Anda di halaman 1dari 9

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0 04-21-19 18L043 ISSUED FOR CONSTRUCTION MAB
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

MAB
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

---
ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
21 APR 19
21 APR 19

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
Saudi Aramco 2616-ENG (03/99)

ABQAIQ PLANT
PUMPS GM-239 A/B/C AT ABQAIQ
REPLACING WASTEWATER INJECTION
SCOPE OF WORK – U/G RADAR MAPPING
For

DOC

SAUDI ARABIA
DWG.TYPE
APRIL 2019
EWO#18L043

Scope of Work

PREPARED BY

X06

JO / EWO:
A
PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

18L043
U/G RADAR MAPPING (SCANNING)

RM-18L043
DRAWING NO.
Daylight All Underground Pipes at YBP

8
1
OF
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

TABLE OF CONTENTS
MAB

1.0 PROJECT DESCRIPTION

2.0 HEALTH, SAFETY AND ENVIRONMENT (HSE) REQUIREMENTS

3.0 CODES, STANDARDS AND SPECIFICATIONS


ISSUED FOR CONSTRUCTION

4.0 WORK DESCRIPTION


DESCRIPTION

5.0 DELIVERABLES

6.0 ATTACHMENTS
JO/EWO

18L04304-21-19
NO. DATE
REV

DISCIPLINE
ENGINEER
MAB
21 APR 19
DATE:
PROJECT
ENGINEER
---

DATE: 21 APR 19
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SCOPE OF WORK – U/G RADAR MAPPING DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

REPLACING WASTEWATER INJECTION DOC 2


X06 RM-18L043
PUMPS GM-239 A/B/C AT ABQAIQ A OF 1
ABQAIQ PLANT SAUDI ARABIA JO / EWO: 18L043 8
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 PROJECT DESCRIPTION:
ENGG CERT

MAB

The objective of this project is to daylight all underground piping at 9 petroleum products
receiving stations using latest Saudi Aramco Engineering Standards at YBP.
This objective will be achieved by providing multiple above ground steel piperacks with new
foundations to support the piping.
Construction of foundations pose a risk of hitting underground facilities, and hence radar
ISSUED FOR CONSTRUCTION

mapping survey need to be conducted for proper siting of piperack foundations.


DESCRIPTION

2.0 HEALTH, SAFETY AND ENVIRONMENT (HSE) REQUIREMENTS


2.1 Subcontractor employees, agents shall comply at all times with all applicable Saudi
Arab Government safety, health and environmental regulations and all Saudi Aramco
General Instructions (G.I.s), and other related rules and regulations. Specifically,
Subcontractor shall comply with the provisions of the Saudi Aramco Construction Safety
Manual (CSM), Saudi Aramco Construction Safety Manual Handbook (CSMH), and all
other such related requirements, specifications and standards as are made known to
Subcontractor by Contractor/Saudi Aramco. In case of conflicting requirements, the
JO/EWO

most stringent requirement shall apply. Sub-contractor shall prepare and submit a
18L043

Hazard Identification Plan (HIP) to SAMPT/JACOBS-ZATE for review and approval


within five (5) days upon award of the contract.
04-21-19
DATE

2.2 Failure to Comply


Should Subcontractor fail to comply with any of the requirements, Saudi Aramco
NO.
REV

DISCIPLINE reserves the right to notify Subcontractor of this situation. Upon receiving such
ENGINEER notification, Subcontractor shall immediately take all necessary corrective actions. Any
MAB
corrective action shall be taken at Subcontractor's expense. If Subcontractor fails to
21 APR 19
DATE: take prompt corrective action, the Client Representative may direct Subcontractor to
PROJECT
ENGINEER suspend all or part of the Work until satisfactory corrective action has been taken.
--- Costs incurred by Subcontractor because of such Work suspension shall be solely
DATE: 21 APR 19 Subcontractor's responsibility, and any resultant Subcontractor performance delays
CERTIFIED shall not be deemed excusable hereunder.

DATE: 2.3 Traffic Safety


CONSTRUCTION
AGENCY All Client (S.A.) posted traffic regulations shall always be followed. Speed limit, belts,
mobile, parking.
DATE:
OPERATIONS 2.4 Loss Prevention Program
Subcontractor shall prepare and submit a job-specific Hazard Identification Plan (HIP),
DATE: to the Client Representative for approval no later than fifteen (15) working days before
CONTROL NUMBER

starting Work. Subcontractor shall ensure full implementation of the Program.


VERIFICATION

Subcontractor shall appoint a qualified Safety Supervisor.


EDSD

The Program shall outline specific essential measures to be taken by Subcontractor to


DATE:
BY:

prevent human injuries, property/equipment damage, loss of process, or damage to the


environment and to ensure compliance with applicable requirements.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

2.5 Work Permits


(DCC) NO. _____________________

SCOPE OF WORK – U/G RADAR MAPPING DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

REPLACING WASTEWATER INJECTION DOC 3


X06 RM-18L043
PUMPS GM-239 A/B/C AT ABQAIQ A OF 1
ABQAIQ PLANT SAUDI ARABIA JO / EWO: 18L043 8
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Subcontractor shall obtain a Work Permit (Saudi Aramco form 924-1 through 924-4) for
ENGG CERT

any Work to be carried out during each shift in any Saudi Aramco specified "Restricted
Area" or as may be required by the Client Representative. It shall be Subcontractor's
MAB

responsibility to ascertain, in advance, whether the Work area is designated a


Restricted Area. The Client Representative can give guidance on Restricted Area
locations. Subcontractor shall only provide qualified and certified craft personnel to
execute and/or supervise Work. Work Permit courses are provided by the Loss
Prevention Department. The certificates of all Saudi Aramco contractors shall be
approved by the proponent organization superintendent.
ISSUED FOR CONSTRUCTION

Supervisory personnel or other qualified staff must always be present at the Work Site
DESCRIPTION

while any Work is in progress. All Work Permit procedures shall be carried out by
Subcontractor in accordance with Saudi Aramco G.I. 2.100, Work Permit System.

2.6 Field Investigation Equipment/Vehicles


All equipment shall comply with best industry standards and be maintained in good
condition. All Subcontractor operators shall be qualified and certified.

2.7 Personal Protective Equipment (PPE)


Subcontractor shall, as a minimum, provide, maintain and enforce the use of the items
JO/EWO

of personal protective equipment (PPE) required for such activities and acceptable to
18L043

client (Saudi Aramco) representative.


04-21-19
DATE

2.8 Transportation
Subcontractor shall ensure that passengers shall travel only in vehicles that are
provided with passenger seats. This requirement shall apply for travel to and from any
NO.
REV

DISCIPLINE
Work Site, and at the Work Site itself. Seat belts shall be installed for all seats and
ENGINEER used in all vehicles carrying personnel (except in the case of buses where seat belts
MAB
are mandatory only for the driver).
21 APR 19
DATE:
PROJECT
ENGINEER The towing of small equipment is allowed, but only after the equipment is properly and
--- safely connected to the tow vehicle (i.e. all safety pins, safety chains, shackles and
DATE: 21 APR 19 brake/indicator lights are in place). The towing speed of the vehicle shall not exceed 40
CERTIFIED kilometers per hour at any time within Saudi Aramco facilities and project sites. For
highway travel, such equipment shall not be towed, but shall be carried in a flat bed
DATE:
truck, etc.
CONSTRUCTION
AGENCY
2.9 Site Clean-up
Subcontractor shall always maintain good housekeeping. Subcontractor shall clean all
DATE:
areas impacted by field work activities and restore to original condition before
OPERATIONS
demobilizing from site.

DATE: 3.0 STANDARDS, CODES AND SPECIFICATIONS


CONTROL NUMBER
VERIFICATION

The Subcontractor shall perform the work in accordance with the applicable Codes, Standards
and Specifications listed below. Specific reference may be made in the following sections of the
EDSD

Scope of Work to sections of these Codes, Standards and Specifications. This does not relieve
DATE:

the Subcontractor of the obligation to comply with the requirements of all applicable sections of
BY:

Codes, Standards and Specifications. Standards and Specifications listed below are not all
REVISIONCERTIFICATION

inclusive; portions of other Saudi Aramco, Industry, National, and International Codes shall also
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

be applied as appropriate
(DCC) NO. _____________________

SCOPE OF WORK – U/G RADAR MAPPING DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

REPLACING WASTEWATER INJECTION DOC 4


X06 RM-18L043
PUMPS GM-239 A/B/C AT ABQAIQ A OF 1
ABQAIQ PLANT SAUDI ARABIA JO / EWO: 18L043 8
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.1 SAUDI ARAMCO Engineering Standards and Specifications
ENGG CERT

The work shall conform to the latest revision of the following Saudi Aramco
Standards and Specifications:
MAB

SAES-A-100 Survey Coordinates, Datum's and Data Formats


SAES-A-202 Saudi Aramco Engineering Drawing Preparation
G.I.2.100 Work Permit System
ISSUED FOR CONSTRUCTION

Saudi Aramco Construction Safety Manual.


3.2 Industrial Codes, Standards and Specifications
DESCRIPTION

The work shall conform to the latest edition of the following Industry Codes and
Specifications:

ASCE 38-02 Standard Guideline for the Collection and Depiction of Existing
Subsurface Utility Data
PIP CVS02005 Topographic and Plant Surveys Specification.
JO/EWO

18L043

4.0 SCOPE OF WORK


04-21-19
DATE

4.1 General
4.1.1 The objective of the U/G Radar Mapping (Scanning) is to determine the
NO.
REV

elevations and exact locations of underground utilities at the proposed locations


DISCIPLINE
ENGINEER
of the new facilities of this project.
MAB

DATE:
21 APR 19 4.1.2 This scope of work describes only the technical content of the activities
PROJECT required for this job. It must be read in conjunction with the other contract
ENGINEER
---
schedules to obtain a complete understanding of the full requirements of the
21 APR 19
Contract.
DATE:
CERTIFIED
4.1.3 The U/G Radar Mapping (Scanning) shall be conducted by a Sub-Contractor
from the list of Saudi Aramco approved Subcontractors.
DATE:
CONSTRUCTION
AGENCY 4.1.4 All work shall be performed to the satisfaction of the Saudi Aramco
representative. Any survey, report or other document that does not meet the
DATE: Saudi Aramco requirements shall be re-worked by the sub-contractor at no
OPERATIONS additional cost.

DATE:
4.1.5 Contractor will coordinate with Saudi Aramco to provide required support for
Sub-Contractor to obtain access work permits, as required, to perform the work.
CONTROL NUMBER
VERIFICATION

4.1.6 Sub-Contractor shall provide all manpower, equipment and materials required
EDSD

to perform this scope of work. Additionally, confirm presence of any existing


DATE:

underground pipes/cable at proposed test locations to avoid damage.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

4.1.7 Sub-Contractor shall arrange for temporary accommodations (as required) for
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

his employees at no additional cost to Contractor/Saudi Aramco.


(DCC) NO. _____________________

SCOPE OF WORK – U/G RADAR MAPPING DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

REPLACING WASTEWATER INJECTION DOC 5


X06 RM-18L043
PUMPS GM-239 A/B/C AT ABQAIQ A OF 1
ABQAIQ PLANT SAUDI ARABIA JO / EWO: 18L043 8
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.1.8 Sub-Contractor shall be responsible for repair of all damage to the facility
ENGG CERT

caused by him while performing this scope of work. All damages shall be
immediately corrected to the satisfaction of Saudi Aramco representative
MAB

4.1.9 Proponent contacts and phone numbers will be provided to Subcontractor upon
request.

4.1.10 Sub-Contractor should provide work execution method statement before any
field activity started.
ISSUED FOR CONSTRUCTION

4.1.11 All Subcontractor personnel must complete safety orientation before


DESCRIPTION

commencing any field activity.

4.2 Detailed Activity Breakdown.

4.2.1 Perform full underground mapping (Scanning) and investigation utilizing a wide
range of equipment such as: Radio Frequency Location & Induction - Ground
Penetrating Radar – Electro-Magnetics - Resistivity Imaging – Microgravity –
Laser Topographical Survey - Total Station to provide detailed underground
JO/EWO

high-quality maps.
18L043

4.2.2 Detect all underground utilities up to 4.0 meter below the ground and reading
04-21-19
DATE

accurately through the water table. The underground objects such as metallic
and non-metallic pipelines, electrical cables, electrical duct bank and Fiber
optical Cables (FOC), concrete structures including pile foundations, manholes,
NO.
REV

catch basins, sewer lines, etc shall be shown clearly on the survey drawings.
DISCIPLINE
ENGINEER
MAB 4.2.3 All underground electrical cables shall be identified as active (live) or inactive
DATE:
21 APR 19 (dead) and clearly reflected on survey drawings.
PROJECT
ENGINEER
4.2.4 Specify the location of underground objects with proper description, size and
---
earth cover from ground level.
DATE: 21 APR 19
CERTIFIED
4.2.5 Indicate all above ground markers and reference points such as edge of roads,
name of street name, building outline and equipment outline etc.
DATE:
CONSTRUCTION
AGENCY 4.2.6 Report of all findings in tabulated format with sketches. (With coordinates and
elevations)
DATE:
OPERATIONS 4.2.7 Provide sketches, underground locations of obstructions, type of obstructions,
direction of obstructions and elevation of obstructions.
DATE:
4.2.8 The scope shall also include establishing minimum of three survey Monuments
CONTROL NUMBER
VERIFICATION

as per SAES-A-100. The survey shall be given in Universal Transverse


Mercator (UTM) grid coordinates. The Contractor shall verify with Saudi
EDSD

Aramco whether this shall be Ain Al Abd (AAA) or 39N datum prior to
DATE:

submission.
BY:
REVISIONCERTIFICATION

4.2.9 The Contractor shall transpose the plant grid co-ordinates provided on the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

survey area plans to UTM system in accordance with SAES-A-100 and the
datum advised by Saudi Aramco.
(DCC) NO. _____________________

SCOPE OF WORK – U/G RADAR MAPPING DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

REPLACING WASTEWATER INJECTION DOC 6


X06 RM-18L043
PUMPS GM-239 A/B/C AT ABQAIQ A OF 1
ABQAIQ PLANT SAUDI ARABIA JO / EWO: 18L043 8
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.2.10 All locations of detected objects shall be given in Universal Transverse
ENGG CERT

Mercator (UTM) grid coordinates as per SAES-A-100. All coordinates shall be


in meters.
MAB

4.2.11 All elevations of detected objects shall be shown in meters and shall be
referenced to Mean Sea Level (MSL) vertical datum as per SAES-A-100.

4.2.12 Plant north and true north orientation for the proposed facilities shall be shown
on all survey drawings.
ISSUED FOR CONSTRUCTION

4.2.13 All legends, abbreviations and symbols used in survey work shall be shown on
DESCRIPTION

the drawings.

4.2.14 At the end of the scanning, Sub-Contractor shall provide a signed guarantee
statement saying that, “All underground objects within the specified areas are
captured and it is reflected in the survey report and drawings”.

4.2.15 Project requirements of U/G Radar Mapping (Scanning) shall be as follows:

Proposed Location * Area (m2)


JO/EWO

18L043

Petroleum Products Receiving


12400m²
Station
04-21-19
DATE

Total Area 12400m²


NO.
REV

DISCIPLINE
4.3 Sub-Contract Schedule
ENGINEER
MAB U/G Radar Mapping (Scanning) survey work including mobilization, demobilization, field
DATE:
21 APR 19 and office work and submission of the final Survey Report, shall be carried out in (6)
PROJECT weeks from the date of issue of work order.
ENGINEER
---
5.0 DELIVERABLES
DATE: 21 APR 19
CERTIFIED

5.1 Sub-Contractor shall relate all field readings to Saudi Aramco vertical datum (MSL) and
DATE: UTM grid.
CONSTRUCTION
AGENCY
5.2 All physical quantities, measurements, etc. in the text shall be reported in metric units
DATE: and in English language.
OPERATIONS
5.3 The Final survey report shall be submitted in electronic (Native) format. (One set of
deliverables in PDF). All drawings shall be in Micro-station format with proper scale.
DATE:
One master drawing shall be developed, while individual area drawings shall be
CONTROL NUMBER
VERIFICATION

developed separately.
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SCOPE OF WORK – U/G RADAR MAPPING DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

REPLACING WASTEWATER INJECTION DOC 7


X06 RM-18L043
PUMPS GM-239 A/B/C AT ABQAIQ A OF 1
ABQAIQ PLANT SAUDI ARABIA JO / EWO: 18L043 8
EDSD/2616-0399.doc
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0 04-21-19 18L043 ISSUED FOR CONSTRUCTION MAB
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER

MAB
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

---
ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
21 APR 19
21 APR 19

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
Saudi Aramco 2616-ENG (03/99)

ABQAIQ PLANT
PUMPS GM-239 A/B/C AT ABQAIQ
6.0 ATTACHMENTS
See Next Page…..

REPLACING WASTEWATER INJECTION


SCOPE OF WORK – U/G RADAR MAPPING
DOC

SAUDI ARABIA
DWG.TYPE

X06

JO / EWO:
A
PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

18L043
RM-18L043
DRAWING NO.

8
8
OF
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
VA-234236 003 001 Q X06 NOTES:
REV. NO. SHT. NO. DRAWING NUMBER INDEX PLANT NO. JOB ORDER/EWO NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YELLOW HIGHLIGHTED TOTAL SURFACE AREA
AREA NEED TO BE RADAR TO BE INVESTIGATED =
MAPPED FOR 40MX310M = 12400M²
UNDERGROUND UTILITIES

REFERENCE DRAWINGS
SAUDI ARAMCO - EX-SAMAREC DWG. NO. CROSS-REFERENCE VE-244535
/ DATION DETAILS DATION DETAILS
/ DATION DETAILS DATION DETAILS
/ DATION DETAILS DATION DETAILS
/ DATION DETAILS DATION DETAILS
/ DATION DETAILS DATION DETAILS
/ DATION DETAILS DATION DETAILS
/ DATION DETAILS DATION DETAILS
/ DATION DETAILS DATION DETAILS
/ DATION DETAILS DATION DETAILS
/ DATION DETAILS DATION DETAILS

SCALE:

SCANNED, INDEXED AND ASSIGNED


01 4/17/95
S.ARAMCO DWG. NO. WITHOUT CHANGES

REV. DATE JO/EWO DESCRIPTION ENGG. CERT. PMT OPRNS.


NO.
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION DESIGN REVIEW FOR
UNTIL CERTIFIED AND DATED. CERTIFICATION KEY DRAWINGS

DESIGN CERTIFICATION
DRAWN BY CHECKED BY
DATE STARTED DATE COMPLETED 4/17/95

DISCIPLINE ENGINEER
PROJECT ENGINEER

THIS DRAWING IS NOT TO BE CERTIFIED BY:


USED FOR CONSTRUCTION (NAME)
UNTIL CERTIFIED AND DATED. SIGNATURE DATE

SAUDI ARABIAN OIL COMPANY


REVIEW FOR KEY DRAWINGS REQUIRED NOT REQUIRED
CONSTRUCTION AGENCY
OPERATIONS
OTHER

DRAWING TYPE

FOUNDATION DETAILS FDN


INSTRUMENTATION, OFFSITE
BULK PLANT
YANBU SAUDI ARABIA
JOB ORDER/EWO NO. PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

X06 Q VA-234236 003 001


Saudi Aramco 2615 ENG. (07/93)

HYBRID CADD-03