Anda di halaman 1dari 42

Annexure: A

DETAILS OF CONTRACTS PLACED BY OPEN TENDER


(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)
(Status for the Month of APRIL 2016 - MARCH 2017)

Works Awarded : APRIL 2016


Quantity Rate Scheduled
S. Tender Date of LOA No. Contractor’s Name and (for supply contract)/ (for supply contract)/ Value of
Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. No. opening and date address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Contract
date
etc Works) Mech. etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 e-Tender 16.12.2015 Supply, installation, testing & IRCON/J&K- M/s Hitech-JK Engineers ` 4,26,56,056.82 7.25% below ` 3,95,63,493/- 12 months
IRCON/J&K-
Cell/JAT/15//1
commissioning of 33/11KV, Cell/JAT/15//1014/ JV from the
014/Package- 2X1000 KVA Conventional & Package-SS-1/967 Hall No. 112-B2, date of
SS-1/967 11/.433 KV 2X1000 KVA Dated 1st Floor, South Block, issue of
Dated Package type Sub-station 14.04.2016 Bahu Plaza, LOA
04.11.2015
along with HT panel, LT panel, Jammu - 180 012
APFC panel, Metering panel,
DG set etc. and other auxiliary
works for Sumber Railway
Station on Dharam- Qazigund
Section of USBRL Project
(J&K) (Package: SS-01)
2 e-Tender 13.04.2016 Supply of DG Set for 11 IRCON/9041/BD- M/s Elmech Engineers ` 39,60,000 Item Rate ` 35,09,000 01 month
IRCON/9041/
Stations of Ishurdi - Darsana S&T/SIG.SUPPLY 1402, Chiranjiv Tower, Contract from the
BD-
S&T/SIG.SU section of Bangladesh Railway /13(R)/05/682 43, Nehru Place, date of
PPLY/13(R)/ Dated New Delhi - 110 019 issue of
05 Dated 25.04.2016 LOA
07.04.2016

Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

3 IRCON/J&K 08.02.2016 Detailed Design Construction IRCON/J&K- M/s Italferr S.P.A. - - ` 12,22,00,000/- 36 months
Cell/JAT/14/
Supervision of Important Bridge Cell/JAT/14/ Via Vito Giuseppe Galati from the
1014/K-B/
DDC-Anji across river Anji Khad between Km 1014/K-B/ 71, 00155 Rome Italy date of
Bridge/337/ 38.430 to Km 39.087 on Katra- DDC Anji issue of
Dated Banihal Section of Udhampur – Bridge/337/ LOA
31.12.2015
Srinagar – Baramulla New BG 18388
Railway Line Project, J&K State, Dated
India (Package DDC - Anji Khad) 26.04.2016

4 e-Tender 22.04.2016 Supply of S&T materials & Tools/Test IRCON/9041 M/s General Auto Electric ` 36,99,611 9% ` 40,32,576 01 month
IRCON/9041/
BD-
Equipment for 11 Stations of Ishurdi - /BD-S&T/ Corporation Above from the
S&T/TOOLS Darsana section of Bangladesh TOOLS & D-207, date of
& TEST Railway TEST Ansa Industrial Estate, issue of
EQPT/70 EQPT/70 Sakinaka, Andheri (E), LOA
Dated
13.04.2016
Dated Mumbai - 400 072
27.04.2016

5 e-Tender 22.03.2016 Works Contract for Maintenance of IRCON/J&K M/s Gh. Nabi Giri & Sons ` 1,74,83,400/- 3.40% ` 1,80,77,835.60 12 months
IRCON/ J&K
NR/IRCON’s establishments (office & Cell/JAT/14/ H.O.: Near Tehsil Office, Above from the
Cell/JAT/14/
1014/ D-Q/ camp up keeping and other misc) 1014/D-Q/ Banihal, date of
Utility Works/ and assisting IRCON’s Engineers Utility Works/ Distt. Ramban, issue of
M-39/168 during supervision of works & survey M-39/168 J&K - 182 146 LOA
works as required at various Dated
locations along the project alignment 30.04.2016
from Reasi to Banihal covering
Ramban, Sangaldan, Sumber, Kohli,
Dharam, Khari, Banihal, Reasi etc. in
connection with Reasi - Banihal
section of USBRL Project (Package:
M-39)

Contd.../-
Works Awarded : MAY 2016
Quantity Rate Scheduled
S. Tender Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. No. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/2063/ 10.03.2016 Cast-in-situ bored piling work for IRCON/2063/ M/s Civcon ` 4,40,00,000/- ` 4,40,00,000/- ` 3,45,02,831.23 6-months
DROB/HOWR
New Howrah Divisional Railway DROB-HOWRAH/ Construction Pvt. Ltd.
AH/TENDER/
PILE/15 Office Building at Howrah in PILE/CCPL/90 21A Shakespeare
Dated West Bengal Dated 03.05.2016 Sarani,
17.02.2016 Kolkata - 700 017

2 e-Tender 22.03.2016 Hiring of Survey Team on Team IRCON/JK M/s Skylark Designer & ` 94,37,574/- 3.50% Above ` 97,67,889.09/- 10 months
IRCON/JK Month Basis for Survey Works Cell/JAT/14/1014/ Engineers Pvt. Ltd from the
Cell/JAT/14/1
014/D-
of R-D & D-B Sections in D-Q/Survey team B-48, IInd Floor, date of
Q/Survey connection with the Construction – K-B Section/ Sector-63, issue of
team – R-B of Reasi-Dharam-Banihal S-2/274 Noida (UP) LOA
Section/S-2/ Section of USBRL New Rail Link Dated
Dated
26.02.2016
Project (Package: S-2) 10.05.2016

3 IRCON/PO/ 28.03.2016 Construction of Staff Quarters, IRCON/2050/ M/s Om Construction ` 35,298,807.56 19.80% above ` 42,287,971.46 15 months
TN/Jaynagar-
2050/16/40
Station Building, Services BGL.JBB/Tender/ At+Po-Bihat, form the
Buildings, Platform, Roads & Pkg.-Bldg-06 Tola-Gurudaspur, date of
other structures at Janakpur (Nepal)/175 Sunderban, issue of
Halt (Nepal) in connection with Dated Dist. - Begusarai LOA
“Gauge Conversion & 10.05.2016 (Bihar) PIN - 851 135
Construction of New Broad Mob.: 9934469716
Gauge Railway Line from
Jaynagar (India) to Bardibas
(Nepal). Pkg.-Bldg.-06 (Nepal)

Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/2062/N 03.03.2016 Earthwork in formation (Cutting IRCON/2062/NMD M/s NSPR RCPL JV, 8- `41.03Crores As Per BOQ `34,31,92,768 08
MDC/NISP/Rly nd
Siding/EW &
& Filling), morum, Blanketing, C/NISP/LOA/EW & 2-12086/5-B, 2 Floor Months
BR/PKG-II construction of new culverts BR/PKG-II Sneha House, Road No -
(RT), Dated alng loading platforms drains, (RT)/438, 3, Banjara Hills,
10.02.2016 pathways etc. Pkg.-2 (RT) in Dated Hyderabad - 500 034
connection with Construction of 12.05.2016
Private Railway Siding for
NMDC’s Integrated Steel Plant
at Nagarnar near Jagdalpur in
Chhattisgarh
5 IRCON/2057/ 13.4.2016 Construction of Private Railway IRCON/2057/ M/s Hari Construction & `30,52,89,615.00 ` 30,52,89,615.00 ` 33,42,92,128.00 09
NSTPP/EW&
P.Way/Pkg.-
Siding with all Contractor’s NSTPP/ Associates Pvt. Limited, Months
2b./2016/01 Materials (Except Rails for EW & P.way/ At & P.O - Keshawe,
Dated Plain Track issued Free of Pkg. -2b./e-Tender/ P.S- Barauni,
22.03.2016 Cost) For Coal transportation LOA/1280 Begusarai,
system for Nabinagar Super Dated Bihar - 851 134
Thermal Power Project of 13.05.2016
NPGC Limited, near Ankohara
Railway Station, Distt.
Aurangabad, Bihar – Civil
works From Ch. 0.972 to Ch.
5.320 & P. Way works In entire
Siding System (Pkg. - 2b)
6 IRCON/PO/ 28.03.2016 Construction of Staff Quarters, IRCON/2050/ M/s Rajesh Kr. Singh ` 20,379,450.72 19.85 % above ` 24,42,4771.69 15
TN/Jaynagar-
2050/16/41
Station Building, Services BGL. JBB/Tender/ Vill+Po - Chhatauni, months
Buildings, Platform, Roads & Pkg.-Bldg-09 P. S. - Basopatti, form
other structures at Loharpatti (Nepal)/187 Dist.- Madhubani (Bihar) issue of
Halt (Nepal) in connection with Dated Mob.: 9934949478 LOA
“Gauge Conversion & 17.05.2016
Construction of New Broad
Gauge Railway Line from
Jaynagar (India) to Bardibas
(Nepal). Pkg.-Bldg.-09 (Nepal)
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

7 IRCON/PO/ 28.03.2016 Construction of Staff IRCON/2050/ M/s Om Construction ` 32,269,722.94 19.90% above ` 38,691,397.81 15 months
TN/Jaynagar
-2050/16/42
Quarters, Station Building, BGL.JBB/Tender/ Ram Chowk, form issue
Services Buildings, Platform, Pkg.-Bldg-10 P. O. - Bhawara, of LOA
Roads & other structures at (Nepal)/188 Dist. - Madhubani (Bihar)
Singyahi Station (Nepal) in Dated Pin - 847 212
connection with “Gauge 17.05.2016 Mob.: 9431202889
Conversion & Construction
of New Broad Gauge
Railway Line from Jaynagar
(India) to Bardibas (Nepal).
Pkg.-Bldg.-10 (Nepal)
8 IRCON/2048/ 06.05.2016 Providing and fixing IRCON/2048/ M/s S.N. Marketing ` 95,00,000/- ` 94,90,000/- ` 99,81,500.00 4-months
ISC-
BEHALA/
Aluminum Composite Panels ISC-BEHALA/ Sharada Complex,
TENDER/ for External Wall Cladding ACP/SNM/25406/ Sevoke Road,
ACP/2016/20 including supply, fabrication 148 Silliguri - 734 001
Dated and erection of structural Dated 18.05.2016
14.04.2016
steel with necessary
aluminum framework for
New Sports Complex of
Eastern Railway at
Gholsapur (Behala), Kolkata,
W.B.
9 IRCON/Civil/5 05.11.2015 Design & Construction of IRCON/Civil/ M/s Premco Rail Engineers Ltd. ` 11,94,91,794/- ` 11,87,11,952/- ` 15,02,10,791/- 11 Months
019/NELS.BN
DM/
Flooring, Embedded Track, 5019/NELS. Axis Mall, CF-9, 3rd Floor,
e-Tender/ Pit Track of various sheds BNDM/ 1C - Rajarhat, New Town,
OT/11 and balance Service e-Tender/OT/ KOLKATA-700 156 (WB)
Dated Buildings for Setting up of 11/54 Tel: 033-40230000-199
14.10.2015
Second Electric Loco Shed Dated Fax: 033-40230110
at Bondamunda, Rourkela 20.05.2016 E-mail: tenders@premcogroup.com
(ODISHA)
10 IRCON/2048/ 18.05.2016 HVAC System for Indoor IRCON/2048/ M/s Unique Engineers Pvt. Ltd. ` 4,85,00,000/- ` 4,85,00,000/- ` 3,63,75,000/- 5-months
ISC-
Stadium & Cricket Pavilion ISC- 332, Tower-A,
BEHALA/
TENDER/ for New Sports Complex of BEHALA/HVAC/ Spaze I-Tech Park, Sector-49,
HVAC/2016/ Eastern Railway at Unique/25408/158 Sohna Road,
21 Dated Gholsapur (Behala), Kolkata, Dated Gurgaon - 122 002
20.04.2016
W.B. 20.05.2016
Contd.../-
Works Awarded : JUNE 2016
Quantity Rate Scheduled
S. Tender Date of LOA No. Contractor’s Name and (for supply contract)/ (for supply contract)/ Value of
Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. No. opening And date address Engg./Elect. /S&T/ Engg./Elect./S&T/ Mech. Contract
Date
Mech. etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/ 21.01.2016 Construction of station building IRCON/2052/ M/s Bridge and Roof Co. ` 138.75 ` 126.67 Crores ` 130.51 Crores 18 months
2052/ TN/
(only composite structural part) Santragachi/ (India) Ltd., KANKARIA Crores
SRC/ STN.
BLDG./ with steel framework and RCC Stn.Bldg.-FOB- CENTRE (5th Floor),
2015/7 slabs, fabrication and erection of Ramp/ 2/1 Russel Street,
Dated two nos. of 12 meter wide FOBs B&R/25409/ 219 Kolkata - 700 071
06.11.2015
(Foot Over Bridges) across Dated
Santagachi Yard and one 08.06.2016
elevated ramp in front of station
building including pile foundation
at Santragachi station in
connection with station
development work of
Santragachi station for South
Eastern Railway
2 e-Tender 07.04.2016 Furnishing of admin building ( RCON/MECH/ M/s Durian Industries Ltd, Various type of ` 88,48,7222.00 ` 88,48,7222.00 12 weeks
IRCON/
MECH/1029/
Phase-III Balance Furniture ) for 1029/RCF. 1/20 W.H.S. Kirti Nagar, furniture from the
RCF.RBL-II/ RCF Rae Bareli RBL-II/ New Delhi-110 015 date of
Furniture/301 Furniture/301/ Tel : 011-4714 0200, issue of
Dated 6832 25161550 Fx : (011) - LOA
16.03.2016
Dated 4740243
09.06.2016 Email : delhidurian
@gmail.com

Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

3 e-Tender 09.04.2016 Alumino -Thermit welding of UIC IRCON/1035/ M/s India Thermit ` 30,78,000/- ` 30,78,000/- `.34,75,000/- 09.05.2017
IRCON/1035/D
60Kg rails, 1080 grade Head DMRC CT-1- Corporation Limited (11 months
MRC CT-1-A
/TENDER/ Hardened, on viaduct/ A/TENDER/ 84/22 Fazalganj, from the
ATW Dated Underground at various locations ATW Kanpur-208 012 (UP) date of
16.02.2016 along the alignment for CT-1-A Dated Ph:0512-2215161 issue of
contract of DMRC, Lajpat Nagar 10.06.2016 LOA)
to Mukundpur Delhi
4 IRCON/J&K 18.05.2016 Balance work of Detailed Design IRCON/J & K M/s GEODATA - - ` 10,98,14,220/- 36 months
Cell/JAT/14/
Consultancy, 3D monitoring & Cell/JAT/14/1014/ Engineering SPA, form issue
1014/K-B/
DDC T-2/8402 Construction Supervision of K-B/DDC T- Corso Boizano, 48/E- of LOA
Dated Tunnel T-2 (Between km 33.212 2/349/8476 10121, Torino, Italy.
06.05.2016 to km 38.375) and associated Dated
works in connection with the 23.06.2016
construction of Katra to Dharam
Section of Udhampur – Srinagar
– Baramulla New BG Railway
Project.
Works Awarded : JULY 2016
Quantity Rate Scheduled
S. Tender Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. No. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/MECH 06.05.2016 Supply of Electrically Operated IRCON/ M/s Marwaha i) Electrically ₹ 39,69,203.00 ₹ 39,69,203.00 5&½
3016/NTPC/S MECH/3016/
Synchronized Screw Jack CAP. 35 Manufacturing Co. operated syn. months i.e.
TPP/JACK/RE NTPC/JACK/
V01/05 TON & Traversing Jack CAP 20 B/3, Street No. 2, Jack – 01 set up to
TON & 35 TON for NTPC’s SSTPP REV01/ Anand Parbat Indl. ii) Traversing 26.12.16
Dated
12.04.2016 SUPPLY/05
Project, Sholapur. Dated
Area, Guru Gobind Jack 20 T & 35 T
12.07.2016 Singh Marg, New – 2 nos. each
Delhi-110005
2 IRCON/2060 12.04.2016 Construction of Civil Works IRCON/2060 DEEVEE-GAWAR ` 20441.43 Lakhs Item rate ` 19755.60 Lakhs 23 months
/CGRLP-
EWC/
including Earthwork in Formation for /CGRLP- (JV) from issue
eTender/ Embankment and Cutting, EWC/ 1st Floor, Vikas date of LOA
PkgI /05 Blanketing, Culverts, Major & Minor eTender/ Complex,
Bridges and other Ancillary Works PkgI /05 Korba -495677 (C.G.)
from Km 98.860 To Km 134.660 and Dated Ph. 07759-245168,
Flyover Line from Km 128.000 To 19.07.2016 9993139999,
Km 135.200 (Package I) in email:
Connection with the Construction of vikas@dvplindia.com
New BG Electrified Double Line in
the State of Chhattisgarh over South
East Central Railway East-West
Corridor – Gevra Road-Pendra
Road via Dipka, Kathghora,
Sendurgarh and Pasan

Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

3 IRCON/2064 17.05.2016 Construction of Service Buildings IRCON/2064 M/s Panchdeep ` 1225.33 Lakhs Item Rate ` 1248.61 Lakhs 9 months
/NMDC-S&T-
Pkg-
including Commercial Office, OHE /NMDC- Constructions Ltd., from issue
II/eTender- Store & Office Room, OHE Staff S&T-Pkg-II/ 545, G.T. Road (S), date of LOA
Service Room, Rolling Hut Room, C&W eTender- Howrah – 711 101
Buildings/01 Staff Room at Sick Lines, Weigh Service
Bridge Room, C&W Office at HSM Buildings/01 Ph. 033-26382405,
area, Crew Guard Rest Room, Dated Mob. 93391 47623
Intermediate Block Cabin, Route 21.07.2016 email:
Relay Interlocking Cabin, C&W Panchdeep.howrah@
Shed, Diesel Loco Shed and other gmail.com
allied works in connection with the
Construction of Private Railway
Siding for proposed 3 MTPA
Integrated Steel Plant for NMDC
Ltd., at Nagarnar, Chhattisgarh
State (Package: II Schedule-A)

4 IRCON/MEC 06.05.2016 Supply of Electric Overhead IRCON/MEC M/s Krane Mfg (India) 01 No. ₹ 49,66,878.00 ₹ 49,66,878.00 Supplied on
H3016/NTPC
/STPP/EOT/
Travelling Crane 25/5 Ton for H/3016/NTP Pvt. Ltd, B-10, Anand 04.10.16
06/ Dated NTPC’S SSTPP Project, Solapur. C/EOT/SUP Nagar, M.I.D.C.,Addl
12.04.2016 PLY/06 Ambernath-421506,
Dated Dist. Thane (INDIA)
22.07.2016
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

5 IRCON/e- 25.04.2016 Supply, installation, testing & IRCON/ M/s Ahluwalia Fire `1,48,04,166/- `1,48,04,166/- `1,58,08,174/- 12 Months
TN/Fire
commissioning of firefighting e-TN/Fire Protection Engineers,
Fighting_
IBT_ system & other related ancillary Fighting_ 10450, East Park
GGN/16/03 works for International Business IBT_ GGN/ Road, (Near Filmistan
Dated Tower at Plot No. 16, Sector - 32, 16/03/48 Cinema),
21.03.2016
Gurgaon (Haryana) Dated Karol Bagh,
22.07.2016 New Delhi – 110 005
Ph.:
23618533,23628796,
Fax: 011-23628796,
E-mail:
ahluwaliafire@gmail.com
6 IRCON/J&K 16.05.2016 Construction of Tunnel T-77D (KM IRCON/J&K M/s Beigh ` 102.32 Crores 14.99% Above ` 117.66 Crores 22 Months
CELL/JAT/14
146.60 TO 148.36 approx. CELL/JAT/1 Construction Co. Pvt. from the
/1014/K-
B/T77D/341 (Western Side of Bichelri River) on 4/1014/K- Ltd. date of
Dated: Katra - Dharam-Qazigund Section B/T77D/341/ Plot No. 4, Opp. issue of
18.02.2016 of Udhampur-Srinagar-Baramulla 8524, Wave Mall, Bye Pass LOA
New BG Railway Line Project Dated: Road, Narwal, Jammu
(Package: T- 77D) 25.07.2016 (J&K)
7 IRCON/J&K 16.05.2016 Construction of Tunnel T- 13, Part IRCON/J&K M/s Hindustan `1633.76Crores 7.09% Above ` 1749.59 Crores 30 Months
CELL/JAT/14
Tunnel T-14 including Station Yard CELL/JAT/1 Construction Co.Ltd. from the
/1014/K-B/T-
13/343 at Basindadhar, Approach Road 4/1014/K- (HCC) date of
Dated: from Adit of T-13 (Khanikote) to P2 B/T-13/343/ Hincon House , 11th issue of
22.03.2016. of T-13 & P1 of T-14 (Basindadhar) 8526 Floor, 247 Park, Lal LOA
and Bridge No. 60 (between Km Dated: Bahadur Shastri
61.004 to Km 73.785 approx.) on 25.07.2016 Marg, Vikroli (West)
Dharam-Qazigund Section of Mumbai-400083.
Udhampur – Srinagar – Baramulla
New BG Railway Line Project
(Package T-13)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

8 IRCON/ 03.11.2015 Supply, Testing and Commissioning IRCON/MEC M/s Techno 01 No `47,00,000.00 `47,00,000.00 Within 02
MECH./1029
/RCF-RBL-
of 01 No Cable Fault Locating KIt for H./1029/RC Instrumentation month from
II/Cable Fault Modern Coach Factory Rae Bareli F-RBL- (India) Pvt Ltd., Plot the issue of
Locating/298 II/Cable No 67, STREET No. LOA
Dated Fault B, G T Road Friends
14.10.2015
Locating/298 Colony, Industrial
/6911 Area Shahdara New
Dated Delhi-110095
26.07.2016

9 IRCON/1034 14.06.2016 Repair and Rehabilitation work for IRCON/1034 M/s SSA Techno % Rate tender ` 175.10 Lakh Tendered 06 months
/ BPHP/
existing structures, Slab Culverts, / PBTL/e- Construction Pvt. Ltd. for composite Rate : i.e. up to
e-Tender/
Rehabilitation Box Culverts, Minor Bridges Tender/ 101-C, Pal House, items (-) 27.07% 28.01.2017
Structures/78 complete between Km 4+200 to Km Rehab. Top Floor, Below
Dated 163+500 of NH-15 near Phalodi in Str/1161 Hari Nagar Ashram,
21.05.2016
connection with Widening and Dated New Delhi - 110 014 Cost =
Strengthening of existing Bikaner – 29.07.2016 ` 127.70 Lakh
Phalodi section to four lane from Km
4+200 to Km 55+250 and two lane
with paved shoulder from Km
55+250 to Km 163+500 in the state
of Rajasthan
Works Awarded : AUGUST 2016
Quantity Rate Scheduled
S. Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Tender No. Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/1034/ 20.06.2016 Transportation of Bulk Bitumen IRCON/1034/ M/s Gopal Kanhaiya 1000 MT Rate ` 2737/- Rate ` 2914/- 03 months
BPHP/
e-Tender/ Tpt
(Grade : VG.40) from ex depot of BPHP/TPT OF Roadlines, per MT per MT i.e. up to
of Bitumen C- IOCL Koyali near Vadodara to BITUMEN C- Parashar Villa, 02.11.2016
1/79 Dated IRCON HMP site at Km 45+600 1/79/1178 3-NA-34 Jawahar Tendered Cost : Cost :
21.05.2016 near Techri Phanta, Shri Kolayat ji Dated Nagar, ` 27.37 Lakh ` 29.14 Lakh
on Bikaner - Phalodi Highway 03.08.2016 Jaipur - 302 005
section of NH-15 in the state of
Rajasthan
2 IRCON/MECH3 20.05.16 Supply of Fuel Injection Pump Test IRCON/MECH/ M/s SLVMR Fuel 01 Set ₹ 10,06,844 ₹ 10,06,844 Supplied on
016/NTPC/STP
P/FIP TEST
Bench with Master Pump Kit & 3016/NTPC/S Injection Equipments 24.11.16
STAND/08 Injector/Nozzle Testing Equipment TPP/FIP/08/0 360 Export Promotion
Dated with Ultrasonic Cleaning Unit for Dated Industrial Park,
12.04.2016 NTPC’s SSTPP Project, Solapur. 03.08.2016 Kundli, Ph-III,
Haryana – 131 028
3 e-Tender No. 27.10.2016 Hiring of inspection vehicles for IRCON/J&K- M/s Friends Sumo Taxi ` 7,99,05,600/- 11.26% Above ` 8,89,87,968/- 24 Months
IRCON/J&K- Cell/BNL/14/10
IRCON's officers and staff in Owners Union from the
Cell/BNL/14/ 14/K-B/Hiring
1014/K-B/ connection with the construction of date of
Dharam-Banihal section of USBRL Vehicle issue of
Hiring Vehicle
Banihal/VH-20/ Banihal/VH-
New Rail Link Project , J&K 20/800 Dated
LOA
Dated
06.04.2016
(Package: VH-20) 05.08.2016
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/CC/ 05.01.2016 Construction of Tunnel T-5 IRCON/2046/ M/s ABCI % Rate tender for 5% below ` 132.94 Crore 22 months
TN/ SR-2046/
CONS. /T-5/
(between Km 11+604 to Km Sivok-Rangpo/ Infrastructures Pvt. composite items from the
15/732 13+697 approx.) on Sivok- T5/48/506 Ltd., 1/3Mc Donald Cost put to date of
st
Dated Rangpo Rail Link Project Dated Tower, 1 Floor, G. S. tender: ` 139.94 issue of
13.11.2015 05.08.2016 Road, Bhangagarh, Crore. LOA
Guwahati-781007,
Assam

5 IRCON/1034/ 27.07.2016 Transportation of Bulk Bitumen IRCON/1034/ M/s Gopal Kanhaiya 1000 MT Rate ` 2458/- Rate ` 2617/- 03 months
NH-15/BPHP/
(Grade : VG.40) from ex depot of BPHP/Tpt of Roadlines, per MT per MT i.e. up to
Transport of
Bitumen/LT-84 IOCL Koyali near Vadodara to Bitumen Parashar Villa, 23.11.2016
Dated IRCON HMP site at Km 45+600 C-2/87/1224 3-NA-34 Jawahar Tendered Cost : Cost :
21.05.2016 near Techri Phanta, Shri Kolayat Dated Nagar, ` 24.58 Lakh ` 26.17 Lakh
ji on Bikaner - Phalodi Highway 24.08.2016 Jaipur - 302 005
section of NH-15 in the state of
Rajasthan

6 IRCON/2048/ 01.08.2016 Balance Civil Works related to IRCON/2048/ M/s Basab Dutta, ` 2.75 Crores ` 2.75 Crores ` 2,54,37,500/- 5-months
ISC-BEHALA/
TENDER/Fin.
Indoor Stadium & Cricket ISC-BEHALA/ 1/ 2/1, Upendranath
Works/2016/ Pavilion for New Sports Complex TENDER/FIN. Chatterjee Lane,
22 Dated of Eastern Railway at Gholsapur WORKS/2016 Howrah
05.05.2016 (Behala), Kolkata, W.B. /22/428 PIN-711 103
Dated
25.08.2016

Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

7 IRCON/1034/ 31.05.2016 'Construction of Road Over-Bridge IRCON/1034/ M/s. Balabharti Infra- % Rate tender for % Rate tender Tendered Rate : 18 months
BPH P/
e-Tender/
and it's approaches with REW work BPH/e- BVS(JV), 2/536,S-1, composite items for composite (-) 14.01% Below i.e. Up to
nd
ROB-LC-06/76 as per specifications, drawings, tender/ROB- 2 Floor, Chitrakoot Cost put to items Cost: ` 22.15 25.12.2016
Dated: designs and maintaining all quality LC-06/1226 Scheme Vaishali tender: ` 25.76 Crore
04.05.2016 control standards etc. complete at Dated Nagar, Jaipur -302 021 Crore.
KM 11+300 of NH-15 near Nal in 26.08.2016 (Rajasthan)
connection with Widening and
Strengthening of existing Bikaner-
Phalodi section to four lane from
Km. 4+200 to Km. 55+250 and two
lane with paved shoulder from Km.
55+250 to Km. 163+500 in the
state Rajasthan”
8 IRCON/1034/ ’31.05.2016 'Construction of Road Over-Bridge IRCON/1034/ M/s. Balabharti Infra- % Rate tender for % Rate tender Tendered Rate : 18 months
BPHP/ e-
Tender/ROB-
and it's approach with REW work BPHP/TN//T- BVS(JV), 2/536, S-1, composite items composite for (-) 12.66% i.e. Up to
nd
LC-57/77 as per specifications, drawings, 91/Laying of 2 Floor, Cost put to Composite items Below Cost: 25.12.2016
Dated: design, maintaining all quality Median Chitrakoot Scheme tender: ` 23.86 ` 20.84 Crore
04.05.2016 control standards etc. complete at Kerb/1245 Vaishali Nagar, Crore
KM 162+850 of NH-15 near Dated: Jaipur -302 021
Phalodi in connection with 31.08.2016
Widening and Strengthening of
existing Bikaner-Phalodi section to
four lane from Km. 4+200 to Km.
55+250 and two lane with paved
shoulder from Km. 55+250 to Km.
163+500 in the state Rajasthan”
9 e-Tender No. 10.08.2016 Providing support services for IRCON/J&K M/s BSS Enterpises ` 99,05,600/- 8.00% Above ` 7,99,05,600/- 12 Months
IRCON/J&K
IRCON's office and guest houses CELL/JAT/1 314, Suraksha from the
CELL/JAT/14
/1014/DQ/Su and other locations at USBRL 4/1014/DQ/ Vihar,Palora Top, date of
pport project office and establishments at Support Jammu (J&K) issue of
Services/M- Jammu . (Package: M-40) Services/M- LOA
40/350
Dated:
40/350/1252
19.07.2016 Dated:
31.08.2016

Contd.../-
Works Awarded : SEPTEMBER 2016
Quantity Rate Scheduled
S. Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Tender No. Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. opening and date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 eTender 21.07.2016 Construction of Toll Plaza and IRCON/3017/ M/s SEWAK RAM `1,66,63,289.00 Schedule A: `1,66,46,497.00 11 Month
IRCON/301 other facilities at Km.258.90 on SGTL/eTend Engineers & Civil + 10.999% from date
7/SGTL/eT NH-3 for Ircon SGTL (Agreement er/Toll Contractors Schedule B: of issue of
ender/Toll No.ISGTL/CO/SG/IRCON/CORR Plaza/321 A-108, + 10.999% LOA
Plaza/321 ES/02 dtd.02.09.2015) in Dated Flex Apartments, CPWD
connection with “4-Laning of 02.09.2016 C-58/22,Sector 62, Schedule-A
Shivpuri -Guna section of NH-3 Noida. -0.10%
from Km 236.000 TO KM 332.100
in the State of Madhya Pradesh”
(STAGE-I).
2 IRCON/MECH/ 08.06.2016 Supply, Installation and IRCON/MECH M/s Innotech 02 `10,44,480.00 `10,44,480.00 03 Month
1029/RCF.RB
Commissioning of 02 Nos /1029/RCF.R Engineering Devices from the
L-II/UTM/304
Dated Universal Testing Machine BL-II/UTM Pvt. Ltd., RZ-D1/6, issue of
17.05.2016 /304/7052 Vashist Park, Opp Purchase
Dated Janak Cinema, New Order
06.09.2016 Delhi-110046
3 e-Tender no. 07.07.2016 Construction of Type-II Railway IRCON/Civil/ M/s Vishnu Saran & Co., `2452.55 Lacs Schedule A: `22,48,22,120/- 18 Months
IRCON/civil/e-
Tender/1029/R
houses (154 Nos) for providing E-Tender/ 113/163 - 8.4% from the
CF-RBL- resenditial accommodation to 1029/RCF- Swaroop Nager , Schedule B: date of
II/OT/02 Modern Coach Factory Personnel RBL/OT/02/ Kanpur – 208 002 (UP) - 5% issue of
Dated. including internal electrical and 9207 Schedule-C LOA
07.06.2016. Dated
telecom works, internal sanitary -8.44%
and plumbing works ,Garraige & 09.09.2016.
Miscellaneous works in the
township of MCF/RBL

Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 IRCON/CC/ 23.06.2016 Supplying and stacking of 50mm IRCON/CC/ M/s Gopal Mishra, `4,89,00,000.00 Item rate `5,46,67,275.00 4 Month
e-TN/JBRLP/
size Pakur variety machine e-TN/JBRLP/ Rajhata, Binodpur, from date of
2050/16/733
Dated: crushed track ballast for New 2050/16/733/ Katihar – 845 105 issue of
19.05.2016 B.G. Line from Jaynagar (India) 542, Dated (Bihar) LOA
to Bardibas (Nepal) Railway 15.09.2016
project for Indian portion only
from Km 0+000 to Km 2+975
5 IRCON/ 3017/ 30.08.2016 Supply of crushed WMM & IRCON/ 3017 M/s, Anil Construction `1,37,50,000.00 ` 310 per MT `1,55,00,000.00 75 days
SGTL/
Asphalt aggregates as per / SGTL/ Company, from issue
eTender/
Works/ WMM Required Gradation & Spec- eTend-er/ Krishan Puram, of LOA
& Asphalt ifications Including Transport- Works/ WMM Shivpuri - 473 551
Aggregates-1/ ation and unloading of & Asphalt (MP)
324
Dated
aggregate at IRCON’s main Aggregates-
03.08.2016 camp 1/324
Dtd:21.09.16
6 IRCON/CC/ 23.06.2016 Supplying and stacking of IRCON/CC/ M/s Raman `13,78,00,000/- Item Rate `16,10,20,035/- 6 Month
e-TN/JBRLP/
2050/16/734
50mm size Pakur variety e-TN/JBRLP/ Construction Pvt. Ltd., from date of
Dated machine crushed track ballast 2050/16/734/ Janakpur-9, issue of
19.05.2016 for New B.G. Line from 551, Dhanusha LOA
Jaynagar (India) to Bardibas Dated Nepal
(Nepal) Railway project for 21.09.2016
Nepal only from Km Km 2+975
to KM16+340

Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 IRCON/CC/ 23.06.2016 Supplying and stacking of 50mm IRCON/CC/ M/s Raman `20,88,00,000/- Item Rate `22,28,51,725/- 6Month
e-TN/JBRLP/
size Pakur variety machine e-TN/JBRLP/ Construction Pvt. Ltd., from date of
2050/16/735
Dated crushed track ballast for New 2050/16/735/ Janakpur-9, Dhanusha issue of
19.05.2016 B.G. Line from Jaynagar (India) 550 Nepal LOA
to Bardibas (Nepal) Railway Dated
project for Nepal only from Km 21.09.2016
Km 16+340 to KM34+800
8 IRCON/2049/R 05.09.2016 Tender for Construction of balance IRCON/2049/ M/s. Tribeni `129,158,419/- 14.25% above `14,75,63,492.57 09 Month
OB-II-
BIHAR/LC-
work of Road over Bridge both ROB-Bihar/e- Construction Ltd., from the
53A/2016/25, railway span and adjacent Tender/LC- New Town Square, date of issue
Dated approach span including 53A/LOA/45 Office No.-4M, 4th Floor, of LOA
06.08.2016 Reinforced Earth wall/ Retaining /1740 Chinarpark,
wall in lieu of LC- 53 A at Km Dated Kolkata – 700 136
613/19-21 between Kauriya Halt - 20/21.09.2016
Bihiya Section on Patna -
Mughalsarai Route in Danapur
Division of E C Railway , Bihar
9 IRCON/MECH/ 05.07.2016 Supply, Testing and IRCON/MEC M/s Godrej & Boyce 02 `47,63,994.00 `47,63,994.00 16 weeks
1029/RE/MCF
commissioning of 10 Ton ( 02 H/1029/RE/M Mfg. Co. Ltd., from the
RBL-II/FORK
LIFT/307 Nos) Diesel Fork Lift Trucks for CF RBL- Godrej Bhawan, Sher issue of
Dated Modern Coach Factory II/FORK Shah Suri Marg , Okhla Purchase
09.06.2016 LIFT/307 New Delhi – 110 065 Order
Dated
23.09.2016

Contd.../-
Works Awarded : OCTOBER 2016
Schedule
Quantity Rate d
S. Tender Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Description of Item/ Work Estimated Cost (For Tendered Cost (For completi
N. No. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
on
etc Works) etc Works)
Date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/ 28.07.2016 Construction of Sports Hostel, IRCON/Civil/ M/s Prakash Infra ` 1668 Lakh Sch A: - 5% `15,53,83,253.89 15 Months
civil/ Sch B - 5%
e-Tender/
Maintenance office (05 Nos) and E-Tender/ Venture Pvt Ltd, from the
external Services including 1029/RCF- 631/305, Patel Nagar, Sch-C-5% date of
1029/RCF-
RBL-II/ Drainage ,sewerage ,water RBL/OT/ Ismail ganj, Sch D - 5% issue of
OT/05 supply,roads fencing Toe wall 05/9299 Indra Nagar, Sch E - As per LOA
Dated
horticulture work ,external Dated Sec-8, quoted
24.06.2016. Sch F - As per
electrical & telecom works for new 05.10.2016 Lucknow – 226 016 quoted
type –II & III Rly Houses &
Miscellaneous civil works in
Prashanti Parishar township of
MCF/RBL for Rly Personnel

2 IRCON/ELE 28.6.2016 Design ,Drawing, Supply, IRCON/ M/s Lanco Solar 01MW Solar `7,37,83,003.00 09 (Nine)
CT/1029/M Installation, Testing and ELECT/1029/ Energy Pvt. Ltd., Power Plant months
CF.RBL- nd
Commissioning of 01MW Solar MCF-RBL/ 2 Floor, Plot No. 397,
II/SOLAR Power Plant with all the electrical SOLAR Udhyog Vihar,
PLANT/01
Dated
and associated equipments PLANT/01/ Phase -III,
07.06.2016 including civil works & integrating it 7157 Gurgaon -122 016
with existing 2MW solar Power Dated ( Haryana)
Plant at Modern Coach Factory, 05.10.2016
Rae Bareli, Lucknow (UP

3 IRCON/MECH 06.06.2016 Supply of Hydraulic Re-Railing IRCON/ M/s Francis Klein & Co. 01 Set ₹ 43,66,220 ₹ 43,66,220 16 weeks
3016/NTPC/ST
PP/RE-
Equipment (HRE) for NTPC’s MECH/3016/ Private Limited i.e. up to
th
RAILING SSTPP Project, Sholapur. NTPC/STPP/ Om Tower, 7 Floor, 30.01.2017
EQUIP/07 RE-RAILING 32, Chowringhee Road
Dated EQUIP./LOI/P Kolkata 700 071
12.04.2016 Fax (+91) (33) 22171540
ART-I/07
Dated Email:
10.10.2016 td.choudhary@francisklei
n.in
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
4 eTender 21.07.2016 Repair and rehabilitation of IRCON/3017/ M/s. Tech Fast Rebuild `1,78,00,000.00 Schedule A: + `1,61,39,490.82 09 Month
IRCON/3017/
existing structures on NH-3 for SGTL/Tender Pvt. Ltd. 5.62% from date
SGTL/Tender
/Structure Ircon SGTL in connection with “4 /Structure A-20,Kalpana Enclave Schedule B: + of issue of
rehabilitetion/ Laning of Shivpuri-Guna Section of rehabilitetion/ Mumbai – 400 069 8.32% LOA
331 NH-3 from Km236+000 to Km. 331 Dated
332+100 in the state of Madhya 15.10.2016
Pradesh (Stage-I)”.
5 IRCON/1034/ 27.07.2016 Transportation of Bulk Bitumen IRCON/1034/ M/s Gopal Kanhaiya 1000 MT Rate ` 2737/- per Rate ` 2914/- per 03 months
BPHP/e-
Tender/Tpt of
(Grade : VG.40) from ex depot of BPHP/Tpt of Roadlines, MT MT i.e. up to
Bitumen C- IOCL Koyali near Vadodara to Bitumen C- Parashar Villa, 17.01.2017
1/84 IRCON HMP site at Km 45+600 1/84/1343 3-NA-34 Jawahar Tendered Cost : Cost :
Dated near Techri Phanta, Shri Kolayat ji Dated Nagar, ` 27.37 Lakh ` 29.14 Lakh
05.07.2016
on Bikaner - Phalodi Highway 18.10.2016 Jaipur - 302 005
section of NH-15 in the state of
Rajasthan
6 IRCON/2046/ 24.09.2016 Construction of access road from IRCON/2046/S M/s Samdup Lepcha, ` 2.44 Crore 9.00 Below ` 2.22 Crore 03 Months
NFR-
existing NH-10 to Portal-II of ivok-Rangpo/ Pagung, from the
SRRP/e-
tender/A. Tunnel -14(approx 1150 mtr long) e-Tender/ Chungthang, date of
Road/ including nala crossing, protection T-14A. Road North Sikkim issue of
122/2064 work & other ancillary work in /122/2023 LOA.
connection with Sivok(WB) to Dated
Rangpo(Sikkim) New BG Rail Line 21.10.2016
Project.
Contd.../
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
7 eTender 19.09.2016 Transportation of Bulk Bitumen ( IRCON/3017/ M/s Arbuda Logistics, `1,94,12,250.00 Item rate `1,83,39,750.00 16 Month
IRCON/301 Grade VG 40) from Ex-depot of SGTL/Tender Plot No. 1204, from date of
7/SGTL/Ten IOCL, Koyali near Vadodara to /Bitumen Ranoli GIDC issue of
der/Bitumen IRCON’s Hot Mix Plant Site at Km. Transport/ Vadodara – 391 350, LOA
Transport/
326
276, Bamaur Village on NH-3 for 326 Gujrat
Ircon SGTL in connection with “4 Dated
Laning of Shivpuri-Guna Section of 22.10.2016
NH-3 from Km. 236+000 to Km.
332+100 in the state of Madhya
Pradesh (Stage-I)”.
8 eTender 19.09.2016 Tranportation of Rapid Settin IRCON/3017/ M/s Arbuda Logistics, `6,89,610.00 Item rate `6,66,900.00 16 Month
IRCON/301 Emulsion (RS-1) from Ex Depot of SGTL/Tender Plot No. 1204, from date of
7/SGTL/Ten HPCL savli to IRCON’s Hot Mix /Bitumen Ranoli GIDC issue of
der/Bitumen Plant Site at Km. 276, Bamaur vill. Transport/ Vadodara – 391 350, LOA
Transport/
327
On NH-3 for Ircon SGTL in 326 Gujrat
connection with “4 Laning of Dated
Shivpuri-Guna Section of NH-3 22.10.2016
from Km. 236+000 to Km.
332+100 in the state of Madhya
Pradesh (Stage-I)”.
9 IRCON/CC/e- 30.06.2016 Manufacturing, Supplying, IRCON/CC/e- M/s Daya Engineering 14,92,00000.00 Item rate `19,88,11,794/- 6 months
TN/JBRLP/20
50/16/736
transportation & Stacking of TN/JBRLP/20 Works Pvt. Ltd., from the
Dated various sizes of 60 Kg UIC Rail 50/16/736/567 The Safe Legend, date of
07.06.2016 PSC Mono Block Sleepers for B.G. Dated 6-3-1239/B/111, issue of
Main Line, Loop Line, Turnouts , 24.10.2016 Renuka Enclave, LOA
Derailing Switch, Bridge Raj Bhawan Road,
approaches & deck slab sleepers, Samajiguda,
Switch Expansion Joints (SEJ) and Hyderabad – 500 082
Level Crossings from Km 2+975 to
Km 34+800 for Nepal Portion of
Jaynagar (India) to Bardibas
(Nepal) New Rail Line Project.

Contd.../
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

10 IRCON/CC/ 30.06.2016 Manufacturing, Supplying, IRCON/CC/ M/s Daya Engineering `3,19,00,000/- Item rate `4,54,66,223/- 4 months
e-TN/JBRLP/
transportation & Stacking of e-TN/JBRLP/ Works Pvt. Ltd., from the
2050/16/737
Dated: various sizes of 60 Kg UIC Rail 2050/16/737/ The Safe Legend, 6-3- date of
07.06.2016 PSC Mono Block Sleepers for B.G. 568 1239/B/111, Renuka issue of
Main Line, Loop Line, Turnouts , Dated Enclave, Raj Bhawan LOA
Derailing Switch, Bridge 24.10.2016 Road, Samajiguda,
approaches & deck slab sleepers, Hyderabad – 500 082
Switch Expansion Joints (SEJ) and
Level Crossings from Km 0+000 to
Km 2+975 for Indian Portion of
Jaynagar (India) to Bardibas
(Nepal) New Rail Line Project.

11 IRCON/ 01.07.2016 Supply & Commissioning of 260 IRCON/MECH/ M/s Delite Kom 260 Nos `15,630.00 `50,35,877.00 90 Days
MECH/1029/
Nos Locker Cabinet for Modern 1029/MCF. Limited, from the
MCF.RBL-II/ RBL-II/Locker
Locker Coach Factory Rae Bareli. Kukreja House issue of
Cabinet/306/ IInd Floor, Purchase
Cabinet/306
Dated 7202 Dated
25.10.2016
46 Rani Jhansi Raod Order
19.06.2016
New Delhi – 110 055
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

12 e-tender 30.06.2016 Providing Consultancy Services to IRCON/CO/ M/s Delhi Integrated `1,28,28,897.00 18% Above `1,51,38,098.31 12 months
IRCON/CO/ carry out Feasibility Study, PETS GM(W)/2071/ Multi Modal Transit from the
GM(W)/207 (Preliminary Engineering and Shivpur System Ltd., date of
1/Shivpur Traffic Survey), Topographic Kathautia/ 1st Floor, issue of
Kathautia/C
onsultancy/
Survey, Final Location Survey, Consultancy/ Maharana Pratap LOA
1 preparation of Detailed Cost 1/166 ISBT Building,
Estimate, Conceptual and Dated Kashmere Gate,
Preliminary Design and General 28.10.2016 Delhi – 110 006
Arrangement Drawings of
structures (excluding buildings),
alignment design, assessment of
land requirement and assistance
in Land Acquisition and
preparation of Detailed Project
Report (DPR) including financial
viability and bankability of the
project, in connection with
construction of new Railway Coal
Corridor from Shivpur (Distt.
Chatra) to Kathautia station (Distt
Hazaribag) (approximate route
length of 49 km) in the state of
Jharkhand under the jurisdiction of
ECR

13 IRCON/J&K 16.05.2016 Construction of Tunnel T74-R IRCON/J&K M/s. ABCI ` 228.42 Crores 12.25% Above ` 256.41 Crores 22 Months
CELL/jat/14/1
014/K-
balance work at North Portal from CELL/jat/14/1 INFRASTRUCTURE from the
B/Tunnel- Km 130/950 to Km 133/910 014/K- Pvt Ltd date of
74R- (Approx) on Katra -Banihal B/Tunnel- 1/3, Mc Donald Tower, issue of
B(N)/342/ Section of Udhampur – Srinagar – 74R- 1st Floor, G.S. Road, LOA
Sated
18.02.2016
Baramulla New BG Railway Line B(N)/342/ Bhangagarh, Guwhati-
Project (Package-T-74R-B(N)) Dated 781007 (Assam)
28.10.2016
Works Awarded : NOVEMBER 2016
Quantity Rate Scheduled
S. Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Tender No. Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/Elect/5 01.08.2016 Design, Drawing, Supply, IRCON/Elect/ M/s Hitech Erectors As per Detailed Given in the `9,63,95,820/- 15 months
109/NELS.BN
Erection, Testing & 5109/NELS.B Pvt Ltd, BOQ of activities. BOQ
DM/S.Rtn.&
Elect.works/O Commissioning of NDM/S.Rtn.& 303, Pragati
T/16 Dated 33kV/433V,2x1000kVA sub Elect.works/ Chambers,
08.06.2016 station, Power distribution OT/16 Ranjit Nagar,
system, Lighting & power supply Dated Commercial Complex,
works jn buildings & workshops 04.11.2016 New Delhi – 110 008.
including Indoor/Outdoor lighting
for setting up of Second Electric
Loco Shed at Bondamunda
(Odisha)
2 IRCON/ 26.08.2016 Construction of two (2) Nos. IRCON/ M/s. ITD Cementation `21.28 Cr. `20.50 Cr. `246479489.00 12 months
2053/TN/ SHM
Subway through Railway Track by 2053/SHM/S Indian Ltd., (excluding
/SW/ 2016/26
Box Pushing and its dispersals on W/25416/ Godrej Waterside, 3 months
the platforms of Shalimar Railway 611 Tower No.1, Sector-V, monsoon
Station in Howrah District for Dated Salt Lake City, period)
South Eastern Railway in West 08.11.2016 Kolkata – 700 091
Bengal.
3 IRCON/MECH/ 15.09.2016 Supply, Testing , Commissioning IRCON/MEC M/s MIGATRONIC A/s MAG Co2 Euro 340215.00 Euro 340215.00 120 Days
1029/MCF.RB
L-II/Co2
& Prove Out of 30 Nos Synergic H/1029/MCF. Post Box 206 Welding Sets & from
WELDING Pulse MIG/MAG Co2 Welding RBL-II/Co2 DENMARK 70 Nos Synergic opening of
Sets/RET Sets & 70 Nos Synergic WELDING MIG/MAG Co2 Letter of
Dated MIG/MAG Co2 Welding Sets for Sets/RET/ Welding Sets Credit (L/c)
03.08.2016
Modern Coach Factory at Lalganj 7235
Rae Bareli Dated
08.11.2016
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/MECH 19.08.2016 Supply, Testing, & IRCON/MEC M/s Cranes Limited, ( 20T- 02 Nos, `2,87,28,149.00 `2,87,28,149.00 180 Days
/1029/RE/MC
Commissioning of Electric H/1029/RE/M 9, D D A Market, 10T-03 Nos & 5T- from the
F RBL-II/EOT
Crane/308 Overhead Travelling Cranes ( CF RBL- Katwaria Sarai, 01 Nos) issue of
Dated 20T- 02 Nos, 10T-03 Nos & 5T- II/EOT Opposite QUTAB Hotel, LOA.
16.07.20 16 01 Nos) for Modern Coach Crane/308/ New Delhi – 110 016
Fcatory Rae Bareli- UP. 7249 Dated
16.11.2016
5 IRCON/ELEC 13.10.2016 Supply, Erection, Testing & IRCON/ELEC M/s Umed Singh `7,76,47,898/- 38.00% above `3,10,74,690.00 6 months
T/CTP-
12/DFC /S&E
Commissioning & other T/CTP- Parnami Tower, (3 Packages) from the
/01A Sated Associated Works including 12/DFC/S&E/ SCO-50-51, 2nd Floor, date of
Dated Fabrication complete in all 01A/Pkg-I/ Old Judicial Complex, issue of
9.09.2016 respect for Dated Civil Lines, LOA
Construction/Modification/Reloc 17.11.2016 Gurgaon – 122 001
ation of Electrical Utility of 33 Kv
& below Power Lines for IRCON/ELEC M/s Creative `3,10,74,690.00
Dedicated Freight Corridor T/CTP- Entrepreneurs LLP
(Vaitarana- Sachin Section of 12/DFC/S&E/ A-3/332, Sector-8,
Western DFC-Phase-2) 01A/Pkg-II/ Rohini,
Package-CTP-12 Project. Dated Delhi – 110 085
25.11.2016
IRCON/ELEC M/s Gupta Traders `3,10,74,690.00
T/CTP- Plot No.4,
12/DFC/S&E/ Unit No. 108,
01A/Pkg-III/ Vardhman Shopping
Dated Complex,
23.11.2016 Derawal Nagar,
Delhi – 110 009

Contd.../-
Works Awarded : DECEMBER 2016
Quantity Rate Scheduled
S. Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Tender No. Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/2070/N 07.10.2016 Construction of Civil Works IRCON/2070/ M/s RKTC-MBPL JV, `24.07 Cr. Item Rate `23,28,09,565.42 09 months
MDC-Pkg.-
including Earthwork in Formation NMDC-Pkg.- Plot no. 65-A, from the dt.
IV/eTender-
Civil Misc. & P- for Embankment and Cutting, IV/eTender- Transport Nagar, Of LOA
Way Works/11 Blanketing, Drains, Platforms, Civil Misc. & Korba - 495 677 (C.G.)
Approach Roads, Sand Hump, P-Way
Foot Over Bridge, Permanent Works/11
works, Extension of existing Dated
Bridges and Level Crossings, 08.12.2016
Miscellaneous works and other
allied works
2 e-Tender No: 27.09.2016 Supply & laying of Epoxy flooring IRCON/Mech M/s Quantum `167.24 Lacs Item Rate `1,35,46,428.30 08 Months
IRCON/Mech/
in Shell shop and Finishing shop / 1029/RCF- Technologies, Contract from the
1029/RCF-
RBL/Epoxyfloo RBL/Epoxyflo HO – 876, date of
ring (Shell oring (Shell Sector - 8 issue of
Sheet & Sheet & Faridabad LOA
Finishing),
Dated
Finishing)/95
22.08.2016 46,
Dated
19.12.2016
3 IRCON/J7K 14.09.2016 Consutancy Services for Proof IRCON/J7K M/s Flient & Neill Ltd., ` 2,86,15,000.00 5.63% Above ` 3,89,76,812.00 36 Months
CELL/JAT/14/
1014/K-B/
Checking of Drawings and CELL/JAT/14 Bevis Marks House, from the
Proof Technical Guidance for important /1014/K-B/ 24 Bevis Marks, date of
Checking-Anji bridge aross the river Anji Khad Proof London EC3A 7JB issue of
Bridge/347 between km 38.430 to km 39.087 Checking- United Kingdom LOA
Dated
on Katra-Banihal Section of Anji
19.08.2016
Udhampur-Srinagar-Baramulla Bridge/347/
Rial Link Project, J&K 8604 Dated
20.12.2016
Contd.../-
Quantity Rate Scheduled
S. Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Tender No. Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/Civil/5 29.09.2016 Detailed Engineering & Design IRCON/Civil/ M/s. Kachroo Design As per BOQ on AS per BOQ `11.11 Lakhs 24 months
019/NELS.BN
consultancy work for Drainage, 5019/NELS. Consulting (P) Ltd, item rate basis
DM/e-
Tender/OT/ 17 Water supply arrangement, BNDM/ B-71, Sector -64,
Dated: Sewerage, Roads, Track, STP, e-Tender/OT/ NOIDA-201301 (UP)
02.09.2016 Fire fighting with related 17 Tel: 0120-2406460,
structures and External services Dated: 4121525
related to construction of Second 30.12.2016
Electric Loco Shed at
Bondamunda, Rourkela (Orissa)
5 IRCON/S&T/2 17.11.2016 Supply of Relays as per RDSO IRCON/S&T/ M/s. AEW `1,30,07,499.78 13.59% lower `1,12,40,273.60 03 months
064/02(R)
RDSO Specification in 2064/02(R)/A Technologies LLP than the from the
Dated
26.10.2016 connection with construction of Dated 14, Watkins Lane, estimated cost date of
Private Rly. Siding for 3MTPA 30.12.2016 Gokul Apartment (near issue of
Integrated Steel Plant of NMDC Howrah AC Market) LOA
Limited at Nagarnar near Howrah - 711101
Jagdalpur city in Bastar District of
Chhattisgarh state.
6 IRCON/S&T/2 17.11.2016 Supply of Relays as per RDSO IRCON/S&T/ M/s. Quartz `18,53,201.28 6.85% lower `17,26,280.64 03 months
064/02(R)
RDSO Specification in 2064/02(R)/Q Technologies, than the from the
Dated
26.10.2016 connection with construction of Dated K-36, Udyog Nagar, estimated cost date of
Private Rly. Siding for 3MTPA 30.12.2016 Rohtak Road, issue of
Integrated Steel Plant of NMDC Near Peera Garhi LOA
Limited at Nagarnar near Chowk,
Jagdalpur city in Bastar District of Delhi- 110041.
Chhattisgarh state
Contd.../-
Works Awarded : JANUARY 2017
Quantity Rate Scheduled
S. Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ completio
Tender No. Description of Item/ Work Estimated Cost (For Tendered Cost (For Value of Contract
N. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ n
etc Works) Mech. etc Works) Date
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 IRCON/J&K 30.11.2016 Construction of Cable Stayed IRCON/J&K M/s. Hindustan `349,78,18,634/- 5.10% below `368,57,94,145/- 36 months
Cell/JAT/14/10
14/K-Q/(Pkg
Bridge including its approaches Cell/JAT/14/ Construction Co. than the from the
BR-Anji Khad) across river Anji Khad between 1014/K-Q/ Ltd.(HCC), tendered value date of
/357 Tunnel T-2 and T-3 on Katra- (Pkg BR-Anji Hincon House, issue of
Dated th
Banihal Section of USBRL Khad) /357/ 11 Floor, 247, LOA
10.10.2016
Project Jammu and Kashmir 8618 Dated Park, Lal Bahadur
(Pkg BR-Anji Khad-Bridge) 06.01.2017 Shastri Marg,
2 IRCON/CO/ 08.09.2016 Earthwork in filling in emba- IRCON/CO/2 M/s. Ram Kripali Singh Both -Item Rate Both -Item `179,86,28,947/- 18 months
2067/KG/CIVIL
/TENDER/11/
nkment, provision of blanketing 067/KG- Construction Pvt. Ltd., & percentage Rate & from the
EW & material, construction /extension I/11/EW- 702, 7th Floor, percentage date of
BRIDGES-I of minor bridges, major bridges PKG- Panchwati Plaza, LOA
Dated no. 32, 40, 63, 64, 97, 123, 140, I/RKSCPL Kuchery Road,
10.08.2016
165, 168 (excluding steel Dated Ranchi – 834 001
superstructure) from Ch-2.000 10.01.2017 (Jharkhand)
(Luckeesarai) to Ch-70.50 (Naw-
adah) and misc works in
connection with doubling of
Railway line in b/w Kiul- Gaya
3 IRCON/CO/ 17.08.2016 Earthwork in filling in emba- IRCON/CO/2 M/s. Ram Kripal Singh Both -Item Rate Both -Item `181,16,71,249.58 18 months
2068/hb/Civil/
GMW/Tender/
nkment, provision of blanketing 068/HB/11/E Construction Pvt. Ltd., & percentage Rate & from the
11/EW 7 material, construction of major W& 702, 7th Floor, percentage date of
Bridges bridge (excluding steel Bridges/RKS Panchwati Plaza, LOA
Dated superstructure), extension of CPL/ Kuchery road, Ranchi-
26.06.2016
minor bridges, construction of Dated 834001 (Jharkhand)
Gate lodge, Level crossing and 11.01.2017
miscellaneous work from Ch-
195.72 (BachwaraStn.) to Ch-
266.98 (Hajipur) in connection
with doubling of Railway line in
between Hajipur - Bachwara
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/J&K 31.12.2016 Providing Support Services for IRCON/J&K M/s. Dreamland ` 4,49,580/- 10.00% above ` 4,94,538/- 12 months
Cell/JAT/14/1
014/K-QSup-
Northern Railway’s office at Cell/JAT/14/ Travels. from
Services/NR/J USBRL Project, Jammu 1014/K-Q Shop No. 9, 01.02.17
ammu/M- (Package-M-41/NR) Sup-Services General Bus Stand,
41/357 /NR/Jammu/ Jammu
Dated M-41/357/1570
16.12.2016
Dated
16.01.2017
5 IRCON/CO/20 09.09.2016 Earthwork in filling in IRCON/CO/ M/s. Hari GPT (JV), Item Rate Item Rate `905111057.42 18 months
67/KG/CIVIL/T
ender//EW &
embankment, provision of 2067/KG- C/O: Hari Construction from the
Brides-II blanketing material, construction/ II/EW-PKG- and Associates Pvt. date of
extension of minor bridges, major II/HARI-GPT Ltd. issue of
bridge no. 209, 230, 248, 297, Dated At & PO: Keshawe, LOA
305 (excld. steel superstructure) 18.01.2017 PS: Barauni,
from Ch-70.500 (Nawadah) to Distt.: Begusarai
Ch-123.00 (Manpur) and misc. PIN - 851 134 (Bihar)
works in connection with doubling
of Railway line in between Kiul –
Gaya
6 IRCON/1034/ 26.10.2016 Transportation of BULK IRCON/1034/ M/s Narendra Road 6000MT/ ` 2575 per MT/ `1,54,50,000/- 3 Months
BPHP/e-
Tender/Tpt of
BITUMEN (GRADE VG-40) from BPHP/e- Lines, ` 1,74,84,000/- ` 1,54,50,000/-
Bitumen Ex depot of IOCL Koyali near Tender/Tpt of Plot No. 313, GIDC,
C-1/95 Vadodara to IRCON HMP Site at Bitumen Ranoli, Vadodara,
Dated Km. 45+600 near Techri Phanta, C-1/95/53 , Gujarat
26.09.2016
Shri Kolayat ji on Bikaner- Dated
Phalodi Highway Section of NH- 18.01.2017
15 in the State of Rajasthan

7 IRCON/1034/ 26.10.2016 Transportation of Bulk Bitumen IRCON/1034/ M/s Narendra Road 6000MT/ ` 2315 per MT `1,38,90,000/- 3 Months
BPHP/e-
(Grade VG-40) from Ex depot of BPHP/e- Lines, ` 1,57,02,000/- ` 1,38,90,000/-
Tender/Tpt of
Bitumen IOCL Koyali near Vadodara to Tender/Tpt of Plot No. 313, GIDC,
C-2/96 , Dated IRCON's Hot Mix Plant at Km. Bitumen Ranoli, Vadodara,
26.09.2016 127+00 near Bap Village, C-2/96/54 , Gujarat
Phalodi on Bikaner Phalodi Dated
Highway Project Section on NH- 18.01.2017
15 in the State of Rajasthan
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
8 IRCON/2065/ 04.11.2016 Earthwork in filling in IRCON/2065/ M/s Tracks & Towers As per BOQ on AS per BOQ `139,79,67,150/- 18 months
Katni-Singrauli/
GMW/Tender/
embankment, provision of Katni – Infratech (P) Ltd., item rates basis from the
11/EW&Bridges blanketing material, construction Singrauli/GM Plot No. 206, date of
-1 Dated /Extension of minor bridges, W/Tender/11/ Phase-III, Road No. 76, issue of
20.09.2016 Limited Height Subways (LHS) EW & Jubilee Hills, LOA
and RUBs (only sub-structure), Bridges – 1 Hyderabad – 500 033
drains and Retaining walls, Level Dated
Crossings in the stretch from New 25.01.2017
Katni Jn. to Beohari station, both
inclusive, in connection with
construction of doubling of Railway
line in between Katni-Singrauli of
West Central Railway.
9 IRCON/2065/ 04.11.2016 Earthwork in filling in IRCON/2065/ M/s Tracks & Towers As per BOQ on AS per BOQ `139,79,67,150/- 18 months
Katni-Singrauli
embankment, provision of Katni – Infratech (P) Ltd., item rates basis from the
/GMW/Tender/
11/EW&Bridges blanketing material, construction Singrauli/GM Plot No. 206, date of
-1 Dated /Extension of minor bridges, W/Tender/11/ Phase - III, issue of
20.09.2016 Limited Height Subways (LHS) EW & Road No.-76, LOA
and RUBs (only sub-structure), Bridges – 1 Jubilee Hills,
drains and Retaining walls, Level Dated Hyderabad – 500 033
Crossings in the stretch from New 25.01.2017
Katni Jn. to Beohari station, both
inclusive, in connection with
construction of doubling of Railway
line in between Katni-Singrauli of
West Central Railway.
10 IRCON/2065/ 04.11.2016 Earthwork in filling in IRCON/2065/ M/s Tracks & Towers As per BOQ on AS per BOQ `120,38.89,804/- 18 months
Katni- embankment, provision of Katni – Infratech (P) Ltd., item rates basis from the
Singrauli/GM blanketing material, construction/ Singrauli/GM Plot No. 206, date of
W/Tender/12/ Extension of minor bridges, W/Tender/12/ Phase- III, issue of
EW&Bridges-
II
Limited Height Subways (LHS), EW & Road No. 76, LOA
Dated drains and Retaining walls, Level Bridges – II Jubilee Hills,
20.09.2016 Crossings & Gate Lodge in the Dated Hyderabad – 500 033
stretch from Marwasgram station 27.01.2017
to Singrauli station, both inclusive,
in connection with construction of
doubling of Railway line in
between Katni-Singrauli of WCR
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
11 IRCON/2065 04.11.2016 Earthwork in filling in IRCON/2065/ M/s Tracks & Towers As per BOQ on AS per BOQ `120,38.89,804/- 18 months
/Katni- embankment, provision of Katni- Infratech (P) Ltd., item rates basis from the
Singrauli/GM blanketing material, construction/ Singrauli/ Plot No. 206, date of
W/Tender/12 Extension of minor bridges, GMW/Tender Phase –III, issue of
/EW&Bridges
-II Dated
Limited Height Subways (LHS), /12/EW & Road No. 76, LOA
20.09.2016 drains and Retaining walls, Level Bridges – II Jubilee Hills,
Crossings & Gate Lodge in the Dated Hyderabad – 500 033
stretch from Marwasgram station 27.01.2017
to Singrauli station, both
inclusive, in connection with
construction of doubling of
Railway line in between Katni-
Singrauli of WCR
12 IRCON/J&K- 05.10.2016 Engagement of vehicles on hiring IRCON/J&K- M/s. Dreamland ` 64,37,934.34 3.25% above ` 66,47,167.20 12 months
Cell/JAT/14/ basis for Officers and Staff Cell/JAT/14/ Travels. than the from
1014/K- working in the office of the CAO, 1014/K- Shop No. 9, tendered value 01.02.2017
B/Vehicle- Northern Railway USBRL Project, B/Vehicle- General Bus Stand,
NR//VH-
21/352
Jammu (J&K) (Package no. VH- NR//VH-21/ Jammu
Dated 21) 352/1630
12.09.2016 Dated
30.01.17
13 e- 17.01.2017 Execution of MILING WORK of IRCON/1034/ M/s Singla 450000 sqm/ Item Rate `1,47,00,000/- 10 Months
Tender/IRCON
existing Asphalt Pavement BPHP/TN/NI Construction Ltd., ` 1,82,00,000/-
/1034/BPHP/T
N/NIT ET-111 , where ever required between Km T/ET- SCO, 22/23,
4+200 to 163+500 in connection 111/Milling First Floor, Sector-28C,
with Widening and Strengthening work/84 , Chandigarh
of Bikaner-Phalodi Section of NH- Dated
15 in the state of Rajasthan. 30.01.2017
Cont…../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

14 IRCON/2048/ 05.12.2016 Supply, Fixing, Installation, IRCON/2048/ M/s. ESCON Elevators `16,10,000/- `16,10,000/- `15,36,745/- 5 Months
ISC-BEHALA
Testing, Commissioning of 1 No. ISC-BEHALA Pvt. Ltd.
/TENDER/LIFT
/2016/33, Machine Room Less Lift/Elevator /TENDER/ EL-116/2,
Dated for atleast 8 passengers/544 Kg LIFT/2016/ T.T.C. Electronic Zone,
11.11.2016 capacity with a speed of 1.0m/sec 33/907, M.I.D.C. Mahape,
for 4 stops B PLUS G PLUS 2 Dated Navi Mumbai - 400 710
with hairline finish stainless steel 31.01.2017
car as per BOQ for New sports
Complex of Eastern Railway at
Ghoslapur Behala, Kolkata, W.B

15 IRCON/ 2053 06.12.2016 Construction of one no 12 m wide IRCON/ M/s. Urmila R.C.P. `23.17 Cr. `21.39 Cr. `208049368.33 18 Months
/TN/ SHM/
Foot Over Bridge FOB 2053/SHM/ Projects Pvt. Ltd.,
FOB, Subway
& PF/2016/ 30, connecting all the platforms, two SW/Urmila/ Flat No.2/A, Block - 2,
Dated nos. RCC Subway and Platform 25420/940 Haldiram Enclave,
02.11.2016 No. 1 Partial stretch at Shalimar Dated VIP Road,
Rly. Station in Howrah district for 31.01.2017 Kolkata – 700 059
South Eastern Railway in West
Bengal

16 IRCON/MECH/ 16.01.2017 Shipmant of Equipment from IRCON/MEC MSA SHIPPING PVT LTD, ` 50 Lacs Item Rate `48,44,764/- 50 Days
PE/SHIPMEN
T/MAL/EE/544
Malaysia to Kasganj(U.P) H/P&E/SHIP 118 H&I,VBMS Towers,
Dated MENT/MAL/E First Floor,
23.12.2016 E/544 South Raja Street,
Dated 3rd Floor, Hawk Tower
31.01.2017 New No 123 Old No 16
TUTICORIN,
TAMILNADU – 628 001
Phone: 04614049327,
Mob: 9789454320,
rajatut@msashipping.com
Cont…../-
Works Awarded : FEBURARY 2017
Quantity Rate Scheduled
S. Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Tender No. Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/3018/ 15.11.2016 Supply of Electronic Total Station IRCON/3018/ M/s Aimil Limited `12,38,940.00 `12,38,940.00 `10,76,288/- 30 Days
DFCCIL-CTP-
12/ST-TS/
(2) nos. and Auto level (6 nos.) DFCCIL- Naimax House (Surat Section)
SUR-INS/2016 CTP-12/ST- A-8 Mohan
/Dated TDR/206 Cooperative Industrial
20.09.2016 Dated Estate
02.02.2017 Mathura Road,
New Delhi
2 NIT-04/ST- 07.11.2016 Building & miscellaneous civil IRCON/3018/ M/s MH Khanusia, ` 2,36,26,632.00 `2,36,26,632.00 `2,62,27,284/- 180 Days
2016
work of Ancheli Depot DFCCIL-CTP First Floor Divine India (Surat Section)
-12/ST-TDR Bulding,
/Civil/204/209 Near RTO Office,
Dated Himmatnagar
03.02.2017
3 IRCON/3018/ 12.01.2017 Construction of RUB at LC IRCON/3018/ M/s Jalaram Projects `11,87,76,000 `11,87,76,000 `13,01,65,110 14 Months
DFCC-CTP-
number 65,67,70,72,73,78,89, 96 DFCCIL- Pvt. Ltd. (Surat Section)
12/ST-
TDR/RUB/213/ ,99,100,103,104,105,112,116,12 CTP-12/ST- Villa Mruduk Park
203 0,121,122,127,131,132,134,136, TDR/RUB/21 Society,
&138 of sec-II of Dedicated 3/208 Near Satadhar Cross
Freight Corridor Project-CTP-12 Dated Road,
of Vaitarna - Sachin section of 4.02.2017 Sola Road, Ghattodia
Western Dedicated Freight Ahmedabad – 380 061
Corridor Tel.: 079-27499814
admin@jalaramprojects.in
info@jalaramprojects.in

Cont…../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/2059/ 05.07.2016 Supply, Fabrication, Erection and IRCON/2059/ M/s SPDD Infra Private `1973 Lakh Schd. A – 0.01% `197329515.56 14 Months
CGRP/e-
Launching of Steel Girders for CGRP/EC16/ Limited, Below including
Tender
EC16/16/ Major Bridges Km.16.00 to 16/Girders Flat No. 3195, & monsoon
Girders Pkg.-II, Km.74.00 (5 nos) in connection Pkg.-II/748, Paradise Enclave Schd. B- At Par period from
Dated with new B.G. Electrified double Dated Secr 50D, the date of
25.05.2016
line Railway track in the State of 06.02.2017 Chandigarh – 160 047, issue of LOA
Chhattisgarh over South East Ph: 0172-2673195,
Central Railway between Chhal M - 9646031286,
and Dharmjaygarh 9988763300, spdd
infra.chd@gmail.com
5 IRCON/2056/ 06.10.2016 Earthwork in filling in IRCON/2056/ M/s ECI-Nayak (JV), `19378.06 Lakh Schd.-I `2085912526.27 18 Months
Agartala-
Akhaura/GMW
embankment, provision of Agartala- Plot no. A-12-13, `1285845499.60 from the date
/Tender/02/EW blanketing material, construction Akhaura/PPP Panchavati Township, of issue of
& bridges of viaduct, minor bridges and /Tender/02/ Manikonda, Schd. II- LOA
Dated RUB, in the stretch from Km 0.00 EW & Hyderabad – 500 089 `783567026.67
26.07.2016
(Agartala) to Km 5.1 (India- Bridges/ Telangana
Bangladesh Border) and 39/32, Ph: 04024786099, &
construction of service road from Dated Fax: 04024786100, Schd.-III –
transhipment yard to NH-44 in 07.02.2017 Email: eci@eciecc.com ` 1,65,00,000/-
connection with construction of
new B.G. Railway line from
Agartala (India)- Akhaura
(Bangladesh)
6 IRCON/3018/ 20.01.2017 Construction of RUB at LC IRCON/3018/ M/s Rajasthan Const. `4,60,97,874 `4,60,97,874/- `5,19,91,948/- 14 Months
DFCC-CTP-
number 44,45,46,47,49,50, DFCCIL- Pvt Ltd.
12/02
53,54,59 and 63 of section II of CTP-12/672 401, Shreeji Krupa Co-
Dedicated Freight Corridor Dated operative Premise
Project-CTP-12 of Vaitarna- 16.02.2017 Society,
Sachin section of Western 77/87 Abechand Gandhi
Dedicated Freight Corridor Marg,
Near Masjid Station
West Mumbai
Tel.: 022-23430448
rcptltd11@gmail.com

Cont…../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

7 IRCON/2062/ 25.01.2017 Supplying and stacking of IRCON/2062/ M/s Gulzar Singh & Co. `79,015 Cum. `1,785/- / Cum `14,10,41,775/- 06 Months
NMDC/NISP/
machine crushed stone ballast of NMDC/NISP/ Geedam Road,
RLY.SIDING/
e-Tender/ 50mm size 65mm to 20mm well RLY.SIDING/ Jagdalpur, Bastar,
Ballast/9, graded for Railway track as per Ballast/9/45, Chhattisgarh – 494 001,
Dated relevant RDSO specification in Dated Ph:07782-222252,
11.01.2017
connection with Construction of 16.02.2017 gsco_jdp@yahoo.com
Private Railway Siding for
NMDC’s Integrated Steel Plant at
Nagarnar near Jagdalpur in
Chhattisgarh
8 IRCON/2065/ 16.01.2017 Geotechnical investigation IRCON/CO/ M/s Jindal Consortium As per BOQ on Item Rate `69,15,229.70 06 months
KTE-SGLR/
including drilling of bore holes, 2065/Katni- SCF-9, Vikash Vihar item rates basis inclusive of 15% from the
JGM/JBP/
TENDER/GEO collecting samples, testing of Singrauli/PP Ambala City, service Tax date of
TECH-1/ sample in laboratory/field in the P/Geo-tech- PIN – 134 003 issue of
Dated: stretch from New Katni Jn. to I/40/60 Haryyana LOA
21.12.2016
(Corrigendum-
Beohari station(112Km), both Dated Email:
1 Dated inclusive, in connection with 17.02.2017 jindals13@gmail.com
10.01.2017). construction of doubling of
Railway line in between Katni-
Singrauli of West Central Railway
9 e-Tender/ 17.01.2017 Execution of Miling Work of IRCON/1034/ M/s Singla 450000 sqm/ Item Rate for `14700000/- 10 months
IRCON/1034/
BPHP/TN/NIT
existing Asphalt Pavement where BPHP/TN/ Constructions Ltd., `18200000/- individual item/ from the
st
ET-111 everrequired between Km 4+200 NIT ET- SCO, 22/23, 1 Floor, `14700000/- date of
to 163+500 in connection with 111/Milling Sec-28C, Chandigarh. issue of
widening & strengthning of work/136, LOA
Bikaner-Phalodi Section of NH- Dated
15 in the State of Rajasthan. 18.02.2017
10 IRCON/1034/B 13.01.2017 Construction of Administrative IRCON/1034/B M/s Kartikye Individual 4.17 % above `2,33,60,326.36 6 months
PHP/TN/NIT
Building and other Facilities at PHP/Toll Constructions, quantity for from Cost put to from Date
ET-106
Toll Plaza -3 near Km 84+500 of Plaza-1/NIT 280, Sector-15, individual item/ tender/ of issue of
Bikaner-Phalodi Section of NH- ET-106/146, Part-1, Delhi-Jaipur `.2,24,25,197.25 `2,33,60,326.36 LOA
15 in the state of Rajasthan Dated Road, (NH-8)
23.02.2017 Gurgaon – 122 001,
kartikyeconstructionsg
mail.com
Cont…../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

11 IRCON/1034/ 14.01.2017 Providing & Relocation of IRCON/1034/ M/s Sarjan Individual (-) 5.05% Below `2,83,75,239.70 3 months
BPHP/ TN/NIT
Existing Air Force Water Pipe BPHP/ Infratech,1,Rajnagar quantity for from estimated from Date
ET-109
Line between Km 4.200 to Km TN/WATER Society, Jail Road, individual item/ cost of issue of
12.800 along Project Highway PIPE LINE Mehsana-384002, ` 2,98,84,402. /`2,83,75,239.70 LOA
on NH-15, in connection with /NIT ET- Ph:9879204243,
Widening of Bikaner Phalodi 109/147, sarjan.infratech@
Highway in the State of Dated gmail.com
Rajasthan (PACKAGE:BPHP/ 23/02/2017
WUS-AF-NAL)
12 IRCON/e-TN/ 27.12.2016 Providing and fixing plumbing IRCON/e-TN M/s. Sacred `106.87 Lacs Item Rate `116.16 Lacs 26.10.2017
Plumbing_Ret
and sanitary works for Retail Mall /Plumbing Constructions Pvt.
Mall_NOIDA_
43/16/Pkg. at Plot No. A-267/1-4, Sector-43, _Ret Mall_ Ltd., AN-29B,
VIII/ NOIDA (U.P.) - Pkg. VIII NOI DA_43/ Shalimar Bagh,Delhi-
Dated 16/Pkg.VIII/ 110088,
06.12.2016
330
Dated
27.02.2017
13 IRCON/e-TN/ 27.12.2016 Providing and fixing external IRCON/e-TN/ M/s. Sacred `347.35 Lacs Item Rate `333.48 Lacs 27.09.2017
Ext
finishing works including Ext Finishings Constructions Pvt.
Finishings_
Ret structural glazing & stone _Ret Mall_NOI Ltd.,
Mall_NOIDA_ cladding works for Retail Mall at DA_43/16/Pkg AN-29B, Shalimar
43/16/Pkg. Plot No. A-267/1-4, Sector-43, . IX/332 Bagh,
IX/Dated
NOIDA (U.P.)-Pkg. IX Dated Delhi – 110 088
06.12.2016
28.02.2017
14 IRCON/e-TN/ 27.01.2017 Interior finishing works for Retail IRCON/e- M/s. Quazar `744.50 Lacs Item Rate ` 610.19 Lacs 26.10.2017
Int Finishing_
Ret
Mall at Plot No. A-267/1-4, TN/Int Infrastructure Private
Mall_NOIDA_ Sector-43, NOIDA (U.P.)-Pkg. X Finishing_Ret Limited , B-64,
43/16/Pkg. Mall_NOIDA_4 Chattarpur Enclave ,
X/Dated 3/16/Pkg. Phase-II,
03.01.2017
X/331 New Delhi – 110 074
Dated
28.02.2017
Cont…../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

15 IRCON/ 2048 / 24.11.2016 Fire Fighting, Fire detection, Fire IRCON/ M/s. S.K. Construction, `1.6 Cr. `1.60 Cr. `1,19,79,200.00 5 Months
ISC-BEHALA/
alarm system and related works 2048/ISC- 1167, Purba Diganta,
TENDER/
FIRE/ 2016/21 as per BOQ for New Sports Behala/Fire 2nd Floor,
Dated Complex of Eastern Railway at Fighting/ Kolkata – 700 075.
26.10.2016 Gholsapur (Behala), Kolkata, SKC/25416/1
W.B. 004A Dated
28.02.2017
16 IRCON/J&K- 22.12.2016 Engagement of vehicles for IRCON/J&K- M/s. Dreamland ` 26,55,264/- 3.99% above `27,61,209/- 12 months
Cell/JAT/14/10
14/K-B/Hiring
Officers and Staff working in the Cell/JAT/14/1 Travels. than the from
Veh-Jammu/ office of the Executive 014/K- Shop No. 9, tendered value 01.03.17
354, Director/IRCON, USBRL Project, B/HiringVeh- General Bus Stand,
Dated Jammu (J&K) (Package no. VH- Jammu/354/ Jammu
21.11.2016
22) 1719
Dated
28.02.2017
17 IRCON/J&K- 27.01.2017 Fabrication, Supply, Erection and IRCON/J&K- M/s. The Braithwaite `662127429.67 58.70% Above `1050796231/- 36 months
CELL/JAT/14/
completing of Superstructure for CELL/JAT/14 Burn & Jessop than the from the
1014/K-B/ Br.
2, 3 & 61/ 362/ Bridge no.2 & 3 (In Sumber /1014/K-B/ Construction Co. Ltd., tendered value date of
8644 Station Yard) and Bridge no. 61 Br. 2, 3 & 61/ 27, Rajendra Nath issue of
Dated (over Tatsun Nallah) on Katra- 362/ 8644 Mukharjee Road, LOA
05.01.2017
Qazigund Section of Udhampur- Dated P.O.Box No. 264,
Srinagar-Baramulla New BG 28.02.2017 Kolkata – 700 001
Railway Line Project. (Package: (WB)
Bridge- 2, 3 & 61)
18 IRCON/CC/TN 11.01.2017 Geotechnical investigation IRCON/2046/ M/s Arihant Drillings `460.81 Lacs 20.50% Below `36634395.00 4 Months
/SR-2046/
Addl. GT/16/03
including drilling of Boreholes, Sivok- Pvt. Ltd. 142/1, Adarsh
Dated testing of samples, seismic Rangpo/Addl. Nagar, Gurgoan-
20.12.2016 refraction etc. from Km 00+000 to GT Invest./ 122001, Haryana
45+000 for construction of Sivok 58/675
(West Bengal) – Rangpo (Sikkim) Dated
New Single Line BG Rail Link 28.02.2017
Project.
Cont…../
-Works Awarded : MARCH 2017
Quantity Rate Scheduled
S. Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
Tender No. Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
N. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
etc Works) etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 IRCON/2050/B 21.12.2016 Design, supply, installation, IRCON/2050/ M/s SS Rail Works Pvt. `16.20 Crores 5.74% Above `17,13,43,269/- 4 Months
GL.JBB/S&T/T
ENDER/06,
testing and commissioning of BGL.JBB/ Ltd., H.No. 8-3- from the
Dated various Electric Interlocking S&T/ 318/6/13/5 Flat No. date of
18.11.2016 based signalling system at 4 TENDER/06, 203, Crystal issue of
station of Inarwa (Nepal Custom Dated Residency, Jaya LOA
Yard) - Kurtha (Nepal) section :01.03.2016 Prakash Nagar,
and provision of 6-Quad +OFC Yallareddy Guda,
Communication system between Hyderabad – 500 073
Inarwa - and Kurtha (Nepal)
2 IRCON/1034/ 13.01.2017 Construction of Administrative IRCON/1034/ Kartikye Constructions, `2,24,25,197.25 4.17 % above ` 2,33,60,326.36 6 months
BPHP/ TN/NIT
ET-107
Building and other Facilities at BPHP/ TN 280, Sector-15, Part-1, from Cost put to from Date
Toll Plaza -1 near Km 84+500 of /Toll Plaza- Delhi - Jaipur Road, tender/ of issue of
Bikaner-Phalodi Section of NH- II/NIT ET- (NH-8) Gurgaon ` 2,33,60,326.36 LOA
15 in the state of Rajasthan 107/160 PIN - 122 001
Dated Email:
3.03.2017 kartikyeconstructionsg
mail.com
3 IRCON/CC/TN 09.12.2016 Construction of tunnel T-14 IRCON/2046/ M/s Abir Infrastructure `129.88 Crores `129.88 Crores `123.52 Crores 30 Months
/SR-
2046/Const./T-
between km 41.954 to Km. SIvok- Pvt. Ltd. 143-144, from the
14/16/741, 43.906 approx) on Sivok (West Rangpo/T- Udyog Vihar, Phase- date of
Dated Bengal) to Rangpo (Sikkim) new 14/56/Vol- IV, Gurgaon-122015 issue of
28.09.2016 single Line BG Railway Project. II/681 (Haryana) LOA
Dated
06.03.2017

Cont/-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4 IRCON/2065 09.02.2017 Geotechnical investigation IRCON/2065/ M/s S & S Associates, As per BOQ on Item Rate `58,85,535.41 06 Months
/PPP/Katni- including drilling of Boreholes, PPP/ consulting Engineers, item Rate basis from the
Singrauli/ collecting samples, testing of Katni- Plot No. 7GH/1353/D- date of
Tender-GT samples in laboratory/ field in the Singrauli/ 15, Sector-9, CDA, issue of
Invest. Pkg-
2/43
stretch from Marwasgram station Tender-GT Cuttack-14 LOA
Dated to Singrauli station (102Km) , both Invest. Pkg-
20.01.2017 inclusive, in connection with 2/43
construction of doubling of Dated
Railway line in between Katni- 08.03.2017
Singrauli of West Central Railway
5 IRCON/e- 27.12.2016 Supplying, installation, testing & IRCON/e- M/s. Ishank Fire ` 202.21 Lacs `181.98 Lacs ` 196.09 Lacs 07.10.2017
TN/Fire
commisioning of fire fighting TN/Fire Protection System,
Fighting_Ret
Mall_NOIDA_4 system & other related ancillary Fighting_Ret 10808,Manak Pura,
3/16/Pkg. VII/ works for Retail Mall at Plot No. Mall_NOIDA_ Gali Phool Wali, Near
Dated A-267/1-4, Sector-43, NOIDA 43/16/Pkg. Filmistan Cinema,New
06.12.2016
(U.P.)-Pkg. VII VII/363, Delhi-110055
Dated
08.03.2017
6 IRCON/Elect/2 20.01.2017 SETC for alteration works for 25 IRCON/ELEC M/s. Shyam Takniki ` 8.79 Crores 28.32% above ` 11,27,71,693/- 11 Months
068/HJP-
BCA/Alt.
kv RE work (OHE PSI and Gen) T/2068/HJP- Udyog, Post Box from Cost put to from the
Works/01 in Hajipur Bachwara section BCA/ALT. No.31, Bhuli Road, Tender date of
Dated WORKS/01, Dhanbad-826001, ` 11.28 Crore issue of
30.11.2016 Dated Jharkhand LOA
10.03.2017
7 IRCON/ELECT 14.02.2017 Supply, installation, testing and IRCON/ELEC M/s Technisys `4,63,89,493.80 10 % Below `4,17,50,544.00 3 Months
/TENDER/ELE
CTRICAL
commissioning of Electrical work T/TENDER/E Engineering Pvt Ltd, from the
WORK FOR IRCON Retail Mall at Sector-43 LECTRICAL plot No-239, Gurkul date of
RETAIL MALL Noida (U.P.) WORK FOR Industrial Area issue of
SEC 43 RETAIL Faridabad Haryana- LOA
NOIDA/337
MALL SEC 121003
43
NOIDA/337,
Dated
10.03.2017
Cont/-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

8 IRCON/2068/H 21.03.2017 Construction of Station buildings, IRCON/2068/ M/s. Ganga `11,99,15,705.82 Item Rate `15,04,39,519.76 12 Months
B/CIVIL-
Signaling complexes, Platforms, HB/CIVIL- Construction Co., Just from the
BUILDING/PK
G- FOB’s including extension of BLDG-PKG- East of Deepshikha date of
st
II/TENDER/20 FOBs, Circulating area, Approach II/2017/02/01/ Cinema, 1 Lane, issue of
17/02, roads, Provision of passenger 634, Vishwanath Nagar, LOA
Dated
amenities, PF fencing & other Dated P.O.:
26.02.2017
miscellaneous works between 30.03.2017 +Distt.:Begusarai, PIN-
Shahpur Patoree (including) to 851101
Chaksikandar (excluding) in
connection with doubling of
Hajipur-Bachhwara Rail line
9 IRCON/2068/H 22.03.2017 Construction of Station buildings, IRCON/2068/ M/s. Trishul Engicon `9,35,26,815.61 Item Rate `11,40,94,720.59 12 Months
B/CIVIL-
Signaling complexes, Platforms, HB/CIVIL- Pvt. Ltd., Anmol Orchid from the
BUILDING/PK rd
G- FOB’s including extension of BLDG-PKG- Mall, Office No. 6, 3 date of
III/TENDER/20 FOBs, Circulating area, Approach III/2017/03/ Floor, Opposite A N issue of
17/03, Dated roads, Provision of passenger 639, College, Boring Road, Letter of
26.02.2017
amenities, PF fencing & other Dated Patna -800 013 (Bihar) Acceptance
miscellaneous works between 30.03.2017 (LOA)
Chaksikandar (including) to
Hajipur (including) in connection
with doubling of Hajipur-
Bachhwara Rail line
10 IRCON/e- 22.02.2017 Supply, installation, testing and IRCON/e- M/s. Sky Construction ` 155.89 Lacs ` 140.30 Lacs ` 134.92 Lacs 29.10.2017
TN/FireFightin
commissioning of fire fighting TN/FireFighti Company , 5 Sri
g_Comml
Comp_Sec-1 system in Commercial cum Office ng_Comml Aurobindo Marg, 1st
& Complexes in Sector-1 & 48, Comp_Sec-1 Floor, South
48_NOIDA/17/ NOIDA (U.P.) - Pkg. XI & 48_NOIDA Apartments , New
Pkg. XI/Dt.
01.02.2017
/17/Pkg. XI/ Delhi-110016
411,
Dated
30.03.2017
Cont/-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

11 IRCON/2065 23.02.2017 Geotechnical investigation IRCON/2065/ M/s GOMA As per BOQ on Item Rate `20,45,400.67 04 Months
/PPP/Katni- including drilling of Boreholes, PPP/Katni- Engineering & item Rates basis from the
Singrauli/Ten collecting samples, testing of Singrauli/ Consultancy, date of
der-GT samples in laboratory/ field in the Tender-GT 320, Joshi Estate, issue of
Invest. Pkg-3
Date
stretch from Beohari Station to Invest. Pkg- Sarkhej-Bavia LOA
02.02.2017 Marwasgram station (47 Km) , 3/44/41 Highway, Changodhar,
both inclusive, in connection with Dated Ahmedabad- 381322
construction of doubling of 31.03.2017
Railway line in between Katni-
Singrauli of West Central Railway
12 IRCON/e- 22.02.2017 External & internal finishing works IRCON/e- M/s. India Wood Craft, ` 311.47 Lacs ` 311.47 Lacs ` 240.76 Lacs 30.10.2017
TN/Civil
including plumbing & sanitary TN/Civil RZ B1, Raghu Nagar,
Works_Comml
Comp_NOIDA works in commercial cum office Works_Com Pankha Road, Street
_1/17/Pkg. complex at Sector-1, NOIDA ml Comp_ No. 6, Opposite Janak
XIII/ (U.P.) – Pkg. XIII NOIDA_1/17/ Cinema, New Delhi-
Dated
01.02.2017
Pkg. XIII/413, 110058
Dated
31.03.2017
13 IRCON/e- 22.02.2017 External & internal finishing works IRCON/e- M/s. India Wood Craft, ` 500.82 Lacs ` 500.82 Lacs ` 389.15 Lacs 30.10.2017
TN/Civil
Works_Comml
including plumbing & sanitary TN/Civil RZ B1, Raghu Nagar,
Comp_NOIDA works in commercial cum office Works_Com Pankha Road, Street
_48/17/Pkg. complex at Sector-48, NOIDA ml No. 6, Opposite Janak
XII/ (U.P.) – Pkg. XII Comp_NOID Cinema, New Delhi-
Dated
A_48/17/Pkg. 110058
01.02.2017
XII/412,
Dated
31.03.2017
Works Awarded : MARCH 2017

Quantity Rate Scheduled


Tender Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of
S. N. Description of Item/ Work Estimated Cost (For Tendered Cost (For completion
No. opening And date and address Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Contract
Date
Etc Works) Etc Works)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
IRCON/MEC 15.12.16 Supply, Testing, commissioning & IRCON/MEC M/s. Vikrant Special 01Set (02 Nos) ` 33,73,000.00 ` 33,73,000.00 120 days
H/1029/RF.R
BL-II/Load
Prove Out of 01Set (02 Nos) Load H/1029/RF.R Private Limited, 90, from date of
Lifting & Lifting and Turning Device for BL-II/Load Nayapattyv Road, issue of
Turning Modern Coach Factory, Rae Lifting & Kolakata-700055
14 Device/321
LOA.
Bareli Project Turning Ph: 2551-3070/ 2550-
Dated
Device/321/7 1462, Fax : 033-2551-
23.11.2016
518 Dated 3070,sales@vikrantspe
08.03.2017 cial.com
Tender No. 02.11.16 Supply, & Installation of LOA No. M/s Durian Industries Compactor ( 08 ` 13,54,820.00 `13,54,820.00 08 (Eight)
IRCON/MEC
Compactors & Almirahs (Open IRCON/MEC Ltd.,1/20, W.H.S. Kirti Bay)-06 Nos Weeks from
H/1029/MCF.
RBL-II/ Rack) at Modern Coach Factory H/1029/MCF. Nagar, New Delhi- (ii) Almirah date of
Compactor & at Lalganj Rae Bareli, U.P RBL-II/ 110015 Tel : 011-
15 Racks /315
(Open type issue of
Compactor & 47140200, 25161550,
Dt. 01.10.16
Racks Fax : 011-47140243, wooden racks)- LOA
/315/7519 Dt. delhidurian@gmail.co 20 Nos
08.03.2017 m
IRCON/MEC 25.10.16 Supply, Testing, commissioning IRCON/MEC M/s Electropneumatics 01 N0 `1,69,23,066.23 `1,69,23,066.23 240 days
H/1029/RF.R
&8 Prove Out of 01 No CNC Pipe H/1029/RF.R & Hydraulic ( India) Pvt from the
BL-II/CNC
Pipe Bending Bending Machine for Modern BL-II/CNC Ltd., A 302/303, date of
/312 Dated Coach Factory, Rae Bareli Project Pipe Bending Universal Business
01.10.2016
issue of
/312/7525 Park Chandivali Farm
16 Dated Road Off Saki Vihar LOA
15.03.2017 Road Andheri (E)
Mumbai,Fax:+91-022-
40492500,Ph:+91-022-
40492525,info@
electropneumatics.com
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

IRCON/Civil/ 15.09.16 Construction of Type III Railway IRCON/Civil/ M/s Anurag ` 54.24 Crores 6.17% Below ` 50.89 Crores 24 Months
e-
Tender/1029/
houses (320Nos.) for providing e-Tender Enterprises, III-H/1, from the
RCF- residential accommodation to /1029/MCF- Rakesh Marg, Nehru date of
RBL/OT/08 Modern Coach Factory Personnel RBL/OT/08/9 Nagar, Ghaziabad –
Dated
issue of
including internal electrical and 937, Dt. 201001 (U.P).
17 13.08.2016 LOA.
Telecom works, internal sanitary 29.03.2017
and plumbing works, Garages
and miscellaneous works in
Prashanti Parisar, Township of
MCF/RBL.
IRCON/Civil/ 17.01.17 Construction of Rain water IRCON/Civil/ M/s. Prakash ` 5.14 Crores 8.60% Below ` 4.69 Crores 09 Months
e
Tender/1029/
harvesting system cum Recharge e-Tender Infraventure Pvt. Ltd, from the
MCF well for Factory area, Township /1029/MCF- 631/305, Patel Nagar, date of
18 RBL/RWH/O area, Administrative Building and RBL/RWH/O Ismailganj,
T/12 Dt
issue of
Technical Training Center of MCF T/12/9941 Indra Nagar, Sector-8,
26.12.2016
Lalganj Rae Bareli, U.P Dt. Lucknow- 226016 LOA.
29.03.2017

Anda mungkin juga menyukai