Name of Work: A/R & M/O Roads in R-IV Division during 2012-13.
SH: - Repair of Toe wall & fixing railing over toe wall near Samrat Hotel Round About.
Bidde
r Excess ( +
Name 0.00 %
)
:
SCHEDULE OF WORKS
Sl. Description of work No.or Unit Estimated Rate AMOUNT
No. Qty. Rs. P
Figure Words
1 Dismantling stone slab flooring laid in cement mortar 34 Square 73.70 #VALUE! 2506.00
including stacking of serviceable material and disposal Metre
of unserviceable material within 50 metres lead.
2 Dismantling steel work manually/ by mechanical means 1632.5 Kilogram 1.05 #VALUE! 1714.00
in built up sections without dismembering and stacking
within 50 metres lead as per direction of Engineer-in-
charge.
4 Providing and laying in position cement concrete of 3.5 Cubic 3427.13 #VALUE! 11995.00
specified grade excluding the cost of centering and Metre
shuttering. All work upto plinth level
(a) 1:5:10 (1 cement: 5 coarse sand:10 graded stone
aggregate 20 mm nominal size).
5 Brick work with common burnt clay F.P.S. (non 16.5 Cubic 3316.55 #VALUE! 54723.00
modular) bricks of class designation 7.5 in foundation Metre
and plinth in:
(a) Cement mortar 1:6 (1 cement : 6 coarse sand)
7 15 mm cement plaster on the rough side of single or 87 Square 130.20 #VALUE! 11327.00
half brick wall of mix : Metre
(a) 1:6 (1 cement: 6 fine sand)
8 Stone work, plain in copings, string courses and plinth 2.5 Cubic 19069.00 #VALUE! 47673.00
couses, upto 75mm thick in cement mortar 1:6 (1 Metre
cement : 6 coarse sand) including pointing with white
cement mortar 1:2 (1 cement : 2 stone dust) with an
admixture of pigment matching the stone shade.(a)
Red sand stone (W.A. to be not more than 5%)
Name of Work: A/R & M/O Roads in R-IV Division during 2012-13.
SH: - Repair of Toe wall & fixing railing over toe wall near Samrat Hotel Round About.
Bidde
r Excess ( +
Name 0.00 %
)
:
SCHEDULE OF WORKS
Sl. Description of work No.or Unit Estimated Rate AMOUNT
No. Qty. Rs. P
Figure Words
9 Steel work welded in built up sections/ framed work, 1397 Kilogram 77.90 #VALUE! 108826.00
including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using
structural steel etc. as required.
(a) In gratings, frames, guard bar, ladder, railings,
brackets, gates
and similar works
10 Providing and laying in position cement concrete of 2 Cubic 4514.05 #VALUE! 9028.00
specified grade excluding the cost of centering and Metre
shuttering –All work up to plinth level:(a)1:2:4
(1cement: 2 coarse sand: 4 graded stone aggregate 20
mm nominal size)
11 Centering and shuttering including strutting, propping 13 Square 365.60 #VALUE! 4753.00
etc. and removal of form work for:(a) Columns, pipes, Metre
abutments, pillars, posts and struts.
12 Refixing of existing M.S. Railing as existing at site after 1632.5 Kilogram 9.06 #VALUE! 14790.00
straghtening in proper position including necessary
welding of M.S. Pieces of vandalism as and where
required including fixing in cement concrete Black of
mix 1:2:4 and of required size ( Necessary cement
concrete, New structured pieces shall be paid
separately) etc. complete as per instruction and
direction of Engineer-in-charge.
14 Extra for every additional lead of 1.0 Km or part thereof 285 Cubic 8.69 #VALUE! 2477.00
beyond initial lead of 1.0 Km up to 20.00km lead. Metre Per
(a) Earth Kilometre
15 Painting with synthetic enamel paint of approved brand 90.5 Square 53.85 #VALUE! 4873.00
and manufacture to give an even shade : Metre
(a) Two or more coats on new work
Name of Work: A/R & M/O Roads in R-IV Division during 2012-13.
SH: - Repair of Toe wall & fixing railing over toe wall near Samrat Hotel Round About.
Bidde
r Excess ( +
Name 0.00 %
)
:
SCHEDULE OF WORKS
Sl. Description of work No.or Unit Estimated Rate AMOUNT
No. Qty. Rs. P
Figure Words
16 16 Painting with synthetic enamel paint of approved 199 Square 35.20 #VALUE! 7005.00
brand and manufacture of required colour to give an Metre
even shade :
(a) One or more coats on old work 199.00 M2 35.20
(Rupees Thirty five and paisa twenty five only) Square
Metre 7005.00
17 Finishing walls with water proofing cement paint of 174 Square 44.95 #VALUE! 7821.00
required shade: Metre
(a) New work (two or more coats applied @ 3.84 kg/10
sqm)