LOKASI :
KOTA TARAKAN
Total
No. Uraian Pekerjaan
(Rp.)
1 2 3
I. PEKERJAAN PERSIAPAN Rp -
II. PEKERJAAN JARINGAN PIPA DAN ACCESSORIES PIPA Rp -
III. PEKERJAAN PENGADAAN SAMBUNGAN RUMAH Rp -
A. T O T A L ( I + II + III ) Rp -
B. PPN 10 % Rp -
C. TOTAL (A+B) Rp -
D. PEMBULATAN Rp -
MATERAI
RP. 6.000,-
NAMA TERANG
JABATAN
KOP PERUSAHAAN
No. Uraian Pekerjaan Volume Satuan Harga Satuan (Rp.) Total (Rp.)
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Plank papan nama proyek dan dokumentasi 1.00 Ls Rp - Rp -
2 Direksikeet dan Gudang Material 1.00 Ls Rp - Rp -
Jumlah I Rp -
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Pengadaan Accessories Pipa Segmented Bend 45° HDPE Ø 100 mm
SATUAN / UNIT : Buah
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Pengadaan Accessories Pipa Segmented Bend 45° HDPE Ø 150 mm
SATUAN / UNIT : Buah
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Pengadaan Accessories Pipa Segmented Bend 45° HDPE Ø 200 mm
SATUAN / UNIT : Buah
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Pengadaan Accessories Pipa Segmented Bend 90° HDPE Ø 100 mm
SATUAN / UNIT : Buah
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Pengadaan Accessories Pipa Segmented Bend 90° HDPE Ø 150 mm
SATUAN / UNIT : Buah
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Pengadaan Accessories Pipa Segmented Bend 90° HDPE Ø 200 mm
SATUAN / UNIT : Buah
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 50 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.050 - -
- Pekerja Oh 0.060 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 75 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.050 - -
- Pekerja Oh 0.060 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 100 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.050 - -
- Pekerja Oh 0.060 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 150 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.075 - -
- Pekerja Oh 0.090 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa HDPE Ø 200 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.010 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.100 - -
- Pekerja Oh 0.120 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 100 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.050 - -
- Pekerja Oh 0.060 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 150 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.075 - -
- Pekerja Oh 0.090 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 50 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.050 - -
- Pekerja Oh 0.060 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 75 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.050 - -
- Pekerja Oh 0.060 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Pengadaan Accessories Pipa Gate Valve All Flange ( CI ) Ø 100 mm
SATUAN / UNIT : Buah
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 100 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.050 - -
- Pekerja Oh 0.060 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Pengadaan Accessories Pipa Gate Valve All Flange ( CI ) Ø 150 mm
SATUAN / UNIT : Buah
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 150 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.075 - -
- Pekerja Oh 0.090 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Pengadaan Accessories Pipa Gate Valve All Flange ( CI ) Ø 200 mm
SATUAN / UNIT : Buah
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa HDPE Ø 200 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.010 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.100 - -
- Pekerja Oh 0.120 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.2000 - -
- Tukang Oh 2.0000 - -
- Kepala tukang Oh 0.4000 - -
- Pekerja Oh 4.0000 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.2000 - -
- Tukang Oh 2.0000 - -
- Kepala tukang Oh 0.4000 - -
- Pekerja Oh 4.0000 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.2000 - -
- Tukang Oh 2.0000 - -
- Kepala tukang Oh 0.4000 - -
- Pekerja Oh 4.0000 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.2000 - -
- Tukang Oh 2.0000 - -
- Kepala tukang Oh 0.4000 - -
- Pekerja Oh 4.0000 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.3000 - -
- Tukang Oh 3.0000 - -
- Kepala tukang Oh 0.6000 - -
- Pekerja Oh 6.0000 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.3000 - -
- Tukang Oh 3.0000 - -
- Kepala tukang Oh 0.6000 - -
- Pekerja Oh 6.0000 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.6000 - -
- Tukang Oh 6.0000 - -
- Kepala tukang Oh 1.2000 - -
- Pekerja Oh 12.0000 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
Pengelasan / Penyambungan Accessories Pipa Steel Ø 50 mm Per Buah ( dengan Sambungan Mur-Baut )
- Mandor Oh 0.008 - -
- Kepala Tukang Oh 0.002 - -
- Tukang Oh 0.050 - -
- Pekerja Oh 0.060 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.2250 - -
- Tukang batu Oh 0.7500 - -
- Kepala tukang Oh 0.0750 - -
- Pekerja Oh 4.5000 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH I -
SUB JUMLAH II -
IV. PERALATAN
V. Jumlah ( I + II + III + IV ) -
VI. Overhead dan profit 15.00 % x IV -
VII. Harga Satuan Pekerjaan ( VI + VII ) -
JENIS PEKERJAAN : Penyambungan 1 titik pipa baru ke pipa yang ada Ø 75 mm tipe 1
SATUAN / UNIT : Per 1 titik
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.1470 - -
- Tukang Pipa Oh 0.7330 - -
- Pekerja Oh 1.4660 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Penyambungan 1 titik pipa baru ke pipa yang ada Ø 100 mm tipe 1
SATUAN / UNIT : Per 1 titik
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.1650 - -
- Tukang Pipa Oh 0.8230 - -
- Pekerja Oh 1.6460 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Penyambungan 1 titik pipa baru ke pipa yang ada Ø 150 mm tipe 1
SATUAN / UNIT : Per 1 titik
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.2100 - -
- Tukang Pipa Oh 1.0480 - -
- Pekerja Oh 2.0960 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Penyambungan 1 titik pipa baru ke pipa yang ada Ø 200 mm tipe 1
SATUAN / UNIT : Per 1 titik
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.2550 - -
- Tukang Pipa Oh 1.2730 - -
- Pekerja Oh 2.5460 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Penyambungan 1 titik pipa baru ke pipa yang ada Ø 75 mm tipe 2
SATUAN / UNIT : Per 1 titik
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.1470 - -
- Tukang Pipa Oh 0.7330 - -
- Pekerja Oh 1.4660 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Penyambungan 1 titik pipa baru ke pipa yang ada Ø 100 mm tipe 2
SATUAN / UNIT : Per 1 titik
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.1650 - -
- Tukang Pipa Oh 0.8230 - -
- Pekerja Oh 1.6460 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Penyambungan 1 titik pipa baru ke pipa yang ada Ø 150 mm tipe 2
SATUAN / UNIT : Per 1 titik
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.2100 - -
- Tukang Pipa Oh 1.0480 - -
- Pekerja Oh 2.0960 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
JENIS PEKERJAAN : Penyambungan 1 titik pipa baru ke pipa yang ada Ø 200 mm tipe 2
SATUAN / UNIT : Per 1 titik
NOMOR PEMBAYARAN :
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.2550 - -
- Tukang Pipa Oh 1.2730 - -
- Pekerja Oh 2.5460 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.090 - -
- Tukang Pipa Oh 0.900 - -
- Pekerja Oh 1.800 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.090 - -
- Tukang Pipa Oh 0.900 - -
- Pekerja Oh 1.800 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.090 - -
- Tukang Pipa Oh 0.900 - -
- Pekerja Oh 1.800 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.090 - -
- Tukang Pipa Oh 0.900 - -
- Pekerja Oh 1.800 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
- Mandor Oh 0.090 - -
- Tukang Pipa Oh 0.900 - -
- Pekerja Oh 1.800 - -
SUB JUMLAH I -
SUB JUMLAH II -
III. PERALATAN
KUANTITAS / HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN DASAR HARGA
(Rp.) (Rp.)
(1) (2) (3) (4) (5) (6)
SUB JUMLAH A -
SUB JUMLAH II -
III. PERALATAN
- Alat Bantu Ls 1.0000 - -
A. MATERIAL UMUM
1 Air Bersih / M3
2 Air Bersih / Ltr
3 Batu Pecah 3 - 5 cm / M3
4 Pasir Pasang / M3
5 Semen PC / Zak (50 kg)
6 Semen PC / kg (50 kg)
7 Minyak Solar ( Non Subsidi ) / Liter
8 Besi Beton / Kg
9 Kawat Beton / Kg
10 Balok Kayu Kelas III / M3
11 Balok Kayu Kelas II / M3
12 Kayu Kelas III / M3
13 Paku Biasa / Kg
14 Minyak Begesting / Ltr
15 Elektroda Las / Kg
16 Aspal Bitumen / Kg
17 Plywood 9 mm / Lbr
18 Dolken Kayu Ø 8 - 10/400 cm / Btg
19 Pagar BRC Lengkap Dengan Tiang / Lbr
20 Pintu Pagar BRC / Unit
21 Kawat Duri / Kg
22 Tanah Urugan (Sirtu) / M3
23 Pasir Urug / M3
24 Batu Belah / M3
25 Tiang Pancang 10.10.200 / Btg
B. MATERIAL KHUSUS
1 Water meter Ø 15 mm / Buah
2 Clamp Sadle HDPE Ø 90 x 15 mm / Buah
3 Pipa HDPE Ø 20 mm / M'
4 Male Tread Adaptor HDPE Ø 20 mm x ½" / Buah
5 Elbow M-F GI Ø ½" / Buah
6 Lockcable valve magnetic Ø ½" / Buah
7 Coupling Brass Ø ½" / Buah
8 Gate Valve/Stop Valve Ø ½" / Buah
9 Double Nipple PVC Ø ½" / Buah
10 Check Valve Brass Ø ½" / Buah
11 Coupling Brass Ø ½" / Buah
12 Valve Socket PVC Ø ½" / Buah
13 Pipa PVC Ø ½" / M'
14 Knie PVC Ø ½" / Buah
15 Tee Pvc Ø ½" / Buah
16 Knie PVC Ø ½" / Buah
17 Dop PVC Ø ½" / Buah
Daftar Harga Satuan Upah Harga Satuan Ukuran
18 Knie Foucet PVC ½" / Buah
19 Kran air Ø ½" / Buah
20 Seat Tape / Roll
21 Lem PVC 60 Gram / Tube
22 Box Watter Meter Plastik / Buah
23 Besi Profile WF.250.125 / M'
24 Besi Profile L.100.100 / M'
25 Besi Profile plat tebal 10 mm / Kg
26 Paking Karet Ø 400 mm / Buah
27 Paking Karet Ø 350 mm / Buah
28 Paking Karet Ø 300 mm / Buah
29 Paking Karet Ø 250 mm / Buah
30 Paking Karet Ø 200 mm / Buah
31 Paking Karet Ø 150 mm / Buah
32 Paking Karet Ø 100 mm / Buah
33 Paking Karet Ø 75 mm / Buah
34 Paking Karet Ø 50 mm / Buah
35 Manometer type basah Ø 15 mm / Buah
36 Mur-Baut dan ring / Buah
37 Single air valve Ø 50 mm / Buah
Diameter
No Pipe & Accessories Jenis Harga
(mm)
o
Bend 90
63
Bend 45 o
Bend 90 o
75
Bend 45 o
Bend 90 o
90
Bend 45 o
Bend 90 o
1 Bend Segmented PE-100 110
Bend 45 o
Bend 90 o
160
Bend 45 o
Bend 90 o
225
Bend 45 o
Bend 90 o
280
Bend 45 o
63
75
90
2 Equal Tee Segmented PE-100 110
160
225
280
63
75
90
3 Un Equal Tee Segmented PE-100 110
160
225
280
63
75
90
4 Stub Flange PE-100 110
160
225
280
50 SDR 17 (PN 10)
63 SDR 17 (PN 10)
75 SDR 17 (PN 10)
90 SDR 17 (PN 10)
110 SDR 17 (PN 10)
125 SDR 17 (PN 10)
5 Pipe HDPE 140 SDR 17 (PN 10)
160 SDR 17 (PN 10)
180 SDR 17 (PN 10)
200 SDR 17 (PN 10)
225 SDR 17 (PN 10)
250 SDR 17 (PN 10)
280 SDR 17 (PN 10)
Diameter
No Pipe & Accessories Jenis Harga
(mm)
90 x 75
90 x 63
110 x 63
110 x 90
160 x 90
6 Reducer PE-100
160 x 110
225 x 160
225 x 11
280 x 160
280 x 225
63
75
90
7 Dop / End Cap PE-100 110
160
225
280
63 x 50
90 x 80
110 x 100
8 Flange Socket (RR)
160 x 150
200 x 200
250 x 250
50
75
100
9 Rubber Ring 150
200
250
300
Bend 90 o
50
Bend 45 o
Bend 90 o
75
Bend 45 o
Bend 90 o
100
Bend 45 o
10 Bend All Flange CI
Bend 90 o
150
Bend 45 o
Bend 90 o
200
Bend 45 o
Bend 90 o
250
Bend 45 o
100
150
11 Blind Flange 200
250
300
100 PN. 8
150 PN. 8
12 Butterfly Valve 200 PN. 8
250 PN. 8
300 PN. 8
Diameter
No Pipe & Accessories Jenis Harga
(mm)
100 CI
150 CI
13 Check Valve 200 CI
250 CI
300 CI
50 PN. 8
75 PN. 8
100 PN. 8
14 Gate Valve All Flange
150 PN. 8
200 PN. 8
250 PN. 8
50 PN. 8
75 PN. 8
100 PN. 8
15 Strainer All Flange
150 PN. 8
200 PN. 8
250 PN. 8
50
75
100
16 Loose Flange
150
200
250
50
75
100
17 Pipe GI
150
200
250
75 x 50
100 x 75
18 Reducer All Flange 150 x 100
200 x 150
250 x 200
50 x 50
75 x 75
100 x 100
19 Tee All Flange
150 x 100
200 x 200
250 X 250
50 x 50
75 x 75
100 x 100
20 Tee " Y " All Flange
150 x 100
200 x 200
250 X 250
50
75
100
21 Water Meter
150
200
250
Diameter
No Pipe & Accessories Jenis Harga
(mm)
150
200
22 Wall Pipe All Flange L = 0,6 m
250
300
50
75
100
23 Dresser Joint
150
200
250
50
75
100
24 Street Box
150
200
250