*(Tick as appropriate)
Civil
1 Isolation checklist for V 2482 to be signed by KEIL. Noted and covered in Sec. 5
Trestle has different sub system Its covered in SYS-
2 Reports to be provided for trestle foundation. 059-001.
Electrical
No Comments
Page 1 of 4
Classification: General
Sl. No. Comments (Identify Section/Page/Paragraph) Response
Instrument
Noted and covered in Sec. 11.1
Instruments and valves 02-PCV-2483B, 02-LT-2483A,02- LSH-2681, 02-RO-
2681A, 02-RO-2681B, 02-RO-2682A,, 02-LSH-26882, 02-LG-2682 that are
1 part of this subsystem (refer P&ID 383-290) are not included in the list of
instrument, PTJ to add the same in this dossier.
Name:Suresh/Dilio/Munther Name:Ehab
Date: 10/5/2018. Date: 29/5/2018.
Note: Please add/ insert rows for additional comments/ response(s).Do not add additional column.
Page 2 of 4
Classification: General
1
Conclusion
Closed.
Closed.
Closed.
Page 3 of 4
Classification: General
Conclusion
Closed.
Closed.
Closed.
Name:Munther/Alaa/Dilio
Date: 10/6/2018.
Page 4 of 4
Classification: General