Anda di halaman 1dari 1

How NASA Builds Teams - Page 2

1. The basics of the 4-D system The 4-D system uses an X-Y coordinate system to simplify
teams and leaders in this way:

The 4-D system simplifies leadership into the four dimensions X-axis How information is used to make a decision.
you must address and balance to be an effective leader: There are two ways to decide anything:
1. Cultivating – you have to make everyone feel appreciated. 1. You can use emotions to make a decision.
2. Including – you must make people’s opinions count. 2. You can base a decision solely on logic.
3. Visioning – you have to think about possible futures.
4. Directing – you have to take action to make things happen. Y-axis How you choose the information you want to
Not only can 4-D be used to build good leaders but it is also a use. There are two options available here:
solid team-building process. It measures the key driver of team 1. You can measure information empirically.
performance – the social context. 2. You can intuit or use your imagination.

By combining this X-axis and Y-axis together, you come up with a


“I am convinced that half the cost of a project is socially
two-by-two matrix which represents the four core elements or
determined.”
dimensions of leaders and high performance teams:
– John Mather, NASA Nobel Laureate in physics
The Hubble Space Telescope cost NASA 15 years of work and How How decisions get made
$1.7 billion of taxpayer money to put into space in 1980. Yet it information is
wasn’t until the Hubble was in orbit that it was discovered the conveyed Emotional Logical
telescope’s mirror had a spherical aberration – making it unable
to be used for what it had been designed for in the first place. C V
When a Failure Review Board analyzed how this problem arose,
Intuited Cultivating Visioning
it was determined the aberration was caused by a misadjusted
null corrector manufactured by a contractor. What was worse,
however, was there had been hints of the mirror flaw in some I D
tests but smart technical people have not pursued these hints
rigorously enough to uncover the underlying problem. Sensed Including Directing
This illustrated the point technical workers often focus so
intensively on the task at hand they fail to notice or manage the The four dimensions are:
larger social context within which their technology is required to C Cultivating (emotional, intuited) embraces deep feelings for
operate. This is the mental equivalent of concentrating so hard an idealized world. Actions in this dimension are concerned
on climbing the ladder nobody has stopped to ponder whether with addressing the interests of others and making them feel
the ladder is standing by the right wall. Social context always understood and appreciated.
plays a large role in how projects turn out: I Including (emotional, sensed) is about building relationships
n In one well-known study by Wilson and Kelling in 1982, they with others. Actions in this dimension focuses on making
showed crime increases in rental buildings in New York when others feel like they are part of a team and injecting integrity
no one repairs broken windows. Unrepaired windows create a by ensuring everyone keeps their commitments.
context where people assume nobody cares and therefore V Visioning (logical, intuited) is blue sky thinking about possible
crime increases. This led to a massive experiment where futures. Leader’s actions in this dimension would be to
crime on New York subways was lowered by removing graffiti articulate a bright future while at the same time
and arresting fare jumpers. acknowledging difficult realities facing the team at present.
n Many of the best and brightest people who serve as project D Directing (logical, sensing) is thinking and organizing.
heads at NASA and other aerospace industry projects have Leader’s actions in this dimension are all management –
authority over multi-billion-dollar budgets and yet expect top planning, organizing, controlling the output of the group.
management to fire them within two years or less. They
believe cost overruns are inevitable and when they have to “Social (that is, relating to the interactions of people) context
make those cost overruns known, they will be fired for what drives behavior and perception. Flawed social contexts cause
they are reporting. space disasters, airplanes to crash, and dysfunctional families.
n In the Hubble case, it was found NASA program managers You can manage your contribution to your work and family
openly criticized and pressured the contractors to meet tight context by managing your behaviors.”
delivery and cost budgets. As a result, the contractors felt they – Charles Pellerin
could not report delays or problems in what they were working “The 4-D System is all about replacing the lists of ‘what matters’
on. They therefore responded by using guerilla tactics for team and leadership excellence with a system akin to a law of
including withholding troubling information. This ultimately led physics. Here is an interesting aspect of how physics works. We
the review board to conclude the problem with the Hubble can never prove a law of physics. All we can do is apply laws and
Space Telescope was a failure of leadership more than fail to disprove them in enough applications that we have faith in
anything else. their predictive powers. The 4-D system analyzes leaders and
In order for context to be understood, measured and therefore teams with sufficient repeatability that I have faith in continuing
managed better, a simple tool was required which could be used its use.”
to analyze the performance of teams and leaders. – Charles Pellerin

Anda mungkin juga menyukai