DATE Work Descriptions

01-08-2016 1. Coal feeder # 8C overhauling job is under progress.


2. Coal feeder # 8B & 8C main motor gearbox & COC gearbox oil replaced.
3. Boiler area ash cleaning done.
4. LHS DWLG both drain valves lapping work is under progress as valve passing was
reported.
(N.B: Jobs interrupted due to manpower engagement at U#7 due to exigency of the plant.)
02-08-2016 1. Coal feeder # 8C overhauling job is under progress.
2. Coal feeder # 8A main motor gearbox & COC gearbox oil replaced.
(N.B: Jobs interrupted due to manpower engagement at U#7 due to exigency of the plant.)
03-08-2016 1. Coal feeder # 8C overhauling job is completed
2. LHS DWLG both drain valves lapping work is under progress
04-08-2016 1. Coal feeder # 8D shutdown maintenance job is under progress
2. Coal feeder # 8D tail end pulley both bearing (6212 ZZ) replaced as found damaged
3. Mill #8E shutdown maintenance job is under progress
4. Mill #8E Bowl hub vertical portion above labyrinth seal area Crack found.
5. LHS DWLG both drain valves lapping work completed.

05-08-2016 1. Mill # 8A motor to gearbox alignment checked:


00
+0.01

-.01 +.01
-0.01 +0.02

00
00

Axial1 Axial2

Axial Final (A1-A2) Radial

00 00

-0.03 +0.02 +.02 00

-0.01 +0.01

2. COAL FEEDER #8B overhauling job started


3. Seal air fan #8B air leakage rectification job started
DATE Work Descriptions
06-08-2016 1. MILL#8D motor to gearbox alignment job completed
00
+0.02

+0.03 +0.02
+0.03 -0.01

+0.03
00

Axial1 Axial2

Axial Final (A1-A2) Radial

00 00

-0.03 -0.01 +.02 +0.03

+0.01 +0.02

2. COAL FEEDER #8B overhauling job under progress


3. Seal air fan #8B air leakage rectification job under progress
4. PA Fan # 8A blade pitch checking is under progress in presence of BHEL Mech &
C&I deptt. , problem observed with pneumatic actuator as it has deviations with
command & feedback.

07-08-2016
1. Coal feeder # 8D shutdown maintenance completed
2. COAL FEEDER #8B overhauling job under progress
3. ID Fan # 8A DE brg. End seal fitted after necessary modifications & maintenance

08-08-2016 1. Coal feeder # 8D belt tracking done & boxed up


2. COAL FEEDER #8B overhauling job under progress
3. COAL FEEDER #8E shutdown maintenance job started
4. Seal air fan #8B air leakage rectification job completed & trial run given.
5. MILL#8E motor to gearbox alignment job completed
00
-0.01

-0.01 -0.01
-0.01 -0.02

-0.02
00

Axial1 Axial2
DATE Work Descriptions

Axial Final (A1-A2) Radial

00 00

+0.01 00 +0.02 +0.03

-0.01 +0.04

09-08-2016 1. COAL FEEDER #8B overhauling job under progress


2. COAL FEEDER #8B new conveyor belt fitted
3. COAL FEEDER #8B tail end pulley bearing housing & bearing outer racer clearance
should be reduced as loose fitting observed
4. COAL FEEDER #8E shutdown maintenance job is under progress
5. MILL#8F motor to gearbox alignment job started
Before alignment readings:
00
_-.06

-.08 +.05
-0.05 -.04

+.03
00

Axial1 Axial2

Axial Final (A1-A2) Radial

00 00

-0.04 +0.1 +.27 -.10

-0.09 +0.14
DATE Work Descriptions
10-08-16 1. MILL#8F motor to gearbox alignment job completed alignment readings:
00
00

00 .00
00 00

00
00

Axial1 Axial2

Axial Final (A1-A2) Radial

00 00

00 00 00 +0.01

00 +0.01

2. COAL FEEDER #8B overhauling job under progress


3. COAL FEEDER #8E shutdown maintenance job is under progress

11-08-16 1. COAL FEEDER #8E shutdown maintenance job completed


2. Mill #8E LOP #A coupling & alignment checked by BHEL Expert.
3. 20 mm thick MS plate bending job started at central workshop for MILL air throat
liners
4. Coal feeder #8B tail pulley bearing housing repairing job started at Central workshop.

12-08-2016 1. COAL FEEDER #8F shutdown maintenance job is under progress


2. 20 mm thick MS plate bending job completed at central workshop for MILL air throat
liners

13-08-2016 1. COAL FEEDER #8F shutdown maintenance job completed


2. COAL FEEDER #8F trial run done
3. Mill #8E 20 mm thick plate welding done at damaged air throat positions
DATE Work Descriptions
16-08-2016 1. Mill #8A 20 mm thick plate welding done at damaged air throat positions
2. FD Fan #8A hydraulic oil line hose fitted & blade pitch operated
3. APH #8B Guide bearing area ash cleaning is under progress.

17-08-2016 1. APH #8B Guide bearing area ash cleaning is under progress.
2. Coal Feeder #8B Tail pulley fitted along with two nos new bearing (6212 ZZ)
3. FD Fan #8A upper housing fitted & bolts tightening done.

18-08-2016 1. Coal Feeder #8B belt tracking done


2. Coal Feeder #8B overhauling job completed
3. APH #8B Guide bearing area ash cleaning job completed.

26-08-2016 1. APH #8B Guide bearing lub oil line(supply&return line) open for cleaning
2. Mill #8A labyrinth seal fittings job under progress
3. Mill #8D bowl hub grinding job under progress
4. Coal Feeder #8B trial run done
05-09-2016 1. APH #8B Guide bearing lub oil line(supply&return line) cleaning job completed
2. APH #8B seal repairing job completed(cold end)
3. MILL 8E bowl hub welding job in progress
4. ESP out let duct ash cleaning job in progress
TO
THE SITE INCHARGE(BHEL)
DPL SITE,DURGAPUR
PLEASE GIVE US 30 NOS(THIRTY PIECES) CORGATED SHEET FOR
UNIT #8 MINI STORE BUILD UP PURPOSE

THANKS