*(Tick as appropriate)
Electrical
No Comments
Civil
1 Piles RFIs/Reports to be provided. Noted & covered in sec 5
2 RC test report for T 2511 to be provided. Foundation poured with pedestal according to
anchor bolt(see drawing)
Instrument
Page 1 of 4
Classification: General
Sl. No. Comments (Identify Section/Page/Paragraph) Response
1 Loop folder for all instruments related with this subsystem shall be
added in the ICSS subsystem MCC Dossier. This comment should be added in ICSS SYSTEM
2
Blind flange is missing for Air manifold on top of Equipment No. T-2511. Done at site
Page 2 of 4
Classification: General
0
Conclusion
Closed.
Closed.
Closed.
Page 3 of 4
Classification: General
Conclusion
Closed.
Closed.
Name: Dilio/Alaa/Munther
Date: 2/6/2018.
Page 4 of 4
Classification: General