THAMRIN NINE PROJECT - PHASE 2

JL. M.H. THAMRIN NO.10, KOTA JAK-PUS, DKI JAKARTA, 10230

REPORT DATE : 20-May-2019 CREATED BY : CATUR OKA NURFANSYAH


POSITION : MEP INSPECTOR
WEATEHER
9:00 AM - 11:00 AM 13:00 AM - 15:00 PM 16:00 PM - 18:00 PM

WORK LOG
CONTRACTOR DESCRIPTION LEVEL/ZONE/AREA QUANTITY

TOTAL
NOTES, ISSUES, CONCENRS
1.

QUALITY CONTROL OBSERVATIONS


1.

PHOTOGRAPHS AND ATTACHEMENTS


THAMRIN NINE PROJECT - PHASE 2
JL. M.H. THAMRIN NO.10, KOTA JAK-PUS, DKI JAKARTA, 10230

REPORT DATE : 20-May-2019 CREATED BY : CATUR OKA NURFANSYAH


POSITION : MEP INSPECTOR
THAMRIN NINE PROJECT - PHASE 2
JL. M.H. THAMRIN NO.10, KOTA JAK-PUS, DKI JAKARTA, 10230

REPORT DATE : 20-May-2019 CREATED BY : CATUR OKA NURFANSYAH


POSITION : MEP INSPECTOR
WORKS PROGRESS PHOTOGRAPHS AND ATTACHEMENTS

Installing Bracket - THP3/Lv5/Town House Prepare Erection CWT - THS1/LvB3/Town House Operating Winch - THP3/Lv9/Town House

Support Pabrication - LvB3/Town House Installing Y-Fitting Cast Iron Pipe Riser - LvGF/Zone Erection Fire Protection Pipe Riser - Lv6/Zone-
C/Town House B/Town House

Installing Fire Protection Pipe Riser Lv6/Zone- Installing Piping Conduit For Lighting Syetem and Installing Exhaust Duct - LvGF/Zone-
C/Town House Socket Electric Sistem - LvB1/Zone-B/Town House B/SideWest/Town House

Installing Smoke Free Lobby Transfer Riser - Installing Exhaust Duct - LvGF/Zone-B/Side
LvB2/Zone-A/Town House East/Town House
THAMRIN NINE PROJECT - PHASE 2