SUBJECT:
DATE:
Item No.
I.
II.
A.
B.
C.
D.
III.
A.
B.
C.
D.
E.
F.
Barracks Extension Phil Army Head Quarters
Complete Supply of Labor, Tools , Materials , Equipment, Consumables and
and Furnishing Works of MFO-MESS HALL HHSG BUILDING
6-May-19
Description
GENERAL REQUIREMENTS
Mobilization / Demobilization
Bonds and Insurances
1.) Performance & Surety Bond
2.) Guarantee Bond
Permits receipted & unreceipted (all required permits, required
licenses and fees / clearances of local government.
Temporary Facilities
1.) Contractor's Office
2.) Warehouse
Temporary Power and Water Supply including required deposits.
Equipment Support (pls. enumerate)
Materials Handling/Lifting and Safekeeping of Materials (including
OFM)
Safety Protection in compliance with safety guidelines of the Owner
including Sign ages, etc.
As-built plans & E-files
STRUCTURAL
SITE PREPARATION
1.1) Site clearing
1.2) Excavation
1.3) Back fill
1.3) Soil treatment/ poisoning
Others (pls. specify)
FORMWORKS
1.1) Lintel Beam
1.2) Stiffener Column
1.3) Column
1.4) beam
1.5) SOG and Kitchen & laundry slab
Rebar Works
1.1) Lintel Beam&Stiffener Column
1.2)beam
1.3) Column
1.4) SOG
1.5) kitchen and laundry counter
CONCRETING
1.1) Lintel Beam&Stiffener Column
1.2)beam
1.3) Column
1.4) SOG
1.5) kitchen and laundry counter
ARCHITECTURAL
CEILING WORKS
1.1) Supply and Installation of 12mm thk. Gypsum Board, CF-01
FINISHING WORKS
1 lot
1 lot
lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
8.1 sq.m
15.36 sq.m
11.52 sq.m
12 sq.m
4.88 sq.m
122.7 kg
103.2 kg
136.18 kg
197.4 kg
40 kg
2.13 cu.m
0.9 cu.m
1.213 cu.m
2.1 cu.m
0.3 cu.m
26.44 sq.m
21.28 sq.m
168 sq.m
47.72 sq.m
13.1 sq.m
21.6 sq.m
13.03 sq.m
21.44 sq.m
4.8 sq.m
16.352 sq.m
48.38 sq.m
41.6 sq.m
1 set
2 set
1 set
2 set
1 set
PROJECT:
SUBJECT:
DATE:
Item No.
I.
II.
A.
B.
C.
D.
III.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
Barracks Extension Phil Army Head Quarters
6-May-19
Description
GENERAL REQUIREMENTS
Mobilization / Demobilization
Bonds and Insurances
1.) Performance & Surety Bond
2.) Guarantee Bond
Permits receipted & unreceipted (all required permits, required
licenses and fees / clearances of local government.
Temporary Facilities
1.) Contractor's Office
2.) Warehouse
Temporary Power and Water Supply including required deposits.
Equipment Support (pls. enumerate)
Materials Handling/Lifting and Safekeeping of Materials (including
OFM)
Safety Protection in compliance with safety guidelines of the Owner
including Sign ages, etc.
As-built plans & E-files
STRUCTURAL
SITE PREPARATION
1.1) Site clearing
1.2) Excavation
1.3) Back fill
1.3) Soil treatment/ poisoning
Others (pls. specify)
FORMWORKS
1.1) Lintel Beam
1.2) Stiffener Column
1.3) Column
1.4) beam
1.5) SOG and Kitchen & laundry slab
Phenolic board or 1/4 ordinary plywood
cocolumber 2"x3"3 m
CWN #3
CWN #2
Rebar Works
1.1) Lintel Beam&Stiffener Column
1.2)beam
1.3) Column
1.4) SOG
1.5) kitchen and laundry counter
10 MM DIA X 6M RSB
12 MM DIA X 6M RSB
16 MM DIA X 6M RSB
TIE WIRE
CONCRETING
1.1) Lintel Beam&Stiffener Column
1.2)beam
1.3) Column
1.4) SOG
1.5) kitchen and laundry counter
SAND
CEMENT
GRAVEL
ARCHITECTURAL
CEILING WORKS
1.1) Supply and Installation of 12mm thk. Gypsum Board, CF-01
Concrete Nutralizer
Boral powder/ Skim Coat
primer
top coat (semi Gloss)
220# sand paper
big roller with tray
baby roller
150# sand paper
FINISHING WORKS
FINISHING WORKS
1.) Supply and installation of 100mm. Drywall partition (gyspsum in
metal stud framing)
2.) Supply and installation of 100mm. CHB and other Preparation
Works.
3.) Supply and installation of 150mm. CHB and other Preparation
Works.
Metal Stud
Metal Tracks
Gypsum Board
100 thk chb
150 thk chb
ROOFING SYSTEM
Pre-painted Metal Roofing Sheet GA 26, Long Span
Pre-painted Metal Roofing Sheet GA 26, 2.44m
150mm x 65mm x 20mm x 2mm LC-Purlins (6m)
255mm x 90mm x 25mm x 5mm thk. LC- Channel beam (6m)
Welding Rod (Fuji)
Oxygen(content only)
Acetylene(content only)
Hacksaw Blade
Paint brush # 4
Paint brush # 2
Red Lead Primer
Paint Thinner
FURNISHING WORKS
1.)Supply of 6-seater dining set
2.)Supply and installation of double deck bed
3.)Supply of bar chair (DR-332)
ELECTRICAL AND AUXILIARY WORKS
PLUMBING WORKS
nsumables and Technical Supervision for the Interior
BUILDING
1 lot
1 lot
lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot
1 lot -
1 lot -
8.1 sq.m
15.36 sq.m
11.52 sq.m
12 sq.m
4.88 sq.m
5 kg 70.00 350.00
5 kg 70.00 350.00
122.7 kg
103.2 kg
136.18 kg
197.4 kg
40 kg
30 kg 16.00 480.00
2.13 cu.m
0.9 cu.m
1.213 cu.m
2.1 cu.m
0.3 cu.m
168 sq.m
47.72 sq.m
13.1 sq.m
21.6 sq.m
13.03 sq.m
21.44 sq.m
4.8 sq.m
48.38
41.6
1 set
2 set
1 set
1 set
3 set
3 pcs
ANNEX A (CONCRETING WORKS MATERIAL BREAKDOWN)
CEMENT
QTY UNITS STRUCTURE CLASS
GRAVEL
QTY UNITS STRUCTURE CLASS