Secant pile walls are formed by constructing intersecting reinforced concrete piles. The secant piles
are reinforced with either steel rebar or with steel beams and are constructed by either drilling
under mud or augering. Primary piles are installed first with secondary (male) piles constructed in
between primary (female) piles once the latter gain sufficient strength. Pile overlap is typically in the
order of 3 inches (8 cm).
Secant pile wall design when steel beams are used involves the use of weaker than normal concrete.
The pile that is lagging the wall between two main beams has to be examined for shear and
compression arching.
VIDEO REFERENCE : https://youtu.be/UF9FLUioZv8
In this method, the basement floors are constructed as the excavation progresses. basement
concrete slabs act as lateral bracing for the perimeter wall system. Ground level and subsequent
basement slabs are poured, accessing holes left to allow excavation beneath. As each subsequent
subgrade level is completed, the floors act as lateral bracing for the perimeter wall system. Perimeter
wall which is generally referred to as Diaphragm wall (or D wall) is a single, safe solution for all the
constructional problems encountered in underground construction. D walls provide effective earth
retention and good control over ground water movement. It’s capable of carrying the superstructure
loads, providing early utilization of the superstructure even before the completion of substructure of
that building.
The top down method is used for deep excavation projects where tieback installation is not feasible
and soil movements need to be minimized, metro station construction, tunnel construction,
underground construction etc.
3. Easier and economical construction of roof since it can be cast on prepared graderather than
using bottom forms.
4. The structural slab act as an internal bracing for the support of excavation, thus reducing the
number of tiebacks required.
5. The virtually vibration-free operation minimizes the potential for ground movement and its
resulting detrimental settlement.
6. It requires less width for construction area. Reduced environmental pollution associated with pre-
construction earthworks
4. Access to the excavation is limited and limited space for the construction of base slab.
The TBM can work continuously for 10,000 hours and can bore at an average speed of
8mm/min. The total weight of all the components of the TBM is more than 400 tonne
with maximum weight of one of the component is 120 tonne which requires a great
deal of logistics to handle from the port to the project site and lowering into the 20m
deep shaft.
The TBM while in operation exerts a maximum force of 45,184 kN. The TBM will operate
at an average speed of nearly 6m/day in rocky strata and of an average speed of
10m/day in soil strata and the boring will continue at depths of 22 to 27 m below
ground level.
The length of the TBM is 78 metres in total and the outer diameter of the cutter head is
6.3 m. The initial drive of the TBM will be to a distance of 10 m which is equal to the
length of the cutter head and associated accessories. We are providing every safety
measures for the tunnelling as the TBM alignment passes below many high buildings.
The ring consisting of 6 segments of 1.2 m width,275mm thickness and 3.7 m length
for each of the 5 segments and 1.3 m for key segment used for lining of the tunnel
which is being cast at the casting yard in Vayalanallor. The surface logistics for the
transportation of the segments has been planned in such a way that the segments can
be brought to site with minimum hindrance to the public while minimising the travel
time of the segments from the casting yard to site. One 40 tonne trailer can carry 2
segments and each shift will be requiring 6-8 trailers of delivery depending upon the
progress of the tunnel.
Launching shaft is constructed to launch and retrieve the tunnel boring machine. For
Launching Shaft construction excavation has to be done depending on the Top Down
Construction (excavation from top to base with the use of struts to retain the structure)
or Bottom Up Construction (excavation from base to top with the construction of slabs).
Dewatering is also being done before the excavation for removal of the water through
dewatering wells. The excavated muck is transported to the dumping yard situated at
35 km away from project site at night time ensuring the cleaning of each dumper on
wheel washing bay to prevent the dust accumulation on road.
Metro station slabs are to be constructed in three levels; viz. base slab, concourse slab
and roof slab level having 6m vertical clearances in each level. The slabs will be
constructed using a combination of top down method at the shaft locations and bottom
up method at the station areas. Waterproofing above and below slabs wherever
necessary is being done to prevent the water leakage.
Construction Methodology
Cut and Cover Method
DRAWING STATUSES
Preliminary Drawings are the initial plans for projects prepared by the designer or architects
and engineers (A/E) firm during the early planning or promotional stage of the building
development. They provide a means of communication between the designer and the
user (customer).