Subsea Wellhead
System
Demo Manual
Prepared For:
ACROBAT 4.0 TEST
DRIL-QUIP
13550 Hempstead Hwy. Houston, Texas 77040
T
Hand Tool Go to First Page Go Back Actual Size
Show/Hide Navigation Page Go to Next Page Fit Page Width
All Cancel OK
Click to go to the
previous / next page
Close Movie
Click to zoom in on an Illustration
Figure (Click the Go Back button to resume)
Play / Stop
OR
Indicates an item has
an action or link Slide Bar
Show photograph
(Click the Go Back button to resume)
MAIN TOC
®
SERVICE MANUAL
DEMO
PREPARED BY:
HEATHER DORITY
The average manual is approximately 200 times more detailed than this one.
An example of the full version is available only for viewing in person,
as the information is confidential and is the property of Dril-Quip.
MAIN TOC
TABLE OF CONTENTS
HELP
INTRODUCTION
DRILLING PHASE
ILLUSTRATED SEQUENCE
MOVIES
Table of Contents
Technical Specifications
The BOP stack test is accomplished with the BOP Test Tool
when it is configured for existing operational conditions. The
configuration of the BOP Test Tool is dependent upon the
following operations:
Pre-Operational Procedures
Figure 2. Wellhead 2. Clean the Wellhead Housing Adapter and inspect it for
Housing Adapter damage.
1 2
33.5 "
CAD
REVISIONS DWN. BY: JRC
REV. DATE CHKD. APP. REL. CHKD. BY: EAB SUBSEA WELLHEAD SYSTEMS TYPE SS-15/SS-10
A 25-OCT-90 EAB GLH JFE AS 18-3/4" JET SUB (SPECIAL),
APP. BY:
W/8.00" MAX. OD, W/4-1/2" API IF BOX UP x PIN DOWN
B 12-NOV-90 WPE AS JFE REL. BY: JFE
ASSEMBLY
C 13-NOV-90 EAB AS JFE REL. DATE: 13-NOV-90
NOTES: 1. STAMP CURRENT REVISION LETTER FROM PARTS LIST. D 19-MAY-93 RTP GLH JFE REF. LAYOUT: ....
..... .........
.........
.....
....
..... .........
......... DWG LAST
E .....
.... .........
......... PART NUMBER
..... ......... SIZE REV
..............................
..............................
..............................
TOC 420295
ITEM NO QTY PART NUMBER DESCRIPTION
1 1 423059 BODY,JET SUB;18.75"(SP)IF :FM
C 07-MAR-95 GWC
Drawn By: TPM DWG
DRIL-QUIP Chk'd By: CDD SIZE PART NUMBER REV
TOC
GO BACK
MAX • Used in combination with the Multi-Purpose Tool Adapter Sub, the Jet Sub
OD
provides means of washing and/or flushing the ID of the wellhead and any
components installed in it.
• Can be attached directly to the Multi-Purpose Tool by the Adapter Sub that
LENGTH
allows for washing of components located further down in the wellhead.
NOM. SIZE MAX. OD MIN. ID LENGTH WEIGHT JET FLOW MAX. LOAD
AREA RATING
(in) (in) (in) (in) (lb) (in2) (Million lb)
MAX
OD
• The BOP Isolation Test Tool allows testing of the BOP Stack and the Wellhead
after removal of the Nominal Bore Protector . A slip on adapter allows landing of
the tool on the primary shoulder of the Wellhead.
• The BOP Isolation Test Tool allows testing of the BOP stack with any Wear
LENGTH
Bushing installed. This method tests the BOP while isolating the Casing Hanger
Seal Assembly from test pressure.
• Can be landed on top of a Casing Hanger with Wear Bushing removed. Seal
Assembly is isolated from test pressure.
• Seal activation mechanism does not allow premature activation of the seal
element.
• Ample flowby area facilitates running and prevents swabbing when the tool is
retrieved.
• 4-1/2” API IF Box up and 4-1/2” API IF Pin down.
NOM. SIZE MAX. OD MIN. ID LENGTH WEIGHT MAX. INT. OR MAX. HANGING
EXT. PRESS. CAPACITY
(in) (in) (in) (in) (lb) (psi) (Million lb)
FLOW-BY SLOTS
POPPET
LARGE O-RING
SEAT
SEAL ELEMENT
ACTUATOR
RELEASE SCREW SEAL SLEEVE
HOLES (TYP. 3 PL.)
RELEASE RING
FLOW-BY SLOTS
FIGURE 1.
POPPET
BOP Test Tool
LARGE O-RING
SEAT
SEAL ELEMENT
RELEASE SCREW
HOLE (TYP. 3 PL.)
ACTUATOR
SEAL SLEEVE
SPRING
RELEASE RING
FIGURE 2.
ACTUATING
Wellhead Housing PINS
Adapter
GO BACK
FIGURE 3.
BOP TEST
BOP Test Tool with
TOOL
Wellhead Adapter
installed
O-RING
SEAL
ELEMENT
WELLHEAD
ADAPTER
ACTUATING
RINGS
SPLIT
RETAINER
RING
GO BACK