NOTES:
6. ANY LOOSE MATERIAL DETECTED AT FOUNDATION GRADE ELEVATION SHOULD BE PROPERLY 26. NO CONCRETE SHALL BE PLACED IN WORKS IF AMBIENT AIR TEMPERATURE IS LIKELY TO BE GREATER
0
GENERAL NOTES COMPACTED TO MEET THE SPECIFICATION REQUIREMENTS OF ARAMCO ENGINEERING STANDARDS THAN 45 C DURING OR WITHIN 2 HOURS SUBSEQUENT TO PLACEMENT. IF CONCRETING DURING HOT- 1. THE GENERAL NOTES APPLY TO ALL CONCRETE
WEATHER IS INEVITABLE, REQUIREMENTS OF ACI-305R SHALL BE CONFORMED. DESIGN DRAWINGS UNLESS OTHERWISE
SAES-A-114. WHERE SOIL AT THE BOTTOM OF EXCAVATION IS NOT SUITABLE TO SUPPORT THE
0 SPECIFIED ON EACH DESIGN DRAWING.
STRUCTURE, IT SHALL BE REMOVED TO AN ADEQUATE STRATUM, AS DIRECTED BY COMPANY NO CONCRETE SHALL BE PLACED IN CONTACT WITH SURFACE HAVING TEMPERATURE LESS THAN 1.6 C.
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
REPRESENTATIVE AND REPLACED WITH SELECTED MATERIAL
27. WATER CURING SHALL BE CONTINUOUS UNTIL THE COMPRESSIVE STRENGTH HAS REACHED 70%
2. ALL ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. IN ACCORDANCE WITH SAES-A-114. OF THE SPECIFIED STRENGTH BUT NOT LESS THAN 7 DAYS, AFTER PLACEMENT.
DUST CONTROL MEASURES SHALL BE IMPLEMENTED DURING CONSTRUCTION BY THE CONTRACTOR AS PER
OF
3. ALL CO- ORDINATES ARE IN METERS UNLESS NOTED OTHERWISE. 28. TDS OF CONCRETE CURING WATER SHALL NOT EXCEED 1000PPM.
SAES-A-114 SEC 5.3.3.
CONSENT
29. PRECAST CONCRETE FOUNDATIONS SHALL BE PLACED OVER 50MM COMPACTED SAND BED WITH 0.15MM
4. ALL COORDINATES GIVEN ARE UTM ZONE 37, 1924 INTERNATIONAL 7. NO BACKFILLING AGAINST WALLS, THAT ARE TO BE LATERALLY SUPPORTED BY A FLOOR SLAB, UNLESS
PLASTICIZED SHEET VAPOR BARRIER BENEATH THE FOUNDATION.
SUPPORT IS PROVIDED OR SLABS HAVE BEEN PLACED. BACK FILL AGAINST CANTILEVER WALLS SHALL NOT
SPHEROID (AIN AL ABD) BASED ON THE FOLLOWING ARAMCO CONTROL
BE PLACED UNTIL THE CONCRETE HAS GAINED ITS 28 DAYS STRENGTH.
STATIONS (BENCH MARKS). 30. FORM-RELEASE AGENTS SHALL NOT BE APPLIED IF CONCRETE SURFACES
8. TESTING OF IN-PLACE DENSITY AND MOISTURE CONTENT(FIELD DENSITY TESTING) ON COMPACTED FILL SHALL RECEIVE SPECIAL FINISHES OR WHERE THE AGENT MAY AFFECT THE
CONTROL STATION N E ELEVATION WILL BE PERFORMED AT THE FOLLOWING RATES. APPLIED COVERINGS. ALTERNATIVELY, INSIDE SURFACES OF UNTREATED FORMWORK SHALL BE SOAKED
TTEN
BM 6466 2649380.306 430053.677 3.992 A) UNDER ALL FOUNDATIONS-ONE TEST EVERY 100 SQ.M OF EACH LIFT WITH CLEAN WATER AND KEPT MOIST BEFORE PLACING CONCRETE.
B) GENERAL FILL-ONE TEST EVERY 500.0 SQ.M OF EACH LIFT
BM 8318 2646659.234 428561.316 3.074 31. FORM WORK DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH ACI 347,SA CONSTRUCTION SAFETY MANUAL.
WRI
9. ANY EXCAVATION WHICH COULD POTENTIALLY UNDERMINE AN EXISTING FOUNDATION SHALL
32. CONCRETE SHALL BE USED WITHIN 90 MINUTES FROM THE INTRODUCING OF WATER IN MIX.
BE BRACED, SHORED OR FOUNDATION SHALL BE UNDERPINNED OR OTHERWISE PROTECTED AGAINST
THE
SETTLEMENT OR LATERAL MOVEMENT. AN EXCAVATION WHICH INTERSECTS AN IMAGINARY PLANE 33. CONCRETE SLUMP CHECK, PREPARATION OF SAMPLE SHALL BE DONE BY THE SAUDI ARAMCO APPROVED
5. ELEVATION DATUM IS SAUDI ARAMCO VERTICAL DATUM (SAVD) BASED ON
WHICH EXTENDS 45 DEGREES TO THE HORIZONTAL, PROJECTED DOWNWARD FROM THE BOTTOM TOE INDEPENDENT LABORATORY. SLUMP TEST CARRIED OUT AT SITE SHALL MEET REQUIREMENTS OF ASTM STANDARDS.
ELEVATION VALUES OF ARMACO CONTROLS AS GIVEN ABOVE.
OF THE ADJACENT FOOTING, IS CONSIDERED TO HAVE THE POTENTIAL TO UNDERMINE THE FOUNDATION. 34. THE DESIGN OF ANCHOR BOLTS SHALL BE IN ACCORDANCE TO SAES-Q-005 AND THE MATERIALS
THOUT
6. ELEVATION 100.00 SHOWN IN DRAWINGS CORRESPONDS TO MEAN SEA SHALL BE IN ACCORDANCE TO 12-SAMSS-007.
CONCRETE WORKS
LEVEL ELEVATION 0.00. THE MINIMUM ANCHOR BOLTS DIAMETER SHALL BE 20mm (3/4") EXCEPT WHEN SPECIFIED OTHERWISE BY
1. THE CEMENT SHALL BE AS PER RECOMMENDATIONS STATED IN EXECUTIVE SUMMARY SECTION OF THE VENDOR FOR SMALL EQUIPMENT OR FOR THE ANCHORAGE OF SMALL MISCELLANEOUS STEEL ITEMS,
WI
7. ALL WORK AND MATERIALS SHALL CONFORM TO FOLLOWING: GEOTECH REPORT 2015/104. SELECTED AS PER TABLE 2 OF SAES-Q-001. SUCH AS, LADDER SUPPORT, SMALL PIPING SUPPORT, HANDRAIL ANCHORAGE, STAIR STRINGERS, SMALL
THE MAXIMUM ALLOWABLE WATER-CEMENT RATIO SHALL BE 0.40 FOR STRUCTURAL AND WATER PLATFORMS, ETC.
NG
(i) CODES AND STANDARDS AS MENTIONED IN SCOPE OF WORK.
RETAINING STRUCTURES AND 0.60 FOR NON-STRUCTURAL CONCRETE. 35. ANCHOR BOLTS AND EMBEDDED ITEMS SHALL BE SET ACCURATELY, USING TEMPLATES WITHIN THE
DRAWI
(ii) PROPORTION OF INGREDIENTS AND MIXTURES,AND TESTING OF WATER QUALITY SHALL BE IN ACCORDANCE TOLERANCE SPECIFIED IN AISC SECTION 7.5, CODE OF STANDARD PRACTICE.
CODES AND STANDARDS SPECIFICALLY FOR A PARTICULAR STRUCTURE AS LISTED IN RELEVANT DRAWINGS.
WITH ARAMCO SPECIFICATION 09-SAMSS-097.
36. MINIMUM CLEAR DISTANCE FROM ANCHOR BOLTS OR ANCHOR BOLTS SLEEVES TO EDGE OF CONCRETE
(iii) QUALITY PROCEDURES
SHALL BE AS PER SASD AA-036322.001 REV 08.
THE TOP OF CONCRETE FOUNDATION/PEDESTALS SHALL BE A MINIMUM OF 150mm ABOVE FINISH
S
(IV) TECHNICAL SUBMITTALS FOR MATERIAL AND FIELD ENGINEERING
THI
GRADE AS PER SAES-Q-005. 37. MASONRY UNITS AND PLASTERING WORKS SHALL BE IN ACCORDNCE WITH SAES-M-100 AND
SAES-Q-001.
(V) ALL APPLICABLE SAUDI ARAMCO STANDARDS AND MATERIALS SPECIFICATIONS COMPLETE CONCRETE MIX DESIGN DATA SHALL BE SUBMITTED TO THE SAUDI ARAMCO REPRESENTATIVE
FOR APPROVAL AT LEAST 30 DAYS PRIOR TO PROPOSED USE. CONCRETE MIX DESIGN SHALL BE REVIEWED 38. THE AVERAGE COMPRESSIVE STRENGTH OF CMU SHALL BE IN COMPLIANCE WITH IBC AND THE
FROM
QUALITY REQUIREMENTS OF MATERIAL SHALL BE IN COMPLIANCE WITH 09-SAMSS-088 AND 09-SAMSS-097.
8. ALL EQUIPMENT FOUNDATIONS SHALL BE DESIGNED BY CONSTRUCTION CONTRACTOR AS PER FINAL VENDOR INFORMATION. AND APPROVED BY EACH PROJECT INSPECTION SECTION AS PER THE PROCEDURES SPECIFIED IN SAEP-1152.
FOUNDATIONS DESIGN SHALL BE BASED FROM THE FINAL GEOTECHNICAL REPORT APPROVED BY CSD.
CEMENT CONTENT AND W/C RATIO FOR CONCRETE SHALL BE IN ACCORDANCE TO TABLE A OF 39. CMU BLOCKS SHALL BE GROUTED WHERE VERTICAL REBARS ARE TO BE PROVIDED.
09-SAMSS-097. PROVIDE {12@400 C/C VERTICAL BARS IN CMU WALLS UNLESS NOTED OTHERWISE.
NED
9. DRAWINGS SHALL NOT BE SCALED. ALL DIMENSIONS SHALL BE READ OR COMPUTED.
LOAD BEARING WALLS SHALL BE IN ACCORDANCE WITH ASTM A90.
2. PREPARE, PLACE, STRIP, CURE AND REPAIR (IF NECESSARY) ALL CONCRETE IN ACCORDANCE WITH
OBTAI
10. THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE SPECIFICATION AND PERTINENT
SAUDI ARAMCO STANDARDS/SPECIFICATIONS SAES-Q-001 AND 09-SAMSS-097. 40. CONSTRUCTION CONTRACTOR SHALL PREPARE BAR BENDING DETAILS AND
ARCHITECTURAL, CIVIL, PIPING AND ELECTRICAL DRAWINGS. SHALL SUBMIT IT FOR ARAMCO REVIEW AND APPROVAL.
3. ALL STRUCTURAL CONCRETE SHALL BE AS PER CLAUSE 7.15 AND TABLE 2 OF SAES-Q-001
11. THE COATING SHALL BE APPLIED AFTER THE FULL CURING TIME OF CONCRETE IN ACCORDANCE WITH
BE
SAES-Q-001. NEW CONCRETE MUST HAVE A MOISTURE CONTENT OF 4% OR LESS BEFORE THE COATING 4. ALL STRUCTURAL CONCRETE FOR LIQUID RETAINING STRUCTURES, PRECAST AND PRESTRESSED CONCRETE
APPLICATIONS COMMENCE. STRUCTURES SHALL HAVE MINIMUM COMPRESSIVE STRENGTH OF 35 MPa @28 DAYS (5000 PSI). STANDARDS & SPECIFICATIONS:
PART,SHALL
D
5. ALL NON -STRUCTURAL CONCRETE (eg:- UNREINFORCED FLOOR CONCRETING FILLER CONCRETE TO
12. DESIGN LOADS SAUDI ARAMCO ENGINEERING STANDARDS (SAES)
MAKE UP SLOPE ON STRUCTURAL CONCRETE/ OTHER SURFACES, BLINDING CONCRETE FOR WATER
A. SEISMIC LOADS ARE APPLICABLE AS PER SAES-A-112. RETAINING UNDERGROUND STRUCTURES) SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF SAES-A-112 METEOROLOGICAL AND SEISMIC DESIGN DATA
14 MPa @28 DAYS (2000 PSI) AS PER SAES-Q-001.
BI
SAES-A-114 EXCAVATION AND BACK FILL
1. Ss IN % g = 20.4
6. ALL FILLER CONCRETE (eg:-BLINDING CONCRETE, MASS CONCRETE BELOW FOUNDATIONS etc.) SAES-B-005 SPACING AND DIKING FOR ATMOSPHERIC AND LOW PRESSURE TANKS
2. S1 IN % g = 5.8
SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 14 MPa @28 DAYS (2000 PSI) SAES-B-006 FIREPROOFING FOR PLANTS
3. SITE CLASS D: AS PER GEOTECH REPORT 2015/104
N
I
7. REINFORCING STEEL SHALL BE DEFORMED BILLET STEEL IN ACCORDANCE WITH ASTM A615/ASTM A615M GRADE 60. SAES-H-101V APPROVED SAUDI ARAMCO DATA SHEETS - PAINTS AND COATINGS
4. IMPORTANCE FCTOR = 1.50
FULL,OR
WHEN USED AS DUCTILE STEEL ELEMENTS TO RESIST EARTHQUAKE EFECTS DEFORMED REINFORCING BAR
R
5. SEISMIC DESIGN CATEGORY : C SAES-H-003 PROTECTIVE COATINGS FOR INDUSTRIAL CONCRETE STRUCTURES
SHALL BE LIMITED TO ASTM A706 GRADE 60, OR ASTM A615 GRADES 40 AND 60 SATISFYING
THE REQUIRMENTS OF ACI 318. SAES-M-001 STRUCTURAL DESIGN CRITERIA FOR NON BUILDING STRUCTURES
B. WIND LOADS PER SAES-A-112 & ASCE 7-05. COATING REQUIRMENT OF REINFORCING STEEL SHALL BE AS STATED IN EXECUTIVE SUMMARY SECTION OF GEOTECH
FO
REPORT 2015/104, SELECTED AS PER TABLE 2 OF SAES-Q-001. SAES-M-100 SAUDI ARAMCO BUILDING CODE
1. BASIC WIND SPEED, 145 KM/H
COATED REINFORCEMENT SHALL BE IN ACCORDANCE WITH 09-SAMSS-106.
SAES-Q-001 CRITERIA FOR DESIGN AND CONSTRUCTION REFERENCE DRAWINGS
N
I
2. EXPOSURE. C
OF CONCRETE STRUCTURES
3. IMPORTANCE FCTOR = 1.15 DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
ON
8. FUSION BONDED EPOXY-COATED REINFORCING BARS SHALL BE FASTENED WITH EPOXY-COATED SAES-Q-005 CONCRETE FOUNDATIONS
REPRODUCTI
TIE WIRES OF 16 GAGE MINIMUM THICKNESS. SAES-Q-007 FOUNDATION AND SUPPORTING STRUCTURES
FOR HEAVY MACHINERY
13. LIVE LOADS
9. ALL STRUCTURAL STEEL EMBEDDED IN CONCRETE SHALL BE HOT DIP GALVANIZED AND GALVANIZING AS
1. LIVE LOADS PER SAES-M-001 AND SAES-M-100 PER ASTM A123. ENDS OF RE-BAR CUT IN THE FIELD AND RE BAR USED AS SUPPORT BARS SHALL BE SAES-Q-009 CONCRETE RETAINING WALLS
ED
EPOXY- COATED WITH THE SAME MATERIAL USED FOR REPAIR OF DAMAGED EPOXY- COATED RE BAR. SAES-Q-010 CEMENT BASED, NON -SHRINK GROUT FOR STRUCTURAL AND
14. CONSTRUCTION CONTRACTOR SHALL SUITABLY DESIGN AND PROVIDE TEMPORARY BRACING AND
EQUIPMENT GROUTING
SHORING FOR ALL STRUCTURES AND EXCAVATION AS REQUIRED. 10. EPOXY COATED WELDED WIRE FABRIC SHALL CONFORM TO ASTM A884/A884M.
SAES-Q-011 EPOXY GROUT FOR MACHINERY SUPPORT
TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE MAINTAINED DURING
SAUDIARAMCO.NO
11. ALL CONSTRUCTION OF CONCRETE STRUCTURES SHALL BE IN ACCORDANCE WITH STANDARDS
CONSTRUCTION OR UNTIL PERMANENT MEASURES ARE COMPLETED AND FUNCTIONING, SAES-Q-012 CRITERIA FOR DESIGN AND CONSTRUCTION OF PRECAST AND
AND SPECIFICATIONS LISTED IN THIS DRAWING UNO.THE SELECTION AND SPECIFICATION OF
PRE STRESSED CONCRETE STRUCTURES
SU
IN A SATISFACTORY MANNER. NON-SHRINK CEMENT BASED GROUT FOR FOUNDATION SHALL COMPLY WITH SAES-Q-010.THE
MINIMUM THICKNESS OF GROUT SHALL BE 25mm MEASURED FROM TOP OF CONCRETE FOUNDATION SAES-R-004 BUILDING ARCHITECTURAL DESIGN AND FINISHES REQUIREMENTS
EXCAVATION ADJACENT TO EXISTING UNDERGROUND INSTALLATIONS (e,g., PIPING,
TO BOTTOM OF STEEL BASE PLATE.
MANHOLES, ELECTRICAL AND DUCT BANKS) OR SIDEWALKS SHALL USE BRACING AND SAUDI ARAMCO MATERIAL SYSTEM SPECIFICATIONS (SAMSS)
12. EPOXY GROUTS FOR MACHINERY SUPPORT SHALL CONFORM TO SAES-Q-011.
SHORING TO PROTECT THOSE INSTALLATIONS DURING CONSTRUCTION.
13. CEMENT BASED NON -SHRINK GROUT FOR EQUIPMENT AND STRUCTURAL BASE PLATE, ANCHOR 09-SAMSS-069 QUALIFICATION REQUIREMENTS FOR EPOXY COATINGS FOR ATMOSPHERIC SERVICE
BOLT SHALL BE IN ACCORDANCE WITH SAES-Q-010.
IS
09-SAMSS-088 AGGREGATES FOR CONCRETE
EARTHWORKS 14. ALL CONCRETE SHALL BE MIXED IN ACCORDANCE WITH 09-SAMSS-097 AND SHALL BE PLACED 09-SAMSS-106 EPOXY COATING OF STEEL REINFORCING BARS
OF
TO CONFORM TO SAES-Q-001.
09-SAMSS-097 READY-MIXED CONCRETE
1. FOUNDATIONS SHALL BE FOUNDED ON EITHER UNDISTURBED SOIL OR COMPACTED SELECT FILL,
PROPERTY
15. ALL REINFORCING STEEL SHALL BE PLACED AND MAINTAINED AT THE CLEAR DISTANCE FROM THE
ROLLED AND COMPACTED IN ACCORDANCE WITH SAES-Q-005&SAES-A-114.
SURFACE OF CONCRETE TO PROVIDE COVER AS SPECIFIED BY SAES-Q-001 TABLE 3 INCLUDING THE REQUIREMENTS
SAUDI ARAMCO STANDARD DRAWINGS
SOIL COMPACTION FOR FOUNDATIONS OF COATING AND PROTECTION IN CONTACT WITH EARTH ACCORDING TO SAES-Q-001.
2.
AA-036322-001 REV 08 ANCHOR BOLT DETAILS
FOUNDATIONS FOUNDED IN UNDISTURBED SOIL SHALL HAVE THE BOTTOM OF THE EXCAVATION COMPACTED 16. EXPOSED CONCRETE FOUNDATIONS AND PEDESTALS ABOVE THE FINISH GRADE
PRIOR TO CONSTRUCTION OF THE FOUNDATION. THE SOIL SHALL BE DEEMED UNDISTURBED WHERE MECHANICAL SHALL BE COATED WITH APCS-1B AS PER SAES-H-003 SEC.6.1. AA-036355-001 & 002 CATHODIC PROTECTION DETAILS
SOLE
EXCAVATION IS STOPPED WITHIN 150MM OF THE PROPOSED FOUNDING LEVEL. FINALTRIM SHALL BE CARRIED OUT
BY HAND OR USING TOOL THAT WILL NOT EXCESSIVELY DISTURB THE FOUNDING MEDIUM. AD-036711 CONCRETE FIRE PROOFING FOR STRUCTURAL MEMBERS
17. ACI 224.3R, " JOINT IN CONCRETE CONSTRUCTION", SHALL BE USED TO DESIGN CONSTRUCT, AND MAINTAIN
FOUNDATIONS CONSTRUCTED ON FILLED OR MADE UP GROUND SHALL HAVE A 600 MM THICK LAYER JOINTS AND IDENTIFY SEALANT MATERIALS AND JOINT TECHNIQUES.
THE
OF SELECT FILL IN ACCORDANCE WITH SAES-A-114 PLACED BENEATH THE FOUNDATION.
18. FOUNDATIONS SHALL HAVE A 50mm SUB-SLAB (LEAN CONCRETE) PLACED BENEATH THE CONCRETE.
BUILDING FLOOR SLABS SHALL BE CONSTRUCTED ON MINIMUM 600MM COMPACTED SELECT FILL THE SIDES AND TOP OF THE CONCRETE THAT COMES IN DIRECT CONTACT WITH EARTH SHALL BE COATED
ARE
WITH TWO COATS OF COAL BITUMINOUS PAINT THAT CONFORMS TO APCS-10. HOWEVER IF SOIL IS
WHERE THE SOIL IS DISTURBED BY EXCAVATIONS AND BACK FILL FOR UNDERGROUND BURIED SERVICES,
CONTAMINATED WITH HYDROCARBON, THEN APCS-3 COATING SHALL BE APPLIED INSTEAD OF APCS-10.
BACKFILL TO AND AROUND STRUCTURE EXCAVATIONS. THE FILL MATERIAL SHALL BE COMPACTED IN
N
ACCORDANCE WITH SAES-A-114. 19. ALL EXPOSED CONCRETE EDGES OF WALLS, COLUMNS,PILASTERS, BEAMS, CURBS, EQUIPMENT PADS, ETC,
HEREI
SHALL HAVE A 20mm CHAMFER.
FOUNDATIONS FOUNDED IN UNDISTURBED SOIL ARE DEEMED TO BE CONSISTENT WITH THE RESULT OF ALL
20. ALL SLEEVES, OPENINGS AND EMBEDDED ITEMS REQUIRED BY ARCHITECTURAL, MECHANICAL (PROCESS
GEOTECHNICAL INVESTIGATION. VERIFICATION OF THE FOUNDING SOIL SHALL BE CARRIED OUT BY THE
PIPING, PLUMBING, HEATING, VENTILATING AND AIR CONDITIONING) AND ELECTRICAL SHALL BE LOCATED
COMPANY REPRESENTATIVE BEFORE COVERING UP. ANY IRREGULARITIES SHALL BE TREATED AS A HOLD
NED
ON THE DRAWINGS AND SUBMITTED TO SAUDI ARAMCO FOR APPROVAL PRIOR TO CONSTRUCTION. MINIMUM
POINT IN CONSTRUCTION UNTIL SUCH TIME THAT ANY FURTHER ACTION IS CONFIRMED BY THE COMPANY SCALE: NTS
COVER REQUIREMENTS (SAES-Q-001) SHALL BE APPLIED TO SEPARATION OF REBAR AND SLEEVES.
ENGINEERING OFFICE.
CONTAI
21. ALL CONCRETE SHALL BE PLACED SO AS TO MINIMIZE THE EFFECT OF SHRINKAGE.
REVISION VALIDATION
FILL AND BACKFILL ADJACENT TO STRUCTURES SUCH AS RETAINING WALLS, PITS, AND BASEMENTS
SHALL NOT BE COMPACTED WITH HEAVY EQUIPMENT, BUT SHALL BE COMPACTED WITH HAND-OPERATED, 22. SCREED CONCRETE FILL INSIDE THE STRUCTURE MORE THAN 100 THICK SHALL HAVE 150x150 WIRE THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
EQUIPMENT TO A DISTANCE OF 1.2 METERS (4 FEET) OR GREATER BEYOND THE SIDES OF THE MESH W2.9xW2.9 AT EXPOSED FACE WITH PROTECTIVE COVER OF 50mm. SCREED CONCRETE REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
ON
STRUCTURES. FILL SHALL HAVE A MINIMUM THICKNESS OF 50mm.
NFORMATI
3. FOUNDATIONS SHALL NOT BE PLACED ABOVE OTHER FOUNDAIONS, UNDERGROUND PIPING, DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
23. ALL SANITARY CONCRETE MANHOLES SHALL BE COATED INTERNALLY WITH APCS-2E
TELECOMMUNICATION OR ELECTRICAL ITEMS IN SUCH A MANNER AS TO EXERT PRESSURE ON (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
AND EXTERNALLY WITH APCS-10 AS PER SAES-S-010.
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
THESE ITEMS WITHOUT PRIOR WRITTEN APPROVAL BY THE GROUP LEADER OF CIVIL ENGINEERING
SMS ASH SAY AHG
PROJECT SUPPORT, CAPITAL PROGRAM SUPPORT DIVISION, CONSULTING SERVICES DEPARTMENT. 24. FOLLOWING MINIMUM CONCRETE COVER TO BE PROVIDED. AS SPECIFIED IN TABLE-3 OF SAES-Q-001 FROM 03/07/16 09/08/16 09/08/16 09/08/16
THE ZONE OF FOUNDATION PRESSURE IS DEFINED AS A PLANE EXTENDING OUTWARD AND DOWN OUTER-MOST REBAR (TIE-BAR). REV.NO. DATE REVISION DESCRIPTION
I
FROM THE BOTTOM EDGES OF THE FOUNDATION AT A 45-DEGREE ANGLE. C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
A - CONCRETE CAST AGAINST OR PERMANENTLY EXPOSED TO EARTH: 75MM
THE
4. FILL OR BACKFILL PLACED BENEATH AND/OR ADJACENT TO GRADE BEAMS, MATS,BUILDINGS JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
B - FORMED CONCRETE EXPOSED TO EARTH OR WEATHER SUPPORTING
AND PROCESS AREAS SHALL BE COMPACTED TO AT LEAST 90% OF 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
PROCESS EQUIPMENT 75MM BUILDINGS,STAIRS,AC PADS 50MM.
THE MAXIMUM MODIFIED PROCTOR DENSITY, AS DETERMINED BY ASTM D1557.
SAUDI ARABIAN OIL COMPANY
AND
C - BEAMS AND COLUMNS 50MM.
FOR FOUNDATION STATIC LOADS OVER 320 KPa AND FOUNDATION FOR VIBRATING OR HEAVY DRAWING TYPE
MACHINERY AS DEFINED IN SAES-Q-007,AND FOR ASPHALT AND CONCRETE PAVEMENT SUBGRADES, FILL D - SLABS 25MM. GENERAL NOTES & STANDARDS FDN
NG
SHALL BE COMPACTED TO 85% RELATIVE DENSITY FOR COHESIONLESS SOILS OR 95% OF THE MAXIMUM
E - BETWEEN REINFORCEMENT AND ANCHOR FLANGE/PIPE WITHIN PIPELINE CONCRETE WORKS
DRAWI
DENSITY AS DETERMINED BY ASTM D1557 FOR COHESIVE MATERIALS.
ANCHOR BLOCKS 100MM.
YANBU DISTRIBUTION HUB
25. CURING SHALL BE AS PER SECTION 7.25 OF SAES-Q-001.
5. FOR COHESIONLESS FREE DRAINING SOILS,70% RELATIVE DENSITY AS DETERMINED BY ASTM D4253 AND
YANBU SAUDI ARABIA
ASTM D4254 SHALL BE USED FOR GENERAL FILL MATERIAL NOT DESIGNATED AS PER OPEN OR
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
LANDSCAPED.
OF
TENSION DEVELOPMENT LENGTH (Ld)
CONSENT
TENSION DEVELOPMENT LENGTH (Ld) FOR UNCOATED AND EPOXY-COATED REINFORCEMENT BARS, IN TERMS OF DIAMETER ( { )
SHALL BE AS INDICATED IN THE FOLLOWING TABLES. BUT SHALL NOT BE LESS THAN 300mm.
TTEN
CLEAR BAR CLEAR BAR
SPACING (S) TOP BARS OTHER BARS SPACING (S) TOP BARS OTHER BARS
S> 2 { S> 2 {
CAL
{
WRI
ON
BAR dia ({) BAR dia ({) S < 6{ S > 6{ S < 6{ S > 6{
SECTI
TI
16mm. and smaller 50 { 40 { 16mm. and smaller 65 { 60 { 58 { 46 {
CRI
THE
20mm. and larger 62 { 50 { 20mm. and larger 81 { 75 { 71 { 58 {
THOUT
- MINIMUM CLEAR SPACING OF BARS BEING DEVELOPED NOT LESS THAN 2{ .
- REDUCTION IN DEVELOPMENT LENGTHS SHALL BE PERMITTED WHERE REINFORCEMENT IN A FLEXURAL MEMBER IS IN EXCESS OF THAT
WI
REOUIRED BY ANALYSIS. THE REDUCTION FACTOR IS: A.S. required / A.S. provided AND MUST BE APPLIED IN COMPLIANCE WITH
S
THI NG
DRAWI
TENSION SPLICE LENGTH
FROM
MINIMUM LENGTH OF LAP FOR TENSION SPICES SHALL BE AS FOLLOWS (BUT NOT LESS THAN 300mm. ):
NED
CLASS B SPLICE = 1.3 Ld
OBTAI
WHERE "Ld" IS THE TENSION DEVELOPENT LENGTH (INICATED IN ABOVE TABLE) WITHOUT ANY REDUCTION FACTOR.
THE FOLLOWING TABLE PRESENTS THE SPLICE REOUIREMENT IN TABULAR FORMS: LAP
{
MAXIMUM PERCENT OF A.S. SPLICED
A.S. PROVIDED
BE
WITH REOUIRED LAP LENGTH
A.S. REQUIRED
{
50 100
PART,SHALL
EOUAL TO OR GREATER THAN 2 CLASS A CLASS B
D
LESS THAN 2 CLASS B CLASS B
BI
N
I
FULL,OR
R
HOOKS FOR REINFORCEMENT MAIN BARS, STIRRUPS AND TIES
FO
a) BARS SELECTION b) STANDARD HOOK FOR REINFORCEMENT c) STANDARD HOOK FOR REFERENCE DRAWINGS
N
d) STIRRUPS AND TIES HOOK
I
MAIN BARS (MINIMUM LENGTH) STIRRUPS AND TIES
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
ON
REPRODUCTI
{ {
DESIGNATION AREA UNIT WEIGHT
ED
u
65mm. (MIN.)
.
{
m
{ 10 79 0.617
M 5m
( 6
)
{
{
.
7
IN
12
{ 12 113 0.888 D D
SAUDIARAMCO.NO
D
{
{ 16 201 1.578 180
SU
{ 20 314 2.466
D
{ 25 491 3.853
135
0
0
9
IS 9
Ld
Ldh
OF
90 STANDARD HOOK 90 - 135 HOOK 180 HOOK
PROPERTY
DEVELOPMENT LENGTH DEVELOPMENT LENGTH * *
BAR * BAR D Lu BAR D Lp
D UNCOATED BARS EPOXY-COATED BARS
Ldh Ldh SIZE SIZE
SIZE mm. mm. mm. mm.
mm. mm. mm.
{ 8 32 75 { 10 60 65
{ 10 60 190 230
SOLE
{ 10 40 75 { 12 72 65
{ 12 80 230 275
{ 12 48 75 { 16 96 65
{ 16 95 305 370
{ 20 120 80
THE
{ 20 115 380 460
ARE
*
D = FINISHED BEND DIAMETER
N
HEREINED
SCALE: NTS
CONTAI
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
CONCRETE WORKS
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00002 002 C
Saudi Aramco 2615 ENG. (05/05)
BEAM)
(IF REQUIRED) SAW CUT 6mmX25mm DEEP
OF
BEAM
WWF
50
(
CONSENT
N
MAI
x x x x x x x x x x
t
D
OF
50
DEPTH
6 (MAX.)
TTEN
CONST. JOINT
WRI
STIRRUPS WELL COMPACTED
0.25 THK. PLASTICIZED
BOTTOM BARS VAPOR BARRIER SELECT FILL
COLUMN TIES
THE
INTERSECTING BEAM BEAM JUNCTION MAIN BEAM
W
COLUMN
THOUT
CAST-IN-PLACE CONCRETE BEAM INTERSECTION CAST-IN-PLACE CONCRETE BEAM COLUMN JOINT CONTRACTION JOINT FOR SLAB ON GRADE
WI
NOTE:- PROVIDE DOWEL IF REINFORCEMENT NOT CONTINUOUS
NG
DRAWI
1 D E T A I L 2 D E T A I L 3 D E T A I L
N. T. S. N. T. S. N. T. S.
- - -
S
THI
FROM
CONSTRUCTION
JOINT TO BE SEALED USING WALL
TWO PARTS OF POLYSULPHIDE JOINT
BACKING ROD
SEALANT CHEM-SEAL II, GRAY
APPROVED PVC
NED
COLOUR & BEIGE (25X25)
STYROPOR WATER STOP OR AS
JOINT SEALANT WWF
(25t)
OBTAI
INDICATED ON DESIGN
25
12 THK. EXPANSION 12 DRAWINGS
150
JOINT FILLER BOARD PRE-MOLDED
(PRE-MOLDED) ROUND ROD BOTTOM SLAB
OR TUBE BACKUP
BE
40 10
(TYP.)
PART,SHALL
D
BI
0.25mm THK POLYETHYLENE
VAPOR BARRIER WELL COMPACTED SELECT FILL
25
20mm{ PLAIN BARS @ ALTERNATE
N
300 C/C (L1200mm) SLEEVES 25mm{
I
FULL,OR
10mm{ U BARS @
R
200 C/C (L760mm) TYP
FO
ISOLATION JOINT EXPANSION JOINT WITH DOWELS FOR SLAB ON GRADE CONSTRUCTION JOINT FOR CONCRETE WALL
N
I ON
REPRODUCTI
REFERENCE DRAWINGS
4 D E T A I L 5 D E T A I L 6 D E T A I L DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
N. T. S. N. T. S.
ED
N. T. S.
- - -
SAUDIARAMCO.NO
SU
WWF FILLED WITH SEALANT
50
x x x x x x x x x x
t
IS
0.25 THK. PLASTICIZED WELL COMPACTED
OF
VAPOR BARRIER SELECT FILL
PROPERTY
CONSTRUCTION JOINT FOR SLAB ON GRADE
600 MIN. 6mm X 6mm CONT. (NOT SUBJECTED TO TRAFFIC)
SOLE
6 PLATE 9 D E T A I L
150
2-12 { TOP & TOP OF REINF. CONC./ N. T. S.
BOT. BARS (TYP.) (TYP. ALL AROUND)
4
TOP OF CHECKERED -
THE
PLATE
1-10{
4
O)
ARE
N.
250
U.
TOP OF
A
0
(
10
ROOF SLAB
OPENING
-
N
HEREI
5 ANCHOR BOLT
0
L 2 x 2 x AS PER PIP STD.
| OF LADDER
N)
4-12 { 10 { GALV. BAR
MI
@ 600 (TYP.) {12 @ 200
(
SLAB REINFORCEMENT
NED
25mm
12-{12 SCALE: NTS
150
R.C. WALL CHAMFER TOC EL
CONTAI
150 AS PER PIP STD. 150
REVISION VALIDATION
FGL EL
SLAB OPENING A C
SECTION SUPPORT FOR CHECKERED PLATE
THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
350
NFORMATI
450
500
I
- N. T. S. _ N . T . S .
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
COMPACTED SUBGRADE THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
LADDER FOUNDATION PLAN B S E C T I O N
DRAWING TYPE
-
SCALE NTS SCALE NTS STANDARD DETAILS FDN
NG
CONCRETE WORKS
DRAWI
YANBU DISTRIBUTION HUB
10 D E T A I L YANBU SAUDI ARABIA
S
N. T. S. PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
-
THI
X40 Q ST-A00002 003 C
Saudi Aramco 2615 ENG. (05/05)
LENGTH)
FACE OF COLUMN HORIZ. BARS ON BOTH SIDES
OF
BACK-UP ROD
ON BOTH SIDES
400
CONSENT
12 { AT 400 O.C.
N.DOWEL
HOR. JOINT
(
TTEN
10 { @ 400 O.C.
OTHER COURSE U.N.O
HOR. BARS (TYP.) (U.N.O)
10 PRE-FORMED
WRI
12 { @ 400 O.C. FIRE-RATED GASKET
VERT.BARS (TYP.) (U.N.O.)
THE
CMU WALL TYPICAL CONTROL JOINT DETAIL
JOINT DET. PLAN JOINT DETAIL PLAN
THOUT
AT WALL INTERSECTION OF AT WALL CORNER OF
200
NON-LOAD BEARING WALL NON-LOAD BEARING WALLS
WI
COLUMN TO CMU CONNECTION
3 D E T A I L
NG
DRAWI
SCALE: N.T.S
2 D E T A I L -
1 D E T A I L SCALE: N.T.S
SCALE: N.T.S -
-
S
THI
FROM
ABBREVIATIONS
NED
AASHTO - AMERICAN ASSOCIATION OF STATE JT - JOINT
OBTAI
ACI - AMERICAN CONCRETE INSTITUTE Ld - DEVELOPMENT LENGTH
INSTITUTE
LT - TENSION LAP
BE
ASTM - AMERICAN SOCIETY FOR TESTING MAX - MAXIMUM
PART,SHALL
AND MATERIALS
MIN - MINIMUM
D
300 B ABS - ALTERNATE BAR
300 MSL - MEAN SEA LEVEL
A STAGGERED
AC - ASPHALT CONCRETE M - METER
BI
MM - MILLIMETER
ADDL - ADDITIONAL
N/A - NOT APPLICABLE
ALT - ALTERNATE
200
300
NF - NEAR FACE
ARCH. - ARCHITECTURAL
N
I
NO - NUMBER
ADJ. - ADJACENT
FULL,OR
NTS - NOT TO SCALE
R
BF - BOTH FACES
ANCHOR A ANCHOR B OD - OUTSIDE DIAMETER
BLDG - BUILDING
OC - ON CENTER
BOP - BOTTOM OF PIPE
FO
DOOR FRAME DOOR FRAME
OPP - OPPOSITE
C C BS - BOTH SIDES, BRITISH STANDARD
N
I
OPNG - OPENING
BOT - BOTTOM
DOOR OPENING DOOR OPENING
ON
R - RADIUS
BB - BOTTOM BAR
REPRODUCTI
RDP - RAINWATER DRAIN PIPE REFERENCE DRAWINGS
BOFT - BOTTOM OF FOOTING
BW - BOTH WAYS REF - REFERENCE DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
1-12 {
ED
CIP - CAST IN PLACE RB - ROOF BEAM
TOP OF CONCRETE REINF - REINFORCING
TOP OF CONCRETE CB - CATCH BASIN
FLOOR SLAB
FLOOR SLAB REV - REVISION
CJ - CONSTRUCTION JOINT
1-12 { 4-12 { RW - RETAINING WALL
SAUDIARAMCO.NO
CP - CATHODIC PROTECTION
DOWEL BAR DOWEL BAR
C - CENTER LINE SEC - SECTION
L
SU
1500 3000
CLR - CLEARANCE SHT - SHEET
MAXIMUM MAXIMUM
COL - COLUMN SJ - SEPARATION JOINT FILLED WITH
(DOOR OPENING REINF. DETAIL) CONT - CONTINUOUS
COMPRESSIBLE FILLER BOARD OR
(DOOR OPENING REINF. DETAIL) ISOLATED BY PLASTIC MEMBRANE
CTJ - CONTROL OR
SPEC(S) - SPECIFICATION(S)
CONTRACTION JOINT
IS
CMU - CONCRETE MASONRY UNIT SQ - SQUARE
S - SLOPE
OF
C/C - CENTER TO CENTER
PROPERTY
DN - DOWN SSA - SAUDI ARABIAN STANDARDS ASSOCIATION
SOLE
8{ @ 200 TOP BARS CMU WALL EGL - EXISTING GROUND LEVEL STIR - STIRRUPS
300
*250
STIRRUPS
*250
200
150
200
200
THE
2-12{
200 200 2-12 { 10 { @ 200 T - TOP
100 2-12{ 2-16{ 10 { @ 200 EQ. - EQUAL
BOT. BARS BOT. BARS TIES VERT. BARS TIES
*250 *250 TB - TOP BAR
FF - FAR FACE
ARE
FOR 150mm THK FDN - FOUNDATION THK - THICK/THICKNESS
FOR 100mm THK FOR 200mm THK FOR 200mm THK FOR 200mm THK
CMU WALL FFL - FINISH FLOOR LEVEL TOW - TOP OF WALKWAY
CMU WALL CMU WALL CMU WALL CMU WALL
N
HEREI
FGL - FINISH GRADE LEVEL TOC - TOP OF CONCRETE
(FOR 250mm THK (FOR 250mm THK (FOR 250mm THK SECTION C-C FPL - FINISH PAVED LEVEL TOG - TOP OF GROUT
SECTION A-A AS MARKED AS *) AS MARKED AS *) AS MARKED AS *) TOP - TOP OF PARAPET
SCALE 1:20 FCJ - FIELD CONSTRUCTION JOINT
NED
SCALE NTS TOB - TOP OF BEAM
FTV - FIELD TO VERIFY SCALE: NTS
SECTION A-A SECTION B-B SECTION C-C
CONTAI
GRD - GROUND TYP - TYPICAL
SCALE NTS SCALE NTS SCALE NTS GL - GROUND LEVEL UNO - UNLESS NOTED OTHERWISE REVISION VALIDATION
GB - GRADE BEAM VERT - VERTICAL THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
HP - HIGH POINT VB - VERTICAL BAR REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
ON
HOR - HORIZONTAL
W/ - WITH
NFORMATI
TYPICAL LINTEL AND REINFORCEMENT IL - INVERT LEVEL DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
WTL - WATER TABLE LEVEL (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
AROUND DOOR OPENING IJ - ISOLATION JOINT ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
WWF - WELDED WIRE FABRIC SMS ASH SAY AHG
ID - INSIDE DIAMETER
(APPLICABLE TO NON-LOAD BEARING WALLS ONLY) 03/07/16 09/08/16 09/08/16 09/08/16
{ - DIAMETER
IE - INVERT ELEVATION REV.NO. DATE REVISION DESCRIPTION
I
% - PERCENT C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
ITJ - INDUCED TIED JOINT
4 D E T A I L
THE
@ - AT JOB ORDER/EWO NO.
ICJ - INDUCED CONSTRUCTION JOINT THIS REVISION IS NOT TO BE USED FOR
N. T. S.
- # - NUMBER 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
- ELEVATION AT POINT MARKED ON PLAN
8x7- 2003 - 150
DRAWING TYPE
- ELEVATION AT POINT MARKED ON SECTION STANDARD DETAILS FDN
NG
BAR SPACING TYP
- BOTTOM BAR CONCRETE WORKS
DRAWI
SERIAL NUMBER
- TOP BAR YANBU DISTRIBUTION HUB
DIA OF BAR
YANBU SAUDI ARABIA
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
NUMBERS REQUIRED
6
.0 2. FOR PROJECT GRADE ELEVATION REFER CIVIL DRAWING.
50
OF
| OF TANK | OF TANK 4. SELECT FILL SHALL MEET THE REQUIREMENT OF
A
MAKKAH SAES-A-114.
WALKWAY (TYP)
CONSENT
A - 1200 WIDE 5. THE SAND FILL SHALL MEET THE REQUIREMENTS
OF SAES-A-114.
-
6. PVC PIPES EMBEDDED IN THE CONCRETE RING WILL
B B BE DESIGNED AND LOCATED BY THE CATHODIC
TTEN
PROTECTION CONTRACTOR.
- - 7. FOR GENERAL NOTES AND STANDARD DETAILS
WRI
REFER DWG.NO ST-A00002.001 TO 004.
THE
(TYP)
J
1" PVC PIPE SLEEVE FOR
C
9. LEAN CONCRETE SHALL COMPLY WITH 09-SAMSS-097
F
12mm THK
F
CATHODIC PROTECTION
J
~ AND SHALL HAVE CONTRACTION JOINTS 12MM WIDE AT
ISOLATION JOINT
THOUT
6000MM CENTERS.
EXPANSION 150mm THICK
10. FOUNDATION IS DESIGNED BASED ON API 650,
JOINT (TYP) CEMENT-SAND LAYER 150 THK. CONCRETE
F
J B B F
J 11TH EDITION. DETAIL DESIGN CONTRACTOR HAS
WI
CJ SEE NOTE-13 WALKWAY
TO VERIFY THE FOUNDATION DESIGN BASED ON
50 25 1200 1800
TANK BOTTOM IFC TANK VENDOR DRAWINGS/LOADINGS.
NG
25
SLOPE
DRAWI
11. EXPANSION JOINT MATERIAL SHALL CONFORM TO THE
SAUDI ARAMCO MATERIAL SPECIFICATION 09-SAMSS-075
300 300
FOR JOINT SEALANT.
EJ EJ EJ
600
| OF TANK 12.SIZES, AREAS, ARRANGEMENT, QUANTITIES, DIMENSIONS,
SPACING, RATING, MATERIAL SELECTION, ELEVATIONS,
S
THI
FGL
SAND FILL ETC. SHOWN ON ANY OF THE PROJECT DELIVERABLE
EL. 105.800
SEE NOTE-5 ARE PRELIMINARY. CONSTRUCTION CONTRACTOR SHALL
1600
VERIFY, CONFIRM, AND REVISE THEM TO THE STATE
FROM
CONSTRUCTION
RGL EL. 105.175 OF FULL COMPLIANCE WITH SAUDI ARAMCO STANDARDS
JOINT (TYP)
FJ C AND PROCEDURES DURING DEVELOPMENT OF THE
J J
C
DETAIL DESIGN PACKAGE.
NED
1600
SELECT FILL 13. CEMENT SAND LAYER SHALL BE PROVIDED AS PER
SEE NOTE-4 B.2.6 OF 32-SAMSS-005.
OBTAI
14. ALL STEEL EMBEDDED ITEMS TO BE GALVANIZED AS PER
F
C
J
C
SAES-Q-001.
J
J
F
600
~
45
100 500
LEGEND
BE
EJ EJ 50 THK.
LEAN CONCRETE FGL FINISHED GRADE LEVEL
150x150 MW9xMW9
PART,SHALL
TYP TYPICAL
D
WELDED WIRE FABRIC A THK THICKNES
GALVANIZED (TYP. ALL AROUND) EJ EXPANSION JOINT
1800 SOP SETTING OUT POINT
BI
EXISTING SOIL
F.J FIELD CONSTRUCTION JOINT
A SHALL BE COMPACTED
IJ ISOLATION JOINT
150x150 MW9xMW9 PER SAES-A-114
150mm THICK
TOC
WELDED WIRE FABRIC TOP OF CONCRETE
N
I
CONCRETE WALKWAY
GALVANIZED (TYP. ALL AROUND) CJ CONTROL JOINT
(TYP ALL AROUND)
FULL,OR
R
RGL ROUGH GRADE LEVEL
TANK FOUNDATION PLAN NTS NOT TO SCALE
SCALE NTS
REFERENCE DRAWINGS
FO
B S E C T I O N DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
N
I
SCALE NTS
- FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
ON
REINFORCEMENT DETAILS ST-A00011.002
REPRODUCTI
A
TANK
18000 TRUE
NORTH
DIRECTION OF
PREVAILING WIND
6
.0
INTERNAL DIA OF TANK
0
-
5
ED
PLANT
1800 1200 650 650 1200 NORTH
|
MAKKAH
THIS DRAWING
400
250
8
6
. 5
955 6
0
980 5 045 8
2
071 6
0
.
5
8 23.
0 .
2
.
0
0 57.
9 .
7
7 49 2
9 66
.1 84
0 48
32 . .5
.
14
265 8
= 265 8
08
29 1
1 09
29 1
9
9
30 9
9 2
1
1
2 1
1 0
3 0
0
8
4 5
4 5
4 5
4 5
9 0
6
6 29 6
2
4
4
E= =
E =
N=
N
N= N=
N
N=
E= E= E= E=
Shareh AL-Khamis
SAUDIARAMCO.NO
TOC EL. 106.100
SAND FILL LAYER
SLEEVES FOR
13mm ASPHALT B
SEE NOTE-5
00
IMPREGNATED BOARD
SU
NG)
STI
CATHODIC PROTECTION
-
T8 (EXI
150mm THICK
75
SEE DETAIL-1
(SEE NOTE - 6)
CEMENT-SAND LAYER
39999
{1
150 THK. CONCRETE
25mm CHAMFER (TYP)
B
45325
46025
56440
L
SLOPE
AL
3 (SEE NOTE-9)
600
800
FGL FGL
GW
1 400
ND
OF
WI
NATIONAL GAS
ON
EL. 105.800 EL. 105.800
NG
RECTI
LI
EXPANSION
PREVAI
1600
IS
DI
50.06 A=3.66 HA.
250
RI
| TANK Shareh AL-AWAL
OF
OF
1600
A
SEE NOTE-4
DI
PROPERTY
45
KEY PLAN
600
L
NA
ER
NT
1800
12mm WIDE ISOLATION JOINT
I
WITH JOINT FILLER ALL AROUND
SOLE
2 COATS OF COAL TAR
EXISTING SOIL
EPOXY PAINT AS PER APCS-3 AND SEALANT AS PER 09-SAMSS-075
SHALL BE COMPACTED
(TYP.)
PER SAES-A-114
A
THE
ARE
A S E C T I O N
N
RINGWALL FOUNDATION PLAN
HEREI
SCALE NTS
-
SCALE NTS
(TANK ANCHORAGE SHALL BE DETERMINED BY LSTK
CONTRACTOR AS PER API650 STANDARD REQUIREMENTS)
NED
SCALE: NTS
CONTAI
REVISION VALIDATION
3mm WIDEx30mm
12 3mm WIDEx30mm
DEEP TOOLED THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
100mm WIDE
100mm WIDE OR SAWCUT JOINT DEEP TOOLED INTER FACE REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
100mm WIDE PLAIN TROWELLED
12mm THK EXPANSION OR SAWCUT JOINT
ON
PLAIN TROWELLED (FILLED WITH SEALANT) OF TANK
PLAIN TROWELLED BORDER STRIP
FILLED WITH 12 x 12mm (FILLED WITH SEALANT)
NFORMATI
BORDER STRIP
BORDER STRIP DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
SEALANT 450 150mm THK (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
150mm THK
150x150 MW9.0xMW9.0 150x150 MW9.0xMW9.0 (LAP) CONCRETE 150x150 MW9.0xMW9.0 25 70 50 TANK BOTTOM ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
25
25
WELDED WIRE FABRIC WELDED WIRE FABRIC WELDED WIRE FABRIC SLOPE
CONCRETE R=5
03/07/16 09/08/16 09/08/16 09/08/16
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
150
150
150
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
13mm ASPHALT
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
IMPREGNATED BOARD
SAUDI ARABIAN OIL COMPANY
AND
DRAWING TYPE
NG
SELECT FILL SELECT FILL SELECT FILL
FIRE WATER TANK-X40-D-0028 A/B
DRAWI
1 D E T A I L YANBU DISTRIBUTION HUB
EXPANSION JOINT (EJ) FIELD CONSTRUCTION JOINT (FJ) CONTROL JOINT (CJ)
NOT TO SCALE - SCALE 1 :10M YANBU SAUDI ARABIA
NOT TO SCALE NOT TO SCALE
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
(NOTE:- DOWEL NOT SHOWN FOR CLARITY) (PROVIDE DOWEL IF REINFORCEMENT NOT CONTINUOUS)
OF
3. FOR GENERAL NOTES AND STANDARD DETAILS
REFER DWG.NO ST-A00002.001 & 004.
CONSENT
4. REBAR ARRANGEMENT SHOWN IN THIS DRAWING IS
INDICATIVE. LSTK CONTRACTOR SHALL USE APPROPRIATE
NUMBER OF SPACER BAR, CHAIRS AND ADDITIONAL
TIES DURING DETAIL DESIGN STAGE.
TTEN
LSTK CONTRACTOR SHALL FINALIZE BAR LAPPING
SCHEDULE AND DETAILS INCLUDING STAGGERING
WRI
OF REBARS FOR OPTIMUM DESIGN
{25 BARS
DURING DETAILED DESIGN.
THE
THOUT
WI
{25 BARS
{12
NG
650 LEGEND
DRAWI
75 CLR. 500 75 CLR. FGL FINISHED GRADE LEVEL
{ DIAMETER
CLR.
S
@ AT
THI
EF EACH FACE
NTS NOT TO SCALE
75
FROM
CLR CLEAR
NED
{25 BARS
A
OBTAI
16 0 0
{12 BARS
-
BE
PART,SHALL
D
CLR.
BI
75
N
I
FULL,OR
R
A S E C T I O N REFERENCE DRAWINGS
SCALE NTS
- DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FO
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
N
I
FOUNDATION DETAILS ST-A00011.001
ON
REPRODUCTI
ED
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
SAUDIARAMCO.NO
MAKKAH
SU
THIS DRAWING
OLD OLD
SANITARY WASTE TIE-IN POTABLE WATER TIE-IN
N 35839.070 N 35827.510 OW
E 32071.380
448
E 32085.140
928
N 2651116.807
E 429746.000
N 2651105.247
68 80 TIE-IN PONT
90
.108
.576
E756
955 429759.760
.9
9
045 058 071
.
42
.
1123
4 225
8
Y=35899.
X=31996.
132. 114. 98 095708. 19
N 34670.220
51
51
798. 809. 820. 0966 0948
65
5
9
9
26 42 26 42 26 42 26 4299 2 4300 26 4300
N=
=
N
= = = N= N= N=
Shareh AL-Khamis
E
E= E= E=
E 33467.420
N 2649947.957
445
411
E 431142.040
588
021
Y=35853.
X=31958.
Y=35885.
X=31920.
E=429712.7671 E=430772.8641
N=2651129.9033 N=2650242.3119
BH2
E=429695.4578 E=429806.8314 E=430738.6476 E=431024.1194
N=2651074.8684 N=2650981.6195 N=2650201.4448 N=2649962.4300
SCALE NTS
E=429680.7983
N=2651063.0141
BH1
E=429612.0347
N=2651056.9232
E=429593.3504
N=2651065.8241
NG)
IS
STI
E=430907.4454E=430848.2380
N=2649920.7064
N=2649871.1342
FENCE
CATEGORY-IFENCE
T8 (EXI
CATEGORY-I
E=429852.0230 E=430077.0221 E=430273.4220 E=430793.2701
N=2650643.1253 N=2650454.7420 N=2650290.3038 N=2649855.0545
E=429660.2006
N=2650739.6555 39999
E=429611.2692
E=429641.7468 E=429801.9981 E=430026.9973 E=430223.3971 E=430743.2452
N=2650748.0462
N=2650717.6148 N=2650583.3772 N=2650394.9939 N=2650230.5557 N=2649795.3064
OF
14NCB-RC1 14NCB-RC1 14NCB-RC1 14NCB-RC1
CATEGORY-I FENCE
45325
46025
56440
57140
FENCE
E=429475.5575 E=429532.1057 E=430147.9323
V
CATEGORY-I
CATEGORY-IFENCE
PROPERTY
E=430077.3166
N=2650056.0817
14NCB-RC1
E=429252.2905
14NCB-RC1
E=430063.6027
N=2650723.9147
14NCB-RC1
N=2650039.7022
14NCB-RC1
CATEGORY-IV FENCE
E=429432.0883
N=2650534.0380
E=429218.2169 E=429376.2340
N=2650682.6265 N=2650550.3248
E=430002.8823
N=2649967.1797
205
712
338
366
X=31635.
Y=35281.
Y=35390.
X=31505.
ND
OF
WI
E=429958.4566
ON
TY
NG
RECTI
LI
LI
GASCO
EXPANSION
PREVAI
FACI
E=429931.9666 E=430534.2727
N=2649882.4801 N=2649377.3725
DI
50.06 A=3.66 HA.
493
788
993
ND
E=429477.5834 E=429702.5826 E=429898.9824 E=430418.8305
E=430462.7783
OF
WI
E=430540.7691
341
X=31485.
Y=35101.
ON
NG
N=2650195.9064 N=2650007.5231 N=2649843.0849 N=2649407.8356
N=2649371.0398
RECTI
LI
2650350.
N=2649302.0751
PREVAI
BH4
NORTH
TRUE
429209.
DI
.06
50
PLANT
NORTH
0000
0000
E=430469.6516
N
E
1000.
1000.
N=2649295.7687
Shareh AL-AWAL
N
E
BH3
SOLE
KEY PLAN
THE
ARE N
HEREI
FRONT VIEW REAR VIEW
CLR.
{12
NED
SCALE: NTS
CONTAI
REVISION VALIDATION
{12
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
16 0 0
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
CLR.
THE
JOB ORDER/EWO NO.
{25 BARS {25 BARS THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
75
AND
DRAWING TYPE
NG
SCALE NTS FIRE WATER TANK-X40-D-0028 A/B
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00011 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
PRELIMINARY AND SHALL BE FINALIZED UPON
.0
50
CONSENT
CONTRACTOR.
PLANT
NORTH 4.FGL SHALL BE AS PER CIVIL GRADING DRAWING.
MAKKAH
TTEN
WRI
6300
THE
| OF TANK
THOUT
A
WI
LP
NG
20 WIDE x 300 LONG
DRAWI
TRIANGULAR GROOVE
| OF TANK
FROM TOP OF FOUNDATION
AT EACH MAJOR AXIS (TYP)
B
1 20
- C T.O.C.
S
THI
45
B
HP
300
FROM
6300
20
| OF TANK LP 20
LP
LEGEND
S.O.P.
HP
NED
20 FGL FINISHED GRADE LEVEL
OBTAI
TOC TOP OF CONCRETE
BE
HP HIGH POINT
- TOP TOP OF PLATE
PART,SHALL
D
LP ANCHOR BOLT BY VENDOR TOW TOP OF WALL
VAR VARYING
1 D E T A I L C S E C T I O N
BI
| CENTER LINE
DRAINAGE GROOVE
(TYP) - SCALE 1 :10M - SCALE NTS
{ DIAMETER
THK THICKNESS
A
N
I
TANK SHELL (BY VENDOR)
FULL,OR
-
R
REFERENCE DRAWINGS
FO
GEN-D0001
TANK FOUNDATION PLAN
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
N
SCALE 1 :50M
I ON
REPRODUCTI
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
ED
PLANT
NORTH
MAKKAH
THIS DRAWING
OLD OLD
SAUDIARAMCO.NO
SANITARY WASTE TIE-IN POTABLE WATER TIE-IN
N 35839.070 N 35827.510 OW
E 32071.380
448
E 32085.140
928
N 2651116.807 N 2651105.247
TIE-IN PONT
756 5
9 8
225 0
108 5
57671
5 6 8 4
8 .05
E 429746.000
2
8. 9
E 429759.760
9 9
0. 9
8. 0
0
9 2.
0 3.
2 4.
9 6.
4
8.
4
00 7
8
. .
Y=35899.
X=31996.
3
5112
1 6
0 95
00 4
9.
4 511
09
8 11 0 09 1
N 34670.220
98
5
5
97
29
6 6 99
6
2
2 2 3 3
= 2
2
4 4 4 4 4
E =
=
=
N=
=
N N
N
=
=
E E E E E
445
411
E 431142.040
588
021
Y=35853.
X=31958.
Y=35885.
X=31920.
E=429712.7671 E=430772.8641
N=2651129.9033 N=2650242.3119
BH2
E=429695.4578 E=429806.8314 E=430738.6476 E=431024.1194
N=2651074.8684 N=2650981.6195 N=2650201.4448 N=2649962.4300
E=429680.7983
N=2651063.0141
BH1
SU
E=429566.6767
N=2651116.9632 E=429612.0347
N=2651056.9232
E=429593.3504
N=2651065.8241
NG)
STI
E=430907.4454E=430848.2380
N=2649920.7064
N=2649871.1342
FENCE
ENCE
T8 (EXI
CATEGORY-IF
CATEGORY-I
E=429852.0230 E=430077.0221 E=430273.4220 E=430793.2701
N=2650643.1253 N=2650454.7420 N=2650290.3038 N=2649855.0545
E=429660.2006
N=2650739.6555 39999
E=429611.2692
E=429641.7468 E=429801.9981 E=430026.9973 E=430223.3971 E=430743.2452
N=2650748.0462
N=2650717.6148 N=2650583.3772 N=2650394.9939 N=2650230.5557 N=2649795.3064
CATEGORY-I FENCE
45325
46025
56440
57140
FENCE
E=429475.5575 E=429532.1057 E=430147.9323
V
CATEGORY-I
CATEGORY-IFENCE
E=430077.3166
E=429243.6495
N=2650056.0817
N=2650731.1494
14NCB-RC1
E=429252.2905
14NCB-RC1
E=430063.6027
N=2650723.9147
14NCB-RC1
N=2650039.7022
14NCB-RC1
CATEGORY-IV FENCE
E=429432.0883
N=2650534.0380
E=429218.2169 E=429376.2340
N=2650682.6265 N=2650550.3248
E=430002.8823
IS N=2649967.1797
205
712
338
366
X=31635.
Y=35281.
Y=35390.
X=31505.
ND
OF
WI
E=429958.4566
ON
TY
NG
RECTI
LI
NORTH
LI
TRUE
GASCO
EXPANSION
5500
PREVAI
FACI
E=429931.9666 E=430534.2727
N=2649882.4801 N=2649377.3725
DI
06
50. A=3.66 HA.
493
788
993
ND
E=429477.5834 E=429702.5826 E=429898.9824 E=430418.8305
E=430462.7783
OF
WI
E=430540.7691
341
X=31485.
Y=35101.
ON
NG
N=2650195.9064 N=2650007.5231 N=2649843.0849 N=2649407.8356
N=2649371.0398
RE CT I
LI
2650350.
N=2649302.0751
PREVAI
BH4
NORTH
TRUE
429209.
DI
OF
6
.0
50
PL AN T
NORTH
0000
0000
E=430469.6516
(TANK I.D)
N
E
1000.
1000.
N=2649295.7687
Shareh AL-AWAL
N
E
BH3
APCS-1B-COATING
PROPERTY
25
T.O.C
300
{12 BAR
T.O.C
SLOPE SLOPE
EL. +106.100
FGL
EL. 105.800
KEY PLAN
25 30 25
1000
SOLE
80
{10 BAR APCS-10 COATING
1 1
1 1
THE
LEAN CONCRETE 50 THK LEAN CONCRETE
COMPACTED 0 0.1 0.2 0.3 0.4 0.5 1.0
SELECT FILL
ARE
METERS
COMPACTED
SUBGRADE
1 : 10M
N
HEREI
320 480 4700 480 320
0 1.0 2.0 3.0 4.0 5.0
6300
METERS
B S E C T I O N
NED
SCALE: 1 : 50M
SCALE NTS
CONTAI
-
A S E C T I O N REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
UTILITY WATER TANK-X40-D-0014
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00012 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
NORTH
ANCHOR BOLT 3. FOUNDATION DESIGN AND ANCHOR BOLT DETAILS ARE
(BY VENDOR) PRELIMINARY AND SHALL BE FINALIZED UPON
6
1150
CONSENT
SLOPE 1.5% SLOPE 1.5%
.0
NORTH TOC
TTEN
450
150
MAKKAH
TOC
WRI
FGL
(SEE NOTE-4)
5%
THE
5%
OILY WATER TREATMENT PACKAGE
1.
1.
5000
7300
| OF FOUNDATION (X40-U-0004)
SLOPE
SLOPE
THOUT
WI
LEGEND
J
.
.
I
NG
ANCHOR BOLT (BY VENDOR)
DRAWI
()TYP
I.J ISOLATION JOINT
CB CATCH BASIN
I.J B S E C T I O N FGL FINISHED GRADE LEVEL
1150
S
THI
SCALE 1 :25M TYP TYPICAL
SLOPE 1.5% SLOPE 1.5% -
TOC TOP OF CONCRETE
FROM
THK THICK
NED
T&B
FOUNDATION PLAN A { DIAMETER
OBTAI
SCALE 1 :50M
12000
BE
B
ANCHOR BOLT (BY VENDOR)
225
PART,SHALL
D
250
BI
185
N
25 425 25
I
FULL,OR
R
FO
REFERENCE DRAWINGS
DE
WI
DWG. CONTROL FOR J.O # 10-02399-0001
N
GEN-D0001
I
GROUT
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
50
ON
TYP)
REPRODUCTI
GAP
OILY WATER TREATMENT PACKAGE
N
I
(
5000
4500
(X40-U-0004) | OF FOUNDATION
ED
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
MAKKAH
THIS DRAWING
SAUDIARAMCO.NO
SU
Shareh AL-Khamis
~
25mm THICK
GROUT
NG)
STI
T8 (EXI
39999
SKID
45325
46025
IS 56440
57140
FOUNDATION
OF
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
EXPANSION
PREVAI
DI
50.06 A=3.66 HA.
PROPERTY
Shareh AL-AWAL
250
| OF FOUNDATION
KEY PLAN
B
SOLE
ANCHOR BOLT LAYOUT PLAN
0 0.5 1.0 1.5 2.0
SCALE 1 :25M
THE
METERS
7300
1 : 20M
ARE
150 1000 5000 1000 150 0 0.5 1.0 2.0
METERS
N
12 THK ISOLATION
HEREI
1 : 25M
{16 JOINT (TYP)
0 1.0 2.0 3.0 4.0 5.0
TOC
NED
PER SAES-H-003
SCALE: 1 : 50M
TOC
CONTAI
650
300
REVISION VALIDATION
{12
TOC FGL THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
FGL
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
REFER NOTE-4
6X2-{ 12
REFER NOTE-4
ON
150
300
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
{12 (TYP)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
I
600 THK. COMPACTED SELECT FILL C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
450
AS PER SAES-A-114
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
2 COATS OF
SAUDI ARABIAN OIL COMPANY
AND
BITUMINOUS
PAINT AS PER
DRAWING TYPE
APCS-10
50 THK FOUNDATION DETAILS FDN
NG
0.25 THK POLYETHYLENE COMPACTED SOIL LEAN CONCRETE
{16 T&B OILY WATER PACKAGE (X40-U-0004)
DRAWI
SHEET (TYP) AS PER SAES-A-114
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
-
THI
SCALE 1 :20M
350
ELEVATIONS ARE IN METERS UNLESS OTHERWISE
TRUE DIRECTION OF
NOTED.
NORTH PREVAILING WIND
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ 2. FOR GENERAL NOTES AND STANDARD DETAILS
6
OF
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
PLANT CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
C
CONSENT
NORTH EJ EJ SHOWN IN RESPECTIVE GRADING AND STORM
ST-A00024
DIKE WALL 2000 HIGH
(TYP.) DRAINAGE PLAN.
SH 001
TTEN
EJ EJ 5. 1.5 MM THICK HDPE LINER SHALL BE PLACED BELOW
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
CONCRETE DIKE WALL INSIDE FACE.
WRI
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
FGL VARIES
AREA WITH HDPE LINER PROVIDED BY OTHER
THE
EJ EJ
(REFER RESPECTIVE CIVIL DRAWING) CONTRACTOR AROUND TANK FOUNDATIONS.
THOUT
7. MINIMUM 500 MM MARL COVER SHALL BE PROVIDED
OVER HDPE LINER FOR PROTECTION.
WI
EJ EJ
LEGEND
NG
DRAWI
EJ EJ FGL FINISHED GRADE LEVEL
EJ EXPANSION JOINT
S
TYPICAL
THI
TYP
FROM
EJ EJ
NED
OBTAI
EJ EJ
BE
EJ EJ
PART,SHALL
D
BI
EJ
EJ
155000
DIESEL STORAGE TANK. X40-D-0006A
N
REFERENCE DRAWINGS
I
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
EJ
EJ FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
FO
FOUNDATION PLAN ST-A00016.002
N
I
FOUNDATION PLAN ST-A00016.003
EJ EJ
ON
REPRODUCTI
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
THIS DRAWING
ED
PLANT
NORTH
EJ EJ MAKKAH
SAUDIARAMCO.NO
HOLD-3 HOLD-3
E: 1876.900
EJ EJ
SU
39999
E: 1572.267
45325
46025
56440
57140
E: 1323.315
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
50.06
EJ EJ
NORTH
PLANT
E: 1063.100
IS
OF
PROPERTY
EJ EJ
KEY PLAN
EJ EJ
SOLE
C
THE
ST-A00024
C EJ
SH 001
EJ
ARE
C
ST-A00024
B SH 001
N
HEREI
ST-A00024
EJ SH 001 DIKE WALL 2000 HIGH EJ
0 10.0 20.0 30.0
(TYP.)
350
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ METERS
NED
SCALE: 1 :300M
CONTAI
EJ EJ
10650
REVISION VALIDATION
ON
EJ EJ
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
FOR CONTINUATION REFER DWG. # ST-A00016.002 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
SCALE 1 :300M 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
DIKE WALL FOR DIESEL STORAGE TANKS
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00016 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
PLANT 3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
NORTH CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
CONSENT
SHOWN IN RESPECTIVE GRADING AND STORM
DRAINAGE PLAN.
MAKKAH
4. TYPICAL EXPANSION JOINT SPACING IS 6M, AS PER
350 200000 350 FIGURE 2 OF SAES-B-005.
TTEN
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
CONCRETE DIKE WALL INSIDE FACE.
WRI
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
AREA WITH HDPE LINER PROVIDED BY OTHER
THE
EJ EJ CONTRACTOR AROUND TANK FOUNDATIONS.
THOUT
7. MINIMUM 500 MM MARL COVER SHALL BE PROVIDED
OVER HDPE LINER FOR PROTECTION.
WI
EJ EJ
NG
DRAWI
EJ EJ
S
THI
LEGEND
FROM
EJ EJ
EJ EXPANSION JOINT
NED
FGL FINISHED GRADE LEVEL
TYP TYPICAL
OBTAI
EJ EJ
BE
PART,SHALL
EJ EJ
D
BI
EJ
EJ
N
REFERENCE DRAWINGS
I
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
DIESEL STORAGE TANK. X40-D-0006B FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
EJ
EJ SECTION AND DETAILS ST-A00024.001
FO
144350
FOUNDATION PLAN ST-A00016.001
N
I
FOUNDATION PLAN ST-A00016.003
ON
EJ EJ
REPRODUCTI
TRUE
DIRECTION OF
ED
NORTH
PREVAILING WIND
6
.0
0
5
EJ EJ PLANT
NORTH
THIS DRAWING
MAKKAH
SAUDIARAMCO.NO
SU
EJ EJ E: 1876.900
HOLD-3 HOLD-3
39999
E: 1572.267
45325
46025
C
56440
57140
C
ST-A00024
E: 1323.315
EJ EJ
IS
SH 001
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
50.06
NORTH
PLANT
E: 1063.100
OF
DIKE WALL 2000 HIGH
PROPERTY
EJ (TYP.) EJ
FGL VARIES
KEY PLAN
(REFER RESPECTIVE CIVIL DRAWING)
SOLE
EJ EJ
C
ST-A00024
C SH 001
THE
EJ EJ
ARE N
HEREI
0 10.0 20.0 30.0
EJ EJ
METERS
B
NED
DIKE WALL 2000 HIGH 1 :300M
SCALE:
ST-A00024 (TYP.)
CONTAI
SH 001
350
EJ
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ REVISION VALIDATION
ON
NFORMATI
13000
EJ EJ DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
B (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
EJ EJ C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
FOR CONTINUATION REFER DWG. # ST-A00016.003 THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
DIKE WALL FOR DIESEL STORAGE TANKS
DRAWI
DIKE WALL FOUNDATION PLAN YANBU DISTRIBUTION HUB
SCALE 1 :300M YANBU SAUDI ARABIA
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00016 002 C
Saudi Aramco 2615 ENG. (05/05)
6
2. FOR GENERAL NOTES AND STANDARD DETAILS
.0
REFER DWG.NO ST-A00002.001 TO 004.
50
OF
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
PLANT
SHOWN IN RESPECTIVE GRADING AND STORM
CONSENT
NORTH
DRAINAGE PLAN.
TTEN
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
CONCRETE DIKE WALL INSIDE FACE.
WRI
FOR CONTINUATION REFER DWG. # ST-A00016.002
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
AREA WITH HDPE LINER PROVIDED BY OTHER
THE
CONTRACTOR AROUND TANK FOUNDATIONS.
THOUT
EJ EJ OVER HDPE LINER FOR PROTECTION.
WI NG
DRAWI
EJ EJ
S
THI
LEGEND
EJ EJ
FROM
EJ EXPANSION JOINT
TYP TYPICAL
NED
EJ EJ
OBTAI
EJ EJ
BE
PART,SHALL
D
EJ EJ
BI
N
EJ REFERENCE DRAWINGS
I
EJ
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
DIESEL STORAGE TANKS. X40-D-0006C
SECTION AND DETAILS ST-A00024.001
FO
EJ
EJ FOUNDATION PLAN ST-A00016.001
N
142000
I
FOUNDATION PLAN ST-A00016.002
ON
REPRODUCTI
EJ EJ
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
ED
6
.0
0
5
PLANT
NORTH
MAKKAH
THIS DRAWING
EJ
C EJ C
SAUDIARAMCO.NO
ST-A00024
SH 001
SU
HOLD-3 HOLD-3
E: 1876.900
EJ EJ E: 1572.267
39999
45325
46025
56440
57140
E: 1323.315
IS
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
50.06
NORTH
PLANT
E: 1063.100
OF
EJ EJ
PROPERTY
EJ EJ
KEY PLAN
FGL VARIES
SOLE
C
ST-A00024 (REFER RESPECTIVE CIVIL DRAWING)
C EJ SH 001 EJ
THE
ARE
EJ EJ
N
HEREI
0 10.0 20.0 30.0
METERS
NED
EJ EJ
SCALE: 1 :300M
CONTAI
REVISION VALIDATION
ON
350
800
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
350 200000 350 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
SH 001
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
DIKE WALL FOR DIESEL STORAGE TANKS
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
SCALE 1 :300M
X40 Q ST-A00016 003 C
Saudi Aramco 2615 ENG. (05/05)
OF
PLANT ST-A00024
EJ EJ
NORTH SH 001 CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
SHOWN IN RESPECTIVE GRADING AND STORM
CONSENT
DRAINAGE PLAN.
MAKKAH
4. TYPICAL EXPANSION JOINT SPACING IS 6M, AS PER
EJ EJ FIGURE 2 OF SAES-B-005.
TTEN
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
CONCRETE DIKE WALL INSIDE FACE.
EJ EJ
WRI
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
AREA WITH HDPE LINER PROVIDED BY OTHER
THE
CONTRACTOR AROUND TANK FOUNDATIONS.
EJ EJ
THOUT
OVER HDPE LINER FOR PROTECTION.
WI
EJ EJ
NG
DRAWI
108925
EJ EJ
PG91 X40-D-0002A
S
THI
LEGEND
EJ EJ
FROM
EJ EXPANSION JOINT
EJ
FGL FINISHED GRADE LEVEL
NED
EJ EJ TYP TYPICAL
OBTAI
C
C EJ ST-A00024 EJ
BE
SH 001
PART,SHALL
D
EJ EJ
BI
FGL VARIES
EJ EJ
(REFER RESPECTIVE CIVIL DRAWING)
N
REFERENCE DRAWINGS
I
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
EJ EJ FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
FO
N
I
350
EJ EJ
ON
REPRODUCTI
TRUE
D NORTH
DIRECTION OF
PREVAILING WIND
ST-A00024 PLANT
NORTH
EJ SH 001 EJ MAKKAH
ED
THIS DRAWING
EJ EJ
SAUDIARAMCO.NO
FGL VARIES
SU
(REFER RESPECTIVE CIVIL DRAWING)
C
EJ C EJ ST-A00024 HOLD-3 HOLD-3
SH 001 E: 1876.900
39999
IS E: 1572.267
EJ EJ
45325
46025
56440
57140
OF
E: 1323.315
PROPERTY
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
EJ EJ
DI
06
50.
NORTH
PLANT
E: 1063.100
EJ EJ
SOLE
108925
PG91 X40-D-0002A KEY PLAN
THE
EJ EJ
ARE
EJ
N
EJ
HEREI
0 10.0 20.0 35.0
METERS
NED
EJ EJ 1 :350M
SCALE:
CONTAI
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
ST-A00024
THE
EJ EJ JOB ORDER/EWO NO.
SH 001 THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
DRAWING TYPE
NG
DIKE WALL FOR PG (91) STORAGE TANKS
DRAWI
350 150000 350 YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
SCALE 1 :350M
X40 Q ST-A00017 001 C
Saudi Aramco 2615 ENG. (05/05)
350
NOTES:
1. ALL DIMENSIONS ARE IN MILLMETERS AND
ELEVATIONS ARE IN METERS UNLESS OTHERWISE
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ NOTED.
TRUE DIRECTION OF
2. FOR GENERAL NOTES AND STANDARD DETAILS
NORTH PREVAILING WIND
C REFER DWG.NO ST-A00002.001 TO 004.
6
ST-A00024
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
OF
.0
EJ SH 001 EJ
50
CONSENT
PLANT DRAINAGE PLAN.
NORTH
EJ EJ 4. TYPICAL EXPANSION JOINT SPACING IS 6M, AS PER
FIGURE 2 OF SAES-B-005.
MAKKAH
TTEN
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
EJ EJ CONCRETE DIKE WALL INSIDE FACE.
WRI
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
THE
AREA WITH HDPE LINER PROVIDED BY OTHER
THOUT
7. MINIMUM 500 MM MARL COVER SHALL BE PROVIDED
OVER HDPE LINER FOR PROTECTION.
WI
EJ EJ
NG
DRAWI
108925
EJ EJ
PG95 X40-D-0016A
S
THI
EJ EJ LEGEND
FROM
EJ EXPANSION JOINT
NED
EJ EJ FGL FINISHED GRADE LEVEL
OBTAI
TYP TYPICAL
EJ EJ
BE
PART,SHALL
D
EJ EJ
BI
EJ EJ
FGL VARIES
N
REFERENCE DRAWINGS
I
(REFER RESPECTIVE CIVIL DRAWING)
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
EJ EJ FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
D SECTION AND DETAILS ST-A00024.001
FO
N
I
350
EJ EJ NORTH
TRUE
DIRECTION OF
PREVAILING WIND
ON
6
.0
0
5
PLANT
REPRODUCTI
NORTH
MAKKAH
D
ST-A00024
EJ EJ
SH 001
ED
THIS DRAWING
EJ EJ
SAUDIARAMCO.NO
SU
HOLD-3 HOLD-3
FGL VARIES
E: 1876.900
SH 001 C
45325
46025
56440
C
57140
ST-A00024
SH 001
IS E: 1323.315
EJ EJ
OF
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
06
50.
NORTH
PLANT
E: 1063.100
PROPERTY
EJ EJ
KEY PLAN
EJ EJ
SOLE
108925
PG95 X40-D-0016B
THE
EJ EJ
ARE N
EJ EJ
HEREI
0 10.0 20.0 35.0
METERS
NED
EJ EJ 1 :350M
SCALE:
CONTAI
REVISION VALIDATION
EJ
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
ST-A00024
THE
EJ EJ JOB ORDER/EWO NO.
SH 001 THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
DRAWING TYPE
NG
DIKE WALL FOR PG (95) STORAGE TANKS
DRAWI
350 150000 350 YANBU DISTRIBUTION HUB
S
C PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
SCALE 1 :350M
X40 Q ST-A00018 001 C
Saudi Aramco 2615 ENG. (05/05)
350
NORTH PREVAILING WIND
2. FOR GENERAL NOTES AND STANDARD DETAILS
REFER DWG.NO ST-A00002.001 TO 004.
6
.0
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
50
OF
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
PLANT
CONSENT
C SHOWN IN RESPECTIVE GRADING AND STORM
NORTH EJ DIKE WALL 2000 HIGH EJ DRAINAGE PLAN.
ST-A00024 (TYP.)
SH 001
4. TYPICAL EXPANSION JOINT SPACING IS 6M, AS PER
MAKKAH
FIGURE 2 OF SAES-B-005.
EJ EJ
5. 1.5 MM THICK HDPE LINER SHALL BE PLACED BELOW
TTEN
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
CONCRETE DIKE WALL INSIDE FACE.
WRI
EJ EJ
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
THE
AREA WITH HDPE LINER PROVIDED BY OTHER
CONTRACTOR AROUND TANK FOUNDATIONS.
EJ EJ
THOUT
7. MINIMUM 500 MM MARL COVER SHALL BE PROVIDED
OVER HDPE LINER FOR PROTECTION.
WI
EJ EJ
NG
DRAWI
EJ EJ
110000
S
THI
EJ
EJ
FROM
EJ EXPANSION JOINT
NED
OBTAI
EJ EJ
BE
FGL VARIES
EJ EJ
PART,SHALL
(REFER RESPECTIVE CIVIL DRAWING)
D
EJ EJ
BI
B
EJ EJ
N
REFERENCE DRAWINGS
I
ST-A00024
SH 001 DIKE WALL 2000 HIGH
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
(TYP.)
R
350
FO
FOUNDATION PLAN ST-A00019.002
N
I
EJ EJ
ON
B
REPRODUCTI
TRUE
DIRECTION OF
NORTH
EJ EJ PREVAILING WIND
6
.0
0
5
C C
ED
C
PLANT
NORTH
ST-A00024 ST-A00024
MAKKAH
THIS DRAWING
SH 001
C SH 001
EJ EJ
SAUDIARAMCO.NO
HOLD-3 HOLD-3
E: 1876.900
FGL VARIES
SU
EJ EJ
(REFER RESPECTIVE CIVIL DRAWING)
39999
E: 1572.267
45325
46025
56440
57140
EJ EJ
E: 1323.315
IS
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
06
OF
50.
EJ EJ
NORTH
PLANT
E: 1063.100
PROPERTY
110000
SOLE
EJ EJ
KEY PLAN
THE
EJ
EJ
ARE
EJ EJ
N
HEREI
0 10 20 30 40
EJ EJ METERS
NED
SCALE: 1 : 400M
CONTAI
EJ EJ
REVISION VALIDATION
B
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ST-A00024
DIKE WALL 2000 HIGH REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
SH 001
(TYP.)
ON
350
EJ EJ
NFORMATI
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
20000
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
EJ EJ
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
EJ EJ
FOUNDATION PLAN FDN
NG
FOR CONTINUATION REFER DWG. # ST-A00019.002
DIKE WALL FOR DPK STORAGE TANKS
DRAWI
YANBU DISTRIBUTION HUB
DIKE WALL FOUNDATION PLAN
YANBU SAUDI ARABIA
SCALE 1 :400M
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00019 001 C
Saudi Aramco 2615 ENG. (05/05)
EJ EJ
OF
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
PLANT CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
NORTH
CONSENT
SHOWN IN RESPECTIVE GRADING AND STORM
EJ EJ DRAINAGE PLAN.
MAKKAH
4. TYPICAL EXPANSION JOINT SPACING IS 6M, AS PER
FIGURE 2 OF SAES-B-005.
TTEN
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
CONCRETE DIKE WALL INSIDE FACE.
WRI
EJ DPK STORAGE TANK. X40-D-0018A EJ
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
THE
AREA WITH HDPE LINER PROVIDED BY OTHER
CONTRACTOR AROUND TANK FOUNDATIONS.
EJ EJ
THOUT
7. MINIMUM 500 MM MARL COVER SHALL BE PROVIDED
OVER HDPE LINER FOR PROTECTION.
WI
EJ EJ
NG
DRAWI
EJ EJ
FGL VARIES
S
EJ
THI
(REFER RESPECTIVE CIVIL DRAWING)
EJ
FROM
LEGEND
EJ EJ
NED
EJ EXPANSION JOINT
B
OBTAI
DIKE WALL 2000 HIGH FGL FINISHED GRADE LEVEL
ST-A00024
EJ (TYP.) EJ
SH 001 TYP TYPICAL
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
BE
EJ EJ
PART,SHALL
D
EJ
B EJ
BI
EJ EJ
N
REFERENCE DRAWINGS
I
226350
FULL,OR
R
ST-A00024
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
EJ SH 001 EJ
FGL VARIES
SECTION AND DETAILS ST-A00024.001
FO
(REFER RESPECTIVE CIVIL DRAWING)
FOUNDATION PLAN ST-A00019.002
N
I
EJ EJ
ON
REPRODUCTI
ST-A00024
SH 001
C
EJ EJ
ED
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
EJ EJ MAKKAH
THIS DRAWING
SAUDIARAMCO.NO
SU
EJ EJ
HOLD-3 HOLD-3
E: 1876.900
E: 1572.267
45325
46025
56440
57140
IS
E: 1323.315
OF
EJ EJ
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
06
50.
PROPERTY
NORTH
PLANT
E: 1063.100
EJ EJ
SOLE
EJ EJ
KEY PLAN
THE
EJ EJ
ARE
EJ EJ
N
HEREI
0 10 20 30 40
EJ EJ
METERS
NED
SCALE: 1 : 400M
CONTAI
EJ C EJ
REVISION VALIDATION
DIKE WALL 2000 HIGH
ST-A00024
(TYP.) THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
SH 001
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
EJ EJ
ON
NFORMATI
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
350
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
DIKE WALL FOR DPK STORAGE TANKS
DRAWI
YANBU DISTRIBUTION HUB
DIKE WALL FOUNDATION PLAN
YANBU SAUDI ARABIA
SCALE 1 :400M
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00019 002 C
Saudi Aramco 2615 ENG. (05/05)
350
1. ALL DIMENSIONS ARE IN MILLMETERS AND
ELEVATIONS ARE IN METERS UNLESS OTHERWISE
NOTED.
TRUE DIRECTION OF
NORTH PREVAILING WIND EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
2. FOR GENERAL NOTES AND STANDARD DETAILS
REFER DWG.NO ST-A00002.001 TO 004.
6
.0
EJ EJ
50
OF
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
DIKE WALL 2000 HIGH
C (TYP.)
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
PLANT
CONSENT
SHOWN IN RESPECTIVE GRADING AND STORM
ST-A00024
NORTH DRAINAGE PLAN.
SH 001
EJ EJ
4. TYPICAL EXPANSION JOINT SPACING IS 6M, AS PER
MAKKAH FIGURE 2 OF SAES-B-005.
TTEN
EJ EJ
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
CONCRETE DIKE WALL INSIDE FACE.
WRI
EJ EJ 6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
THE
AREA WITH HDPE LINER PROVIDED BY OTHER
CONTRACTOR AROUND TANK FOUNDATIONS.
THOUT
EJ EJ 7. MINIMUM 500 MM MARL COVER SHALL BE PROVIDED
OVER HDPE LINER FOR PROTECTION.
WI
EJ EJ
NG
DRAWI
EJ EJ
125000
PG95 X40-D-0016C
S
THI
LEGEND
EJ EJ
FROM
EJ EXPANSION JOINT
NED
FGL
TYP TYPICAL
OBTAI
EJ EJ
BE
PART,SHALL
EJ
FGL VARIES
D
(REFER RESPECTIVE CIVIL DRAWING) EJ
BI
EJ EJ
N
REFERENCE DRAWINGS
I
EJ EJ
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
B
EJ EJ SECTION AND DETAILS ST-A00024.001
ST-A00024
FO
SH 001 DIKE WALL 2000 HIGH FOUNDATION PLAN ST-A00022.001
350
(TYP.)
N
I
EJ EJ
ON
REPRODUCTI
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
EJ EJ
.0
0
ED
5
PLANT
NORTH
MAKKAH
EJ EJ
SAUDIARAMCO.NO
THIS DRAWING
SU
FGL VARIES
EJ EJ
(REFER RESPECTIVE CIVIL DRAWING) HOLD-3 HOLD-3
C C E: 1876.900
ST-A00024
SH 001
EJ EJ E: 1572.267
39999
IS
45325
46025
56440
57140
OF
E: 1323.315
EJ EJ
ND
OF
WI
PROPERTY
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
06
50.
NORTH
PLANT
E: 1063.100
EJ EJ
SOLE
EJ EJ
125000
C KEY PLAN
PG91 X40-D-0002C
THE
ST-A00024
SH 001
C
EJ EJ
ARE
EJ
N
EJ
HEREI
0 10 20 30 40
METERS
EJ
NED
EJ SCALE: 1 : 400M
CONTAI
REVISION VALIDATION
EJ EJ
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
NFORMATI
EJ EJ DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
AND
(TYP.) ST-A00024
SH 001
DRAWING TYPE
350
NG
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
DIKE WALL FOR PG(95) & PG(91) TANKS
DRAWI
6600
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
DIKE WALL FOUNDATION PLAN
SCALE 1 :400M X40 Q ST-A00020 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
PLANT SHOWN IN RESPECTIVE GRADING AND STORM
CONSENT
NORTH DRAINAGE PLAN.
TTEN
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
45 116536
CONCRETE DIKE WALL INSIDE FACE.
350
WRI
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
AREA WITH HDPE LINER PROVIDED BY OTHER
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
THE
EJ EJ EJ EJ
CONTRACTOR AROUND TANK FOUNDATIONS.
THOUT
OVER HDPE LINER FOR PROTECTION.
C
J
E
ST-A00024
WI
EJ
SH 001
DIKE WALL 2000 HIGH
(TYP.)
NG
J
DRAWI
E
LEGEND
EJ
S
THI
J
E
3
EJ EXPANSION JOINT
3
0
9
TYPICAL
6
TYP
FROM
FGL FINISHED GRADE LEVEL
J
E
EJ
NED
OBTAI
J
E
EJ
BE
J
PART,SHALL
E
D
BI
EJ
J
E
C
C ST-A00024
N
SH 001 REFERENCE DRAWINGS
I
5
4
GEN-D0001
FULL,OR
R
EJ EJ FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
FO
FOUNDATION PLAN ST-A00021.002
N
I ON
EJ EJ
REPRODUCTI
TRUE
DIRECTION OF
NORTH
6
.0
0
5
PLANT
MAKKAH
ED
THIS DRAWING
C
C EJ
ST-A00024
EJ
SH 001
SAUDIARAMCO.NO
140050
HOLD-3 HOLD-3
E: 1876.900
SU
39999
E: 1572.267
EJ EJ
45325
46025
56440
57140
E: 1323.315
IS
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
06
50.
NORTH
PLANT
E: 1063.100
OF
EJ EJ
PROPERTY
KEY PLAN
EJ EJ
SOLE
91586
THE
EJ EJ
ARE N
HEREI
0 5 10 15 20 25
EJ EJ METERS
NED
SCALE: 1 : 250M
CONTAI
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
DO/DPK (T&I) X40-D-0009 THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
EJ EJ
FOUNDATION PLAN FDN
NG
DIKE WALL FOR DO/DPK T & I TANK
DRAWI
YANBU DISTRIBUTION HUB
FOR CONTINUATION REFER DWG. # ST-A00021.002 YANBU SAUDI ARABIA
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
DIKE WALL FOUNDATION PLAN
THI
SCALE 1 :250M X40 Q ST-A00021 001 C
Saudi Aramco 2615 ENG. (05/05)
6
.0 NOTED.
50
OF
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
MAKKAH
SHOWN IN RESPECTIVE GRADING AND STORM
CONSENT
DRAINAGE PLAN.
FOR CONTINUATION REFER DWG. # ST-A00021.001
4. TYPICAL EXPANSION JOINT SPACING IS 6M, AS PER
FIGURE 2 OF SAES-B-005.
TTEN
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
CONCRETE DIKE WALL INSIDE FACE.
WRI
DO/DPK (T&I) X40-D-0009 6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
AREA WITH HDPE LINER PROVIDED BY OTHER
CONTRACTOR AROUND TANK FOUNDATIONS.
THE
EJ EJ
THOUT
WI
EJ EJ
NG
DRAWI
LEGEND
S
EJ EJ
THI
EJ EXPANSION JOINT
FROM
TYP TYPICAL
NED
EJ EJ
OBTAI
BE
EJ EJ
PART,SHALL
D
BI
EJ EJ
N
REFERENCE DRAWINGS
I
134950
FULL,OR
R
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
EJ EJ
SECTION AND DETAILS ST-A00024.001
FO
FOUNDATION PLAN ST-A00021.001
N
I ON
134950
REPRODUCTI
EJ
EJ
C
TRUE
C
DIRECTION OF
NORTH
ST-A00024 PREVAILING WIND
6
.0
0
SH 001
ED
5
PLANT
NORTH
EJ EJ
THIS DRAWING
SAUDIARAMCO.NO
SU
HOLD-3 HOLD-3
E: 1876.900
EJ EJ 39999
E: 1572.267
45325
46025
56440
57140
IS
E: 1323.315
OF
ND
OF
WI
ON
NG
C
RECTI
LI
NORTH
TRUE
PREVAI
DI
06
50.
NORTH
PLANT
E: 1063.100
PROPERTY
EJ ST-A00024 EJ
SH 001
SOLE
EJ EJ
KEY PLAN
THE
ARE
EJ EJ
N
HEREI
0 5 10 15 20 25
METERS
NED
EJ EJ
SCALE: 1 : 250M
CONTAI
REVISION VALIDATION
ON
(TYP.)
NFORMATI
C DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ST-A00024
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
SH 001
SMS ASH SAY AHG
1100
I
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
THE
JOB ORDER/EWO NO.
350
350
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
165000
SAUDI ARABIAN OIL COMPANY
AND
350 350
DRAWING TYPE
NG
C DIKE WALL FOR DO/DPK T & I TANK
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
SCALE 1 :250M X40 Q ST-A00021 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
6
.0 CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
SHOWN IN RESPECTIVE GRADING AND STORM
50
CONSENT
DRAINAGE PLAN.
PLANT
4. TYPICAL EXPANSION JOINT SPACING IS 6M, AS PER
NORTH FIGURE 2 OF SAES-B-005.
TTEN
CONCRETE DIKE WALL INSIDE FACE.
WRI
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
AREA WITH HDPE LINER PROVIDED BY OTHER
THE
CONTRACTOR AROUND TANK FOUNDATIONS.
THOUT
OVER HDPE LINER FOR PROTECTION.
WI NG
DRAWI
LEGEND
S
THI
EJ EXPANSION JOINT
FOR CONTINUATION REFER DWG. # ST-A00020.001
EJ EJ FGL FINISHED GRADE LEVEL
FROM
TYP TYPICAL
NED
EJ EJ
OBTAI
EJ EJ
FGL VARIES
BE
(REFER RESPECTIVE CIVIL DRAWING)
EJ EJ
PART,SHALL
D
X40-D-0010A
68400
SLOP TANK
BI
EJ EJ
N
REFERENCE DRAWINGS
I
EJ EJ
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
EJ EJ
SECTION AND DETAILS ST-A00024.001
FO
FOUNDATION PLAN ST-A00020.001
N
I
B EJ
ON
EJ
ST-A00024 TRUE
DIRECTION OF
REPRODUCTI
NORTH
SH 001 PREVAILING WIND
6
.0
0
5
(TYP.) PLANT
NORTH
EJ MAKKAH
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
ED
THIS DRAWING
350
EJ EJ
B
SAUDIARAMCO.NO
HOLD-3 HOLD-3
E: 1876.900
SU
C C
EJ EJ
ST-A00024
39999
SH 001 E: 1572.267
45325
46025
56440
57140
EJ EJ E: 1323.315
C
IS
ND
OF
WI
ON
NG
FGL VARIES
RECTI
LI
NORTH
ST-A00024
TRUE
C
PREVAI
DI
06
50.
OF
NORTH
PLANT
E: 1063.100
SH 001
EJ (REFER RESPECTIVE CIVIL DRAWING) EJ
PROPERTY
75000
X40-D-0010B EJ
EJ SLOP TANK
SOLE
KEY PLAN
EJ
EJ
THE
EJ EJ
ARE N
HEREI
EJ EJ
METERS
EJ EJ
NED
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
SCALE: 1 : 400M
CONTAI
350
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
C (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
DIKE WALL FOR SLOP TANKS
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00022 001 C
Saudi Aramco 2615 ENG. (05/05)
TRUE DIRECTION OF
OF
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
NORTH PREVAILING WIND
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
CONSENT
SHOWN IN RESPECTIVE GRADING AND STORM
6
.0
DRAINAGE PLAN.
50
TTEN
DIKE AREA WITH APPROPRIATE HDPE INSERT ON
MAKKAH CONCRETE DIKE WALL INSIDE FACE.
WRI
6. CMEI CONTRACTOR SHALL WELD HDPE LINER FOR DIKE
THE
AREA WITH HDPE LINER PROVIDED BY OTHER
CONTRACTOR AROUND TANK FOUNDATIONS.
THOUT
7. MINIMUM 500 MM MARL COVER SHALL BE PROVIDED
OVER HDPE LINER FOR PROTECTION.
WI NG
DRAWI
LEGEND
S
THI
C EJ EXPANSION JOINT
FROM
350 56440 350 FGL FINISHED GRADE LEVEL
TYP TYPICAL
NED
350
OBTAI
EJ EJ EJ EJ EJ EJ EJ EJ
BE
DIKE WALL 2000 HIGH
PART,SHALL
C
D
(TYP.)
ST-A00024
SH 001
BI
FGL VARIES
N
REFERENCE DRAWINGS
I
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
FO
N
I ON
EJ EJ
REPRODUCTI
ED
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
THIS DRAWING
45325
MAKKAH
SAUDIARAMCO.NO
SU
SURGE RELIEF X40-D-0011
EJ EJ E: 1876.900
HOLD-3 HOLD-3
C C
39999
E: 1572.267
45325
46025
C
56440
57140
ST-A00024 ST-A00024
IS
SH 001 SH 001
E: 1323.315
OF
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
06
50.
NORTH
PLANT
E: 1063.100
PROPERTY
EJ EJ
SOLE
KEY PLAN
THE
ARE
EJ EJ
N
HEREI
EJ EJ EJ EJ EJ EJ EJ EJ 0 5.0 10.0 15.0
350
METERS
NED
SCALE: 1 :150M
CONTAI
ST-A00024
SH 001 REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
DIKE WALL FOR SURGE TANK
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00023 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
3290 3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
OUTSIDE DIKE AREA FOR HANDRAIL DETAIL 750 350 750 SHOWN IN RESPECTIVE GRADING AND STORM
CONSENT
REFER TO PIP STF 05520
DRAINAGE PLAN.
TYP
G TOC TOC
200
200
200
0
0
6
TTEN
ON
{10 {10
F’
F’
SECTI
13-{10 {10
WRI
F
E E {10
750
ON
ON
ON
LEGEND
SECTI
SECTI
SECTI
DIKE WALL
{10
FOR
THE
{10
TOC TOP OF CONCRETE
ABLE
2000
FOR
FOR
= 1900
1800
TYP TYPICAL
300
THOUT
FOR
OUTSIDE DIKE AREA
VARI
INSIDE DIKE AREA
FGL FINISHED GRADE LEVEL
ABLE
ABLE
0
2000
0
6 DIKE WALL
WI
{ DIAMETER
VARI
VARI
10@190
F F {10 1
750
NG
-
UP
DRAWI
FGL FGL
100
S
1.5mm THK. HDPE
THI
FGL
2 COATS OF LINER (TYP)
G
800
BITUMINOUS
COATING APCS 10
FROM
200 THK PAVING SLAB
2540 750
850 1800
2 LAYER WIRE MESH
INSIDE DIKE AREA
50 THK
600 LEAN CONCRETE 2 COATS OF
NED
{16
BITUMINOUS
400
COATING APCS 10
OBTAI
FGL
F S E C T I O N (A S D R A W N)
500
SCALE 1 :20M
-
BE
2 COATS OF
{10 50 THK
BITUMINOUS
PLAN - STAIRCASE LEAN CONCRETE
PART,SHALL
3-{12 PAINT APCS-10
SCALE 1:20M
E S E C T I O N (S I M I L A R)
D
500
SCALE 1 :20M
-
(NO. OF RISERS FOR OUTSIDE FLIGHT TO BE 3000
ADJUSTED AS PER DIFFERENT FGL.)
BI
2 D E T A I L
200 THK CONCRETE PAVING -
SCALE 1 :20M G S E C T I O N
SCALE 1 :20M
N
- REFERENCE DRAWINGS
I
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
DIKE WALL 2 FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
8 -
1
FO
N
FGL
I ON
EARTH FILLING
REPRODUCTI
ON
REINFORCED
CONCRETE WALL
| CONSTRUCTI
TYPICAL RAMP DETAIL (APPLICABLE TO TANK AREA DIKE) 12X12 POLYSULPHIDE SEALER
ED
SCALE N.T.S 25 (BOTH SIDE) 150 WIDE PVC WATER
STOPPER
NT
350 350 FLEXIBLE FIRE-RESISTANT
JOI
100
JOINT FILLER
25
25x25mm 25x25mm
(3 HOUR RATING)
CHAMFER (TYP) CHAMFER (TYP) OUTSIDE
150
SAUDIARAMCO.NO
TOC TOC
CKNESS
SU
{12 {12 70
THI
{16 {16
COATING APCS-1B
COATING APCS-1B COATING APCS-1B COATING APCS-1B
ABOVE FGL
IS
ABOVE FGL ABOVE FGL ABOVE FGL
INSIDE
{25 FIRE RETARDING
ABLE
2000
2000
REINFORCEMENT ROPE
OF
INSIDE DIKE AREA INSIDE DIKE AREA
VARI
PROPERTY
STEEL WATER BAR
(SEE DETAIL BELOW) 1 D E T A I L
1 1 -
SCALE N.T.S
- -
TYPICAL EXPANSION JOINT(EJ) DETAIL
FOR WALLS
SOLE
FGL FGL FGL SCALE N.T.S
500
THE
1.5mm THK. HDPE 1.5mm THK. HDPE SHALL BE PROVIDED ON EITHER CHAMFER (TYP)
LINER (TYP) LINER (TYP)
800
800
ARE
ABOVE FGL 250
850 1800 1200 1200
TOC
1mm THICK
N
COATING APCS-1B
HEREI
1
450
{12 ABOVE FGL
25 100 25 100 25 0 0.5 1.0 1.5 2.0
400
400
{12
-
FGL METERS
2 COATS OF
NED
2 COATS OF SCALE: 1 : 20M
BITUMINOUS
500
25
2 COATS OF
300
BITUMINOUS
CONTAI
COATING
700
COATING BITUMINOUS
APCS 10
50 THK APCS 10 50 THK COATING APCS 10
{20 {20 REVISION VALIDATION
LEAN CONCRETE
{20
LEAN CONCRETE
{20
STAINLESS STEEL THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
WATER BAR DETAIL 1.5mm THK. HDPE REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
LINER (TYP)
ON
3000 2750
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
{20
50 THK ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
C S E C T I O N B S E C T I O N
THE
D S E C T I O N JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
SCALE 1 :20M SCALE 1 :20M
- - 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
- SCALE 1 :20M
SAUDI ARABIAN OIL COMPANY
AND
REFER DWG. #
ST-A00016 TO ST-A00023 DRAWING TYPE
NG
DIKE WALL
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00024 001 C
Saudi Aramco 2615 ENG. (05/05)
6000 6000 6000 6000 2. FOR GENERAL NOTES AND STANDARD DETAILS
REFER DWG.NO ST-A00002.001 TO 004.
DIRECTION OF
OF
PREVAILING WIND
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
CONSENT
F1/P1 F1/P1 F1/P1
SHOWN IN RESPECTIVE GRADING AND STORM
DRAINAGE PLAN.
MAKKAH GB-1 GB-1 4. CONSTRUCTION CONTRACTOR SHALL FINALIZE
THE FOUNDATION DEIGN IN ACCORDANCE WITH
| OF COLUMN
A A SUPPORT REACTIONS SUPPLIED BY PEB VENDOR.
TTEN
IJ IJ
WRI
WWF 150X150 MW9XMW9
C C
THE
THOUT
IJ
6000
WI
LEGEND
NG
GB-1
GB-1
J
J
I
I
GB GRADE BEAM
DRAWI
EL ELEVATION
IJ ISOLATION JOINT
S
THI
THK THICKNESS
COLUMN
COLUMN
COLUMN
TOC TOP OF CONCRETE
J
I
FROM
12000
12000
J
I
FOAM SKID FOUNDATION T&B TOP AND BOTTOM
TYP TYPICAL
OF
OF
OF
NED
WWF WELDED WIRE FABRIC
|
|
TOW TOP OF WALKWAY
OBTAI
TOG TOP OF GROUT
{ DIAMETER
BE
REFERENCE DRAWINGS
PART,SHALL
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
GB-1
GB-1
D
6000
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
J
I
I
FOUNDATION DETAILS ST-A00032.002
BI
IJ FOUNDATION DETAILS ST-A00032.002
150 THK.
N
I
TOC.
GRADE SLAB
F1/P1 F1/P1 F1/P1 EL. +100.000
FULL,OR
R
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
FO
| OF COLUMN IJ IJ MAKKAH
B B
N
I
GB-1 GB-1
THIS DRAWING
ON
TOW.
REPRODUCTI
EL. +99.850
FGL.
EL. +99.700
ED
RDP (TYP)
HOLD-3 HOLD-3
E: 1876.900
600
SAUDIARAMCO.NO
E: 1572.267
SU
SCALE 1:50M SCALE 1:50M E: 1323.315
ND
OF
WI
ON
NG
RECTI
LI
NORTH
TRUE
PREVAI
DI
06
50.
NORTH
PLANT
E: 1063.100
600
IS
KEY PLAN
OF
PROPERTY
12-{20
SOLE
B S E C T I O N 0 0.1 0.2 0.3 0.4 0.5 1.0
SCALE 1 :10M
GRID - METERS
(PEDESTAL P1)
THE
1 : 10M
12 THK ISOLATION JOINT
| FOOTING & PEDESTAL 0 0.5 1.0 2.0
WITH JOINT FILLER AND
ARE
JOINT SEALANT (TYP)
2200 METERS
N
1 : 25M
HEREI
GRADE SLAB
PEDESTAL
NED
TOG EL. 100.200 EL. 99.850
1 : 50M
SCALE:
600
&
CONTAI
150
= =
NG
FGL
REVISION VALIDATION
FOOTI
FGL 99.700
EL +99.700
=
700
2200
ON
600
GRID
NFORMATI
SHEET (TYP) GB1
1200
=
600 THK. COMPACTED SELECT ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
=
I
AS PER APCS-10 {10 C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
PAINT APCS-10 (TYP)
THE
JOB ORDER/EWO NO.
50mm LEAN CONCRETE 3-{16 THIS REVISION IS NOT TO BE USED FOR
{16 T&B
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
50mm THK LEAN COMPACTED SOIL
SAUDI ARABIAN OIL COMPANY
AND
CONCRETE
A AS PER SAES-A-114
DRAWING TYPE
NG
AS PER SAES-A-114
A S E C T I O N C S E C T I O N FOAM SKID SHELTER (2 UNITS)
DRAWI
SCALE 1:25
SCALE 1 :25M SCALE 1 :10M
- - YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00032 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
3. FOUNDATION DESIGN SHALL BE VERIFIED UPON
TRUE
RECEIPT OF VENDOR DATA BY CONSTRUCTION
CONSENT
NORTH
CONTRACTOR.
TTEN
5. GIVEN SIZE OF SKID IS PRELIMINARY, SAME SHALL BE
DIRECTION OF
REVISED BASED ON FINAL VENDOR DATA.
WRI
PREVAILING WIND
MAKKAH
THE
ANCHOR BOLT
(BY VENDOR)
THOUT
WI NG
DRAWI
LEGEND
S
3500
THI
FGL FINISH GRADE LEVEL
EL ELEVATION
FROM
TOC TOP OF CONCRETE
NED
TYP TYPICAL
THK THICKNESS
OBTAI
{ DIAMETER
A A
BE
7000
PART,SHALL
REFERENCE DRAWINGS
BI
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FACILITY PLOT PLAN TANK FRAM AREA PI-A00001.001
N
I
FULL,OR
R
FO
3500
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
N
I
PLANT
NORTH
MAKKAH
ON
REPRODUCTI
THIS DRAWING
ED
SAUDIARAMCO.NO
HOLD-3 HOLD-3
SU
39999
45325
46025
56440
57140
ND
OF
WI
ON
NG
OF
RECTI
LI
NORTH
TRUE
PREVAI
DI
50.06
NORTH
PLANT
PROPERTY
KEY PLAN
SOLE
THE
GROUT
NON
7000x7000
ARE
THK
NK
N
SHRI
HEREI
ANCHOR BOLT
25
{16 T&B
TOC METERS
200
EL. +100.000
NED
1 : 25M
SCALE:
CONTAI
FGL EL. +97.700 (SEE NOTE-4)
600
REVISION VALIDATION
2 COATS OF
ON
BITUMINOUS PAINT
NFORMATI
50mm THK
AS PER APCS-10 (TYP) DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
LEAN CONCRETE (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
A S E C T I O N DRAWING TYPE
NG
FOAM SKID (2 UNITS)
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00032 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
A 16 A 3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
4 CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
5 5 SHOWN IN RESPECTIVE GRADING AND STORM
CONSENT
00
1
14 DRAINAGE PLAN.
24
0
45
6 9 00
B 10 11 12 50 75
0
B
F1/C D 3 00 F1/C
1
1 1 35
0
75
DIRECTION OF 0
TTEN
F2 45 F2
50
F1/C
PREVAILING WIND 2 1
MAKKAH /C
23
50
F1
WRI
7 8
43
00
00
62
RW -1
-1 RW
20
THE
F1 1
/C
1 F1/C
THOUT
1
F1/C
C LEGEND
F1 F1/C 22
00
/C
1 C
/C
1 D 1
150
0 F1
00
WI
22 C 1
00
59
1 COLUMN NUMBER
/C
NG
F1
RW-2 COLUMN
DRAWI
00
F1 1
/C F 1
62
/C F1
1
F5
FOOTING NUMBER
F1 1 FOOTING
S
/C /C
THI
1 F1
RW REINFORCED CONCRETE WALL
D 1
F1/C F1/C /C
1
F1/C D
1 1 F1
0
FROM
100
F1 1
/C
1 F1/C EL ELEVATION
1
F1 /C
E /C
2
F1 E THK THICKNESS
NED
FGL FINISHED GRADE LEVEL
OBTAI
{ DIAMETER
EF EACH FACE
BE
F1/C1 F1/C1 TOC TOP OF CONCRETE
F3 F3
COL COLUMN
PART,SHALL
62 20 { DIAMETER
D
00 72
F1 2 REFERENCE DRAWINGS
/C F1/C
2
60 00 DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
00
BI
F1/C3 F1/C3 50
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
35 00
00 35
GROUND FLOOR PLAN AR-A00001.001
22 00
N
00 22
I
27 0
20 22
0 27 GRADE SLAB & BEAM LAYOUT PLAN ST-A00040.002
00
FULL,OR
48
00 48
R
FIRST FLOOR SLAB FRAMING PLAN ST-A00040.003
FO
N
I ON
ND
30
OF
WI
THIS DRAWING
ON
NG
REPRODUCTI
RECTI
LI
NORTH
TRUE
PREVAI
DI
.06
50
NORTH
PLANT
ED
FOUNDATION LAYOUT PLAN Shareh AL-Khamis
SCALE 1 :100M
500
NG)
STI
50 400 50
T8 (EXI
SAUDIARAMCO.NO
39999
45325
46025
56440
50
57140
SU
16- {20
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
50.06 A=3.66 HA.
Shareh AL-AWAL
IS
700
600
2500
OF
1250 1250 KEY PLAN
PROPERTY
{10
0 0.1 0.2 0.3 0.4 0.5 1.0
{10
50
METERS
(COLUMN C2)
{10
1 : 10M
SOLE
0 0.5 1.0 1.5
C1/C2
C S E C T I O N
1250
METERS
THE
SCALE 1 :10M 200mm THK.
{16 R.C.C WALL 1 :15M
ARE
FGL 99.700
{12
C.J METERS
A A
N
FFL
HEREI
1 : 25M
EL. 100.000
0 1.0 2.0 3.0 4.0 5.0 10.0
FGL EL.
500
2500
C C 99.700
50 400 50 METERS
1000
NED
SCALE: 1 : 100M
B B
50
CONTAI
{10
1500
C1/C2
2 COATS OF C.J REVISION VALIDATION
12- {20
1500
BITUMINOUS 02 COATS OF THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
PAINT APCS 10 {12 BITUMINOUS PAINT
C.J REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
1250
AS PER APCS-10
ON
500
400
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
500
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
500
I
50
THE
JOB ORDER/EWO NO.
CONCRETE COMPACTED SOIL THIS REVISION IS NOT TO BE USED FOR
{16 T&B
AS PER SAES-A-114 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
F1
COMPACTED SOIL
SAUDI ARABIAN OIL COMPANY
AND
AS PER SAES-A-114
DRAWING TYPE
NG
SCALE 1 : 15M ENGINEEERING & MAINTENANCE BUILDING
DRAWI
-
SCALE 1 :15M SCALE 1 :10M SCALE 1 :25M
-
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00040 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
2 3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
PACU-1
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
17
CONSENT
SHOWN IN RESPECTIVE GRADING AND STORM
3 DRAINAGE PLAN.
A 16 A
4
DIRECTION OF
5 15
PREVAILING WIND
MAKKAH 14
24
TTEN
6 9
00
B 10 11 12 B
13
WRI
GB -1
-1 UP GB
THE
RAM
P
I
J RA MP J
I
RAM
P
MP 7 8 RA
-1
62
RA - 9
THOUT
GB MP GB MW LEGEND
-1
-1 9X
MW
GB
00
J
I
J 50
I
GB WWF J
I X1
150 150
X15 F
0 M WW
02 C/C CENTER TO CENTER
WI
W9X
158
MW9 -
GB -1 CU
-1 GB AC C
J
-1
I
EL ELEVATION
C
00
-1
GB
NG
I
J GB J
GB
- I
1 TOW
-1
J
THK THICKNESS
-1
DRAWI
I
J
J
I
I
GB
I
J GB EL. 99.850
GB
J
-1
J
-1
FGL FINISHED GRADE LEVEL
-1
I
-1 2
-1
GB GB GB
-
J
UP
2
GB
I
GB
J
I
UP
J
GB
{ DIAMETER
I
01
J
J
I -
I
I
J -1 J
I CU
GB AC
S
TOC TOP OF CONCRETE
THI
GB J
62
-2 I -2 GB GRADE BEAM
GB
-1
-1
-1
00
I
J J
I IJ ISOLATION JOINT
TOC
GB
GB
FROM
GB
20 2
J
0M GB -
GB
J
TH M -2
I
K. EL. 99.950 TOW TOP OF WALKWAY
WOR SL
AB U-1 K
KSH AH AC
I B J
I ST
-1
OP
ONL
J R
AI D WWF WELDED WIRE FABRIC
D Y
GB
2
J
GB -2 U-
NED
{ DIAMETER
I
-2 GB AH
-1
J
-1
I
1 I
J J
I
J
50
OBTAI
-1
-1
I
MM 2
GB
J
TH - 1
GB
GB
I
K. -
GB SL GB A GB
E
GB
E
GB
- AB -2
J
1
I
TOC J
I J
I
I
J I
J MM
B
-1
EL. 50 AB
J
1
-1
I
99. SL
GB 950 K.
TH
GB
-
BE
1
TOC
GB
J
I
I
1
950 GB
-
99.
I
J EL.
PART,SHALL
-1
150MM
D
-1
GB THK. SLAB -1
GB
GB
-1
GB
WWF
J
I
150 TOC
I
J X15 J
I
0 M
W9X
MW9
GB
-1
EL. 99.950
GB
-1 A
BI
REFERENCE DRAWINGS
GB-1
J
I
GB -1 DWG. CONTROL FOR J.O # 10-02399-0001
-1 GB GEN-D0001
62 I J
I FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
00 J
20
N
GB 72
I
-1 -1
GB GROUND FLOOR PLAN AR-A00001.001
GB 1
FULL,OR
- -
R
I
J 1 GB J
I
60 GB-1 BUILDING ELEVATION & SECTION AR-A00001.003
00 MP
00
J
I RA
50
FOUNDATIONS AND COLUMNS LAYOUT ST-A00040.001
35 00
FO
00 35 FIRST FLOOR SLAB FRAMING PLAN ST-A00040.003
22 RA
27 MP 00 0
20 00 22 22
0 27 ROOF SLAB FRAMING PLAN ST-A00040.004
N
I
48 00
00 48
ON
ND
OF
REPRODUCTI
WI
ON
NG
RECTI
TOW
LI
MP
NORTH
45
TRUE
00
PREVAI
00 RA 45
DI
EL. 99.850 THIS DRAWING
.06
50
NORTH
PLANT
FGL
ED
EL. 99.700
55
9 8
80
5
8
1
96
. 4
5
. 7
6
0
2
6
.9
.9
.0
8 0
.0
5
3.
0
. 4
7
2 7
.4
4 2 6 1
7
.8
8 5
3
2 9
9 6
5
0 4
1 8. 0. 8 9
2 11
1
0 9
9
9
80
9
0
1
51
51
0
0
7 8 0
0
65
5
5
5
9
9
9
6 9 0
6
2
3
3
2
2
2
42 26 4 2 26 4
4
42
4
=
=
=
N=
E= =
N=
N
N
= = N
Shareh AL-Khamis
E
E=
E
E= E=
30
NG)
SAUDIARAMCO.NO
STI
T8 (EXI
39999
SU
45325
46025
T7
56440
57140
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
50.06 A=3.66 HA.
NORTH
PLANT
Shareh AL-AWAL
IS
OF
{12
PROPERTY
200 THK. CMU WALL VERTICAL REINF. 200 THK. CMU WALL {12
VERTICAL REINF.
LAP)
KEY PLAN
SOLE
{12 DOWEL BARS
(
(
12 THK ISOLATION JOINT 12 THK ISOLATION JOINT
THE
WITH JOINT FILLER AND WITH JOINT FILLER AND
JOINT SEALANT (TYP) JOINT SEALANT (TYP)
0 0.1 0.2 0.3 0.4 0.5 1.0
ARE
WWF WWF
4-{12 4-{12
GRADE SLAB GRADE SLAB METERS
3-{20 3-{25
{10 {10
N
1 : 10M
HEREI
TOC EL. 99.950 TOC EL. 99.950
{10 (TYP) WWF
0 1.0 2.0 3.0 4.0 5.0 10.0
TOW
150
150
EL. 99.850
METERS
150
NED
SCALE: 1 : 100M
FGL 99.700
CONTAI
REVISION VALIDATION
0.25 THK POLYETHYLENE 0.25 THK POLYETHYLENE THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
(300X600) (300X600)
NFORMATI
600 THK. COMPACTED SELECT 600 THK. COMPACTED SELECT DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
FILL AS PER SAES-A-114 FILL AS PER SAES-A-114 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
50mm LEAN CONCRETE 3-{20 50mm LEAN CONCRETE 3-{20 C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
COMPACTED SOIL COMPACTED SOIL JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
AS PER SAES-A-114 AS PER SAES-A-114 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
A S E C T I O N B S E C T I O N GRADE SLAB & BEAM LAYOUT PLAN FDN
NG
SCALE 1 :10M SCALE 1 :10M
- - ENGINEERING & MAINTENANCE BUILDING
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00040 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
NORTH OF FINAL BUILDING RISK ASSESSMENT
3 RECOMMENDATIONS.
A
CONSENT
16 A
4 4. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
5 15 CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
24
14 SHOWN IN RESPECTIVE GRADING AND STORM
00
DRAINAGE PLAN.
B 6 9 10 11 12 B
3
TTEN
1
DIRECTION OF
C
WRI
PREVAILING WIND FB -3
MAKKAH -3 FB
7 8
THE
62
FB 3
-1
-3 -
FB
-1
00
FB
FB
C
THOUT
LEGEND
158
FB -3
-3 FB
00
C -3
C FB FLOOR BEAM
WI
FB FB
-3
TOC TOP OF CONCRETE
-1
NG
FB
-1
DN FB TOB TOP OF BEAM
DN
-1
- 3
3 -
A
-1
FB
-1
DRAWI
-1
UP
FB
UP
-1
-1
T&B TOP AND BOTTOM
FB
FB
FB
FB
A
-1
ID
FB
FB
VO { DIAMETER
-1
OP -1
FB
FB
-1
EN
FB
62
TO
-1
BE
FB
LO
W
00
S
-1
FB
-1
FB
THI
-3
FB
FB
-3
FB FB
FB -3
-1
-3
FROM
FB
-1
D FB
-3 FB -3 D
FB
-3 FB
-1
DN
-1
-1
3
NED
-
FB
FB FB -3
FB -3 FB
E
FB
FB
-3 E
OBTAI
FB-1
-1
-1
FB
FB
-
FB
3
-1
3
-1
-
FB
-1
FB
-1
FB
-1
BE
-1
FB
FB
FB 200MM
FB
-3 -3
FB
THK. SLAB FB
TOC
PART,SHALL
D
FB EL. 104.450
-2 FB -1 -2
-1 FB FB
62 FB-1
00
FB FB 3 20
-3 FB
- -2 72 REFERENCE DRAWINGS
BI
-2
FB
-1
-1
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FB
FB
60 FB
00 -3 3
FB
FB
- -2 00
-2 50
FB
- -3 B FB FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
3 FB
N
I
35 FB-1
00 00 FIRST FLOOR PLAN AR-A00001.002
35
FULL,OR
22
R
00 00 FOUNDATIONS AND COLUMNS LAYOUT ST-A00040.001
27 22 0
20 22
0 27
48
00 B 48
00 GRADE SLAB & BEAM LAYOUT PLAN ST-A00040.002
FO
FB-3 ROOF SLAB FRAMING PLAN ST-A00040.004
45
00 00
45
N
I ON
REPRODUCTI
30
ED
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
FIRST FLOOR SLAB FRAMING PLAN
5
PLANT
NORTH
SCALE 1 :100M
MAKKAH
THIS DRAWING
SAUDIARAMCO.NO
56 5
8
2 0
1 45
8
5 71
5
.96
.8 5
0
8
2
6
9 9 .0 0 0
0
9 2.
0 .
.
4
. 7
.7 3
.4
4 .2
66
7
19 8
. .
8 2
95
4
8
9
8
1 8
1
1 9 9
0
4 51
1
4 51
0
0
0
7 8 9
0
0
4 5
4 5
65
9
9
9
0
0
6 2
26
6 2 65 2 6
3
3
= 2
= 2
= 2
= 2
4
4
=
=
= =
=
=
N
Shareh AL-Khamis
E
E=
E
E=
E
SU
39999
45325
46025
56440
57140
IS
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
50.06 A=3.66 HA.
NORTH
PLANT
OF
Shareh AL-AWAL
PROPERTY
LONG BARS SHORT BARS
KEY PLAN
SOLE
SUPPORT SUPPORT SUPPORT
THE
SCALE NTS
ARE
METERS
N
1 : 10M
HEREI
0 1.0 2.0 3.0 4.0 5.0 10.0
NED
@450 C/C
SCALE: 1 : 100M
TOC TOB TOC
CONTAI
REVISION VALIDATION
2-{20
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
{10 {10 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
600
600
600
ON
1-{12 EF 1-{12 EF 1-{12 EF
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
{10
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
(FB-1) (FB-2) (FB-2) JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
A S E C T I O N B S E C T I O N C S E C T I O N
DRAWING TYPE
SCALE 1 :10M SCALE 1 :10M SCALE 1 :10M FIRST FLOOR SLAB FRAMING PLAN
- - - FDN
NG
ENGINEERING & MAINTENANCE BUILDING
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00040 003 C
Saudi Aramco 2615 ENG. (05/05)
OF
TRUE
CONSTRUCTION CONTRACTOR.
NORTH 3
A
CONSENT
16 A
4
5 15
24
14
00
B 6 B
3
TTEN
1
A
DIRECTION OF
WRI
RB -1
PREVAILING WIND -4 RB
MAKKAH
7 8
THE
62
RB
-4
-4 -1
RB
-4
00
RB
A
RB
C
THOUT
LEGEND
-4
158
C
RB
RB -1
-1 RB RB ROOF BEAM
00
-1
C -1 RB C
WI
RB RB
-
-1
1 EF EACH FACE
B-1
RB
TOC TOP OF CONCRETE
NG
DN
-4
R
RB 1 DN -1
-1 - RB
-4
RB
DRAWI
-4
RB -1 TOB TOP OF BEAM
RB
-4
- RB
-1
1
-1
RB
RB
-4
RB
RB
RB T&B TOP AND BOTTOM
RB
-1
-1
RB
RB TOP TOP OF PARAPET
RB
62
-1 1
-1
-
RB { DIAMETER
00
S
-4
-4
RB
THI
RB
-4
-
RB
RB
-1
RB
RB
RB
20 -4
MM
FROM
-3
0M
50
-4
TH M 1 AB
K. SL
SL K.
D
RB
AB RB TH D
RB
- -1
1 RB
D
-1
-1
TOC DN
-4
-4
D
RB
NED
RB
EL. RB -1
RB
RB 109 -1 TOC RB
E
RB
-4 .000 .000 E
109
-4
OBTAI
RB-4
-1 EL.
RB
RB
-4
RB
-
RB
4
-1
-1
RB
-4
P
RB
TO 0
0.20
-4
RB
BE
.11
-1
RB EL
RB
-1 -1 )
P.
RB
RB
RB-1
TY
(
PART,SHALL
RB-1
D
RB
-2 -2
RB
62
00 REFERENCE DRAWINGS
RB RB 1 20
-1 RB
- -2 72
-2
RB
BI
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
60 RB
00 -1 FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
RB
RB
-1
-2 00
-2 50
RB-3 RB-3 RB-3 B RB
N
FIRST FLOOR PLAN AR-A00001.002
I
35
00 00
35
BUILDING ELEVATION & SECTION AR-A00001.003
FULL,OR
22
R
00 00
27 22 0
20 22 FOUNDATIONS AND COLUMNS LAYOUT ST-A00040.001
0 27
48
00 B 48
00
GRADE SLAB & BEAM LAYOUT PLAN ST-A00040.002
FO
45 RB-1
FIRST FLOOR SLAB FRAMING PLAN ST-A00040.003
00 00
45
N
TOP
I
EL. 110.800
ON
REPRODUCTI
30
ED
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
ROOF SLAB FRAMING PLAN
5
PLANT
NORTH
THIS DRAWING
MAKKAH
SCALE 1 :100M
SAUDIARAMCO.NO
2651 . 955
4 68
. 80
045
8
071
8 5
6
6
.9 90
8 .0
4.
2 0966.
42
3 0948.
2. 75
0 3
22 10
00 7
57
.
.
.
3
9 12
1
9. 8 5 9
1 1
0 9
9
1
2 1
2 1
8 0
99
00
= 265
5
4 5
9798 9820 5
6
265 2 2 4 26 3 2 4
4
E =
E =
N=
N=
SU
N
N=
N
=
=
E= E E= E
Shareh AL-Khamis
NG)
STI
T8 (EXI
{10 T&B {10 T&B
39999
45325
46025
0
56440
57140
IS
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
OF
LI
NORTH
TRUE
EXPANSION
PREVAI
’b’ LONG BARS ’a’ SHORT BARS
DI
50.06 A=3.66 HA.
NORTH
PLANT
Shareh AL-AWAL
PROPERTY
END INTERIOR INTERIOR
SUPPORT SUPPORT SUPPORT
SOLE
8-{20
THE
TOB
{25 SPACER BAR
0 0.5 1.0 1.5 2.0
(TYP)
ARE
METERS
{10 1 : 20M
N
200
HEREI
0 1.0 2.0 3.0 4.0 5.0 10.0
3-{20 2-{20 1-{12 EF 3-{25
NED
1000
SCALE: 1 : 100M
CONTAI
1-{12 EF
{10 {10 REVISION VALIDATION
600
600
600
{10 THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
1-{12 EF 1-{12 EF
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
3-{20 2-{20 8-{20 3-{20 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
300 400 300
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
SCALE 1 :10M SCALE 1 :10M SCALE 1 :10M SCALE 1 :10M
- - - - ENGINEERING & MAINTENANCE BUILDING
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00040 004 C
Saudi Aramco 2615 ENG. (05/05)
ND
OF
WI
1. ALL DIMENSIONS ARE IN MILLMETERS AND
NORTH
200 THK. CMU WALL ELEVATIONS ARE IN METERS UNLESS OTHERWISE
TRUE {12
ON
1 2 3 4
NG
VERTICAL REINF. NOTED.
RECTI
LI
PREVAI
{12 DOWEL BARS 2. FOR GENERAL NOTES AND STANDARD DETAILS
12600
REFER DWG.NO ST-A00002.001 TO 004.
6
DI
.0
OF
LAP)
3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
NORTH
PLANT
CONSENT
(
RECOMMENDATIONS.
MAKKAH
12 THK ISOLATION JOINT
WITH JOINT FILLER AND 4. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
F1/C1 F1/C1 FOR DETAIL REFER HVAC
F2/C1 F2/C1 CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
DWG. HV-A00005.001 JOINT SEALANT (TYP)
SHOWN IN RESPECTIVE GRADING AND STORM
WWF DRAINAGE PLAN.
4-{12
TTEN
| OF COLUMN GRADE SLAB
A 3-{16
10A {10
WRI
TOC EL. 99.950
{10 (TYP) WWF
TOW
LEGEND
150
ND
EL. 99.850
COLUMN
COLUMN
COLUMN
COLUMN
OF
WI
THE
NORTH
150
TRUE
3900
RECTI
LI
FGL 99.700
THOUT
C/C CENTER TO CENTER
PREVAI
OF
OF
OF
OF
C.J CONSTRUCTION JOINT
50
DI
|
C 1 COLUMN
.0
WI
0.25 THK POLYETHYLENE
6
(300X600)
NG
EF EACH FACE
DRAWI
600 THK. COMPACTED SELECT
MAKKAH
S
THI
50mm LEAN CONCRETE 3-{16 GB1 GRADE BEAM
FROM
AS PER SAES-A-114 LF LADDER FOUNDATION
FOUNDATION LAYOUT A S E C T I O N
RB1 ROOF BEAM
SCALE 1 :50M SCALE 1 :10M
- THK THICKNESS
NED
TOC TOP OF CONCRETE
OBTAI
1 2 3 4 1 2 3 4 TOW TOP OF WALKWAY
12600
WWF WELDED WIRE FABRIC
12600
3800 5000 3800 { DIAMETER
BE
3800 5000 3800 BOTTOM BAR
PART,SHALL
TOP BAR
D
F.G.L.
BI
(TYP)
T.O.W. EL. 99.850
A A
N
REFERENCE DRAWINGS
I
I.J GB1 I.J GB1 GB1 I.J
{10 T&B DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
E FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
J
150 THK
J
WWF
.
.
I
I
I
SLAB FLOOR PLAN, ELEV. & SECTION AR-A00004.001
150x150 MW9xMW9
T&B
FO
3900
3900
RB1
RB2
RB2
RB1
GB1
GB1
GB1
GB1
J
J
T.O.C.
N
I
I
{ 10
I
EL. 104.000
C C B B E T.O.C. TRUE
DIRECTION OF
ON
NORTH
PREVAILING WIND
6
.0
EL. 99.950 A
0
200 THK
REPRODUCTI
5
T.O.C. PLANT
NORTH
SLAB
EL. 99.850 MAKKAH
THIS DRAWING
ED
I.J GB1 I.J GB1 GB1 I.J 5
4 68
0
08 5
42 8
1
.95
0. .98
04
= 265 8. 5
6
90
25
76
.9
0 07
4 511 5
.
0 7.
.
132
7
80 23
29 114
29 0966
8
5
.
.
.
8 9. 948
82
1 79 1 998 0 019
300
= 265
265
9 5095
29
0
6
6
3
2 265
2
4
4
4 4
N=
N=
N=
N=
N= N=
E=
=
=
Shareh AL-Khamis
E
E E=
E
B B
RB1 RB1 RB1 I.J I.J I.J
SAUDIARAMCO.NO
39999
45325
46025
T7
SU
56440
57140
SCALE 1 :50M
WWF MW50.2 x
MW50.2 150x150 MM GRADE SLAB PLAN A
ND
3-{20
OF
WI
NATIONAL GAS
TOC EL+99.950
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
SCALE 1 :50M
NORTH
PLANT
150
150
x x x x x x
OF
300
500
PROPERTY
8-{20
VERTICAL BARS RB2 {10
300
KEY PLAN
{10
{10 TIES
3-{20
1 0 0.1 0.2 0.3 0.4 0.5 1.0
SOLE
AS PER SAES-A-114 1 : 10M
300
0 0.5 1.0 1.5
6-{12
F S E C T I O N CONTINUOUS BARS 0.25 THK POLYETHYLENE
THE
METERS
SHEET (TYP)
SCALE 1 :10M
- B S E C T I O N 1 :15M
E S E C T I O N
ARE
SCALE 1 :10M 0 0.5 1.0 1.5 2.0
-
SCALE 1 :10M
- METERS
1700
N
HEREI
1 : 20M
1500 150
0 1.0 2.0 3.0 4.0 5.0
850 850 FGL 99.700
15
NED
SCALE: 1 : 50M
{10
CONTAI
{12
450
F F
850
1000
{16 {12
{10 THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
750
D D 3-{20
ON
1500
D D
1700
NFORMATI
TOC EL. 104.000 2 COATS OF
C.J DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
1500
PAINT APCS -10 {12 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
500
I
RB1 C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
500
THE
300
3-{20
SAUDI ARABIAN OIL COMPANY
AND
F1 F1
50 THK LEAN DRAWING TYPE
(RB-1)
CONCRETE STRUCTURAL DETAILS FDN
NG
{12 {16 {12 {16
300
OPERATOR SHELTER (2 UNITS)
DRAWI
COMPACTED SOIL
AS PER SAES-A-114 YANBU DISTRIBUTION HUB
FOUNDATION PLAN F1/C1 FOUNDATION PLAN F2/C1 C S E C T I O N D S E C T I O N YANBU SAUDI ARABIA
S
SCALE 1 :20M SCALE 1 :20M SCALE 1 :10M SCALE 1 :15M PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
4 NOS. REQUIRED 4 NOS. REQUIRED - -
X40 Q ST-A00041 001 C
Saudi Aramco 2615 ENG. (05/05)
TRUE DIRECTION OF
3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
OF
NORTH PREVAILING WIND
OF FINAL BUILDING RISK ASSESSMENT
RECOMMENDATIONS.
CONSENT
6
.0
TTEN
750 750
MAKKAH
WRI
{16
THE
LEGEND
750
{12
THOUT
C/C CENTER TO CENTER
A A
EL ELEVATION
WI
1500
THK THICKNESS
NG
FGL FINISHED GRADE LEVEL
1 2 3 4
DRAWI
TOC TOP OF CONCRETE
C1
I.J ISOLATION JOINT
750
{16
{ DIAMETER
S
THI
C 1
19600
{12 COLUMN NUMBER
FROM
6550 6500 6550 COLUMN
F1 F 1
FOOTING NUMBER
NED
FOOTING
FOUNDATION PLAN - F1/C1
OBTAI
F1/C1 F1/C1 F1/C1 F1/C1 SCALE 1 : 15M
BE
| OF COLUMN
A
PART,SHALL
REFERENCE DRAWINGS
D
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
COLUMN
COLUMN
COLUMN
BI
FLOOR PLAN AR-A00013.001
N
I
OF
OF
OF
OF
GRADE BEAM & GARDE SLAB DETAILS ST-A00042.002
FULL,OR
ROOF BEAM/SLAB PLAN & DETAILS ST-A00042.003
|
|
FGL 99.700
R
FO
F1/C1 F1/C1 F1/C1 F1/C1
N
I
B B
1000
9600
ON
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
| OF COLUMN
REPRODUCTI
.0
B
0
5
PLANT
NORTH
MAKKAH
1500
2 COATS OF
C.J THIS DRAWING
BITUMINOUS
ED
PAINT APCS 10 {12
Shareh AL-Khamis
SAUDIARAMCO.NO
4800
500
NG)
STI
T8 (EXI
{16
SU
39999
45325
46025
56440
57140
50 THK LEAN
CONCRETE
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
50.06 A=3.66 HA.
COMPACTED SOIL
NORTH
PLANT
IS
AS PER SAES-A-114 Shareh AL-AWAL
OF
| OF COLUMN
C A S E C T I O N
PROPERTY
SCALE 1 :15M
-
KEY PLAN
FOUNDATION PLAN
SCALE 1 :50M
SOLE
0 0.1 0.2 0.3 0.4 0.5 1.0
METERS
THE
1 : 10M
ARE
FOR DETAIL REFER HVAC
METERS
DWG. HV-A00010.001
N
1 :15M
HEREI
8-{20 BARS
0 1.0 2.0 3.0 4.0 5.0
PACU-1 PACU-1
400
METERS
NED
{10 TIES
SCALE: 1 : 50M
CONTAI
REVISION VALIDATION
ON
B S E C T I O N
NFORMATI
SCALE 1 :10M DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
- (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
CHEMICAL SHELTER BUILDING
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00042 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
OF FINAL BUILDING RISK ASSESSMENT
6
19600
.0
CONSENT
RECOMMENDATIONS.
50
TTEN
MAKKAH
RAMP
WRI
THE
THOUT
LEGEND
WI
C.J CONSTRUCTION JOINT
NG
EL ELEVATION
TOW
DRAWI
EL. 99.850 THK THICKNESS
S
GB1 GB1 GB1
THI
EF EACH FACE
FROM
TOW TOP OF WALKWAY
TOC
NED
WWF WELDED WIRE FABRIC
4800
GB1
GB1
GB1
GB1
EL. 99.95
GB GRADE BEAM
OBTAI
{ DIAMETER
A A
BE
PART,SHALL
150 THK
D
SLAB
9600
REFERENCE DRAWINGS
B
BI
GB1 DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
N
FLOOR PLAN AR-A00013.001
I
ELEVATION AND SECTION AR-A00013.002
FULL,OR
WWF 150X150 MW9XMW9
R
FOUNDATION PLAN & DETAILS ST-A00042.001
4800
GB1
GB1
GB1
GB1
ROOF BEAM/SLAB PLAN & DETAILS ST-A00042.003
FO
N
I ON
REPRODUCTI
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
ED
GB1 GB1 GB1 MAKKAH
THIS DRAWING
C
SAUDIARAMCO.NO
Shareh AL-Khamis
SU
NG)
STI
T8 (EXI
39999
45325
46025
T7
56440
57140
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
SCALE 1 :50M
DI
50.06 A=3.66 HA.
NORTH
PLANT
OF
Shareh AL-AWAL
PROPERTY
200 THK. CMU WALL {12
VERTICAL REINF. KEY PLAN
SOLE
{12 DOWEL BARS
LAP)
THE
(
ARE
WITH JOINT FILLER AND
METERS
JOINT SEALANT (TYP)
1 : 10M
WWF
N
HEREI
4-{12
GRADE SLAB
3-{16 0 1.0 2.0 3.0 4.0 5.0
{10
TOC EL. 99.950
{10 (TYP) WWF METERS
TOW
NED
150
CONTAI
150
REVISION VALIDATION
FGL 99.700
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
0.25 THK POLYETHYLENE
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
SHEET (TYP) GB1
3-{12 (TYP) (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
(300X600) ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
2 COATS OF BITUMINOUS
{10
THE
PAINT APCS-10 (TYP) JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
50mm LEAN CONCRETE 3-{16 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
COMPACTED SOIL
AS PER SAES-A-114 DRAWING TYPE
NG
CHEMICAL SHELTER BUILDING
DRAWI
A S E C T I O N
SCALE 1 :10M
YANBU DISTRIBUTION HUB
-
YANBU SAUDI ARABIA
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00042 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
6
CONSENT
RECOMMENDATIONS.
50
PLANT
NORTH
MAKKAH
TTEN
1 2 3 4
WRI
LEGEND
19600
THE
200 6550 6500 6550 200 EL ELEVATION
THOUT
THK THICKNESS
WI
TOP TOP OF PARAPET
RB ROOF BEAM
NG
A
200
DRAWI
{ DIAMETER
A TOP BAR
S
THI
A
FROM
RB1
RB1
RB1
RB1
NED
4800
{12 T&B
OBTAI
T&B
BE
REFERENCE DRAWINGS
{ 12
PART,SHALL
B DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
D
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
9600
BI
RB1 RB1 RB1 ELEVATION & SECTION AR-A00013.002
N
I
GRADE BEAM & GARDE SLAB DETAILS ST-A00042.002
TOC
FULL,OR
EL. 104.000
R
TRUE DIRECTION OF
RB1
RB1
6
NORTH PREVAILING WIND
.0
4800
50
RB1
RB1
PLANT
NORTH
FO
200 THK
MAKKAH
SLAB
N
THIS DRAWING
I ON
REPRODUCTI
Shareh AL-Khamis
ED
NG)
STI
T8 (EXI
C 39999
45325
46025
200
56440
57140
SAUDIARAMCO.NO
ND
OF
WI
SU
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
50.06 A=3.66 HA.
Shareh AL-AWAL
OF
PROPERTY
KEY PLAN
SOLE
150
15
THE
200
ARE
RCC PARAPET WALL
TOC EL. 104.000 TOC EL. 104.000 METERS
200
200
1 : 10M
N
HEREI
0 1.0 2.0 3.0 4.0 5.0
600
METERS
3-{20
NED
600
SCALE: 1 : 50M
400
400
CONTAI
{10 TIES
{10 TIES REVISION VALIDATION
3-{20 3-{20
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
NFORMATI
300
300 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
- - JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
CHEMICAL SHELTER BUILDING
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00042 003 C
Saudi Aramco 2615 ENG. (05/05)
OF
6
.0
CONSENT
1 2 1 2 DRAINAGE PLAN.
PLANT
NORTH 2610 275 2610 275 4. FOR GENERAL NOTES AND STANDARD DETAILS
REFER DWG.NO ST-A00002.001 TO 004.
MAKKAH
TTEN
WRI
THE
1550
THOUT
F1/P1 F1/P1
150 THK
WI
1000
NG
A A
DRAWI
WWF 150x150
MW9xMW9
LEGEND
S
THI
1550
12 THK ISOLATION JOINT TOC TOP OF CONCRETE
WITH JOINT FILLER AND
JOINT SEALANT (TYP) FGL FINISHED GRADE LEVEL
FROM
1000
T&B TOP AND BOTTOM
TYP. TYPICAL
NED
C/C CENTER TO CENTER
FOUNDATION PLAN
OBTAI
THK THICKNESS
SCALE 1 :25M
TOG TOP OF GROUT
BE
A BW BOTHWAYS
EF EACH FACE
GRADE SLAB PLAN
PART,SHALL
D
@ AT
SCALE 1 :25M
{ DIAMETER
BI
{10 (TYP) 4-{12 (TYP)
N
I
REFERENCE DRAWINGS
FULL,OR
R
FFL
EL. 100.00 (TOC) DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
150
FGL
FO
EL. 99.85 FLOOR PLAN AR-A00010.001
N
I
STEEL FRAMING ST-A00106.001
TYP)
ON
300
REPRODUCTI
WWF
(
TRUE
DIRECTION OF
6
.0
0
PAINT AS PER APCS-10
5
PLANT
ED
NORTH
550
MAKKAH
THIS DRAWING
0.25 THK
600 THK. COMPACTED SELECT FILL 125 300 125
POLYETHYLENE SHEET
AS PER SAES-A-114
SAUDIARAMCO.NO
Shareh AL-Khamis
SU
140
C S E C T I O N
NG)
STI
T8 (EXI
SCALE 1 :10M
ON
- 39999
PROJECTI
45325
46025
T7
56440
57140
550
270
ANCHOR BOLT
NK
IS
SHRI
4-{12 (TYP) BASE PLATE
ND
OF
WI
NATIONAL GAS
THK
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
120
DI
06
GROUT
50. A=3.66 HA.
140
OF
{10 (TYP) 12 THK ISOLATION JOINT
NORTH
PLANT
WITH JOINT FILLER AND
NON
Shareh AL-AWAL
25
PROPERTY
TOG+100.15
4 AB 2-M20-120-500-(2)
300
TOC
KEY PLAN
150
SOLE
1000
FGL+99.85
500 500
THE
WWF SCALE 1 :10M
0 0.1 0.2 0.3 0.4 0.5 1.0
ARE
900
METERS
- 1 : 10M
N
HEREI
B 0 0.5 1.0 2.0
500
NED
PAINT AS PER APCS-10
SCALE: 1 : 25M
1-{12 EF
CONTAI
1000
400
REVISION VALIDATION
A 12-{20
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
T&B
ON
550
500
{ 16
NFORMATI
- DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
{16 T&B 12-{20
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
I
LEAN CONCRETE AS PER SAES-A-114 C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
{10 JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
SMOKING SHELTER
DRAWI
SCALE 1 :10M SCALE 1 :10M SCALE 1 :10M
- -
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00043 001 C
Saudi Aramco 2615 ENG. (05/05)
10300 NOTED.
B 3650 3000 3650
3650 3000 3650 PRECAST MINARET 2. FOR GENERAL NOTES AND STANDARD DETAILS
F TOC
O D WITH PRECAST STAIR REFER DWG.NO ST-A00002.001 TO 004.
N IN 2000 3070 EL+99.980
IO W
T G
OF
C N
E I 1000 1000 1000 1000 1070 3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
R
I IL
D A OF FINAL BUILDING RISK ASSESSMENT
V
E STEEL LADDER PER
R
CONSENT
P F1 CF2 I.J (TYP) RECOMMENDATIONS.
PIP STF05501
550
1000
1000
4. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
2000
MAKKAH CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
C1
C1 A SHOWN IN RESPECTIVE GRADING AND STORM
900
| OF COLUMN
A GB1 GB1 GB1 DRAINAGE PLAN.
500
UP
1000
TTEN
C1 C1
I.J (TYP)
850
1030
WRI
COLUMN
COLUMN
COLUMN
F1 F1
3650
GB1
RCC MINARET
3650
THE
TOC C.J
GB1
GB1
1050 TOC
EL+99.850
OF
OF
OF
EL+99.930
THOUT
B LEGEND
|
|
F1 F1
EL ELEVATION
WI
C1
| OF COLUMN
C1 B THK THICKNESS
NG
B GB1 GB1 GB1 FFL FINISHED FLOOR LEVEL
DRAWI
C1 C1
FGL FINISHED GRADE LEVEL
9800
TOC TOP OF CONCRETE
3000
9800
F1 F1
3000
GB1
S
THI
GB1
C.J D
TOC { DIAMETER
F1 F1
150 THK
EL+99.950 D C 1
FROM
SLAB ST-A00044 COLUMN NUMBER
SH.002
COLUMN
C1
| OF COLUMN
C1 C C.J C.J
F 1
NED
C FOOTING NUMBER
COLUMN
COLUMN
OBTAI
FOOTING
C.J
TOW
BOTTOM BAR
3150
GB1
GB1
EL+99.850
OF
OF
TOP BAR
3150
BE
CF1
|
|
CF1
FOR DETAIL REFER HVAC
DWG. HV-A00002.001 TOC
PART,SHALL
F1 F1
EL+99.980
D
GB1 GB1
C1 C1 C1 C1
D REFERENCE DRAWINGS
BI
D | OF COLUMN DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
N
FLOOR PLAN AR-A00002.001
I
575
FULL,OR
R
C2
C2
COLUMN
FO
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
N
6
.0
I
0
5
425 2150 425 PLANT
OF NORTH
-
ON
MAKKAH
THIS DRAWING
GRADE SLAB/BEAM LAYOUT
REPRODUCTI
|
SCALE 1 :50M
ED
FOUNDATION PLAN PRECAST MINARET WALL Shareh AL-Khamis
SCALE 1 :50M
NG)
250
STI
T8 (EXI
SAUDIARAMCO.NO
150
(TYP) 150 THK SLAB 39999
45325
46025
SU
T7
56440
57140
FGL
CONCRETE WALL
ND
{10 BARS EF
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
NORTH
PLANT
{12 BARS EF
Shareh AL-AWAL
IS
2 COATS OF CF2 FOOTING
5000
BITUMINOUS
OF
PAINT APCS 10
2000 1000 2000
PROPERTY
2000
SOLE
0 0.5 1.0 1.5
B S E C T I O N {16
1350
300 METERS
- SCALE 1 :25M
{16
THE
1 :15M
1000
0 0.5 1.0 2.0
8-{20
A A
ARE
VERTICAL BARS
300
C1 C1 METERS
150
D {10 TIES A A
N
1 : 25M
HEREI
FGL 99.700
2000
0 1.0 2.0 3.0 4.0 5.0
1025
METERS
NED
{16 T&B 1 : 50M
C2
C2
C S E C T I O N SCALE:
C1
CONTAI
C C
1000
SCALE 1 :10M
-
REVISION VALIDATION
1000
{16 T&B THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
1500
C2 C2 2 COATS OF {16
ON
900
C.J
BITUMINOUS
NFORMATI
150
PAINT APCS-10 {16 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
{16 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
100
1
500
6-{20
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
{16 T&B
{10 TIES {16
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
1000 3000 1000
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
2
AND
50 THK LEAN
6
1
1
5
0
NG
COMPACTED SOIL
SCALE 1 : 15M MUSALLA/MOSQUE
DRAWI
AS PER SAES-A-114
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00044 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
F
O D 3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
N IN {12 DOWEL BARS
IO W
T OF FINAL BUILDING RISK ASSESSMENT
C G
CONSENT
E IN
R
I IL RECOMMENDATIONS.
D A
V
E
LAP)
R 4. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
P
C CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
1 2 3 4 SHOWN IN RESPECTIVE GRADING AND STORM
(
MAKKAH 12 THK ISOLATION JOINT DRAINAGE PLAN.
TTEN
10300 WITH JOINT FILLER AND
JOINT SEALANT (TYP)
3650 3000 3650
WRI
WWF
RB1 4-{12
GRADE SLAB
3-{16
CONCRETE
THE
1500 {10
RB2
RB2
CANOPY (TYP.) TOC EL. 99.950
{10 (TYP) WWF
TOW
150
THOUT
EL. 99.850
150
RB1 RB1 RB1
WI
FGL 99.700 LEGEND
NG
C
DRAWI
GB1 GRADE BEAM 1
0.25 THK POLYETHYLENE
3650
RB2
RB2
3-{12 (TYP)
RB1
RB1
(300X600)
TOW TOP OF WALKWAY
200 THK SLAB
600 THK. COMPACTED SELECT
S
FGL FINISHED GRADE LEVEL
THI
FILL AS PER SAES-A-114
TOC 1-{12 SB @ EF
{ DIAMETER
EL+103.800 2 COATS OF BITUMINOUS
{10 RB ROOF BEAM
FROM
PAINT APCS-10 (TYP)
NED
RB1 RB1 RB1 AS PER SAES-A-114
B B
OBTAI
9800
D S E C T I O N
3000
ST-A00044
RB2
RB2
RB1
RB1
SCALE 1 :10M
SH 001
BE
A A
PART,SHALL
D
C REFERENCE DRAWINGS
BI
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
RB1
FLOOR PLAN AR-A00002.001
N
I
3150
FULL,OR
FOUNDATION & GRADE SLAB PLAN ST-A00044.001
R
FO
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
N
I
PLANT
D NORTH
MAKKAH
ON
THIS DRAWING
REPRODUCTI
ED
Shareh AL-Khamis
NG)
STI
SAUDIARAMCO.NO
T8 (EXI
39999
SU
45325
46025
T7
ROOF PLAN
56440
57140
SCALE 1 :50M
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
NORTH
PLANT
Shareh AL-AWAL
IS
OF
PROPERTY
KEY PLAN
SOLE
THE
{20 BAR {12 BARS
{20 BARS 0 0.1 0.2 0.3 0.4 0.5 1.0
ARE
TOC EL+103.800 TOC EL+103.800 TOC EL+103.800
METERS
200
200
200
N
HEREI
1 : 10M
NED
300
{10 TIES
SCALE: 1 : 50M
400
RB1 RB1
CONTAI
{20 BARS
{10 TIES REVISION VALIDATION
{20 BAR THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
NFORMATI
300 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
- - - JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
(BEAM REINFORCEMENT NOT SHOWN FOR CLARITY)
DRAWING TYPE
NG
MUSALLA/MOSQUE
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00044 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
8-{20 3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
{16
VERTICAL BARS
300
OF FINAL BUILDING RISK ASSESSMENT
CONSENT
RECOMMENDATIONS.
750
{10 TIES {12
1 2 3 4 5 6 4. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
B B SHOWN IN RESPECTIVE GRADING AND STORM
DIRECTION OF DRAINAGE PLAN.
1500
PREVAILING WIND
TTEN
MAKKAH
C S E C T I O N
20210
WRI
SCALE 1 :10M LEGEND
2625 4500 5055 4225 3805
-
C1
GB GRADE BEAM
750
THE
F1/C1 F1/C1 {16 C.J CONSTRUCTION JOINT
EL ELEVATION
THOUT
THK THICKNESS
A FOR DETAIL REFER HVAC
{12
WI
F1 FGL FINISHED GRADE LEVEL
EF EACH FACE
NG
DRAWI
B FOUNDATION PLAN - F1/C1 TOC TOP OF CONCRETE
S
THI
C 1
PACU-2
3430
COLUMN NUMBER
FROM
COLUMN
F1/C1 F1/C1
F 1
FOOTING NUMBER
8610
NED
FOOTING
530
OBTAI
BOTTOM BAR
C TOP BAR
BE
REFERENCE DRAWINGS
PART,SHALL
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
D
3630
PACU-1
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
BI
BUILDING ELEVATION & SECTION AR-A00007.005
F1/C1 F1/C1 F1/C1 F1/C1 F1/C1 F1/C1
ROOF BEAM / SLAB PLAN & DETAILS ST-A00045.002
N
I
FULL,OR
D
R
FGL 99.700 TRUE
NORTH
DIRECTION OF
PREVAILING WIND
6
.0
0
5
FO
PLANT
NORTH
MAKKAH
N
I
FOUNDATION PLAN
ON
SCALE 1 :50M THIS DRAWING
C C
REPRODUCTI
1000
1 2 3 4 5 6
ED
1500
20210 2 COATS OF
C.J Shareh AL-Khamis
BITUMINOUS
2625 4500 5055 4225 3805
PAINT APCS 10 {12
SAUDIARAMCO.NO
NG)
STI
T8 (EXI
39999
SU
500
45325
46025
T7
56440
57140
{16
ND
A
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
50 THK LEAN
PREVAI
DI
06
50. A=3.66 HA.
NORTH
PLANT
GB1 CONCRETE
IS
1550
Shareh AL-AWAL
COMPACTED SOIL
OF
AS PER SAES-A-114
PROPERTY
B B S E C T I O N
GB1 GB1 GB1 GB1
SCALE 1 :15M
-
KEY PLAN
GB1
GB1
GB1
GB1
GB1
GB1
3430
SOLE
200 THK. CMU WALL {12
VERTICAL REINF. 0 0.1 0.2 0.3 0.4 0.5 1.0
THE
METERS
8610
150x150
1 : 10M
LAP)
ARE
0 0.5 1.0 1.5
GB1
C METERS
(
GB1 GB1 GB1 GB1
N
TOC 12 THK ISOLATION JOINT
HEREI
1 :15M
EL. 99.850 WITH JOINT FILLER AND
GB1
WWF
GB1
GB1
GB1
GB1
GB1
METERS
4-{12
NED
3630
CONTAI
TOC EL. 99.950 WWF
{10 (TYP)
A TOW REVISION VALIDATION
150
EL. 99.850 THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
150
ON
GB1 GB1 GB1 GB1 GB1
NFORMATI
FGL 99.700
D TOW
DESIGN CERTIFICATION
(DESIGN AGENCY)
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)
OTHER
I
(300X600) C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
600 THK. COMPACTED SELECT JOB ORDER/EWO NO.
A FILL AS PER SAES-A-114
10-02399-0001
THIS REVISION IS NOT TO BE USED FOR
CONSTRUCTION UNTIL CERTIFIED AND DATED
1-{12 SB @ EF
FOR LADDER DETAIL
2 COATS OF BITUMINOUS SAUDI ARABIAN OIL COMPANY
AND
REFER TO PIP STF 05501 {10
FGL PAINT APCS-10 (TYP) DRAWING TYPE
EL. 99.700
50mm LEAN CONCRETE 3-{16 FOUNDATION & GRADE SLAB PLAN FDN
NG
SECURITY SUPPORT BUILDING-TANK FARM
DRAWI
COMPACTED SOIL
AS PER SAES-A-114
YANBU DISTRIBUTION HUB
A S E C T I O N YANBU SAUDI ARABIA
RAMP RAMP SCALE 1 :10M
S
GRADE SLAB PLAN - PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
SCALE 1 :50M X40 Q ST-A00045 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
OF FINAL BUILDING RISK ASSESSMENT
RECOMMENDATIONS.
CONSENT
1 2 3 4 5 6
DIRECTION OF
PREVAILING WIND 2625 4500 5055 4225 3805
TTEN
MAKKAH
WRI
LEGEND
THE
CONCRETE CANOPY
RB1
RB ROOF BEAM
RB1
C (TYP)
{10 { DIAMETER
THOUT
RB1 RB1
RB1 EL ELEVATION
A
THK THICKNESS
RB1
WI
RB1
RB1
RB1
RB1
RB1
1550
RB1
FFL FINISHED FLOOR LEVEL
NG
TOC TOP OF CONCRETE
DRAWI
RB1 RB1 RB1 RB1 RB1
T&B TOP AND BOTTOM
B
BOTTOM BAR
C TOP BAR
RB1
RB1
RB1
RB1
S
THI
RB1 RB1 RB1 RB1 200 THK
RB1
RB1
RB1
RB1
RB1
SLAB
3430
FROM
A A
T&B
B B TOC
EL. 103.600
NED
{ 12
OBTAI
RB1
C
RB1 RB1 RB1 RB1
BE
REFERENCE DRAWINGS
PART,SHALL
{12 T&B
{10
D
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
RB1
RB1
RB1
RB1
RB1
RB1
3630
BI
FLOOR PLAN AR-A00007.004
N
I
FULL,OR
R
D RB1 RB1 RB1 RB1 RB1
FO
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
N
5
I
PLANT
NORTH
ON
REPRODUCTI
SCALE 1 :50M
THIS DRAWING
ED
Shareh AL-Khamis
SAUDIARAMCO.NO
NG)
STI
SU
T8 (EXI
39999
45325
46025
56440
57140
150
ND
OF
WI
NATIONAL GAS
ON
NG
IS
RECTI
LI
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
15
OF
PROPERTY
{10
KEY PLAN
{10
SOLE
{20 BARS {12 BARS
{20 BARS
TOC EL. 103.600 TOC EL. 103.600 TOC EL. 103.600
THE
200
200
200
ARE
METERS
500
500
N
1 : 10M
HEREI
300
300
{10 TIES
0 1.0 2.0 3.0 4.0 5.0
{10 TIES RB1 RB1
{20 BARS {20 BARS
METERS
NED
SCALE: 1 : 50M
CONTAI
300
300
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
A S E C T I O N B S E C T I O N C S E C T I O N (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
(BEAM REINFORCEMENT NOT SHOWN FOR CLARITY) C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
SECURITY SUPPORT BUILDING-TANK FARM
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00045 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
6
.0
RECOMMENDATIONS.
CONSENT
750
{12 4. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
PLANT CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
NORTH SHOWN IN RESPECTIVE GRADING AND STORM
C B B DRAINAGE PLAN.
MAKKAH
TTEN
1500
WRI
F1/C1 F1/C1 F1/C1 F1/C1 F1/C1
LEGEND
3630
C1
THE
750
{16 GB GRADE BEAM
{ DIAMETER
THOUT
{12 C/C CENTER TO CENTER
WI
7260
F1
EL ELEVATION
B
530
NG
THK THICKNESS
DRAWI
FOUNDATION PLAN - F1/C1 FFL FINISHED FLOOR LEVEL
F1/C1 F1/C1 F1/C1 SCALE 1 : 15M
FGL FINISHED GRADE LEVEL
EF EACH FACE
S
3630
F1/C1 F1/C1
THI
TOC TOP OF CONCRETE
FROM
I.J ISOLATION JOINT
200 THK. CMU WALL {12
C 1
VERTICAL REINF.
COLUMN NUMBER
NED
{12 DOWEL BARS
COLUMN
A
OBTAI
F 1
FOOTING NUMBER
LAP)
F1/C1 F1/C1 F1/C1 F1/C1 F1/C1 FOOTING
BE
(
12 THK ISOLATION JOINT REFERENCE DRAWINGS
WITH JOINT FILLER AND
PART,SHALL
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
D
JOINT SEALANT (TYP)
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
FOUNDATION PLAN WWF
4-{12
SCALE 1 :50M GRADE SLAB FLOOR PLAN AR-A00007.001
{16 BARS
BI
{10 ROOF BEAM / SLAB PLAN & DETAILS ST-A00046.002
PACU-2
PACU-1
150
N
EL. 99.850
I
FULL,OR
150
R
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
FGL 99.700
0
5
FOR DETAIL REFER HVAC PLANT
NORTH
FO
THIS DRAWING
0.25 THK POLYETHYLENE
N
I
SHEET (TYP) GB1
3-{12 (TYP)
(300X600)
ON
600 THK. COMPACTED SELECT
REPRODUCTI
Shareh AL-Khamis
NG)
2 COATS OF BITUMINOUS
STI
T8 (EXI
{10
ED
PAINT APCS-10 (TYP)
1 2 3 4 5 {16 BARS
39999
45325
46025
T7
56440
57140
SAUDIARAMCO.NO
4350 3600 4500 2625
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
SU
TRUE
EXPANSION
PREVAI
DI
RAMP
06
50. A=3.66 HA.
A S E C T I O N
NORTH
PLANT
Shareh AL-AWAL
SCALE 1 :10M
-
300
IS
FGL
EL. 99.700
OF
{20 BARS
KEY PLAN
PROPERTY
VERTICAL
300
{10 TIES
TOW
EL. 99.850
SOLE
GB1 GB1 GB1 GB1 0 0.1 0.2 0.3 0.4 0.5 1.0
C S E C T I O N
SCALE 1 :10M
THE
- METERS
1 : 10M
GB1
GB1
3630
ARE
0 0.5 1.0 1.5
GB1
GB1
GB1
N
HEREI
1 :15M
METERS
7260
1000
NED
B
530
SCALE: 1 : 50M
GB1
CONTAI
1500
REVISION VALIDATION
2 COATS OF
C.J
A A BITUMINOUS THIS REVISION NO.
ON
3630
GB1
GB1
GB1
NFORMATI
TOC
GB1
GB1
500
SMS ASH SAY AHG
03/07/16 09/08/16 09/08/16 09/08/16
{16
REV.NO. DATE REVISION DESCRIPTION
I
GB1 GB1 GB1 GB1 C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
50 THK LEAN JOB ORDER/EWO NO.
A CONCRETE 10-02399-0001
THIS REVISION IS NOT TO BE USED FOR
CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
COMPACTED SOIL
AS PER SAES-A-114 DRAWING TYPE
NG
B S E C T I O N
SECURITY SUPPORT BUILDING-MAIN GATE
DRAWI
SCALE 1 :15M
- YANBU DISTRIBUTION HUB
GRADE SLAB PLAN
YANBU SAUDI ARABIA
SCALE 1 :50M
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00046 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
TRUE
DIRECTION OF
CONSENT
NORTH
PREVAILING WIND
6
.0
50
1 2 3 4 5
TTEN
PLANT 15075
NORTH
WRI
4350 3600 4500 2625
MAKKAH
THE
THOUT
LEGEND
WI
{ DIAMETER
NG
C/C CENTER TO CENTER
DRAWI
C.J CONSTRUCTION JOINT
3630
EL ELEVATION
RB1
RB1
RB1
RB1
RB1
S
THK THICKNESS
THI
{12 T&B FFL FINISHED FLOOR LEVEL
FROM
EF EACH FACE
RB1
7260
RB1 RB1
TOC TOP OF CONCRETE
B
530
NED
RB1 TOP TOP OF PARAPET
OBTAI
TOP BARS
TOC
A A BOTTOM BARS
3630 EL. 103.600
BE
T&B
RB1
B B
RB1
RB1
RB1
RB1
200 THK
PART,SHALL
SLAB
D
REFERENCE DRAWINGS
{ 12
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
BI
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
N
I
FOUNDATION & GRADE SLAB PLAN ST-A00046.001
FULL,OR
R
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
FO
ROOF FRAMING PLAN MAKKAH
SCALE 1 :50M
N
I ON
THIS DRAWING
REPRODUCTI
ED
Shareh AL-Khamis
NG)
STI
T8 (EXI
SAUDIARAMCO.NO
39999
45325
46025
T7
56440
57140
SU
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
NORTH
PLANT
Shareh AL-AWAL
150
15
IS
TOP EL. 104.200
OF
PROPERTY
{10 BARS
RCC PARAPET WALL
KEY PLAN
600
{10
SOLE
{20 BARS {20 BARS
THE
200
200
ARE
500
METERS
500
N
HEREI
300
300
1 : 10M
{10 TIES
{10 TIES 0 1.0 2.0 3.0 4.0 5.0
NED
SCALE: 1 : 50M
CONTAI
300
300
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
A S E C T I O N B S E C T I O N (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
SECURITY SUPPORT BUILDING-MAIN GATE
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00046 002 C
Saudi Aramco 2615 ENG. (05/05)
ND
1000
OF
WI
1. ALL DIMENSIONS ARE IN MILLMETERS AND
ELEVATIONS ARE IN METERS UNLESS OTHERWISE
ON
NG
NOTED.
RECTI
LI
NORTH
TRUE
PLANT
PREVAI
2. FOR GENERAL NOTES AND STANDARD DETAILS
NORTH
REFER DWG.NO ST-A00002.001 TO 004.
DI
50
.06 TRUE
NORTH 3. FOUNDATION SIZES AND ANCHOR BOLTS ARE
OF
{10
PRELIMINARY AND SHALL BE FINALIZED UPON
.06
50
NORTH
PLANT
RECEIPT OF FINAL SUPPORT REACTIONS FROM
CONSENT
SPACE FRAME VENDOR.
1000
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
DIRECTION OF {10 SHOWN IN RESPECTIVE GRADING AND STORM
PREVAILING WIND
TTEN
DRAINAGE PLAN.
WRI
SAUDI ARAMCO STANDER DRAWING # AA-036024.001.
SECURITY GATEHOUSE-MAIN GATE SECURITY GATEHOUSE-TANK FARM GATE
THE
20-{25
THOUT
WI
B S E C T I O N
NG
2 1
DRAWI
- SCALE 1:10M
16000
VENDOR
NK
SHRI
S
THI
ON
LEGEND
PROJECTI
THK.
M35 ANCHOR BOLTS AS PER
NON
PER
EL ELEVATION
SUNSHADE SUADI ARAMCO STANDARD
FROM
1000x1000
DRAWING# AA-036024-001
THK THICKNESS
GROUT
F1/P1 F1/P1
AS
25MM
C.J CONSTRUCTION JOINT
NED
E.F EACH FACE
TOC
OBTAI
T&B TOP AND BOTTOM
B B
A
770
{ DIAMETER
150
WALKWAY
EL. @ AT
BE
FGL
P 1
PART,SHALL
PEDESTAL NUMBER
D
700
12MM THK. {10 PEDESTAL
BI
FOOTING NUMBER
FOOTING
2-{12 EF
N
800
I
REFERENCE DRAWINGS
2 COATS OF BITUMINOUS PAINT
FULL,OR
R
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
PER APCS-10 (TYP)
FO
COMPACTED SOIL 50THK LEAN {20
N
I
AS PER SAES-A-114 CONCRETE
ON
REPRODUCTI
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
THIS DRAWING
ED
MAKKAH
A S E C T I O N
- SCALE 1:25M
Shareh AL-Khamis
SAUDIARAMCO.NO
32000
NG)
SU
STI
5000
T8 (EXI
39999
45325
46025
T7
56440
2500 2500
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
50.06 A=3.66 HA.
IS
NORTH
PLANT
Shareh AL-AWAL
OF
PROPERTY
THIS DRAWING
KEY PLAN
SOLE
{20 T&B METERS
2500
1 : 10M
THE
0 0.5 1.0 2.0
ARE
METERS
1 : 25M
N
F1/P1 F1/P1
HEREI
0 1.0 2.0 3.0 4.0 5.0 10.0
A A
5000
METERS
NED
SCALE: 1 : 100M
B
CONTAI
REVISION VALIDATION
T&B
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
{ 20
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
2500
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
(2 NOS. REQUIRED)
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
SECURITY GATEHOUSE
DRAWI
YANBU DISTRIBUTION HUB
S
SCALE 1:25M PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00047 001 C
Saudi Aramco 2615 ENG. (05/05)
4100 3000
50
7100 F.G.L.
OF
3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
PLANT EL. 99.700
OF FINAL BUILDING RISK ASSESSMENT
NORTH 4100 3000 RECOMMENDATIONS.
REFER TO PIP STF 05501
CONSENT
MAKKAH T.O.W. 4. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
150 150
CONCRETE CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
EL. 99.850
CANOPY SHOWN IN RESPECTIVE GRADING AND STORM
F1/C1 F1/C1 F1/C1 DRAINAGE PLAN.
I.J I.J RB1 RB1
A A
TTEN
I.J GB1 GB1
A {10
WRI
150
| OF COLUMN A A
THE
GB1
WWF
GB1
J
150X150 D D
RB1
I
LEGEND
4500
4500
MW9XMW9
COLUMN
COLUMN
COLUMN
THOUT
.
IJ
RB1
{ 10
J
T.O.C. BOF BOTTOM OF FOUNDATION
.
4500
I
J
200 THK
.
I
PACU-1 EL. 99.950 SLAB C.J CONSTRUCTION JOINT
RB1
WI
T.O.C.
E E C 1
OF
OF
OF
COLUMN
150 THK
EL. 99.850 TOC
NG
SLAB EL ELEVATION
EL. 103.500
|
DRAWI
EF EACH FACE
F1/C1 F1/C1 F1/C1
I.J GB1 GB1 FFL FINISHED FLOOR LEVEL
FOR DETAIL REFER HVAC
150
DWG. HV-A00009.001
FGL FINISHED GRADE LEVEL
B I.J I.J B
S
| OF COLUMN RB1 RB1
THI
F1 FOOTING
B GB1 GRADE BEAM
FROM
I.J ISOLATION JOINT
LF LADDER FOUNDATION
ROOF FRAMING PLAN
GRADE SLAB PLAN SCALE 1 :50
RB1 ROOF BEAM
NED
FOUNDATION LAYOUT SCALE 1 :50M THK THICKNESS
OBTAI
SCALE 1 :50M
TOC TOP OF CONCRETE
BE
BOTTOM BAR
1500
TOP BAR
PART,SHALL
D
750 750 200 THK. CMU WALL {12
VERTICAL REINF.
BI
{16 DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
LAP)
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
750
N
{12
I
FLOOR PLAN AR-A00008.001
FULL,OR
12 THK ISOLATION JOINT
B B
R
HVAC LAYOUT HV-A00009.001
WITH JOINT FILLER AND
JOINT SEALANT (TYP)
1500
WWF
FO
4-{12
GRADE SLAB
3-{16
N
I
{10 TRUE
DIRECTION OF
ON
WWF
6
{10 (TYP)
.0
0
5
TOW
750
REPRODUCTI
150
PLANT
{16 NORTH
150
ED
{12
FGL 99.700 Shareh AL-Khamis
F1
NG)
STI
T8 (EXI
0.25 THK POLYETHYLENE
SAUDIARAMCO.NO
SHEET (TYP) GB1 39999
3-{12 (TYP)
FOUNDATION PLAN - F1/C1 (300X600)
45325
46025
T7
SU
56440
57140
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
{10
TRUE
EXPANSION
PREVAI
DI
PAINT APCS-10 (TYP)
06
50. A=3.66 HA.
150
NORTH
PLANT
50mm LEAN CONCRETE 3-{16 Shareh AL-AWAL
IS
TOP EL. 104.500
COMPACTED SOIL
OF
AS PER SAES-A-114
THIS DRAWING
PROPERTY
A S E C T I O N
SCALE 1 :10M
-
KEY PLAN
RCC PARAPET WALL
1000
SOLE
FGL 99.700
0 0.1 0.2 0.3 0.4 0.5 1.0
{10@
THE
METERS
{10
1 : 10M
0 0.5 1.0 1.5
ARE
C C 3-{20
1000
METERS
TOC EL. 103.500
3-{20
N
HEREI
1 :15M
200
200
BITUMINOUS
METERS
PAINT APCS 10 {12
500
NED
SCALE: 1 : 50M
300
300
500
CONTAI
{10 TIES
300
3-{20 {10 TIES REVISION VALIDATION
500
ON
300
NFORMATI
50 THK LEAN {10 TIES DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
CONCRETE 300
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
B S E C T I O N C S E C T I O N D S E C T I O N E S E C T I O N
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
SCALE 1 :15M SCALE 1 :10M SCALE 1 :10M SCALE 1 :10M 10-02399-0001
- - - - CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
FSF BUILDING
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00048 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
3. FOUNDATION SIZES AND ANCHOR BOLTS ARE
PRELIMINARY AND SHALL BE FINALIZED UPON
15000 2500 RECEIPT OF FINAL SUPPORT REACTIONS FROM
CONSENT
SPACE FRAME VENDOR.
1250 1250
TTEN
PREVAILING WIND DRAINAGE PLAN.
MAKKAH
WRI
1250
THE
T&B
A
2500
THOUT
A
{ 16
A
2500
WI
-
F1/P1 F1/P1
NG
DRAWI
1250
P1 LEGEND
S
THI
TOC TOP OF CONCRETE
{16 T&B
FAL FINISHED ASPHALT LEVEL
FROM
T&B TOP AND BOTTOM
TYP. TYPICAL
NED
THK THICK
OBTAI
BW BOTH WAY
12000
BE
SCALE 1 :20M
PART,SHALL
D
BI
REFERENCE DRAWINGS
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
N
I
)
STEEL FRAMING ST-A00108.001
TYP.
NK
FULL,OR
R
CK
SHRI
M35 ANCHOR BOLTS (A-307) 3-{10 TIES
(
THI
AS PER SUNSHADE SUADI ARAMCO
GROUT
STANDARD DRAWING# AA-036024-001
NON
TRUE
DIRECTION OF
25
NORTH
FO
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
TOG+100.00
N
MAKKAH
I
300
ON
REPRODUCTI
Shareh AL-Khamis
FGL 99.70
NG)
STI
T8 (EXI
ED
B 33 Ha
B 39999
ES
45325
46025
T7
56440
57140
TI
SAUDIARAMCO.NO
{ 10
B
2300
33 Ha
ND
2 COATS OF
OF
WI
NATIONAL GAS
ON
NG
1500
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
F1/P1 F1/P1
SU
BITUMINOUS PAINT
NORTH
PLANT
Shareh AL-AWAL
AS PER APCS 10
T7
(TYP)
C.J
FOUNDATION PLAN (TYP)
SCALE 1 :50M
IS
4-{12 BARS
THIS DRAWING
500
2 COATS OF BITUMINOUS
OF
PAINT AS PER APCS-10
PROPERTY
KEY PLAN
{16 T&B
SOLE
0 1.0 2.0 3.0 4.0 5.0
1000
METERS
THE
1 : 50M
ARE
METERS
{10 A S E C T I O N 1 :15M
N
HEREI
SCALE 1 :20M
- 0 0.5 1.0 1.5 2.0
METERS
NED
1000
SCALE: 1 : 20M
{10
CONTAI
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
SCALE 1 :10M
- DRAWING TYPE
NG
SHELTER FOR FSF CHECK POINT
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00048 002 C
Saudi Aramco 2615 ENG. (05/05)
UP
UP
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
OF
CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
SHOWN IN RESPECTIVE GRADING AND STORM
CONSENT
DRAINAGE PLAN.
TTEN
WRI
TOW AIR STACK
EL.99.+980 LEGEND
A
THE
C
BOF BOTTOM OF FOUNDATION
EL ELEVATION
THOUT
EF EACH FACE
WI
A FGL FINISHED GRADE LEVEL
NG
{ DIAMETER
DRAWI
ACCU-02
C
TOC
EL.+100.000
B UP B
15000
D D
S
TOC
THI
ACCU-02
EL.+100.000
C
FROM
ACCU-01
BE NED
OBTAI
PART,SHALL
REFERENCE DRAWINGS
D
B DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
BI
FLOOR PLAN AR-A00003.001
N
I
ROOF PLAN ST-A00049.002
FOUNDATION SLAB PLAN
FULL,OR
TRANSFORMER YARD FDN PLAN ST-A00049.003
R
SCALE
1 :100M
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
FO
6
.0
0
5
PRECAST WALL PLANT
NORTH THIS DRAWING
N
I
MAKKAH
ON
1500 1500
12 THK ISOLATION JOINT
REPRODUCTI
1500 WITH JOINT FILLER AND WWF
130
TOC TOW JOINT SEALANT (TYP) Shareh AL-Khamis
EL.100.000 EL.99.+980
ED
450
2700 3000
NG)
STI
TOC {10
T8 (EXI
800
50
AROUND
45325
46025
56440
57140
SAUDIARAMCO.NO
FGL
75 THK LEAN
EL.+99.850
CONCRETE
{20
SU
450
2 COATS OF
ND
500 3500
OF
WI
NATIONAL GAS
ON
NG
02 COATS OF APCS-10
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
BITUMINOUS PAINT
DI
06
50. A=3.66 HA.
APCS-10
Shareh AL-AWAL
OF
FOUNDATION SLAB
PROPERTY
A S E C T I O N
-
SCALE 1 :25M
KEY PLAN
B S E C T I O N
SOLE
- SCALE 1 :25M
THE
0 0.5 1.0 2.0
ARE
METERS
PRECAST WALL
N
HEREI
1 : 25M
{20
0 1.0 2.0 3.0 4.0 5.0 10.0
TOC {20
ANCHOR BOLT BY VENDOR
EL.+100.000 METERS
{16
NED
450
SCALE: 1 : 100M
CONTAI
300
3-{16 EF FGL REVISION VALIDATION
EL.+99.850
500
600
1-{16 @ EF CONCRETE
ON
2 COATS OF
BITUMINOUS PAINT
NFORMATI
{12
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
APCS-10
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
600 THK. COMPACTED SELECT 500 1100 500
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
FILL AS PER SAES-A-114 50 THK LEAN
SMS ASH SAY AHG
CONCRETE 03/02/16 09/08/16 09/08/16 09/08/16
I
COMPACTED SOIL C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
AS PER SAES-A-114
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
D S E C T I O N C S E C T I O N FOUNDATION PLAN AND DETAILS FDN
NG
- -
SCALE 1 :25M SCALE 1 :25M
RECEIVING SUBSTATION
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00049 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
NORTH
CONSENT
TTEN
DIRECTION OF
WRI
LEGEND
THE
THOUT
WIS
THI
FROMNG
DRAWI
NED
OBTAI
1 2 3 4 5
43560
BE
PART,SHALL
D
12mm THK CONTINUOUS GALVANIZED
TENSION PLATE W/STUD EMBEDDED
IN DOUBLE TEE SLAB
BI
(TYP FOR ALL DOUBLE TEE SLAB)
N
REFERENCE DRAWINGS
I
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
FO
BUILDING ELEVATION & SECTION AR-A00003.003
N
I
500
650
650
FOUNDATION PLAN AND DETAILS ST-A00049.001
TYP)
ON
+109.
+106.
+106.
TRANSFORMER YARD FDN PLAN ST-A00049.003
THK
REPRODUCTI
(
C/C
TRUE
TOC. EL.
TOC. EL.
TOC. EL.
DIRECTION OF
NORTH
15000
PREVAILING WIND
75x50x8m m
6
.0
THIS DRAWING
0
5
BENT
ED
PLANT
NORTH
@ 500m m
MAKKAH
E60
L=200)GALV.
Shareh AL-Khamis
SAUDIARAMCO.NO
NOS
PLATE
NG)
STI
SU
T8 (EXI
13
39999
(
45325
46025
56440
57140
ND
OF
WI
IS NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
NORTH
PLANT
OF
Shareh AL-AWAL
PROPERTY
250x175mmx THK GALVANIZED 150x50x8mm THK (L=175)
STEEL PLATE EMBEDDED IN GALVANIZED BENT PLATE
PRECAST INSULATED PANEL EMBEDDED IN DOUBLE TEE
@ 500 C/C SLAB @ 500mm C/C
KEY PLAN
SOLE
150x150x8mm THK
GALVANIZED STEEL
12mm THK CONTINOUS PLATE EMBEDDED IN
GALVANIZED TENSION PLATE PRE-CAST PANEL
THE
W/STUD EMBEDDED IN DOUBLE TEE SLAB
(TYP FOR ALL DOUBLE TEE SLAB)
ARE
ROOF PLAN
SCALE 1 :100M
N
HEREI
0 1.0 2.0 3.0 4.0 5.0 10.0
METERS
NED
SCALE: 1 : 100M
CONTAI
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
RECEIVING SUBSTATION
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00049 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
3. FOR GENERAL NOTES AND STANDARD DETAILS
1 2 3 4 5
REFER DWG.NO ST-A00001 & ST-A00002.
43560
CONSENT
15000 3500 17840 7220
DIRECTION OF
TTEN
MAKKAH PREVAILING WIND
WRI
LEGEND
THE
B
TOC CJ CONSTRUCTION JOINT
300
2608 3590 3590
THOUT
TOP OF TRANSFORMER EL ELEVATION
4000
FGL FINISHED GRADE LEVEL
WI
TOE WALL TOC TOP OF CONCRETE
3200
TOE WALL (TYP)
NG
(TYP)
DWG.
{ DIAMETER
DRAWI
APCS-1E COATING
AS PER SAES-H-003
CAL
4125
ELECTRI
2070 A
S
THI
POWER TRANSFORMER, POWER TRANSFORMER,
FROM
PER
15000 15000
NED
AS
12000 FIRE RATED
LAP)
OBTAI
WALL (TYP)
A
6880
BE
6200
C C FGL
PART,SHALL
D
7500
2100
1000
2 COATS OF
{16
BITUMINOUS PAINT REFERENCE DRAWINGS
BI
B B
1500*
APCS-10
{12
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
CJ
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
N
I
FLOOR PLAN AR-A00003.001
500
FULL,OR
R
BUILDING ELEVATION & SECTION AR-A00003.003
FO
50MM THK. LEAN CAST IN PLACE ANCHOR/ROOF PLAN ST-A00049.002
{16 CONCRETE
N
I
600 300 600 COMPACTED SOIL
ON
AS PER SAES-A-114
1500
REPRODUCTI
* DEPTH OF FOUNDATION SHALL BE FINALIZED BY LSTK
CONTRACTOR DURING DETAIL DESIGN BASED ON TRUE
DIRECTION OF
NORTH
PREVAILING WIND
ED
DESIGN CALCULATIONS FOR REQUIRED HEIGHT OF
6
.0
0
5
TRANSFORMER. PLANT
NORTH
MAKKAH
THIS DRAWING
SAUDIARAMCO.NO
A S E C T I O N
Shareh AL-Khamis
SCALE 1 :25M
SU
-
NG)
STI
T8 (EXI
39999
45325
46025
56440
57140
IS
OF
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
PROPERTY
Shareh AL-AWAL
KEY PLAN
SOLE
0 0.1 0.2 0.3 0.4 0.5 1.0
METERS
THE
1 : 10M
TRANSFORMER YARD FOUNDATION PLAN
0 0.5 1.0 2.0
SCALE 1 :100M
ARE
METERS
300 1 : 25M
N
HEREI
0 1.0 2.0 3.0 4.0 5.0 10.0
THK.
METERS
NK
3-{20 TOP
NED
SHRI
300
SCALE: 1 : 100M
CONTAI
GROUT
25
{10
6200x2100 ANCHOR BOLT
NON
600
EL.+100.000
TOC THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
300
FGL BITUMINOUS PAINT
NFORMATI
APCS-10 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
3-{20 BOTTOM
600
I
APCS-10 C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
CONCRETE
THE
50MM THK. LEAN JOB ORDER/EWO NO.
COMPACTED SOIL THIS REVISION IS NOT TO BE USED FOR
CONCRETE 10-02399-0001
AS PER SAES-A-114 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
AS PER SAES-A-114
DRAWING TYPE
NG
RECEIVING SUBSTATION
DRAWI
C S E C T I O N B S E C T I O N YANBU DISTRIBUTION HUB
SCALE 1 :25M SCALE 1 :10M YANBU SAUDI ARABIA
- -
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00049 003 C
Saudi Aramco 2615 ENG. (05/05)
43400
OF
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
PLANT
10200 5200 14057 13943 CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
NORTH
CONSENT
SHOWN IN RESPECTIVE GRADING AND STORM
DRAINAGE PLAN.
MAKKAH
TTEN
WRI
A
1100
ACCU-01 2703 5000 LEGEND
THE
{ DIAMETER
3135
BOF BOTTOM OF FOUNDATION
C C
THOUT
D D EL ELEVATION
=
C EF EACH FACE
4160
ACCU-01 ACCU-02
10000
865
FFL FINISHED FLOOR LEVEL
B B
WI
ACCU-02 TOC
FGL FINISHED GRADE LEVEL
=
EL.+100.000
NG
WWF WELDED WIRE FABRIC
DRAWI
UP
A
4100
= =
2600
3833
S
THI
FROM
B
AIR STACK
TOW
EL.99.+980
NED
OBTAI
3700 FGL
EL.+99.850 A
BE
PART,SHALL
UP
D
FOUNDATION SLAB PLAN
BI
SCALE 1 :100M
REFERENCE DRAWINGS
N
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
I
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
FULL,OR
R
FLOOR PLAN AR-A00003.003
FO
PRECAST WALL ROOF PLAN ST-A00049.005
N
I
TRANSFORMER YARD FDN PLAN ST-A00049.006
ON
1500 1500
12 THK ISOLATION JOINT
REPRODUCTI
1500 1200 WITH JOINT FILLER AND WWF
130
TOW JOINT SEALANT (TYP)
TRUE
EL.99.+980 NORTH
DIRECTION OF
PREVAILING WIND
THIS DRAWING
6
ED
.0
0
450
5
2700 3000 PLANT
NORTH
50
SAUDIARAMCO.NO
75 THK LEAN FGL Shareh AL-Khamis
EL.+99.850
CONCRETE
{20
SU
450
NG)
2 COATS OF
STI
500 3500
T8 (EXI
BITUMINOUS PAINT 02 COATS OF APCS-10
39999
APCS-10
45325
46025
56440
57140
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
SHEET
LI
EXPANSION
PREVAI
FOUNDATION SLAB
DI
06
50. A=3.66 HA.
OF
Shareh AL-AWAL
PROPERTY
A S E C T I O N
-
SCALE 1 :25M
KEY PLAN
B S E C T I O N
SOLE
- SCALE 1 :25M
THE
0 0.5 1.0 2.0
ARE
METERS
PRECAST WALL
N
HEREI
1 : 25M
{20
0 1.0 2.0 3.0 4.0 5.0 10.0
TOC {20@200mm C/C
ANCHOR BOLT BY VENDOR
EL.+100.000 METERS
{16
NED
450
SCALE: 1 : 100M
CONTAI
300
3-{16 EF FGL REVISION VALIDATION
EL.+99.850
500
600
1-{16 @ EF CONCRETE
ON
2 COATS OF
BITUMINOUS PAINT
NFORMATI
{25
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
APCS-10
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
600 THK. COMPACTED SELECT 500 1100 500
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
FILL AS PER SAES-A-114 50 THK LEAN
SMS ASH SAY AHG
CONCRETE 03/02/16 09/08/16 09/08/16 09/08/16
I
COMPACTED SOIL C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
AS PER SAES-A-114
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
D S E C T I O N C S E C T I O N FOUNDATION PLAN AND DETAILS FDN
NG
- -
SCALE 1 :25M SCALE 1 :25M
UTILITY POWER SUBSTATION
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00049 004 C
Saudi Aramco 2615 ENG. (05/05)
OF
6
CONSENT
.0
50
PLANT
NORTH
TTEN
MAKKAH
WRI
LEGEND
THE
THOUT
WI
THI
FROMNG
DRAWI
S NED
OBTAI
BE
PART,SHALL
D
1 2 3 4 5
43400
BI
10200 5200 14057 13943
N
REFERENCE DRAWINGS
I
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FULL,OR
R
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
FO
A BUILDING ELEVATION & SECTION AR-A00003.004
N
I
FOUNDATION PLAN & DETAILS ST-A00049.004
TYP)
ON
TRANSFORMER YARD FDN PLAN ST-A00049.006
REPRODUCTI
THK
650
C/C
75x50x8m m
+106.
ED
BENT
@ 500m m
10000
TOC. EL.
L=200)GALV.
TRUE
DIRECTION OF
E60
NORTH
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
SAUDIARAMCO.NO
MAKKAH
NOS
PLATE
THIS DRAWING
SU
13
(
Shareh AL-Khamis
NG)
STI
B
IS
T8 (EXI
39999
OF
45325
46025
56440
57140
PROPERTY
GALVANIZED BENT PLATE
STEEL PLATE EMBEDDED IN
EMBEDDED IN DOUBLE TEE
PRECAST SHEAR WALL
ND
SLAB @ 500mm C/C
OF
WI
NATIONAL GAS
@ 500 C/C
ON
NG
RECTI
LI
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
Shareh AL-AWAL
SOLE
W/STUD EMBEDDED IN DOUBLE TEE SLAB
(TYP FOR ALL DOUBLE TEE SLAB)
THE
KEY PLAN
ARE N
HEREI
0 1.0 2.0 3.0 4.0 5.0 10.0
METERS
NED
SCALE: 1 : 100M
CONTAI
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
UTILITY POWER SUBSTATION
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00049 005 C
Saudi Aramco 2615 ENG. (05/05)
OF
PLANT
CONSENT
NORTH
MAKKAH
TTEN
WRI
LEGEND
THE
TOC CJ CONSTRUCTION JOINT
300
EL ELEVATION
THOUT
TOP OF TRANSFORMER
6405 5095 5095 4500 3590 3590
FGL FINISHED GRADE LEVEL
68 68
FGL FINISHED GROUND LEVEL
WI
TOE WALL (TYP) FIRE RATED POWER TRANSFORMER, TOC TOP OF CONCRETE
WALL (TYP)
NG
DWG.
470
DRAWI
2770 B B C C
APCS-1E COATING
AS PER SAES-H-003
4000
CAL
910
ELECTRI
S
THI
4155
FROM
6000
PER
POWER TRANSFORMER, A
NED
AS
LAP)
OBTAI
3100 TOE WALL (TYP)
A
(
TOE WALL TOE WALL
3200
BE
(TYP) (TYP)
FGL
PART,SHALL
D
4000
1000
2 COATS OF
{16
POWER TRANSFORMER, POWER TRANSFORMER, BITUMINOUS PAINT
BI
REFERENCE DRAWINGS
1500*
APCS-10
{12
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
CJ
N
I
FLOOR PLAN AR-A00003.003
500
FULL,OR
R
BUILDING ELEVATION & SECTION AR-A00003.004
FO
50MM THK. LEAN
CAST IN PLACE ANCHOR/ROOF PLAN ST-A00049.005
{16 CONCRETE
N
I
COMPACTED SOIL
600 300 600
ON
AS PER SAES-A-114
REPRODUCTI
10200 5200 14057 13943
1500
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
43400
.0
0
THIS DRAWING
5
PLANT
ED
NORTH
MAKKAH
1 2 3 4 5
Shareh AL-Khamis
SAUDIARAMCO.NO
A S E C T I O N
NG)
SCALE 1 :25M
SU
STI
T8 (EXI
-
39999
45325
46025
56440
ND
OF
WI
IS NATIONAL GAS
ON
NG
RECTI
LI
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
OF
Shareh AL-AWAL
PROPERTY
KEY PLAN
SOLE
0 0.1 0.2 0.3 0.4 0.5 1.0
METERS
300
THE
1 : 10M
THK.
NK
SHRI
ARE
GROUT
3-{20 TOP
25
METERS
2770x910 ANCHOR BOLT
300
NON
BY VENDOR
1 : 25M
N
{10
HEREI
TOC TOC
1-{12 E.F 0 1.0 2.0 3.0 4.0 5.0 10.0
600
300
FGL METERS
NED
2 COATS OF
300
SCALE: 1 : 100M
BITUMINOUS PAINT
600
CONTAI
APCS-10
2 COATS OF
3-{20 BOTTOM REVISION VALIDATION
BITUMINOUS PAINT
APCS-10 THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
CONCRETE
CONCRETE
NFORMATI
{16 600 THK. COMPACTED SOIL DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
COMPACTED SOIL (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
AS PER SAES-A-114
AS PER SAES-A-114 ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
C S E C T I O N B S E C T I O N
SAUDI ARABIAN OIL COMPANY
AND
SCALE 1 :25M SCALE 1 :10M
- - DRAWING TYPE
NG
UTILITY POWER SUBSTATION
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00049 006 C
Saudi Aramco 2615 ENG. (05/05)
PLANT NOTED.
.0
6
2. FOR GENERAL NOTES AND STANDARD DETAILS
.0
REFER DWG.NO ST-A00002.001 TO 004.
50
OF
PLANT
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
NORTH DIRECTION OF {16
MAKKAH
CONSENT
TRUE CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
PREVAILING WIND
NORTH SHOWN IN RESPECTIVE GRADING AND STORM
{12 DRAINAGE PLAN.
800
TTEN
WRI
B B
THE
1600
THOUT
WI
C1
LEGEND
NG
DRAWI
800
{ DIAMETER
1 2 3
BW BOTHWAYS
8490
C CENTER LINE
S
{16 L
THI
4480 4010 CJ CONSTRUCTION JOINT
FROM
{12
NED
OBTAI
TOB TOP OF BEAM
FOUNDATION PLAN - F1/C1
SCALE 1 : 10M TOS TOP OF SLAB
| OF COLUMN
A THK THICK
BE
TOSW TOP OF SIDE WALK
PART,SHALL
D
WWF WELDED WIRE FABRIC
GB GRADE BEAM
BI
RB ROOF BEAM
N
I
WWE WELDED WIRE FABRIC
FULL,OR
R
COLUMN
COLUMN
COLUMN
FGL 99.700
REFERENCE DRAWINGS
3880
FO
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
OF
OF
OF
N
FLOOR PLAN AR-A00012.001
I
GRADE AND ROOF BEAM SLAB PLAN AND DETAILS ST-A00051.002
|
ON
REPRODUCTI
FOR IDAS SHELTER 001
THIS DRAWING
1000
C C
ED
C1/F1
C1/F1 C1/F1
Shareh AL-Khamis
2 COATS OF
1500
BITUMINOUS
SAUDIARAMCO.NO
NG)
STI
PAINT APCS 10
T8 (EXI
SU
| OF COLUMN
39999
C.J
B
45325
46025
56440
57140
{12
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
IS
Shareh AL-AWAL
500
OF
PROPERTY
{16 THIS DRAWING
FOR IDAS SHELTER 002
SCALE 1 :25M
SOLE
COMPACTED SOIL
(2 NOS. REQUIRED)
AS PER SAES-A-114
B S E C T I O N
THE
SCALE 1 :10M
- 0 0.1 0.2 0.3 0.4 0.5 1.0
ARE
METERS
1 : 10M
N
HEREI
0 0.5 1.0 2.0 2.5
METERS
NED
SCALE: 1 : 25M
300
CONTAI
REVISION VALIDATION
300
ON
NFORMATI
{10 TIES DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
C S E C T I O N
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
SCALE 1 :10M
- 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
IDAS SHELTER
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00051 001 C
Saudi Aramco 2615 ENG. (05/05)
PLANT NOTED.
.0
NORTH
50
6
.0
REFER DWG.NO ST-A00002.001 TO 004.
50
OF
PLANT
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
NORTH 200 THK. CMU WALL {12
DIRECTION OF CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
MAKKAH
CONSENT
TRUE VERTICAL REINF.
PREVAILING WIND SHOWN IN RESPECTIVE GRADING AND STORM
NORTH
{12 DOWEL BARS DRAINAGE PLAN.
LAP)
TTEN
(
1 2 3
WRI
12 THK ISOLATION JOINT
WITH JOINT FILLER AND
8490
JOINT SEALANT (TYP)
THE
4480 4010
WWF
4-{12
GRADE SLAB
3-{16
THOUT
{10
TOC EL. 100.000
{10 (TYP) WWF
TOW
150
WI
EL. 99.850
150
NG
DRAWI
GB1 GB1 FGL 99.700
A
0.25 THK POLYETHYLENE LEGEND
S
THI
SHEET (TYP) GB1
3-{12 (TYP)
(300X600)
BW BOTHWAYS
600 THK. COMPACTED SELECT
FROM
FILL AS PER SAES-A-114 B BOTTOM
PACC-2B 1-{12 SB @ EF
PACU-1B
FDN C
L CENTER LINE
FDN 2 COATS OF BITUMINOUS
{10 FGL FINISH GRADE LINE
PAINT APCS-10 (TYP)
NED
3-{16 FFL FINISH FLOOR LINE
50mm LEAN CONCRETE
OBTAI
FDN FOUNDATION
COMPACTED SOIL
GB GRADE BEAM
TOC TOC AS PER SAES-A-114
EL. +100.000 EL. +100.000
A A RB ROOF BEAM
3880
TYP TYPICAL
GB1
GB1
BE
A S E C T I O N
GB1
TOB TOP OF BEAM
150 THK
PART,SHALL
SCALE 1 :10M
- TOS TOP OF SLAB
D
SLAB
WWF TOP TOP OF PARAPET
BI
T TOP
PACC-2A { DIAMETER
PACU-1A
N
FDN 150
I
FDN BOTTOM BAR
FOR DETAIL REFER HVAC TOP EL. 104.200
FULL,OR
R
DWG. HV-A00012.001 TOP BAR
(TYP)
{10@
REFERENCE DRAWINGS
FO
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
B
600
N
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
I
GB1 GB1 FLOOR PLAN AR-A00012.001
ON
BUILDING ELEVATION AND SECTION AR-A00012.002
REPRODUCTI
FOUNDATION PLAN SECTION AND DETAILS ST-A00051.001
TOW
EL.+99.850 3-{20
{10 TOC EL. 103.600
ED
200
FOR IDAS SHELTER 001
THIS DRAWING
SAUDIARAMCO.NO
500
SCALE 1 :25M Shareh AL-Khamis
SU
{10 TIES
300
1 2 3
NG)
STI
T8 (EXI
3-{20
39999
45325
46025
56440
57140
300
8490
IS
ND
OF
WI
NATIONAL GAS
ON
NG
OF
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
4480 4010
Shareh AL-AWAL
PROPERTY
B THIS DRAWING
S E C T I O N FOR IDAS SHELTER 002
RB1 RB1 SCALE 1 :10M
-
A
SOLE
KEY PLAN
{10 T&B
THE
0 0.5 1.0 2.0
ARE
METERS
C C 1 : 25M
N
HEREI
3-{20
0 0.1 0.2 0.3 0.4 0.5 1.0
TOC EL. 103.600
METERS
200
TOC
3880
NED
EL. +103.600 SCALE: 1 : 10M
CONTAI
RB1
RB1
RB1
500
T&B
REVISION VALIDATION
200 THK
300
SLAB THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
{ 10
{10 TIES REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
ON
3-{20
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
B
C S E C T I O N SAUDI ARABIAN OIL COMPANY
AND
RB1 RB1 DRAWING TYPE
SCALE 1 :10M
- GRADE AND ROOF FRAMING PLAN FDN
NG
B IDAS SHLTER
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
SCALE 1 :25M
X40 Q ST-A00051 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
2000
6
.0
RECOMMENDATIONS.
CONSENT
4. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
PLANT CORRESPONDS TO HIGHEST POINT OF FINISHED GRADE
NORTH SHOWN IN RESPECTIVE GRADING AND STORM
MAKKAH DRAINAGE PLAN.
TTEN
WRI
LEGEND
THE
{ DIAMETER
{16 (BOT)
C/C CENTER TO CENTER
THOUT
{12 (TOP) C.J CONSTRUCTION JOINT
1 2 3
THK THICKNESS
A A
WI
FGL FINISHED GRADE LEVEL
200 3700 7500 200
2000
NG
TOC TOP OF CONCRETE
DRAWI
C 1
COLUMN NUMBER
C1 COLUMN
S
THI
{16 (BOT) F 1
FOOTING NUMBER
FROM
FOOTING
{12 (TOP)
200
BOTTOM BAR
NED
A TOP BAR
OBTAI
F1
F1/C1 F1/C1 F1/C1
BE
REFERENCE DRAWINGS
PART,SHALL
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
D
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
FOUNDATION PLAN - F1
FLOOR PLAN,ELEV. & SECTION AR-A00005.001
SCALE 1 : 15M
BI
GRADE SLAB & ROOF SLAB PLAN ST-A00052.002
7500
N
I
FULL,OR
R
FO
N
I
THIS DRAWING
ON
REPRODUCTI
FGL 99.700
ED
B
Shareh AL-Khamis
B B
200
1000
SAUDIARAMCO.NO
NG)
STI
T8 (EXI
F1/C1 F1/C1 F1/C1
2 COATS OF
1500
SU
39999
BITUMINOUS
C.J
45325
46025
56440
57140
PAINT APCS 10
{12
FOUNDATION PLAN
ND
OF
WI
NATIONAL GAS
SCALE 1 :50M
ON
NG
RECTI
LI
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
IS
500
Shareh AL-AWAL
{16
OF
PROPERTY
50 THK LEAN
CONCRETE
KEY PLAN
COMPACTED SOIL
AS PER SAES-A-114
A S E C T I O N
SOLE
SCALE 1 :15M 0 0.1 0.2 0.3 0.4 0.5 1.0
-
THE
METERS
1 : 10M
ARE
0 0.5 1.0 1.5
METERS
N
HEREI
1 :15M
METERS
NED
SCALE: 1 : 50M
500
CONTAI
REVISION VALIDATION
ON
NFORMATI
500 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
B S E C T I O N DRAWING TYPE
NG
REMOTE I/O BUILDING (2 UNITS)
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00052 001 C
Saudi Aramco 2615 ENG. (05/05)
TRUE
1 2 3
2. FOR GENERAL NOTES AND STANDARD DETAILS
NORTH DIRECTION OF
REFER DWG.NO ST-A00002.001 TO 004.
PREVAILING WIND
11200
OF
3. BUILDING DESIGN SHALL BE VERIFIED UPON RECEIPT
6
.0
CONSENT
200 3700 7500 200 RECOMMENDATIONS.
TTEN
WRI
1 2 3
THE
200 3700 7500 200
LEGEND
THOUT
RB ROOF BEAM
200
WI
EL. 99.850
{ DIAMETER
NG
C/C CENTER TO CENTER
A A
DRAWI
GB1 RB1 EL ELEVATION
THK THICKNESS
T&B
TOC TOP OF CONCRETE
S
THI
TOW TOP OF WALKWAY
{ 12
I.J ISOLATION JOINT
FROM
WWF WELDED WIRE FABRIC
NED
BOTTOM BAR
RB1
RB1
150 THK SLAB
A A
GB1
GB1
GB1
TOP BAR
OBTAI
GB1
ON GRADE
7500
7500
~ {12 T&B
RB1
BE
200 THK
B B REFERENCE DRAWINGS
WWF SLAB
PART,SHALL
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
D
TOC FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
EL. 104.000
FLOOR PLAN, ELEV. & SECTION AR-A00005.001
BI
FOUNDATION PLAN & DETAILS ST-A00052.001
N
I
FULL,OR
GB1 RB1
R
B B
200
200
FO
N
I ON
REPRODUCTI
TRUE
DIRECTION OF
NORTH
6
.0
0
5
SCALE 1 :50M PLANT THIS DRAWING
NORTH
ED
MAKKAH
SAUDIARAMCO.NO
Shareh AL-Khamis
SU
NG)
STI
T8 (EXI
39999
45325
46025
56440
57140
IS
OF
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
PROPERTY
200 THK. CMU WALL {12 Shareh AL-AWAL
VERTICAL REINF.
150
{12 DOWEL BARS
15
TOP EL. 104.450
LAP)
SOLE
{10 KEY PLAN
(
450
12 THK ISOLATION JOINT RCC PARAPET WALL
THE
WITH JOINT FILLER AND
JOINT SEALANT (TYP) {10
0 0.1 0.2 0.3 0.4 0.5 1.0
3-{20
WWF
ARE
4-{12 TOC EL. 104.000
GRADE SLAB METERS
3-{16
200
{10 1 : 10M
N
HEREI
TOC EL. 99.950
{10 (TYP) WWF
TOW
150
600
METERS
150
NED
{10 TIES
SCALE: 1 : 50M
400
FGL 99.700
CONTAI
REVISION VALIDATION
SHEET (TYP) GB1 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
3-{12 (TYP)
ON
(300X600)
NFORMATI
600 THK. COMPACTED SELECT 300
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
FILL AS PER SAES-A-114 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
1-{12 SB @ EF
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
2 COATS OF BITUMINOUS SMS ASH SAY AHG
{10 03/07/16 09/08/16 09/08/16 09/08/16
PAINT APCS-10 (TYP)
REV.NO. DATE REVISION DESCRIPTION
50mm LEAN CONCRETE 3-{16 B S E C T I O N
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
SCALE 1 :10M
-
THE
COMPACTED SOIL JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
AS PER SAES-A-114
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
A S E C T I O N DRAWING TYPE
NG
SCALE 1 :10M
-
REMOTE I/O BUILDING (2 UNITS)
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00052 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
{12
50
CONSENT
B SHOWN IN RESPECTIVE GRADING AND STORM
125
625 575
PLANT DRAINAGE PLAN.
C2 C2 RB2
1200
NORTH
MAKKAH A A A R
DIRECTION OF 2
917
917
917
B B
R 2
PREVAILING WIND
MAKKAH
TTEN
B
{12
C C
RB1
C1 C1
WRI
150MM
{ 10
{16
THK SLAB
A A A A
RB2
RB2
3750
3750
3750
1916
1916
1916
THE
GUARD HOUSE-MAIN GATE GUARD HOUSE-TANK FARM GATE
THOUT
RB1
TOC LEGEND
917
917
917
575 625
R EL. 103.050
B 2
1200
WI
2 B
R RL ROAD LEVEL
B B B { DIAMETER
125
NG
C2 C2 RB2
DRAWI
C/C CENTER TO CENTER
EL ELEVATION
1200 1200
S
THI
THK THICK
FOUNDATION REINFORCEMENT PLAN ROOF BEAM AND ROOF SLAB PLAN CJ CONTRACTION JOINT
SCALE 1:50M SCALE 1:50M
FOUNDATION & COLUMN LAYOUT
FROM
FGL FINISHED GRADE LEVEL
0
0
0
5
NED
5 1 2 TOW TOP OF WALKWAY
{10
OBTAI
RB ROOF BEAM
3700 5500 6000 5000 3850 3950
WWF WELDED WIRE FABRIC
300
TOP BAR
BE
C 1
PART,SHALL
COLUMN NUMBER
D
1825
2
0
0 COLUMN
{10 15-{16
850
BI
IJ
A REFERENCE DRAWINGS
IJ
917
IJ
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
TYPICAL DETAIL COLUMN-C2
N
I
FOR DETAIL REFER HVAC FACILITY PLOT PLAN TANK FARM AREA P1-A00001-001
SCALE 1 :10M DWG. HV-A00007.001 FLOOR PLAN GUARD HOUSE AR-A00006-001
FULL,OR
R
WWF
E E
150mm THK.
GRADE SLAB
3750
1916
FO
IJ IJ
250 TOC
N
I
EL. 99.950
ACCU-01 ACCU-02
100
ON
CJ CJ CJ
REPRODUCTI
917
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
IJ
6
100
.0
IJ
0
5
PLANT
B NORTH
THIS BUILDING
ED
MAKKAH
IJ
1450
{12
1825
TOW
EL. 99.850
SAUDIARAMCO.NO
Shareh AL-Khamis
ES
SU
VARI
300
{12
NG)
STI
RL
T8 (EXI
EL. 99.700 39999
39999
45325
46025
56440
56440
57140
57140
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
GRADE SLAB PLAN
50.06 A=3.66 HA.
NORTH
PLANT
OF
Shareh AL-AWAL
SCALE 1:50M
CLR.
PROPERTY
TOC TYP)
EL. 99.950
7
50
TOW 5
(
75
TOP
200
SOLE
FCL EL. 103.550
EL. 99.700 0 0.1 0.2 0.3 0.4 0.5 1.0
{10@
METERS
THE
500
1 : 10M
2 {10 RCC PARAPET WALL
0 0 0.5 1.0 1.5 2.0
ARE
0
0
5
METERS
2
750
TOC 3-{16
N
0
HEREI
0
1 : 20M
10-{16
3
EL. 103.050
0 1.0 2.0 3.0 4.0 5.0
150
METERS
3-{10 EF
NED
{12 SCALE: 1 : 50M
500 12-{12
TYPICAL DETAIL COLUMN-C1 3-{16
CONTAI
TOC
750
REVISION VALIDATION
WWF
150
(RING)
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
500
2 COATS OF {10
ON
450
NFORMATI
AS PER APCS-10 1-{12 EF DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
FGL EL. 99.70
350
50
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
{10
300
I
(TYP) C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
LEAN CONCRETE 50
(RB1) 3-{16
THE
2 COATS OF 4-{12 BARS 600 THK. COMPACTED SOIL JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
BITUMINOUS PAINT AS PER SAES-A-114 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
COMPACTED SOIL
AS PER APCS-10 800 300 300 250
AS PER SAES-A-114 {16 {12
SAUDI ARABIAN OIL COMPANY
AND
DRAWING TYPE
NG
A S E C T I O N E S E C T I O N C S E C T I O N B S E C T I O N
SECURITY GUARD HOUSE
DRAWI
SCALE 1 :10M SCALE 1 :20M SCALE 1 :10M SCALE 1 :10M
- - - - YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00053 001 C
Saudi Aramco 2615 ENG. (05/05)
ND
OF
ELEVATIONS ARE IN METERS UNLESS OTHERWISE
WI
NOTED.
NORTH
TRUE
ON
NG
RECTI
LI
2. FOR GENERAL NOTES AND STANDARD DETAILS
PREVAI
REFER DWG.NO ST-A00002.001 TO 004.
06
DI
OF
3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
0.
CONSENT
PLANT
MAKKAH
TTEN
WRI
THE
LEGEND
THOUT
1125
EL ELEVATION
150
WI
THK THICKNESS
TOC
15
A B EL 104.50 FGL FINISHED GRADE LEVEL
NG
DRAWI
TOC TOP OF CONCRETE
4500
| OF GRID LINE
600
I.J ISOLATION JOINT
TOC
1500 C 1
1200
EL 103.90
S
THI
825 675 75 COLUMN NUMBER
150
(TYP) COLUMN
F 1
TYP)
FROM
75
825
FOOTING NUMBER
C1 C1
1500
(
FOOTING
3
675
NED
BOTTOM BAR
OBTAI
B B TOP BAR
BE
12-{16
4000
PART,SHALL
PACU-1
REFERENCE DRAWINGS
D
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
8000
BI
A A FLOOR PLAN X-RAY BUILDING AR-A00009.001
N
I
C1 C1 TRUE
DIRECTION OF
FULL,OR
NORTH
PREVAILING WIND
6
.0
0
5
LAP
PLANT
NORTH
MAKKAH
RCC WALL
FO
THIS DRAWING
250 THK.
N
(TYP) TOW EL TOC
4000
I
99.850 EL 99.950
ON
FGL OLD OLD
REPRODUCTI
SANITARY WASTE TIE-IN POTABLE WATER TIE-IN
N 35839.070 N 35827.510 OW
E 32071.380
448
E 32085.140
928
N 2651116.807 N 2651105.247
TIE-IN PONT
= 265 8. 955
8 5
84258
1
96
80
650 . 4
.57 7
E 429746.000
756
225
8 6
E 429759.760
0. 9
0
0
EL 99.700
79 32.
.49
4.
.
0
8.
6 1 7.
08.
Y=35899.
299096
X=31996.
23. 1
95
809
8 9
9
511
1
511 82 0 094
N 34670.220
43 5
429
429
430
001
26
2 29
= 2
26
4
4
= =
N=
N=
=
N
N
N=
E=
E=
E=
E=
Shareh AL-Khamis
E
E 33467.420
N 2649947.957
445
411
E 431142.040
588
021
Y=35853.
X=31958.
Y=35885.
X=31920.
E=429712.7671 E=430772.8641
N=2651129.9033 N=2650242.3119
BH2
E=429695.4578 E=429806.8314 E=430738.6476 E=431024.1194
N=2651074.8684 N=2650981.6195 N=2650201.4448 N=2649962.4300
E=429680.7983
N=2651063.0141
BH1
E=429566.6767
N=2651116.9632 E=429612.0347
N=2651056.9232
E=429593.3504
N=2651065.8241
NG)
ED
STI
E=430907.4454E=430848.2380
N=2649920.7064
N=2649871.1342
ENCE
FENCE
T8 (EXI
CATEGORY-IF
CATEGORY-I
1000
E=429852.0230 E=430077.0221 E=430273.4220 E=430793.2701
N=2650643.1253 N=2650454.7420 N=2650290.3038 N=2649855.0545
E=429660.2006
N=2650739.6555 39999
E=429611.2692
E=429641.7468 E=429801.9981 E=430026.9973 E=430223.3971 E=430743.2452
N=2650748.0462
N=2650717.6148 N=2650583.3772 N=2650394.9939 N=2650230.5557 N=2649795.3064
CATEGORY-I FENCE
45325
46025
1500
56440
57140
FENCE
E=429475.5575 E=429532.1057 E=430147.9323
V
CATEGORY-I
CATEGORY-IFENCE
C1 C1 {16 BARS
SAUDIARAMCO.NO
E=430077.3166
E=429243.6495
N=2650056.0817
N=2650731.1494
14NCB-RC1
E=429252.2905
14NCB-RC1
E=430063.6027
N=2650723.9147
14NCB-RC1
N=2650039.7022
14NCB-RC1
CATEGORY-IV FENCE
E=429432.0883
N=2650534.0380
E=429218.2169 E=429376.2340
N=2650682.6265 N=2650550.3248
E=430002.8823
N=2649967.1797
205
712
338
366
X=31635.
Y=35281.
Y=35390.
X=31505.
ND
OF
WI
2 COATS OF
SU
E=429958.4566
ON
TY
NG
RECTI
LI
NORTH
500
LI
TRUE
GASCO
EXPANSION
PREVAI
FACI
E=429931.9666 E=430534.2727
N=2649882.4801 N=2649377.3725
DI
06
50. A=3.66 HA.
BITUMINOUS PAINT
493
788
993
ND
E=429477.5834 E=429702.5826 E=429898.9824 E=430418.8305
E=430462.7783
OF
WI
E=430540.7691
341
X=31485.
Y=35101.
ON
NG
N=2650195.9064 N=2650007.5231 N=2649843.0849 N=2649407.8356
N=2649371.0398
RECTI
LI
2650350.
N=2649302.0751
PREVAI
BH4
NORTH
TRUE
429209.
DI
06
50.
PLANT
NORTH
0000
0000
E=430469.6516
N
E
1000.
1000.
N=2649295.7687
N
E
BH3
50mm THK
LEAN CONCRETE
COMPACTED
IS
50 1500
FOUNDATION PLAN SUBGRADE
(TYP)
OF
SCALE 1:50M
PROPERTY
KEY PLAN
A S E C T I O N
SCALE 1 :25M
-
SOLE
0 0.1 0.2 0.3 0.4 0.5 1.0
METERS
THE
1 : 10M
ARE
METERS
N
HEREI
1 :15M
400
0 1.0 2.0 3.0 4.0 5.0
50 CLEAR METERS
NED
COVER
SCALE: 1 : 50M
CONTAI
12-{16
REVISION VALIDATION
400
THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
{10@150 C/C REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
B S E C T I O N
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
SCALE 1 :10M 10-02399-0001
- CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
X-RAY BUILDING
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00058 001 C
Saudi Aramco 2615 ENG. (05/05)
ND
MW18.7xMW18.7 NOTED.
OF
TOC
WI
NORTH
EL 99.980 GALVANIZED (TYP)
TRUE
ON
NG
RECTI
REFER DWG.NO ST-A00002.001 TO 004.
LI
2115 (NTS) 1760 (NTS)
PREVAI
OF
TOC 3. FINISHED GRADE LEVEL SHOWN IN THIS DRAWING
6
DI
.0
CONSENT
SHOWN IN RESPECTIVE GRADING AND STORM
NORTH 5
{10@150 C/C
PLANT
150
EL 99.700
MAKKAH
{10@150 C/C
300
TTEN
3-{12
WRI
WITH JOINT FILLER AND
JOINT SEALANT
THE
1250
0.25 THK POLYETHYLENE
150 300
SHEET
THOUT
FILL AS PER SAES-A-114 (TYP)
1750
WI
LEGEND
NG
EL ELEVATION
DRAWI
THK THICKNESS
S
THI
I.J ISOLATION JOINT
2 COATS OF
250 WWF WELDED WIRE FABRIC
FROM
BITUMINOUS PAINT
AS PER APCS-10 (TYP)
500
A B
NED
OBTAI
1125 4500 1125
BE
FGL C COMPACTED
EL 99.700 UP 50 1500 SUBGRADE
PART,SHALL
D
(TYP)
REFERENCE DRAWINGS
{10
1760
BI
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
C S E C T I O N FLOOR PLAN AR-A00009.001
N
ROOF BEAM SLAB PLAN AND SECTIONS ST-A00058.003
I
1115
FULL,OR
R
TRUE
DIRECTION OF
NORTH
PREVAILING WIND
6
FO
1125
.0
TOW 200mm THK.
0
5
PLANT
NORTH
EL 99.850 R.C.C WALL
N
MAKKAH
I
3
ON
REPRODUCTI
C
THIS DRAWING
ED
12MM ISOLATION JOINT C.J
Shareh AL-Khamis
SAUDIARAMCO.NO
JOINT SEALANT (TYP)
SU
NG)
WWF
STI
4-{12
T8 (EXI
8000
GRADE SLAB
A 39999
39999
{10
45325
46025
56440
56440
57140
57140
150
EL. 99.850
IS
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
150
PREVAI
DI
06
50. A=3.66 HA.
NORTH
PLANT
A
OF
Shareh AL-AWAL
FGL 99.700
WWF 150x150
PROPERTY
MW18.7xMW18.7
GALVANIZED (TYP) 0.25 THK POLYETHYLENE
4000
SHEET (TYP)
150MM 3-{12 (TYP)
THK SLAB
600 THK. COMPACTED SELECT KEY PLAN
TOC FILL AS PER SAES-A-114
SOLE
EL 99.950
{10
THE
1
02 COATS OF
1125
ARE
1500
TOW
AS PER APCS-10
EL 99.850 METERS
C.J
WWF 150x150
4-{12 3-{16 12 THK ISOLATION JOINT
N
MW18.7xMW18.7 1 : 10M
HEREI
1115
NED
SCALE: 1 : 50M
300
CONTAI
150
500
REVISION VALIDATION
600
ON
0.25 THK POLYETHYLENE
NFORMATI
150 300
SHEET (TYP) DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
GB
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
600 THK. COMPACTED SELECT
SMS ASH SAY AHG
FILL, AS PER SAES-A-114 (TYP) 03/07/16 09/08/16 09/08/16 09/08/16
1-{12 SB @ EF
50 THK LEAN REV.NO. DATE REVISION DESCRIPTION
I
2 COATS OF BITUMINOUS
{10 @ 200 C/C CONCRETE {16 T&B C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
PAINT APCS-10 (TYP)
THE
FGL UP JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
EL 99.700 50mm LEAN CONCRETE 3-{16 COMPACTED SOIL {16 T&B
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
50 300 AS PER SAES-A-114 1500
COMPACTED SUBGRADE
SAUDI ARABIAN OIL COMPANY
AND
(TYP)
DRAWING TYPE
NG
X-RAY BUILDING
DRAWI
GRADE BEAM & GRADE SLAB PLAN A S E C T I O N B S E C T I O N
SCALE 1:50M SCALE 1 :10M SCALE 1 :10M
YANBU DISTRIBUTION HUB
- -
YANBU SAUDI ARABIA
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00058 002 C
Saudi Aramco 2615 ENG. (05/05)
OF
50
CONSENT
SHOWN IN RESPECTIVE GRADING AND STORM
PLANT
DRAINAGE PLAN.
NORTH
MAKKAH
TTEN
WRI
A B
THE
1125 4500 1125
THOUT
LEGEND
WI NG
C/C CENTER TO CENTER
1125
DRAWI
EL ELEVATION
THK THICKNESS
3
TOP TOP OF PARAPET
S
THI
TOC TOP OF CONCRETE
RB 1
FROM
BEAM NUMBER
BEAM
T&B
4000
NED
BOTTOM BAR
10@150C/C
OBTAI
TOP BAR
8000
A
BE
RB-1
PART,SHALL
D
REFERENCE DRAWINGS
A
DWG. CONTROL FOR J.O # 10-02399-0001 GEN-D0001
BI
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
150MM FLOOR PLAN AR-A00009.001
THK SLAB
4000 BUILDING ELEVATION & SECTION AR-A00009.002
N
TOC FOUNDATION PLAN & SECTIONS ST-A00058.001
I
EL 103.90 GRADE BEAM SLAB PLAN AND SECTIONS ST-A00058.002
FULL,OR
R
TRUE
DIRECTION OF
6
.0
0
5
PLANT
FO
NORTH
MAKKAH
N
I
1
ON
1125
THIS DRAWING
REPRODUCTI
ROOF
PROJECTION
Shareh AL-Khamis
ED
NG)
STI
T8 (EXI
ROOF BEAM & ROOF SLAB PLAN 39999
39999
SAUDIARAMCO.NO
SCALE 1:50M
45325
46025
56440
56440
57140
57140
SU
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
NORTH
TRUE
EXPANSION
PREVAI
DI
06
50. A=3.66 HA.
NORTH
PLANT
Shareh AL-AWAL
IS
OF
PROPERTY
KEY PLAN
SOLE
THE
TOC {20 T&B
0 0.1 0.2 0.3 0.4 0.5 1.0
EL 103.90
ARE
150
METERS
N
1 : 10M
HEREI
0 1.0 2.0 3.0 4.0 5.0
500
RB1
350
METERS
NED
{10 @150 C/C SCALE: 1 : 50M
CONTAI
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
A S E C T I O N ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
X-RAY BUILDING
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00058 003 C
Saudi Aramco 2615 ENG. (05/05)
OF
DIRECTION OF 3.FOUNDATION DESIGN AND ANCHOR BOLT DETAILS ARE
TRUE
PREVAILING WIND PRELIMINARY AND SHALL BE FINALIZED UPON
NORTH
CONSENT
RECEIPT OF FINAL VENDOR INFORMATION.
6
.0
4.FGL SHALL BE AS PER CIVIL GRADING DRAWING.
50
PLANT
TTEN
NORTH
MAKKAH
WRI
THE
THOUT
A B
ST-A00070 ST-A00070
SH 002 SH 002
WI
LEGEND
NG
12620
ISOLATION JOINT
DRAWI
I.J
CB CATCH BASIN
910 4800 1700 4300 910
EL ELEVATION
CB CATCH BASIN FGL FINISHED GRADE LEVEL
S
THI
CONCRETE
TYP TYPICAL
CURB
TOC TOP OF CONCRETE
FROM
THK THICK
910
910
SLOPE 1.5% SLOPE 1.5%
I.J I.J
NED
OBTAI
GREEN DYE INJECTION SKID FDN. RED DYE INJECTION SKID FDN.
2700
5%
5%
(X40-U-0003)
5%
(X40-U-0002)
1.
1.
1.
2800
4620
SLOPE
SLOPE
SLOPE
BE
ON
ANCHOR BOLT
PART,SHALL
ANCHOR BOLT
CONTRACTI
(TYP)
D
(TYP)
NT
I.J
1010
I.J
JOI
910
SLOPE 1.5%
BI
SLOPE 1.5%
N
I
FULL,OR
A B
R
FO
REFERENCE DRAWINGS
FOUNDATION PLAN DWG. CONTROL FOR J.O # 10-02399-0001
N
GEN-D0001
I
SCALE 1 :50M
FACILITY PLOT PLAN TANK FARM AREA PI-A00001.001
ON
REPRODUCTI
TRUE
DIRECTION OF
NORTH
ED
PREVAILING WIND
6
.0
0
5
PLANT
NORTH
MAKKAH
SAUDIARAMCO.NO
Shareh AL-Khamis
SU
NG)
STI
T8 (EXI
39999
45325
46025
C C 56440
57140
- -
IS
ND
OF
WI
NATIONAL GAS
ON
NG
RECTI
LI
EXPANSION
PREVAI
OF
DI
06
50. A=3.66 HA.
Shareh AL-AWAL
PROPERTY
4800 4300
THIS DRAWING
160
160
185
SOLE
185
250
ANCHOR BOLT (BY VENDOR)
250
THE
ANCHOR BOLT (BY VENDOR)
ARE
25mm THICK NON-SHRINK
25 425 25
GROUT AS PER METERS
~ SAES-Q-010 (TYP)
25mm THICK
N
~
1 : 25M
2800
2430
HEREI
25mm THICK TOC
2700
2330
GROUT
GREEN DYE INJECTION SKID FDN. GROUT RED DYE INJECTION SKID FDN.
375
0 1.0 2.0 3.0 4.0 5.0
DE
(X40-U-0003) (X40-U-0002)
DE
WI
WI
TOC
GROUT
METERS
GROUT
NED
50
SCALE: 1 : 50M
TYP)
TYP)
150
FOUNDATION FOUNDATION REFER NOTE-4
CONTAI
GAP
GAP
N
I
(
N
I
(
REVISION VALIDATION
600 THK. COMPACTED SELECT
FILL AS PER SAES-A-114 THIS REVISION NO. C IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
185
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
C 09/08/16 ISSUED FOR 100% PROJECT PROPOSAL
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
ANCHOR BOLT LAYOUT PLAN ANCHOR BOLT LAYOUT PLAN C S E C T I O N 10-02399-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
DYE INJECTION SKIDS
DRAWI
YANBU DISTRIBUTION HUB
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
X40 Q ST-A00070 001 C
Saudi Aramco 2615 ENG. (05/05)
OF
3.FOUNDATION DESIGN AND ANCHOR BOLT DETAILS ARE
PRELIMINARY AND SHALL BE FINALIZED UPON
CONSENT
RECEIPT OF FINAL VENDOR INFORMATION.