If we will re-use old panel relocated from the line we have to modify all red marked items as shown...

This panel will feed from the main distribution panel MDB1 ( TR.1 2000KVA) from a spare circuit breaker 800A, and as this 800 Amps circuit breaker is not connected to neither UPS nor
Generator so the proposals are:
1 ) Install a static UPS with batteries which will keep the line running for a duration for 5 minutes and eliminate small power off only but it can't grantee operate the line more than this
2 )As - built LV SLD for three transformers and re-design all loads to allow studying disconnect some not important loads like chillers (vendor advise is needed) and connect the complete
new line to existing UPSs

Rev Date By Check Description

Client

Nestle Water Algerie Spa.


Prepared By

Engineering Services & Consultancy Center Co.


Water Way, Unit BS08, Parcel 22A NI, New Cairo

Tel/ Fax: +202 22900908

DWG. Name
5L line 2 Distribution Board SLD
5L line 2 Distribution Board SLD old one
need to validate once delivered
Scale DWG. Number Designed By Drawn By Checked By
M.Abdelsattar M.Abdelsattar