AAT 2019 WORKSHECDULE GSA = AD CHECK GSB= C CHECK . LMH =C CHECK .

LMF C CHECK

737-400 REV 88, 25 SEPT 2018

9M – GSA ( AD CHECK)

ASSISTED IN CARRYING OUT REMOVAL OF

APU FIRE EXTINGUISHER BOTTLE DUE TO

WEIGHT CHECK DURING _____ CHECK.

JN : CC00001 ( 17/1/2019)

REF : 26-22-11 PG 401 ( HASSIM)

OBSERVED IN CARRYING OUT REMOVAL OF

AUTOTHROTTLE COMPUTER DUE TO

E1 RACK REMOVAL DURING ___ CHECK

JN: CC00003 (20/1/2019)

REF : 22-31-10 PG 401 ( HASSAN)

PARTICIPATE IN LOCATING WING FUEL TANK

ACCESS PANEL ON LH WING DUE TO ACCESS PANEL

REMOVAL DURING ----- CHECK.

JN: DR00055 (22/1/19)

REF: 06-52-00 PG 201

OBSERVED IN CARRYING OUT THE REMOVAL OF

AIRBORNE VIBRATION MONITOR (AVM) SIGNAL CONDITIONER

UNIT DUE TO E1 RACK REMOVAL DURING ___ CHECK

JN : CC00016 (20/1/19)

REF: 77-31-03 PG 401


OBSERVED IN CARRYING OUT OPERATIONAL TEST ON

UNDERWATER LOCATOR BEACON DUE TO BATTERY

REPLACEMENT DURING _____ CHECK

JN:SR-013 (11/01/2019)

REF : 31-24-09 PG 210

OBSERVED IN CARRYING OUT REMOVAL OF ENGINE FIRE

DETECTION SYSTEM DETECTOR ON ENGINE NO (ESN 726362)

DUE TO CUSTOMER REQUEST DURING ____ CHECK

JN:A00020 (4/3/19)

REF:26-11-11 PG401

ATR 72-600 (9M-LMH&LMF) REV 19 DEC 2018 C CHECK

OBSERVED IN CARRYING OUT REMOVAL OF

FLIGHT DATA RECORDER (FDR) DUE TO MODIFICATION

DURING C CHECK.

JN : DR00277 ( 15/1/2019) & INSTALL DR00278

REF 31-31-31 RAI 10000 (9M-LMH)

OBSERVED IN CARRYING OUT REMOVAL OF

EMERGENCY LIGHTING POWER SUPPLY BATTERY

DUE TO CAPACITY CHECK DURING C CHECK

JN :DR00161 ( 7/1/19)

REF : 33-51-21 RAI 10010 (9M-LMH)


OBSERVED IN CARRYING OUT OPERATIONAL TEST

OF ENGINE INTERSTAGE TURBINE TEMPERATURE (ITT)

INDICATING SYSTEM ON ENG NO1 DURING C CHECK

JN : ATR-772181-FUT-10000-1-01-MLD ( 15/1/19)

REV: 77-21-81 FUT 10000 (9M-LMH)

ASSISTED IN CARRYING OUT OPERATIONAL TEST OF

NORMAL BRAKING SYSTEM DURING C CHECK

JN ; DR 00220 ( 15/1/19)

REF : JIC 32-42-00 OPT-10000 (9M-LMH)

ASSISTED IN CARRYING OUT INSTALLATION OF

LH HORIZONTAL STABILIZER LEADING EDGE DUE

TO CUSTOMER REQUEST DURING C CHECK.

JN:A00006 ( 16/1/19) & RH (A00034)

REF : JIC 55-12-00 RAI 10000 (9M LMH)

ASSISTED IN CARRYING OUT REMOVAL OF

RIGHT HAND WING LEADING EDGE 612 DUE

TO ACCESS FOR INSPECTION DURING C CHECK

JN:DR00134 (17/1/19) & DR00135 INSTALL

REF : JIC 57-40-00 RAI 10000

9M-LNK 737- 900ER


PARTICIPATED IN CARRYING OUT EXTERNAL ZONAL

INSPECTION OF NOSE LANDING GEAR DURING C CHECK

JN : B789-32-800-00-01-MLD ( 4/1/2019)

REF : 05-41-07-210
PARTICIPATED IN CARRYING OUT REMOVAL OF NOSE RADOME

DUE TO PAINT TOUCH UP DURING C CHECK.

REF : 53-52-00 PG 401 (5/1/2019)

JN:DR00053 ( REV 67 15 OCT 2018) & INSTALL DR00054 (B1)

PARTICIPATED IN CARRYING OUT VISUAL CHECK ON

ENGINE FIRE BOTTLE PRESSURE GAUGE FOR CORRECT

PRESSURE DURING C CHECK.

REF : 26-20-00-210 ( 7/1/2019)

JN: B789-26-050-00-01 MLD (B1)