Status Date Preliminaries

MANDATORY REQUIREMENTS ELECTIVE REQUIREMENTS


New
LANDSITE & SUSTAINABILITY
Construction Activity Control Pollution Prevention Site Election
a. Site Excavation Plan a. Site Development Plan
b. Site Photographs b. Ground Profile
c. Erosion Control Plan
d. Sedimentation Control Plan Certification from PAG-ASA that the
c. development area is safe for a 10
e. Air Pollution Control Plan year, 24 hour rain base on historical
Note : a, c, d, e shall be signed information
by the Construction Manager Flood Mitigation Study/ Flood Risk
d. Assessment Report
Mixed Use Neighborhood Center

Public passage ways (e.g. path walks


a. and bike lanes) inside the building
project with security precaution in
place.
Community Connectivity

Site vicinity map showing the


a. project is situated within a 2km
radius and a listing of the identified
10 basic services
Transportation Involving Bike Racks on Parking Lots
a. Bicycle Parking Plan
Transportation Involving Site Proximity to Transport Hubs

a. Vicinity plan indicating the location


& proximity of transportation hub
facilities with provisions for benches
and waiting sheds
Transportation Involving Provisions of Adequate Parking Capacity
a. Vehicle parking plan
b. Calculation required parking space
Greenery Involving Open Space (Landscape)
a. Landscape plan
b. Calculation of landscape areas
Greenery Involving Light Colored Paving or Open Grid Paving (Hardscape)
a. Hardscape plan
b. Calculation of hardscape areas
Green Roof
a. Green roof plan
b. Calculation of green roof areas
- or -

Roof plan and shop drawings of the


typical parts of roof construction
c. indicating the specification of heat
insulation materials

d. Calculation of Total Roof Areas vs.


Heat Insulated Areas
Stormwater Management
a. Stormwater management plan
ENERGY EFFICIENCY
Energy Efficiency Plan Building Envelope Design
a. Lighting Layout Plan DONE available data a. Site Development Plan
b. Elevation Drawings and calculation
Calculation of baseline electric Done available data of sun shading
b. consumption using typical
fixtures according to the Air-conditioning System
Philippine Electrical Code
Mechanical Floor plan highlighting
a. applicable areas for air-conditioning
Calculation of projected system
c. electric consumption in
consideration of energy b. Calculation for air-conditioning
efficient lighting system reduction coverage
Natural Ventilation
Projected total electric
consumption in wattage in
consideration to the required
d. levels of illumination based on
respective area per DOE
Projected total electric
consumption in wattage in a. Architectural plans and elevations in
consideration to the required the N-S direction
d. levels of illumination based on
respective area per DOE Calculation showing areas for
guidelines and standard on b. natural ventilation is equivalent to
efficient lighting 50%of the areas identified for
ventilation
Electric Consumption Reduction
Technical specification of
energy efficient lighting system
e. in consideration to the Description of energy efficiency
required illuminance level per measures to be
a.
area implemented/functional description
of strategies employed

Accreditation/Test Certification
of energy efficient lighting Calculation of baseline electric
f. system from DOE/DTI/DOST consumption using typical fixtures,
and other relevant b. devices & equipment according to
government agencies Philippine Electrical Code

g. Monitoring system
h. Evidence of installation Calculation of projected electrical
c. consumption in consideration of
energy efficient fixtures, devices and
equipment.
d. Projected total electric consumption
in wattage.

Technical specification of energy


e. efficient fixtures, devices and
equipment
f. Inventory of energy efficient lighting
system from DOE/DTI
h. Monitoring System
Renewable Energy

Comparative analysis (%
a. replacement vs. assumed fossil fuel
electricity consumption
Comparative analysis (%
a. replacement vs. assumed fossil fuel
electricity consumption

b. Technical specification of renewable


energy as alternative power source
Accreditation of the renewable
c. energy system/equipment from
DOST/DTI
WATER EFFICIENCY
Water Reduction Involving Water Efficient Fixtures Water Use Reduction
a. Sanitary/Plumbing plans
Description of water reduction
Calculation of baseline water measures to be
a.
consumption using typical implemented/Functional description
sanitary/plumbing fixtures of strategies employed
b. according to National
Plumbing Code of the
Philippines
b. Calculation of baseline water usage
Calculation of projected water using typical fixtures according to
c. consumption in consideration the Philippine Plumbing Code
of water efficient fixtures
Calculation of projected water usage
c. in consideration of water saving
Projected total water
consumption in liters in strategies
consideration to the required Technical Specifications of water
d. d.
minimum sanitary/plumbing efficient fixtures
facilities based on the
projected/final occupancy e. Projected total number of
occupant/s

Technical specification for f. Accreditation of water efficient


e. sanitary/plumbing low-flow fixtures from DTI
fixtures
g.
Inventory of water efficient fixtures
Accreditation of
sanitary/plumbing low-flow h. Monitoring system
f. fixtures from DTI/DOST and Water Use Reduction Involving Grey water or Rainwater
other relevant government
agencies a. Reusable water source and storage
tank plan
g. Monitoring system b. Technical Specification
h. Evidence of installation Reusable water management plan
c.
and monitoring system
MATERIAL & RESOURCES
Material Segregation Facility Construction Waste Management
a. Waste Management Plan Construction Waste Management
a.
Functional description of the program
b.
facility and monitoring system
Monitoring system on the
b. implementation of the waste
Plans and specification management plan
conforming location of the Materials Reuse
dedicated recyclable area,
c. storage area for general waste, Certification from structural
area of the storage space(s) a. engineer in case structural elements
and description of the labeling are to be conserved
b. Architectural/ structural plan
highlighting areas to be conserved
Calculation of baseline waste
d. generation using the typical Calculation baseline cost using
c.
procedure of waste disposal brand new materials

Calculation of waste genration Calculation of costs using the


e. in consideration of material d. identified recyclable material and/or
segragation facility structural members
e. Evidence of installation recycled
materials
Rapid Renewable Materials
a. Specification of materials
b. Calculation baseline cost using
typical construction materials
c. Calculation cost using rapidly
renewable materials
d. Evidence of installation recycled
materials
Waste Diversion/Reduction
Description of waste
diversion/reduction measures to be
a. implemented/functional description
of the system to be applied

Calculation of baseline waste


b. generation using the typical
procedure of waste disposal

Calculation of waste generation in


c. consideration of waste
diversion/reduction scheme
d. Inventory of equipment and/or
devices
Refuse Disposal Equipment

a. Plans and specifications to include


but not limited to the detailed
design of refuse disposal equipment
b. Location and size of space for refuse
disposal equipment
INDOOR ENVIRONMENT QUALITY
Designate Smoking Area Indoor Air Quality Performance
a. Mechanical plan showing exhaust
Plan on the designated ventilation location
smoking areas outside of b. Technical specification
a. prohibited building and away
from pedestrians and air c. Indoor Air Quality Management Plan
intakes for building ventilation including monitoring system
Low-Emitting Materials Involving Volatile Organic Compound
b. Postings of signs, "SMOKING
AREA" Tabulation of materials to be
a. used/used with the corresponding
required VOC Levels against the
actual VOC levels.
Technical specification of the
b. material to be used/used with
including literature for its repective
application
c. Accreditation of materials to be
used/used from DTI/DOST
Refrigerant Management Involving Refrigerant with Low ODP and GWP

Tabulation of materials to be used


a. with the corresponding required
ODP and GWP Levels against the
actual ODP and GWP levels
b. Technical specification of the
material to be used/used with
c. Accreditation of materials to be
used/used from DTI/DOST
Refrigerant Management Involving Use Equipment With Long Service Life

Tabulation of materials to be
a. used/used with the corresponding
required VOC Levels against the
actual VOC levels.
b. Technical specification of the
material to be used/used with
c. Accreditation of materials to be
used/used from DTI/DOST
SEWAGE TREATMENT PLANT (STP)
a. Plan, section and details of
facility including devices
b. Calculation for sewage waste
quality discharge
Technical specifications of
treatment system satisfying
c. the provisions of DENR Water
Quality Guidelines and General
Effluent Standards
Technical specifications of
treatment system satisfying
c. the provisions of DENR Water
Quality Guidelines and General
Effluent Standards

- or -
d. Certificate of Accomodation
for STP
e. Approved application for STP
f. Actual tapping point location

Note : d, e, f shall be from


Utility Companies such as
MWSS, MWCI, etc.
GREEN BUILDING PROFESSIONALS
BERDE Professionals
a. Comprehensive CV of the BERDE
Professional(s)
b. Discussion of his role in the project
Preliminaries Final
Retrofitting New Retrofitting

t Hubs

rking Capacity
rid Paving (Hardscape)

-
water
ompound
h Low ODP and GWP

With Long Service Life