 1.50 30.00 974.0 6.00
11.60 25.00 22.50 40.00 1.50 30.00 1004.0 6.00
11.80 25.00 21.88 35.00 1.00 20.00 1024.0 4.00
12.00 20.00 20.63 39.00 1.90 38.00 1062.0 9.50
12.20 20.00 19.38 39.00 1.90 38.00 1100.0 9.50
12.40 20.00 18.75 39.00 1.90 38.00 1138.0 9.50
12.60 20.00 18.75 39.00 1.90 38.00 1176.0 9.50
12.80 20.00 20.00 39.00 1.90 38.00 1214.0 9.50
13.00 15.00 20.00 28.00 1.30 26.00 1240.0 8.67
Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 11 Juli 2017
Proyek : Perencanaan Pembangunan Jembatan Lalar 2 Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Barat, NTB Coordinate : 442541;9029906
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

13.20 15.00 20.00 28.00 1.30 26.00 1266.0 8.67


13.40 20.00 20.00 36.00 1.60 32.00 1298.0 8.00
13.60 20.00 20.63 36.00 1.60 32.00 1330.0 8.00
13.80 30.00 21.88 36.00 0.60 12.00 1342.0 2.00
14.00 20.00 22.13 36.00 1.60 32.00 1374.0 8.00
14.20 20.00 22.38 36.00 1.60 32.00 1406.0 8.00
14.40 20.00 21.38 36.00 1.60 32.00 1438.0 8.00
14.60 20.00 21.63 36.00 1.60 32.00 1470.0 8.00
14.80 25.00 20.38 45.00 2.00 40.00 1510.0 8.00
15.00 22.00 21.00 43.00 2.10 42.00 1552.0 9.55
15.20 22.00 21.63 43.00 2.10 42.00 1594.0 9.55
15.40 22.00 21.63 43.00 2.10 42.00 1636.0 9.55
15.60 22.00 22.00 43.00 2.10 42.00 1678.0 9.55
15.80 10.00 21.75 25.00 1.50 30.00 1708.0 15.00
16.00 25.00 21.50 40.00 1.50 30.00 1738.0 6.00
16.20 25.00 21.25 40.00 1.50 30.00 1768.0 6.00
16.40 25.00 31.88 40.00 1.50 30.00 1798.0 6.00
16.60 25.00 29.38 40.00 1.50 30.00 1828.0 6.00
16.80 20.00 26.88 35.00 1.50 30.00 1858.0 7.50
17.00 20.00 26.50 35.00 1.50 30.00 1888.0 7.50
17.20 20.00 26.13 35.00 1.50 30.00 1918.0 7.50
17.40 95.00 26.38 118.00 2.30 46.00 1964.0 2.42
17.60 5.00 26.63 10.00 0.50 10.00 1974.0 10.00
17.80 5.00 26.88 10.00 0.50 10.00 1984.0 10.00
18.00 22.00 16.00 40.00 1.80 36.00 2020.0 8.18
18.20 22.00 16.38 40.00 1.80 36.00 2056.0 8.18
18.40 22.00 16.75 40.00 1.80 36.00 2092.0 8.18
18.60 22.00 15.00 40.00 1.80 36.00 2128.0 8.18
18.80 22.00 13.25 40.00 1.80 36.00 2164.0 8.18
19.00 8.00 13.00 10.00 0.20 4.00 2168.0 2.50
19.20 8.00 12.75 10.00 0.20 4.00 2172.0 2.50
19.40 8.00 12.50 10.00 0.20 4.00 2176.0 2.50
19.60 8.00 14.00 10.00 0.20 4.00 2180.0 2.50
19.80 8.00 15.50 10.00 0.20 4.00 2184.0 2.50
20.00 20.00 15.75 35.00 1.50 30.00 2214.0 7.50
Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 11 Juli 2017
Proyek : Perencanaan Pembangunan Jembatan Lalar 2 Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Barat, NTB Coordinate : 442541;9029906
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

20.20 20.00 16.00 35.00 1.50 30.00 2244.0 7.50


20.40 20.00 15.88 35.00 1.50 30.00 2274.0 7.50
20.60 20.00 14.00 35.00 1.50 30.00 2304.0 7.50
20.80 20.00 12.63 35.00 1.50 30.00 2334.0 7.50
21.00 10.00 11.25 15.00 0.50 10.00 2344.0 5.00
21.20 10.00 9.88 15.00 0.50 10.00 2354.0 5.00
21.40 7.00 11.13 14.00 0.70 14.00 2368.0 10.00
21.60 5.00 32.38 10.00 0.50 10.00 2378.0 10.00
21.80 9.00 57.38 11.00 0.20 4.00 2382.0 2.22
22.00 9.00 80.25 11.00 0.20 4.00 2386.0 2.22
22.20 9.00 104.63 15.00 0.60 12.00 2398.0 6.67
22.40 30.00 130.38 45.00 1.50 30.00 2428.0 5.00
22.60 180.00 157.38 195.00 1.50 30.00 2458.0 0.83
22.80 210.00 185.00 230.00 2.00 40.00 2498.0 0.95
23.00 190.00 207.14 200.00 1.00 20.00 2518.0 0.53
23.20 200.00 211.67 220.00 2.00 40.00 2558.0 1.00
23.40 215.00 212.00 230.00 1.50 30.00 2588.0 0.70
23.60 225.00 217.50 245.00 2.00 40.00 2628.0 0.89
23.80 230.00 223.33 250.00 2.00 40.00 2668.0 0.87
24.00 >250
24.20
24.40
24.60
24.80
25.00
25.20
25.40
25.60
25.80
26.00
26.20
26.40
26.60
26.80
27.00
Laporan No : 051 / LAPORAN /GEOTEKNIK / VII / 2017 Tgl. pengujian 11 Juli 2017
Proyek : Perencanaan Pembangunan Jembatan Lalar 2 Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Barat, NTB Coordinate : 442541;9029906
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Ujung Konus (kg/cm2) Rasio Gesekan (%)

0 50 100 150 200 250 0 2 4 6 8 10


0.00 0.00

2.00 2.00

4.00 4.00

6.00 6.00

8.00 8.00
Kedalaman penetrasi (m)

Kedalaman penetrasi (m)


10.00 10.00

12.00 12.00

14.00 14.00

16.00 16.00

18.00
18.00

20.00
20.00

22.00
22.00
Perlawanan Konus (PK)
24.00
JHL 24.00

26.00
0 600 1200 1800 2400 3000 26.00

Jumlah Hambatan Lekat (kg/cm)

Catatan: Titik 0 m dari permukaan tanah dasar ( tempat lokasi sondir )


: MUKA AIR TANAH kedalaman - m
Laporan No : 050 / LAPORAN /GEOTEKNIK / VI / 2017 Tgl. pengujian 5 Mei 2017

Proyek : Perencanaan Pembangunan Jembatan Benteng 7 Dikerjakan Tim Geo 2017


Lokasi : Hodo, Kab. Dompu, NTB Coordinate : 609630;9065357
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya,
M.Eng, Ph.D

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

0.00 0.00 0.00 0.00 0.00 0.0 0.00


0.20 75.00 80.00 0.50 10.00 10.0 0.67
0.40 75.00 80.00 0.50 10.00 20.0 0.67
0.60 75.00 75.00 80.00 0.50 10.00 30.0 0.67
0.80 75.00 75.00 80.00 0.50 10.00 40.0 0.67
1.00 75.00 75.00 80.00 0.50 10.00 50.0 0.67
1.20 75.00 75.00 80.00 0.50 10.00 60.0 0.67
1.40 75.00 75.00 80.00 0.50 10.00 70.0 0.67
1.60 75.00 75.00 80.00 0.50 10.00 80.0 0.67
1.80 75.00 77.50 80.00 0.50 10.00 90.0 0.67
2.00 75.00 80.00 80.00 0.50 10.00 100.0 0.67
2.20 75.00 86.88 80.00 0.50 10.00 110.0 0.67
2.40 75.00 93.75 80.00 0.50 10.00 120.0 0.67
2.60 75.00 103.13 80.00 0.50 10.00 130.0 0.67
2.80 95.00 121.25 110.00 1.50 30.00 160.0 1.58
3.00 95.00 127.86 110.00 1.50 30.00 190.0 1.58
3.20 130.00 136.67 150.00 2.00 40.00 230.0 1.54
3.40 130.00 145.00 150.00 2.00 40.00 270.0 1.54
3.60 150.00 157.50 170.00 2.00 40.00 310.0 1.33
3.80 220.00 166.67 250.00 3.00 60.00 370.0 1.36
4.00 > 250.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
Laporan No : 050 / LAPORAN /GEOTEKNIK / VI / 2017 Tgl. pengujian 5 Mei 2017

Proyek : Perencanaan Pembangunan Jembatan Benteng 7 Dikerjakan Tim Geo 2017


Lokasi : Hodo, Kab. Dompu, NTB Coordinate : 609630;9065357
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Ujung Konus (kg/cm2) Rasio Gesekan (%)

0 50 100 150 200 250 0 1 2


0.00 0.00

1.00 1.00
Kedalaman penetrasi (m)

Kedalaman penetrasi (m)


2.00 2.00

3.00 3.00

4.00 4.00

Perlawanan Konus (PK)


JHL
5.00 5.00
0 100 200 300 400 500

Jumlah Hambatan Lekat (kg/cm)

Catatan: Titik 0 m dari permukaan tanah dasar ( tempat lokasi sondir )


: MUKA AIR TANAH kedalaman - m
Laporan No : 050 / LAPORAN /GEOTEKNIK / VI / 2017 Tgl. pengujian 5 Mei 2017
Proyek : Perencanaan Pembangunan Jembatan Benteng 7 Dikerjakan Tim Geo 2017
Lokasi : Hodo, Kab. Dompu, NTB Coordinate : 613355;9241830
No. Titik : SO - 02 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

0.00 0.00 0.00 0.00 0.00 0.0 0.00


0.20 30.00 45.00 1.50 30.00 30.0 5.00
0.40 35.00 50.00 1.50 30.00 60.0 4.29
0.60 50.00 82.50 70.00 2.00 40.00 100.0 4.00
0.80 75.00 100.63 90.00 1.50 30.00 130.0 2.00
1.00 100.00 122.50 120.00 2.00 40.00 170.0 2.00
1.20 115.00 140.00 130.00 1.50 30.00 200.0 1.30
1.40 120.00 158.75 135.00 1.50 30.00 230.0 1.25
1.60 135.00 176.88 155.00 2.00 40.00 270.0 1.48
1.80 175.00 185.71 190.00 1.50 30.00 300.0 0.86
2.00 210.00 196.67 220.00 1.00 20.00 320.0 0.48
2.20 190.00 209.00 210.00 2.00 40.00 360.0 1.05
2.40 225.00 217.50 240.00 1.50 30.00 390.0 0.67
2.60 245.00 220.00 250.00 0.50 10.00 400.0 0.20
2.80 > 250.00
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
Laporan No : 050 / LAPORAN /GEOTEKNIK / VI / 2017 Tgl. pengujian 5 Mei 2017
Proyek : Perencanaan Pembangunan Jembatan Benteng 7 Dikerjakan Tim Geo 2017
Lokasi : Hodo, Kab. Dompu, NTB Coordinate : 613355;9241830
No. Titik : SO - 02 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Ujung Konus (kg/cm2) Rasio Gesekan (%)

0 50 100 150 200 250 0 1 2 3 4 5 6


0.00 0.00

1.00 1.00
Kedalaman penetrasi (m)

Kedalaman penetrasi (m)


2.00 2.00

3.00
3.00

Perlawanan Konus (PK)


JHL

4.00
0 100 200 300 400 500 4.00

Jumlah Hambatan Lekat (kg/cm)

Catatan: Titik 0 m dari permukaan tanah dasar ( tempat lokasi sondir )


: MUKA AIR TANAH kedalaman - m
Laporan No : 050 / LAPORAN /GEOTEKNIK / VI / 2017 Tgl. pengujian 29 Mei 2017

Proyek : Perencanaan Pembangunan Jembatan Padak Talas Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Besar Coordinate : 600088; 903353
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

0.00 0.00 0.00 0.00 0.00 0.0 0.00


0.20 55.00 60.00 0.50 10.00 10.0 0.91
0.40 55.00 60.00 0.50 10.00 20.0 0.91
0.60 55.00 45.25 60.00 0.50 10.00 30.0 0.91
0.80 62.00 40.88 72.00 1.00 20.00 50.0 1.61
1.00 26.00 35.38 42.00 1.60 32.00 82.0 6.15
1.20 51.00 29.88 63.00 1.20 24.00 106.0 2.35
1.40 33.00 23.25 41.00 0.80 16.00 122.0 2.42
1.60 25.00 21.13 34.00 0.90 18.00 140.0 3.60
1.80 20.00 15.88 35.00 1.50 30.00 170.0 7.50
2.00 11.00 13.25 14.00 0.30 6.00 176.0 2.73
2.20 11.00 11.50 14.00 0.30 6.00 182.0 2.73
2.40 9.00 11.50 11.00 0.20 4.00 186.0 2.22
2.60 9.00 12.63 11.00 0.20 4.00 190.0 2.22
2.80 9.00 13.75 11.00 0.20 4.00 194.0 2.22
3.00 12.00 15.13 22.00 1.00 20.00 214.0 8.33
3.20 11.00 15.25 22.00 1.10 22.00 236.0 10.00
3.40 20.00 16.13 33.00 1.30 26.00 262.0 6.50
3.60 20.00 16.63 33.00 1.30 26.00 288.0 6.50
3.80 20.00 17.75 32.00 1.20 24.00 312.0 6.00
4.00 20.00 18.25 40.00 2.00 40.00 352.0 10.00
4.20 10.00 20.13 20.00 1.00 20.00 372.0 10.00
4.40 16.00 24.00 22.00 0.60 12.00 384.0 3.75
4.60 16.00 27.88 22.00 0.60 12.00 396.0 3.75
4.80 20.00 30.63 27.00 0.70 14.00 410.0 3.50
5.00 24.00 33.88 32.00 0.80 16.00 426.0 3.33
5.20 35.00 34.00 52.00 1.70 34.00 460.0 4.86
5.40 51.00 33.63 56.00 0.50 10.00 470.0 0.98
5.60 51.00 32.75 56.00 0.50 10.00 480.0 0.98
5.80 32.00 30.88 50.00 1.80 36.00 516.0 5.63
6.00 42.00 27.00 52.00 1.00 20.00 536.0 2.38
Laporan No : 050 / LAPORAN /GEOTEKNIK / VI / 2017 Tgl. pengujian 29 Mei 2017

Proyek : Perencanaan Pembangunan Jembatan Padak Talas Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Besar Coordinate : 600088; 903353
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

6.20 17.00 22.50 21.00 0.40 8.00 544.0 2.35


6.40 17.00 19.75 21.00 0.40 8.00 552.0 2.35
6.60 17.00 16.63 21.00 0.40 8.00 560.0 2.35
6.80 20.00 16.63 25.00 0.50 10.00 570.0 2.50
7.00 20.00 16.63 25.00 0.50 10.00 580.0 2.50
7.20 15.00 18.88 25.00 1.00 20.00 600.0 6.67
7.40 10.00 20.75 20.00 1.00 20.00 620.0 10.00
7.60 17.00 22.63 32.00 1.50 30.00 650.0 8.82
7.80 17.00 23.25 32.00 1.50 30.00 680.0 8.82
8.00 17.00 24.50 32.00 1.50 30.00 710.0 8.82
8.20 35.00 24.88 50.00 1.50 30.00 740.0 4.29
8.40 35.00 25.25 50.00 1.50 30.00 770.0 4.29
8.60 35.00 25.63 60.00 2.50 50.00 820.0 7.14
8.80 20.00 24.88 25.00 0.50 10.00 830.0 2.50
9.00 20.00 24.00 25.00 0.50 10.00 840.0 2.50
9.20 20.00 22.75 25.00 0.50 10.00 850.0 2.50
9.40 20.00 23.38 32.00 1.20 24.00 874.0 6.00
9.60 20.00 24.00 42.00 2.20 44.00 918.0 11.00
9.80 29.00 24.63 45.00 1.60 32.00 950.0 5.52
10.00 28.00 24.50 45.00 1.70 34.00 984.0 6.07
10.20 25.00 24.38 45.00 2.00 40.00 1024.0 8.00
10.40 25.00 23.13 43.00 1.80 36.00 1060.0 7.20
10.60 25.00 22.75 43.00 1.80 36.00 1096.0 7.20
10.80 25.00 22.38 43.00 1.80 36.00 1132.0 7.20
11.00 19.00 22.13 25.00 0.60 12.00 1144.0 3.16
11.20 19.00 21.88 25.00 0.60 12.00 1156.0 3.16
11.40 19.00 21.63 25.00 0.60 12.00 1168.0 3.16
11.60 25.00 22.13 42.00 1.70 34.00 1202.0 6.80
11.80 22.00 22.50 43.00 2.10 42.00 1244.0 9.55
12.00 23.00 22.13 40.00 1.70 34.00 1278.0 7.39
12.20 23.00 21.00 40.00 1.70 34.00 1312.0 7.39
12.40 23.00 21.38 40.00 1.70 34.00 1346.0 7.39
12.60 23.00 21.63 42.00 1.90 38.00 1384.0 8.26
12.80 22.00 21.88 42.00 2.00 40.00 1424.0 9.09
13.00 16.00 20.88 30.00 1.40 28.00 1452.0 8.75
Laporan No : 050 / LAPORAN /GEOTEKNIK / VI / 2017 Tgl. pengujian 29 Mei 2017

Proyek : Perencanaan Pembangunan Jembatan Padak Talas Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Besar Coordinate : 600088; 903353
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

13.20 16.00 20.38 30.00 1.40 28.00 1480.0 8.75


13.40 25.00 20.00 42.00 1.70 34.00 1514.0 6.80
13.60 25.00 20.38 42.00 1.70 34.00 1548.0 6.80
13.80 25.00 21.63 42.00 1.70 34.00 1582.0 6.80
14.00 15.00 21.00 30.00 1.50 30.00 1612.0 10.00
14.20 19.00 21.63 30.00 1.10 22.00 1634.0 5.79
14.40 19.00 22.88 30.00 1.10 22.00 1656.0 5.79
14.60 19.00 25.38 30.00 1.10 22.00 1678.0 5.79
14.80 26.00 27.50 39.00 1.30 26.00 1704.0 5.00
15.00 20.00 27.75 30.00 1.00 20.00 1724.0 5.00
15.20 30.00 28.00 45.00 1.50 30.00 1754.0 5.00
15.40 35.00 27.25 45.00 1.00 20.00 1774.0 2.86
15.60 35.00 28.38 46.00 1.10 22.00 1796.0 3.14
15.80 36.00 28.13 45.00 0.90 18.00 1814.0 2.50
16.00 21.00 26.88 34.00 1.30 26.00 1840.0 6.19
16.20 21.00 25.63 35.00 1.40 28.00 1868.0 6.67
16.40 20.00 24.25 35.00 1.50 30.00 1898.0 7.50
16.60 29.00 24.38 40.00 1.10 22.00 1920.0 3.79
16.80 28.00 24.50 40.00 1.20 24.00 1944.0 4.29
17.00 25.00 23.88 45.00 2.00 40.00 1984.0 8.00
17.20 25.00 22.13 45.00 2.00 40.00 2024.0 8.00
17.40 25.00 20.50 43.00 1.80 36.00 2060.0 7.20
17.60 22.00 19.13 43.00 2.10 42.00 2102.0 9.55
17.80 22.00 17.75 43.00 2.10 42.00 2144.0 9.55
18.00 15.00 16.75 25.00 1.00 20.00 2164.0 6.67
18.20 15.00 16.13 25.00 1.00 20.00 2184.0 6.67
18.40 15.00 15.50 20.00 0.50 10.00 2194.0 3.33
18.60 14.00 15.75 16.00 0.20 4.00 2198.0 1.43
18.80 14.00 17.63 16.00 0.20 4.00 2202.0 1.43
19.00 17.00 22.00 23.00 0.60 12.00 2214.0 3.53
19.20 17.00 26.50 23.00 0.60 12.00 2226.0 3.53
19.40 17.00 31.00 23.00 0.60 12.00 2238.0 3.53
19.60 17.00 36.38 23.00 0.60 12.00 2250.0 3.53
19.80 30.00 41.75 50.00 2.00 40.00 2290.0 6.67
20.00 50.00 48.38 64.00 1.40 28.00 2318.0 2.80
Laporan No : 050 / LAPORAN /GEOTEKNIK / VI / 2017 Tgl. pengujian 29 Mei 2017

Proyek : Perencanaan Pembangunan Jembatan Padak Talas Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Besar Coordinate : 600088; 903353
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Nilai Jumlah Hambatan Rasio


Kedalaman Konus Rerata Perlawanan Lekat HLx20 JHL Gesekan
(PK) (qc) (JP) HL=(JP-PK)/10 FR=(HL/PK)
(METER) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM2) (KG/CM) (KG/CM) (%)

20.20 50.00 55.00 60.00 1.00 20.00 2338.0 2.00


20.40 50.00 60.00 60.00 1.00 20.00 2358.0 2.00
20.60 60.00 62.50 75.00 1.50 30.00 2388.0 2.50
20.80 60.00 65.00 73.00 1.30 26.00 2414.0 2.17
21.00 70.00 77.50 81.00 1.10 22.00 2436.0 1.57
21.20 70.00 85.00 81.00 1.10 22.00 2458.0 1.57
21.40 70.00 98.75 81.00 1.10 22.00 2480.0 1.57
21.60 70.00 113.75 80.00 1.00 20.00 2500.0 1.43
21.80 70.00 130.00 80.00 1.00 20.00 2520.0 1.43
22.00 150.00 146.25 162.00 1.20 24.00 2544.0 0.80
22.20 120.00 165.00 140.00 2.00 40.00 2584.0 1.67
22.40 170.00 187.00 190.00 2.00 40.00 2624.0 1.18
22.60 190.00 192.29 200.00 1.00 20.00 2644.0 0.53
22.80 200.00 204.33 220.00 2.00 40.00 2684.0 1.00
23.00 200.00 211.20 220.00 2.00 40.00 2724.0 1.00
23.20 220.00 216.50 240.00 2.00 40.00 2764.0 0.91
23.40 246.00 222.00 250.00 0.40 8.00 2772.0 0.16
23.60 >250
23.80
24.00
24.20
24.40
24.60
24.80
25.00
25.20
25.40
25.60
25.80
26.00
26.20
26.40
26.60
26.80
27.00
Laporan No : 050 / LAPORAN /GEOTEKNIK / VI / 2017 Tgl. pengujian 29 Mei 2017

Proyek : Perencanaan Pembangunan Jembatan Padak Talas Dikerjakan Tim Geo 2017
Lokasi : Kab. Sumbawa Besar Coordinate : 600088; 903353
No. Titik : SO - 01 Diperiksa Ir. Didi S Agustawijaya

UJI PENETRASI KONUS


(ASTM D 3441 - 86)

Perlawanan Ujung Konus (kg/cm2) Rasio Gesekan (%)

0 50 100 150 200 250 0 2 4 6 8 10


0.00 0.00

2.00 2.00

4.00 4.00

6.00 6.00

8.00 8.00
Kedalaman penetrasi (m)

Kedalaman penetrasi (m)


10.00 10.00

12.00 12.00

14.00 14.00

16.00 16.00

18.00
18.00

20.00
20.00

22.00
22.00

24.00 Perlawanan Konus (PK)


24.00
JHL
26.00
0 600 1200 1800 2400 3000 26.00

Catatan: Titik 0 m dari permukaan tanah dasar ( tempat lokasi sondir )


: MUKA AIR TANAH kedalaman - m
Lokasi Pengujian Sondir untuk Proyek Pekerjaan
Pembangunan Jembatan Penatoi

Pengujian Sondir Titik I Jembatan Penatoi


Pengujian Sondir Titik I Jembatan Penatoi

Pembacaan Manometer Uji Sondir Jembatan Penatoi titik I


Pengujian Sondir Titik I Jembatan Lalar 2

Pengujian Sondir Titik I Jembatan Lalar 2


Lokasi Pengujian Sondir untuk Proyek Pekerjaan
Pembangunan Jembatan Benteng 7

Pengujian Sondir Titik I Jembatan Benteng 7


Pengujian Sondir Titik I Jembatan Benteng 7
Lokasi Pengujian Sondir untuk Proyek Pekerjaan
Pembangunan Jembatan Padak Talas

Pengujian Sondir Titik I Jembatan Padak Talas


Pengujian Sondir Titik I Jembatan Padak Talas

Pembacaan Manometer pada Uji Sondir titik I

Anda mungkin juga menyukai