REGION V
CAMARINES NORTE DISTRICT ENGINEERING OFFICE
F. PIMENTEL AVENUE, DAET, CAMARINES NORTE
BEG. N = 14° 15' 24.90", E = 122° 41' 46.48" END N = 14° 17' 54.53", E = 122° 39' 45.39"
A. GENERAL
TRAVERSE, LOCATION MAP, VICINITY MAP, LEGEND, ABBREVIATION AND SYMBOLS G-02 02
CONSTRUCTION REQUIREMENTS, DETAIL OF BILLBOARD FRAME, DPWH STANDARD PROJECT BILLBOARD G-04 04
SPRING DEVELOPMENT PLAN, SECTION THRU A-A, SECTION THRU B-B, SECTION F, SECTION THRU C-C G-06 06
SECTION THRU D-D, SECTION DETAILS, SECTION THRU E-E, CROSS SECTION OF MAIN STRUCTURES,
SECTION G, SECTION H, SECTION I, SECTION J G-07 07
SECTION THRU MANHOLE, DETAILED SECTION THRU MANHOLE, SECTION DETAILS, SECTION OF PIPELINE EXCAVATION,
DETAIL OF R.C. BEAM, SCHEMATIC DIAGRAM FOR IRON AND MANGANESE REMOVAL G-08 08
ELEVATION OF STORAGE TANK, STORAGE TANK PLAN, HOLD DOWN BRACKET, DOME ROOF TRUSS, WALL PROFILE, LADDER
AND PLATFORM DETAILS, DETAILS OF ANTI VORTEX, DETAILS OF INLET DEFLECTOR, PLAN AND ELEVATION OF RING G-09 09
BEAM,PLAN AND ELEVATION OF SCOUR FITTING, FOOTING DETAIL AND HOLD DOWN BRACKET
LUZON
VISAYAS
PHILIPPINES
MINDANAO
2 LOCATION MAP
3 2 NOT TO SCALE
THIS SITE
CAPALONGA
PARACALE
JOSE
PANGANIBAN
VINZONS
STA. ELENA
LABO TALISAY
DAET MERCEDES
3 VICINITY MAP
3 2 NOT TO SCALE
1 TRAVERSE
3 2 SCALE: 1:15000
1220
1220
THE STRAIGHT-EDGE SHALL BE HELD IN SUCCESSIVE POSITIONS PARALLEL TO THE ROAD SHALL BE FACED AND DRILLED TO 560 N DISPLAY AREA
CENTERLINE AND IN CONTACT WITH THE SURFACE AND THE WHOLE AREA GONE OVER FROM ONE AMERICAN STANDARD DIMENSION; FLANGES (1220 x 2440 x 12mm)
THE PLACING OF CONCRETE SHALL BE CARRIED CONTINUOUSLY FROM JOINT TO JOINT. THE SIDE OF THE SLAB TO THE OTHER AS NECESSARY. ADVANCEMENT ALONG THE DECK SHALL BE IN OF VALVES FOR WATER WORKING PRESSURE
50 x 50 HORIZONTAL
MARINE PLYWOOD/TARPAULIN
FACE EDGES OF ALL JOINTS WHICH ARE EXPOSED TO VIEW SHALL BE CAREFULLY FINISHED TRUE TO SUCCESSIVE STAGES OF NOT MORE THAN ONE-HALF THE LENGTH OF THE STRAIGHT-EDGE. ANY GREATER THAN 1.20 MPa SHALL BE FACED
COCOLUMBER
LINE AND ELEVATION. DEPRESSION FOUND SHALL BE IMMEDIATELY FILLED WITH FRESHLY MIXED CONCRETE, STRUCK OFF, AND DRILLED TO 1120 N AMERICAN
CONSOLIDATED AND REFINISHED. THE STRAIGHT-EDGE TESTING AND REFLOATING SHALL CONTINUE STANDARD DIMENSION.
UNTIL THE ENTIRE SURFACE IS FOUND TO BE FREE FROM OBSERVABLE DEPARTURE FROM THE
407.3.7 CONCRETE SURFACE FINISHING STRAIGHT-EDGE AND THE SLABS HAS THE REQUIRED GRADE AND CONTOUR, UNTIL THERE ARE NO EACH VALVE BODY SHALL BE TESTED
DEVIATIONS OF MORE THAN 3 MM UNDER THE 3 M STRAIGHT-EDGE. UNDER A TEST PRESSURE EQUAL TO TWICE ITS
SURFACE FINISHING SHALL BE CLASSIFIED AS FOLLOWS: DESIGN WORKING PRESSURE, EXCEPT THAT
WHEN THE CONCRETE HAS HARDENED SUFFICIENTLY, THE SURFACE SHALL BE GIVEN A BROOM GATE VALVE SHALL BE TESTED IN
50 x 75 VERTICAL
FINISH. THE BROOM SHALL BE AN APPROVED TYPE. THE STROKES SHALL BE SQUARE ACROSS THE ACCORDANCE WITH "STANDARD GATE COCOLUMBER
CLASS 1, ORDINARY FINISH SLABS FROM EDGE TO EDGE, WITH ADJACENT STROKES SLIGHTLY OVERLAPPED, AND SHALL BE VALVES FOR ORDINARY WATERWORKS
CLASS 2, RUBBED FINISH MADE BY DRAWING THE BROOM WITHOUT TEARING THE CONCRETE, BUT SO AS TO PRODUCE SERVICES"(AWWA C-500).
1000
1000
CLASS 3, FLOATED FINISH REGULAR CORRUGATIONS NOT OVER 3 MM IN DEPTH. THE SURFACE AS THUS FINISHED SHALL BE
FREE FROM POROUS SPOTS, IRREGULARITIES, DEPRESSIONS AND SMALL POCKETS OR ROUGH SPOTS ALL BURIED VALVES SHALL BE PROVIDED 50 x 50
ALL CONCRETE SHALL BE GIVEN CLASS 1, ORDINARY FINISH AND ADDITIONALLY ANY FURTHER SUCH AS MAY BE CAUSED BY ACCIDENTAL DISTURBING, DURING THE FINAL BROOMING OF WOODEN STAKE
WITH AN EXTERIOR PROTECTIVE COATING.
FINISH AS SPECIFIED. PARTICLES OF COARSE AGGREGATE EMBEDDED NEAR THE SURFACE.
WHEN OPERATING OUT OF A BURIED
UNLESS OTHERWISE SPECIFIED, THE FOLLOWING SURFACES SHALL BE GIVEN A CLASS 2, 507.1.1 PREPARATION OF FOUNDATION BED VALVE IS LOCATED MORE THAN 1.50 metres
RUBBED FINISH. BELOW GROUND SURFACE, AS EXTENSION
THE FOUNDATION BED SHALL BE EXCAVATED TO THE LINES AND GRADES AS SHOWN IN THE SHALL BE INSTALLED IN THE VALVE BOX. THE
1. THE EXPOSED FACES OF PIERS, ABUTMENTS, WINGWALLS, AND RETAINING WALLS. PLANS AS DIRECTED BY THE ENGINEER, AND SHALL BE THOROUGHLY COMPACTED IN ACCORDANCE BOTTOM OF THE BOTTOM OF THE EXTENSION
500
500
2. THE OUTSIDE FACES OF GIRDERS, T-BEAMS, SLABS, COLUMNS, BRACKETS, CURBS, HEADWALLS, WITH ITEM 104.3.3. SHALL BE SECURELY FASTENED TO THE
RAILINGS, ARCH RINGS, SPANDREL WALLS AND PARAPETS. OPERATING NUT OF THE VALVE AND THE TOP
ITEM 801 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS OF THE EXTENSION SHALL BE CENTERED IN
THE VALVE BOX.
EXCLUDED, HOWEVER, ARE THE TOPS AND BOTTOMS OF FLOOR SLABS AND SIDEWALKS,
BOTTOMS OF BEAMS AND GIRDERS, SIDES OF INTERIOR BEAMS AND GIRDERS, BACKWALLS ABOVE 801.2.1 GENERAL
BRIDGE SEATS OR THE UNDERSIDE OF COPINGS. THE SURFACE FINISH ON PIERS AND ABUTMENTS TO PERMIT OPERATION OF ALL BURIED
SHALL INCLUDE ALL EXPOSED SURFACES BELOW THE BRIDGE SEATS TO 20 CM BELOW LOW WATER VALVES REGARDLESS OF DEPTH, SIX(6)
THE CONTRACTOR SHALL PERFORM THE WORK DESCRIBED IN THE DESCRIPTION, WITHIN AND TEE-HANDLE VALVE KEYS OF SUFFICIENT
ELEVATION OR 50 CM BELOW FINISHED GROUND LEVEL WHEN SUCH GROUND LEVEL IS ABOVE THE ADJACENT TO THE ROADWAY, ON GOVERNMENT LAND OR EASEMENT, AS SHOWN ON THE PLANS
WATER SURFACE. WINGWALLS SHALL BE FINISHED FROM THE TOP TO 50 CM BELOW THE FINISHED
SLOPE LINES ON THE OUTSIDE FACE AND SHALL BE FINISHED ON TOP AND FOR A DEPTH OF 20 CM
OR AS DIRECTED BY THE ENGINEER. ALL DESIGNATED SALVABLE MATERIAL SHALL BE REMOVED,
LENGTH SHALL BE FURNISHED.
1 DETAIL OF BILLBOARD FRAME
WITHOUT UNNECESSARY DAMAGE, IN SECTIONS OR PIECES WHICH MAY BE READILY TRANSPORTED, 2 4
BELOW THE TOP ON THE BACK SIDES. AND SHALL BE STORED BY THE CONTRACTOR AT SPECIFIED PLACES ON THE PROJECT OR AS VALVES SHALL BE INSPECTED IN OPENED SCALE: 1:20
OTHERWISE SHOWN IN THE SPECIAL PROVISIONS. PERISHABLE MATERIAL SHALL BE HANDLED AS AND CLOSED POSITION TO ENSURE THAT ALL
UNLESS OTHERWISE SPECIFIED, THE SURFACE OF THE TRAVELED WAY SHALL BE CLASS 3, DESIGNATED IN SUBSECTION 100.2.2. NONPERISHABLE MATERIAL MAY BE DISPOSED OFF OUTSIDE PARTS ARE IN GOOD WORKING CONDITION,
FLOATED FINISH. THE LIMITS OF VIEW FROM THE PROJECT WITH WRITTEN PERMISSION OF THE PROPERTY OWNER ON OTHERWISE IT WILL BE REPLACED PRIOR TO
WHOSE PROPERTY THE MATERIAL IS PLACED. COPIES OF ALL AGREEMENTS WITH PROPERTY OWNERS INSTALLATION. IT SHALL HAVE THE INTERIOR 2440
ARE TO BE FURNISHED TO THE ENGINEER. BASEMENTS OR CAVITIES LEFT BY THE STRUCTURE CLEANED OF ALL FOREIGN MATERIALS BEFORE
CLASS 1, CONCRETE ORDINARY FINISH INSTALLATION.
REMOVAL SHALL BE FILLED WITH ACCEPTABLE MATERIAL TO THE LEVEL OF THE SURROUNDING
GROUND AND, IF WITHIN THE PRISM OF CONSTRUCTION, SHALL BE COMPACTED TO THE REQUIRED
IMMEDIATELY FOLLOWING THE REMOVAL OF FORMS, ALL FINS AND IRREGULAR PROTECTION DENSITY.
SHALL BE REMOVED FROM ALL SURFACE EXCEPT FROM THOSE WHICH ARE NOT TO BE EXPOSED OR
50
CONSTRUCTION OF (Name of Project and Location)
ARE NOT TO BE WATERPROOFED. ON ALL SURFACES THE CAVITIES PRODUCED BY FORM TIES AND
ALL OTHER HOLES, HONEYCOMB SPOTS, BROKEN CORNERS OR EDGES AND OTHER DEFECTS SHALL 801.2.3 REMOVAL OF PIPES OTHER THAN PIPE CULVERTS
90
BE THOROUGHLY CLEANED, AND AFTER HAVING BEEN KEPT SATURATED WITH WATER FOR A
PERIOD OF NOT LESS THAN THREE HOURS SHALL BE CAREFULLY POINTED AND MADE TRUE WITH A UNLESS OTHERWISE PROVIDED, ALL PIPES SHALL BE CAREFULLY REMOVED AND EVERY
50 70
MORTAR OF CEMENT AND FINE AGGREGATE MIXED IN THE PROPORTIONS USED IN THE GRADE OF PRECAUTION TAKEN TO AVOID BREAKAGE OR DAMAGED. PIPES TO BE RE-LAID SHALL BE REMOVED
THE CONCRETE BEING FINISHED. MORTAR USED IN POINTING SHALL NOT BE MORE THAN ONE HOUR AND STORED WHEN NECESSARY SO THAT THERE WILL BE NO LOSS OF DAMAGE BEFORE RE-LAYING. CONTRACTOR :
30
THE CONTRACTOR SHALL REPLACE SECTIONS LOST FROM STORAGE OR DAMAGE BY NEGLIGENCE, AT
OLD. THE MORTAR PATCHES SHALL BE CURED AS SPECIFIED UNDER SUBSECTION 407.3.8. ALL
DATE STARTED :
50
CONSTRUCTION AND EXPANSION JOINTS IN THE COMPLETED WORK SHALL BE LEFT CAREFULLY HIS OWN EXPENSE.
30
TOOLED AND FREE OF ALL MORTAR AND CONCRETE. THE JOINT FILLER SHALL BE LEFT EXPOSED FOR
CONTRACT COMPLETION DATE :
50
ITS FULL LENGTH WITH A CLEAN AND TRUE EDGES.
30
ITEM 1201 – WATER PUMPING SYSTEM
CONTRACT COST :
50
THE RESULTING SURFACE SHALL BE TRUE AND UNIFORM. ALL REPAIRED SURFACES, THE
30
APPEARANCE OF WHICH IS NOT SATISFACTORY TO THE ENGINEER, SHALL BE "RUBBED" AS SPECIFIED
IMPLEMENTING OFFICE / CONTACT No.:
50
EXPOSED PIPINGS SHALL BE PROVIDED WITH CONCRETE SADDLE OR STEEL CLAMPS OR
BELOW.
30
1220
HANGERS TO SECURE THEM FIRMLY TO THE BUILDING STRUCTURES.
SOURCE OF FUND :
50
30
CLASS 2, CONCRETE RUBBED FINISH PIPE THREADS SHALL BE LUBRICATED BY WHITE LEAD, RED LEAD, TEFLON OR OTHER
APPROVED LUBRICATION BEFORE TIGHTENING.
170
AFTER REMOVAL OF FORMS, THE RUBBING OF CONCRETE SHALL BE STARTED AS SOON AS ITS PIPING SUPPORTS SHALL BE PLACED AT 3 m INTERVAL OR LESS.
CONDITION WILL PERMIT. IMMEDIATELY BEFORE STARTING THIS WORK, THE CONCRETE SHALL BE
KEPT THOROUGHLY SATURATED WITH WATER FOR A MINIMUM PERIOD OF THREE HOURS.
SUFFICIENT TIME SHALL HAVE ELAPSED BEFORE THE WETTING DOWN TO ALLOW THE MORTAR USED
IN THE POINTING OF ROAD HOLES AND DEFECTS TO THOROUGHLY SET. SURFACES TO BE FINISHED
ITEM 1601 - BACKFILL AND FILL
DEPARTMENT OF
SHALL BE RUBBED WITH A MINIMUM COARSE CARBORUNDUM STONE USING A SMALL AMOUNT OF BACKFILL MATERIALS SHALL BE LAID IN HORIZONTAL LAYERS, NOT MORE THAN 200 mm IN
THICKNESS AND COMPACTED TO 100 PERCENT OF MAXIMUM DENSITY AND TO BE CARRIED TO THE PUBLIC WORKS AND HIGHWAYS
320
MORTAR ON EACH FACE. THE MORTAR SHALL BE COMPOSED OF CEMENT AND FINE SAND MIXED IN
LEVEL OF THE SURROUNDING GROUND OR TO THE LINES AND GRADES AS SHOWN ON THE
THE PROPORTIONS USED IN THE CONCRETE BEING FINISHED. RUBBING SHALL BE CONTINUED UNTIL
ALL FORM MARKS, PROTECTIONS AND IRREGULARITIES HAVE BEEN REMOVED, ALL VOIDS HAVE BEEN DRAWINGS. TEXT 2920 or call (02) 165 - 02 for any concern on this project
FILLED, AND A UNIFORM SURFACE HAS BEEN OBTAINED. THE FACE PRODUCED BY THIS RUBBING
SHALL BE LEFT IN PLACE AT THIS TIME. BACKFILL SHALL NOT BE PLACED AROUND OR UPON ANY STRUCTURE UNTIL THE STRUCTURE www.dpwh.gov.ph
AFTER ALL CONCRETE ABOVE THE SURFACE BEING CREATED HAS BEEN CAST, THE FINAL FINISH HAS ATTAINED SUFFICIENT STRENGTH TO WITHSTAND THE LOADS IMPOSED. SPECIAL PRECAUTION
SHALL BE OBTAINED BY RUBBING WITH A FINE CARBORUNDUM STONE AND WATER. THIS RUBBING SHALL BE TAKEN TO PREVENT ANY WEDGING ACTION AGAINST COMPLETED STRUCTURES OR
SHALL BE CONTINUED UNTIL THE ENTIRE SURFACE IS OF SMOOTH TEXTURE AND UNIFORM COLOR. FACILITIES. IN THE COURSE OF FILLING, ANY SLOPED SURFACE IN THE EXCAVATION AROUND 40 320
STRUCTURE SHALL BE "CUT INTO" HORIZONTALLY WITH EVERY LAYER PLACED, IN ORDER TO
AFTER THE FINAL RUBBING IS COMPLETED AND THE SURFACE HAS DRIED, IT SHOULD BE ELIMINATE ANY WEDGE ACTION.
RUBBED WITH BURLAP TO REMOVE LOOSE POWDER AND SHALL BE LEFT FREE FROM ALL UNSOUND
PATCHES, PASTE, POWDER AND OBJECTIONABLE MARKS. WHERE THE USE OF POWER DRIVEN COMPACTING EQUIPMENT WOULD NOT BE PRACTICAL, 2 DPWH STANDARD PROJECT BILLBOARD
LAYERS OR MATERIALS SHALL BE COMPACTED BY ANY OTHER METHOD WHICH WILL PRODUCE THE 2 4 SCALE: 1:10
CLASS 3, CONCRETE FLOATED FINISH REQUIREMENT FOR COMPACTION.
AFTER THE CONCRETE IS COMPACTED AS SPECIFIED IN SUBSECTION 407.3.2, COMPACTION OF ITEM 1602 - INSTALLATION OF PIPELINE
CONCRETE, THE SURFACE SHALL BE CAREFULLY STRUCK OFF WITH A STRIKE BOARD TO CONFORM TO NOTE:
THE CROSS-SECTION AND GRADE SHOWN ON THE PLANS. PROPER ALLOWANCE SHALL BE MADE FOR 1602.3.2 CAST IRON WATER PIPE
CAMBER IF REQUIRED. THE STRIKE BOARD MAY BE OPERATED LONGITUDINALLY OR TRANSVERSELY 1. THE BILLBOARDDESIGNLAYOUT,DIMENSION
& LETTERSIZESON WHITEBACKGROUND,ASSHOWNON THE ATTACHEDDRAWING,SHALL
BE DEPECTED
AND SHALL BE MOVED FORWARD WITH A COMBINED LONGITUDINAL AND TRANSVERSE MOTION, CAST IRON AND FITTING SHALL BE LINED WITH CEMENT MORTAR IN ACCORDANCE WITH THE
THE MANIPULATION BEING SUCH THAT NEITHER IS RAISED FROM THE SIDE FORMS DURING THE ON A STANDARDBILLBOARDMEASURING1220mmX 2440mm(4ft. X 8ft.) USING12.50mm(12 in.) THICKMARINEPLYWOODOR TARPAULINOF THE SAMESIZE
REQUIREMENT OF THE "STANDARD FOR INSTALLATION OF CAST IRON WATER MAINS" (AWWA C-600).
PROCESS. A SLIGHT EXCESS OF CONCRETE SHALL BE KEPT IN FRONT OF THE CUTTING EDGE AT ALL 3
TIMES. POSTED ON 5mm
16( inch) MARINE PLYWOOD.
1602.3.4 PVC (POLYVINYL CHLORIDE) PIPE
2. ALL EXISTING BILLBOARDS OF ON GOING PROJECTS SHALL BE REPLACED WITH NEW ONE ADOPTING THE ABOVE GUIDELINES.
AFTER STRIKING OFF AND CONSOLIDATING AS SPECIFIED ABOVE, THE SURFACE SHALL BE
MADE UNIFORM BY LONGITUDINAL OR TRANSVERSE FLOATING OR BOTH. LONGITUDINAL FLOATING
AFTER A SECTION OF A PIPE HAS BEEN LOWERED INTO THE PREPARED TRENCH AND 3. FOR EACH BUILDING PROJECT,THE BILLBOARD SHALL BE INSTALLED IN FRONT OF THE PROJECT SITE.
IMMEDIATELY BEFORE JOINING THE PIPE, THE ENDS OF THE PIPE TO BE JOINED SHALL BE CLEANED,
WILL BE REQUIRED EXCEPT IN PLACES WHERE THIS METHOD IS NOT FEASIBLE. 4. FOR EACH ROAD/BRIDGE/FLOOD CONTROLPROJECT,TWOBILLBOARDSSHALL BE INSTALLED,ONEAT THE BEGINNINGAND ONE AT THE END OF
AND THE RUBBER GASKET LUBRICATED, WITH A VEGETABLE COMPOUND SOAP ALL IN ACCORDANCE
WITH THE PIPE MANUFACTURER'S INSTRUCTIONS. ASSEMBLY OF THE PIPE LENGTH SHALL BE IN PROJECT.
THE LONGITUDINAL FLOAT, OPERATED FROM FOOT BRIDGES, SHALL BE WORKED WITH A ACCORDANCE WITH THE RECOMMENDATION OF THE MANUFACTURER OF THE TYPE OF THE JOINT
SAWING MOTION WHILE HELD IN A FLOATING POSITION PARALLEL TO THE ROAD CENTERLINE AND USE. ALL SPECIAL TOOLS AND APPLIANCES REQUIRED FOR JOINING THE PIPE SHALL BE PROVIDED BY 5. FOR ROAD PROJECTS WITH LENGHT OF 10 KILOMETERS OR MORE,ADDITIONAL BILLBOARDS SHALL ALSO BE INSTALLED AT EVERY 5 KILOMETER INTERVAL.
PASSING GRADUALLY FROM ONE SIDE OF THE PAVEMENT TO THE OTHER. THE FLOAT SHALL THEN BE THE CONTRACTOR. WHEN CUTTING OR MACHINING OF THE PIPE IS NECESSARY, ONLY TOOLS AND
MOVED FORWARD ONE-HALF OF EACH LENGTH AND THE ABOVE OPERATION REPEATED. MACHINE 6. NAME(s) and/or PICTURE(s) OF ANY PERSONAGES SHOULD NOT APPEAR IN THE BILLBOARD.
METHODS RECOMMENDED BY THE PIPE MANUFACTURER AND APPROVED BY THE ENGINEER SHALL
FLOATING WHICH PRODUCES AN EQUIVALENT RESULT MAY BE SUBSTITUTED FOR THE ABOVE BE EMPLOYED. 7. NO OTHERBILLBOARDSSHALLBE ALLOWEDTO BE INSTALLED100 METERSBEFOREAND 100 METERAFTERALL DPWHPROJECTSAND BETWEENTHE
MANUAL METHOD.
PROJECTS AND IN BETWEEN THE PROJECTS LIMITS OR WITHIN THE ROAD RIGHT OF WAY.
8. DPWH CONTRACTORS SHALL NOT BE ALLOWED TO PLACE NAMES OF POLITICIANS OR CARRY POLITICAL BILLBOARD ON THEIR EQUIPMENT.
NOTES:
1. ALL QUANTITIES ARE SUBJECT TO INCREASE OR DECREASE TO SUIT ACTUAL FIELD CONDITION.
2. ALL DIMENSIONS, ELEVATIONS AND STATIONING SHALL BE VERIFIED BEFORE THE START OF CONSTRUCTION.
7 SECTION I
5 SECTION G 8 7 SCALE: 1:20
8 7 SCALE: 1:20
LEGEND:
2 PROFILE NATURAL GROUND LINE
2 10 HOR.SCALE: 1:4000 PROPOSED PIPE ELEV. =
VERT.SCALE: 1:400
0.75m BELOW N.G.L.
EXISTING PIPE ELEV.
1 TRAVERSE
2 11 SCALE: 1:4000
LEGEND:
2 PROFILE NATURAL GROUND LINE
2 11 HOR.SCALE: 1:4000 PROPOSED PIPE ELEV. =
VERT.SCALE: 1:400
0.75m BELOW N.G.L.
EXISTING PIPE ELEV.
1 TRAVERSE
2 12 SCALE: 1:4000
LEGEND:
2 PROFILE NATURAL GROUND LINE
2 12 HOR.SCALE: 1:4000 PROPOSED PIPE ELEV. =
VERT.SCALE: 1:400
0.75m BELOW N.G.L.
EXISTING PIPE ELEV.
1 TRAVERSE
2 13 SCALE: 1:4000
LEGEND:
2 PROFILE NATURAL GROUND LINE
2 13 HOR.SCALE: 1:4000 PROPOSED PIPE ELEV. =
VERT.SCALE: 1:400
0.75m BELOW N.G.L.
EXISTING PIPE ELEV.