Anda di halaman 1dari 145

METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
METRADOS DE MADERA IESTP JOSE CARLOS MARIATEGUI

01.00.00 BASE DE PIZARRON


01.01.00 SECTOR A PIE2 1.00 16.67 0.80 0.60 0.67
01.02.00 SECTOR B PIE2 0.50 16.67 0.80 0.60 0.33
01.03.00 SECTOR C PIE2 1.00 16.67 1.00 0.60 0.83
01.04.00 SECTOR D PIE2 0.50 16.67 3.40 3.60 8.50
SECTOR E PIE2 1.00 16.67 0.80 3.60 4.00

02.00.00 MARCO DE PUERTA

02.01.00 LADOS
02.01.01 EJE 1-1 Y 2-2 ENTRE A Y B PIE2 2.00 7.00 3.00 2.20 7.70

02.01.02 EJE 1-1 Y 2-2 ENTRE B Y C PIE2 2.00 7.00 2.20 1.60 4.11

02.02.00 PARTE SUPERIOR


02.02.01 EJE 1-1 Y 2-2 ENTRE A Y B PIE2 1.00 2.97 3.00 2.20 1.63

02.02.02 EJE 1-1 Y 2-2 ENTRE B Y C PIE2 1.00 2.97 2.20 1.60 0.87

03.00.00 PUERTA

03.01.00 EJE VERTICAL


EJE 1-1 Y 1'-1' ENTRE A Y E' PIE2 1.00 2.05 6.00 2.00 2.05

EJE 1'-1' Y 2-2 ENTRE A Y E' PIE2 1.00 2.05 6.00 2.00 2.05

DESCUENTO POR DETALLE PIE2 8.00 0.57 0.20 0.40 -0.03

03.02.00 EJE HORIZONTAL


EJE A-A Y A'-A' ENTRE 1' Y 1" PIE2 1.00 2.00 6.00 2.00 2.00

EJE B-B Y B'-B' ENTRE 1' Y 1" PIE2 1.00 2.00 6.00 2.00 2.00

EJE C-C Y C'-C' ENTRE 1' Y 1" PIE2 1.00 2.00 6.00 2.00 2.00

EJE D-D Y D'-D' ENTRE 1' Y 1" PIE2 1.00 2.00 6.00 2.00 2.00

EJE E-E Y E'-E' ENTRE 1' Y 1" PIE2 1.00 2.00 6.00 2.00 2.00

DESCUENTO POR DETALLE PIE2 8.00 0.57 0.20 0.40 -0.03

03.03.00 CARAS CENTRALES DE PUERTA

CARA MAYOR
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
EJE 1-1 Y 2-2 ENTRE A-A Y B-B PIE2 2.00 2.17 14.40 0.40 2.08

EJE 1-1 Y 2-2 ENTRE A-A Y B-B PIE2 2.00 2.17 14.40 0.40 2.08

CARA MENOR
EJE 1-1 Y 2-2 ENTRE A-A Y B-B PIE2 2.00 1.67 8.00 0.20 0.44

EJE 1-1 Y 2-2 ENTRE A-A Y B-B PIE2 2.00 1.67 8.00 0.20 0.44

07.00.00 JUNTA DE DILATACION


07.01.00 JUNTA ASFALTICA ML 3.00 32.00 96.00
7.00 19.00 133.00
08.00.00 CARPINTERIA METALICA
08.01.00 EQ. COMPLETO DE ARCO Y TABLERO DE BASKET C/TUB. Ø 2" GLB. 1.00 2.00 2.00
08.02.00 EQUIPO COMPLETO NET PARA VOLEY GLB. 1.00 1.00 1.00
08.03.00 IMPLEMENTO DEPORTIVO GLB. 1.00 1.00 1.00
08.04.00 BARANDA METALICAS LATERALES GLB. 2.00 1.00 2.00
08.05.00 PROTECTOR DE GRADERIA METALICAS LATERALES GLB. 1.00 1.00 1.00
09.00.00 OBRAS PRELIMINARES.
09.01.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 19.30 11.50 221.95
09.02.00 TRAZO NIVELES Y REPLANTEO M2 1.00 19.30 11.50 221.95

10.00.00 MOVIMIENTO DE TIERRA


10.01.00 EXCAVACION (ZAPATAS, CIMIENTO CORRIDO Y I.S) M3
ZAPATAS
Z-1 4.00 0.60 0.60 0.90 1.30
Z-2 9.00 1.00 0.60 0.90 4.86
Z-3 2.00 0.90 0.50 0.90 0.81
Z-4 2.00 0.60 0.60 0.90 0.65
Z-5 4.00 1.00 1.00 0.90 3.60
Z-6 1.00 0.90 0.90 0.90 0.73
CIMIENTOS CORRIDOS (0.50 X 0.90) M3
EJE 3 TRAMO B - G 1.00 2.03 0.50 0.90 0.91
1.00 2.20 0.50 0.90 0.99
1.00 1.52 0.50 0.90 0.68
1.00 0.35 0.50 0.90 0.16
1.00 1.52 0.50 0.90 0.68
1.00 2.23 0.50 0.90 1.00
EJE 2 TRAMO B-C 1.00 2.03 0.50 0.90 0.91
EJE 3-2 TRAMO C-D 1.00 2.70 0.50 0.90 1.22
EJE 3-2 TRAMO F 1.00 1.95 0.50 0.90 0.88
EJE 2 TRAMO F-G 1.00 2.23 0.50 0.90 1.00
1.00 2.13 0.50 0.90 0.96
EJE 1 TRAMO B - G 1.00 2.02 0.50 0.90 0.91
1.00 2.20 0.50 0.90 0.99
1.00 2.10 0.50 0.90 0.95
1.00 2.10 0.50 0.90 0.95
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
1.00 2.23 0.50 0.90 1.00
EJE B TRAMO 1-3 1.00 2.32 0.50 0.90 1.04
1.00 2.42 0.50 0.90 1.09
EJE C TRAMO 1-3 1.00 2.32 0.50 0.90 1.04
1.00 2.57 0.50 0.90 1.16
1.00 0.47 0.50 0.90 0.21
EJE D TRAMO 1-3 1.00 2.53 0.50 0.90 1.14
1.00 2.42 0.50 0.90 1.09
EJE E TRAMO 1-3 1.00 2.57 0.50 0.90 1.16
1.00 0.60 0.50 0.90 0.27
2.00 1.38 0.50 0.90 1.24
EJE F TRAMO 1-3 1.00 2.42 0.50 0.90 1.09
1.00 2.53 0.50 0.90 1.14
1.00 0.47 0.50 0.90 0.21
EJE G TRAMO 1-3 1.00 2.32 0.60 0.90 1.25
1.00 2.42 0.60 0.90 1.31

10.02.00 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN C M3


CIMIENTOS CORRIDOS (0.50 X 0.90)
EJE 3 TRAMO B - G 1.00 2.03 0.50 0.10 0.10
1.00 2.18 0.50 0.10 0.11
1.00 1.52 0.50 0.10 0.08
1.00 0.35 0.50 0.10 0.02
1.00 1.52 0.50 0.10 0.08
1.00 2.23 0.50 0.10 0.11
EJE 2 TRAMO B-C 1.00 2.03 0.50 0.10 0.10
EJE 3-2 TRAMO C-D 1.00 2.70 0.50 0.10 0.14
EJE 3-2 TRAMO D-F 1.00 1.95 0.50 0.10 0.10
EJE 2 TRAMO F-G 1.00 2.23 0.50 0.10 0.11
1.00 2.03 0.50 0.10 0.10
EJE 1 TRAMO B - G 1.00 2.02 0.50 0.10 0.10
1.00 2.20 0.50 0.10 0.11
1.00 2.10 0.50 0.10 0.11
1.00 2.10 0.50 0.10 0.11
1.00 2.23 0.50 0.10 0.11
EJE B TRAMO 1-3 1.00 2.32 0.50 0.10 0.12
1.00 2.42 0.50 0.10 0.12
EJE C TRAMO 1-3 1.00 2.32 0.50 0.10 0.12
1.00 2.57 0.50 0.10 0.13
1.00 0.47 0.50 0.10 0.02
EJE D TRAMO 1-3 1.00 2.53 0.50 0.10 0.13
1.00 2.42 0.50 0.10 0.12
EJE E TRAMO 1-3 1.00 2.57 0.50 0.10 0.13
1.00 0.60 0.50 0.10 0.03
2.00 1.38 0.50 0.10 0.14
EJE F TRAMO 1-3 1.00 2.42 0.50 0.10 0.12
1.00 2.53 0.50 0.10 0.13
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
1.00 0.47 0.50 0.10 0.02
EJE G TRAMO 1-3 1.00 2.32 0.60 0.10 0.14
1.00 2.42 0.60 0.10 0.15

10.03.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1.00 37.40

11.00.00 CONCRETO SIMPLE


11.01.00 CONCRETO F´C= 140 KG/CM2 EN VEREDAS M3
VEREDA 1.00 15.85 1.50 0.10 2.38

11.02.00 ENCOFRADO Y DESENCOFRADO EN VEREDAS M2


ENCOFRADO Y DESENCOFRADO EN VEREDAS 1.00 15.85 0.20 3.17
2.00 1.50 0.20 0.60

11.03.00 SOLADO PARA ZAPATAS C:H 1:12 E= 0.10 M3


Z-1 4.00 0.60 0.60 0.10 0.14
Z-2 9.00 1.00 0.60 0.10 0.54
Z-3 2.00 0.90 0.50 0.10 0.09
Z-4 2.00 0.60 0.60 0.10 0.07
Z-5 4.00 1.00 1.00 0.10 0.40
Z-6 1.00 0.90 0.90 0.10 0.08

11.04.00 CONCRETO DE SOBRECIMIENTO C:H = 1:8 + 25% P.M. M3


CIMIENTO
EJE 3 TRAMO B - G 1.00 1.85 0.15 0.30 0.08
1.00 1.05 0.15 0.30 0.05
1.00 2.22 0.15 0.30 0.10
1.00 2.22 0.15 0.30 0.10
1.00 1.05 0.15 0.30 0.05
EJE 2 TRAMO B-C 1.00 2.75 0.15 0.30 0.12
EJE 3-2 TRAMO C-D 1.00 2.20 0.15 0.30 0.10
EJE 3-2 TRAMO D-F 1.00 2.66 0.15 0.30 0.12
EJE 3-2 TRAMO F-G 1.00 2.20 0.15 0.30 0.10
EJE 1 TRAMO B - G 1.00 2.75 0.15 0.30 0.12
1.00 2.95 0.15 0.30 0.13
1.00 2.85 0.15 0.30 0.13
1.00 2.85 0.15 0.30 0.13
1.00 2.95 0.15 0.30 0.13
EJE B TRAMO 1-3 1.00 3.15 0.15 0.30 0.14
1.00 2.25 0.15 0.30 0.10
EJE C TRAMO 1-3 1.00 3.15 0.15 0.30 0.14
1.00 2.25 0.15 0.30 0.10
EJE D TRAMO 1-3 1.00 2.25 0.15 0.30 0.10
1.00 3.25 0.15 0.30 0.15
EJE E TRAMO 1-3 2.00 1.80 0.15 0.30 0.16
1.00 1.10 0.15 0.30 0.05
1.00 3.25 0.15 0.30 0.15
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
EJE F TRAMO 1-3 1.00 2.25 0.15 0.30 0.10
1.00 3.25 0.15 0.30 0.15
EJE G TRAMO 1-3 1.00 3.15 0.15 0.30 0.14
1.00 3.25 0.15 0.30 0.15

11.05.00 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO M2


EJE 3 TRAMO B - G 2.00 1.85 0.30 1.11
2.00 1.05 0.30 0.63
2.00 2.22 0.30 1.33
2.00 2.22 0.30 1.33
2.00 1.05 0.30 0.63
EJE 2 TRAMO B-C 2.00 2.75 0.30 1.65
EJE 3-2 TRAMO C-D 2.00 2.20 0.30 1.32
EJE 3-2 TRAMO D-F 2.00 2.66 0.30 1.60
EJE 3-2 TRAMO F-G 2.00 2.20 0.30 1.32
EJE 1 TRAMO B - G 2.00 2.75 0.30 1.65
2.00 2.95 0.30 1.77
2.00 2.85 0.30 1.71
2.00 2.85 0.30 1.71
2.00 2.95 0.30 1.77
EJE B TRAMO 1-3 2.00 3.15 0.30 1.89
2.00 2.25 0.30 1.35
EJE C TRAMO 1-3 2.00 3.15 0.30 1.89
2.00 2.25 0.30 1.35
EJE D TRAMO 1-3 2.00 2.25 0.30 1.35
2.00 3.25 0.30 1.95
EJE E TRAMO 1-3 2.00 1.80 0.30 1.08
2.00 1.10 0.30 0.66
2.00 3.25 0.30 1.95
EJE F TRAMO 1-3 2.00 2.25 0.30 1.35
2.00 3.25 0.30 1.95
EJE G TRAMO 1-3 2.00 3.15 0.30 1.89
2.00 3.25 0.30 1.95

12.00.00 CONCRETO CICLOPEO


12.01.00 CONCRETO EN CIMIENTO C:H = 1:10 + 30% P.M. M3
CIMIENTO
EJE 3 TRAMO B - G 1.00 2.03 0.50 0.70 0.71
1.00 2.18 0.50 0.70 0.76
1.00 1.52 0.50 0.70 0.53
1.00 0.35 0.50 0.70 0.12
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
1.00 1.52 0.50 0.70 0.53
1.00 2.23 0.50 0.70 0.78
EJE 2 TRAMO B-C 1.00 2.03 0.50 0.70 0.71
EJE 3-2 TRAMO C-D 1.00 2.70 0.50 0.70 0.95
EJE 3-2 TRAMO D-F 1.00 1.95 0.50 0.70 0.68
EJE 2 TRAMO F-G 1.00 2.23 0.50 0.70 0.78
1.00 2.03 0.50 0.70 0.71
EJE 1 TRAMO B - G 1.00 2.02 0.50 0.70 0.71
1.00 2.20 0.50 0.70 0.77
1.00 2.10 0.50 0.70 0.74
1.00 2.10 0.50 0.70 0.74
1.00 2.23 0.50 0.70 0.78
EJE B TRAMO 1-3 1.00 2.32 0.50 0.70 0.81
1.00 2.42 0.50 0.70 0.85
EJE C TRAMO 1-3 1.00 2.32 0.50 0.70 0.81
1.00 2.57 0.50 0.70 0.90
1.00 0.47 0.50 0.70 0.16
EJE D TRAMO 1-3 1.00 2.53 0.50 0.70 0.89
1.00 2.42 0.50 0.70 0.85
EJE E TRAMO 1-3 1.00 2.57 0.50 0.70 0.90
1.00 0.60 0.50 0.70 0.21
2.00 1.38 0.50 0.70 0.97
EJE F TRAMO 1-3 1.00 2.42 0.50 0.70 0.85
1.00 2.53 0.50 0.70 0.89
1.00 0.47 0.50 0.70 0.16
EJE G TRAMO 1-3 1.00 2.32 0.60 0.70 0.97
1.00 2.42 0.60 0.70 1.02

13.00.00 CONCRETO ARMADO


13.01.00 ZAPATAS
13.01.01 CONCRETO EN ZAPATAS fc' = 210 Kg/cm2 M3
Z-1 4.00 0.60 0.60 0.70 1.01
Z-2 9.00 1.00 0.60 0.70 3.78
Z-3 2.00 0.90 0.50 0.70 0.63
Z-4 2.00 0.60 0.60 0.70 0.50
Z-5 4.00 1.00 1.00 0.70 2.80
Z-6 1.00 0.90 0.90 0.70 0.57

13.01.02 ACERO GRADO 60 EN ZAPATAS ver planila de aceros

13.02.00 COLUMNAS
13.02.01 CONCRETO EN COLUMNAS FC=210 kg/cm2 M3
PRIMER NIVEL
C-1 21.00 0.25 0.25 2.60 3.41
SEGUNDO NIVEL
C-2 18.00 0.10 0.10 2.45 0.44
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO

13.02.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS M2


PRIMER NIVEL
C-1 84.00 0.25 2.60 54.60
SEGUNDO NIVEL
C-2 18.00 0.10 2.45 4.41
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO

13.02.03 ACERO EN COLUMNAS fy´= 4200 kg/cm2 KG ver planila de aceros

13.03.00 VIGAS
13.03.01 CONCRETO EN VIGAS FC=210 kg/cm2 M3
PRIMER NIVEL
EJE 3 TRAMO B - G 1.00 2.75 0.25 0.25 0.17
1.00 2.95 0.25 0.25 0.18
1.00 2.22 0.25 0.25 0.14
1.00 1.00 0.25 0.25 0.06
1.00 2.22 0.25 0.25 0.14
1.00 2.95 0.25 0.25 0.18
EJE 2 TRAMO B-G 1.00 2.75 0.25 0.25 0.17
1.00 2.95 0.25 0.25 0.18
1.00 2.85 0.25 0.25 0.18
1.00 2.85 0.25 0.25 0.18
1.00 2.95 0.25 0.25 0.18
EJE 1 TRAMO B - G 1.00 2.75 0.25 0.25 0.17
1.00 2.95 0.25 0.25 0.18
1.00 2.85 0.25 0.25 0.18
1.00 2.85 0.25 0.25 0.18
1.00 2.95 0.25 0.25 0.18
EJE 2-3 TRAMO D-F 2.00 2.22 0.25 0.25 0.28
1.00 1.00 0.25 0.25 0.06
EJE B TRAMO 1-3 1.00 3.15 0.25 0.25 0.20
1.00 2.25 0.25 0.25 0.14
EJE C TRAMO 1-3 1.00 3.15 0.25 0.25 0.20
1.00 2.25 0.25 0.25 0.14
EJE D TRAMO 1-3 1.00 2.25 0.25 0.25 0.14
1.00 3.25 0.25 0.25 0.20
EJE E TRAMO 1-3 2.00 1.80 0.25 0.25 0.23
1.00 1.10 0.25 0.25 0.07
1.00 3.25 0.25 0.25 0.20
EJE F TRAMO 1-3 1.00 3.15 0.25 0.25 0.20
1.00 3.25 0.25 0.25 0.20
EJE G TRAMO 1-3 1.00 3.15 0.25 0.25 0.20
1.00 3.25 0.25 0.25 0.20

13.03.02 ENCOFRADO Y DENCOFRADO EN VIGAS M2


PRIMER NIVEL
EJE 3 TRAMO B - G 3.00 2.75 0.25 2.06
3.00 2.95 0.25 2.21
3.00 2.22 0.25 1.67
3.00 1.00 0.25 0.75
3.00 2.22 0.25 1.67
3.00 2.95 0.25 2.21
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
EJE 2 TRAMO B-G 3.00 2.75 0.25 2.06
3.00 2.95 0.25 2.21
3.00 2.85 0.25 2.14
3.00 2.85 0.25 2.14
3.00 2.95 0.25 2.21
EJE 1 TRAMO B - G 3.00 2.75 0.25 2.06
3.00 2.95 0.25 2.21
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
3.00 2.85 0.25 2.14
3.00 2.85 0.25 2.14
3.00 2.95 0.25 2.21
EJE 2-3 TRAMO D-F 3.00 2.22 0.25 1.67
3.00 1.00 0.25 0.75
EJE B TRAMO 1-3 3.00 3.15 0.25 2.36
3.00 2.25 0.25 1.69
EJE C TRAMO 1-3 3.00 3.15 0.25 2.36
3.00 2.25 0.25 1.69
EJE D TRAMO 1-3 3.00 2.25 0.25 1.69
3.00 3.25 0.25 2.44
EJE E TRAMO 1-3 3.00 1.80 0.25 1.35
3.00 1.10 0.25 0.83
3.00 3.25 0.25 2.44
EJE F TRAMO 1-3 3.00 3.15 0.25 2.36
3.00 3.25 0.25 2.44
EJE G TRAMO 1-3 3.00 3.15 0.25 2.36
3.00 3.25 0.25 2.44
13.03.03 ACERO GRADO 60 EN VIGAS fy´= 4200 kg/cm2 KG ver planila de aceros

14.00.00 LOSA ALIGERADA DE TECHO


14.01.00 CONCRETO EN LOSA ALIGERADA
14.02.00 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA M3 1.00 7.15 15.85 0.05 5.67
40.00 7.15 0.10 0.15 4.29
ENCOFRAD Y DESESNCOFRADOPARA LOSA ALIGERADA M2
OFICINA ADMINISTRATIVA 1.00 2.85 3.35 9.55
DEPOSITO 1.00 2.85 3.35 9.55
VESTUARIO CABALLEROS 1.00 5.70 3.05 17.39
1.00 5.63 1.00 5.63
1.00 2.00 2.43 4.86
SS. Hh 2.00 4.70 3.00 28.20
VESTUARIO DAMAS 1.00 5.70 3.05 17.39
1.00 5.63 1.00 5.63
1.00 2.00 2.43 4.86
SS. Hh 2.00 4.70 3.00 28.20
14.02.00 ACERO DE REFUERZO PARA LOSA ALIGERADA KG 1.00 622.72
14.03.00 LADRILLO HUECO DE ARCILLA PARA LOSA ALIGERADA UND 950.00 950.00

15.00.00 COBERTURA Y ESTRUCTURA DE MADERA


15.01.00 MADREA PARA TECHO 2" X 4" UND
TIPO 01 6.00 6.00

15.02.00 CORREAS DE MADERA DE 2" X 2" ML


CORREA DE MADERA 1 8.00 8.00 64.00

15.03.00 COBERTURA CON CALAMINA M2


1.00 8.00 6.20 49.60
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
METRADOS ARQUITECTURA

16.00.00 MUROS Y TABIQUES


16.01.00 MUROS DE SOGA LADRILLO KING-KONG CEMENTO- ARENA M2
PRIMER PISO
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
EJE 3 TRAMO B - G 1.00 2.10 2.60 5.46
1.00 1.30 2.60 3.38
1.00 2.73 2.60 7.10
1.00 2.93 2.60 7.62
1.00 1.30 2.60 3.38
EJE 2 TRAMO B-C 1.00 3.00 2.60 7.80
EJE 3-2 TRAMO C-D 1.00 2.20 2.60 5.72
EJE 3-2 TRAMO D-F 1.00 3.15 2.60 8.19
EJE 3-2 TRAMO F-G 1.00 2.20 2.60 5.72
EJE 1 TRAMO B - G 1.00 3.00 2.60 7.80
1.00 2.15 2.60 5.59
1.00 0.90 2.10 1.89
1.00 3.00 2.10 6.30
1.00 3.00 2.10 6.30
1.00 3.05 2.10 6.41
EJE B TRAMO 1-3 1.00 3.35 1.00 3.35
1.00 0.30 2.60 0.78
1.00 2.05 2.60 5.33
EJE C TRAMO 1-3 1.00 3.50 2.60 9.10
1.00 3.35 2.60 8.71
EJE D TRAMO 1-3 1.00 5.70 2.60 14.82
EJE E TRAMO 1-3 2.00 2.00 2.60 10.40
1.00 4.85 2.60 12.61
EJE F TRAMO 1-3 1.00 5.70 2.60 14.82
EJE G TRAMO 1-3 1.00 7.00 2.60 18.20

SEGUNDO NIVEL 1.00 6.60 1.20 7.92


1.00 4.80 1.20 5.76
1.00 2.70 1.20 3.24

17.00.00 REVOQUES Y ENLUCIDOS


17.01.00 CIELORASOS CON YESO M2
PRIMER PISO
OFICINA ADMINISTRATIVA 1.00 2.85 3.35 9.55
DEPOSITO 1.00 2.85 3.35 9.55
VESTUARIO CABALLEROS 1.00 5.70 3.05 17.39
1.00 5.63 1.00 5.63
1.00 2.00 2.43 4.86
ss. Hh 2.00 4.70 3.00 28.20
VESTUARIO DAMAS 1.00 5.70 3.05 17.39
1.00 5.63 1.00 5.63
1.00 2.00 2.43 4.86
ss. Hh 2.00 4.70 3.00 28.20

17.02.00 TARRAJEO EN SUPERFICIE DE VIGAS CEMENTO-ARENA M2


PRIMER PISO
EJE 3 TRAMO B - G 1.00 2.75 0.15 0.41
1.00 2.95 0.15 0.44
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
1.00 2.22 0.15 0.33
1.00 1.00 0.15 0.15
1.00 2.22 0.15 0.33
1.00 2.95 0.15 0.44
EJE 2 TRAMO B-G 1.00 2.75 0.15 0.41
1.00 2.95 0.15 0.44
1.00 2.85 0.15 0.43
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
1.00 2.85 0.15 0.43
1.00 2.95 0.15 0.44
EJE 1 TRAMO B - G 1.00 2.75 0.15 0.41
1.00 2.95 0.15 0.44
1.00 2.85 0.15 0.43
1.00 2.85 0.15 0.43
1.00 2.95 0.15 0.44
EJE 2-3 TRAMO D-F 2.00 2.22 0.15 0.67
1.00 1.00 0.15 0.15
EJE B TRAMO 1-3 1.00 3.15 0.15 0.47
1.00 2.25 0.15 0.34
EJE C TRAMO 1-3 1.00 3.15 0.15 0.47
1.00 2.25 0.15 0.34
EJE D TRAMO 1-3 1.00 2.25 0.15 0.34
1.00 3.25 0.15 0.49
EJE E TRAMO 1-3 2.00 1.80 0.15 0.54
1.00 1.10 0.15 0.17
1.00 3.25 0.15 0.49
EJE F TRAMO 1-3 1.00 3.15 0.15 0.47
1.00 3.25 0.15 0.49
EJE G TRAMO 1-3 1.00 3.15 0.15 0.47
1.00 3.25 0.15 0.49

17.03.00 TARRAJEO EN SUPERFICIE EN COLUMNAS CEMENTO-ARENA M2


PRIMER PISO
C-1 21.00 0.20 2.60 10.92

17.04.00 TARRAJEO INTERIOR Y EXTERIOR CON CEMENTO Y ARENA M2


PRIMER PISO
EJE 3 TRAMO B - G (INTERIOR) 1.00 1.95 2.60 5.07
1.00 1.15 2.60 2.99
1.00 2.58 2.60 6.71
1.00 0.20 2.60 0.52
37.5 1.00 2.58 2.60 6.71
1.00 0.20 2.60 0.52
1.00 2.58 2.60 6.71
1.00 1.15 2.60 2.99
EJE 3 TRAMO B - G (EXTERIOR) 1.00 2.10 2.60 5.46
1.00 1.30 2.60 3.38
1.00 2.73 2.60 7.10
1.00 2.93 2.60 7.62
1.00 1.30 2.60 3.38
EJE 2 TRAMO B-C 2.00 3.00 2.60 15.60
EJE 3-2 TRAMO C-D 2.00 2.20 2.60 11.44
EJE 3-2 TRAMO D-F 1.00 0.93 2.60 2.42
1.00 1.00 2.60 2.60
1.00 0.93 2.60 2.42
2.00 1.50 2.60 7.80
EJE 3-2 TRAMO F-G 1.00 2.20 2.60 5.72
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
1.00 2.05 2.60 5.33
EJE 1 TRAMO B - G (INTERIOR) 1.00 2.85 2.60 7.41
1.00 2.15 2.60 5.59
1.00 0.90 2.10 1.89
1.00 3.00 2.10 6.30
1.00 3.00 2.10 6.30
1.00 3.05 2.10 6.41
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
EJE 1 TRAMO B - G (EXTERIOR) 1.00 5.30 2.60 13.78
1.00 0.60 2.60 1.56
1.00 0.90 2.10 1.89
1.00 3.00 2.10 6.30
1.00 3.00 2.10 6.30
1.00 3.05 2.10 6.41
EJE B TRAMO 1-3 (INTERIOR) 1.00 3.35 1.00 3.35
1.00 0.30 2.60 0.78
1.00 2.05 2.60 5.33
EJE B TRAMO 1-3 (EXTERIOR) 1.00 3.35 1.00 3.35
1.00 0.75 2.60 1.95
1.00 2.05 2.10 4.31
EJE C TRAMO 1-3 1.00 3.50 2.60 9.10
1.00 3.35 2.60 8.71
1.00 6.85 2.60 17.81
EJE D TRAMO 1-3 1.00 5.70 2.60 14.82
1.00 2.70 2.60 7.02
1.00 6.60 2.60 17.16
EJE E TRAMO 1-3 4.00 2.00 2.60 20.80
1.00 4.70 2.60 12.22
EJE F TRAMO 1-3 1.00 5.70 2.60 14.82
1.00 2.70 2.60 7.02
1.00 6.60 2.60 17.16
EJE G TRAMO 1-3 (INTERIRO) 1.00 6.85 2.60 17.81
EJE G TRAMO 1-3 (EXTERIOR) 1.00 7.15 2.60 18.59

SEGUNDO NIVEL
INTERIOR 1.00 6.40 1.20 7.68
2.00 4.60 1.20 11.04
2.00 2.60 1.20 6.24
EXTERIOR 1.00 6.60 1.20 7.92
2.00 4.80 1.20 11.52
2.00 2.70 1.20 6.48

17.05.00 VESTIDURA DE ARISTAS EN VIGAS ML


PRIMER PISO
EJE 1,2,3 TRAMO B-G 3.00 14.09 42.27
EJE 2-3 TRAMO D-F 1.00 5.44 5.44
EJE B,C,D,F,G TRAMO 1-2-3 5.00 6.60 33.00
EJE E TRAMO 1-2-3 1.00 7.95 7.95

017.06.00 VESTIDURA DE ARISTAS EN COLUMNAS ML


PRIMER PISO
EJE 1,2,3 TRAMO B-G 13.00 2.60 33.80
EJE B,C,D,F,G TRAMO 1-2-3 5.00 2.60 13.00

17.07.00 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS ML


VESTIDURA DE DERRAMES VENTANAS E=0.15 cm
V-1 1.00 4.05 4.05
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
V-2 2.00 4.00 8.00
V-3 1.00 1.90 1.90
V-4 1.00 3.05 3.05
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
V-5 1.00 6.55 6.55
V-6 1.00 3.70 3.70
VESTIDURAS DE DERRAMES PUERTAS E=0.15 cm ML
P-3 5.00 2.60 13.00
P -4 1.00 2.60 2.60
P -5 1.00 2.60 2.60
P -6 1.00 4.90 4.90
17.08.00 BRUÑA E= 1 cm. ML 1.00 77.40 77.40

18.00.00 PISOS Y PAVIMENTOS


18.01.00 PISO DE CERAMICO M2
PRIMER PISO
OFICINA ADMINISTRATIVA 1.00 2.85 3.35 9.55
DEPOSITO 1.00 2.85 3.35 9.55
VESTUARIO CABALLEROS 1.00 5.70 3.05 17.39
1.00 5.63 1.00 5.63
1.00 2.00 2.43 4.86
VESTUARIO DAMAS 1.00 5.70 3.05 17.39
1.00 5.63 1.00 5.63
1.00 2.00 2.43 4.86

18.02.00 PISO DE CERAMICO 0.30 X 0.30 M2


ss. Hh 1.00 4.70 3.00 14.10
1.00 2.00 2.42 4.84
ss. Dm 1.00 4.70 3.00 14.10
1.00 2.00 2.42 4.84
19.00.00 ZOCALOS
19.01.00 ZOCALO DE CERAMICO 0.30 X 0.15 CM M2
PRIMER PISO
ss. Hh 1.00 20.71 0.95 19.67
ss. Dm 1.00 20.71 0.95 19.67

20.00.00 CARPINTERIA DE MADERA Y METALICA


20.01.01 PUERTA DE MADERA APANELADA M2
P - 1 (metalica) 1.00 3.00 3.00 9.00
P - 2 (metalica) 1.00 1.50 3.00 4.50
P - 4 (tablero rebajado) 1.00 0.90 2.10 1.89
P - 5 (tablero rebajado) 1.00 0.80 2.10 1.68
P - 6 (tablero rebajado) 1.00 1.20 2.10 2.52

20.01.01 PUERTA METALICA


PUERTA METALICA PARA BAÑO M2
(metalica) 8.00 0.62 1.80 8.93

20.02.00 VENTANA
20.02.01 VENTANA CON PERFILES DE ALUMINIO - VIDRIO M2
V-1 1.00 3.05 0.50 1.53
V-2 2.00 3.00 0.50 3.00
V-3 1.00 0.90 0.50 0.45
V-4 1.00 2.05 1.60 3.28
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
V-5 1.00 1.50 1.60 2.40
V-6 17.00 1.20 1.25 25.50
21.00.00 CERRAJERIA
21.01.00 CERRADURA PARA PUERTA EXTERIOR TIPO PARCHE 3 GOLPES UND 5.00
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO

21.02.00 BISAGRA CAPUCHINA DE 4" UND 21.00

21.03.00 PICAPORTE DE 4" UND 5.00

22.00.00 VIDRIOS, CRISTALES Y SIMILARES P2 MULTIPLICADO = 10.7 10.66


22.01.00 VIDRIO SEMIDOBLE
V-1 1.00 3.05 0.50 1.53
V-2 2.00 3.00 0.50 3.00
V-3 1.00 0.90 0.50 0.45
V-4 1.00 2.05 1.60 3.28
V-5 1.00 1.50 1.60 2.40

23.00.00 PINTURA
23.01.00 CIELO RAZO M2
OFICINA ADMINISTRATIVA 1.00 2.85 3.35 9.55
DEPOSITO 1.00 2.85 3.35 9.55
VESTUARIO CABALLEROS 1.00 5.70 3.05 17.39
1.00 5.63 1.00 5.63
1.00 2.00 2.43 4.86
ss. Hh 1.00 4.70 3.00 14.10
VESTUARIO DAMAS 1.00 5.70 3.05 17.39
1.00 5.63 1.00 5.63
1.00 2.00 2.43 4.86
ss. Dm 1.00 4.70 3.00 14.10

23.02.00 PINTURA LATEX 2 MANOS EN MUROS INTERIORES Y EXTERIOR M2


PRIMER PISO
EJE 3 TRAMO B - G (INTERIOR) 1.00 1.95 2.60 5.07
1.00 1.15 2.60 2.99
1.00 2.58 2.60 6.71
1.00 0.20 2.60 0.52
1.00 2.58 2.60 6.71
1.00 0.20 2.60 0.52
1.00 2.58 2.60 6.71
1.00 1.15 2.60 2.99
EJE 3 TRAMO B - G (EXTERIOR) 1.00 2.10 2.60 5.46
1.00 1.30 2.60 3.38
1.00 2.73 2.60 7.10
1.00 2.93 2.60 7.62
1.00 1.30 2.60 3.38
EJE 2 TRAMO B-C 2.00 3.00 2.60 15.60
EJE 3-2 TRAMO C-D 2.00 2.20 2.60 11.44
EJE 3-2 TRAMO D-F 1.00 0.93 2.60 2.42
1.00 1.00 2.60 2.60
1.00 0.93 2.60 2.42
2.00 1.50 2.60 7.80
EJE 3-2 TRAMO F-G 1.00 2.20 2.60 5.72
1.00 2.05 2.60 5.33
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
EJE 1 TRAMO B - G (INTERIOR) 1.00 2.85 2.60 7.41
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
1.00 2.15 2.60 5.59
1.00 0.90 2.10 1.89
1.00 3.00 2.10 6.30
1.00 3.00 2.10 6.30
1.00 3.05 2.10 6.41
EJE 1 TRAMO B - G (EXTERIOR) 1.00 5.30 2.60 13.78
1.00 0.60 2.60 1.56
1.00 0.90 2.10 1.89
1.00 3.00 2.10 6.30
1.00 3.00 2.10 6.30
1.00 3.05 2.10 6.41
EJE B TRAMO 1-3 (INTERIOR) 1.00 3.35 1.00 3.35
1.00 0.30 2.60 0.78
1.00 2.05 2.60 5.33
EJE B TRAMO 1-3 (EXTERIOR) 1.00 3.35 1.00 3.35
1.00 0.75 2.60 1.95
1.00 2.05 2.10 4.31
EJE C TRAMO 1-3 1.00 3.50 2.60 9.10
1.00 3.35 2.60 8.71
1.00 6.85 2.60 17.81
EJE D TRAMO 1-3 1.00 5.70 2.60 14.82
1.00 2.70 2.60 7.02
1.00 6.60 2.60 17.16
EJE E TRAMO 1-3 4.00 2.00 2.60 20.80
1.00 4.70 2.60 12.22
EJE F TRAMO 1-3 1.00 5.70 2.60 14.82
1.00 2.70 2.60 7.02
1.00 6.60 2.60 17.16
EJE G TRAMO 1-3 (INTERIRO) 1.00 6.85 2.60 17.81
EJE G TRAMO 1-3 (EXTERIOR) 1.00 7.15 2.60 18.59
SEGUNDO NIVEL
INTERIOR 1.00 6.40 1.20 7.68
2.00 4.60 1.20 11.04
2.00 2.60 1.20 6.24
EXTERIOR 1.00 6.60 1.20 7.92
2.00 4.80 1.20 11.52
2.00 2.70 1.20 6.48

23.03.00 PINTURA LATEX 2 MANOS EN VIGAS M2


PRIMER PISO
EJE 1,2,3 TRAMO B-G 3.00 14.09 0.30 12.68
EJE 2-3 TRAMO D-F 1.00 5.44 0.30 5.44
EJE B,C,D,F,G TRAMO 1-2-3 5.00 6.60 0.30 33.00
EJE E TRAMO 1-2-3 1.00 7.95 0.30 7.95

24.04.00 PINTURA LATEX 2 MANOS EN COLUMNAS M2


PRIMER PISO
C-1 4.00 2.60 0.20 2.08
C-2 9.00 2.60 0.20 23.40
C-3 2.00 2.60 0.20 5.20
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
C-4 2.00 2.60 0.20 5.20
C-5 4.00 2.60 0.20 10.40

24.05.00 PINTURA BARNIZ EN PUERTAS M2


P - 3 (tablero rebajado) 5.00 1.00 2.10 10.50
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
P - 4 (tablero rebajado) 1.00 0.90 2.10 1.89
P - 5 (tablero rebajado) 1.00 0.80 2.10 1.68
P - 6 (tablero rebajado) 1.00 1.20 2.10 2.52
24.06.00 PINTURA EN DERRAMES ML
PINTURA LATEX 2 MANOS EN DERRAME VENTANAS E=0.15 cm
V-1 1.00 4.05 4.05
V-2 2.00 4.00 8.00
V-3 1.00 1.90 1.90
V-4 1.00 3.05 3.05
V-5 1.00 6.55 6.55
V-6 1.00 3.70 3.70
PINTURA LATEX DOS MANOS EN DERRAMES PUERTAS E=0.15 cm ML
P-3 5.00 2.60 13.00
P -4 1.00 2.60 2.60
P -5 1.00 2.60 2.60
P -6 1.00 2.45 2.45
24.07.00 PINTURA ESMALTE EN COBERTURA DE TECHO COLOR ROJO M2
1.00 8.00 6.20 49.60

25.00.00 INSTALACION DE MOBILIARIOS


25.01.00 SILLA BIPERSONAL UND 24.00
25.02.00 MESA UNIPERSONAL UND 12.00
25.03.00 ESCRITORIO ADMINISTRATIVOS UND 1.00
25.04.00 SILA PARA ADMINISTRATIVO UND 1.00

METRADOS INSTALACIONES ELECTRICAS

26.00.00 INSTALACIONES ELECTRICAS


26.01.00 SALIDA DE TECHO DE CENTRO DE LUZ PTO 21.00
26.02.00 SALIDA DE INTERRUPTOR SIMPLE PTO 13.00
26.05.00 SALIDA PARA TOMA CORRIENTE PTO 21.00
26.06.00 TABLERO GENERAL CON 3 CIR. CON INTERRUP. THERMOMAGNETIC UND 1.00
26.07.00 TABLERO DE DISTRIBUCION UND 2.00
26.08.00 ARTEFACTO FLUORECENTE (tubo) PTO 12.00
26.09.00 ARTEFACTO FLUORECENTE (circular) PTO 2.00
26.10.00 POSO DE PUESTA A TIERRA UND 1.00
26.11.00 CAJA UND 1.00

METRADOS INSTALACIONES SANITARIAS


27.00.00 SISTEMA DE AGUA FRIA Y CONTRAINCENDIO
27.01.00 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" UND 18.00
27.02.00 RED DE DISTRIBUCIÓN TUBERIA DE 1/2" PVC -SAP UND 5.00
27.03.00 CODO PVC SAP 1/2x 90 PZA 25.00
27.04.00 TEE PVC SAP 1/2" PZA 20.00
27.05.00 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" PZA 1.00
27.06.00 LLAVE DE COMPUERTA DE 1/2" PZA 7.00
27.07.00 UNION DE 1/2" UND 5.00
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO

28.00.00 SISTEMA DE DESAGUE


28.01.00 SALIDAS DE PVC SAL PARA DESAGUE 2" PTO 15.00
28.02.00 SALIDAS DE PVC SAL PARA DESAGUE DE 4" PTO 8.00
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
28.03.00 SALIDAS DE PVC SAL PARA VENTILACION DE 2" PTO 1.00
28.04.00 TUBERIA DE PVC SAL 2" UND 10.00
28.05.00 TUBERIA PVC SAL 4" UND 6.00
28.06.00 YEE PVC SAL 4" PZA 8.00
28.07.00 YEE PVC DE 4" CON REDUCCION 2" PZA 8.00
28.08.00 REGISTROS DE BRONCE CROMADO 4" PZA 2.00
28.09.00 SOMBRERO DE VENTILACION PVC DE 2" PZA 1.00
28.10.00 CAJA DE REGISTRO DE DESAGUE 12"x 24" PZA 1.00
28.11.00 SUMIDERO PZA 7.00
29.00.00 APARATOS SANITARIOS Y ACCESOROS
29.01.00 INODORO SIFON JET COLOR BLANCO INC. ACCESORIOS Y COLOCAC UND 8.00
29.02.00 URINARIO COLOR BLANCO INC. ACCESORIOS Y COLOCACION UND 3.00
29.03.00 LLAVE PARA LAVADERO UND 6.00
29.04.00 LLAVE PARA URINARIO UND 3.00
30.00.00 OBRAS DE ARTE
30.01.00 SISTEMA DE DRENAJE
30.01.01 MOVIMIENTO DE TIERRAS EN DRENAJE M3 2.00 32.00 0.70 0.70 31.36
30.01.02 ELIMINACION DE MATERIAL EXCEDENTE M3 2.00 32.00 0.70 0.70 31.36
30.01.03 ENCOFRADO Y DESENCOFRADO EN SISTEMA DE DRENAJE M2 2.00 32.00 0.70 44.80
30.01.04 CONCRETO F'C=210 KG/CM2 EN SISTEMA DE DRENAJE M3 4.00 32.00 0.10 0.70 8.96
2.00 32.00 0.50 0.10 3.20
30.01.05 TARRAJEO EN SISTEMADE DRENAJE M2 1.00 32.00 1.90 60.80
30.01.06 JUNTAS DE DILATACION EN SISTEMA DE DRENAJE ML 11.00 1.90 20.90

31.00.00 ESTRUCTURA DE MADERA


31.01.00 ESCALERA DE MADERA
31.01.01 MOVIMIENTO DE TIERRAS M3 2.00 0.55 0.55 0.70 0.42
2.00 0.55 0.55 0.60 0.36
31.01.02 ELIMINACION DE MATERIAL EXCEDENTE M3 2.00 0.55 0.55 0.70 0.42
2.00 0.55 0.55 0.60 0.36
31.01.03 ENCOFRADO Y DESENCOFRADO M2 8.00 0.70 0.30 1.68
4.00 0.35 0.30 0.42
31.01.04 CONCRETO F'C=210 KG/CM2 EN SISTEMA DE DRENAJE M3 2.00 0.70 0.15 1.00 0.21
2.00 0.35 0.10 1.00 0.07
31.01.05 MADERA EN ESCALERA M2 2.00 0.55 0.55 0.61
31.01.06 MADERA DE 6" x 6" EN PARANTES ML 2.00 8.75 17.50
31.01.07 TABLA DE MADERA e=2" M2 1.00 5.40 1.20 6.48
1.00 3.00 1.20 3.60
31.01.08 BARANDA DE MADERA e=2" ML 1.00 18.60 18.60

31.00.00 CERCO PERIMETRICO


31.01.00 MOVIMIENTO DE TIERRAS EN CERCO M3 2.00 44.00 0.20 0.20 3.52
2.00 24.30 0.20 0.10 0.97
31.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 2.00 44.00 0.20 0.20 3.52
2.00 24.30 0.20 0.10 0.97
31.03.00 ENCOFRADO Y DESENCOFRADO EN EN CERCO M2 2.00 44.00 0.50 44.00
2.00 24.30 0.50 24.30
METRADOS TRABAJO CALCULO DE MADERA PIE2

PROYECTO: CALCULO DE PIE2 DE LA MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

MOQUEGUA - MARISCAL NIETO - SAMEGUA 5/27/2019

MEDIDAS
PARTIDA DESCRIPCIÓN UNID. CANT. PARCIAL
LARGO ANCHO ALTO
31.04.00 CONCRETO F'C=210 KG/CM2 EN CERCO M3 2.00 44.00 0.15 0.70 9.24
2.00 24.30 0.15 0.10 0.73
31.05.00 TARRAJEO EN CERCO M2 2.00 44.00 0.50 44.00
2.00 24.30 0.50 24.30
31.06.00 MALLA EN CERCO M2 44.00 2.40 2.80 295.68
31.07.00 POSTE METALICO DE 6" x 6" ML 45.00 2.50 112.50
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

DERA IESTP JOSE CARLOS MARIATEGUI

14.34

14.31

14.04

5.05
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

229.00

2.00
1.00
1.00

221.95
221.95

40.58
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

3.18
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

37.40

2.38

3.77

1.33

3.09
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

40.14

22.23
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

9.29

162.13

3.85
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

59.01
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

624.84

5.33

60.95
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

916.25

9.96

131.25

622.72
950.00

6.00

64.00

49.60
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

TRADOS ARQUITECTURA

186.77
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

131.25

31.98
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

10.92

435.59
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

88.66

46.80

45.45
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

77.40

74.85

37.88

39.35

19.59

8.93

10.66
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

5.00
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

21.00

5.00

114.01

93.50

435.59
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

59.07

46.28
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

16.59
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

47.90

49.60

24.00
12.00
1.00
1.00

S INSTALACIONES ELECTRICAS

21.00
13.00
21.00
1.00
2.00
12.00
2.00
1.00
1.00

OS INSTALACIONES SANITARIAS

18.00
5.00
25.00
20.00
1.00
7.00
5.00
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

15.00
8.00
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

1.00
10.00
6.00
8.00
8.00
2.00
1.00
1.00
7.00

8.00
3.00
6.00
3.00

31.36
31.36
44.80
12.16

60.80
20.90

0.79

0.79

2.10

0.28

0.61
17.50
10.08

18.60

4.49

4.49

68.30
BAJO CALCULO DE MADERA PIE2

A MADERA EN : PUERTA - MARCO - BASE DE LA PIZARRA

TOTAL

9.97

68.30

295.68
112.50
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS –

HUANCARAMA-ANDAHUAYLAS - APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
ZAPATAS
Acero f´c=4200 Kg/cm2

Z-1 1/2" 4.00 6.00


1.50
Z-2 1/2" 9.00 4.00
1/2" 9.00 7.00
Z-3 1/2" 2.00 3.00
1/2" 2.00 6.00
Z-4 1/2" 2.00 8.00
1.50

Z-5 1/2" 3.00 12.00


Z-6 1/2" 1.00 12.00
Peso en kilogramos por metro lineal
Longitud total porø en metros lineales
Total en kilogramos por ø

PLANILLA DE METRADOS DE FIERRO


PROYECTO: CREACION DE ESPACIO PUBLICO DE RECREACION ACTIVA, DISTRITO DE HUACCANA, PROVINCIA DE CHINCHERO
HUANCARAMA-ANDAHUAYLAS - APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
VIGAS DE CONEXIÓN
Acero f´c=4200 Kg/cm2
P-V
EJE 1 - 2 - 3 8.00 6.00
ESTRIBOS 1.00 51.00
EJE 1" - 2 - 3 3.00 6.00
ESTRIBOS 1.00 39.00
P-S
EJE A - B - C - D - E 2.00 6.00
3/8": 1@.05,2@.10, 3@.15,Rto.@.20 a/e.
0.25
ESTRIBOS 1.00 104.00
EJE J - K - L - M 1.00 13.30
ESTRIBOS 1.00 81.00
EJE M - N - Ñ 1.00 6.00
0.40

ESTRIBOS 1.00 54.00

VIGA DE CONEXION
Peso en kilogramos por metro lineal
Longitud total porø en metros lineales
Total en kilogramos por ø

2137.5
1700
596.491228
750

PLANILLA DE METRADOS DE FIERRO


PROYECTO:

HUANCARAMA-ANDAHUAYLAS - APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
COLUMNETAS
Acero f´c=4200 Kg/cm2

COLUMNETAS 3/8 36.00 4.00


ESTRIBO 1/4 36.00 14.00

1/4": 1@.05, 4@.10,

COLUMNETA

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO:

HUANCARAMA-ANDAHUAYLAS - APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
COLUMNAS
Acero f´c=4200 Kg/cm2
C -1 1/2 21 4
ESTRIBO 3/8 21 24
C -2 1/8 18 4
ESTRIBO 1/4 18 8

CUADRO DE COLUMNAS

TIPO
C-1
DESCRIPCION
DIMENSION 0.25x0.25

ARMADURA 4ø1/2"

3/8": 1@.05,
4 @.10 a/e.
ESTRIBOS
Rto.@.20 a/e.

FORMA
ARMADURA 4ø1/2"

3/8": 1@.05,
4 @.10 a/e.
ESTRIBOS
Rto.@.20 a/e.

FORMA

RECUBRIMIENTO

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø

PLANILLA DE METRADOS DE FIERRO


PROYECTO:

HUANCARAMA-ANDAHUAYLAS - APURIMAC
DESCRIPCION ø CANTIDAD # de
elementos
VIGAS
Acero f´c=4200 Kg/cm2

EJE 3 TRAMO B - G 1/2" 1.00 4.00


ESTRIBO 3/8" 1.00 87.00
EJE 2 TRAMO B-G 1/2" 1.00 4.00
CUADRO DE VIGAS ESTRIBO 3/8" 1.00 87.00
EJE 1 TRAMO B - G 1/2" 1.00 4.00
TIPO
DESCRIPCION
V.S. V.P. V.COLLAR. V.CHATA. ESTRIBO 3/8 1.00 87.00
DIMENSION VP 0.25X0.40 VP 0.25X0.50 VC 0.25X0.40 VC 0.25X0.20
EJE 2-3 TRAMO D-F 1/2" 1.00 4.00
ARMADURA 4ø5/8" 6ø5/8"-2ø1/2" 4ø1/2" 4ø1/2"
ESTRIBO 3/8 1.00 35.00
3/8": 1@.05, 3/8": 1@.05, 3/8": 1@.05, 3/8": 1@.05,
2@.10, 2@.10, 2@.10, 2@.10, EJE B TRAMO 1-3 1/2" 1.00 4.00
ESTRIBOS 3@.15, 3@.15, 3@.15, 3@.15,
Rto.@.20 a/e. Rto.@.20 a/e. Rto.@.20 a/e. Rto.@.20 a/e. ESTRIBO 3/8 1.00 37.00
EJE C TRAMO 1-3 1/2" 1.00 4.00
ESTRIBO 3/8 1.00 37.00
FORMA
EJE D TRAMO 1-3 3/8" 1.00 4.00
ESTRIBO 1/2" 1.00 37.00
RECUBRIMIENTO 4.00cm. 4.00cm. 4.00cm. 4.00cm.
EJE E TRAMO 1-3 1/2" 1.00 31.00
ESTRIBO 3/8 1.00 41.00
EJE F TRAMO 1-3 1/2" 1.00 4.00
ESTRIBO 3/8 1.00 37.00
EJE G TRAMO 1-3 1/2" 1.00 4.00
ESTRIBO 3/8 1.00 37.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: ANPLIACION Y CONSTRUCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E.S.M. "UNION SAN JOSE" A

HUANCARAMA-ANDAHUAYLAS - APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
LOSA ALIGERADDA

Acero f´c=4200 Kg/cm2


acero en viguetas 3/8" 40.00 2
55.00 1
64.00 2
2.00 1
2.00 1
2.00 1
2.00 1
1/4" 29.00 1.00
63.00 1.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: ANPLIACION Y CONSTRUCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E.S.M. "UNION SAN JOSE" A

HUANCARAMA-ANDAHUAYLAS - APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
VIGA SOLERA EN MUROS

Acero f´c=4200 Kg/cm2


Tramo 1 y 2 descanso 1/2" 1.00 8
Estribo 3/8 1.00 25.00
descanso 3/8 1.00 6.00
Peso en kilogramos por metro lineal
Longitud total porø en metros lineales
Total en kilogramos por ø

SUMATORIA DE LOS TRE VIGAS TIPOS 1,2 Y


FIERRO
UACCANA - CHINCHEROS – APURÍMAC

FECHA NOVIEMBRE - 2,016

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

0.55 13.2
0.55 19.8
0.95 59.85
0.45 2.7
0.85 10.2
0.55 8.8
0.95 34.2
0.85 10.2
metro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en
tros lineales 158.95 Kg.
ø 0.00 0.00 162.13 0 162.13

FIERRO
PROVINCIA DE CHINCHEROS - APURIMAC
FECHA : MAYO - 2,008

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

9.37 449.76
1.53 78.03
6.8 122.4
1.53 59.67

17.8 213.6
1.28 133.12
13.3 176.89
1.28 103.68
5.7 34.2
1.28 69.12
metro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en
tros lineales 0.00 990.71 0.00 Kg.
ø 0.00 554.80 0.00 554.80

2.85 750

FIERRO

FECHA : MAYO - 2,013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

2.88 414.72
0.94 473.76

metro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


tros lineales 473.76 473.76 Kg.
ø 118.44 265.31 383.75
FIERRO

FECHA : MARZO - 2,013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

2.85 239.4
0.94 473.76
2.45 176.4
0.46 66.24
metro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en
tros lineales 66.24 650.16 239.40 0 Kg.
ø 16.56 364.09 244.19 624.84

FIERRO

FECHA : MARZO - 2,013


Longitud del LONGITUD POR ø EN ML.
elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

16.25 65
0.94 81.78
16.25 65
0.94 81.78
16.25 65
0.94 81.78
6.85 27.4
0.94 32.9
7.55 30.2
0.94 34.78
7.55 30.2
0.94 34.78
7.55 30.2
0.94 34.78
7.95 246.45
1.25 51.25
7.55 30.2
0.94 34.78
7.55 30.2
0.94 34.78

metro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


tros lineales 0.00 498.81 624.43 0 Kg.
ø 0.00 279.33 636.92 0 916.25
FIERRO
E.S.M. "UNION SAN JOSE" ARCAHUA

FECHA : MAYO - 2,008

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

7.15 572
1.50 82.5
0.40 51.2
6.93 13.86
7.25 14.5
3.93 7.86
1.75 3.5
15.85 459.65
7.15 450.45

metro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


tros lineales 910.10 705.70 0.00 Kg.
ø 227.53 395.19 0.00 622.72
FIERRO
E.S.M. "UNION SAN JOSE" ARCAHUA

FECHA : MAYO - 2,008

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

18.97 151.76
1.50 37.50
3.10 18.60
metro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en
tros lineales 56.10 151.76 Kg.
ø 0.00 31.42 154.80 186.21

LOS TRE VIGAS TIPOS 1,2 Y 3 KG. #REF!


0 PLANILLA DE METRADOS D
PROYECTO: CREACION DE ESPACIO PUBLICO DE RECREACION ACTIVA, DISTRITO DE HUAC

HUANCARAMA-ANDAHUAYLAS - APURIMAC

DESCRIPCION ø
VIGAS DE CIMENTACION
VIGUETAS VC-2
EJE A ENTRE 1-4 1/2"
VIGUETAS VC-1
EJE 4-4 ENTRE A-D 1/2"
EJE 1 ENTRE C-D 1/2"
EJE 2 ENTRE C-D 1/2"

ESTRIBOS VC-2
EJE A ENTRE 1-2 1/4"
ESTRIBOS VC-1
EJE 1 ENTRE A-B 1/4"
EJE 4 ENTRE B-C 1/4"

Peso en kilogramos p
Longitud total porø en
Total en kilogramos
METRADOS DE FIERRO
VA, DISTRITO DE HUACCANA, PROVINCIA DE CHINCHEROS - APURIMAC

FECHA : MAYO - 2,008

# DE # DE LONGITU LONGITUD POR ø EN ML.


ELEMENT ELEMENTO
D DE LA
OS POR S POR
PIEZAS PIEZA
PIEZAS
1/4" 3/8" 1/2" 5/8" 3/4"

4 6 14.1 338.4

2 6 12.60 151.2
2 6 3.60 43.2
2 6 3.65 43.8

12 28 1.21 406.56

8 26 1.31 272.48
2 41 1.31 107.42

Peso en kilogramos por metro lineal 0.25 0.56 1.02 1.6 2.26
ongitud total porø en metros lineales 786.46 0.00 576.60
Total en kilogramos por ø 196.62 0.00 588.13
L.

1"

4.04 Total en
Kg.
784.75
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
ZAPATAS
Acero f´c=4200 Kg/cm2

1.20
1/2" 8.00 10.00
4.00 8.00
C

1.20
6 ø 1/2" Z-1

ø 5/8" @ .20

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
COLUMNAS
Acero f´c=4200 Kg/cm2

1/2" 8.00 6.00


1/2" 4.00 4.00
ESTRIBOS 3/8" 8.00 28.00
3/8" 4.00 28.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
VIGAS DE CONEXIÓN
Acero f´c=4200 Kg/cm2
EJE 1 TRAMO A-B 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 21.00
TRAMO B-C 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 10.00
EJE 2 TRAMO A-B 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 21.00
Ø 1/4": 1 @.05, 4 @ .10
EJE 2 TRAMO B-C 5/8" 1.00 4.00
rto. @.20. C /EXTREM O. C /TRAM O
ESTRIBOS 3/8" 1.00 12.00
EJE 3 TRAMO B-C 5/8" 1.00 4.00
4 ø 1/2" ESTRIBOS 3/8" 1.00 14.00
EJE 4 TRAMO A-B 5/8" 1.00 4.00
.40 ESTRIBOS 3/8" 1.00 21.00
EJE 4 TRAMO B-C 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 16.00
EJE 5 TRAMO B-C 5/8" 1.00 4.00
.25 ESTRIBOS 3/8" 1.00 17.00
EJE 6 TRAMO D-E, F-G, G-B 5/8" 3.00 4.00
ESTRIBOS 3/8" 3.00 11.00
EJE 7 TRAMO D-E,E-F, F-G, G-B 5/8" 4.00 4.00
VC - 1 (.25 x .40)
ESTRIBOS 3/8" 4.00 11.00
EJE 7 TRAMO B-C 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 18.00
VIG AS DE C ONEXION
.25

PLANILLA DE METRADOS DE FIERRO


VC - 1 (.25 x .40)
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
VIG AS DE C ONEXION EJE A TRAMO 1,2 5/8" 2.00 4.00
ESC : 1/25 ESTRIBOS 3/8" 2.00 11.00
EJE B TRAMO 1 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 11.00
EJE B TRAMO 2-3 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 11.00
EJE B TRAMO 3-4 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 11.00
EJE C 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 11.00
EJE C TRAMO 3-4 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 8.00
EJE D,E,F,B,C TRAMO 6-7 5/8" 5.00 4.00
ESTRIBOS 3/8" 5.00 21.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
COLUMNAS
Acero f´c=4200 Kg/cm2
C-1 5/8" 31.00 4.00
1/2" 31.00 2.00
C -1 C -2 C-2 5/8" 1.00 4.00
1/2" 1.00 2.00
.30 X .25 .25 X .25 ESTRIBOS C-1 3/8" 31.00 41.00
ESTRIBOS C-2 3/8" 1.00 41.00
6 o/ 1/2" 4 o/ 1/2"

o/ 3/8" @ .25 o/ 3/8" @ .25

6 o/ 1/2" 4 o/ 1/2"

.30 .25

.25
.25

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
COLUMNETAS
Acero f´c=4200 Kg/cm2
CT - 1 3/8" 23.00 4.00
ESTRIBOS 1/4" 23.00 10.00
CT - 2 3/8" 24.00 4.00
ESTRIBOS 1/4" 24.00 6.00
CT - 3 3/8" 5.00 4.00
ESTRIBOS 1/4" 5.00 9.00
CT - 1 3/8" 23.00 4.00
ESTRIBOS 1/4" 23.00 10.00
CT - 2 3/8" 24.00 4.00
ESTRIBOS 1/4" 24.00 6.00
CT - 3 3/8" 5.00 4.00
ESTRIBOS 1/4" 5.00 9.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
VIGAS
Acero f´c=4200 Kg/cm2
EJE 1 TRAMO A-B 5/8" 1.00 4.00
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 31.00
EJE 1´TRAMO B-C 5/8" 1.00 4.00
4 Ø 1/2"
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 20.00
ø 1/4" EJE 1´ ,2,3,4 TRAMO A-B 5/8" 4.00 4.00
.40 1 @ .05 1/2" 4.00 2.00
3 @ .10 ESTRIBOS 3/8" 1.00 20.00
EJE 2 TRAMO B-C 5/8" 1.00 4.00
3 @ .15
1/2" 1.00 2.00
R @ .20 ESTRIBOS 3/8" 1.00 22
EJE 3 TRAMO B-C 5/8" 1.00 4.00
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 24.00
EJE 4 TRAMO B-C 5/8" 1.00 4.00
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 25.00
.25 EJE 5 TRAMO B-C 5/8" 1.00 4.00
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 25.00
EJE 6 TRAMO D-E, E-F, F-G, G-B 5/8" 4.00 4.00
V-2 (.25x.40)
PLANILLA DE METRADOS DE FIERRO
.25
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

V-2 (.25x.40)
HUACCANA-CHINCHEROS -APURIMAC
ESTRIBOS 3/8" 4.00 20.00
ESC : 1/20 EJE 6 TRAMO B-C 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 25.00
EJE 7 TRAMO D-E,E-F, F-G, G-B 5/8" 4.00 4.00
ESTRIBOS 3/8" 4.00 20.00
EJE 7 TRAMO B-C 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 25.00
EJE A,B TRAMO 1-1´, 1´- 2, 2-3, (V-C) 1/2" 6.00 4.00
ESTRIBOS 3/8" 6.00 20.00
EJE A,B TRAMO 3-4 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 20.00
EJE D TRAMO 6-5 5/8 1.00 4.00
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 32.00
EJE E TRAMO 5-6 5/8" 1.00 44.00
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 30.00
EJE F TRAMO 5-6 5/8" 1.00 4.00
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 28.00
EJE G TRAMO 5-6 5/8" 1.00 4.00
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 26.00
EJE B TRAMO 5-6 5/8" 1.00 4.00
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 24.00
EJE C TRAMO 5-6 5/8" 1.00 4.00
1/2" 1.00 2.00
ESTRIBOS 3/8" 1.00 24.00
EJE C TRAMO 3-4 5/8" 1.00 4.00
ESTRIBOS 3/8" 1.00 17.00
EJE D,E,F,G,B,C TRAMO 6-7 5/8" 6.00 4.00
1/2" 6.00 2.00
ESTRIBOS 3/8" 6.00 31.00

VIGA CHATA 1/2" 1.00 4.00


1/2" 1.00 4.00
ESTRIBOS 3/8" 1.00 81.00
3/8" 1.00 60.00
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
Peso en kilogramos por metro lineal
Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
ESCALERA
Acero f´c=4200 Kg/cm2
1/2" 1.00 16
1/2" 1.00 16
1/2" 1.00 16
1/2" 1.00 16
1/2" 1.00 16
3/8" 1.00 10
3/8" 1.00 22
3/8" 1.00 25.00
3/8" 1.00 6.00
1/2" 1.00 16.00
1/2" 1.00 16.00
1/2" 1.00 16.00
1/2" 1.00 16.00
1/2" 1.00 16.00
3/8" 1.00 9.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
LOSA ALIGERADA
Acero f´c=4200 Kg/cm2
acero en viguetas 3/8" 2.00 56.00
2.00 25.00
2.00 60.00
2.00 9.00
2.00 6.00

Acero de Temperatura 1/4" 1.00 66.00


1.00 21.00
1.00 14.00
1.00 16.00
1.00 31.00
1.00 16.00

Bastones 1.00 66.00


1.00 21.00
1.00 31.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
PLACA
Acero f´c=4200 Kg/cm2
h 5/8" 1.00 19.00
h 5/8" 1.00 6.00
v 5/8" 1.00 15.00
1/2" 1.00 2.00
1/2" 1.00 2.00
1/2" 1.00 2.00
3/8" 1.00 1.00
3/8" 1.00 14.00

ESTRIBOS 3/8" 1.00 13.00


3/8" 1.00 13.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
PLACA DE REFUERZO
Acero f´c=4200 Kg/cm2
EJE A de 1-3 Horiz 1/2" 1 6
EJE 1 de A-B horiz 1/2" 1.00 6.00
EJE 1 de B-C horiz 1/2" 1.00 3.00
EJE 3 de A -B horiz 1/2" 1.00 6.00
EJE 3 de B-C horIz 1/2" 1.00 3.00
PLACA DE REFUERZO EJE A de 1-3 Vert 1/2" 1.00 21.00
EJE 1 de A-B vert 1/2" 1.00 14.00
1.33 ø 1/2" @ 0.25 en EJE 1 de B-C vert 1/2" 1.00 14.00
ambos sentidos
EJE 3 de A -B vert 1/2" 1.00 14.00
EJE 3 de B-C vert 1/2" 1.00 9.00

EJE E de 1-3 Horiz 1/2" 1 4


EJE 1 de E-F horiz 1/2" 1.00 4.00
EJE 3 de E-F horiz 1/2" 1.00 4.00
EJE E de 1-3 Vert 1/2" 1.00 21.00
COLUM NA
EJE 1 de E-F vert 1/2" 1.00 14.00
CIM IENTO CORRIDO
EJE 3 de E-F vert 1/2" 1.00 14.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

PLANILLA DE METRADOS DE FIERRO


PROYECTO: CONSTRUCION DE LA INSTITUCION EDUCATIVA DE ARCAHUA

HUANCARAMA - ANDAHAYLAS - APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
VIGAS DE CONEXIÓN
Acero f´c=4200 Kg/cm2
EJE 1 1/2" 1 4
EJE 1 3/8 7 24

Ø 1/4": 1 @.05, 4 @ .10


rto. @.20. C /EXTR EM O. C /TRAM O
EJE2 1/2" 1.00 4.00
EJE 2 3/8 6.00 24.00
4 ø 1/2" EJE 3 1/2 1.00 4.00
EJE 5 3/8 2.00 24.00
.40
ESTR. EJE 7 3/8 2.00 24.00
ESTR. EJE A,B,C,D,E,F,L,N, 3/8 8.00 38.00

.25

VC - 1 (.25 x .40)

VIG AS DE C ONEXION
ES C : 1/25
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
COLUMNETAS
Acero f´c=4200 Kg/cm2
COLUMNETAS EJE 1 de A-I 3/8" 16.00 4
ESTRIBOS EJE 1 de A-1 1/4" 16.00 14.00
CT
C OLUM N ETA COLUMNETAS EJE 3 de A-I 3/8" 16.00 4
ESTRIBOS EJE 3 de A-1 1/4" 16.00 12.00
.25 X .15

4 o/ 3/8"

o/ 1/4" @ .25

4 o/ 3/8"

.25

.25

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
COLUMNAS
Acero f´c=4200 Kg/cm2
C-1 1/2" 24.00 6
3/8" 24.00 37.00
C -1 C -2 C-2 1/2" 11.00 6.00
3/8" 11.00 37.00
.30 X .25 .25 X .25 C-3 1/2" 6.00 4.00
3/8" 6.00 37.00
6 o/ 1/2" 4 o/ 1/2" C-4 1/2" 2.00 9.00
3/8" 2.00 37.00
o/ 3/8" @ .25 o/ 3/8" @ .25

6 o/ 1/2" 4 o/ 1/2"

.30 .25

.25
.25

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
VIGAS
Acero f´c=4200 Kg/cm2
EJE 1 1/2" 1.00 4
ESTRIBOS 3/8 7.00 24.00
4 Ø 1/2"
EJE 2 1/2" 1.00 4
ø 1/4" ESTRIBOS 3/8 6.00 38.00
.40 1 @ .05
3 @ .10 EJE 3 1/2 1.00 4.00
ESTRIBOS 3/8 6.00 24.00
3 @ .15
R @ .20 EJE 4 1/2 1.00 4.00
ESTRIBOS 3/8 2.00 24.00

EJE 5 1/2 1.00 4.00


ESTRIBOS 3/8 2.00 24

EJE 7 1/2 1.00 4


.25 ESTRIBOS 3/8 3.00 24.00

V-2 (.25x.40)
ESC: 1/20
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
VIGAS
Acero f´c=4200 Kg/cm2
EJE 1 1/2" 4.00 4
ESTRIBOS 1/4" 4.00 21.00
V-1 (.15x .40)

ES C : 1:50
.15
2 Ø 1/2"

ø 1/4"
1 @ .05
.40
3 @ .10
3 @ .15
R @ .20
2 Ø 1/2"

S EC C ION 2-2
ESC : 1/20

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
ESCALERA
Acero f´c=4200 Kg/cm2
Tramo 1 y descanso 1/2" 1.00 16
Tramo 1 y descanso 1/2" 1.00 16
Tramo 1 y descanso 1/2" 1.00 16
Tramo 1 y descanso 1/2" 1.00 16
Tramo 1 y descanso 1/2" 1.00 16
rampa 1er tramo 3/8" 1.00 10
Descanso 3/8" 1.00 22
Estribo 3/8" 1.00 25.00
descanso 3/8" 1.00 6.00
Tramo 2 y descanso 1/2" 1.00 16.00
Tramo 2 y descanso 1/2" 1.00 16.00
Tramo 2 y descanso 1/2" 1.00 16.00
Tramo 2 y descanso 1/2" 1.00 16.00
Tramo 2 y descanso 1/2" 1.00 16.00
rampa 2do tramo 3/8" 1.00 9.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
LOSA ALIGERADA
Acero f´c=4200 Kg/cm2
acero en viguetas 3/8" 2.00 92.00
2.00 24.00
2.00 24.00
2.00 24.00
2.00 20.00
2.00 12.00
2.00 1.00
2.00 11.00
2.00 10.00
2.00 7.00

Acero de Temperatura 1/4" 1.00 95.00


1.00 55.00
1.00 19.00
1.00 37.00
1.00 18.00
1.00 17

Bastones 1.00 95.00


1.00 55
1.00 19.00
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC
1.00 37.00

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
VIGA SOLERA EN MUROS
Acero f´c=4200 Kg/cm2
V.S en eje 1c/puertas horizontal 3/8" 4.00 4
estribos 1/4" 4.00 17.00
Ø 1/4" @.25 4 Ø 3/8"

V.S en eje 1c/puertas vertical 3/8" 4.00 4


.15 estribos 1/4" 4.00 3.00

V.S en eje 1s/puertas horizontal 3/8" 4.00 4


.25
estribos 1/4" 4.00 22.00

V.S en eje 1s/puertas vertical 3/8" 4.00 4


S EC C ION 3-3 estribos 1/4" 4.00 3.00
ESC : 1/20
V.S en eje 2 c/ventanas horizontal 3/8" 8.00 4
estribos 1/4" 8.00 24.00

3 V.S en eje 2 c/ventanas vertical 3/8" 8.00 4


estribos 1/4" 8.00 12.00
.15

3
3

.15
PLANILLA DE METRADOS DE FIERRO
3 CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC
PROYECTO:

HUACCANA-CHINCHEROS -APURIMAC

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø

SUMATORIA DE LOS TRE VIGAS TIPOS 1,2


PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

DESCRIPCION ø CANTIDAD # de
elementos
LOSA ALIGERADA
Acero f´c=4200 Kg/cm2
3/8" 4.00 4
1/4" 4.00 17.00

3/8" 4.00 4
1/4" 4.00 3.00

3/8" 4.00 4
1/4" 4.00 22.00

3/8" 4.00 4
1/4" 4.00 3.00

3/8" 8.00 4
1/4" 8.00 24.00

3/8" 8.00 4
1/4" 8.00 12.00
PLANILLA DE METRADOS DE FIERRO
PROYECTO: CREACIÓN DE LOSA DE RECREACIÓN MULTIUSOS EN HUACCANA, DISTRITO DE HUACCANA - CHINCHEROS – APURÍMAC

HUACCANA-CHINCHEROS -APURIMAC

Peso en kilogramos por metro lineal


Longitud total porø en metros lineales
Total en kilogramos por ø
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

1.20 96
1.00 32

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 128.00 0 Kg.
0.00 0.00 130.56 0 130.56
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

4.43 212.64
4.43 70.88
1.30 291.20
1.10 123.20

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 414.40 283.52 0 Kg.
0.00 232.06 289.19 0 521.25
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

5.95 23.8
1.66 34.86
3.73 14.92
1.66 16.6
5.95 23.8
1.66 34.86
4.13 16.52
1.66 19.92
4.52 18.08
1.66 23.24
5.95 23.8
1.66 34.86
4.87 19.48
1.66 26.56
5.05 20.2
1.66 28.22
3.88 46.56
1.66 54.78
3.88 62.08
1.66 73.04
5.30 21.2
1.66 29.88
DE FIERRO

FECHA : MAYO 2013


3.88 31.04
1.66 36.52
3.87 15.48
1.66 18.26
3.88 15.52
1.66 18.26
3.85 15.4
1.66 18.26
3.90 15.6
1.66 18.26
3.36 13.44
1.66 13.28
5.95 119
1.66 174.3

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 673.96 515.92 Kg.
377.42 0.00 825.472 1202.89
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

6.60 818.4
6.60 409.2
6.60 26.4
6.60 13.2
1.44 1830.24
1.44 59.04

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 0.00 1889.28 422.40 844.8 Kg.
0.00 1058.00 430.85 1351.68 2840.52
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

2.50 230.00
0.88 202.40
1.40 134.40
0.88 126.72
2.20 44.00
0.88 39.60
2.50 230.00
0.88 202.40
1.40 134.40
0.88 126.72
2.20 44.00
0.88 39.60

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 737.44 816.80 Kg.
184.36 457.41 641.77
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

6.35 25.4
6.35 12.7
1.40 43.4
4.13 16.52
4.13 8.26
1.40 28
4.13 66.08
4.13 33.04
1.40 28
4.53 18.12
4.53 9.06
1.40 30.8
4.92 19.68
4.92 9.84
1.40 33.6
5.28 21.12
5.28 10.56
1.40 35
5.30 21.2
5.30 10.6
1.40 35
4.13 66.08
DE FIERRO

FECHA : MAYO 2013


1.20 96
5.30 21.2
1.20 30
4.13 66.08
1.20 96
5.30 21.2
1.20 30
4.13 99.12
1.20 144
4.13 16.52
1.20 24
6.58 26.32
DE FIERRO

FECHA : MAYO 2013


6.58 13.16
1.40 44.8
6.18 271.92
6.18 12.36
1.40 42
5.79 23.16
5.79 11.58
1.40 39.2
5.39 21.56
5.39 10.78
1.40 36.4
5.00 20
5.00 10
1.40 33.6
5.00 20
5.00 10
1.40 33.6
3.63 14.52
1.20 20.4
6.35 152.4
6.35 76.2
1.40 260.40

16.50 66
12.36 49.44
0.80 64.80
0.80 48.00
DE FIERRO

FECHA : MAYO 2013


ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en
s lineales 1277.00 452.70 929.08 Kg.
715.12 461.75 1486.528 2663.40
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

3.58 57.28
1.61 25.76
1.06 16.96
3.14 50.24
2.54 40.64
2.40 24
5.05 111.1
1.50 37.5
3.10 18.6
6.04 96.64
2.92 46.72
1.04 16.64
0.93 14.88
1.38 22.08
2.40 21.6

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 191.20 409.44 Kg.
107.07 417.63 524.70
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

3.88 434.56
5.05 252.5
3.88 465.6
3.89 70.02
3.57 42.84

9.21 607.86
11.86 249.06
3.38 47.32
6.94 111.04
9.35 289.85
6.94 111.04

2.65 174.9
2.65 55.65
2.65 82.15

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 1728.87 1265.52 Kg.
432.22 708.69 1140.91
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

1.40 26.6
4.60 27.6
6.00 90.00
6.20 12.4
5.37 10.74
4.87 9.74
4.87 4.87
1.20 16.80

0.94 12.22
0.70 9.10

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 42.99 32.88 144.2 Kg.
0.00 24.07 33.54 145.8 203.41
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

5.46 32.76
3.53 21.18
3.53 10.59
3.53 21.18
2.28 6.84
1.70 35.7
1.70 23.8
1.20 16.8
1.70 23.8
1.20 10.8

5.46 21.84
3.53 14.12
3.53 14.12
1.50 31.5
1.50 21
1.50 21

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 327.03 0 Kg.
0.00 0.00 333.57 1.6 335.17
DE FIERRO

FECHA : MAYO 2013

RRO
A

FECHA : FEBRERO - 2,008

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

30.53 122.12
1.35 226.8

26.45 105.8
1.35 194.4
8.99 35.96
1.35 64.8
1.35 64.8
1.35 410.4
DE FIERRO

FECHA : MAYO 2013

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 263.88 961.2 Kg.
269.16 1537.92 1807.08
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

3.57 228.48
0.90 201.6

3.15 201.6
0.90 172.8

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 374.40 430.08 Kg.
93.60 240.84 334.44
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

6.30 907.2
1.30 1154.4
6.30 415.8
1.06 431.42
6.30 151.2
0.76 168.72
6.30 113.4
1.70 125.8

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 1880.34 1587.60 Kg.
DE FIERRO

FECHA : MAYO 2013


470.09 1619.35 2089.44
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

27.09 108.36
1.44 241.92

26.35 105.4
1.44 328.32

24.97 99.88
1.44 207.36

7.44 29.76
1.44 69.12

8.99 35.96
1.44 69.12

12.97 51.88
1.44 103.68
DE FIERRO

FECHA : MAYO 2013

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 1019.52 431.24 Kg.
570.93 439.86 1010.80
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

4.45 71.2
1.20 100.8

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 100.80 71.20 Kg.
25.20 72.62 97.82
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

3.58 57.28
1.61 25.76
1.06 16.96
3.14 50.24
2.54 40.64
2.40 24
5.05 111.1
1.50 37.5
3.10 18.6
6.04 96.64
2.92 46.72
1.04 16.64
0.93 14.88
1.38 22.08
2.40 21.6

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 191.20 409.44 Kg.
DE FIERRO

FECHA : MAYO 2013


107.07 417.63 524.70
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

4.72 868.48
5.75 276
4.62 221.76
4.70 225.6
4.72 188.8
4.70 112.8
10.39 20.78
8.96 197.12
14.41 288.2
14.77 206.78

9.50 902.5
9.50 522.5
8.08 153.52
9.00 333
3.98 71.64
2.20 37.4

5.87 557.65
5.85 321.75
4.54 86.26
DE FIERRO

FECHA : MAYO 2013


4.95 183.15

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 3169.37 2606.32 Kg.
792.34 1459.54 2251.88
DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

4.33 69.28
0.78 53.04

0.70 11.2
0.78 9.36

5.50 88
0.78 68.64

0.70 11.2
0.78 9.36

6.00 192
0.78 149.76

3.10 99.2
0.78 74.88
DE FIERRO

FECHA : MAYO 2013

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 365.04 470.88 0.00 Kg.
91.26 263.69 0.00 354.95

S TRE VIGAS TIPOS 1,2 Y 3 KG. 1633.32


DE FIERRO

FECHA : MAYO 2013

Longitud del LONGITUD POR ø EN ML.


elemento 1/4" 3/8" 1/2" 5/8" 3/4" 1"

4.33 69.28
0.78 53.04

0.70 11.2
0.78 9.36

5.50 88
0.78 68.64

0.70 11.2
0.78 9.36

6.00 192
0.78 149.76

3.10 99.2
0.78 74.88
DE FIERRO

FECHA : MAYO 2013

ro lineal 0.25 0.56 1.02 1.6 2.26 4.04 Total en


s lineales 365.04 470.88 0.00 Kg.
91.26 263.69 0.00 354.95