PROJECT:

SUBJECT:

DATE:

Item No.

I.

II.
A.
B.

C.

D.

III.
A.

B.
C.

D.

E.
F.
Barracks Extension Phil Army Head Quarters
Complete Supply of Labor, Tools , Materials , Equipment, Consumables and
and Furnishing Works of MFO-MESS HALL HHSG BUILDING
6-May-19

Description

GENERAL REQUIREMENTS
Mobilization / Demobilization
Bonds and Insurances
1.) Performance & Surety Bond
2.) Guarantee Bond
Permits receipted & unreceipted (all required permits, required
licenses and fees / clearances of local government.
Temporary Facilities
1.) Contractor's Office
2.) Warehouse
Temporary Power and Water Supply including required deposits.
Equipment Support (pls. enumerate)
Materials Handling/Lifting and Safekeeping of Materials (including
OFM)
Safety Protection in compliance with safety guidelines of the Owner
including Sign ages, etc.
As-built plans & E-files
STRUCTURAL
SITE PREPARATION
1.1) Site clearing
1.2) Excavation
1.3) Back fill
1.3) Soil treatment/ poisoning
Others (pls. specify)
FORMWORKS
1.1) Lintel Beam
1.2) Stiffener Column
1.3) Column
1.4) beam
1.5) SOG and Kitchen & laundry slab
Rebar Works
1.1) Lintel Beam&Stiffener Column
1.2)beam
1.3) Column
1.4) SOG
1.5) kitchen and laundry counter
CONCRETING
1.1) Lintel Beam&Stiffener Column
1.2)beam
1.3) Column
1.4) SOG
1.5) kitchen and laundry counter
ARCHITECTURAL
CEILING WORKS
1.1) Supply and Installation of 12mm thk. Gypsum Board, CF-01

1.2) Supply and Installation of 12mm thk. M.R. Gypsum Board


(T&B AND KITCHEN AREA )
PAINTING WORKS
1.) Concrete Surface (WALL)
1.1) Supply and Application of (Paint Approved color)Paint Finish
(Field Wall),
2.) Ceiling

2.1) Supply and Application(Paint Approved Color) in Eggshell


Paint Finish, CF-01

FINISHING WORKS

1.) FLOOR FINISHES including 2" Concrete Topping, Concrete


Measures and other Preparation Works.
1.1) Installation of 600mm x 600mm Ceramic Tile, FF-01
1.2) Installation of 600mm x 600mm Ceramic Tile,non-skid FF-02
(Kitchen and Dining Area)
1.3) Installation of 300mm x 300mm Ceramic Tile, FF-03 (Toilet
floor)
1.4) Installation of 300mm x 300mm Ceramic Tile, WF-01 (Toilet
wall)
1.5) Installation of 300mm x 300mm Ceramic Tile, Kitchen Counter
& laundry
FINISHING WORKS
1.) Supply and installation of 100mm. Drywall partition (gyspsum in
metal stud framing)
2.) Supply and installation of 100mm. CHB and other Preparation
Works.
3.) Supply and installation of 150mm. CHB and other Preparation
Works.
Doors, Jambs and Hardwares
1.) Installation and supply of Solid Wood Door in Laminated Finish
including Installation
of Door Jamb and Hardwares.
1.1) D-01- Panel do0r in stain finish (0.8mx2.1m)
1.2) D-02- Pvc hollow core with louver (0.8mx2.1m)
1.3) D-03- Panel Door in stain finish (.9mx2.1m)
Glass and Glazing Works(window)
1.) Installation of Sliding Window in Aluminum Framing System
Installation including of Hardwares.
1.1) W-01 -(0.3mx.4m) toilet
1.2) W-02 -(.8mx1.2) kitchen Area
nsumables and Technical Supervision for the Interior Renovation

Qty Unit Unit Cost Total Cost

1 lot

1 lot

lot

1 lot

1 lot

1 lot

1 lot

1 lot

1 lot

1 lot
1 lot

8.1 sq.m

15.36 sq.m

11.52 sq.m

12 sq.m

4.88 sq.m

122.7 kg

103.2 kg

136.18 kg

197.4 kg

40 kg

2.13 cu.m

0.9 cu.m

1.213 cu.m

2.1 cu.m

0.3 cu.m

26.44 sq.m

21.28 sq.m
168 sq.m

47.72 sq.m

13.1 sq.m

21.6 sq.m

13.03 sq.m

21.44 sq.m

4.8 sq.m

16.352 sq.m

48.38 sq.m

41.6 sq.m
1 set

2 set

1 set

2 set

1 set
PROJECT:
SUBJECT:

DATE:

Item No.

I.

II.
A.

B.

C.

D.
III.
A.

B.
C.

D.
E.

F.
G.

H.

I.
J.
Barracks Extension Phil Army Head Quarters

Complete Supply of Labor, Tools , Materials , Equipment, Consumables and


Renovation and Furnishing Works of MFO-MESS HALL HHSG BUILDING

6-May-19

Description

GENERAL REQUIREMENTS
Mobilization / Demobilization
Bonds and Insurances
1.) Performance & Surety Bond
2.) Guarantee Bond
Permits receipted & unreceipted (all required permits, required
licenses and fees / clearances of local government.
Temporary Facilities
1.) Contractor's Office
2.) Warehouse
Temporary Power and Water Supply including required deposits.
Equipment Support (pls. enumerate)
Materials Handling/Lifting and Safekeeping of Materials (including
OFM)
Safety Protection in compliance with safety guidelines of the Owner
including Sign ages, etc.
As-built plans & E-files
STRUCTURAL
SITE PREPARATION
1.1) Site clearing
1.2) Excavation
1.3) Back fill
1.3) Soil treatment/ poisoning
Others (pls. specify)
FORMWORKS
1.1) Lintel Beam
1.2) Stiffener Column
1.3) Column
1.4) beam
1.5) SOG and Kitchen & laundry slab
Phenolic board or 1/4 ordinary plywood
cocolumber 2"x3"3 m
CWN #3
CWN #2

Rebar Works
1.1) Lintel Beam&Stiffener Column
1.2)beam
1.3) Column
1.4) SOG
1.5) kitchen and laundry counter
10 MM DIA X 6M RSB
12 MM DIA X 6M RSB
16 MM DIA X 6M RSB
TIE WIRE
CONCRETING
1.1) Lintel Beam&Stiffener Column
1.2)beam
1.3) Column
1.4) SOG
1.5) kitchen and laundry counter
SAND
CEMENT
GRAVEL
ARCHITECTURAL
CEILING WORKS
1.1) Supply and Installation of 12mm thk. Gypsum Board, CF-01

1.2) Supply and Installation of 12mm thk. M.R. Gypsum Board


(T&B AND KITCHEN AREA )
9 mm Gypsum board
16ft. Metal furring
w clip
Hanger rod full treaded
1' black screw
PAINTING WORKS
1.) Concrete Surface (WALL)
1.1) Supply and Application of (Paint Approved color)Paint Finish
(Field Wall),
2.) Ceiling

2.1) Supply and Application(Paint Approved Color) in Eggshell


Paint Finish, CF-01

Concrete Nutralizer
Boral powder/ Skim Coat
primer
top coat (semi Gloss)
220# sand paper
big roller with tray
baby roller
150# sand paper
FINISHING WORKS

1.) FLOOR FINISHES including 2" Concrete Topping, Concrete


Measures and other Preparation Works.
1.1) Installation of 600mm x 600mm Ceramic Tile, FF-01
1.2) Installation of 600mm x 600mm Ceramic Tile,non-skid FF-02
(Kitchen and Dining Area)
1.3) Installation of 300mm x 300mm Ceramic Tile, FF-03 (Toilet
floor)
1.4) Installation of 300mm x 300mm Ceramic Tile, WF-01 (Toilet
wall)
1.5) Installation of 300mm x 300mm Ceramic Tile, Kitchen Counter
& laundry
600mm x 600mm Ceramic Tile
600mm x 600mm Ceramic Tile,non-skid
300mm x 300mm Ceramic Tile
300mm x 300mm Ceramic Tile polished
Tile Adhesive
cement
grout

FINISHING WORKS
1.) Supply and installation of 100mm. Drywall partition (gyspsum in
metal stud framing)
2.) Supply and installation of 100mm. CHB and other Preparation
Works.
3.) Supply and installation of 150mm. CHB and other Preparation
Works.
Metal Stud
Metal Tracks
Gypsum Board
100 thk chb
150 thk chb

1.) Installation and supply of Solid Wood Door in Laminated Finish


including Installation
of Door Jamb and Hardwares.
1.1) D-01- Panel do0r in stain finish (0.8mx2.1m)
1.2) D-02- Pvc hollow core with louver (0.8mx2.1m)
1.3) D-03- Panel Door in stain finish (.9mx2.1m)
Panel do0r in stain finish (0.8mx2.1m)
panel door with louver (0.8mx2.1m)
Panel Door in stain finish (.9mx2.1m)
Heavy duty butt hinge
deadbolt
cylindrical knob type lockset
level type handel tubular lockset
Glass and Glazing Works(window)
1.) Installation of Sliding Window in Aluminum Framing System
Installation including of Hardwares.
1.1) W-01 -(0.3mx.4m) toilet
1.2) W-02 -(.8mx1.2) kitchen Area
Awning type window (0.3x0.4m)
Sliding window (0.8x1.2m)

ROOFING SYSTEM
Pre-painted Metal Roofing Sheet GA 26, Long Span
Pre-painted Metal Roofing Sheet GA 26, 2.44m
150mm x 65mm x 20mm x 2mm LC-Purlins (6m)
255mm x 90mm x 25mm x 5mm thk. LC- Channel beam (6m)
Welding Rod (Fuji)
Oxygen(content only)
Acetylene(content only)
Hacksaw Blade
Paint brush # 4
Paint brush # 2
Red Lead Primer
Paint Thinner
FURNISHING WORKS
1.)Supply of 6-seater dining set
2.)Supply and installation of double deck bed
3.)Supply of bar chair (DR-332)
ELECTRICAL AND AUXILIARY WORKS
PLUMBING WORKS
nsumables and Technical Supervision for the Interior
BUILDING

Qty Unit Unit Cost Total Cost

1 lot

1 lot

lot

1 lot

1 lot

1 lot

1 lot

1 lot

1 lot

1 lot -
1 lot -

8.1 sq.m

15.36 sq.m

11.52 sq.m

12 sq.m

4.88 sq.m

17 pcs 330.00 5,610.00

35 length 280.00 9,800.00

5 kg 70.00 350.00

5 kg 70.00 350.00

122.7 kg

103.2 kg

136.18 kg

197.4 kg

40 kg

134 PCS 156.00 20,904.00

12 PCS 223.00 2,676.00

21 PCS 394.00 8,274.00

30 kg 16.00 480.00

2.13 cu.m
0.9 cu.m

1.213 cu.m

2.1 cu.m

0.3 cu.m

12 CU.M 1,035.00 12,420.00

148 BAGS 260.00 38,480.00

8 CU.M 1,010.00 8,080.00

10 pcs 410.00 4,100.00

70 length 112.00 7,840.00

130 pcs 4.00 520.00

70 pcs 65.00 4,550.00

500 pcs 1.00 500.00

168 sq.m

47.72 sq.m

2 gallons 429.00 858.00


3 bags 660.00 1,980.00
20 gallons 600.00 12,000.00
12 gallons 652.00 7,824.00
30 pcs 9.00 270.00
3 pcs 150.00 450.00
3 pcs 94.00 282.00
30 pcs 9.00 270.00

13.1 sq.m

21.6 sq.m

13.03 sq.m

21.44 sq.m

4.8 sq.m

40 pcs 199.00 7,965.53


66 pcs 199.00 13,134.00
159 pcs 47.00 7,485.01
262 pcs 47.00 12,316.09
19 bags 390.00 7,410.00
4 bags 260.00 1,040.00
5 bags 48.00 240.00
16.352

48.38

41.6

12 length 75.00 900.00


2 length 75.00 150.00
7 pcs 410.00 2,870.00
600 pcs 10.00 6,000.00
520 pcs 16.00 8,320.00

1 set

2 set

1 set

1 pcs 4,500.00 4,500.00


2 pcs 4,500.00 9,000.00
1 pcs 5,000.00 5,000.00
12 pcs 90.00 1,080.00
1 set 640.00 640.00
1 set 570.00 570.00
3 set 600.00 1,800.00
2.58 sq.ft 550 1,419.00

10.33 sq.ft 550 5,681.50

3 sheet 732.00 2,196.00

6 sheet 480.00 2,880.00

5 length 1,090.00 5,450.00

2 length 4,057.00 8,114.00

2 box 2330.00 4,660.00

2 tank 1575.00 3,150.00

2 tank 2000.00 4,000.00

3 pc. 65.00 195.00

2 pc. 65.00 130.00

2 pc. 35.00 70.00

4 gal. 429.00 1,716.00

2 gal. 552.00 1,104.00

1 set

3 set

3 pcs
ANNEX A (CONCRETING WORKS MATERIAL BREAKDOWN)

REINFORCE STEEL BARS

QTY UNITS SIZE DIAX 6M. STRUCTURE


9 PCS 10 MM LINTEL 134 PCS
9 PCS 12 MM STIFF. COL 9 PCS
12 PCS 10 MM LINTEL BEAM ANMD STIFF COL 21 PCS
7 PCS 16MM BEAM
11 PCS 10 MM BEAM
36 PCS 10 MM WALL
22 PCS 10 MM WALL
9 PCS 16 MM COLUMN
15 PCS 10 MM COLUMN
17 PCS 10 MM SLAB
12 PCS 10MM COUNTER
5 PCS 16 MM FOOTING

SAND (FINE AGREGIATE)

QTY UNITS STRUCTURE CLASS

1.06 CU. M LINTEL BEAM & STIFF COL A


0.6 CU. M COLUMN AA
0.45 CU.M BEAM AA
0.67 CU.M MORTAR CHB WALL B
3.36 CU.M FILLER CHB WALL B
2.76 CU.M PLASTERING CHB WALL B
1.3 CU.M SOG AND FOOTING A
1.7 CU.M LAUNDY AND KITCHEN SINK B
11.9 TOTAL
12 CU.M

CEMENT
QTY UNITS STRUCTURE CLASS

19 BAGS LINTEL BEAM & STIFF COL A


17 BAGS COLUMN AA
10.8 BAGS BEAM AA
8 BAGS MORTAR CHB WALL B
40 BAGS FILLER CHB WALL B
33 BAGS PLASTERING CHB WALL B
18 BAGS SOG AND FOOTING A
2 BAGS LAUNDY AND KITCHEN SINK B
147.8
148 BAGS TOTAL

GRAVEL
QTY UNITS STRUCTURE CLASS

3.3 CU.M LINTEL BEAM & STIFF COL A


0.8 CU.M COLUMN AA
0.9 CU.M BEAM AA
2.4 CU.M SOG AND FOOTING A
0.33 CU.M LAUNDY AND KITCHEN SINK B
7.73
8 CU.M TOTAL
10MM
12MM
16MM