MANO DE OBRA
0147010002 OPERARIO hh 84.5999 9.85 833.31
0147010004 PEON hh 148.0419 6.75 999.28
1,832.59
MATERIALES
0205010024 THINER gal 7.9303 17.00 134.82
0205010025 PINTURA BLANCA gal 15.8605 25.00 396.51
531.33
Total S/. 2,363.92