PENGINTEGRASIAN PMCB DENGAN SISTEM SCADA

PADA PENYULANG SRIKANDI GI TALANG KELAPA


DI PT PLN (PERSERO) PALEMBANG

LAPORAN AKHIR

Disusun Untuk Memenuhi Syarat Menyelesaikan Pendidikan Diploma III


Pada Jurusan Teknik Elektro Program Studi Teknik Listrik

Oleh :

Theresia Fransisca Sipahutar


0612 3031 1563

POLITEKNIK NEGERI SRIWIJAYA


PALEMBANG
2015
PENGINTEGRASIAN PMCB DENGAN SISTEM SCADA
PADA PENYULANG SRIKANDI GI TALANG KELAPA
DI PT PLN (PERSERO) PALEMBANG

Oleh :
THERESIA FRANSISCA SIPAHUTAR
0612 3031 1563

Palembang, Juli 2015

Menyetujui,
Pembimbing I Pembimbing II

Ir. Siswandi, M.T. Mohammad Noer, S.S.T., M.T.


NIP.19640901 199303 1 002 NIP. 19650512 199502 1 001

Mengetahui,
Ketua Jurusan Ketua Program Studi
Teknik Elektro Teknik Listrik

Ir. Ali Nurdin , M.T. Herman Yani, S.T.,M.Eng.


NIP.19621207 199103 1 001 NIP.19651001 199003 1 006

ii
MOTTO :

 AKU PASTI SUKSES KALAU TIDAK SUKSES PASTI BUKAN

AKU

- Theresia Fransisca Sipahutar -

 Don’t worry about ANYTHING instead, pray about

EVERYTHING tell God what YOU NEED, thank Him for all HE

HAS DONE.

–Philippians 4 : 6–

 Orang yang masuk akal mengadaptasikan dirinya

dengan dunia. Orang yang tidak masuk akal

mengadaptasikan dunia dengan dirinya. Semua kemajuan

bergantung pada orang yang tidak masuk akal.

- George Bernard –

Laporan Akhir Ini Kupersembahkan Kepada:

 Kedua Orang Tua ku yang selalu


membimbing dan mendoakanku.
 Saudara-saudaraku tersayang (Kak
Casuarina, Kak Elisabet, Daniel dan
Maruli).
 Sahabat – sahabatku seperjuangan.
 Almamaterku.

iii
ABSTRAK
PENGINTEGRASIAN PMCB DENGAN SISTEM SCADA
PADA PENYULANG SRIKANDI GI TALANG KELAPA
DI PT PLN (PERSERO) PALEMBANG
(2015 : xiii + 61 Halaman + Daftar Pustaka + Lampiran)

THERESIA FRANSISCA SIPAHUTAR


0612 3031 1563
Jurusan Teknik Elektro Program Studi Teknik Listrik
Politeknik Negeri Sriwijaya

SCADA (Supervisory Control And Data Acquisition) merupakan sistem


proteksi yang bekerja secara real time dan dapat dikendalikan dalam jarak jauh.
Sistem ini memiliki kemampuan akuisisi data dan kendali dan juga untuk
melakukan perintah Remote Control (RC) buka / tutup PMCB dengan
menggunakan radio frekuensi sebagai media penyampaian informasinya. PMCB
(Pole Mounted Circuit Breaker) adalah salah satu alat proteksi penyulang yang
dipasang pada gardu tiang, pengintegrasian PMCB dengan sistem SCADA akan
menambah kehandalan dari sistem proteksi penyulang. Tujuan penulis membuat
laporan akhir ini adalah untuk mengetahui proses pengintegrasian PMCB dengan
sistem SCADA dan juga pengaruh pengintegrasian PMCB dengan sistem SCADA
terhadap kehandalan penyulang dalam mengatasi gangguan. Dari hasil
pembahasan proses pengintegrasian dimulai dengan melakukan survei untuk
menentukan titik yang akan diintegrasi, kemudian menyetting PMCB dengan
settingan relay proteksi arus lebih dan gangguan tanah di penyulang berturut-turut
sebesar 1400 A dan 180 A, dan pada settingan pada PMCB Musi Pahit berturut-
turut sebesar 2912 A dan 280 A. Selanjutnya melakukan proses diagnostik pola
komunikasi, design wiring peralatan dan deliver hasil pengintegrasian. Setelah
PMCB terintegrasi dengan sistem SCADA lama pemadaman penyulang
berkurang, dimana pada tahun 2013, sebelum terintegrasi SCADA yaitu rata-rata
54.93 menit pergangguan, sedangkan setelah pengintegrasian hanya diperlukan
waktu rata-rata 17.12 menit untuk menormalkan satu kali gangguan.
Kata kunci : SCADA, PMCB, Relay Proteksi.

iv
ABSTRACT
THE INTEGRATION OF PMCB WITH SCADA SYSTEM
AT SRIKANDI FEEDER TALANG KELAPA SUBTATION
IN PT PLN (PERSERO) PALEMBANG
(2015 : xiii + 61 Pages + References + Appendixes)

THERESIA FRANSISCA SIPAHUTAR


0612 3031 1563
Electrical Engineering Program
State Polytechnic Of Sriwijaya

SCADA (Supervisory Control And Data Acquisition) is a protection


system that works in real time and can be controlled over long distance. This
system has data acquisition and control capability and also to carry out the order
Remote Control (RC) open / close of PMCB by using radio frequencies as a
medium to deliver information. PMCB (Pole Mounted Circuit Breaker) is one of
the protective devices installed on the substation feeder pole, PMCB integration
with SCADA systems will increase the reliability of the feeder protection system.
The purpose of the author makes this final report is to investigate the process of
integrating PMCB with SCADA system as well as the impact to the reliability of
feeder to overcome the interference. From the results of the discussion of the
integration process began by conducting a survey to determine the point to be
integrated, then set its PMCB with overcurrent protection relay settings and
ground fault relay setting in the feeder sequentially of 1400 A and 180 A, and on
the settings in the PMCB Musi Pahit sequentially for 2912 A and 280 A then
diagnose the communication patterns will be used, wiring equipment design and
deliver the results of integration. After PMCB integrated with SCADA systems,
feeder blackouts time decreased, which in 2013, before integrated with SCADA is
about 54.93 minutes each fault, whereas after integration only takes over about
17.12 minutes to normalize an interruption.
Key words: SCADA, PMCB, Protection Relay.

v
KATA PENGANTAR

Puji dan syukur bagi Tuhan Yang Esa yang telah memberikan rahmat serta
karunia-Nya serta terima kasihku kepada orang tua ku yang selalu memberikan
semangat sehingga penulis dapat menyelesaikan Laporan Akhir ini yang berjudul
“Pengintegrasian PMCB dengan Sistem SCADA pada Penyulang Srikandi GI
Talang Kelapa di PT PLN (Persero) Palembang” dengan baik dan tepat pada
waktunya.
Laporan akhir dibuat untuk memenuhi syarat menyelesaikan Pendidikan
Diploma III pada Jurusan Teknik Elektro Program Studi Teknik Listrik di
Politeknik Negeri Sriwijaya Palembang.
Pada kesempatan ini penulis ingin menyampaikan rasa terima kasih
kepada semua pihak yang telah membantu baik moril maupun spiritual atas
terwujudnya laporan akhir ini terutama kepada :
1. Bapak Ir. Siswandi, M.T., selaku Dosen Pembimbing I.
2. Bapak Mohammad Noer, S.S.T., M.T., selaku Dosen Pembimbing II.
Yang telah memberikan bimbingan pengarahan dan nasihatnya kepada
penulis dalam menyelesaikan laporan akhir ini.
Penulis juga mengucapkan terima kasih atas bantuan dan kesempatan yang
telah diberikan sehingga penulis dapat menyelesaikan laporan akhir ini. Untuk itu
penulis mengucapkan terima kasih kepada :
1. Bapak RD. Kusumato, S.T., M.M., selaku Direktur Politeknik Negeri
Sriwijaya.
2. Bapak Ir. Ali Nurdin, M.T., selaku Ketua Jurusan Teknik Elektro
Politeknik Negeri Sriwijaya.
3. Bapak Ir. Siswandi, M.T., selaku Sekretaris Jurusan Teknik Elektro
Politeknik Negeri Sriwijaya.
4. Bapak Herman Yani, S.T., M.Eng., selaku Ketua Program Studi
Teknik Listrik Politeknik Negeri Sriwijaya.
5. Bapak Harry Nofrianz Prakasa, S. T., dan Bapak Achmad Meiledy
selaku Pembimbing dari PT. PLN (Persero) APD WS2JB.

vi
6. Dan semua pihak yang tidak mungkin penulis sebutkan satu persatu
yang telah terlibat banyak membantu sehingga Laporan Akhir ini dapat
diselesaikan.
Penulis menyadari bahwa dalam penyusunan laporan ini masih banyak
kekurangan baik dalam penulisan maupun materinya. Oleh karena itu, kritik dan
saran yang membangun sangat diharapkan oleh penulis guna perbaikan dimasa
yang akan datang. Demikianlah, semoga Laporan Akhir ini dapat bermanfaat dan
berguna bagi kita semua.

Palembang, Juli 2015

Penulis

vii
DAFTAR ISI

Halaman
HALAMAN JUDUL ...................................................................................... i
LEMBAR PENGESAHAN ........................................................................... ii
ABSTRAK ..................................................................................................... iv
ABSTRACT .................................................................................................... v
KATA PENGANTAR .................................................................................. vi
DAFTAR ISI .................................................................................................. viii
DAFTAR GAMBAR ....................................................................................... x
DAFTAR TABEL ......................................................................................... xi
DAFTAR LAMPIRAN ................................................................................. xii

BAB I PENDAHULUAN
1.1 Latar Belakang ....................................................................... 1
1.2 Tujuan dan Manfaat ................................................................... 2
1.2.1 Tujuan .............................................................................. 2
1.2.2 Manfaat ............................................................................. 2
1.3 Rumusan Masalah ...................................................................... 3
1.4 Batasan Masalah ....................................................................... 3
1.5 Metode Penulisan ...................................................................... 3
1.6 Sistematika Penulisan ............................................................... 4

BAB II TINJAUAN PUSTAKA


2.1 Sistem Tenaga Listrik ............................................................... 6
2.2 Sistem Distribusi Tenaga Listrik .............................................. 7
2.3 Gangguan pada Sistem Jaringan Dstribusi .............................. 8
2.3.1 Jenis-jenis Gangguan ...................................................... 9
2.4 Relay Proteksi .......................................................................... 9
2.4.1 Relay Arus Lebih .......................................................... 10
2.4.2 Relay Hubung Tanah .................................................... 14
2.4.2.1 Pengertian GFR ................................................ 13
2.4.2.2 Prinsip Kerja GFR ............................................ 14
2.4.3 Penyetelan Relay Arus Lebih ....................................... 14
2.4.3.1 Penyetelan Arus ............................................... 15
2.4.3.2 Perhtungan Setelan Time Multiple Setting ....... 15
2.4.4 Penyetelan Relay Gangguan Tanah .............................. 16
2.4.4.1 Penyetelan Arus ............................................... 16
2.4.4.2 Perhtungan Setelan Time Multiple Setting ....... 16
2.5 Pengertian PMCB ..................................................................... 17
2.5.1 Fungsi PMCB .................................................................. 17
2.5.2 Cara Kerja PMCB............................................................ 18
2.5.2.1 Cara Kerja PMCB Secara Otomatis ................. 18
2.5.2.1 Cara Kerja PMCB Secara Manual ................... 19
2.6 Sistem Integrasi ....................................................................... 20
2.7 Sistem SCADA ......................................................................... 21

viii
2.7.1 Fungsi Utama Sistem SCADA ........................................ 23
2.7.2 Komponen – komponen pada Sistem SCADA… ........... 24
2.7.3 Software SCADA ............................................................ 28
2.7.4 Protokol Antarmuka IEC 101 dan IEC 104 ..................... 28

BAB III METODE PENELITIAN


3.1 Data-data Gardu Induk Talang Kelapa ..................................... 29
3.1.1 Trafo Daya ....................................................................... 30
3.2 Data – data Penyulang Srikandi ............................................... 32
3.2.1 Setting Rele ..................................................................... 32
3.2.2 Penghantar ....................................................................... 33
3.2.3 PMCB Musi Pahit ............................................................ 33
3.3 Peralatan ................................................................................... 35
3.4 Flowchart Pekerjaan Pengintegrasian ....................................... 37
3.5 Diagram Garis Tunggal Penyulang Srikandi ............................. 38
3.6 Pola Komunikasi Radio Data APD Area Palembang ................ 38

BAB IV PEMBAHASAN
4.1 Proses Komunikasi Sistem SCADA ........................................ 39
4.2 Proses Perencanaan Pengintegrasian PMCB dengan sistem
SCADA .................................................................................... 40
4.2.1 Hasil Survei ................................................................ .... 41
4.3 Integrasi PMCB – SCADA ....................................................... 44
4.4 Proses Penormalan Gangguan pada Penyulang
dengan Menggunakan Sistem SCADA ................................... 52
4.5 Perbandingan Jumlah Gangguan dan Lama Padam Penyulang
Sebelum dan Sesudah Terintegrasi SCADA ............................ 57
4.6 Pembahasan .............................................................................. 58

BAB V KESIMPULAN DAN SARAN


5.1 Kesimpulan ............................................................................... 60
5.2 Saran .......................................................................................... 60

DAFTAR PUSTAKA
LAMPIRAN

ix
DAFTAR GAMBAR

Halaman

Gambar 2.1 Sistem Tenaga Listrik................................................................... 6


Gambar 2.2 Blok Diagram Sistem Tenaga Listrik ........................................... 7
Gambar 2.3 Rangkaian Pengawatan Relay Arus Lebih .................................. 11
Gambar 2.4 Karakteristik Relay Seketika ........................................................ 11
Gambar 2.5 Karakteristik Relay Waktu Tertentu ............................................ 12
Gambar 2.6 Karakteristik Relay Waktu Terbalik ............................................ 13
Gambar 2.7 Rangkaian Pengawatan Relay GFR ............................................. 14
Gambar 2.8 Konstruksi Pemasangan PMCB .................................................. 17
Gambar 2.9 Konstruksi Pemutus Daya ............................................................ 19
Gambar 2.10 Hubungan Rele Proteksi dan Pemutus Daya ................................ 20
Gambar 2.11 Konfigurasi Sistem SCADA ........................................................ 23
Gambar 2.12 Intranet Storage, I/O LAN, Server main radio dan monitor......... 24
Gambar 2.13 Antar muka RTU DF 1725IED beserta modul-modul I/O ........... 26
Gambar 2.14 Wiring straight dari Port Ethernet ke Port Serial ........................ 28
Gambar 3.1 Gardu Induk Talang Kelapa ......................................................... 30
Gambar 3.2 Trafo Daya I 60 MVA ................................................................. 31
Gambar 3.3 PMCB Musi Pahit ........................................................................ 34
Gambar 3.4 Lokasi PMCB di Penyulang Srikandi .......................................... 34
Gambar 3.5 Flowchart Pekerjaan Pengintegrasian .......................................... 37
Gambar 3.6 Diagram Garis Tunggal Penyulang Srikandi ............................... 38
Gambar 3.7 Pola Komunikasi Radio Data APD Area Palembang .................. 38
Gambar 4.1 Arsitektur Komunikasi RTU dan Master Station ......................... 39
Gambar 4.2 Proses Perencanaan Penambahan Titik Remote .......................... 40
Gambar 4.3 Grafik Total Gangguan pada Penyulang di GI Talang Kelapa .... 41
Gambar 4.4 Grafik Koordinasi Relay .............................................................. 43
Gambar 4.5 Flowchart Pekerjaan .................................................................... 44
Gambar 4.6 Pola komunikasi point to multipoint ............................................ 45
Gambar 4.7 Perancangan Teleinformasi Plan .................................................. 45
Gambar 4.8 Prinsip Kerja Integrasi PMCB...................................................... 47
Gambar 4.9 Peralatan SCADA ........................................................................ 47
Gambar 4.10 Flowchart mekanisme pengintegrasian PMCB dengan Sistem
SCADA........................................................................................ 48
Gambar 4.11 Wiring CB, VT dan CT ................................................................ 49
Gambar 4.12 Wiring Sistem Kontrol dan Indikator ........................................... 49
Gambar 4.13 Wiring Power Supply untuk keadaan Reclose .............................. 50
Gambar 4.14 Wiring Relay Proteksi Vamp 40 ................................................... 50
Gambar 4.15 Wiring CB (Circuit Breaker)........................................................ 51
Gambar 4.16 Wiring VT dan CT........................................................................ 51
Gambar 4.17 HMI Master Station Titik Remote PMCB ................................... 52
Gambar 4.18 Flowchart Polling Status Normal Jaringan .................................. 53
Gambar 4.19 Tampilan Program pada Keadan Normal jaringan ....................... 54

x
Gambar 4.20 Flowchart polling status gangguan jaringan ................................ 55
Gambar 4.21 Tampilan Program pada Keadaan Normal Jaringan ................... 56
Gambar 4.22 Tampilan Kolom Pengoperasian untuk Open / Close PMCB ...... 56

xi
DAFTAR TABEL

Halaman

Tabel 2.1 Faktor α dan β tergantung pada kurva arus vs waktu ...................... 16
Tabel 3.1 Data Penghantar Penyulang Srikandi ............................................... 33
Tabel 3.2 Impedansi Penghantar ...................................................................... 33
Tabel 3.3 Spesifikasi PMCB ............................................................................ 35
Tabel 4.1 Data Settingan PMCB Musi Pahit ................................................... 42
Tabel 4.2 Koordinasi Waktu Kerja Terhadap Arus Gangguan antara Relay
PMT GI dengan PMCB Musi Pahit ............................................... 42
Tabel 4.3 Teleinformasi Data pada Pengintegrasian PMCB – SCADA .......... 46
Tabel 4.4 Data Jumlah Gangguan dan Lama Waktu Padam Penyulang
Srikandi Tahun 2013 dan Tahun 2014 ............................................. 57

xii
DAFTAR LAMPIRAN

Lampiran 1. Surat Kesepakatan Bimbingan Dosen Pembimbing I


Lampiran 2. Surat Kesepakatan Bimbingan Dosen Pembimbing II
Lampiran 3. Lembar Konsultasi Bimbingan Dosen Pembimbing I
Lampiran 4. Lembar Konsultasi Bimbingan Dosen Pembimbing II
Lampiran 5. Surat Rekomendasi Sidang Laporan Akhir
Lampiran 6. Surat Permohonan Magang dari Udiklat Palembang
Lampiran 7. Surat Permohonan Izin Pengambilan Data di APD Ampera
Lampiran 8. Lembar Uraian Kegiatan Magang di PT PLN 9Persero) Rayon
Sukarami
Lampiran 9. Data Arus Hubung Singkat 3 Fasa di UPT Palembang
Lampiran 10. Data Impedansi Kabel
Lampiran 11. Data Setelan Relay Penghantar, Transformator dan Penyulang
Lampiran 12. Diagram Garis Tuggal GI Talang kelapa
Lampiran 13. Diagram Garis Tuggal Penyulang Srikandi
Lampiran 14. Rekap Laporan Kinerja Penyulang
Lampiran 15. Data Settingan PMCB Musi Pahit
Lampiran 16. Surat Pelaksanaan Revisi Laporan Akhir

xiii