Anda di halaman 1dari 1892

PEMBANGUNAN

RAB
GEDUNG KANTOR BUPATI
KABUPATEN LOMBOK TENGAH

NO. URAIAN PEKERJAAN SUB JUMLAH

I PEKERJAAN PERSIAPAN

II BANGUNAN A (AS 01-09/ B-M)

PEKERJAAN STRUKTUR 20,967,102,877.28

PEKERJAAN ARSITEKTUR 15,866,948,802.67

PEKERJAAN ELEKTRIKAL 3,577,640,757.26

PEKERJAAN MEKANIKAL 6,721,802,871.42

III BANGUNAN B (AS 9-28/ A-M)

PEKERJAAN STRUKTUR 34,099,370,108.99

PEKERJAAN ARSITEKTUR 26,084,447,249.72

PEKERJAAN ELEKTRIKAL 10,191,603,991.62

PEKERJAAN MEKANIKAL 16,784,604,951.58

IV BANGUNAN C (AS 28-36/ B-M)

PEKERJAAN STRUKTUR 23,332,509,681.91

PEKERJAAN ARSITEKTUR 15,968,460,064.01

PEKERJAAN ELEKTRIKAL 3,718,846,789.15

PEKERJAAN MEKANIKAL 7,074,372,729.55

V PEKERJAAN LANDSCAPE

VI PEKERJAAN SITE DEVELOPMENT

VII PEKERJAAN GENSET SILENT 1.000 KVA

TOTAL BIAYA PEKERJAAN

Page | 1 of 1892
TOTAL BIAYA PEKERJAAN

Jumlah Total Seluruh Pekerjaan

PPN 10 %

Jumlah Total Seluruh Pekerjaan + PPN

DIBULATKAN

TERBILANG : Dua Ratus Delapan Milyar Lima Ratus Juta Delapan Ratus Tujuh Puluh Lima Ribu Rupiah

Page | 2 of 1892
No : 54/BA-DIVREG.3/SPH/XI/2017
Tanggal : 13 November 2017
RAB
Lokasi : LOMBOK TENGAH
Owner : KABUPATEN LOMBOK TENGAH

JUMLAH % TOTAL

Rp 330,859,575.00

Rp 47,133,495,308.63

Rp 87,160,026,301.91

Rp 50,094,189,264.61

Rp 1,763,969,508.93

Rp 1,023,581,647.50

Rp 2,040,128,427.04

Rp 189,546,250,033.62

Page | 3 of 1892
Rp 189,546,250,033.62

0.00% Rp 189,546,250,033.62

Rp 18,954,625,003.36

Rp 208,500,875,036.98

Rp 208,500,875,000.00

h Lima Ribu Rupiah

Surabaya, 13 November 2017


PT. Brantas Abipraya (Persero)
Divisi Regional 3

Ir. Herman Dwi Haryanto


General Manager

Page | 4 of 1892
RENCANA PEMBAGIAN PORSI PEKERJAAN

Pembagian Porsi PT. Pembagian Porsi PT.


No. Uraian
Brantas Abipraya (Persero) Bunga Raya

I PERSIAPAN 198,515,745.00 132,343,830.00

II BANGUNAN A (AS 01-09/ B-M)


a PEKERJAAN STRUKTUR 20,967,102,877.28
b PEKERJAAN ARSITEKTUR 15,866,948,802.67
c PEKERJAAN ELEKTRIKAL 3,577,640,757.26
d PEKERJAAN MEKANIKAL 3,563,550,350.00 3,158,252,521.42

III BANGUNAN B (AS 9-28/ A-M)


a PEKERJAAN STRUKTUR 34,099,370,108.99
b PEKERJAAN ARSITEKTUR 26,084,447,249.72
c PEKERJAAN ELEKTRIKAL 10,191,603,991.62
d PEKERJAAN MEKANIKAL 16,784,604,951.58

IV BANGUNAN C (AS 28-36/ B-M)


a PEKERJAAN STRUKTUR 23,332,509,681.91
b PEKERJAAN ARSITEKTUR 15,968,460,064.01
c PEKERJAAN ELEKTRIKAL 3,718,846,789.15
d PEKERJAAN MEKANIKAL 7,074,372,729.55

V PEKERJAAN LANDSCAPE 1,058,381,705.36 705,587,803.57


VI PEKERJAAN SITE DEVELOPMENT 780,173,040.62 243,408,606.88
VII PEKERJAAN GENSET SILENT 1.000 KVA 2,040,128,427.04
Jumlah 113,727,750,020.17 75,818,500,013.45
Prosentase (%) 60.00% 40.00%
SI PEKERJAAN

Keterangan

Pekerjaan AC karena 1 sistem di Gedung B maka akan diambil alih


PEMBANGUNAN
GEDUNG KANTOR BUPATI
KABUPATEN LOMBOK TENGAH

No. ITEM PEKERJAAN

I PEKERJAAN PERSIAPAN
A PEKERJAAN PERSIAPAN
1 Papan nama proyek
2 Rambu-rambu proyek
3 Pagar sementara dari seng gelombang
tinggi 2 meter (sewa)
4 Uitzet & Bowplank gedung
5 Air dan listrik kerja
6 Biaya uji tes material
7 Administrasi dan dokumentasi
TOTAL BIAYA PEKERJAAN PERSIAPAN

RAB (RENCANA ANGGARAN BIAYA) page 7 of 1892


II BANGUNAN A (AS 01-09/ B-M)
PEKERJAAN STRUKTUR
A PEKERJAAN GALIAN DAN URUGAN
1 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm samp
2 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm samp
3 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm samp
4 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm lebih
5 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
6 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
7 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
8 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm lebih
9 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm samp
10 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm samp
11 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm samp
12 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm lebih
13 Urug tanah kembali bekas galian footplat+pondasi cor beton, dipad
14 Urug pasir bawah pondasi cor beton, t : 100 mm

- LIFT KHUSUS
1 Galian pondasi pit lift, sampai 1m
2 Galian pondasi pit lift, sampai 2m
RAB (RENCANA ANGGARAN BIAYA) page 8 of 1892
BIAYA PEKERJAAN GALIAN DAN URUGAN
B PEKERJAAN BETON
LANTAI 1
1 Cor rabat bawah lantai tebal = 100 mm
1 pc : 3 ps : 5 sp
2 Cor rabat bawah pondasi cor beton tebal = 100 mm
1 pc : 3 ps : 5 sp
- LIFT KHUSUS
3 Pondasi cor beton, mutu beton f'c 25 Mpa + stek besi D13 mm
4 Cor pondasi pit lift t : 300 mm, mutu beton f'c 25 MPa
5 Cor dinding beton t : 200 mm, mutu beton f'c 25 MPa
6 Cor dinding beton t : 250 mm, mutu beton f'c 25 MPa
7 Pondasi cor beton 3500 x 3500 mm, mutu beton f'c 15 Mpa + stek b
8 Pondasi cor beton 3100 x 3100 mm, mutu beton f'c 15 Mpa + stek b
9 Pondasi cor beton 1900 x 1900 mm, mutu beton f'c 15 Mpa + stek b
10 Cor footplat F1 2600 x 2600 mm, mutu beton f'c 25 MPa
11 Cor footplat F2 2200 x 2200 mm, mutu beton f'c 25 MPa
12 Cor footplat F4 1600 x 1600 mm, mutu beton f'c 25 MPa
13 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 9 of 1892


14 Cor kolom K3 - 300x400 mm, mutu beton f'c 25 MPa
15 Cor kolom K4 - 200x400 mm, mutu beton f'c 25 MPa
16 Cor kolom K7 - SESUAI DETAIL, mutu beton f'c 25 MPa
17 Cor kolom K8 - SESUAI DETAIL, mutu beton f'c 25 MPa
18 Cor sloof S2 - 350x500 mm, mutu beton f'c 25 MPa
19 Cor sloof S2 - 350x500 mm, mutu beton f'c 25 MPa
20 Cor sloof S3 - 200x400 mm, mutu beton f'c 25 MPa

21 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


22 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
23 Cor balok B11 - 150x500 mm, mutu beton f'c 25 MPa

Elevasi (- 4.200) - (± 0.000)


24 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (- 4.200) - (± 0.000)


25 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (- 4.200) - (± 0.000)


26 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

27 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa


RAB (RENCANA ANGGARAN BIAYA) page 10 of 1892
28 Plat A3 tebal 100 mm, mutu beton f'c 25 MPa
29 Cor beton meja pantry, tebal = 100 mm 1pc : 3 ps : 5sp
LANTAI 2
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K3 - 300x400 mm, mutu beton f'c 25 MPa
3 Cor kolom K4 - 200x400 mm, mutu beton f'c 25 MPa
4 Cor kolom K7 - SESUAI DETAIL, mutu beton f'c 25 MPa
5 Cor kolom K8 - SESUAI DETAIL, mutu beton f'c 25 MPa

6 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


7 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
8 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
9 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
10 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
11 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
12 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
13 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
14 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
15 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
16 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 11 of 1892


17 Cor balok B10b - 200x600 mm, mutu beton f'c 25 MPa

18 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


19 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa

20 Cor balok B11 - 150x500 mm, mutu beton f'c 25 MPa

Elevasi (± 0.000) - (+ 4.200)


21 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (± 0.000) - (+ 4.200)


22 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (± 0.000) - (+ 4.200)


23 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M
24 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

25 Plat A3 tebal 100 mm, mutu beton f'c 25 MPa

LANTAI 3
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K3 - 300x400 mm, mutu beton f'c 25 MPa
RAB (RENCANA ANGGARAN BIAYA) page 12 of 1892
3 Cor kolom K4 - 200x400 mm, mutu beton f'c 25 MPa
4 Cor kolom K7 - SESUAI DETAIL, mutu beton f'c 25 MPa
5 Cor kolom K8 - SESUAI DETAIL, mutu beton f'c 25 MPa

6 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


7 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
8 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
9 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
10 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
11 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
12 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
13 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
14 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
15 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
16 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
17 Cor balok B10b - 200x600 mm, mutu beton f'c 25 MPa

18 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


19 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
20 Cor balok B11 - 150x500 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 13 of 1892


21 Cor balok B15 - (Sesuai Detail), mutu beton f'c 25 MPa

Elevasi (+ 4.200) - (+ 8.400)


22 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (+ 4.200) - (+ 8.400)


23 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (+ 4.200) - (+ 8.400)


24 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

25 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

26 Plat A3 tebal 100 mm, mutu beton f'c 25 MPa

LANTAI 4
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K3 - 300x400 mm, mutu beton f'c 25 MPa
3 Cor kolom K4 - 200x400 mm, mutu beton f'c 25 MPa
4 Cor kolom K8 - SESUAI DETAIL, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 14 of 1892


5 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
6 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
7 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
8 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
9 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
10 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
11 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
12 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
13 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
14 Cor balok B10b - 200x600 mm, mutu beton f'c 25 MPa
15 Cor balok B16 - 250x600 mm, mutu beton f'c 25 MPa

16 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


17 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
18 Cor balok B11 - 150x500 mm, mutu beton f'c 25 MPa

19 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


20 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
21 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
22 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 15 of 1892


23 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
24 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
25 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
26 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
27 Cor balok B10c - 200x600 mm, mutu beton f'c 25 MPa
28 Cor balok L2 - 150x600 mm, mutu beton f'c 25 MPa

29 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


30 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
31 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
32 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
33 Cor balok B18 - 250x600 mm, mutu beton f'c 25 MPa
34 Cor balok B18 - 250x600 mm, mutu beton f'c 25 MPa
35 Cor balok L3 - 150x700 mm, mutu beton f'c 25 MPa

36 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


37 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
38 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
39 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
40 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 16 of 1892


41 Cor balok L4 - 150x950 mm, mutu beton f'c 25 MPa

Elevasi (+ 8.400) - (+ 12.600)


42 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

43 Cor tangga beton, mutu beton f'c 25 Mpa

44 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

45 Plat A3 tebal 100 mm, mutu beton f'c 25 MPa

46 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

47 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

48 Plat A4 tebal 250 mm, mutu beton f'c 25 MPa

49 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

50 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

LANTAI 5
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 17 of 1892


2 Cor kolom K5 - 250x400 mm, mutu beton f'c 25 MPa

(ELEVASI + 17.550)
3 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
4 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
5 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
6 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
7 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
8 Cor balok L4 - 150x950 mm, mutu beton f'c 25 MPa

9 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

10 Plat A4 tebal 250 mm, mutu beton f'c 25 MPa

BIAYA PEKERJAAN BETON


TOTAL BIAYA PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTUR
A PEKERJAAN GALIAN DAN URUGAN
1 Galian pondasi batu kali sedalam 1 m
2 Urugan pasir bawah pondasi batu kali tebal 100 mm

RAB (RENCANA ANGGARAN BIAYA) page 18 of 1892


3 Urugan pasir bawah lantai tebal 100 mm
4 Urugan tanah kembali bekas galian pondasi + pemadatan
5 Urugan tanah peninggian peil lantai dengan tanah bekas galian + p
BIAYA PEKERJAAN GALIAN DAN URUGAN
B PEKERJAAN ANTI RAYAP
1 Anti rayap galian pondasi batu kali
2 Anti rayap bawah lantai
BIAYA PEKERJAAN ANTI RAYAP
C PEKERJAAN BETON PRAKTIS
LANTAI 1
1 Sloof praktis SP1, ukuran = 100 x 200 mm
2 Sloof praktis SP2, ukuran = 120 x 200 mm
3 Kolom praktis KP02, ukuran = 120 x 120 mm
4 Kolom praktis KP01, ukuran = 100 x 100 mm
5 Balok praktis BP01, ukuran = 100 x 100 mm
6 Balok praktis BP02, ukuran = 120 x 120 mm
7 Balok latiu BL1 100x100 mm
8 Balok latiu BL2 120x120 mm
9 Balok latiu BL3 100x400 mm

RAB (RENCANA ANGGARAN BIAYA) page 19 of 1892


LANTAI 2
1 Kolom praktis KP02, ukuran = 120 x 120 mm
2 Kolom praktis KP01, ukuran = 100 x 100 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm
5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm

LANTAI 3
1 Kolom praktis KP02, ukuran = 120 x 120 mm
2 Kolom praktis KP01, ukuran = 100 x 100 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm
5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm

LANTAI 4
1 Kolom praktis KP02, ukuran = 120 x 120 mm

RAB (RENCANA ANGGARAN BIAYA) page 20 of 1892


2 Kolom praktis KP01, ukuran = 100 x 100 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm
5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm

LANTAI 5
1 Kolom praktis KP01, ukuran = 100 x 100 mm
2 Kolom praktis KP04, ukuran = 100 x 300 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok latiu BL1 100x100 mm
BIAYA PEKERJAAN BETON PRAKTIS
D PEKERJAAN PASANGAN DAN PLESTERAN
LANTAI 1
1 Pasangan pondasi batu kali 1pc : 6ps
2 Pasangan rollag
3 Pasangan dinding bata ringan
4 Plesteran dinding bata ringan tebal 10 mm
5 Acian dinding bata ringan

RAB (RENCANA ANGGARAN BIAYA) page 21 of 1892


6 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
7 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
8 Pasangan dinding 1/2 bata merah 1 pc : 6 ps
9 Plesteran dinding 1/2 bata merah 1 pc : 6 ps
8 Acian dinding bata merah
6 Plester dan acian beton (kolom dan balok, lisplank)
7 Plesteran tali air
8 Plesteran skoning
9 Plesteran ban-banan
10 Wallfiller plat tangga

LANTAI 2
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Acian dinding bata merah
7 Plester dan acian beton (kolom dan balok, lisplank)
8 Plesteran tali air

RAB (RENCANA ANGGARAN BIAYA) page 22 of 1892


9 Plesteran skoning
10 Wallfiller plat tangga
11 Screeding plat
LANTAI 3
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Acian dinding bata merah
7 Plester dan acian beton (kolom dan balok, lisplank)
8 Plesteran tali air
9 Plesteran skoning
10 Wallfiller plat tangga
11 Screeding plat
LANTAI 4
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps

RAB (RENCANA ANGGARAN BIAYA) page 23 of 1892


5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Acian dinding bata merah
7 Plester dan acian beton (kolom dan balok, lisplank)
8 Plesteran tali air
9 Plesteran skoning
10 Wallfiller plat tangga
11 Screeding plat
LANTAI 5
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Plester dan acian beton (kolom dan balok, lisplank)
5 Plesteran tali air
6 Plesteran skoning
7 Screeding plat lantai beton
8 Screeding plat atap dak + kawat ayam

BIAYA PEKERJAAN PASANGAN DAN PLESTERAN


E PEKERJAAN PINTU DAN JENDELA
LANTAI 1

RAB (RENCANA ANGGARAN BIAYA) page 24 of 1892


1 Pintu P01
2 Pintu P02
3 Pintu P03
4 Pintu P04
5 Pintu P05
6 Pintu P06
7 Pintu P07
8 Pintu P08
9 Pintu shaft PSH
10 Jendela J01
11 Jendela J02
12 Boven BV01
13 Boven BV02
14 Boven BV06
15 Curtainwall 01 dari elv. - 2.100 s/d elv + 13.850
16 Curtainwall 03 dari elv. - 3.100 s/d elv + 11.400
17 Curtainwall 04 dari elv. - 3.100 s/d elv + 5.550

LANTAI 2
1 Pintu P01

RAB (RENCANA ANGGARAN BIAYA) page 25 of 1892


2 Pintu P03
3 Pintu P04
4 Pintu P05
5 Pintu P06
6 Pintu P07
7 Pintu P08
8 Pintu shaft PSH
9 Jendela J01
10 Jendela J07
11 Boven BV01
12 Boven BV02
13 Boven BV06

LANTAI 3
1 Pintu P01
2 Pintu P03
3 Pintu P04
4 Pintu P05
5 Pintu P06
6 Pintu P07

RAB (RENCANA ANGGARAN BIAYA) page 26 of 1892


7 Pintu P08
8 Pintu shaft PSH
9 Jendela J01
10 Jendela J07
11 Boven BV01
12 Boven BV02
13 Boven BV06

LANTAI 4
1 Pintu jendela PJ02
2 Pintu P01
3 Pintu P03
4 Pintu P04
5 Pintu P05
6 Pintu P06
7 Pintu P07
8 Pintu P08
9 Pintu shaft PSH
10 Jendela J01
11 Jendela J07

RAB (RENCANA ANGGARAN BIAYA) page 27 of 1892


12 Boven BV01
13 Boven BV02
14 Boven BV06

LANTAI 5
1 Pintu P02
2 Pintu besi PB01
3 Pintu besi PB02
4 Pintu shaft PSH

BIAYA PEKERJAAN PINTU DAN JENDELA


F PEKERJAAN PLAFON
LANTAI 1
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing
3 Plafon kalsium silikat t = 6 mm, rangka metal furing
4 Shadow line
5 Maintenance hole 600 x 600 mm
LANTAI 2
1 Plafond gypsum tebal 12 mm rangka metal furing

RAB (RENCANA ANGGARAN BIAYA) page 28 of 1892


2 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing
3 Plafon kalsium silikat t = 6 mm, rangka metal furing
4 Shadow line
5 Maintenance hole 600 x 600 mm
LANTAI 3
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing
3 Plafon kalsium silikat t = 6 mm, rangka metal furing
4 Shadow line
5 Maintenance hole 600 x 600 mm
LANTAI 4
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing
3 Plafon kalsium silikat t = 6 mm, rangka metal furing
4 Shadow line
5 Maintenance hole 600 x 600 mm
BIAYA PEKERJAAN PLAFON
G PEKERJAAN PARTISI GYPSUM, PARTISI KACA, WORK STATIO
LANTAI 1
1 Partisi Gypsum PR01

RAB (RENCANA ANGGARAN BIAYA) page 29 of 1892


2 Partisi Gypsum PR02
3 Partisi Gypsum PR03
4 Partisi Gypsum PR04
5 Partisi Gypsum PR05
6 Partisi Kaca PK01
7 Work Station WS 01
8 Work Station WS 02
9 Work Station WS 03
10 Work Station WS 04
11 Work Station WS 05
12 Work Station WS 06
13 Work Station WS 07
LANTAI 2
1 Partisi Gypsum PR01
2 Partisi Gypsum PR02
3 Partisi Gypsum PR03
4 Partisi Gypsum PR04
5 Partisi Gypsum PR05
6 Partisi Gypsum PR06
7 Partisi Gypsum PR07

RAB (RENCANA ANGGARAN BIAYA) page 30 of 1892


8 Partisi Kaca PK01
9 Partisi Kaca PK02
10 Work Station WS 01
11 Work Station WS 02
12 Work Station WS 03
13 Work Station WS 04
14 Work Station WS 05
15 Work Station WS 06
16 Work Station WS 07
17 Work Station WS 08
18 Work Station WS 09
LANTAI 3
1 Partisi Gypsum PR01
2 Partisi Gypsum PR02
3 Partisi Gypsum PR03
4 Partisi Gypsum PR04
5 Partisi Gypsum PR05
6 Partisi Gypsum PR06
7 Partisi Gypsum PR07
8 Partisi Kaca PK01

RAB (RENCANA ANGGARAN BIAYA) page 31 of 1892


9 Partisi Kaca PK02
10 Work Station WS 01
11 Work Station WS 02
12 Work Station WS 03
13 Work Station WS 04
14 Work Station WS 05
15 Work Station WS 06
16 Work Station WS 07
17 Work Station WS 08
18 Work Station WS 09
LANTAI 4
1 Partisi Gypsum PR01
2 Partisi Gypsum PR02
3 Partisi Gypsum PR03
4 Partisi Gypsum PR04
5 Partisi Gypsum PR05
6 Partisi Gypsum PR07
7 Partisi Kaca PK01
8 Work Station WS 02
9 Work Station WS 03

RAB (RENCANA ANGGARAN BIAYA) page 32 of 1892


10 Work Station WS 04
11 Work Station WS 05
12 Work Station WS 06
13 Work Station WS 07
BIAYA PEKERJAAN PARTISI
H PEKERJAAN FINISHING LANTAI DAN DINDING
LANTAI 01

1 Homogeneous Tile Semipolished / Lappato Tipe C 600 x 600 mm (


2 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )
3 Homogeneous Tile Matt Tipe B 600 x 600 mm
4 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
5 Plint Homogeneous Tile 80 x 600 mm
6 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
7 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm
8 Stepnosing 80 x 600 mm
9 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
10 Homogeneous Tile 300 x 600 jumplift
11 Homogeneous Tile finishing meja pantry 300 x 600 mm
12 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

RAB (RENCANA ANGGARAN BIAYA) page 33 of 1892


LANTAI 02

1 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )


2 Homogeneous Tile Matt Tipe B 600 x 600 mm
3 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
4 Plint Homogeneous Tile 80 x 600 mm
5 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
6 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm
7 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
8 Homogeneous Tile 300 x 600 jumplift
9 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

LANTAI 03

1 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )


2 Homogeneous Tile Matt Tipe B 600 x 600 mm
3 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
4 Plint Homogeneous Tile 80 x 600 mm
5 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
6 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm
7 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
8 Homogeneous Tile 300 x 600 jumplift
RAB (RENCANA ANGGARAN BIAYA) page 34 of 1892
9 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

LANTAI 04

1 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )


2 Homogeneous Tile Matt Tipe B 600 x 600 mm
3 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
4 Plint Homogeneous Tile 80 x 600 mm
5 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
6 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm
7 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
8 Homogeneous Tile 300 x 600 jumplift
9 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

BIAYA PEKERJAAN FINISHING LANTAI DAN DINDING


I PEKERJAAN PENGECATAN
LANTAI 1
1 Cat dinding luar (dinding, kolom, balok)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon

RAB (RENCANA ANGGARAN BIAYA) page 35 of 1892


4 Cat wall filler plat tangga

LANTAI 2
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat tangga
5 Waterproofing plat
6 Waterproofing km/wc
LANTAI 3
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat tangga
5 Waterproofing plat
6 Waterproofing km/wc
LANTAI 4
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon

RAB (RENCANA ANGGARAN BIAYA) page 36 of 1892


4 Cat wall filler plat tangga
5 Waterproofing plat
6 Waterproofing km/wc
LANTAI ATAP
1 Cat dinding luar (dinding, kolom)
2 Cat dinding dalam (dinding, kolom)
3 Waterproofing plat
BIAYA PEKERJAAN PENGECATAN
J PEKERJAAN RAILING
Catatan:
Pekerjaan railing dikerjakan sesuai gambar detail lengkap dengan a
Railing menggunakan hollow stainless 40 x 60 mm dan 20 x 20 mm
Tangga type 01
LANTAI 01
1 Handrail H01
2 Handrail H02
3 Handrail H03
4 Handrail H04
5 Handrail H05
6 Handrail H06

RAB (RENCANA ANGGARAN BIAYA) page 37 of 1892


LANTAI 02
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 03
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 04
1 Handrail H09

Tangga type 02
LANTAI 01
1 Handrail H01

RAB (RENCANA ANGGARAN BIAYA) page 38 of 1892


2 Handrail H02
3 Handrail H03
4 Handrail H04
5 Handrail H05
6 Handrail H06
LANTAI 02
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 03
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 04

RAB (RENCANA ANGGARAN BIAYA) page 39 of 1892


1 Handrail H09

Tangga type 03
LANTAI 01
1 Handrail H01
2 Handrail H02
3 Handrail H03
4 Handrail H04
5 Handrail H05
6 Handrail H06
LANTAI 02
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 03
1 Handrail H03
2 Handrail H04

RAB (RENCANA ANGGARAN BIAYA) page 40 of 1892


3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 04
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 05
1 Handrail H09

Railing void type 06


LANTAI 02
1 Handrail H01
2 Handrail H02
3 Handrail H03
LANTAI 03

RAB (RENCANA ANGGARAN BIAYA) page 41 of 1892


1 Handrail H01
2 Handrail H02
3 Handrail H03
LANTAI 04
1 Handrail H01
2 Handrail H02
3 Handrail H03

Railing void type 09


LANTAI 01
1 Railing R01
2 Railing R02

LANTAI 02
1 Railing R01
2 Railing R02

LANTAI 03
1 Railing R01
2 Railing R02

RAB (RENCANA ANGGARAN BIAYA) page 42 of 1892


Railing void type 11
LANTAI 02
1 Railing R04

LANTAI 03
1 Railing R04

LANTAI 04
1 Railing R04

Railing type 13
LANTAI 04
1 Railling R07

Railing type 14
LANTAI 02
1 Handrailing H01
2 Handrailing H02

RAB (RENCANA ANGGARAN BIAYA) page 43 of 1892


LANTAI 03
1 Handrailing H01
2 Handrailing H02

LANTAI 04
1 Handrailing H01
2 Handrailing H02

Railing type 15
LANTAI 02
1 Handrailing H01
2 Handrailing H02

LANTAI 03
1 Handrailing H01
2 Handrailing H02

LANTAI 04
1 Handrailing H01
2 Handrailing H02

RAB (RENCANA ANGGARAN BIAYA) page 44 of 1892


Tangga maintenance
1 Tangga maintenance pipa BS Ø 2" tebal 1.6 mm type C
Tangga maintenance pipa BS Ø 2" tebal 1.6 mm type C
Penutup shaft, Plat bordes tebal = 2 mm
Tarikan Besi Ø 10 mm
Engsel besi
Pasangan grill besi siku

2 Tangga maintenance pipa BS Ø 2" tebal 1.6 mm type D


Tangga maintenance pipa BS Ø 2" tebal 1.6 mm type D
Penutup shaft, Plat bordes tebal = 2 mm
Tarikan Besi Ø 10 mm
Engsel besi
Pasangan grill besi siku

BIAYA PEKERJAAN RAILING


K PEKERJAAN CUBICLE TOILET
Catatan:
Pekerjaan cubicle toilet dikerjakan sesuai gambar detail lengkap de
LANTAI 01
1 Cubicle toilet type A

RAB (RENCANA ANGGARAN BIAYA) page 45 of 1892


2 Cubicle toilet type B
3 Cubicle toilet type C
LANTAI 02
1 Cubicle toilet type A
2 Cubicle toilet type B
3 Cubicle toilet type C
LANTAI 03
1 Cubicle toilet type A
2 Cubicle toilet type B
3 Cubicle toilet type C
LANTAI 04
1 Cubicle toilet type A
2 Cubicle toilet type B
3 Cubicle toilet type C
BIAYA PEKERJAAN RAILING
L PEKERJAAN FASADE
1 Detail motif 1
- Bahan papan fiber cement non silica tebal 25 mm
- Rangka utama 80x100x2 mm
- Rangka pembagi 40x40x 1.8 mm

RAB (RENCANA ANGGARAN BIAYA) page 46 of 1892


2 Detail motif 2 module 3000 x 2450 mm
- Bahan papan fiber cement non silica tebal 25 mm
- Rangka utama 40x60x2 mm
3 Detail motif 03
- Bahan papan fiber cement non silica tebal 11 mm
- Rangka utama 80x100x2 mm
- Rangka pembagi 40x40x 1.8 mm
4 Detail motif 08
- Covering kolom dengan GRC tebal 50 mm
- Kolom pedestal 300 x 400 mm tul. 6 D16 mm
- Kolom H beam 200 x 200 x 8 x 12 mm
- Plat rib tebal 8 mm
- Plat plendes tebal 15 mm
- 2 lipped channel 150 x 150 x 20 x 3.2 mm
- Angkur M16
5 Detail motif 11
- Bahan papan fiber cement non silica tebal 25 mm (100x150)
6 Detail motif 12
Finishing Veeneer Batu

RAB (RENCANA ANGGARAN BIAYA) page 47 of 1892


7 Finishing cat teksture

TAMPAK SELATAN
LANTAI 1
a Finishing Cat Tekstur
LANTAI 2
b Finishing Cat Tekstur
LANTAI 3
c Finishing Cat Tekstur
LANTAI 4
d Finishing Cat Tekstur
TAMPAK UTARA
LANTAI 1
a Finishing Cat Tekstur
LANTAI 2
b Finishing Cat Tekstur
LANTAI 3
c Finishing Cat Tekstur
LANTAI 4
d Finishing Cat Tekstur
TAMPAK BARAT

RAB (RENCANA ANGGARAN BIAYA) page 48 of 1892


LANTAI 1
a Finishing Cat Tekstur
LANTAI 2
b Finishing Cat Tekstur
LANTAI 3
c Finishing Cat Tekstur
LANTAI 4
d Finishing Cat Tekstur

8 Pekerjaan Ban-banan

TAMPAK SELATAN
Ban-banan

TAMPAK UTARA
Ban-banan

TAMPAK BARAT
Ban-banan

BIAYA PEKERJAAN FINISHING EXTERIOR

RAB (RENCANA ANGGARAN BIAYA) page 49 of 1892


TOTAL BIAYA PEKERJAAN ARSITEKTUR
PEKERJAAN ELEKTRIKAL
A PEKERJAAN PANEL
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
1 PANEL SDP PENERANGAN DAN DAYA
LANTAI 1
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H
Magnetic Contactor 3P 1NO 1NC
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju LVMDP
Wiring + Pemasangan
LANTAI 2

RAB (RENCANA ANGGARAN BIAYA) page 50 of 1892


Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H
Magnetic Contactor 3P 1NO 1NC
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju LVMDP
Wiring + Pemasangan
LANTAI 3
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H
Magnetic Contactor 3P 1NO 1NC
Lampu Indikator

RAB (RENCANA ANGGARAN BIAYA) page 51 of 1892


Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju LVMDP
Wiring + Pemasangan
LANTAI 4
Box panel uk. (500 x 400 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H
Magnetic Contactor 3P 1NO 1NC
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju LVMDP
Wiring + Pemasangan
LANTAI 5
Box panel uk. (500 x 400 x 250) mm type wall mounted

RAB (RENCANA ANGGARAN BIAYA) page 52 of 1892


MCCB 25A / 3p / 10kA
MCB 10A / 1p / 6kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 6 mm2 menuju LVMDP
Wiring + Pemasangan
3 PANEL SDP AC INDOOR DAN OUTDOOR
LANTAI 1
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 Menuju panel penerangan & daya
Wiring + Pemasangan

RAB (RENCANA ANGGARAN BIAYA) page 53 of 1892


Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 Menuju panel penerangan & daya
Wiring + Pemasangan
LANTAI 2
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie

RAB (RENCANA ANGGARAN BIAYA) page 54 of 1892


Grounding sistem BCC 35 mm2 Menuju panel penerangan & daya
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 15A / 3p / 6kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 Menuju panel penerangan & daya
Wiring + Pemasangan
LANTAI 3
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A

RAB (RENCANA ANGGARAN BIAYA) page 55 of 1892


Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 Menuju panel penerangan & daya
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 160A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 15A / 3p / 6kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 Menuju panel penerangan & daya
Wiring + Pemasangan
LANTAI 4
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA

RAB (RENCANA ANGGARAN BIAYA) page 56 of 1892


Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 Menuju panel penerangan & daya
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 Menuju panel penerangan & daya
Wiring + Pemasangan
4 PANEL SDP LIFT
PANEL SDP LIFT A
Box panel uk. (500 x 400 x 250) mm type wall mounted

RAB (RENCANA ANGGARAN BIAYA) page 57 of 1892


MCCB 50A / 3p / 10kA
MCB 25A / 3p / 6kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 Menuju panel penerangan & daya
Wiring + Pemasangan

B PEKERJAAN PENARIKAN KABEL


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
Penarikan Kabel dari:
1 Panel SDP Penerangan dan Daya Lantai 01 ke LVMDP
Kabel NYY 4 x 25 mm2
2 Panel SDP Penerangan dan Daya Lantai 02 ke LVMDP
Kabel NYY 4 x 25 mm2
3 Panel SDP Penerangan dan Daya Lantai 03 ke LVMDP
Kabel NYY 4 x 25 mm2
4 Panel SDP Penerangan dan Daya Lantai 04 ke LVMDP

RAB (RENCANA ANGGARAN BIAYA) page 58 of 1892


Kabel NYY 4 x 25 mm2
5 Panel SDP Penerangan dan Daya Lantai 05 ke LVMDP
Kabel NYY 4 x 6 mm2

6 Panel SDP Indoor AC Lantai 01 ke Panel SDP AC Lantai 01


Kabel NYY 4 x 6 mm2
7 Panel SDP AC Lantai 01 ke LVMDP
Kabel NYY 4 x 70 mm2
8 Panel SDP Indoor AC Lantai 02 ke Panel SDP AC Lantai 02
Kabel NYY 4 x 6 mm2
9 Panel SDP AC Lantai 02 ke LVMDP
Kabel NYY 4 x 70 mm2
10 Panel SDP Indoor AC Lantai 03 ke Panel SDP AC Lantai 03
Kabel NYY 4 x 6 mm2
11 Panel SDP AC Lantai 03 ke LVMDP
Kabel NYY 4 x 70 mm2
12 Panel SDP Indoor AC Lantai 04 ke Panel SDP AC Lantai 04
Kabel NYY 4 x 6 mm2
13 Panel SDP AC Lantai 04 ke LVMDP
Kabel NYY 4 x 70 mm2

RAB (RENCANA ANGGARAN BIAYA) page 59 of 1892


14 Panel SDP Lift A ke LVMDP
Kabel NYY 4 x 10 mm2

C PEKERJAAN INSTALASI LAMPU DAN KOTAK KONTAK


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Spotlight Led 5W 4000K + Housing
8 Lampu Uplight Pohon 8W 3000K
9 Lampu Barret Led 17W 4000K
10 Saklar Tunggal
11 Saklar Ganda
12 Saklar 3 Gang Switch

RAB (RENCANA ANGGARAN BIAYA) page 60 of 1892


13 Saklar Tukar Tunggal
14 Ekshaust Fan 140 CFM 23W
15 Stop kontak dinding single outlet 220 V
16 Stop kontak dinding double outlet 220 V
17 Stop kontak lantai double outlet 220 V
18 Pipa PVC AW Ø 6"
LANTAI 2
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Spotlight Led 5W 4000K + Housing
8 Lampu Barret Led 17W 4000K
9 Led Strip 2835 IP65 4.8W/m 3000K panjang 22000 mm
10 Led Strip 2835 IP65 4.8W/m 3000K panjang 30299 mm
11 Led Strip 2835 IP65 4.8W/m 3000K panjang 34800 mm
12 Wall Washer 1200mm Led 36W 3000K
13 Exit lamp

RAB (RENCANA ANGGARAN BIAYA) page 61 of 1892


14 Emergency lamp
15 Saklar Tunggal
16 Saklar Ganda
17 Saklar 4 Gang Switch
18 Saklar Tukar Ganda
19 Ekshaust Fan 140 CFM 23W
20 Stop kontak dinding single outlet 220 V
21 Stop kontak dinding double outlet 220 V
22 Stop kontak lantai double outlet 220 V
23 Pipa PVC AW Ø 6"
LANTAI 3
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Spotlight Led 5W 4000K + Housing
8 Lampu Barret Led 17W 4000K
9 Led Strip 2835 IP65 4.8W/m 3000K panjang 22000 mm

RAB (RENCANA ANGGARAN BIAYA) page 62 of 1892


10 Led Strip 2835 IP65 4.8W/m 3000K panjang 30299 mm
11 Led Strip 2835 IP65 4.8W/m 3000K panjang 34800 mm
12 Wall Light Up & Down 14.5W 3000K
13 Exit lamp
14 Emergency lamp
15 Saklar Tunggal
16 Saklar Ganda
17 Saklar 4 Gang Switch
18 Saklar Tukar Ganda
19 Ekshaust Fan 140 CFM 23W
20 Stop kontak dinding single outlet 220 V
21 Stop kontak dinding double outlet 220 V
22 Stop kontak lantai double outlet 220 V
23 Pipa PVC AW Ø 6"
LANTAI 4
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K

RAB (RENCANA ANGGARAN BIAYA) page 63 of 1892


6 Flat Downlight ∅ 95mm 7W 4000K
7 Spotlight Led 5W 4000K + Housing
8 Lampu Barret Led 17W 4000K
9 Led Strip 2835 IP65 4.8W/m 3000K panjang 30299 mm
10 Led Strip 2835 IP65 4.8W/m 3000K panjang 34800 mm
11 Wall Washer 1200mm Led 36W 3000K
12 Exit lamp
13 Emergency lamp
14 Saklar Tunggal
15 Saklar Ganda
16 Saklar 4 Gang Switch
17 Saklar Tukar tunggal
18 Ekshaust Fan 140 CFM 23W
19 Stop kontak dinding single outlet 220 V
20 Stop kontak dinding double outlet 220 V
21 Stop kontak lantai double outlet 220 V
22 Pipa PVC AW Ø 6"
LANTAI 5
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak

RAB (RENCANA ANGGARAN BIAYA) page 64 of 1892


3 TKO TL Led T8 1200 mm 2 x 18W
4 Saklar Tunggal
5 Stop kontak dinding single outlet 220 V

Testing and Commissioning


D PEKERJAAN TELEPON
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x20x0,6mm
5 Handset Telepon
LANTAI 2
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x30x0,6mm
5 Handset Telepon

RAB (RENCANA ANGGARAN BIAYA) page 65 of 1892


LANTAI 3
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x30x0,6mm
5 Handset Telepon
LANTAI 4
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x30x0,6mm
5 Handset Telepon

Testing and Commissioning


E PEKERJAAN LAN
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6

RAB (RENCANA ANGGARAN BIAYA) page 66 of 1892


3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel cat-6 16 port
5 Patch Cord cat-6
6 Switch Hub POE 16 port Managable w/ SFP
7 Optic Terminal Box

LANTAI 2
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel cat-6 16 port
5 Patch Cord cat-6
6 Switch Hub POE 16 port Managable w/ SFP
7 Optic Terminal Box

LANTAI 3
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel cat-6 16 port

RAB (RENCANA ANGGARAN BIAYA) page 67 of 1892


5 Patch Cord cat-6
6 Switch Hub POE 16 port Managable w/ SFP
7 Optic Terminal Box

LANTAI 4
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel 24 port
5 Patch Cord cat-6
6 Switch Hub POE 24 port Managable w/ SFP
7 Optic Terminal Box

Testing and Commissioning

F PEKERJAAN CCTV
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 01
1 Instalasi Cabel UTP cat 6

RAB (RENCANA ANGGARAN BIAYA) page 68 of 1892


2 Dome IP Camera
3 IP Dome Camera w/Vari-focal Lens 2MP 1080p

LANTAI 02
1 Instalasi Cabel UTP cat 6
2 Dome IP Camera
3 IP Dome Camera w/Vari-focal Lens 2MP 1080p

LANTAI 03
1 Instalasi Cabel UTP cat 6
2 Dome IP Camera
3 Switch Hub POE 48 port Managable w/ SFP
4 IP Dome Camera w/Vari-focal Lens 2MP 1080p
5 Patch panel cat-6 48 port
6 Patch Cord cat-6
7 Wiring Management

LANTAI 04
1 Instalasi Cabel UTP cat 6
2 Dome IP Camera

RAB (RENCANA ANGGARAN BIAYA) page 69 of 1892


3 IP Dome Camera w/Vari-focal Lens 2MP 1080p

Testing and Commissioning


G PEKERJAAN TATA SUARA
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm
1 Instalasi ceiling speaker + attenuator kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator

LANTAI 2
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm
1 Instalasi ceiling speaker + attenuator kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator

LANTAI 3
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm

RAB (RENCANA ANGGARAN BIAYA) page 70 of 1892


1 Instalasi ceiling speaker + attenuator kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator

LANTAI 4
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm
1 Instalasi Speaker kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator

Testing and Commissioning


H PEKERJAAN KABEL TRAY
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 01
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm

RAB (RENCANA ANGGARAN BIAYA) page 71 of 1892


6 Elbow tray 300 x 100 mm

LANTAI 02
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm
6 Elbow tray 300 x 100 mm

LANTAI 03
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm
6 Elbow tray 300 x 100 mm

LANTAI 04
1 Kabel tray 400 x 100 mm

RAB (RENCANA ANGGARAN BIAYA) page 72 of 1892


2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm
6 Elbow tray 300 x 100 mm

LANTAI 05
1 Kabel tray 400 x 100 mm
2 Elbow tray 400 x 100 mm

I PEKERJAAN PROJECTOR
LANTAI 01
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

LANTAI 02

RAB (RENCANA ANGGARAN BIAYA) page 73 of 1892


1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

LANTAI 03
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

LANTAI 04
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio

RAB (RENCANA ANGGARAN BIAYA) page 74 of 1892


Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

TOTAL BIAYA PEKERJAAN ELEKTRIKAL


V PEKERJAAN MEKANIKAL
A Instalasi air bersih
LANTAI 1
1 Stop Kran Ø 3/4"
2 Stop Kran Ø 1 1/4"
3 Stop Kran Ø 1"
4 Pipa Suplay Ø 1 1/4" (ground water tank ke rooftank)
5 Pipa Riser Distribusi Ø 1 1/2"
6 Pipa Riser Distribusi Ø 1 1/4"
7 Pipa Riser Distribusi Ø 1"
8 Pipa PVC AW Distribusi dia 1 1/4''
9 Pipa PVC AW Distribusi dia 1''
10 Pipa PVC AW Distribusi dia 3/4''
11 Pompa transfer
Total head : 50 m

RAB (RENCANA ANGGARAN BIAYA) page 75 of 1892


Debit : 70 liter/menit
12 Panel kontrol pompa transfer
Flexible joint, pressure guage, pressure switch, check valve, gate v

13 Fitting + Supporting
LANTAI 2
1 Stop Kran Ø 3/4"
2 Stop Kran Ø 1 1/4"
3 Stop Kran Ø 1"
4 Pipa Riser Distribusi Ø 1 1/2"
5 Pipa Riser Distribusi Ø 1 1/4"
6 Pipa Riser Distribusi Ø 1"
7 Pipa PVC AW Distribusi dia 1 1/4''
8 Pipa PVC AW Distribusi dia 1''
9 Pipa PVC AW Distribusi dia 3/4''
10 Fitting + Supporting
LANTAI 3
1 Stop Kran Ø 3/4"
2 Stop Kran Ø 1 1/4"
3 Stop Kran Ø 1"

RAB (RENCANA ANGGARAN BIAYA) page 76 of 1892


4 Pipa Riser Distribusi Ø 1 1/2"
5 Pipa Riser Distribusi Ø 1 1/4"
6 Pipa Riser Distribusi Ø 1"
7 Pipa PVC AW Distribusi dia 1 1/4''
8 Pipa PVC AW Distribusi dia 1''
9 Pipa PVC AW Distribusi dia 3/4''
10 Fitting + Supporting
LANTAI 4
1 Stop Kran Ø 3/4"
2 Stop Kran Ø 1 1/4"
3 Stop Kran Ø 1"
4 Pipa Riser Distribusi Ø 1 1/2"
5 Pipa Riser Distribusi Ø 1 1/4"
6 Pipa Riser Distribusi Ø 1"
7 Pipa PVC AW Distribusi dia 1 1/4''
8 Pipa PVC AW Distribusi dia 1''
9 Pipa PVC AW Distribusi dia 3/4''
10 Fitting + Supporting
LANTAI 05
1 Stop kran Ø 2"

RAB (RENCANA ANGGARAN BIAYA) page 77 of 1892


2 Stop kran Ø 1 1/2"
3 Stop kran Ø 1 1/4"
4 Pipa header Ø 3"
5 Pipa PVC AW Distribusi Ø 2"
6 Pipa PVC AW Distribusi Ø 1 1/2"
7 Pipa PVC AW Distribusi Ø 1 1/4"
8 Pipa PVC AW Distribusi Ø 1"
9 Pipa PVC AW Kuras Ø 2"
10 Rooftank kap 2000 liter + automatic
11 Rooftank kap 1000 liter + automatic
12 Dudukan rooftank cor beton kosong 1pc : 3ps : 5 sp
13 Instalasi autoswitch kabel NYY 2x2.5 mm2
14 Pompa booster
Total head : 12 m
Debit : 40 liter/menit, include : header,
flexible, pressure guage, pressure switch, check valve, gate valve,
base frame, panel kontrol, 1 set terdiri dari 2 pompa
15 Fitting + Supporting

Testing and Commissioning

RAB (RENCANA ANGGARAN BIAYA) page 78 of 1892


B Instalasi Air Bekas
LANTAI 1
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC AW riser Ø 3"
5 Sumur resapan air bekas
6 Fitting + Supporting
LANTAI 2
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC AW riser Ø 3"
5 Fitting + Supporting
LANTAI 3
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC AW riser Ø 3"
5 Fitting + Supporting

RAB (RENCANA ANGGARAN BIAYA) page 79 of 1892


LANTAI 4
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC D vent Ø 2"
5 Fitting + Supporting
C Instalasi Air Kotor
LANTAI 1
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa PVC AW riser Ø 4"
5 Sumur resapan air kotor
6 Bio septick tank kap 4 m3
7 Fitting + Supporting
LANTAI 2
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa riser PVC AW Ø 4"

RAB (RENCANA ANGGARAN BIAYA) page 80 of 1892


5 Fitting + Supporting
LANTAI 3
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa riser PVC AW Ø 4"
5 Fitting + Supporting
LANTAI 4
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa riser PVC AW Ø 4"
5 Fitting + Supporting
D Peralatan saniter
LANTAI 1
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer
RAB (RENCANA ANGGARAN BIAYA) page 81 of 1892
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Kitchen zink + kran
11 Pegangan stainless steel (untuk toilet difabel)
LANTAI 2
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Pegangan stainless steel (untuk toilet difabel)
LANTAI 3
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
RAB (RENCANA ANGGARAN BIAYA) page 82 of 1892
5 Kloset duduk difabel
6 Jet washer
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Pegangan stainless steel (untuk toilet difabel)
LANTAI 4
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Pegangan stainless steel (untuk toilet difabel)
E Instalasi Air Hujan
LANTAI 2
1 Pipa PVC AW Ø 2"

RAB (RENCANA ANGGARAN BIAYA) page 83 of 1892


2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Floordrain Ø 2"
5 Gutter (uk. 100 x 50 mm)
LANTAI 3
1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Floordrain Ø 2"
5 Gutter (uk. 100 x 50 mm)
LANTAI 4
1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Floordrain Ø 2"
5 Gutter (uk. 100 x 50 mm)
LANTAI 5
1 Pipa PVC AW Ø 4"
2 Pipa PVC AW Ø 5"
3 Roofdrain Ø 4"

RAB (RENCANA ANGGARAN BIAYA) page 84 of 1892


4 Roofdrain Ø 5"
5 Gutter (uk. 100 x 50 mm)
Lantai Atap
1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Roofdrain Ø 4"
4 Gutter (uk. 100 x 50 mm)
F PEKERJAAN TATA UDARA
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 153.000 Btu/h
4 Outdoor Unit 232.000 Btu/h
5 Outdoor Unit 267.000 Btu/h
6 Ceiling Mounted Cassette kap 19.100 Btu/h
7 Ceiling Mounted Cassette kap 24.200 Btu/h
8 Ceiling Mounted Cassette kap 36.200 Btu/h
9 Ceiling Mounted Cassette kap 47.800 Btu/h

RAB (RENCANA ANGGARAN BIAYA) page 85 of 1892


10 Slim Mounted Duct kap 7.500 Btu/h
11 Refrigerant Joint Pipe
12 Wired Remote Controller
13 Aksesoris cover panel
14 Pipa Drain Ø 32 mm

LANTAI 2
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 267.000 Btu/h
4 Outdoor Unit 365.000 Btu/h
5 Ceiling Mounted Cassette kap 19.100 Btu/h
6 Ceiling Mounted Cassette kap 24.200 Btu/h
7 Ceiling Mounted Cassette kap 36.200 Btu/h
8 Ceiling Mounted Cassette kap 47.800 Btu/h
9 Slim Mounted Duct kap 7.500 Btu/h
10 Refrigerant Joint Pipe
11 Wired Remote Controller
12 Aksesoris cover panel
13 Pipa Drain Ø 32 mm

RAB (RENCANA ANGGARAN BIAYA) page 86 of 1892


LANTAI 3
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 267.000 Btu/h
4 Outdoor Unit 365.000 Btu/h
5 Ceiling Mounted Cassette kap 19.100 Btu/h
6 Ceiling Mounted Cassette kap 24.200 Btu/h
7 Ceiling Mounted Cassette kap 36.200 Btu/h
8 Ceiling Mounted Cassette kap 47.800 Btu/h
9 Slim Mounted Duct kap 7.500 Btu/h
10 Refrigerant Joint Pipe
11 Wired Remote Controller
12 Aksesoris cover panel
13 Pipa Drain Ø 32 mm

LANTAI 4
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 249.000 Btu/h

RAB (RENCANA ANGGARAN BIAYA) page 87 of 1892


4 Outdoor Unit 267.000 Btu/h
5 Outdoor Unit 365.000 Btu/h
6 Ceiling Mounted Cassette kap 19.100 Btu/h
7 Ceiling Mounted Cassette kap 24.200 Btu/h
8 Ceiling Mounted Cassette kap 36.200 Btu/h
9 Ceiling Mounted Cassette kap 47.800 Btu/h
10 Slim Mounted Duct kap 7.500 Btu/h
11 Refrigerant Joint Pipe
12 Wired Remote Controller
13 Aksesoris cover panel
14 Pipa Drain Ø 32 mm

LANTAI 5
1 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
2 Indoor unit split type kap 1 PK
3 Pipa Drain Ø 32 mm
4 Pipa refrigerant Ø 1/4"
5 Pipa refrigerant Ø 1/2"

Testing and Commissioning

RAB (RENCANA ANGGARAN BIAYA) page 88 of 1892


G PEKERJAAN TRANSPORTASI VERTIKAL (LIFT)
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
1 Pekerjaan Lift
(Kapasitas 11 orang, 4 lantai, 800 kg)
Speed : 1 m/s
Include ARD
2 Testing and Commissioning

TOTAL BIAYA PEKERJAAN MEKANIKAL


TOTAL BIAYA BANGUNAN A
III BANGUNAN B (AS 9-28/ A-M)
PEKERJAAN STRUKTUR
A PEKERJAAN GALIAN DAN URUGAN
1 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm samp
2 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm samp
3 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm samp
4 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm lebih
5 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
6 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
RAB (RENCANA ANGGARAN BIAYA) page 89 of 1892
7 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
8 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm lebih
9 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
10 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
11 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
12 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm lebih
13 Urug tanah kembali bekas galian footplat+pondasi cor beton, dipad
14 Urug pasir bawah pondasi cor beton, t : 100 mm

- LIFT KHUSUS
1 Galian pondasi pit lift, sampai 1m
2 Galian pondasi pit lift, sampai 2m

- LIFT KARYAWAN
1 Galian pondasi pit lift, sampai 1m
2 Galian pondasi pit lift, sampai 2m
3 Galian pondasi pit lift, sampai 3m

- LIFT BARANG
1 Galian pondasi pit lift, sampai 1m
2 Galian pondasi pit lift, sampai 2m
3 Galian pondasi pit lift, sampai 3m

RAB (RENCANA ANGGARAN BIAYA) page 90 of 1892


BIAYA PEKERJAAN GALIAN DAN URUGAN
B PEKERJAAN BETON
LANTAI 1
1 Cor rabat bawah lantai tebal = 100 mm
1 pc : 3 ps : 5 sp
2 Cor rabat bawah pondasi beton tebal = 100 mm
1 pc : 3 ps : 5 sp
- LIFT KHUSUS
3 Pondasi cor beton, mutu beton f'c 25 Mpa + stek besi D13 mm
4 Cor pondasi pit lift t : 300 mm, mutu beton f'c 25 MPa
5 Cor dinding beton t : 200 mm, mutu beton f'c 25 MPa
6 Cor dinding beton t : 250 mm, mutu beton f'c 25 MPa
- LIFT KARYAWAN
7 Pondasi cor beton, mutu beton f'c 25 Mpa + stek besi D13 mm
8 Cor pondasi pit lift t : 300 mm, mutu beton f'c 25 MPa
9 Cor dinding beton t : 250 mm, mutu beton f'c 25 MPa
- LIFT BARANG
10 Pondasi cor beton, mutu beton f'c 25 Mpa + stek besi D13 mm
11 Cor pondasi pit lift t : 300 mm, mutu beton f'c 25 MPa
12 Cor dinding beton t : 250 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 91 of 1892


13 Cor dinding beton DB1 t : 200 mm, mutu beton f'c 25 MPa

14 Pondasi cor beton 3500 x 3500 mm, mutu beton f'c 15 Mpa + stek b
15 Pondasi cor beton 3100 x 3100 mm, mutu beton f'c 15 Mpa + stek b
16 Pondasi cor beton 3100 x 3100 mm, mutu beton f'c 15 Mpa + stek b
17 Cor footplat F1 2600 x 2600 mm, mutu beton f'c 25 MPa
18 Cor footplat F2 2200 x 2200 mm, mutu beton f'c 25 MPa
19 Cor footplat F3 2200 x 2200 mm, mutu beton f'c 25 MPa
20 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
21 Cor kolom K2 - 1000x1000 mm, mutu beton f'c 25 MPa
22 Cor kolom K7 - SESUAI DETAIL, mutu beton f'c 25 MPa
23 Cor kolom K9 - SESUAI DETAIL, mutu beton f'c 25 MPa
24 Cor sloof S1 - 400x600 mm, mutu beton f'c 25 MPa
25 Cor sloof S2 - 350x500 mm, mutu beton f'c 25 MPa
26 Cor sloof S1 - 400x600 mm, mutu beton f'c 25 MPa
27 Cor sloof S2 - 350x500 mm, mutu beton f'c 25 MPa
28 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
29 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
30 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
31 Cor balok miring B2 - 400x600 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 92 of 1892


32 Cor balok miring B3 - 300x600 mm, mutu beton f'c 25 MPa

33 Cor tangga beton tebal plat bordes 200 mm, mutu beton f'c 25 M

Elevasi (- 4.200) - (± 0.000)


34 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

35 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M
36 Plat A0 tebal 120 mm, mutu beton f'c 25 MPa

37 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

38 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

39 Waterproofing dinding beton


40 Waterstop

LANTAI 2
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K2 - 1000x1000 mm, mutu beton f'c 25 MPa
3 Cor kolom K7 - SESUAI DETAIL, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 93 of 1892


4 Cor kolom K9 - SESUAI DETAIL, mutu beton f'c 25 MPa
5 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
6 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
7 Cor balok B1b - 400x600 mm, mutu beton f'c 25 MPa
8 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
9 Cor balok B2a - 400x700 mm, mutu beton f'c 25 MPa
10 Cor balok B2b - 400x600 mm, mutu beton f'c 25 MPa
11 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
12 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
13 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
14 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
15 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
16 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
17 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
18 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
19 Cor balok B12 - 200x400 mm, mutu beton f'c 25 MPa
20 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
21 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

22 Cor tangga beton tebal plat bordes 200 mm, mutu beton f'c 25 M

RAB (RENCANA ANGGARAN BIAYA) page 94 of 1892


Elevasi (± 0.000) - (+ 4.200)
23 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

24 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

25 Cor tangga beton, mutu beton f'c 25 Mpa

26 Cor tangga beton, mutu beton f'c 25 Mpa

27 Cor beton meja pantry, tebal = 100 mm 1pc : 3 ps : 5sp


LANTAI 3
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K2 - 1000x1000 mm, mutu beton f'c 25 MPa
3 Cor kolom K7 - SESUAI DETAIL, mutu beton f'c 25 MPa
4 Cor kolom K9 - SESUAI DETAIL, mutu beton f'c 25 MPa
5 Cor kolom K10 - SESUAI DETAIL, mutu beton f'c 25 MPa
6 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
7 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
8 Cor balok B1b - 400x600 mm, mutu beton f'c 25 MPa
9 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
10 Cor balok B2a - 400x700 mm, mutu beton f'c 25 MPa
11 Cor balok B2b - 400x600 mm, mutu beton f'c 25 MPa
RAB (RENCANA ANGGARAN BIAYA) page 95 of 1892
12 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
13 Cor balok B3a - 300x600 mm, mutu beton f'c 25 MPa
14 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
15 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
16 Cor balok B5a - 300x700 mm, mutu beton f'c 25 MPa
17 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
18 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
19 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
20 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
21 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
22 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
23 Cor balok B12 - 200x400 mm, mutu beton f'c 25 MPa
24 Cor balok B13 - 400x600/450 mm, mutu beton f'c 25 MPa
25 Cor balok B14 - 300x450 mm, mutu beton f'c 25 MPa
26 Cor balok L1 - 150x700 mm, mutu beton f'c 25 MPa

27 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


28 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
29 Cor balok B15 - (Sesuai Detail), mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 96 of 1892


30 Cor tangga beton tebal plat bordes 200 mm, mutu beton f'c 25 M

Elevasi (+ 4.200) - (+ 8.400)


31 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

32 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

33 Plat A1 tebal 150 mm, mutu beton f'c 25 Mpa

34 Cor beton meja pantry, tebal = 100 mm 1pc : 3 ps : 5sp


LANTAI 4
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
3 Cor kolom K2 - 1000x1000 mm, mutu beton f'c 25 MPa
4 Cor kolom K9 - SESUAI DETAIL, mutu beton f'c 25 MPa
5 Cor kolom K10 - SESUAI DETAIL, mutu beton f'c 25 MPa
6 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
7 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
8 Cor balok B1b - 400x600 mm, mutu beton f'c 25 MPa
9 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
10 Cor balok B2b - 400x600 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 97 of 1892


11 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
12 Cor balok B3a - 300x700 mm, mutu beton f'c 25 MPa
13 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
14 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
15 Cor balok B5a - 300x700 mm, mutu beton f'c 25 MPa
16 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
17 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
18 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
19 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
20 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
21 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
22 Cor balok B12 - 200x400 mm, mutu beton f'c 25 MPa
23 Cor balok L2 - 150x600 mm, mutu beton f'c 25 MPa

24 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa


25 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
26 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
27 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
28 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
29 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 98 of 1892


30 Cor balok B10b - 200x600 mm, mutu beton f'c 25 MPa

31 Cor tangga beton tebal plat bordes 200 mm, mutu beton f'c 25 M

Elevasi (+ 12.600) - (+ 16.800)


32 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

33 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

34 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

35 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

36 Cor beton meja pantry, tebal = 100 mm 1pc : 3 ps : 5sp


LANTAI 5
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K2 - 1000x1000 mm, mutu beton f'c 25 MPa
3 Cor kolom K9 - SESUAI DETAIL, mutu beton f'c 25 MPa
4 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
5 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
6 Cor kolom K2 - 1000x1000 mm, mutu beton f'c 25 MPa
7 Cor kolom K6 - 300x400 mm, mutu beton f'c 25 MPa
RAB (RENCANA ANGGARAN BIAYA) page 99 of 1892
8 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
9 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
10 Cor balok B1b - 400x600 mm, mutu beton f'c 25 MPa
11 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
12 Cor balok B2b - 400x600 mm, mutu beton f'c 25 MPa
13 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
14 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
15 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
16 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
17 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
18 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
19 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
20 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
21 Cor balok B17 - (Sesuai detail) mm, mutu beton f'c 25 MPa
22 Cor balok L2 - 150x600 mm, mutu beton f'c 25 MPa

23 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa

24 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


25 Cor balok B1b - 400x600 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 100 of 1892


26 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
27 Cor balok B2b - 400x600 mm, mutu beton f'c 25 MPa
28 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
29 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
30 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
31 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
32 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
33 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
34 Cor balok L2 - 150x600 mm, mutu beton f'c 25 MPa

35 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


36 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
37 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
38 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
39 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
40 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa

41 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


42 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
43 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 101 of 1892


44 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa

45 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


46 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
47 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
48 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
49 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
50 Cor balok B7 - 700x1400/1000 mm, mutu beton f'c 25 MPa
51 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
52 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
53 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
54 Cor balok B10d - 200x600 mm, mutu beton f'c 25 MPa
55 Cor balok L2 - 150x600 mm, mutu beton f'c 25 MPa

56 Cor balok B19 - 800x400 mm, mutu beton f'c 25 MPa


57 Cor balok B22 - (SESUAI DETAIL), mutu beton f'c 25 MPa
58 Cor balok B20 - 400x750 mm, mutu beton f'c 25 MPa
59 Cor balok B21 - 400x550 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 102 of 1892


60 Cor tangga beton tebal plat bordes 200 mm, mutu beton f'c 25 M

61 Cor tangga beton tebal plat bordes 200 mm, mutu beton f'c 25 M

62 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

63 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

64 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

65 Plat A4 tebal 250 mm, mutu beton f'c 25 MPa

66 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

67 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

68 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

69 Plat A2 tebal 200 mm, mutu beton f'c 25 MPa

70 Plat A4 tebal 250 mm, mutu beton f'c 25 MPa


71 Plat tangga kubah, tebal 150 mm, mutu beton f'c 25 Mpa

RAB (RENCANA ANGGARAN BIAYA) page 103 of 1892


72 Cor beton meja pantry, tebal = 100 mm 1pc : 3 ps : 5sp
C PEKERJAAN RAMP
1 Galian pondasi footplat sampai 1 m
2 Galian pondasi footplat sampai 2 m
3 Urug pasir bawah footplat, t : 100 mm
4 Urug pasir bawah ramp t : 100 mm
5 Urug tanah kembali bekas galian footplat + pemadatan
6 Urug tanah baru peninggian ramp + pemadatan
7 Anti rayap galian footplat
8 Cor rabat beton bawah footplat, t : 100 mm 1pc : 3ps : 5kr
9 Cor rabat beton bawah ramp, t : 100 mm 1pc : 3ps : 5kr
10 Cor footplat t : 300 mm , mutu beton f'c 25 MPa
11 Cor dinding beton ramp t : 150 mm, mutu beton f'c 25 MPa
12 Cor dinding beton pot tanaman t : 150 mm, mutu beton f'c 25 MPa
13 Cor plat beton ramp t : 120 mm, mutu beton f'c 25 MPa
14 Besi P10 - 500 mm dan Siku L 50x50x5 mm

BIAYA PEKERJAAN BETON


D PEKERJAAN DILATASI
- (ELEVASI - 0.050)
1 Elastomeric rubber tebal 2x50 mm
2 Cairan pengisi Dilatasi
3 Besi siku L 50.50.5 mm
RAB (RENCANA ANGGARAN BIAYA) page 104 of 1892
4 Dynabolt Ø 10 mm
5 Plat galvanis tebal 0.45 mm

- (ELEVASI + 4.150)
1 Elastomeric rubber tebal 2x50 mm
2 Cairan pengisi Dilatasi
3 Besi siku L 50.50.5 mm
4 Dynabolt Ø 10 mm
5 Plat galvanis tebal 0.45 mm

- (ELEVASI + 8.350)
1 Elastomeric rubber tebal 2x50 mm
2 Cairan pengisi Dilatasi
3 Besi siku L 50.50.5 mm
4 Dynabolt Ø 10 mm
5 Plat galvanis tebal 0.45 mm

- (ELEVASI + 11.600)
1 Elastomeric rubber tebal 2x50 mm
2 Cairan pengisi Dilatasi
3 Besi siku L 50.50.5 mm
4 Dynabolt Ø 10 mm
5 Plat galvanis tebal 0.45 mm

RAB (RENCANA ANGGARAN BIAYA) page 105 of 1892


BIAYA PEKERJAAN DILATASI
TOTAL BIAYA PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTUR
A PEKERJAAN GALIAN DAN URUGAN
1 Galian pondasi batu kali 1 m
2 Urugan pasir bawah pondasi batu kali tebal = 100 mm
3 Urugan pasir bawah lantai tebal = 100 mm
4 Urugan kembali galian pondasi + pemadatan
5 Urugan tanah peninggian peil lantai dengan tanah bekas galian + p
6 Urugan tanah baru peninggian peil bangunan + pemadatan
BIAYA PEKERJAAN GALIAN DAN URUGAN
B PEKERJAAN ANTI RAYAP
1 Anti rayap galian pondasi batu kali
2 Anti rayap bawah lantai
BIAYA PEKERJAAN ANTI RAYAP
C PEKERJAAN BETON PRAKTIS
LANTAI 1
1 Sloof praktis SP1, ukuran = 100 x 200 mm
2 Sloof praktis SP2, ukuran = 120 x 200 mm

RAB (RENCANA ANGGARAN BIAYA) page 106 of 1892


3 Kolom praktis KP02, ukuran = 120 x 120 mm
4 Kolom praktis KP01, ukuran = 100 x 100 mm
5 Balok praktis BP01, ukuran = 100 x 100 mm
6 Balok praktis BP02, ukuran = 120 x 120 mm
7 Balok latiu BL1 100x100 mm
8 Balok latiu BL2 120x120 mm
9 Balok latiu BL3 100x400 mm

LANTAI 2
1 Kolom praktis KP02, ukuran = 120 x 120 mm
2 Kolom praktis KP01, ukuran = 100 x 100 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm
5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm

LANTAI 3
1 Kolom praktis KP02, ukuran = 120 x 120 mm
2 Kolom praktis KP01, ukuran = 100 x 100 mm

RAB (RENCANA ANGGARAN BIAYA) page 107 of 1892


3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm
5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm

LANTAI 4
1 Kolom praktis KP02, ukuran = 120 x 120 mm
2 Kolom praktis KP01, ukuran = 100 x 100 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm
5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm

LANTAI 5
1 Kolom praktis KP02, ukuran = 120 x 120 mm
2 Kolom praktis KP01, ukuran = 100 x 100 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm

RAB (RENCANA ANGGARAN BIAYA) page 108 of 1892


5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm
8 Balok latiu BL4 100x300 mm

LANTAI 6
1 Kolom praktis KP01, ukuran = 100 x 100 mm
2 Balok praktis BP01, ukuran = 100 x 100 mm
3 Balok latiu BL1 100x100 mm
BIAYA PEKERJAAN BETON PRAKTIS
D PEKERJAAN PASANGAN DAN PLESTERAN
LANTAI 1
1 Pasangan pondasi batu kali 1pc : 6ps
2 Pasangan rollag
3 Pasangan dinding bata ringan
4 Plesteran dinding bata ringan tebal 10 mm
5 Acian dinding bata ringan
6 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
7 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
8 Pasangan dinding 1/2 bata merah 1 pc : 6 ps

RAB (RENCANA ANGGARAN BIAYA) page 109 of 1892


9 Plesteran dinding 1/2 bata merah 1 pc : 6 ps
10 Acian dinding bata merah
11 Plester dan acian beton (kolom dan balok, lisplank)
12 Plesteran tali air
13 Plesteran skoning
14 Plesteran ban-banan
15 Wallfiller plat tangga
16 Wallfiller plat lantai

LANTAI 2
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Pasangan dinding 1/2 bata merah 1 pc : 6 ps
7 Plesteran dinding 1/2 bata merah 1 pc : 6 ps
8 Acian dinding bata merah
9 Plester dan acian beton (kolom dan balok, lisplank)
10 Plesteran tali air

RAB (RENCANA ANGGARAN BIAYA) page 110 of 1892


11 Plesteran skoning
12 Wallfiller plat tangga

LANTAI 3
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Pasangan dinding 1/2 bata merah 1 pc : 6 ps
7 Plesteran dinding 1/2 bata merah 1 pc : 6 ps
8 Acian dinding bata merah
9 Plester dan acian beton (kolom dan balok, lisplank)
10 Plesteran tali air
11 Plesteran skoning
12 Wallfiller plat tangga
13 Screeding plat + kawat ayam
LANTAI 4
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm

RAB (RENCANA ANGGARAN BIAYA) page 111 of 1892


3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Pasangan dinding 1/2 bata merah 1 pc : 6 ps
7 Plesteran dinding 1/2 bata merah 1 pc : 6 ps
8 Acian dinding bata merah
9 Plester dan acian beton (kolom dan balok, lisplank)
10 Plesteran tali air
11 Plesteran skoning
12 Wallfiller plat tangga
13 Wallfiller plat

LANTAI 5
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Pasangan dinding 1/2 bata merah 1 pc : 6 ps
7 Plesteran dinding 1/2 bata merah 1 pc : 6 ps

RAB (RENCANA ANGGARAN BIAYA) page 112 of 1892


8 Acian dinding bata merah
9 Plester dan acian beton (kolom dan balok, lisplank)
10 Plesteran tali air
11 Plesteran skoning
12 Wallfiller plat tangga
13 Screeding plat + kawat ayam
LANTAI 6
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 6 ps
5 Plesteran dinding 1/2 bata merah 1 pc : 6 ps
6 Acian dinding bata merah
7 Plester dan acian beton (kolom dan balok)
8 Plesteran tali air
9 Plesteran skoning
10 Wallfiller plat lantai
11 Screeding plat atap dak + kawat ayam

BIAYA PEKERJAAN PASANGAN DAN PLESTERAN

RAB (RENCANA ANGGARAN BIAYA) page 113 of 1892


E PEKERJAAN PINTU DAN JENDELA
LANTAI 1
1 Pintu P01
2 Pintu P02
3 Pintu P05
4 Pintu P08
5 Pintu P09
6 Pintu Shaft PSH
7 Pintu Jendela PJ01
8 Jendela J03
9 Jendela J04
10 Jendela J05
11 Bouvent BV03
12 Bouvent BV04
13 Bouvent BV05
14 Bouvent BV06
15 Bouvent BV07
16 Curtainwall 01 dari elv. - 2.100 s/d elv + 13.850
17 Curtainwall 02 dari elv. - 2.100 s/d elv + 20.200
18 Curtainwall 05 dari elv. - 3.100 s/d elv + 5.550

RAB (RENCANA ANGGARAN BIAYA) page 114 of 1892


LANTAI 2
1 Pintu Utama PU01
2 Pintu P01
3 Pintu P03
4 Pintu P04
5 Pintu P05
6 Pintu P07
7 Pintu P08
8 Pintu P09
9 Pintu Shaft PSH
10 Jendela J01
11 Jendela J03
12 Jendela J04
13 Jendela J05
14 Jendela J06
15 Bouvent BV02
16 Bouvent BV03
17 Bouvent BV04
18 Bouvent BV05

RAB (RENCANA ANGGARAN BIAYA) page 115 of 1892


19 Bouvent BV06
20 Bouvent BV07
21 Bouvent BV08
22 Bouvent BV09
23 Bouvent BV10
24 Curtainwall 06 dari elv. 0.000 s/d elv + 12.400

LANTAI 3
1 Pintu P01
2 Pintu P02
3 Pintu P03
4 Pintu P04
5 Pintu P05
6 Pintu P07
7 Pintu P08
8 Pintu P09
9 Pintu Shaft PSH
10 Jendela J01
11 Jendela J03
12 Jendela J04

RAB (RENCANA ANGGARAN BIAYA) page 116 of 1892


13 Jendela J05
14 Bouvent BV02
15 Bouvent BV03
16 Bouvent BV04
17 Bouvent BV05
18 Bouvent BV06
19 Bouvent BV07
20 Bouvent BV08
21 Bouvent BV09
22 Bouvent BV10
23 Curtainwall 07 dari elv. +4.200 s/d elv + 11.950

LANTAI 4
1 Pintu P01
2 Pintu P02
3 Pintu P03
4 Pintu P04
5 Pintu P05
6 Pintu P07
7 Pintu P08

RAB (RENCANA ANGGARAN BIAYA) page 117 of 1892


8 Pintu P09
9 Pintu P10
10 Pintu Shaft PSH
11 Jendela J01
12 Jendela J02
13 Jendela J03
14 Jendela J04
15 Jendela J05
16 Jendela J08
17 Bouvent BV01
18 Bouvent BV02
19 Bouvent BV03
20 Bouvent BV04
21 Bouvent BV05
22 Bouvent BV06
23 Bouvent BV07
24 Bouvent BV11
25 Bouvent BV12
26 Bouvent BV13
27 Bouvent BV14

RAB (RENCANA ANGGARAN BIAYA) page 118 of 1892


28 Bouvent BV15
29 Bouvent BV16
30 Bouvent BV17
31 Pintu Bouvent PBV02

LANTAI 5
1 Pintu P01
2 Pintu P02
3 Pintu P04
4 Pintu P05
5 Pintu P07
6 Pintu P08
7 Pintu P09
8 Pintu P11
9 Pintu P12
10 Pintu Shaft PSH
11 Pintu Bouvent PBV01
12 Pintu Jendela PJ03
13 Pintu Jendela PJ04
14 Jendela J01

RAB (RENCANA ANGGARAN BIAYA) page 119 of 1892


15 Jendela J04
16 Jendela J05
17 Jendela J09
18 Jendela J10
19 Bouvent BV02
20 Bouvent BV03
21 Bouvent BV04
22 Bouvent BV05

LANTAI 6
1 Pintu besi PB01
2 Pintu besi PB02
3 Pintu besi PB03
4 Pintu Shaft PSH
5 Pintu Jendela PJ05
6 Bouvent BV02
7 Bouvent BV03

BIAYA PEKERJAAN PINTU DAN JENDELA


F PEKERJAAN PLAFON

RAB (RENCANA ANGGARAN BIAYA) page 120 of 1892


LANTAI 1
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Plafond gypsum tebal 12 mm rangka metal furing
3 Plafond gypsum tebal 12 mm rangka metal furing
4 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing
5 Shadow line
6 Maintenance hole 600 x 600 mm
LANTAI 2
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Plafond gypsum tebal 12 mm rangka metal furing
3 Plafond gypsum tebal 12 mm rangka metal furing
4 Plafond gypsum tebal 12 mm rangka metal furing
5 Shadow line
6 Maintenance hole 600 x 600 mm
LANTAI 3
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Plafond gypsum tebal 12 mm rangka metal furing
3 Plafond gypsum tebal 12 mm rangka metal furing
4 Shadow line
5 Maintenance hole 600 x 600 mm

RAB (RENCANA ANGGARAN BIAYA) page 121 of 1892


LANTAI 4
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Plafond gypsum tebal 12 mm rangka metal furing
3 Plafond gypsum tebal 12 mm rangka metal furing
4 Shadow line
5 Maintenance hole 600 x 600 mm
LANTAI 5
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Plafond gypsum tebal 12 mm rangka metal furing
3 Plafond gypsum tebal 12 mm rangka metal furing
4 Plafond akustik tebal 12,5 mm rangka metal furing
5 Drop ceiling plafond akustik tebal 12,5 mm rangka metal furing
6 Shadow line
7 Maintenance hole 600 x 600 mm
LANTAI 6
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Shadow line

PERKUATAN PLAFON
1 Lipped channel 150 x 50 x 20 x 2.3 mm

RAB (RENCANA ANGGARAN BIAYA) page 122 of 1892


2 Plat besi tebal 8 mm
3 Dynabolt Ø 12 mm

BIAYA PEKERJAAN PLAFON


G PEKERJAAN PARTISI GYPSUM, PARTISI KACA, WORK STATIO
LANTAI 2
1 Partisi Gypsum PR11
2 Partisi Gypsum PR12
3 Partisi Gypsum PR13
4 Partisi Gypsum PR14
5 Partisi Gypsum PR15
6 Partisi Gypsum PR16
7 Partisi Gypsum PR17
8 Partisi Gypsum PR18
9 Partisi Gypsum PR19
10 Partisi Gypsum PR20
11 Partisi Gypsum PR21
12 Partisi Kaca PK01
13 Partisi Kaca PK03
14 Partisi Kaca PK04

RAB (RENCANA ANGGARAN BIAYA) page 123 of 1892


15 Partisi Kaca PK05
16 Work Station WS 10
17 Work Station WS 11
18 Work Station WS 12
19 Work Station WS 13
20 Work Station WS 14
21 Work Station WS 15
LANTAI 3
1 Partisi Gypsum PR11
2 Partisi Gypsum PR12
3 Partisi Gypsum PR13
4 Partisi Gypsum PR14
5 Partisi Gypsum PR15
6 Partisi Gypsum PR16
7 Partisi Gypsum PR17
8 Partisi Gypsum PR18
9 Partisi Gypsum PR19
10 Partisi Gypsum PR20
11 Partisi Gypsum PR21
12 Partisi Kaca PK01

RAB (RENCANA ANGGARAN BIAYA) page 124 of 1892


13 Partisi Kaca PK03
14 Partisi Kaca PK04
15 Partisi Kaca PK05
16 Work Station WS 10
17 Work Station WS 11
18 Work Station WS 12
19 Work Station WS 13
20 Work Station WS 14
21 Work Station WS 15
LANTAI 4
1 Partisi Gypsum PR02
2 Partisi Gypsum PR11
3 Partisi Gypsum PR12
4 Partisi Gypsum PR14
5 Partisi Gypsum PR19
6 Partisi Gypsum PR20
7 Partisi Gypsum PR22
8 Partisi Gypsum PR23
9 Partisi Gypsum PR24
10 Partisi Gypsum PR25

RAB (RENCANA ANGGARAN BIAYA) page 125 of 1892


11 Partisi Gypsum PR26
12 Partisi Gypsum PR27
13 Partisi Gypsum PR28
14 Partisi Gypsum PR29
15 Partisi Gypsum PR30
16 Partisi Gypsum PR31
17 Partisi Gypsum PR32
18 Partisi Gypsum PR33
19 Partisi Gypsum PR34
20 Partisi Kaca PK01
21 Partisi Kaca PK05
22 Partisi Kaca PK06
23 Partisi Kaca PK07
24 Partisi Kaca PK08
25 Partisi Kaca PK09
26 Partisi Kaca PK10
27 Partisi Kaca PK11
28 Partisi Kaca PK12
29 Partisi Kaca PK13
30 Partisi Kaca PK14

RAB (RENCANA ANGGARAN BIAYA) page 126 of 1892


31 Partisi Kaca PK15
32 Partisi Kaca PK16
33 Partisi Kaca PK17
34 Work Station WS 11
35 Work Station WS 12
36 Work Station WS 14
37 Work Station WS 15
38 Work Station WS 16
39 Work Station WS 17
LANTAI 5
1 Partisi Gypsum PR35
2 Partisi Kaca PK18
3 Partisi Kaca PK19
4 Partisi Geser PG

BIAYA PEKERJAAN PARTISI


H PEKERJAAN FINISHING LANTAI DAN DINDING
LANTAI 01

1 Floor Hardener + Finishing Epoxy


2 Homogeneous Tile Polished Tipe A 600 x 600 mm ( Warna hitam )

RAB (RENCANA ANGGARAN BIAYA) page 127 of 1892


3 Homogeneous Tile Semipolished / Lappato Tipe C 600 x 600 mm (
4 Homogeneous Tile Matt Tipe B 600 x 600 mm
5 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
6 Plint Homogeneous Tile 80 x 600 mm
7 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
8 Homogeneous Tile Matt dinding Km/Wc 300 x 600 mm
9 Homogeneous Tile 300 x 600 jumplift
10 Homogeneous Tile finishing meja pantry 300 x 600 mm
11 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

LANTAI 02

1 Floor Hardener + Finishing Epoxy


2 Homogeneous Tile Polished Tipe A 600 x 600 mm ( Warna hitam )
3 Homogeneous Tile Semipolished / Lappato Tipe B 600 x 600 mm (
4 Homogeneous Tile Semipolished / Lappato Tipe C 600 x 600 mm (
5 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )
6 Homogeneous Tile Matt Tipe B 600 x 600 mm
7 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
8 Plint Homogeneous Tile 80 x 600 mm
9 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
RAB (RENCANA ANGGARAN BIAYA) page 128 of 1892
10 Homogeneous Tile Matt dinding Km/Wc 300 x 600 mm
11 Stepnosing 80 x 600 mm
12 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
13 Homogeneous Tile 300 x 600 jumplift
14 Homogeneous Tile finishing meja pantry 300 x 600 mm
15 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

LANTAI 03

1 Homogeneous Tile Polished Tipe A 600 x 600 mm ( Warna hitam )


2 Homogeneous Tile Semipolished / Lappato Tipe C 600 x 600 mm (
3 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )
4 Homogeneous Tile Matt Tipe B 600 x 600 mm
5 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
6 Plint Homogeneous Tile 80 x 600 mm
7 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
8 Homogeneous Tile Matt dinding Km/Wc 300 x 600 mm
9 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
10 Homogeneous Tile 300 x 600 jumplift
11 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

RAB (RENCANA ANGGARAN BIAYA) page 129 of 1892


LANTAI 04

1 Homogeneous Tile Polished Tipe A 600 x 600 mm ( Warna hitam )


2 Homogeneous Tile Semipolished / Lappato Tipe C 600 x 600 mm (
3 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )
4 Homogeneous Tile Matt Tipe B 600 x 600 mm
5 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
6 Plint Homogeneous Tile 80 x 600 mm
7 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
8 Homogeneous Tile Matt dinding Km/Wc 300 x 600 mm
9 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
10 Homogeneous Tile 300 x 600 jumplift
11 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

LANTAI 05

1 Homogeneous Tile Polished Tipe A 600 x 600 mm ( Warna hitam )


2 Homogeneous Tile Semipolished / Lappato Tipe C 600 x 600 mm (
3 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )
4 Homogeneous Tile Matt Tipe B 600 x 600 mm
5 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
6 Plint Homogeneous Tile 80 x 600 mm
RAB (RENCANA ANGGARAN BIAYA) page 130 of 1892
7 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
8 Homogeneous Tile Matt dinding Km/Wc 300 x 600 mm
9 Karpet roll, lebar 2000 mm panjang 30000 mm dan tebal 4.3 mm
10 Karpet tile 500x500 mm tebal 6.2 mm
11 Homogeneous Tile 300 x 600 jumplift
12 Homogeneous Tile finishing meja pantry 300 x 600 mm
13 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

LANTAI 06

1 Homogeneous Tile Matt Tipe B 600 x 600 mm


2 Plint Homogeneous Tile 80 x 600 mm

BIAYA PEKERJAAN FINISHING LANTAI DAN DINDING


I PEKERJAAN PENGECATAN
LANTAI 1
1 Cat dinding luar (dinding, kolom, balok)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat lantai dan tangga

RAB (RENCANA ANGGARAN BIAYA) page 131 of 1892


LANTAI 2
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat tangga
5 Waterproofing km/wc
LANTAI 3
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat tangga
5 Waterproofing plat
6 Waterproofing km/wc
LANTAI 4
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat lantai dan tangga
5 Waterproofing km/wc
LANTAI 5

RAB (RENCANA ANGGARAN BIAYA) page 132 of 1892


1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat tangga
5 Waterproofing plat
6 Waterproofing km/wc
LANTAI 6
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat
5 Waterproofing plat

BIAYA PEKERJAAN PENGECATAN


J PEKERJAAN RAILING
Catatan:
Pekerjaan railing dikerjakan sesuai gambar detail lengkap dengan a
Railing menggunakan hollow stainless 40 x 60 mm dan 20 x 20 mm
Tangga type 04
LANTAI 01

RAB (RENCANA ANGGARAN BIAYA) page 133 of 1892


1 Handrail H01
2 Handrail H02
3 Handrail H03
4 Handrail H04
5 Handrail H05
6 Handrail H06
LANTAI 02
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 03
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08

RAB (RENCANA ANGGARAN BIAYA) page 134 of 1892


LANTAI 04
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 05
1 Handrail H09

Tangga type 05
LANTAI 01
1 Handrail H01
2 Handrail H02
3 Handrail H03
4 Railing R01
5 Railing R02
6 Railing R03
LANTAI 02
1 Handrail H02

RAB (RENCANA ANGGARAN BIAYA) page 135 of 1892


2 Handrail H03
3 Handrail H04
4 Railing R01
5 Railing R02
6 Railing R03
LANTAI 03
1 Handrail H02
2 Handrail H03
3 Handrail H04
4 Railing R01
5 Railing R02
6 Railing R03
LANTAI 04
1 Handrail H02
2 Handrail H03
3 Handrail H04
4 Railing R01
5 Railing R02
6 Railing R03
LANTAI 05

RAB (RENCANA ANGGARAN BIAYA) page 136 of 1892


1 Handrail H02
2 Handrail H03
3 Handrail H04
4 Railing R01
5 Railing R02
6 Railing R03
LANTAI 06
1 Handrail H05

Railing void type 07


LANTAI 03
1 Railing R01
2 Railing R02

LANTAI 04
1 Railing R01
2 Railing R02

Railing type 08
LANTAI 01

RAB (RENCANA ANGGARAN BIAYA) page 137 of 1892


1 Railling R01

LANTAI 02
1 Railling R01

LANTAI 03
1 Railling R01

Railing type 10
LANTAI 03
1 Railling R03

LANTAI 04
1 Railling R03

Railing type 12
LANTAI 04
1 Railling R08

Tangga maintenance

RAB (RENCANA ANGGARAN BIAYA) page 138 of 1892


1 Tangga maintenance pipa BS Ø 2" tebal 1.6 mm type A
Penutup shaft, Plat bordes tebal = 2 mm
Tarikan Besi Ø 10 mm
Engsel besi
Pasangan grill besi siku

2 Tangga maintenance pipa BS Ø 2" tebal 1.6 mm type B


Pasangan grill besi siku

BIAYA PEKERJAAN RAILING


K PEKERJAAN CUBICLE TOILET
Catatan:
Pekerjaan cubicle toilet dikerjakan sesuai gambar detail lengkap de
LANTAI 01
1 Cubicle toilet type A
2 Cubicle toilet type B
LANTAI 02
1 Cubicle toilet type A
2 Cubicle toilet type B
LANTAI 03
1 Cubicle toilet type A

RAB (RENCANA ANGGARAN BIAYA) page 139 of 1892


2 Cubicle toilet type B
LANTAI 04
1 Cubicle toilet type A
2 Cubicle toilet type B
LANTAI 05
1 Cubicle toilet type A
2 Cubicle toilet type B
3 Pasangan kaca buram 10 mm tempered di toilet ruang istirahat

BIAYA PEKERJAAN CUBICLE TOILET


L PEKERJAAN FASADE
1 Detail motif 1
- Bahan papan fiber cement non silica tebal 25 mm
- Rangka utama 80x100x2 mm
- Rangka pembagi 40x40x 1.8 mm
2 Detail motif 03
- Bahan papan fiber cement non silica tebal 11 mm
- Rangka utama 80x100x2 mm
- Rangka pembagi 40x40x 1.8 mm
3 Detail motif 04

RAB (RENCANA ANGGARAN BIAYA) page 140 of 1892


4 Detail motif 05
- GRC cetak 150 x 600 mm tebal 30 mm
- Koneksi dynabolt Ø 12 mm
5 Detail motif 06
6 Detail motif 07
- Kubah bahan GRC dan plat stainless steel
- Rangka pipa stainless
7 Detail motif 09
- Covering kolom
8 Detail motif 08
- Covering kolom dengan GRC tebal 50 mm
- Kolom pedestal 300 x 400 mm tul. 6 D16 mm
- Kolom H beam 200 x 200 x 8 x 12 mm
- Plat rib tebal 8 mm
- Plat plendes tebal 15 mm
- 2 lipped channel 150 x 150 x 20 x 3.2 mm
- Angkur M16

9 Detail motif 12
Finishing Veeneer Batu

RAB (RENCANA ANGGARAN BIAYA) page 141 of 1892


10 Title building
Bahan Resin tebal = 0.8 mm, Embose 40 mm
LOGO

11 Tali air

12 Kanopi Beton

12 Finishing cat teksture

TAMPAK SELATAN
LANTAI 1
a Finishing Cat Tekstur
LANTAI 2
b Finishing Cat Tekstur
LANTAI 3
c Finishing Cat Tekstur

BIAYA PEKERJAAN FINISHING EXTERIOR


M PEKERJAAN PANGGUNG
Catatan:
Pekerjaan panggung dikerjakan sesuai gambar detail lengkap den

RAB (RENCANA ANGGARAN BIAYA) page 142 of 1892


PANGGUNG
1 Besi siku 50x50x5 mm
2 Plat buhul tebal 6 mm
3 Baut Ø 10 mm
4 Kalsi floor tebal 20 mm
5 Karpet tebal 4.3 mm
6 Dynabolt Ø 10 mm

TANGGA NAIK PANGGUNG


1 Besi hollow 50x50x2 mm
2 Kalsi floor tebal 20 mm
3 Karpet tebal 4.3 mm

BIAYA PEKERJAAN PANGGUNG


N PEKERJAAN BACKDROP
Catatan:
Pekerjaan backdrop dikerjakan sesuai gambar detail lengkap deng
i BACKDROP R.RAPAT BESAR
1 Besi hollow 40x40x2 mm

RAB (RENCANA ANGGARAN BIAYA) page 143 of 1892


2 Besi siku 40x40x4 mm
3 Multiplek tebal 18 mm
4 Finishing HPL
5 Finishing cat duco
6 Dynabolt Ø 10 mm

ii BACKDROP LOBBY LANTAI 2


1 Besi hollow 40x40x2 mm
2 Besi siku 40x40x4 mm
3 Multiplek tebal 18 mm
4 Finishing HPL
5 Lapis MDF Cutting 9 mm (biasa)
6 Lapis MDF Cutting 9 mm (ukir)
7 Dynabolt Ø 10 mm
8 Title building
"KANTOR BUPATI LOMBOK TENGAH"
- Bahan resin 0.8 mm (Warna tentukan kemudian)
- Pemasangan disesuaikan tampak backdrop
- Embose 40 mm
- Arial bold font

RAB (RENCANA ANGGARAN BIAYA) page 144 of 1892


9 Cover kolom
- Hollow besi 40x40x1.2 mm
- Plywood 18 mm
- HPL 0.7 mm

BIAYA PEKERJAAN PANGGUNG


P PEKERJAAN DINDING PEREDAM SUARA
Catatan:
Pekerjaan dinding peredam suara dikerjakan sesuai gambar detail
1 Peredam type 01
2 Peredam type 02
3 Peredam type 03
4 Peredam type 04
5 Peredam type 05

BIAYA PEKERJAAN PANGGUNG


TOTAL BIAYA PEKERJAAN ARSITEKTUR
PEKERJAAN ELEKTRIKAL
A PEKERJAAN PANEL

RAB (RENCANA ANGGARAN BIAYA) page 145 of 1892


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
1 Trafo 1000kVA 20kV/380 V DYn5

2 Kabel ladder 400 x 100 mm untuk trafo

3 Elbow tray 400 x 100 mm

4 Schoen kabel CU 300

5 Terminating raychem 3x(1x70) mm2

6 PANEL MVMDP
CUBICLE PELANGGAN
a INCOMING CUBICLE IM-SM6 lengkap dengan :
Switch Cubicle (LBS-SF6) 24 kV, 16 kA, 630 A
Voltage Indicators 3 pcs
Busbar 630 A 3 unit
Heater 50 W, ( 220 VAC )
CIT Operating Mechanism

b OUTGOING CUBICLE QM-SM6 lengkap dengan :


Switch Cubicle (LBS-SF6) 24 kV, 16 kA, 630 A
RAB (RENCANA ANGGARAN BIAYA) page 146 of 1892
Voltage Indicators 3 pcs
Busbar 630 A 3 unit
Heater 50 W, ( 220 VAC )
Shunt Trip 220 VAC 50Hz
Fusarc x 3

7 PANEL LVMDP
Each unit Consist of :
- BOX SIZE : H.2100 x W.800 x D.800 T=2mm c/w Base
BOX TYPE : Free Standing
FINISHING: Powder Coating RAL 7035,
- ACB 3P 2000A, E22N20 F/T 66KA
- MCCB 3P 200A A2B 250/R200 18KA
- MCCB 3P 50A A1B 125/R50 18KA
- MCCB 3P 100A A1A 125/R100 10KA
- Power meter digital dengan komunikasi serial modbus
- ICX - 1, CT 2000/5A
- Selector Switch A-O-M, AXC-20-3-3P
- Pilot Lamp "On, AD22-222DS Led Type (Green)
- Pilot Lamp "Off, AD22-221DS Led Type (Red)

RAB (RENCANA ANGGARAN BIAYA) page 147 of 1892


- Push Button On, AXP-B235 22.5mm ( Green )
- Push Button Off, AXP-B245 22.5mm ( Red )
- Pilot Lamp "RST"220V, AD22-22..DS 22.5mm
- Emergency Push Button, AXP-MH 542 d=40mm
- Fuse + Base for size 10,3 x 38,
- Terminal Block
- CU Busbar + Busbar Support ( RSTN=2x80x10 / E=50x10 )
- Wiring + Pemasangan
- Surge protective device 3 fasa
- Grounding sistem BCC 120 mm2 sampai muka air tanah

ATS/AMF (Automatic Transfer Switch) :


BOX SIZE : H.2100 x W.800 x D.800 T=2mm c/w Base
type Floor Stand, finish powder coating
ACB 4P 2000A, E22N20 F/T 66KA
Motorize MT 630
Shunt Trip LV429387
SDE LV429451
MCB 6A / 1P / 4.5 KA
Mini Fuse
Pilot Lamp
RAB (RENCANA ANGGARAN BIAYA) page 148 of 1892
Current Transformer 600 / 5A
Digital meter
Auto / Manual Selector
Push Button ON
Push Button OFF
Reset Button
Auto Battery Charger 24 V
Timer 220V H3 CRA8
Relay 8 pin MK2P
pase failure Relay
Bus Bar System (R,S,T,N,G) 40 x 10 mm
Wiring & Accessories

PANEL CAP. BANK 600 KVAR


Each unit Consist of :
- BOX SIZE : H.2100 x W.800 x D.800 T=2mm c/w Base
BOX TYPE : Free Standing
FINISHING: Powder Coating RAL 7035,
- LBS 3P 1000A Type Sirco, Direct Drive
- PFR 12 step, RVC12
- Capacitor 50KVAR 400V 50Hz, CLMD 63
- Contactor 3P, 50 KVAR UA75-30-11 400VAC
RAB (RENCANA ANGGARAN BIAYA) page 149 of 1892
- MCCB 3P (87.5-125)A XT2N160/R125 36KA
- Selector Switch (A-O-M) 3P 16A, SA16-3-3
- Iluminated PB On Off with Led, HDPB4333
- MCB 3P 6A SH203 L-C6 4.5KA
- MCB 1P 10A SH201 L-C10 4.5KA
- Exhaust Fan
- Thermostat THWE-SG 230V 10° - 60°
- Relay MY-2 220VAC + Socket
- CU Busbar + Busbar Support
- Wiring + Pemasangan

2 PANEL SDP PENERANGAN DAN DAYA


LANTAI 1
Box panel uk (500 x 400 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)

RAB (RENCANA ANGGARAN BIAYA) page 150 of 1892


Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 16 mm2 menuju ke LVMDP
Wiring + Pemasangan
LANTAI 2
Box panel uk (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H
Magnetic contactor 3P 1NO 1 NC
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju ke LVMDP
Wiring + Pemasangan
LANTAI 3
Box panel uk (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA

RAB (RENCANA ANGGARAN BIAYA) page 151 of 1892


MCB 10A / 1p / 6kA
Timer 24H
Magnetic contactor 3P 1NO 1 NC
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju ke LVMDP
Wiring + Pemasangan
LANTAI 4
Box panel uk (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H
Magnetic contactor 3P 1NO 1 NC
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie

RAB (RENCANA ANGGARAN BIAYA) page 152 of 1892


Grounding sistem BCC 50 mm2 menuju ke LVMDP
Wiring + Pemasangan
LANTAI 5
Box panel uk (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju ke LVMDP
Wiring + Pemasangan
LANTAI 6
Box panel uk (500 x 400 x 250) mm type wall mounted
MCCB 50A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Lampu Indikator
Fuse Lamp 2A

RAB (RENCANA ANGGARAN BIAYA) page 153 of 1892


Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 10 mm2 menuju ke LVMDP
Wiring + Pemasangan
3 PANEL SDP AC INDOOR DAN OUTDOOR
LANTAI 2
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA

RAB (RENCANA ANGGARAN BIAYA) page 154 of 1892


MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
LANTAI 3
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted

RAB (RENCANA ANGGARAN BIAYA) page 155 of 1892


MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
LANTAI 4
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan

RAB (RENCANA ANGGARAN BIAYA) page 156 of 1892


Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
LANTAI 5
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie

RAB (RENCANA ANGGARAN BIAYA) page 157 of 1892


Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
4 PANEL SDP LIFT
PANEL SDP LIFT B
Box panel uk. (500 x 400 x 250) mm type wall mounted
MCCB 50A / 3p / 10kA
MCB 25A / 3p / 6kA
Lampu Indikator
Fuse Lamp 2A

RAB (RENCANA ANGGARAN BIAYA) page 158 of 1892


Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 10 mm2 menuju LVMDP
Wiring + Pemasangan
4 PANEL POMPA
PANEL SDP RUANG POMPA
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 50A / 3p / 18kA
MCB 16A / 3p / 6kA
MCB 16A / 1p / 6kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 10 mm2 menuju LVMDP
Wiring + Pemasangan
PANEL SDP POMPA HYDRANT
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 100A / 3p / 10kA

RAB (RENCANA ANGGARAN BIAYA) page 159 of 1892


MCCB 50A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju LVMDP
Wiring + Pemasangan
B PEKERJAAN PENARIKAN KABEL
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
Penarikan Kabel dari:
1 Panel SDP Penerangan dan Daya Lantai 01 ke LVMDP
Kabel NYY 4 x 25 mm2
2 Panel SDP Penerangan dan Daya Lantai 02 ke LVMDP
Kabel NYY 4 x 25 mm2
3 Panel SDP Penerangan dan Daya Lantai 03 ke LVMDP
Kabel NYY 4 x 25 mm2
4 Panel SDP Penerangan dan Daya Lantai 04 ke LVMDP
Kabel NYY 4 x 25 mm2

RAB (RENCANA ANGGARAN BIAYA) page 160 of 1892


5 Panel SDP Penerangan dan Daya Lantai 05 ke LVMDP
Kabel NYY 4 x 25 mm2
6 Panel SDP Penerangan dan Daya Lantai 06 ke LVMDP
Kabel NYY 4 x 10 mm2

7 Panel SDP Indoor AC Lantai 02 ke Panel SDP AC Lantai 02


Kabel NYY 4 x 6 mm2
8 Panel SDP AC Lantai 02 ke LVMDP
Kabel NYY 4 x 70 mm2
9 Panel SDP Indoor AC Lantai 03 ke Panel SDP AC Lantai 03
Kabel NYY 4 x 6 mm2
10 Panel SDP AC Lantai 03 ke LVMDP
Kabel NYY 4 x 70 mm2
11 Panel SDP Indoor AC Lantai 04 ke Panel SDP AC Lantai 04
Kabel NYY 4 x 6 mm2
12 Panel SDP AC Lantai 04 ke LVMDP
Kabel NYY 4 x 70 mm2
13 Panel SDP Indoor AC Lantai 05 ke Panel SDP AC Lantai 05
Kabel NYY 4 x 6 mm2
14 Panel SDP AC Lantai 05 ke LVMDP

RAB (RENCANA ANGGARAN BIAYA) page 161 of 1892


Kabel NYY 4 x 70 mm2

15 Panel SDP Lift B ke LVMDP


Kabel NYY 4 x 10 mm2

16 Panel SDP R. Pompa ke Panel pompa hydrant


Kabel NYY 4 x 10 mm2
17 Panel SDP Panel Pompa Hydrant ke LVMDP
Kabel NYY 4 x 70 mm2

16 ATS ke LVMDP
Kabel NYY 4 x 2 x (1 x 300) mm2

17 Trafo ke ATS
Kabel NYY 4 x 2 x (1 x 300) mm2

18 Genset ke ATS
Kabel NYY 4 x 2 x (1 x 300) mm2

RAB (RENCANA ANGGARAN BIAYA) page 162 of 1892


Galian kabel power dan kabel FO:
Galian tanah sedalam 1 m
Urug pasir bawah galian kabel tebal 100 mm
Urugan tanah bekas galian + pemadatan
1/2 Buis beton Ø 300 mm
Patok penanda kabel
Bak kontrol galian kabel
Pipa galvanis Ø 8" pelindung tarikan kabel dari power house ke lvm
yang melintasi jalan
C PEKERJAAN INSTALASI LAMPU DAN KOTAK KONTAK
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 TKO TL Led T8 1200 mm 2 x 18W
6 Flat Downlight ∅ 244mm 20W 4000K
7 Flat Downlight ∅ 95mm 7W 4000K

RAB (RENCANA ANGGARAN BIAYA) page 163 of 1892


8 Lampu Barret Led 17W 4000K
9 Saklar Tunggal
10 Saklar Ganda
11 Saklar 3 Gang Switch
12 Saklar Tukar Tunggal
13 Ekshaust Fan 140 CFM 23W
14 Stop kontak dinding single outlet 220 V
15 Pipa PVC AW Ø 6"
LANTAI 2
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Lampu Barret Led 17W 4000K
8 Wall Washer 1200mm Led 36W 3000K
9 Uplight Adjustable Angle Led 6W 3000K
10 Exit lamp
11 Emergency lamp

RAB (RENCANA ANGGARAN BIAYA) page 164 of 1892


12 Saklar Tunggal
13 Saklar Ganda
14 Saklar 3 Gang Switch
15 Saklar Tukar Ganda
16 Ekshaust Fan 140 CFM 23W
17 Stop kontak dinding single outlet 220 V
18 Stop kontak dinding double outlet 220 V
19 Stop kontak lantai double outlet 220 V
20 Pipa PVC AW Ø 6"
LANTAI 3
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Spotlight Led 5W 4000K + Housing
8 Lampu Barret Led 17W 4000K
9 Wall Light Up & Down 14.5W 3000K
10 Flood Light Led 40W IP65 4000K

RAB (RENCANA ANGGARAN BIAYA) page 165 of 1892


11 Wall Washer 1200mm Led 36W 3000K
12 Exit lamp
13 Emergency lamp
14 Saklar Tunggal
15 Saklar Ganda
16 Saklar 3 Gang Switch
17 Saklar Tukar Ganda
18 Ekshaust Fan 140 CFM 23W
19 Stop kontak dinding single outlet 220 V
20 Stop kontak dinding double outlet 220 V
21 Pipa PVC AW Ø 6"
LANTAI 4
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Lampu Barret Led 17W 4000K
8 Wall Washer 1200mm Led 36W 3000K

RAB (RENCANA ANGGARAN BIAYA) page 166 of 1892


9 Exit lamp
10 Emergency lamp
11 Saklar Tunggal
12 Saklar Ganda
13 Saklar 3 Gang Switch
14 Saklar 4 Gang Switch
15 Saklar Tukar Ganda
16 Ekshaust Fan 140 CFM 23W
17 Stop kontak dinding single outlet 220 V
18 Stop kontak dinding double outlet 220 V
19 Stop kontak lantai double outlet 220 V
20 Pipa PVC AW Ø 6"
LANTAI 5
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Lampu Barret Led 17W 4000K

RAB (RENCANA ANGGARAN BIAYA) page 167 of 1892


8 Led Strip 2835 IP65 4.8W/m 3000K panjang 18598 mm
9 Led Strip 2835 IP65 4.8W/m 3000K panjang 16998 mm
10 Led Strip 2835 IP65 4.8W/m 3000K panjang 15398 mm
11 Led Strip 2835 IP65 4.8W/m 3000K panjang 13798 mm
12 Led Strip 2835 IP65 4.8W/m 3000K panjang 12198 mm
13 Led Strip 2835 IP65 4.8W/m 3000K panjang 10598 mm
14 Exit lamp
15 Emergency lamp
16 Saklar Tunggal
17 Saklar Ganda
18 Saklar 3 Gang Switch
19 Saklar Tukar Tunggal
20 Ekshaust Fan 140 CFM 23W
21 Stop kontak dinding single outlet 220 V
22 Pipa PVC AW Ø 6"
LANTAI 6
1 Instalasi Titik Lampu
2 Flat Downlight ∅ 244mm 20W 4000K
3 Lampu Barret Led 17W 4000K
4 Lampu Sorot Flood Light LED 48W 3000K <30°

RAB (RENCANA ANGGARAN BIAYA) page 168 of 1892


5 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K panjang 3065 mm
6 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K panjang 3736 mm
7 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K panjang 6350 mm
8 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K panjang 8350 mm
9 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K panjang 9894 mm
10 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K panjang 11952 m
11 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K panjang 12556 m
12 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K panjang 13019 m
13 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K panjang 13835 m
14 Saklar Tunggal
15 Saklar Ganda

Testing and Commissioning


D PEKERJAAN TELEPON
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
1 Instalasi titik telepone
2 Outlet telpon
3 Handset Telepon

RAB (RENCANA ANGGARAN BIAYA) page 169 of 1892


LANTAI 2
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x30x0,6mm
5 Handset Telepon
LANTAI 3
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x30x0,6mm
5 Handset Telepon
LANTAI 4
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x20x0,6mm
5 TDM Phone Handset w/ 6 lines monochrome,backlit (sekda)
6 TDM Phone Handset w/ 2 lines monochrome (sekertaris)
7 Handset Telepon

RAB (RENCANA ANGGARAN BIAYA) page 170 of 1892


LANTAI 5
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x10x0,6mm
5 TDM Phone Handset w/ 6 lines monochrome,backlit (sekda)
6 TDM Phone Handset w/ 2 lines monochrome (sekertaris)
7 Handset Telepon

Testing and Commissioning


E PEKERJAAN LAN
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
PERALATAN UTAMA TELEPON, LAN, DAN CCTV
1 Optical Line Terminal (OLT)
2 Security Gateway
3 10G 16-Port Managed Aggregation Switch
4 IP PBX 350 Port (8 Co Analog, 280 Ext TDM, 5 IP Ext w/Licence)
- Basic System OpenScape Business X8
- Card Analog Trunk TMANI (8MSI) + Kabel SIVAPAC

RAB (RENCANA ANGGARAN BIAYA) page 171 of 1892


- Expansion Card Analog 24 + Licence + Kabel SIVAPAC
- OpenScape Business IP User
- Expansion Box OpenScape Business X8
- LUNA2 Power Supply Unit
- Voice Channel Booster OCCB 1
- OpenStage 40 HFA V3 Lava
- OpenStage Key Module 40 Lava
- Testing, Instal, Program dan Training

5 NVR CCTV Kapasitas 128 Channel w/ Hard disk 24 Terabyte


6 Monitor 32" dan aksesori
7 Sambungan Internet dan Telepon
8 Cabinet Rack 45U ABBA
9 UPS 10KVA APC SRT10KXLI
10 Surge protective device 10 kA
11 MDF Telepone
12 Kabel FO single mode dari jalan ke ruang server gedung B
13 Program, Setting, dan Training
14 Material bantu

RAB (RENCANA ANGGARAN BIAYA) page 172 of 1892


LANTAI 1
1 Wall Mounted Rack 15U-490mm
2 UPS Rackmount 1KVA
3 FO 8 core Singlemode 9/125um,OS2
4 FO Pigtail Singlemode 9/125um LC Simplex, 1 meter
5 FO Patchcord Singlemode 9/125um LC - LC Duplex, 2m
6 Cables Assembly, Connector & Terminals
7 Wiring Management

LANTAI 2
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Switch Hub POE 16 port Managable w/ SFP
5 Patch Cord cat-6
6 Switch Hub POE 16 port Managable w/ SFP
7 Optic terminal box

8 Wall Mounted Rack 15U


9 UPS Rackmount 1KVA

RAB (RENCANA ANGGARAN BIAYA) page 173 of 1892


10 Wiring Management
11 FO 8 core Singlemode 9/125um,OS2
12 FO Pigtail Singlemode 9/125um LC Simplex, 1 meter
13 FO Patchcord Singlemode 9/125um LC - LC Duplex, 2m
14 Cables Assembly, Connector & Terminals

LANTAI 3
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel 16 port
5 Switch Hub POE 16 port Managable w/ SFP
6 Patch Cord cat-6
7 Optic terminal box

8 Wall Mounted Rack 8U


9 UPS Rackmount 1KVA
10 Wiring Management
11 FO 8 core Singlemode 9/125um,OS2
12 FO Pigtail Singlemode 9/125um LC Simplex, 1 meter

RAB (RENCANA ANGGARAN BIAYA) page 174 of 1892


13 FO Patchcord Singlemode 9/125um LC - LC Duplex, 2m
14 Cables Assembly, Connector & Terminals

LANTAI 4
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel 16 port
5 Switch Hub POE 16 port Managable w/ SFP
6 Patch Cord cat-6
7 Optic terminal box

8 Wall Mounted Rack 8U


9 UPS Rackmount 1KVA
10 Wiring Management
11 FO 8 core Singlemode 9/125um,OS2
12 FO Pigtail Singlemode 9/125um LC Simplex, 1 meter
13 FO Patchcord Singlemode 9/125um LC - LC Duplex, 2m
14 Cables Assembly, Connector & Terminals

RAB (RENCANA ANGGARAN BIAYA) page 175 of 1892


LANTAI 5
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel 24 port
5 Switch Hub POE 24 port Managable w/ SFP
6 Patch Cord cat-6
7 Optic terminal box

Testing and Commissioning

F PEKERJAAN CCTV
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 01
1 Instalasi Cabel cat 6
2 IP Bullet Camera w/Vari-focal Lens 2MP 1080p
3 IP Dome Camera w/Vari-focal Lens 2MP 1080p

LANTAI 02

RAB (RENCANA ANGGARAN BIAYA) page 176 of 1892


1 Instalasi Cabel cat 6
2 Dome IP Camera
3 IP Dome Camera w/Vari-focal Lens 2MP 1080p
4 IP Bullet Camera w/Vari-focal Lens 2MP 1080p

LANTAI 03
1 Instalasi Cabel cat 6
2 Dome IP Camera
3 IP Dome Camera w/Vari-focal Lens 2MP 1080p
4 Switch Hub POE 48 port Managable w/ SFP
5 Patch panel cat-6 48 port
6 Patch Cord cat-6
7 Wiring Management

LANTAI 04
1 Instalasi Cabel cat 6
2 Dome IP Camera
3 IP Dome Camera w/Vari-focal Lens 2MP 1080p

LANTAI 05

RAB (RENCANA ANGGARAN BIAYA) page 177 of 1892


1 Instalasi Cabel cat 6
2 Dome IP Camera

Testing and Commissioning


G PEKERJAAN TATA SUARA
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
PERALATAN UTAMA
1 CD/MMC/USB Player w/FM Tuner
2 Emergency Micropone
3 Remote Paging Micropone 10 Channel (RM-200M)
4 Remote Paging Micropone 10 Channel (RM-210)
5 Power Amplifier 360 Watt w/ EVAC System
6 Power Amplifier 360 Watt w/ EVAC System Expansion
7 Power Amplifier 240 Watt
8 Sound Repeater, Digital Voice Evacuation
9 Cabinet Rack w/accessories
10 UPS 3KVA
11 Main Panel Sound
12 Kabel Tuvur Sound NYMHY 3x2,5mm

RAB (RENCANA ANGGARAN BIAYA) page 178 of 1892


13 Setting Adjustment termasuk pemasangan peralatan speaker dan t

LANTAI 1
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm
1 Instalasi Speaker kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Wide Horn Speaker 15W
4 Terminal Box Tata Suara

LANTAI 2
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm
1 Instalasi ceiling speaker + attenuator kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator
4 Terminal Box Tata Suara

LANTAI 3
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm
1 Instalasi ceiling speaker + attenuator kabel NYMHY 3 x 1.5 mm

RAB (RENCANA ANGGARAN BIAYA) page 179 of 1892


2 Ceiling speaker 3 W
3 Attenuator
4 Terminal Box Tata Suara

LANTAI 4
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm
1 Instalasi ceiling speaker + attenuator kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator
4 Terminal Box Tata Suara

LANTAI 5
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm
1 Instalasi ceiling speaker + attenuator kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator
4 Terminal Box Tata Suara

Testing and Commissioning


H FIRE ALARM SYSTEM

RAB (RENCANA ANGGARAN BIAYA) page 180 of 1892


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
Peralatan Fire Alarm
1 Master Control Fire Alarm Panel cap. 2 loop lengkap dengan :
- Power Supply & Battery 2x12 VDC, 12 AH
- LCD Display
- TCP/IP connection module
2 Terminal Box
3 Addressable Alarm Signal Module
4 Addressable Monitor Module
5 Addressable Relay Module
6 Addressable potoelectric Smoke Detector lengkap dengan base
7 Addressable Heat Detector lengkap dengan base
8 Addressable Manual Call Point lengkap dengan back box
9 Horn Strobe lengkap dengan back box

Pekerjaan Instalasi Fire Alarm


1 Pekerjaan Pemasangan MCFA
Material : AWG 16 TSP, FRC 3x2.5mm2 dalam PVC Conduit

RAB (RENCANA ANGGARAN BIAYA) page 181 of 1892


2 Pengkabelan dan pemasangan detector dan call point
Material : AWG 16 TSP dalam PVC Conduit,
3 Pengkabelan ke Multitone Strobe, Pressure Switch dan Flow Switch
Material : NYA 2x1.5mm2 dalam PVC Conduit
4 Pengkabelan dan Pemasangan Terminal Box berikut dengan modu
Material : AWG 16 TSP, NYA 2x1.5mm2 dalam PVC Conduit
5 Pekerjaan Interlock ke Lift, VAC Power & HVAC
Material : Contactor, NYA 2x1.5mm2 dalam PVC Conduit, berikut h

LANTAI 2
Peralatan Fire Alarm
1 Terminal Box
2 Addressable Release Module
3 Addressable Alarm Signal Module
4 Addressable Monitor Module
5 Addressable Relay Module
6 Addressable potoelectric Smoke Detector lengkap dengan base
7 Addressable Heat Detector lengkap dengan base
8 Addressable Manual Call Point lengkap dengan back box
9 Abort Station lengkap dengan back box

RAB (RENCANA ANGGARAN BIAYA) page 182 of 1892


10 Horn Strobe lengkap dengan back box
11 Alarm Bell
12 Evacuate Sign Lamp
13 Gas Discharge Sign Lamp

Pekerjaan Instalasi Fire Alarm


1 Pengkabelan dan pemasangan detector, call point dan abort station
Material : AWG 16 TSP dalam PVC Conduit,
2 Pengkabelan ke IVO Kit, Multitone Strobe, Bell, Sign Lamp, Switche
Material : NYA 2x1.5mm2 dalam PVC Conduit
3 Pengkabelan dan Pemasangan Terminal Box berikut dengan modu
Material : AWG 16 TSP, NYA 2x1.5mm2 dalam PVC Conduit
4 Pekerjaan Interlock ke HVAC
Material : Contactor, NYA 2x1.5mm2 dalam PVC Conduit, berikut h

LANTAI 3
Peralatan Fire Alarm
1 Terminal Box
2 Addressable Alarm Signal Module
3 Addressable Monitor Module

RAB (RENCANA ANGGARAN BIAYA) page 183 of 1892


4 Addressable potoelectric Smoke Detector lengkap dengan base
5 Addressable Heat Detector lengkap dengan base
6 Addressable Manual Call Point lengkap dengan back box
7 Horn Strobe lengkap dengan back box

Pekerjaan Instalasi Fire Alarm


1 Pengkabelan dan pemasangan detector dan call point
Material : AWG 16 TSP dalam PVC Conduit,
2 Pengkabelan ke Multitone Strobe dan Flow Switch
Material : NYA 2x1.5mm2 dalam PVC Conduit
3 Pengkabelan dan Pemasangan Terminal Box berikut dengan modu
Material : AWG 16 TSP, NYA 2x1.5mm2 dalam PVC Conduit

LANTAI 4
Peralatan Fire Alarm
1 Terminal Box
2 Addressable Alarm Signal Module
3 Addressable Monitor Module
4 Addressable potoelectric Smoke Detector lengkap dengan base
5 Addressable Heat Detector lengkap dengan base

RAB (RENCANA ANGGARAN BIAYA) page 184 of 1892


6 Addressable Manual Call Point lengkap dengan back box
7 Horn Strobe lengkap dengan back box

Pekerjaan Instalasi Fire Alarm


1 Pengkabelan dan pemasangan detector dan call point
Material : AWG 16 TSP dalam PVC Conduit,
2 Pengkabelan ke Multitone Strobe dan Flow Switch
Material : NYA 2x1.5mm2 dalam PVC Conduit
3 Pengkabelan dan Pemasangan Terminal Box berikut dengan modu
Material : AWG 16 TSP, NYA 2x1.5mm2 dalam PVC Conduit

LANTAI 5
Peralatan Fire Alarm
1 Terminal Box
2 Addressable Alarm Signal Module
3 Addressable Monitor Module
4 Addressable potoelectric Smoke Detector lengkap dengan base
5 Addressable Heat Detector lengkap dengan base
6 Addressable Manual Call Point lengkap dengan back box
7 Horn Strobe lengkap dengan back box

RAB (RENCANA ANGGARAN BIAYA) page 185 of 1892


Pekerjaan Instalasi Fire Alarm
1 Pengkabelan dan pemasangan detector dan call point
Material : AWG 16 TSP dalam PVC Conduit,
2 Pengkabelan ke Multitone Strobe dan Flow Switch
Material : NYA 2x1.5mm2 dalam PVC Conduit
3 Pengkabelan dan Pemasangan Terminal Box berikut dengan modu
Material : AWG 16 TSP, NYA 2x1.5mm2 dalam PVC Conduit

LANTAI ATAP
Peralatan Fire Alarm
1 Addressable potoelectric Smoke Detector lengkap dengan base
2 Addressable Heat Detector lengkap dengan base

Pekerjaan Instalasi Fire Alarm


1 Pengkabelan dan pemasangan detector
Material : AWG 16 TSP dalam PVC Conduit,

Testing and Commissioning

RAB (RENCANA ANGGARAN BIAYA) page 186 of 1892


I PEKERJAAN KABEL TRAY
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 01
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm

6 Kabel ladder 400 x 100 mm

7 Kabel ladder 300 x 100 mm

LANTAI 02
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm
6 Kabel ladder 400 x 100 mm
7 Kabel ladder 300 x 100 mm

RAB (RENCANA ANGGARAN BIAYA) page 187 of 1892


LANTAI 03
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm
6 Kabel ladder 400 x 100 mm
7 Kabel ladder 300 x 100 mm

LANTAI 04
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm
6 Kabel ladder 400 x 100 mm
7 Kabel ladder 300 x 100 mm

LANTAI 05

RAB (RENCANA ANGGARAN BIAYA) page 188 of 1892


1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Kabel ladder 400 x 100 mm
6 Kabel ladder 300 x 100 mm

LANTAI 06
1 Kabel tray 400 x 100 mm
2 Elbow tray 400 x 100 mm

PEKERJAAN PROJECTOR
LANTAI 02
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

RAB (RENCANA ANGGARAN BIAYA) page 189 of 1892


LANTAI 03
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

LANTAI 04
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

LANTAI 05
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate

RAB (RENCANA ANGGARAN BIAYA) page 190 of 1892


Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

Ruang Rapat Besar


1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

J PEKERJAAN PENANGKAL PETIR


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
1 Air terminal Kurn R-150 Early Streamer Emmission (ESE) technolo
2 Kabel NYY 1x50mm² utk down conductor
3 Connecting Sleeve
4 Schoen cable CU 50
5 Pipa Galvanis 1,5" med A dan dudukan untuk air terminal
6 Bare cooper Conductor 50 mm² untuk gounding

RAB (RENCANA ANGGARAN BIAYA) page 191 of 1892


7 Pipa Galvanis 3/4" ( untuk grounding )
8 Slitzen tembaga murni 3/4"( bukan lapisan ) untuk ground rod
9 Timah
10 Pipa PVC 3/4" wavin untuk kabel NYY
11 Klem kabel dan material bantu
12 Pembuatan sumur grounding 2 titik
13 Pembuatan bak kontrol grounding 40x40x30 cm
14 Biaya instalasi penangkal petir
15 Sertifikasi dari Depnaker

K PEKERJAAN SAMBUNG DAYA


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
1 Biaya Penyambungan (BP)
2 Uang Jaminan Langganan (UJL)
3 Biaya supervisi / Keur
4 Sertifikat Layak Operasi (SLO)
5 Perluasan Jaringan TM (tiang, kabel, KWH meter, Cubicle PLN), m
Pemasangan APP
a KWH Mtr Electronic 3 fs 57.7/ 100V, 5/10A, class 05
b MCB 1 pasa 250 V, tp PLN 2 - 20 A lengkap
c Kotak APP type I, lengkap
RAB (RENCANA ANGGARAN BIAYA) page 192 of 1892
d Smartbox APP 3P TM
CM 2-11 (BC 6mm2)
e GSM Modem berikut Kartu Perdana
f Cubicle set
- Incoming cubicle, switch LBS-SF6, 24KV, 16KA, 10-400/5A
- Matering cubicle, switch LBS-SF6, 24KV, 16 KA, 10-400/5A
lengkap dengan voltage transformer 20V3
- Out going circuit breaker, SF6, 24Kv, 16KA, 630A
lengkap dengan current transformer dan relay proteksi
Relay UVR
Pemasangan Cubicle dan Commisioning
NFA2X-T 2x10mm2 (Power Cubicle)
NYFGBY 4x 4mm2 (kWh)
Pemasangan Jaringan
a Tiang Beton C12-350da N+E
b Konstruksi JTM 3 ps
CC1-A
CC 7
CC 8
c Konstruksi SKUTM

RAB (RENCANA ANGGARAN BIAYA) page 193 of 1892


CTM-5
d Konstruksi Tambahan
CM2-12
CM2 -12A
CM 5-6 (Arrester) Polymer
CM 5-9 (FCO) Polymer
CM 5-15 ( Cross Arm2000, PB SR 8,5 " & Brace stell 770)
CM5 -16 (PBSR 8,5" + Cross Arm 3000mm)
CM 5-20 (Suspention Pole Band)
EI -2 ( 11m)
F1-2
Kawat Penghantar (Konduktor)
a Pemasangan JTM A3C 3x70+N70mm2
b Pengadaan Kawat A3C 70mm
c Compresion Conector H Type 70/70 mm2
d Sepatu Kabel Kepala AL/CU 70 mm2
Kawat Penghantar (Konduktor)
a Pengadaan Kabel NA2XSY 20 KV 3 x (1 x 70 mm)
b Terminating Kabel 1 x 70 mm2 outdoor
c Terminating Kabel 1x 70 mm2 indoor

RAB (RENCANA ANGGARAN BIAYA) page 194 of 1892


d NFA2X-T3x1x70+N50mm2 U/Jumper
e Sepatu Kabel Kepala AL/CU 70 mm2
f Compresion Conector H Type 70/70 mm2

TOTAL BIAYA PEKERJAAN ELEKTRIKAL


V PEKERJAAN MEKANIKAL
A Instalasi air bersih
LANTAI 1
1 Stop Kran Ø 1 1/4"
2 Stop Kran Ø 1"
3 Stop Kran Ø 3/4"
4 Pipa Hisap Ø 1"
5 Pipa suplai dari PDAM ke Ground water tank pipa PVC AW Ø 1"
6 Pipa Suplay Ø 1 1/4" (dari ground water tank ke rooftank)
7 Pipa Riser Ø 1 1/4"
8 Pipa Riser Ø 1"
9 Pipa PVC AW Distribusi Ø 1 1/4"
10 Pipa PVC AW Distribusi Ø 1"
11 Pipa PVC AW Distribusi Ø 3/4"
12 Pekerjaan pengeboran (sumur deep well)

RAB (RENCANA ANGGARAN BIAYA) page 195 of 1892


i Pekerjaan Utama
- Movin
- Persiapan area boring
ii Pemasangan Konduktor Mudpid
- Pengeboran/pilot hole Ø 4"
- Reming hole Ø 6"
- Materal bantu & bandtonite
- Pengadaan pipa casing PVC Ø 6"
- Pengadaan pipa casing PVC Ø 4"
- Grevel pack dan pemasangan
- Pencucian sumur
- Grotting/spron
- Logging
- Geolistrik
- Reming hole Ø 12
iii Pompa dan aksesoris
- Submersible pump + panel kontrol
- Aksesoris pump
- Panel box
iv Biaya perijinan pengeboran

13 Pompa transfer
Total head : 50 m

RAB (RENCANA ANGGARAN BIAYA) page 196 of 1892


Debit : 70 liter/menit
Flexible joint, pressure guage, pressure switch, check valve, gate v

14 Panel kontrol pompa transfer


15 Fitting + Supporting
LANTAI 2
1 Stop Kran Ø 1 1/4"
2 Stop Kran Ø 1"
3 Stop Kran Ø 3/4"
4 Pipa riser dia 1 1/4"
5 Pipa riser dia 1"
6 Pipa PVC AW Distribusi dia 1 1/4''
7 Pipa PVC AW Distribusi dia 1''
8 Pipa PVC AW Distribusi dia 3/4''
9 Fitting + Supporting
LANTAI 3
1 Stop Kran Ø 1 1/4"
2 Stop Kran Ø 1"
3 Stop Kran Ø 3/4"
4 Pipa riser dia 1 1/4"

RAB (RENCANA ANGGARAN BIAYA) page 197 of 1892


5 Pipa riser dia 1"
6 Pipa PVC AW Distribusi dia 1 1/4''
7 Pipa PVC AW Distribusi dia 1''
8 Pipa PVC AW Distribusi dia 3/4''
9 Fitting + Supporting
LANTAI 4
1 Stop Kran Ø 1 1/4"
2 Stop Kran Ø 1"
3 Stop Kran Ø 3/4"
4 Pipa riser dia 1 1/4"
5 Pipa riser dia 1"
6 Pipa PVC AW Distribusi dia 1 1/4''
7 Pipa PVC AW Distribusi dia 1''
8 Pipa PVC AW Distribusi dia 3/4''
9 Fitting + Supporting
LANTAI 5
1 Stop Kran Ø 1 1/4"
2 Stop Kran Ø 1"
3 Stop Kran Ø 3/4"
4 Pipa riser dia 1 1/2"

RAB (RENCANA ANGGARAN BIAYA) page 198 of 1892


5 Pipa riser dia 1 1/4"
6 Pipa riser dia 1"
7 Pipa PVC AW Distribusi dia 1 1/4''
8 Pipa PVC AW Distribusi dia 1''
9 Pipa PVC AW Distribusi dia 3/4''
10 Pipa PPR PN-20 Ø 20 mm
11 Fitting + Supporting
Lantai Atap Elv. +16.600
1 Stop kran Ø 2 1/2"
2 Stop kran Ø 2"
3 Stop kran Ø 1 1/4"
4 Pipa header Ø 3"
5 Pipa PVC AW Distribusi Ø 2 1/2"
6 Pipa PVC AW Distribusi Ø 2"
7 Pipa PVC AW Distribusi Ø 1 1/4"
8 Pipa PVC AW Distribusi Ø 1"
9 Pipa PVC AW Kuras Ø 2"
10 Rooftank kap 2000 liter + automatic
11 Dudukan rooftank cor beton kosong 1pc : 3ps : 5 sp
12 Instalasi autoswitch kabel NYY 2x2.5 mm2

RAB (RENCANA ANGGARAN BIAYA) page 199 of 1892


13 Pompa booster
Total head : 12 m
Debit : 40 liter/menit, include : header,
flexible, pressure guage, pressure switch, check valve, gate valve,
base frame, panel kontrol, 1 set terdiri dari 2 pompa
14 Fitting + Supporting

Testing and Commissioning


B Instalasi Air Bekas
LANTAI 1
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC AW riser Ø 3"
5 Sumur resapan air bekas
6 Fitting + Supporting
LANTAI 2
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"

RAB (RENCANA ANGGARAN BIAYA) page 200 of 1892


3 Pipa PVC AW Ø 3"
4 Pipa PVC AW riser Ø 3"
5 Fitting + Supporting
LANTAI 3
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC AW riser Ø 3"
5 Fitting + Supporting
LANTAI 4
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC AW riser Ø 3"
5 Fitting + Supporting
LANTAI 5
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC D vent Ø 2"

RAB (RENCANA ANGGARAN BIAYA) page 201 of 1892


5 Fitting + Supporting
C Instalasi Air Kotor
LANTAI 1
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa PVC AW riser Ø 4"
5 Sumur resapan air kotor
6 Bio septick kap 2 m3
7 Bio septick kap 8 m3
8 Fitting + Supporting
LANTAI 2
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa PVC AW riser Ø 4"
5 Fitting + Supporting
LANTAI 3
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"

RAB (RENCANA ANGGARAN BIAYA) page 202 of 1892


3 Pipa PVC AW Ø 4"
4 Pipa PVC AW riser Ø 4"
5 Fitting + Supporting
LANTAI 4
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa PVC AW riser Ø 4"
5 Fitting + Supporting
LANTAI 5
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa PVC D vent Ø 2.5"
5 Fitting + Supporting
D Peralatan saniter
LANTAI 1
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)

RAB (RENCANA ANGGARAN BIAYA) page 203 of 1892


4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Kitchen zink + kran
11 Pegangan stainless steel (untuk toilet difabel)
LANTAI 2
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Kitchen zink + kran
11 Pegangan stainless steel (untuk toilet difabel)

RAB (RENCANA ANGGARAN BIAYA) page 204 of 1892


LANTAI 3
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Kitchen zink + kran
11 Pegangan stainless steel (untuk toilet difabel)
LANTAI 4
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer
7 Floor drain

RAB (RENCANA ANGGARAN BIAYA) page 205 of 1892


8 Urinoir + penutup protector
9 Sekat urinoir
10 Kitchen zink + kran
11 Pegangan stainless steel (untuk toilet difabel)
LANTAI 5
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Shower
7 Jet washer
8 Floor drain
9 Urinoir + penutup protector
10 Sekat urinoir
11 Kitchen zink + kran
12 Pegangan stainless steel (untuk toilet difabel)
13 Water heater
E Instalasi Air Hujan
Lantai 02

RAB (RENCANA ANGGARAN BIAYA) page 206 of 1892


1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Gutter (uk. 100 x 50 mm)
5 Floordrain Ø 2"
Lantai 03
1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Gutter (uk. 100 x 50 mm)
5 Floordrain Ø 2"
6 Roofdrain Ø 4 "
Lantai 04
1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Gutter (uk. 100 x 50 mm)
5 Floordrain Ø 2"
Lantai 05
1 Pipa PVC AW Ø 2"

RAB (RENCANA ANGGARAN BIAYA) page 207 of 1892


2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Gutter (uk. 100 x 50 mm)
5 Floordrain Ø 2"
Lantai Atap
1 Pipa PVC AW Ø 4"
2 Pipa PVC AW Ø 5"
3 Gutter (uk. 100 x 50 mm)
4 Roofdrain Ø 4 "
5 Roofdrain Ø 5 "
E Landscape
1 Saluran Air Hujan dengan batu kali
2 Penutup Saluran Plat Beton
3 Bak Kontrol Hujan
4 Sumur Peresapan Hujan
5 Pipa PVC AW air hujan Ø 4"
6 Pipa PVC AW air hujan Ø 5"
7 Pipa PVC AW air hujan Ø 6"

F PEKERJAAN TATA UDARA

RAB (RENCANA ANGGARAN BIAYA) page 208 of 1892


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 2
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 402.000 Btu/h
4 Ceiling Mounted Cassette kap 15.400 Btu/h
5 Ceiling Mounted Cassette kap 19.100 Btu/h
6 Ceiling Mounted Cassette kap 24.200 Btu/h
7 Ceiling Mounted Cassette kap 36.200 Btu/h
8 Slim Mounted Duct kap 15.400 Btu/h
9 Refrigerant Joint Pipe
10 Wired Remote Controller
11 Aksesoris cover panel
12 Pipa Drain Ø 32 mm

LANTAI 3
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 365.000 Btu/h

RAB (RENCANA ANGGARAN BIAYA) page 209 of 1892


4 Ceiling Mounted Cassette kap 15.400 Btu/h
5 Ceiling Mounted Cassette kap 19.100 Btu/h
6 Ceiling Mounted Cassette kap 24.200 Btu/h
7 Ceiling Mounted Cassette kap 36.200 Btu/h
8 Slim Mounted Duct kap 15.400 Btu/h
9 Refrigerant Joint Pipe
10 Wired Remote Controller
11 Aksesoris cover panel
12 Pipa Drain Ø 32 mm

LANTAI 4
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 249.000 Btu/h
4 Outdoor Unit 327.000 Btu/h
5 Ceiling Mounted Cassette kap 15.400 Btu/h
6 Ceiling Mounted Cassette kap 19.100 Btu/h
7 Ceiling Mounted Cassette kap 24.200 Btu/h
8 Ceiling Mounted Cassette kap 36.200 Btu/h
9 Slim Mounted Duct kap 7.500 Btu/h

RAB (RENCANA ANGGARAN BIAYA) page 210 of 1892


10 Slim Mounted Duct kap 15.400 Btu/h
11 Refrigerant Joint Pipe
12 Wired Remote Controller
13 Aksesoris cover panel
14 Pipa Drain Ø 32 mm

LANTAI 5
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 402.000 Btu/h
4 Ceiling Mounted Cassette kap 19.100 Btu/h
5 Ceiling Mounted Cassette kap 24.200 Btu/h
6 Ceiling Mounted Cassette kap 36.200 Btu/h
7 Ceiling Mounted Cassette kap 47.800 Btu/h
8 Slim Mounted Duct kap 7.500 Btu/h
9 Slim Mounted Duct kap 15.400 Btu/h
10 Refrigerant Joint Pipe
11 Wired Remote Controller
12 Aksesoris cover panel
13 Pipa Drain Ø 32 mm

RAB (RENCANA ANGGARAN BIAYA) page 211 of 1892


LANTAI 6
1 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
2 Indoor unit split type kap 1 PK
3 Pipa Drain Ø 32 mm
4 Pipa refrigerant Ø 1/4"
5 Pipa refrigerant Ø 1/2"

PIPA REFRIGERANT
Pekerjaan pipa refrigerant seluruh lantai bangunan A, B dan C.
1 Piping ¼"
2 Piping ⅜"
3 Piping ½"
4 Piping ⅝"
5 Piping ¾"
6 Piping ⅞"
7 Piping 1"
8 Piping 1⅛"
9 Piping 1¼"
10 Piping 1⅜"

RAB (RENCANA ANGGARAN BIAYA) page 212 of 1892


11 Piping 1½"
12 Piping 1⅝"
13 Extra refrigerant charge

14 Kabel data AC awg 18 untuk gedung A, B, dan C

15 P-AIMS BASIC SOFT


16 Communication Adaptor conector

Testing and Commissioning

G HYDRANT & SPRINKLER SYSTEM


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
Peralatan di Rumah Pompa
1 Diesel Engine Fire Pump per NFPA 20, Cap. 500 USGPM, Head 10
lengkap dengan Fuel Tank, Muffler, Battery & Panel Pompa
2 Electric Fire Pump per NFPA 20, Cap. 500 USGPM, Head 10 bar
lengkap dengan Panel Pompa

RAB (RENCANA ANGGARAN BIAYA) page 213 of 1892


3 Jockey Pump, Cap. 25 USGPM, Head 12 bar
c/w cable & Pump Panel
4 Primming Tank 500 ltr + otomatis
5 Foot Valve 1"
6 Strainer 1"
7 Priming pump (18 liter @ 10 m)
8 Panel kontrol priming pump
9 Check valve 1"
10 Flexible Joint 6"
11 Flexible Joint 2"
12 Flow Meter 6"
13 Foot Valve 8"
14 Pressure Relief Valve 4", UL/FM
15 Check Valve 6", UL/FM
16 Strainer 8", UL/FM
17 Butterfly Valve 8", grooved, UL/FM
18 Butterfly Valve 6", grooved, UL/FM
19 Butterfly Valve 4", grooved, UL/FM
20 Air Vent Valve 1"
21 Pressure Switch, UL/FM

RAB (RENCANA ANGGARAN BIAYA) page 214 of 1892


22 Pressure Gauge 600 psig
23 Ball Valve 1"
24 Ball Valve 1/2"

Pekerjaan Instalasi di Rumah Pompa


1 Pemasangan Pipa berikut hanger, support & pengecatan
- Pipa Black Steel Sch. 40 ASTM A53, Size : 8"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 6"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1/2"
- Pipa drain PVC AW Ø 1/2 "
2 Pemasangan Fitting berikut support & pengecatan
- Elbow 90 deg. Sch. 40, Size : 8"
- Elbow 90 deg. Sch. 40, Size : 6"
- Elbow 90 deg. Sch. 40, Size : 4"
- Elbow 90 deg. Sch. 40, Size : 2"
- Elbow 90 deg. Sch. 40, Size : 1"
- Elbow 90 deg. Sch. 40, Size : 1/2"

RAB (RENCANA ANGGARAN BIAYA) page 215 of 1892


- Reducer Sch. 40, Size : 8" x 6"
- Reducer Sch. 40, Size : 6" x 4"
- Reducer Sch. 40, Size : 2" x 1-1/2"
- Tee Sch. 40, Size : 6"
- Tee Sch. 40, Size : 1"
- Tee Reducer Sch. 40, Size : 8" x 6"
- Tee Reducer Sch. 40, Size : 6" x 4"
- Weld Outlet 2"
- Thread Outlet 1"
- Grooved Coupling 8"
- Grooved Coupling 6"
- Grooved Coupling 4"
- Flange 8" ANSI 150 c/w gasket
- Flange 6" ANSI 150 c/w gasket
- Flange 4" ANSI 150 c/w gasket
- Flange 2" ANSI 150 c/w gasket
- Flange 1-1/2" ANSI 150 c/w gasket
- Blinde Flange 8" ANSI 150 c/w gasket

Peralatan Hydrant & Sprinkler

RAB (RENCANA ANGGARAN BIAYA) page 216 of 1892


1 Alarm Check Valve 6", UL/FM, lengkap dengan :
- Trim Set
- Water Motor Alarm
- Retard Chamber
- Pressure Switch
2 Hydrant Pillar, 2 way
3 Siamese Connection
4 Outdoor Hydrant Box lengkap dengan :
- Rubber Fire Hose 2-1/2" x 30m
- Variable Nozzle
5 Indoor Hydrant Box lengkap dengan :
- Rubber Fire Hose 1-1/2" x 30m
- Variable Nozzle
- Hydrant Valve 1-1/2"
6 Sprinkler Head, 1/2" NPT, Pendent, K5.6, 68 deg.C, UL/FM
7 Sprinkler Head, 1/2" NPT, Upright, K5.6, 68 deg.C, UL/FM
8 Check Valve 4", UL/FM
9 Butterfly Valve 6", grooved, UL/FM
10 Butterfly Valve 4", grooved, UL/FM
11 Test & Drain Valve 1", UL/FM

RAB (RENCANA ANGGARAN BIAYA) page 217 of 1892


12 Flow Switch 4", UL/FM
13 Pressure Gauge 300 psig
14 Ball Valve 1"

Pekerjaan Instalasi Hydrant & Sprinkler


1 Pemasangan Pipa berikut hanger, support & pengecatan
- Pipa Black Steel Sch. 40 ASTM A53, Size : 6"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 2-1/2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1"
2 Pemasangan Fitting berikut support & pengecatan
- Elbow 90 deg. Sch. 40, Size : 6"
- Elbow 90 deg. Sch. 40, Size : 4"
- Elbow 90 deg. Sch. 40, Size : 2-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/4"
- Elbow 90 deg. Sch. 40, Size : 1"
- Reducer Sch. 40, Size : 4" x 2-1/2"

RAB (RENCANA ANGGARAN BIAYA) page 218 of 1892


- Reducer Sch. 40, Size : 1-1/2" x 1-1/4"
- Reducer Sch. 40, Size : 1-1/2" x 1"
- Reducer Sch. 40, Size : 1-1/4" x 1"
- Tee Sch. 40, Size : 4"
- Tee Sch. 40, Size : 1-1/2"
- Tee Sch 40, Size : 1"
- Tee Reduce Sch. 40, Size : 6" x 4"
- Tee Reduce Sch. 40, Size : 4" x 2-1/2"
- Tee Reduce Sch. 40, Size : 2-1/2" x 1-1/2"
- Tee Reduce Sch. 40, Size : 1-1/2" x 1"
- Tee Reduce Sch. 40, Size : 1-1/4" x 1"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1-1/2"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1"
- Grooved Coupling 6"
- Grooved Coupling 4"
- Flange 4" ANSI 150 c/w gasket
- Blind Flange 4" ANSI 150 c/w gasket

Alat Pemadam Api Ringan


1 APAR typeABC Dry Chemical Powder, Kapasitas 6 kg

RAB (RENCANA ANGGARAN BIAYA) page 219 of 1892


LANTAI 2
Peralatan Hydrant & Sprinkler
1 Indoor Hydrant Box lengkap dengan :
- Rubber Fire Hose 1-1/2" x 30m
- Variable Nozzle
- Hydrant Valve 1-1/2"
2 Sprinkler Head, 1/2" NPT, Pendent, K5.6, 68 deg.C, UL/FM
3 Butterfly Valve 6", grooved, UL/FM
4 Butterfly Valve 4", grooved, UL/FM
5 Test & Drain Valve 1", UL/FM
6 Flow Switch 4", UL/FM
7 Pressure Gauge 300 psig
8 Ball Valve 1"

Pekerjaan Instalasi Hydrant & Sprinkler


1 Pemasangan Pipa berikut hanger, support & pengecatan
- Pipa Black Steel Sch. 40 ASTM A53, Size : 6"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 2-1/2"

RAB (RENCANA ANGGARAN BIAYA) page 220 of 1892


- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1"
2 Pemasangan Fitting berikut support & pengecatan
- Elbow 90 deg. Sch. 40, Size : 4"
- Elbow 90 deg. Sch. 40, Size : 2-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/4"
- Elbow 90 deg. Sch. 40, Size : 1"
- Reducer Sch. 40, Size : 4" x 2-1/2"
- Reducer Sch. 40, Size : 1-1/2" x 1-1/4"
- Reducer Sch. 40, Size : 1-1/2" x 1"
- Reducer Sch. 40, Size : 1-1/4" x 1"
- Tee Sch. 40, Size : 4"
- Tee Sch. 40, Size : 1-1/2"
- Tee Sch 40, Size : 1"
- Tee Reduce Sch. 40, Size : 6" x 4"
- Tee Reduce Sch. 40, Size : 4" x 2-1/2"
- Tee Reduce Sch. 40, Size : 2-1/2" x 1-1/2"
- Tee Reduce Sch. 40, Size : 1-1/2" x 1"

RAB (RENCANA ANGGARAN BIAYA) page 221 of 1892


- Tee Reduce Sch. 40, Size : 1-1/4" x 1"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1-1/2"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1"
- Grooved Coupling 6"
- Grooved Coupling 4"
- Blind Flange 4" ANSI 150 c/w gasket

Peralatan FK-5-1-12
1 FK-5-1-12 Container assembly Cap. 215 lb c/w strap and rapture di
2 FK-5-1-12 Agent
3 Impulse Valve Operator Kit
4 Discharge Pressure Switch
5 FK-5-1-12 Nozzle

Pekerjaan Instalasi FK-5-1-12


1 Pemasangan Pipa berikut hanger, support & pengecatan
- Pipa Black Steel Sch. 40 ASTM A53, Size : 2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1"
2 Pemasangan Fitting berikut support & pengecatan
- Elbow 90 deg. Class 3000, Size : 2"

RAB (RENCANA ANGGARAN BIAYA) page 222 of 1892


- Elbow 90 deg. Class 300, Size : 1"
- Reducer Class 300, Size : 2" x 1"
- Grooved Coupling 2"

Alat Pemadam Api Ringan


1 APAR typeABC Dry Chemical Powder, Kapasitas 6 kg

LANTAI 3
Peralatan Hydrant dan Sprinkler
1 Indoor Hydrant Box lengkap dengan :
- Rubber Fire Hose 1-1/2" x 30m
- Variable Nozzle
- Hydrant Valve 1-1/2"
2 Sprinkler Head, 1/2" NPT, Pendent, K5.6, 68 deg.C, UL/FM
3 Butterfly Valve 6", grooved, UL/FM
4 Butterfly Valve 4", grooved, UL/FM
5 Test & Drain Valve 1", UL/FM
6 Flow Switch 4", UL/FM
7 Pressure Gauge 300 psig
8 Ball Valve 1"

RAB (RENCANA ANGGARAN BIAYA) page 223 of 1892


Pekerjaan Instalasi Hydrant & Sprinkler
1 Pemasangan Pipa berikut hanger, support & pengecatan
- Pipa Black Steel Sch. 40 ASTM A53, Size : 6"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 2-1/2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1"
2 Pemasangan Fitting berikut support & pengecatan
- Elbow 90 deg. Sch. 40, Size : 4"
- Elbow 90 deg. Sch. 40, Size : 2-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/4"
- Elbow 90 deg. Sch. 40, Size : 1"
- Reducer Sch. 40, Size : 4" x 2-1/2"
- Reducer Sch. 40, Size : 1-1/2" x 1-1/4"
- Reducer Sch. 40, Size : 1-1/2" x 1"
- Reducer Sch. 40, Size : 1-1/4" x 1"
- Tee Sch. 40, Size : 4"

RAB (RENCANA ANGGARAN BIAYA) page 224 of 1892


- Tee Sch. 40, Size : 1-1/2"
- Tee Sch 40, Size : 1"
- Tee Reduce Sch. 40, Size : 6" x 4"
- Tee Reduce Sch. 40, Size : 4" x 2-1/2"
- Tee Reduce Sch. 40, Size : 2-1/2" x 1-1/2"
- Tee Reduce Sch. 40, Size : 1-1/2" x 1"
- Tee Reduce Sch. 40, Size : 1-1/4" x 1"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1-1/2"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1"
- Grooved Coupling 6"
- Grooved Coupling 4"
- Blind Flange 4" ANSI 150 c/w gasket

Alat Pemadam Api Ringan


1 APAR typeABC Dry Chemical Powder, Kapasitas 6 kg

LANTAI 4
Peralatan Hydrant & Sprinkler
1 Indoor Hydrant Box lengkap dengan :
- Rubber Fire Hose 1-1/2" x 30m

RAB (RENCANA ANGGARAN BIAYA) page 225 of 1892


- Variable Nozzle
- Hydrant Valve 1-1/2"
2 Sprinkler Head, 1/2" NPT, Pendent, K5.6, 68 deg.C, UL/FM
3 Butterfly Valve 6", grooved, UL/FM
4 Butterfly Valve 4", grooved, UL/FM
5 Test & Drain Valve 1", UL/FM
6 Flow Switch 4", UL/FM
7 Pressure Gauge 300 psig
8 Ball Valve 1"

Pekerjaan Instalasi Hydrant & Sprinkler


1 Pemasangan Pipa berikut hanger, support & pengecatan
- Pipa Black Steel Sch. 40 ASTM A53, Size : 6"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 2-1/2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1"
2 Pemasangan Fitting berikut support & pengecatan
- Elbow 90 deg. Sch. 40, Size : 4"

RAB (RENCANA ANGGARAN BIAYA) page 226 of 1892


- Elbow 90 deg. Sch. 40, Size : 2-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/4"
- Elbow 90 deg. Sch. 40, Size : 1"
- Reducer Sch. 40, Size : 4" x 2-1/2"
- Reducer Sch. 40, Size : 1-1/2" x 1-1/4"
- Reducer Sch. 40, Size : 1-1/2" x 1"
- Reducer Sch. 40, Size : 1-1/4" x 1"
- Tee Sch. 40, Size : 4"
- Tee Sch. 40, Size : 1-1/2"
- Tee Sch 40, Size : 1"
- Tee Reduce Sch. 40, Size : 6" x 4"
- Tee Reduce Sch. 40, Size : 4" x 2-1/2"
- Tee Reduce Sch. 40, Size : 2-1/2" x 1-1/2"
- Tee Reduce Sch. 40, Size : 1-1/2" x 1"
- Tee Reduce Sch. 40, Size : 1-1/4" x 1"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1-1/2"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1"
- Grooved Coupling 6"
- Grooved Coupling 4"

RAB (RENCANA ANGGARAN BIAYA) page 227 of 1892


- Blind Flange 4" ANSI 150 c/w gasket

Alat Pemadam Api Ringan


1 APAR typeABC Dry Chemical Powder, Kapasitas 6 kg

LANTAI 5
Peralatan Hydrant
1 Indoor Hydrant Box lengkap dengan :
- Rubber Fire Hose 1-1/2" x 30m
- Variable Nozzle
- Hydrant Valve 1-1/2"
2 Sprinkler Head, 1/2" NPT, Pendent, K5.6, 68 deg.C, UL/FM
3 Butterfly Valve 6", grooved, UL/FM
4 Butterfly Valve 4", grooved, UL/FM
5 Test & Drain Valve 1", UL/FM
6 Flow Switch 4", UL/FM
7 Pressure Gauge 300 psig
8 Ball Valve 1"

Pekerjaan Instalasi Hydrant & Sprinkler

RAB (RENCANA ANGGARAN BIAYA) page 228 of 1892


1 Pemasangan Pipa berikut hanger, support & pengecatan
- Pipa Black Steel Sch. 40 ASTM A53, Size : 6"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 2-1/2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/2"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/4"
- Pipa Black Steel Sch. 40 ASTM A53, Size : 1"
2 Pemasangan Fitting berikut support & pengecatan
- Elbow 90 deg. Sch. 40, Size : 4"
- Elbow 90 deg. Sch. 40, Size : 2-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/2"
- Elbow 90 deg. Sch. 40, Size : 1-1/4"
- Elbow 90 deg. Sch. 40, Size : 1"
- Reducer Sch. 40, Size : 4" x 2-1/2"
- Reducer Sch. 40, Size : 1-1/2" x 1-1/4"
- Reducer Sch. 40, Size : 1-1/4" x 1"
- Tee Sch. 40, Size : 4"
- Tee Sch. 40, Size : 1-1/2"
- Tee Sch 40, Size : 1"
- Tee Reduce Sch. 40, Size : 6" x 4"

RAB (RENCANA ANGGARAN BIAYA) page 229 of 1892


- Tee Reduce Sch. 40, Size : 4" x 2-1/2"
- Tee Reduce Sch. 40, Size : 2-1/2" x 1-1/2"
- Tee Reduce Sch. 40, Size : 1-1/2" x 1"
- Tee Reduce Sch. 40, Size : 1-1/4" x 1"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1-1/2"
- Mechanical Tee Reducer Sch. 40, Size : 4" x 1"
- Grooved Coupling 6"
- Grooved Coupling 4"
- Blind Flange 4" ANSI 150 c/w gasket

Alat Pemadam Api Ringan


1 APAR typeABC Dry Chemical Powder, Kapasitas 6 kg

Testing and Commissioning

H PEKERJAAN TRANSPORTASI VERTIKAL (LIFT)


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
1 Pekerjaan Lift
(Kapasitas 11 orang, 5 lantai, 800 kg)

RAB (RENCANA ANGGARAN BIAYA) page 230 of 1892


Speed : 1 m/s
Include ARD, Ijin Disnaker
2 Pekerjaan Lift
(Kapasitas 15 orang, 5 lantai, 1000 kg)
Speed : 1 m/s
Include ARD, Ijin Disnaker
3 Pekerjaan Lift Barang
(Kapasitas 15 orang, 5 lantai, 1000 kg)
Speed : 1 m/s
Include ARD, Ijin Disnaker

4 Testing and Commissioning

TOTAL BIAYA PEKERJAAN MEKANIKAL


TOTAL BIAYA BANGUNAN B
IV BANGUNAN C (AS 28-36/ B-M)
PEKERJAAN STRUKTUR
A PEKERJAAN GALIAN DAN URUGAN
1 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm samp
2 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm samp
3 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm samp
RAB (RENCANA ANGGARAN BIAYA) page 231 of 1892
4 Galian pondasi footplat + pondasi cor beton 3500 x 3500 mm lebih
5 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
6 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
7 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm samp
8 Galian pondasi footplat + pondasi cor beton 3100 x 3100 mm lebih
9 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm samp
10 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm samp
11 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm samp
12 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm lebih
13 Urug tanah kembali bekas galian footplat+pondasi cor beton, dipad
14 Urug pasir bawah pondasi cor beton, t : 100 mm
- LIFT KHUSUS
1 Galian pondasi pit lift, sampai 1m
2 Galian pondasi pit lift, sampai 2m

BIAYA PEKERJAAN GALIAN DAN URUGAN


B PEKERJAAN BETON
LANTAI 1
1 Cor rabat bawah lantai tebal = 100 mm
1 pc : 3 ps : 5 sp
2 Cor rabat bawah pondasi cor beton tebal = 100 mm
RAB (RENCANA ANGGARAN BIAYA) page 232 of 1892
1 pc : 3 ps : 5 sp
- LIFT KHUSUS
3 Pondasi cor beton, mutu beton f'c 25 Mpa + stek besi D13 mm
4 Cor pondasi pit lift t : 300 mm, mutu beton f'c 25 MPa
5 Cor dinding beton t : 200 mm, mutu beton f'c 25 MPa
6 Cor dinding beton t : 250 mm, mutu beton f'c 25 MPa
7 Pondasi cor beton 3500 x 3500 mm, mutu beton f'c 15 Mpa + stek b
8 Pondasi cor beton 3100 x 3100 mm, mutu beton f'c 15 Mpa + stek b
9 Pondasi cor beton 3100 x 3100 mm, mutu beton f'c 15 Mpa + stek b
10 Cor footplat F1 2600 x 2600 mm, mutu beton f'c 25 MPa
11 Cor footplat F2 2200 x 2200 mm, mutu beton f'c 25 MPa
12 Cor footplat F4 1600 x 1600 mm, mutu beton f'c 25 MPa
13 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
14 Cor kolom K3 - 300x400 mm, mutu beton f'c 25 MPa
15 Cor kolom K4 - 200x400 mm, mutu beton f'c 25 MPa
16 Cor kolom K7 - SESUAI DETAIL, mutu beton f'c 25 MPa
17 Cor kolom K8 - SESUAI DETAIL, mutu beton f'c 25 MPa
18 Cor sloof S2 - 350x500 mm, mutu beton f'c 25 MPa
19 Cor sloof S2 - 350x500 mm, mutu beton f'c 25 MPa
20 Cor sloof S3 - 200x400 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 233 of 1892


21 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
22 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
23 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
24 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
25 Cor balok miring B2 - 400x600 mm, mutu beton f'c 25 MPa
26 Cor balok miring B3 - 300x600 mm, mutu beton f'c 25 MPa
27 Cor balok B11 - 150x500 mm, mutu beton f'c 25 MPa

Elevasi (- 4.200) - (± 0.000)


28 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (- 4.200) - (± 0.000)


29 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (- 4.200) - (± 0.000)


30 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

31 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

32 Plat A3 tebal 100 mm, mutu beton f'c 25 MPa


LANTAI 2
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
RAB (RENCANA ANGGARAN BIAYA) page 234 of 1892
2 Cor kolom K3 - 300x400 mm, mutu beton f'c 25 MPa
3 Cor kolom K4 - 200x400 mm, mutu beton f'c 25 MPa
4 Cor kolom K7 - SESUAI DETAIL, mutu beton f'c 25 MPa
5 Cor kolom K8 - SESUAI DETAIL, mutu beton f'c 25 MPa
6 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
7 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
8 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
9 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
10 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
11 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
12 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
13 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
14 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
15 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
16 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
17 Cor balok B10b - 200x600 mm, mutu beton f'c 25 MPa
18 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
19 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
20 Cor balok B11 - 150x500 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 235 of 1892


Elevasi (± 0.000) - (+ 4.200)
21 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (± 0.000) - (+ 4.200)


22 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (± 0.000) - (+ 4.200)


23 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

24 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

25 Plat A3 tebal 100 mm, mutu beton f'c 25 MPa


LANTAI 3
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K3 - 300x400 mm, mutu beton f'c 25 MPa
3 Cor kolom K4 - 200x400 mm, mutu beton f'c 25 MPa
4 Cor kolom K7 - SESUAI DETAIL, mutu beton f'c 25 MPa
5 Cor kolom K8 - SESUAI DETAIL, mutu beton f'c 25 MPa
6 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
7 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
8 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
9 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
RAB (RENCANA ANGGARAN BIAYA) page 236 of 1892
10 Cor balok B4 - 500x700 mm, mutu beton f'c 25 MPa
11 Cor balok B5 - 300x700 mm, mutu beton f'c 25 MPa
12 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
13 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
14 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
15 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
16 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
17 Cor balok B10b - 200x600 mm, mutu beton f'c 25 MPa

18 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


19 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
20 Cor balok B11 - 150x500 mm, mutu beton f'c 25 MPa
21 Cor balok B15 - (Sesuai Detail), mutu beton f'c 25 MPa

Elevasi (+ 4.200) - (+ 8.400)


22 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (+ 4.200) - (+ 8.400)


23 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

Elevasi (+ 4.200) - (+ 8.400)

RAB (RENCANA ANGGARAN BIAYA) page 237 of 1892


24 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

25 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

26 Plat A3 tebal 100 mm, mutu beton f'c 25 MPa


LANTAI 4
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K3 - 300x400 mm, mutu beton f'c 25 MPa
3 Cor kolom K4 - 200x400 mm, mutu beton f'c 25 MPa
4 Cor kolom K8 - SESUAI DETAIL, mutu beton f'c 25 MPa
5 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
6 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
7 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
8 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
9 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
10 Cor balok B8a - 400x700 mm, mutu beton f'c 25 MPa
11 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
12 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
13 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
14 Cor balok B10b - 200x600 mm, mutu beton f'c 25 MPa
15 Cor balok B16 - (SESUAI DETAIL) , mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 238 of 1892


16 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
17 Cor balok B6 - 400x600 mm, mutu beton f'c 25 MPa
18 Cor balok B11 - 150x500 mm, mutu beton f'c 25 MPa
Elevasi (+ 8.400) - (+ 12.600)
19 Cor tangga beton tebal plat bordes 150 mm, mutu beton f'c 25 M

20 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

21 Plat A3 tebal 100 mm, mutu beton f'c 25 MPa

22 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


23 Cor balok B1a - 400x700 mm, mutu beton f'c 25 MPa
24 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
25 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
26 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
27 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
28 Cor balok B10 - 200x600 mm, mutu beton f'c 25 MPa
29 Cor balok B10a - 200x600 mm, mutu beton f'c 25 MPa
30 Cor balok B10c - 200x600 mm, mutu beton f'c 25 MPa
31 Cor balok L2 - 150x600 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 239 of 1892


32 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
33 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
34 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
35 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa
36 Cor balok B18 - 250x600 mm, mutu beton f'c 25 MPa
37 Cor balok B18 - 250x600 mm, mutu beton f'c 25 MPa
38 Cor balok L3 - 150x700 mm, mutu beton f'c 25 MPa

39 Cor tangga beton, mutu beton f'c 25 Mpa

40 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

41 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

42 Plat A4 tebal 250 mm, mutu beton f'c 25 MPa

43 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

44 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 240 of 1892


LANTAI 5
1 Cor kolom K1 - 650x650 mm, mutu beton f'c 25 MPa
2 Cor kolom K5 - 250x400 mm, mutu beton f'c 25 MPa

3 Cor balok B1 - 400x600 mm, mutu beton f'c 25 MPa


4 Cor balok B2 - 400x600 mm, mutu beton f'c 25 MPa
5 Cor balok B3 - 300x600 mm, mutu beton f'c 25 MPa
6 Cor balok B8 - 400x600 mm, mutu beton f'c 25 MPa
7 Cor balok B9 - 300x600 mm, mutu beton f'c 25 MPa
8 Cor balok L4 - 150x950 mm, mutu beton f'c 25 MPa

9 Plat A1 tebal 150 mm, mutu beton f'c 25 MPa

10 Plat A4 tebal 250 mm, mutu beton f'c 25 MPa

BIAYA PEKERJAAN BETON


TOTAL BIAYA PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTUR
A PEKERJAAN GALIAN DAN URUGAN
1 Galian pondasi batu kali 1 m
2 Urugan pasir bawah pondasi batu kali tebal = 100 mm

RAB (RENCANA ANGGARAN BIAYA) page 241 of 1892


3 Urugan pasir bawah lantai tebal = 100 mm
4 Urugan kembali galian pondasi + pemadatan
5 Urugan tanah peninggian peil lantai dengan tanah bekas galian + p
BIAYA PEKERJAAN GALIAN DAN URUGAN
B PEKERJAAN ANTI RAYAP
1 Anti rayap galian pondasi batu kali
2 Anti rayap bawah lantai
BIAYA PEKERJAAN ANTI RAYAP
C PEKERJAAN BETON PRAKTIS
LANTAI 1
1 Sloof praktis SP1, ukuran = 100 x 200 mm
2 Sloof praktis SP2, ukuran = 120 x 200 mm
3 Kolom praktis KP02, ukuran = 120 x 120 mm
4 Kolom praktis KP01, ukuran = 100 x 100 mm
5 Balok praktis BP01, ukuran = 100 x 100 mm
6 Balok praktis BP02, ukuran = 120 x 120 mm
7 Balok latiu BL1 100x100 mm
8 Balok latiu BL2 120x120 mm
9 Balok latiu BL3 100x400 mm

RAB (RENCANA ANGGARAN BIAYA) page 242 of 1892


LANTAI 2
1 Kolom praktis KP02, ukuran = 120 x 120 mm
2 Kolom praktis KP01, ukuran = 100 x 100 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm
5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm

LANTAI 3
1 Kolom praktis KP02, ukuran = 120 x 120 mm
2 Kolom praktis KP01, ukuran = 100 x 100 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm
5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm

LANTAI 4
1 Kolom praktis KP02, ukuran = 120 x 120 mm

RAB (RENCANA ANGGARAN BIAYA) page 243 of 1892


2 Kolom praktis KP01, ukuran = 100 x 100 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok praktis BP02, ukuran = 120 x 120 mm
5 Balok latiu BL1 100x100 mm
6 Balok latiu BL2 120x120 mm
7 Balok latiu BL3 100x400 mm

LANTAI 5
1 Kolom praktis KP01, ukuran = 100 x 100 mm
2 Kolom praktis KP04, ukuran = 100 x 300 mm
3 Balok praktis BP01, ukuran = 100 x 100 mm
4 Balok latiu BL1 100x100 mm
BIAYA PEKERJAAN BETON PRAKTIS
D PEKERJAAN PASANGAN DAN PLESTERAN
LANTAI 1
1 Pasangan pondasi batu kali 1pc : 6ps
2 Pasangan rollag
3 Pasangan dinding bata ringan
4 Plesteran dinding bata ringan tebal 10 mm
5 Acian dinding bata ringan

RAB (RENCANA ANGGARAN BIAYA) page 244 of 1892


6 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
7 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
8 Pasangan dinding 1/2 bata merah 1 pc : 6 ps
9 Plesteran dinding 1/2 bata merah 1 pc : 6 ps
10 Acian dinding bata merah
11 Plester dan acian beton (kolom dan balok, lisplank)
12 Plesteran tali air
13 Plesteran skoning
14 Plesteran ban-banan
15 Wallfiller plat tangga

LANTAI 2
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Acian dinding bata merah
7 Plester dan acian beton (kolom dan balok, lisplank)
8 Plesteran tali air

RAB (RENCANA ANGGARAN BIAYA) page 245 of 1892


9 Plesteran skoning
10 Wallfiller plat tangga
11 Screeding plat lantai beton
LANTAI 3
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps
5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Acian dinding bata merah
7 Plester dan acian beton (kolom dan balok, lisplank)
8 Plesteran tali air
9 Plesteran skoning
10 Wallfiller plat tangga
11 Screeding plat lantai beton
LANTAI 4
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Pasangan dinding 1/2 bata merah 1 pc : 3 ps

RAB (RENCANA ANGGARAN BIAYA) page 246 of 1892


5 Plesteran dinding 1/2 bata merah 1 pc : 3 ps
6 Acian dinding bata merah
7 Plester dan acian beton (kolom dan balok, lisplank)
8 Plesteran tali air
9 Plesteran skoning
10 Wallfiller plat tangga
11 Screeding plat lantai beton
LANTAI 5
1 Pasangan dinding bata ringan
2 Plesteran dinding bata ringan tebal 10 mm
3 Acian dinding bata ringan
4 Plester dan acian beton (kolom dan balok)
5 Plesteran tali air
6 Plesteran skoning
7 Screeding plat lantai beton
8 Screeding plat dak + kawat ayam

BIAYA PEKERJAAN PASANGAN DAN PLESTERAN


E PEKERJAAN PINTU DAN JENDELA
LANTAI 1

RAB (RENCANA ANGGARAN BIAYA) page 247 of 1892


1 Pintu P01
2 Pintu P03
3 Pintu P04
4 Pintu P05
5 Pintu P06
6 Pintu P07
7 Pintu P08
8 Pintu Shaft PSH
9 Jendela J01
10 Bouvent BV01
11 Bouvent BV02
12 Boven BV06
13 Curtainwall 01 dari elv. - 2.100 s/d elv + 13.850
14 Curtainwall 03 dari elv. - 3.100 s/d elv + 11.400
15 Curtainwall 04 dari elv. - 3.100 s/d elv + 5.550

LANTAI 2
1 Pintu P01
2 Pintu P03
3 Pintu P04

RAB (RENCANA ANGGARAN BIAYA) page 248 of 1892


4 Pintu P05
5 Pintu P06
6 Pintu P07
7 Pintu P08
8 Pintu Shaft PSH
9 Jendela J01
10 Jendela J07
11 Bouvent BV01
12 Boven BV02
13 Boven BV06

LANTAI 3
1 Pintu P01
2 Pintu P03
3 Pintu P04
4 Pintu P05
5 Pintu P06
6 Pintu P07
7 Pintu P08
8 Pintu shaft PSH

RAB (RENCANA ANGGARAN BIAYA) page 249 of 1892


9 Jendela J01
10 Jendela J07
11 Bouvent BV01
12 Boven BV02
13 Boven BV06

LANTAI 4
1 Pintu jendela PJ02
2 Pintu P01
3 Pintu P03
4 Pintu P04
5 Pintu P05
6 Pintu P06
7 Pintu P07
8 Pintu P08
9 Pintu Shaft PSH
10 Jendela J01
11 Jendela J07
12 Bouvent BV01
13 Boven BV02

RAB (RENCANA ANGGARAN BIAYA) page 250 of 1892


14 Boven BV06

LANTAI 5
1 Pintu P02
2 Pintu besi PB01
3 Pintu besi PB02
4 Pintu shaft PSH

BIAYA PEKERJAAN PINTU DAN JENDELA


G PEKERJAAN PLAFON
LANTAI 1
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing
3 Plafon kalsium silikat t = 6 mm, rangka metal furing
4 Shadow line
5 Maintenance hole 600 x 600 mm
LANTAI 2
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing
3 Plafon kalsium silikat t = 6 mm, rangka metal furing

RAB (RENCANA ANGGARAN BIAYA) page 251 of 1892


4 Shadow line
5 Maintenance hole 600 x 600 mm
LANTAI 3
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing
3 Plafon kalsium silikat t = 6 mm, rangka metal furing
4 Shadow line
5 Maintenance hole 600 x 600 mm
LANTAI 4
1 Plafond gypsum tebal 12 mm rangka metal furing
2 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing
3 Plafon kalsium silikat t = 6 mm, rangka metal furing
4 Shadow line
5 Maintenance hole 600 x 600 mm
BIAYA PEKERJAAN PLAFON
H PEKERJAAN PARTISI GYPSUM, PARTISI KACA, WORK STATIO
LANTAI 1
1 Partisi Gypsum PR01
2 Partisi Gypsum PR02
3 Partisi Gypsum PR03

RAB (RENCANA ANGGARAN BIAYA) page 252 of 1892


4 Partisi Gypsum PR04
5 Partisi Gypsum PR05
6 Partisi Gypsum PR06
7 Partisi Gypsum PR07
8 Partisi Gypsum PR08
9 Partisi Gypsum PR09
10 Partisi Gypsum PR10
11 Partisi Kaca PK01
12 Partisi Kaca PK02
13 Work Station WS 01
14 Work Station WS 02
15 Work Station WS 03
16 Work Station WS 04
17 Work Station WS 05
18 Work Station WS 06
19 Work Station WS 07
20 Work Station WS 08

LANTAI 2
1 Partisi Gypsum PR01

RAB (RENCANA ANGGARAN BIAYA) page 253 of 1892


2 Partisi Gypsum PR02
3 Partisi Gypsum PR03
4 Partisi Gypsum PR04
5 Partisi Gypsum PR05
6 Partisi Gypsum PR06
7 Partisi Gypsum PR07
8 Partisi Gypsum PR09
9 Partisi Gypsum PR10
10 Partisi Kaca PK01
11 Partisi Kaca PK02
12 Work Station WS 01
13 Work Station WS 02
14 Work Station WS 03
15 Work Station WS 04
16 Work Station WS 05
17 Work Station WS 06
18 Work Station WS 07
19 Work Station WS 08

LANTAI 3

RAB (RENCANA ANGGARAN BIAYA) page 254 of 1892


1 Partisi Gypsum PR01
2 Partisi Gypsum PR02
3 Partisi Gypsum PR03
4 Partisi Gypsum PR04
5 Partisi Gypsum PR05
6 Partisi Gypsum PR06
7 Partisi Gypsum PR07
8 Partisi Gypsum PR09
9 Partisi Gypsum PR10
10 Partisi Kaca PK01
11 Partisi Kaca PK02
12 Work Station WS 01
13 Work Station WS 02
14 Work Station WS 03
15 Work Station WS 04
16 Work Station WS 05
17 Work Station WS 06
18 Work Station WS 07
19 Work Station WS 08

RAB (RENCANA ANGGARAN BIAYA) page 255 of 1892


LANTAI 4
1 Partisi Gypsum PR01
2 Partisi Gypsum PR02
3 Partisi Gypsum PR03
4 Partisi Gypsum PR04
5 Partisi Gypsum PR05
6 Partisi Gypsum PR06
7 Partisi Gypsum PR07
8 Partisi Gypsum PR09
9 Partisi Gypsum PR10
10 Partisi Kaca PK01
11 Partisi Kaca PK02
12 Work Station WS 02
13 Work Station WS 03
14 Work Station WS 04
15 Work Station WS 05
16 Work Station WS 06
17 Work Station WS 07
18 Work Station WS 08

RAB (RENCANA ANGGARAN BIAYA) page 256 of 1892


BIAYA PEKERJAAN PARTISI
I PEKERJAAN FINISHING LANTAI DAN DINDING
LANTAI 01

1 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )


2 Homogeneous Tile Matt Tipe B 600 x 600 mm
3 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
4 Plint Homogeneous Tile 80 x 600 mm
5 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
6 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm
7 Stepnosing 80 x 600 mm
8 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
9 Homogeneous Tile 300 x 600 jumplift
10 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

LANTAI 02

1 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )


2 Homogeneous Tile Matt Tipe B 600 x 600 mm
3 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
4 Plint Homogeneous Tile 80 x 600 mm
5 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
RAB (RENCANA ANGGARAN BIAYA) page 257 of 1892
6 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm
7 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
8 Homogeneous Tile 300 x 600 jumplift
9 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

LANTAI 03

1 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )


2 Homogeneous Tile Matt Tipe B 600 x 600 mm
3 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
4 Plint Homogeneous Tile 80 x 600 mm
5 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
6 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm
7 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
8 Homogeneous Tile 300 x 600 jumplift
9 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

LANTAI 04

1 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )


2 Homogeneous Tile Matt Tipe B 600 x 600 mm
3 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area
RAB (RENCANA ANGGARAN BIAYA) page 258 of 1892
4 Plint Homogeneous Tile 80 x 600 mm
5 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm
6 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm
7 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )
8 Homogeneous Tile 300 x 600 jumplift
9 Granit custom tebal 28 mm finishing meja wastafel rangka baja siku

BIAYA PEKERJAAN FINISHING LANTAI DAN DINDING


J PEKERJAAN PENGECATAN
LANTAI 1
1 Cat dinding luar (dinding, kolom, balok)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat tangga

LANTAI 2
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat tangga

RAB (RENCANA ANGGARAN BIAYA) page 259 of 1892


5 Waterproofing plat
6 Waterproofing km/wc
LANTAI 3
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat tangga
5 Waterproofing plat
6 Waterproofing km/wc
LANTAI 4
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Cat Plafon
4 Cat wall filler plat tangga
5 Waterproofing plat
6 Waterproofing km/wc
LANTAI ATAP
1 Cat dinding luar (dinding, kolom)
2 Cat dinding dalam (dinding, kolom)
3 Waterproofing plat

RAB (RENCANA ANGGARAN BIAYA) page 260 of 1892


BIAYA PEKERJAAN PENGECATAN
K PEKERJAAN RAILING
Catatan:
Pekerjaan railing dikerjakan sesuai gambar detail lengkap dengan a
Railing menggunakan hollow stainless 40 x 60 mm dan 20 x 20 mm
Tangga type 01
LANTAI 01
1 Handrail H01
2 Handrail H02
3 Handrail H03
4 Handrail H04
5 Handrail H05
6 Handrail H06
LANTAI 02
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08

RAB (RENCANA ANGGARAN BIAYA) page 261 of 1892


LANTAI 03
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 04
1 Handrail H09

Tangga type 02
LANTAI 01
1 Handrail H01
2 Handrail H02
3 Handrail H03
4 Handrail H04
5 Handrail H05
6 Handrail H06
LANTAI 02
1 Handrail H03

RAB (RENCANA ANGGARAN BIAYA) page 262 of 1892


2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 03
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 04
1 Handrail H09

Tangga type 03
LANTAI 01
1 Handrail H01
2 Handrail H02
3 Handrail H03

RAB (RENCANA ANGGARAN BIAYA) page 263 of 1892


4 Handrail H04
5 Handrail H05
6 Handrail H06
LANTAI 02
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 03
1 Handrail H03
2 Handrail H04
3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 04
1 Handrail H03
2 Handrail H04

RAB (RENCANA ANGGARAN BIAYA) page 264 of 1892


3 Handrail H05
4 Handrail H06
5 Handrail H07
6 Handrail H08
LANTAI 05
1 Handrail H09

Railing void type 06


LANTAI 02
1 Handrail H01
2 Handrail H02
3 Handrail H03
LANTAI 03
1 Handrail H01
2 Handrail H02
3 Handrail H03
LANTAI 04
1 Handrail H01
2 Handrail H02
3 Handrail H03

RAB (RENCANA ANGGARAN BIAYA) page 265 of 1892


Railing void type 09
LANTAI 01
1 Railing R01
2 Railing R02

LANTAI 02
1 Railing R01
2 Railing R02

LANTAI 03
1 Railing R01
2 Railing R02

Railing void type 11


LANTAI 02
1 Railing R04

LANTAI 03
1 Railing R04

RAB (RENCANA ANGGARAN BIAYA) page 266 of 1892


LANTAI 04
1 Railing R04

Railing type 13
LANTAI 04
1 Railling R07

Railing type 14
LANTAI 02
1 Handrailing H01
2 Handrailing H02

LANTAI 03
1 Handrailing H01
2 Handrailing H02

LANTAI 04
1 Handrailing H01
2 Handrailing H02

RAB (RENCANA ANGGARAN BIAYA) page 267 of 1892


Railing type 15
LANTAI 02
1 Handrailing H01
2 Handrailing H02

LANTAI 03
1 Handrailing H01
2 Handrailing H02

LANTAI 04
1 Handrailing H01
2 Handrailing H02
Tangga maintenance
1 Tangga maintenance pipa BS Ø 2" tebal 1.6 mm type D
2 Penutup shaft, Plat bordes tebal = 2 mm
3 Tarikan Besi Ø 10 mm
4 Engsel besi
5 Pasangan grill besi siku

BIAYA PEKERJAAN RAILING


RAB (RENCANA ANGGARAN BIAYA) page 268 of 1892
L PEKERJAAN CUBICLE TOILET
Catatan:
Pekerjaan cubicle toilet dikerjakan sesuai gambar detail lengkap de
LANTAI 01
1 Cubicle toilet type A
2 Cubicle toilet type B
3 Cubicle toilet type C
LANTAI 02
1 Cubicle toilet type A
2 Cubicle toilet type B
3 Cubicle toilet type C
LANTAI 03
1 Cubicle toilet type A
2 Cubicle toilet type B
3 Cubicle toilet type C
LANTAI 04
1 Cubicle toilet type A
2 Cubicle toilet type B
3 Cubicle toilet type C

RAB (RENCANA ANGGARAN BIAYA) page 269 of 1892


BIAYA PEKERJAAN CUBICLE TOILET
M PEKERJAAN FASADE
1 Detail motif 1
- Bahan papan fiber cement non silica tebal 25 mm
- Rangka utama 80x100x2 mm
- Rangka pembagi 40x40x 1.8 mm
2 Detail motif 2 module 3000 x 2450 mm
- Bahan papan fiber cement non silica tebal 25 mm
- Rangka utama 40x60x2 mm
3 Detail motif 03
- Bahan papan fiber cement non silica tebal 11 mm
- Rangka utama 80x100x2 mm
- Rangka pembagi 40x40x 1.8 mm
4 Detail motif 08
- Covering kolom dengan GRC tebal 50 mm
- Kolom pedestal 300 x 400 mm tul. 6 D16 mm
- Kolom H beam 200 x 200 x 8 x 12 mm
- Plat rib tebal 8 mm
- Plat plendes tebal 15 mm
- 2 lipped channel 150 x 150 x 20 x 3.2 mm

RAB (RENCANA ANGGARAN BIAYA) page 270 of 1892


- Angkur M16
5 Detail motif 11
- Bahan papan fiber cement non silica tebal 25 mm (100x150)
6 Detail motif 12
Finishing Veeneer Batu

7 Finishing cat teksture

TAMPAK SELATAN
LANTAI 1
a Finishing Cat Tekstur
LANTAI 2
b Finishing Cat Tekstur
LANTAI 3
c Finishing Cat Tekstur
LANTAI 4
d Finishing Cat Tekstur
TAMPAK UTARA
LANTAI 1
a Finishing Cat Tekstur
LANTAI 2

RAB (RENCANA ANGGARAN BIAYA) page 271 of 1892


b Finishing Cat Tekstur
LANTAI 3
c Finishing Cat Tekstur
LANTAI 4
d Finishing Cat Tekstur

TAMPAK TIMUR
LANTAI 1
a Finishing Cat Tekstur
LANTAI 2
b Finishing Cat Tekstur
LANTAI 3
c Finishing Cat Tekstur
LANTAI 4
d Finishing Cat Tekstur

8 Pekerjaan Ban-banan

TAMPAK SELATAN
Ban-banan

RAB (RENCANA ANGGARAN BIAYA) page 272 of 1892


TAMPAK UTARA
Ban-banan

TAMPAK TIMUR
Ban-banan

BIAYA PEKERJAAN FINISHING EXTERIOR


TOTAL BIAYA PEKERJAAN ARSITEKTUR
PEKERJAAN ELEKTRIKAL
A PEKERJAAN PANEL
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
1 PANEL SDP PENERANGAN DAN DAYA
LANTAI 1
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H

RAB (RENCANA ANGGARAN BIAYA) page 273 of 1892


Magnetic Contactor 3P 1NO 1NC
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju LVMDP
Wiring + Pemasangan
LANTAI 2
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H
Magnetic Contactor 3P 1NO 1NC
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju LVMDP
Wiring + Pemasangan

RAB (RENCANA ANGGARAN BIAYA) page 274 of 1892


LANTAI 3
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H
Magnetic Contactor 3P 1NO 1NC
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju LVMDP
Wiring + Pemasangan
LANTAI 4
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 100A / 3p / 10kA
MCB 16A / 1p / 6kA
MCB 10A / 1p / 6kA
Timer 24H
Magnetic Contactor 3P 1NO 1NC

RAB (RENCANA ANGGARAN BIAYA) page 275 of 1892


Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju LVMDP
Wiring + Pemasangan
LANTAI 5
Box panel uk. (500 x 400 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 10A / 1p / 6kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 50 mm2 menuju LVMDP
Wiring + Pemasangan
3 PANEL SDP AC INDOOR DAN OUTDOOR
LANTAI 1
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted

RAB (RENCANA ANGGARAN BIAYA) page 276 of 1892


MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
LANTAI 2

RAB (RENCANA ANGGARAN BIAYA) page 277 of 1892


Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day

RAB (RENCANA ANGGARAN BIAYA) page 278 of 1892


Wiring + Pemasangan
LANTAI 3
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)

RAB (RENCANA ANGGARAN BIAYA) page 279 of 1892


Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
LANTAI 4
Panel indoor AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 25A / 3p / 10kA
MCB 6A / 1p / 4.5kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
Panel SDP AC
Box panel uk. (700 x 500 x 250) mm type wall mounted
MCCB 200A / 3p / 18kA
MCCB 60A / 3p / 10kA
MCCB 25A / 3p / 10kA
Lampu Indikator

RAB (RENCANA ANGGARAN BIAYA) page 280 of 1892


Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan
4 PANEL SDP LIFT
PANEL SDP LIFT C
Box panel uk. (500 x 400 x 250) mm type wall mounted
MCCB 50A / 3p / 10kA
MCB 25A / 3p / 6kA
Lampu Indikator
Fuse Lamp 2A
Bus Bar Sistem/ Cu 4 x (15x2mm)
Sepatu kabel+ Sleeve+ Cable tie
Grounding sistem BCC 35 mm2 menuju Panel penerangan dan day
Wiring + Pemasangan

B PEKERJAAN PENARIKAN KABEL


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra

RAB (RENCANA ANGGARAN BIAYA) page 281 of 1892


Penarikan Kabel dari:
1 Panel SDP Penerangan dan Daya Lantai 01 ke LVMDP
Kabel NYY 4 x 25 mm2
2 Panel SDP Penerangan dan Daya Lantai 02 ke LVMDP
Kabel NYY 4 x 25 mm2
3 Panel SDP Penerangan dan Daya Lantai 03 ke LVMDP
Kabel NYY 4 x 25 mm2
4 Panel SDP Penerangan dan Daya Lantai 04 ke LVMDP
Kabel NYY 4 x 25 mm2
5 Panel SDP Penerangan dan Daya Lantai 05 ke LVMDP
Kabel NYY 4 x 6 mm2

6 Panel SDP Indoor AC Lantai 01 ke Panel SDP AC Lantai 01


Kabel NYY 4 x 6 mm2
7 Panel SDP AC Lantai 01 ke LVMDP
Kabel NYY 4 x 70 mm2
8 Panel SDP Indoor AC Lantai 02 ke Panel SDP AC Lantai 02
Kabel NYY 4 x 6 mm2
9 Panel SDP AC Lantai 02 ke LVMDP
Kabel NYY 4 x 70 mm2

RAB (RENCANA ANGGARAN BIAYA) page 282 of 1892


10 Panel SDP Indoor AC Lantai 03 ke Panel SDP AC Lantai 03
Kabel NYY 4 x 6 mm2
11 Panel SDP AC Lantai 03 ke LVMDP
Kabel NYY 4 x 70 mm2
12 Panel SDP Indoor AC Lantai 04 ke Panel SDP AC Lantai 04
Kabel NYY 4 x 6 mm2
13 Panel SDP AC Lantai 04 ke LVMDP
Kabel NYY 4 x 70 mm2

14 Panel SDP Lift C ke LVMDP


Kabel NYY 4 x 10 mm2

C PEKERJAAN INSTALASI LAMPU DAN KOTAK KONTAK


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K

RAB (RENCANA ANGGARAN BIAYA) page 283 of 1892


5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Spotlight Led 5W 4000K + Housing
8 Lampu Uplight Pohon 8W 3000K
9 Lampu Barret Led 17W 4000K
10 Led Strip 2835 IP65 4.8W/m 3000K panjang 22000 mm
11 Led Strip 2835 IP65 4.8W/m 3000K panjang 30299 mm
12 Led Strip 2835 IP65 4.8W/m 3000K panjang 34800 mm
13 Saklar Tunggal
14 Saklar Ganda
15 Saklar 4 Gang Switch
16 Saklar Tukar Tunggal
17 Ekshaust Fan 140 CFM 23W
18 Stop kontak dinding single outlet 220 V
19 Stop kontak dinding double outlet 220 V
20 Stop kontak lantai double outlet 220 V
21 Stop kontak RJ 45
22 Pipa PVC AW Ø 6"
LANTAI 2
1 Instalasi Titik Lampu

RAB (RENCANA ANGGARAN BIAYA) page 284 of 1892


2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Spotlight Led 5W 4000K + Housing
8 Lampu Barret Led 17W 4000K
9 Led Strip 2835 IP65 4.8W/m 3000K panjang 30299 mm
10 Led Strip 2835 IP65 4.8W/m 3000K panjang 34800 mm
11 Wall Washer 1200mm Led 36W 3000K
12 Exit lamp
13 Emergency lamp
14 Saklar Tunggal
15 Saklar Ganda
16 Saklar 4 Gang Switch
17 Saklar Tukar Ganda
18 Ekshaust Fan 140 CFM 23W
19 Stop kontak dinding single outlet 220 V
20 Stop kontak dinding double outlet 220 V
21 Stop kontak lantai double outlet 220 V

RAB (RENCANA ANGGARAN BIAYA) page 285 of 1892


22 Pipa PVC AW Ø 6"
LANTAI 3
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Spotlight Led 5W 4000K + Housing
8 Lampu Barret Led 17W 4000K
9 Led Strip 2835 IP65 4.8W/m 3000K panjang 30299 mm
10 Led Strip 2835 IP65 4.8W/m 3000K panjang 34800 mm
11 Wall Light Up & Down 14.5W 3000K
12 Exit lamp
13 Emergency lamp
14 Saklar Tunggal
15 Saklar Ganda
16 Saklar 4 Gang Switch
17 Saklar Tukar Ganda
18 Ekshaust Fan 140 CFM 23W

RAB (RENCANA ANGGARAN BIAYA) page 286 of 1892


19 Stop kontak dinding single outlet 220 V
20 Stop kontak dinding double outlet 220 V
21 Stop kontak lantai double outlet 220 V
22 Pipa PVC AW Ø 6"
LANTAI 4
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Instalasi Titik exhaust fan
4 Led Panel 595 x 595mm 36W 4000K
5 Flat Downlight ∅ 244mm 20W 4000K
6 Flat Downlight ∅ 95mm 7W 4000K
7 Spotlight Led 5W 4000K + Housing
8 Lampu Barret Led 17W 4000K
9 Led Strip 2835 IP65 4.8W/m 3000K panjang 22000 mm
10 Led Strip 2835 IP65 4.8W/m 3000K panjang 30299 mm
11 Led Strip 2835 IP65 4.8W/m 3000K panjang 34800 mm
12 Wall Washer 1200mm Led 36W 3000K
13 Exit lamp
14 Emergency lamp
15 Saklar Tunggal

RAB (RENCANA ANGGARAN BIAYA) page 287 of 1892


16 Saklar Ganda
17 Saklar 4 Gang Switch
18 Saklar Tukar tunggal
19 Ekshaust Fan 140 CFM 23W
20 Stop kontak dinding single outlet 220 V
21 Stop kontak dinding double outlet 220 V
22 Stop kontak lantai double outlet 220 V
23 Pipa PVC AW Ø 6"
LANTAI 5
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 TKO TL Led T8 1200 mm 2 x 18W
4 Saklar Tunggal
5 Stop kontak dinding single outlet 220 V

Testing and Commissioning


D PEKERJAAN TELEPON
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1

RAB (RENCANA ANGGARAN BIAYA) page 288 of 1892


1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x30x0,6mm
5 Handset Telepon
LANTAI 2
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x30x0,6mm
5 Handset Telepon
LANTAI 3
1 Instalasi titik telepone
2 Outlet telpon
3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x30x0,6mm
5 Handset Telepon
LANTAI 4
1 Instalasi titik telepone
2 Outlet telpon

RAB (RENCANA ANGGARAN BIAYA) page 289 of 1892


3 Telepone Terminal Box /TTB
4 Kabel Feeder ITC 2x30x0,6mm
5 Handset Telepon

Testing and Commissioning


E PEKERJAAN LAN
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel cat-6 48 port
5 Patch panel cat-6 16 port
6 Switch Hub POE 48 port Managable w/ SFP
7 Switch Hub POE 16 port Managable w/ SFP
8 Patch Cord cat-6
9 Optic Terminal Box

LANTAI 2

RAB (RENCANA ANGGARAN BIAYA) page 290 of 1892


1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel cat-6 16 port
5 Switch Hub POE 16 port Managable w/ SFP
6 Patch Cord cat-6
7 Optic Terminal Box

LANTAI 3
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6
3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel cat-6 16 port
5 Switch Hub POE 16 port Managable w/ SFP
6 Patch Cord cat-6
7 Optic Terminal Box

LANTAI 4
1 Intalasi titik LAN dengan kabel UTP cat.6
2 Outlet LAN RJ-45 cat-6

RAB (RENCANA ANGGARAN BIAYA) page 291 of 1892


3 Ceiling Access point Long Range 5Ghz w/ POE
4 Patch panel cat-6 16 port
5 Switch Hub POE 16 port Managable w/ SFP
6 Patch Cord cat-6
7 Optic Terminal Box

Testing and Commissioning

F PEKERJAAN CCTV
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 01
1 Instalasi Cabel cat 6
2 Dome IP Camera
3 IP Dome Camera w/Vari-focal Lens 2MP 1080p
4 IP Fisheye Camera 6MP

LANTAI 02
1 Instalasi Cabel cat 6
2 Dome IP Camera

RAB (RENCANA ANGGARAN BIAYA) page 292 of 1892


3 IP Dome Camera w/Vari-focal Lens 2MP 1080p

LANTAI 03
1 Instalasi Cabel cat 6
2 Dome IP Camera
3 IP Dome Camera w/Vari-focal Lens 2MP 1080p
4 Switch Hub POE 24 port Managable w/ SFP
5 Patch panel cat-6 24 port
6 Patch Cord cat-6
7 Wiring Management

LANTAI 04
1 Instalasi Cabel cat 6
2 Dome IP Camera
3 IP Dome Camera w/Vari-focal Lens 2MP 1080p

Testing and Commissioning


G PEKERJAAN TATA SUARA
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra

RAB (RENCANA ANGGARAN BIAYA) page 293 of 1892


LANTAI 1
Kabel NYMHY 3x1.5 mm dalam High Impact conduit dia. 20 mm
1 Instalasi ceiling speaker + attenuator kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator

LANTAI 2
1 Instalasi Speaker kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator

LANTAI 3
1 Instalasi Speaker kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator

LANTAI 4
1 Instalasi Speaker kabel NYMHY 3 x 1.5 mm
2 Ceiling speaker 3 W
3 Attenuator

RAB (RENCANA ANGGARAN BIAYA) page 294 of 1892


Testing and Commissioning
H PEKERJAAN KABEL TRAY
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 01
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm
6 Elbow tray 300 x 100 mm

LANTAI 02
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm

RAB (RENCANA ANGGARAN BIAYA) page 295 of 1892


6 Elbow tray 300 x 100 mm

LANTAI 03
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm
6 Elbow tray 300 x 100 mm

LANTAI 04
1 Kabel tray 400 x 100 mm
2 Kabel tray 300 x 100 mm
3 Tee tray 400 x 100 mm
4 Tee tray 300 x 100 mm
5 Elbow tray 400 x 100 mm
6 Elbow tray 300 x 100 mm

LANTAI 05
1 Kabel tray 400 x 100 mm

RAB (RENCANA ANGGARAN BIAYA) page 296 of 1892


2 Elbow tray 400 x 100 mm

PEKERJAAN PROJECTOR
LANTAI 01
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm
LANTAI 02
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm
LANTAI 03
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD

RAB (RENCANA ANGGARAN BIAYA) page 297 of 1892


Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm
LANTAI 04
1 Instalasi Proyekor dalam pipa uPVC HI Ø20 Include :
Kabel HDMI Full HD
Kabel VGA Gold Plate
Outlet HDMI + VGA + Audio
Bracket Proyektor
Kabel Power Proyektor NYM 3x1,5mm

TOTAL BIAYA PEKERJAAN ELEKTRIKAL


V PEKERJAAN MEKANIKAL
A Instalasi air bersih
LANTAI 1
1 Stop Kran Ø 3/4"
2 Stop Kran Ø 1 1/4"
3 Stop Kran Ø 1"
4 Pipa Suplay Ø 1 1/4" (ground water tank ke rooftank)

RAB (RENCANA ANGGARAN BIAYA) page 298 of 1892


5 Pipa Riser Distribusi Ø 1 1/2"
6 Pipa Riser Distribusi Ø 1 1/4"
7 Pipa Riser Distribusi Ø 1"
8 Pipa PVC AW Distribusi dia 1 1/4''
9 Pipa PVC AW Distribusi dia 1''
10 Pipa PVC AW Distribusi dia 3/4''
11 Pompa transfer
Total head : 50 m
Debit : 70 liter/menit
Flexible joint, pressure guage, pressure switch, check valve, gate v

12 Panel kontrol pompa transfer


13 Fitting + Supporting
LANTAI 2
1 Stop Kran Ø 3/4"
2 Stop Kran Ø 1 1/4"
3 Stop Kran Ø 1"
4 Pipa Riser Distribusi Ø 1 1/2"
5 Pipa Riser Distribusi Ø 1 1/4"
6 Pipa Riser Distribusi Ø 1"

RAB (RENCANA ANGGARAN BIAYA) page 299 of 1892


7 Pipa PVC AW Distribusi dia 1 1/4''
8 Pipa PVC AW Distribusi dia 1''
9 Pipa PVC AW Distribusi dia 3/4''
10 Fitting + Supporting
LANTAI 3
1 Stop Kran Ø 3/4"
2 Stop Kran Ø 1 1/4"
3 Stop Kran Ø 1"
4 Pipa Riser Distribusi Ø 1 1/2"
5 Pipa Riser Distribusi Ø 1 1/4"
6 Pipa Riser Distribusi Ø 1"
7 Pipa PVC AW Distribusi dia 1 1/4''
8 Pipa PVC AW Distribusi dia 1''
9 Pipa PVC AW Distribusi dia 3/4''
10 Fitting + Supporting
LANTAI 4
1 Stop Kran Ø 3/4"
2 Stop Kran Ø 1 1/4"
3 Stop Kran Ø 1"
4 Pipa Riser Distribusi Ø 1 1/2"

RAB (RENCANA ANGGARAN BIAYA) page 300 of 1892


5 Pipa Riser Distribusi Ø 1 1/4"
6 Pipa Riser Distribusi Ø 1"
7 Pipa PVC AW Distribusi dia 1 1/4''
8 Pipa PVC AW Distribusi dia 1''
9 Pipa PVC AW Distribusi dia 3/4''
10 Fitting + Supporting
LANTAI 05
1 Stop kran Ø 2"
2 Stop kran Ø 1 1/2"
3 Stop kran Ø 1 1/4"
4 Pipa header Ø 3"
5 Pipa PVC AW Distribusi Ø 2"
6 Pipa PVC AW Distribusi Ø 1 1/2"
7 Pipa PVC AW Distribusi Ø 1 1/4"
8 Pipa PVC AW Distribusi Ø 1"
9 Pipa PVC AW Kuras Ø 2"
10 Rooftank kap 2000 liter + automatic
11 Rooftank kap 1000 liter + automatic
12 Dudukan rooftank cor beton kosong 1pc : 3ps : 5 sp
13 Instalasi autoswitch kabel NYY 2x2.5 mm2

RAB (RENCANA ANGGARAN BIAYA) page 301 of 1892


14 Pompa booster
Total head : 12 m
Debit : 40 liter/menit, include : header,
flexible, pressure guage, pressure switch, check valve, gate valve,
base frame, panel kontrol, 1 set terdiri dari 2 pompa
15 Fitting + Supporting

Testing and Commissioning


B Instalasi Air Bekas
LANTAI 1
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC AW riser Ø 3"
5 Sumur resapan air bekas
6 Fitting + Supporting
LANTAI 2
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"

RAB (RENCANA ANGGARAN BIAYA) page 302 of 1892


4 Pipa PVC AW riser Ø 3"
5 Fitting + Supporting
LANTAI 3
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC AW riser Ø 3"
5 Fitting + Supporting
LANTAI 4
1 Pipa PVC AW Ø 1 1/4"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 3"
4 Pipa PVC D vent Ø 2"
5 Fitting + Supporting
C Instalasi Air Kotor
LANTAI 1
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa PVC AW riser Ø 4"

RAB (RENCANA ANGGARAN BIAYA) page 303 of 1892


5 Sumur resapan air kotor
6 Bio septick tank kap 4 m3
7 Fitting + Supporting
LANTAI 2
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa riser PVC AW Ø 4"
5 Fitting + Supporting
LANTAI 3
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa riser PVC AW Ø 4"
5 Fitting + Supporting
LANTAI 4
1 Pipa PVC AW Ø 1 1/2"
2 Pipa PVC AW Ø 2"
3 Pipa PVC AW Ø 4"
4 Pipa riser PVC AW Ø 4"

RAB (RENCANA ANGGARAN BIAYA) page 304 of 1892


5 Fitting + Supporting
D Peralatan saniter
LANTAI 1
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Pegangan stainless steel (untuk toilet difabel)
LANTAI 2
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer

RAB (RENCANA ANGGARAN BIAYA) page 305 of 1892


7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Pegangan stainless steel (untuk toilet difabel)
LANTAI 3
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk
5 Kloset duduk difabel
6 Jet washer
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Pegangan stainless steel (untuk toilet difabel)
LANTAI 4
1 Kran air Ø1/2 "
2 Wastafel + kran + cermin (type 1 umum)
3 Wastafel + kran + cermin (type 2 difabel)
4 Kloset duduk

RAB (RENCANA ANGGARAN BIAYA) page 306 of 1892


5 Kloset duduk difabel
6 Jet washer
7 Floor drain
8 Urinoir + penutup protector
9 Sekat urinoir
10 Pegangan stainless steel (untuk toilet difabel)
E Instalasi Air Hujan
LANTAI 2
1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Floordrain Ø 2"
5 Gutter (uk. 100 x 50 mm)
LANTAI 3
1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Floordrain Ø 2"
5 Gutter (uk. 100 x 50 mm)
LANTAI 4

RAB (RENCANA ANGGARAN BIAYA) page 307 of 1892


1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Pipa PVC AW Ø 5"
4 Floordrain Ø 2"
5 Gutter (uk. 100 x 50 mm)
LANTAI 5
1 Pipa PVC AW Ø 4"
2 Pipa PVC AW Ø 5"
3 Roofdrain Ø 4"
4 Roofdrain Ø 5"
5 Gutter (uk. 100 x 50 mm)
Lantai Atap
1 Pipa PVC AW Ø 2"
2 Pipa PVC AW Ø 4"
3 Roofdrain Ø 4"
4 Gutter (uk. 100 x 50 mm)
E PEKERJAAN TATA UDARA
Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
LANTAI 1

RAB (RENCANA ANGGARAN BIAYA) page 308 of 1892


1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 249.000 Btu/h
4 Outdoor Unit 267.000 Btu/h
5 Outdoor Unit 365.000 Btu/h
6 Ceiling Mounted Cassette kap 19.100 Btu/h
7 Ceiling Mounted Cassette kap 24.200 Btu/h
8 Ceiling Mounted Cassette kap 36.200 Btu/h
9 Ceiling Mounted Cassette kap 47.800 Btu/h
10 Slim Mounted Duct kap 7.500 Btu/h
11 Refrigerant Joint Pipe
12 Wired Remote Controller
13 Aksesoris cover panel
14 Pipa Drain Ø 32 mm

LANTAI 2
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 249.000 Btu/h
4 Outdoor Unit 267.000 Btu/h

RAB (RENCANA ANGGARAN BIAYA) page 309 of 1892


5 Outdoor Unit 365.000 Btu/h
6 Ceiling Mounted Cassette kap 19.100 Btu/h
7 Ceiling Mounted Cassette kap 24.200 Btu/h
8 Ceiling Mounted Cassette kap 36.200 Btu/h
9 Ceiling Mounted Cassette kap 47.800 Btu/h
10 Slim Mounted Duct kap 7.500 Btu/h
11 Refrigerant Joint Pipe
12 Wired Remote Controller
13 Aksesoris cover panel
14 Pipa Drain Ø 32 mm

LANTAI 3
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 249.000 Btu/h
4 Outdoor Unit 267.000 Btu/h
5 Outdoor Unit 365.000 Btu/h
6 Ceiling Mounted Cassette kap 19.100 Btu/h
7 Ceiling Mounted Cassette kap 24.200 Btu/h
8 Ceiling Mounted Cassette kap 36.200 Btu/h

RAB (RENCANA ANGGARAN BIAYA) page 310 of 1892


9 Ceiling Mounted Cassette kap 47.800 Btu/h
10 Slim Mounted Duct kap 7.500 Btu/h
11 Refrigerant Joint Pipe
12 Wired Remote Controller
13 Aksesoris cover panel
14 Pipa Drain Ø 32 mm

LANTAI 4
1 Instalasi Power AC Out Door Unit Kabel NYY 4 x 10 mm2
2 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
3 Outdoor Unit 249.000 Btu/h
4 Outdoor Unit 267.000 Btu/h
5 Outdoor Unit 365.000 Btu/h
6 Ceiling Mounted Cassette kap 19.100 Btu/h
7 Ceiling Mounted Cassette kap 24.200 Btu/h
8 Ceiling Mounted Cassette kap 36.200 Btu/h
9 Ceiling Mounted Cassette kap 47.800 Btu/h
10 Slim Mounted Duct kap 7.500 Btu/h
11 Refrigerant Joint Pipe
12 Wired Remote Controller

RAB (RENCANA ANGGARAN BIAYA) page 311 of 1892


13 Aksesoris cover panel
14 Pipa Drain Ø 32 mm

LANTAI 5
1 Instalasi Power AC In Door Unit Kabel NYM 3 x 2.5 mm2
2 Indoor unit split type kap 1 PK
3 Pipa Drain Ø 32 mm
4 Pipa refrigerant Ø 1/4"
5 Pipa refrigerant Ø 1/2"

Testing and Commissioning

F PEKERJAAN TRANSPORTASI VERTIKAL (LIFT)


Catatan :
Pekerjaan ini sudah termasuk material pendukung dan terpasang ra
1 Pekerjaan Lift
(Kapasitas 11 orang, 4 lantai, 800 kg)
Speed : 1 m/s
Include ARD, Ijin Disnaker
2 Testing and Commissioning
TOTAL BIAYA PEKERJAAN MEKANIKAL
RAB (RENCANA ANGGARAN BIAYA) page 312 of 1892
TOTAL BIAYA BANGUNAN C
VI PEKERJAAN LANDSCAPE
A PEKERJAAN SOFTSCAPE
BANGUNAN A
1 Tanah subur
2 Rumput gajah mini (Axonopus compressus Dwarf)
3 Pohon Ketapang Kencana (Terminalia Molineti)
4 Pot tanaman

POT TANAMAN KETEPENG


1 Urug pasir bawah pondasi batu kali, t : 100 mm
2 Pasangan pondasi batu kali 1pc : 6ps
3 Pasangan rollag bata
4 Sloof 120x200 mm
5 Kolom 120x120 mm
6 Balok praktis 120x120 mm
7 Plat beton tebal : 100 mm
8 Pasangan dinding bata merah 1pc : 6ps
9 Plesteran dinding bata merah 1pc : 6ps
10 Acian dinding bata merah
11 Pengecatan dinding

RAB (RENCANA ANGGARAN BIAYA) page 313 of 1892


12 Finishing plat stainlees steel tebal 0.8 mm

BANGUNAN B
1 Tanah subur
2 Rumput gajah mini (Axonopus compressus Dwarf)
BANGUNAN C
1 Tanah subur
2 Rumput gajah mini (Axonopus compressus Dwarf)
3 Pohon Ketapang Kencana (Terminalia Molineti)

POT TANAMAN KETEPENG


1 Urug pasir bawah pondasi batu kali, t : 100 mm
2 Pasangan pondasi batu kali 1pc : 6ps
3 Pasangan rollag bata
4 Sloof 120x200 mm
5 Kolom 120x120 mm
6 Balok praktis 120x120 mm
7 Plat beton tebal : 100 mm
8 Pasangan dinding bata merah 1pc : 6ps
9 Plesteran dinding bata merah 1pc : 6ps
10 Acian dinding bata merah

RAB (RENCANA ANGGARAN BIAYA) page 314 of 1892


11 Pengecatan dinding
12 Finishing plat stainlees steel tebal 0.8 mm
B PEKERJAAN HARDSCAPE
BANGUNAN A
1 Pasangan Paving, t = 80 mm (mutu K - 400)
BANGUNAN C
1 Pasangan Paving, t = 80 mm (mutu K - 400)
C PEKERJAAN PAGAR PANEL PRECAST
1 Pekerjaan Tanah
a . Galian Tanah

2 Pekerjaan Pasangan dan Beton


a. Pek. Pasangan Pondasi batu kali Tembok
1. Urugan pasir dibawah pondasi
2.Pas. Batu Kosong
3.Pas. Batu Kali 1:6

b. Pekerjaan Paasangan pagar precast


1. Panel Precast + Kolom Precast T = 1.60 m

RAB (RENCANA ANGGARAN BIAYA) page 315 of 1892


3 Pekerjaan Pagar Panel Precast

C BANGUNAN POWER HOUSE DAN RUANG POMPA


PEKERJAAN STRUKTUR
PEKERJAAN GALIAN DAN URUGAN
1 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm samp
2 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm samp
3 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm samp
4 Galian pondasi footplat + pondasi cor beton 1900 x 1900 mm lebih
5 Urug tanah kembali bekas galian footplat
6 Urug pasir bawah pondasi cor beton, tebal = 100 mm
7 Urug pasir bawah sloof, t : 50 mm
8 Galian pondasi genset sampai 1 m
9 Galian grountank sedalam 1 m
10 Galian grountank sedalam 2 m
11 Galian grountank sedalam 3 m
12 Galian grountank lebih dari 3 m
13 Urug pasir bawah lantai grountank tebal 100 mm

RAB (RENCANA ANGGARAN BIAYA) page 316 of 1892


PEKERJAAN ANTI RAYAP
1 Anti rayap lantai dan dinding galian pondasi footplat + pondasi cor b
2 Anti rayap bawah pondasi batu kali
3 Anti rayap bawah lantai

PEKERJAAN BETON
1 Cor rabat bawah pondasi beton tebal = 100 mm
1 pc : 3 ps : 5 sp
2 Cor rabat beton bawah lantai 1 pc : 3 ps : 5 sp, t = 100 mm
3 Cor rabat beton bawah lantai grountank 1 pc : 3 ps : 5 sp, t = 100 m
4 Cor rabat bawah sloof tebal = 50mm
1 pc : 3 ps : 5 sp
5 Pondasi cor beton 1900 x 1900 mm, mutu beton f'c 15 Mpa + stek b
6 Cor footplat F1 1500 x 1500 mm, mutu beton f'c 25 MPa
7 Cor kolom K1 - 350x350 mm, mutu beton f'c 25 MPa
8 Cor sloof S1 - 200x350 mm, mutu beton f'c 25 MPa
9 Cor balok B1 - 250x400 mm, mutu beton f'c 25 MPa
10 Cor balok B1 - 250x400 mm, mutu beton f'c 25 MPa
11 Cor balok B2 - 250x400 mm, mutu beton f'c 25 MPa

RAB (RENCANA ANGGARAN BIAYA) page 317 of 1892


12 Cor balok L1, mutu beton f'c 25 MPa
13 Plat A0 tebal 200 mm, mutu beton f'c 25 Mpa
14 Plat A1 tebal 120 mm, mutu beton f'c 25 Mpa, termasuk ramp
15 Plat A2 tebal 150 mm, mutu beton f'c 25 MPa
16 Cor dinding beton DB t : 200 mm, mutu beton f'c 25 MPa
17 Plat A1 tebal 120 mm, mutu beton f'c 25 MPa
18 Pondasi plat beton genset tebal = 300 mm, mutu 25 MPa
19 Pondasi cyclope, 40% batu kali 60% beton 1pc : 2ps : 5sp dibawah
20 Waterstop
21 Plat galvanis tebal 0.45 mm
22 Tarikan Besi Ø 10 mm
23 Engsel besi

PEKERJAAN ARSITEKTUR
PEKERJAAN GALIAN DAN URUGAN
1 Galian pondasi batu kali 1 m
2 Urugan pasir bawah pondasi batu kali tebal = 100 mm
3 Urugan pasir bawah lantai tebal = 100 mm
4 Urugan tanah baru peninggian peil bangunan
dengan tanah galian grountank + pemadatan

RAB (RENCANA ANGGARAN BIAYA) page 318 of 1892


5 Urugan kembali tanah galian pondasi

PEKERJAAN BETON PRAKTIS


1 Kolom praktis 120x120 mm
2 Cor sloof praktis 120x200 mm
3 Balok lateiu 120x150

PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan pondasi batu kali 1pc : 6ps
2 Pasangan dinding 1/2 bata 1pcc : 6ps
3 Plesteran dinding 1 pcc : 6 ps
4 Plester dan acian beton 1 Pcc : 3 Ps
(kolom, balok, lisplank beton)
5 Plesteran skoning 1 pcc : 2 ps
6 Acian dinding
7 Wall filler plat lantai
8 Screeding plat + kawat ayam
9 Penutup saluran menggunakan baja siku 50.50.5

PEKERJAAN PINTU DAN JENDELA

RAB (RENCANA ANGGARAN BIAYA) page 319 of 1892


1 Pintu P01
2 Folding Gate FG1
3 Louver LV01

PEKERJAAN FINISHING LANTAI


1 Pasangan keramik lantai 300 x 300 mm grountank
2 Pasangan keramik dinding 300 x 300 mm grountank
3 Finishing lantai floor hardener

PEKERJAAN PENGECATAN
1 Cat dinding luar (dinding, kolom, balok, lisplank beton)
2 Cat dinding dalam (dinding, kolom)
3 Pengecatan wall filler
4 Waterproofing coating area grountank
5 Waterproofing coating untuk plat atap

PEKERJAAN RAILLING TANGGA PIPA STAINLESS STEEL


1 Tangga Maintenance R. GWT

PEKERJAAN ELEKTRIKAL

RAB (RENCANA ANGGARAN BIAYA) page 320 of 1892


PEKERJAAN INSTALASI LAMPU DAN KOTAK KONTAK
LANTAI 01
1 Instalasi Titik Lampu
2 Instalasi Titik Stop Kontak
3 Lampu TKO TL LED T8 2 x 18 W
4 Lampu Bulb 18 W Fitting tempe E27
5 Lampu Emergency LED 30505
6 Saklar ganda
7 Stop Kontak Daya
8 Exhaust fan di ruang trafo

PEKERJAAN MEKANIKAL
1 Roof Drain
2 Gutter Uk 50 x 200 mm
3 Pipa PVC Ø 4"
TOTAL BIAYA PEKERJAAN LANDSCAPE

PEKERJAAN SITE DEVELOPMENT


Pembentukan badan jalan

RAB (RENCANA ANGGARAN BIAYA) page 321 of 1892


TOTAL BIAYA PEKERJAAN SITE DEVELOPMENT

PEKERJAAN GENSET SILENT 1.000 KVA LENGKAP DG ACCES


1 Unit Utama
a. Unit Genset Silent, Kapasitas : 1000 KVA
b. Panel Syncrhone Genset 1250 KVA
c. Grounding body genset
d. Ducting pengarah udara panas
e. Peletakan genset ke Pondasi
2 Sistem Bahan Bakar
a. Storage Tank, Kapasitas : 10.000 Liter
b. Electric Transfer Pump 30 lpm / Gear Pump
c. Hand Pump 8 lpm
d. Pemipaan bahan bakar pipa BSP Sch 40
- diameter 25 mm
- Gate valve, stainer, check valve + accessories
- Level switch + kabel
3 Sistem Elektrikal
a. Kabel dari Genset ke P.Syncrhon Genset, NYY 4 (4 x 1 x 300mm
b. Kabel ke Elektrik Transfer Pump, NYY 4 x 2,5 mm2

RAB (RENCANA ANGGARAN BIAYA) page 322 of 1892


c. Panel Pompa Solar
4 Testing commisioning dan ijin depnaker

TOTAL BIAYA PEMBANGUNAN

RAB (RENCANA ANGGARAN BIAYA) page 323 of 1892


R
AH
RENCANA ANG

KODE
VOL SAT
ANALISA

1.00 unit
5.00 unit
453.00 m1 A 2

730.00 m1 A 1
1.00 ls
1.00 ls
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 324 of 1892


mm sampai 1 m 698.25 m3 B 1
mm sampai 2 m 698.25 m3 B 2
mm sampai 3 m 698.25 m3 B 3
mm lebih dari 3 m 139.65 m3 B 4
mm sampai 1 m 19.22 m3 B 1
mm sampai 2 m 19.22 m3 B 2
mm sampai 3 m 19.22 m3 B 3
mm lebih dari 3 m 3.84 m3 B 4
mm sampai 1 m 7.22 m3 B 1
mm sampai 2 m 7.22 m3 B 2
mm sampai 3 m 7.22 m3 B 3
mm lebih dari 3 m 1.44 m3 B 4
on, dipadatkan 1193.22 m3 B 7
72.47 m3 B 5

6.25 m3 B 1
6.25 m3 B 2
RAB (RENCANA ANGGARAN BIAYA) page 325 of 1892
229.95 m3 E i 2

72.47 m3 E i 2

10.00 m3 E iv 1
1.88 m3 E vi 6
33.65 m3 E xii 1
13.25 m3 E xii 2
pa + stek besi D13mm 698.25 m3 E iv 1
pa + stek besi D13 mm 19.22 m3 E iv 1
pa + stek besi D13 mm 7.22 m3 E iv 1
243.23 m3 E vi 1
6.18 m3 E vi 2
6.75 m3 E vi 4
162.56 m3 E viii 1

RAB (RENCANA ANGGARAN BIAYA) page 326 of 1892


1.66 m3 E viii 3
7.18 m3 E viii 4
2.55 m3 E viii 5
5.80 m3 E viii 6
Elev. - 4.350 9.85 m3 E vii 2
Elev. - 4.270 106.73 m3 E vii 2
Elev. - 4.270 0.99 m3 E vii 3

Elev. - 2.050 0.96 m3 E ix 1


Elev. - 2.050 1.51 m3 E ix 12
Elev. - 0.950 4.67 m3 E ix 22

AS (8-9) - (E-F) 4.22 m3 E xi 1

AS (1-2) - (D-E) 4.22 m3 E xi 1

AS (4-6) - (K-L) 4.98 m3 E xi 1

Elev. - 2.050 0.23 m3 E x 1


RAB (RENCANA ANGGARAN BIAYA) page 327 of 1892
Elev. - 1.350 5.28 m3 E x 3
0.27 m3 E x 6

101.15 m3 E viii 9
1.01 m3 E viii 11
4.37 m3 E viii 12
1.55 m3 E viii 15
3.53 m3 E viii 16

Elev. - 0.050 48.76 m3 E ix 1


Elev. - 0.050 8.20 m3 E ix 2
Elev. - 0.050 58.82 m3 E ix 4
Elev. - 0.050 36.73 m3 E ix 7
Elev. - 0.050 6.06 m3 E ix 9
Elev. - 0.050 2.56 m3 E ix 10
Elev. - 0.050 10.57 m3 E ix 14
Elev. - 0.050 3.95 m3 E ix 15
Elev. - 0.050 10.31 m3 E ix 16
Elev. - 0.050 18.92 m3 E ix 17
Elev. - 0.050 8.57 m3 E ix 18

RAB (RENCANA ANGGARAN BIAYA) page 328 of 1892


Elev. - 0.050 6.36 m3 E ix 19

Elev. + 2.150 0.90 m3 E ix 1


Elev. + 2.150 1.41 m3 E ix 12

Elev. + 3.250 4.31 m3 E ix 22

AS (8-9) - (E-F) 4.22 m3 E xi 1

AS (1-2) - (D-E) 4.22 m3 E xi 1

AS (4-6) - (K-L) 4.98 m3 E xi 1


Elev. - 0.050 395.89 m3 E x 1

Elev. + 2.850 5.28 m3 E x 3

101.15 m3 E viii 9
1.01 m3 E viii 11
RAB (RENCANA ANGGARAN BIAYA) page 329 of 1892
4.37 m3 E viii 12
0.78 m3 E viii 15
3.53 m3 E viii 16

Elev. + 4.150 48.76 m3 E ix 1


Elev. + 4.150 8.20 m3 E ix 2
Elev. + 4.150 58.82 m3 E ix 4
Elev. + 4.150 36.73 m3 E ix 7
Elev. + 4.150 6.06 m3 E ix 9
Elev. + 4.150 2.56 m3 E ix 10
Elev. + 4.150 10.57 m3 E ix 14
Elev. + 4.150 3.95 m3 E ix 15
Elev. + 4.150 10.31 m3 E ix 16
Elev. + 4.150 18.92 m3 E ix 17
Elev. + 4.150 8.57 m3 E ix 18
Elev. + 4.150 3.54 m3 E ix 19

Elev. + 6.250 1.40 m3 E ix 1


Elev. + 6.250 1.73 m3 E ix 12
Elev. + 7.450 6.15 m3 E ix 22

RAB (RENCANA ANGGARAN BIAYA) page 330 of 1892


Elev. + 6.250 13.55 m3 E ix 26

AS (8-9) - (E-F) 4.22 m3 E xi 1

AS (1-2) - (D-E) 4.22 m3 E xi 1

AS (4-6) - (K-L) 4.98 m3 E xi 1

Elev. + 4.150 395.89 m3 E x 1

Elev. + 7.050 5.28 m3 E x 3

101.15 m3 E viii 9
1.01 m3 E viii 11
4.37 m3 E viii 12
3.53 m3 E viii 16

RAB (RENCANA ANGGARAN BIAYA) page 331 of 1892


Elev. + 8.350 48.76 m3 E ix 1
Elev. + 8.350 8.20 m3 E ix 2
Elev. + 8.350 58.82 m3 E ix 4
Elev. + 8.350 36.73 m3 E ix 7
Elev. + 8.350 10.57 m3 E ix 14
Elev. + 8.350 3.95 m3 E ix 15
Elev. + 8.350 10.31 m3 E ix 16
Elev. + 8.350 18.92 m3 E ix 17
Elev. + 8.350 8.57 m3 E ix 18
Elev. + 8.350 6.36 m3 E ix 19
Elev. + 8.350 10.01 m3 E ix 27

Elev. + 10.450 0.90 m3 E ix 1


Elev. + 10.450 1.41 m3 E ix 12
Elev. + 11.650 4.31 m3 E ix 22

Elev. + 12.550 48.76 m3 E ix 1


Elev. + 12.550 8.20 m3 E ix 2
Elev. + 12.550 58.82 m3 E ix 4
Elev. + 12.550 36.73 m3 E ix 7

RAB (RENCANA ANGGARAN BIAYA) page 332 of 1892


Elev. + 12.550 17.67 m3 E ix 14
Elev. + 12.550 14.88 m3 E ix 16
Elev. + 12.550 18.92 m3 E ix 17
Elev. + 12.550 1.13 m3 E ix 18
Elev. + 12.550 6.84 m3 E ix 20
Elev. + 12.550 15.52 m3 E ix 36

Elev. + 13.350 3.49 m3 E ix 1


Elev. + 13.350 5.29 m3 E ix 4
Elev. + 13.350 2.05 m3 E ix 7
Elev. + 14.000 0.90 m3 E ix 1
Elev. + 15.050 18.07 m3 E ix 29
Elev. + 15.500 5.60 m3 E ix 29
Elev. + 15.500 9.26 m3 E ix 37

Elev. + 17.550 6.31 m3 E ix 1


Elev. + 17.550 7.22 m3 E ix 4
Elev. + 17.550 4.32 m3 E ix 7
Elev. + 17.550 3.56 m3 E ix 14
Elev. + 17.550 1.91 m3 E ix 16

RAB (RENCANA ANGGARAN BIAYA) page 333 of 1892


Elev. + 17.550 10.29 m3 E ix 38

AS (4-6) - (K-L) 4.98 m3 E xi 1

AS (4-6) - (L-M) 1.89 m3 E xi 1

Elev. + 8.350 407.37 m3 E x 1

Elev. + 11.250 5.28 m3 E x 3

Elev. + 12.550 434.06 m3 E x 1

Elev. + 13.350 15.32 m3 E x 1

Elev. + 13.350 1.45 m3 E x 3

Elev. + 14.000 0.23 m3 E x 1

Elev. + 15.050 36.17 m3 E x 1

lev. (+12.550) - (+17.550) 21.13 m3 E viii 9

RAB (RENCANA ANGGARAN BIAYA) page 334 of 1892


lev. (+12.550) - (+15.500) 11.51 m3 E viii 13

Elev. + 17.550 6.31 m3 E ix 1


Elev. + 17.550 7.22 m3 E ix 4
Elev. + 17.550 4.32 m3 E ix 7
Elev. + 17.550 3.56 m3 E ix 14
Elev. + 17.550 1.91 m3 E ix 16
Elev. + 17.550 10.29 m3 E ix 38

Elev. + 17.550 38.82 m3 E x 1

Elev. + 17.550 1.44 m3 E x 4

153.28 m3 B 1
45.31 m3 B 5

RAB (RENCANA ANGGARAN BIAYA) page 335 of 1892


229.95 m3 B 5
51.09 m3 B 7
galian + pemadatan 804.81 m3 B 7

726.92 m2 D 1
2299.45 m2 D 1

425.03 m1 E v 1
132.09 m1 E v 2
369.75 m1 E v 3
1500.25 m1 E v 4
575.40 m1 E v 5
157.45 m1 E v 6
184.45 m1 E v 7
8.47 m1 E v 8
2.40 m1 E v 9

RAB (RENCANA ANGGARAN BIAYA) page 336 of 1892


352.80 m1 E v 3
1407.00 m1 E v 4
582.90 m1 E v 5
168.00 m1 E v 6
200.50 m1 E v 7
37.07 m1 E v 8
2.40 m1 E v 9

352.80 m1 E v 3
1381.80 m1 E v 4
582.90 m1 E v 5
165.50 m1 E v 6
200.50 m1 E v 7
38.41 m1 E v 8
2.40 m1 E v 9

495.60 m1 E v 3

RAB (RENCANA ANGGARAN BIAYA) page 337 of 1892


1520.40 m1 E v 4
796.72 m1 E v 5
158.50 m1 E v 6
213.82 m1 E v 7
38.61 m1 E v 8
15.60 m1 E v 9

248.45 m1 E v 3
75.60 m1 E v 4
119.45 m1 E v 5
7.41 m1 E v 7

378.97 m3 C 1
3.98 m3 C 4
2064.68 m2 C 14
3756.04 m2 C 15
3384.64 m2 C 16

RAB (RENCANA ANGGARAN BIAYA) page 338 of 1892


431.58 m2 C 3
863.15 m2 C 6
22.03 m2 C 2
44.07 m2 C 5
907.22 m2 C 10
834.99 m2 C 17
1687.25 m1 C 9
390.66 m1 C 7
254.77 m1 C 11
81.68 m2 C 8

1704.40 m2 C 14
3017.60 m2 C 15
2680.12 m2 C 16
424.77 m2 C 3
849.54 m2 C 6
849.54 m2 C 10
917.00 m2 C 17
1687.25 m1 C 9

RAB (RENCANA ANGGARAN BIAYA) page 339 of 1892


936.40 m1 C 7
81.68 m2 C 8
30.00 m2 C 13

1732.14 m2 C 14
3027.71 m2 C 15
2722.66 m2 C 16
442.44 m2 C 3
884.88 m2 C 6
884.88 m2 C 10
898.23 m2 C 17
1166.73 m1 C 9
482.63 m1 C 7
81.68 m2 C 8
30.00 m2 C 13

1579.10 m2 C 14
2766.99 m2 C 15
2462.21 m2 C 16
390.27 m2 C 3

RAB (RENCANA ANGGARAN BIAYA) page 340 of 1892


780.54 m2 C 6
780.54 m2 C 10
1893.83 m2 C 17
1166.73 m1 C 9
536.08 m1 C 7
81.68 m2 C 8
78.00 m2 C 13

546.23 m2 C 14
1092.46 m2 C 15
1092.46 m2 C 16
279.57 m2 C 17
24.95 m1 C 9
14.82 m1 C 7
2496.66 m2 C 13
248.10 m2 C 13

RAB (RENCANA ANGGARAN BIAYA) page 341 of 1892


1.00 unit G 11
3.00 unit G 12
18.00 unit G 13
3.00 unit G 14
2.00 unit G 15
2.00 unit G 16
4.00 unit G 17
1.00 unit G 18
4.00 unit G 21
42.00 unit G 27
8.00 unit G 28
6.00 unit G 37
4.00 unit G 38
4.00 unit G 42
1.00 unit G 54
2.00 unit G 56
1.00 unit G 57

1.00 unit G 11

RAB (RENCANA ANGGARAN BIAYA) page 342 of 1892


16.00 unit G 13
4.00 unit G 14
5.00 unit G 15
1.00 unit G 16
5.00 unit G 17
1.00 unit G 18
4.00 unit G 21
48.00 unit G 27
1.00 unit G 33
6.00 unit G 37
7.00 unit G 38
4.00 unit G 42

1.00 unit G 11
16.00 unit G 13
4.00 unit G 14
5.00 unit G 15
1.00 unit G 16
5.00 unit G 17

RAB (RENCANA ANGGARAN BIAYA) page 343 of 1892


1.00 unit G 18
4.00 unit G 21
48.00 unit G 27
1.00 unit G 33
6.00 unit G 37
7.00 unit G 38
4.00 unit G 42

2.00 unit G 6
1.00 unit G 11
14.00 unit G 13
3.00 unit G 14
4.00 unit G 15
1.00 unit G 16
4.00 unit G 17
1.00 unit G 18
4.00 unit G 21
46.00 unit G 27
1.00 unit G 33

RAB (RENCANA ANGGARAN BIAYA) page 344 of 1892


6.00 unit G 37
7.00 unit G 38
4.00 unit G 42

1.00 unit G 12
3.00 unit G 24
1.00 unit G 25
1.00 unit G 21

2305.55 m2 H 1
16.10 m2 H 2
145.51 m2 H 6
1573.54 m1 H 4
1.00 bh H 5

2296.05 m2 H 1

RAB (RENCANA ANGGARAN BIAYA) page 345 of 1892


178.72 m2 H 2
145.34 m2 H 6
1752.86 m1 H 4
1.00 bh H 5

2296.05 m2 H 1
178.72 m2 H 2
145.34 m2 H 6
1752.86 m1 H 4
1.00 bh H 5

2411.09 m2 H 1
158.96 m2 H 2
145.34 m2 H 6
1362.04 m1 H 4
1.00 bh H 5

K STATION

1.00 unit I 2

RAB (RENCANA ANGGARAN BIAYA) page 346 of 1892


1.00 unit I 3
2.00 unit I 4
1.00 unit I 5
1.00 unit I 6
1.00 unit I 38
8.85 m2 I 55
11.55 m2 I 55
4.58 m2 I 55
4.46 m2 I 55
4.05 m2 I 55
4.35 m2 I 55
5.55 m2 I 55

2.00 unit I 2
2.00 unit I 3
2.00 unit I 4
1.00 unit I 5
1.00 unit I 6
1.00 unit I 8
4.00 unit I 9

RAB (RENCANA ANGGARAN BIAYA) page 347 of 1892


3.00 unit I 38
1.00 unit I 39
8.85 m2 I 55
11.55 m2 I 55
4.58 m2 I 55
4.46 m2 I 55
4.05 m2 I 55
30.45 m2 I 55
5.55 m2 I 55
23.63 m2 I 55
5.40 m2 I 55

2.00 unit I 2
2.00 unit I 3
2.00 unit I 4
1.00 unit I 5
1.00 unit I 6
1.00 unit I 8
4.00 unit I 9
3.00 unit I 38

RAB (RENCANA ANGGARAN BIAYA) page 348 of 1892


1.00 unit I 39
8.85 m2 I 55
11.55 m2 I 55
4.58 m2 I 55
4.46 m2 I 55
4.05 m2 I 55
30.45 m2 I 55
5.55 m2 I 55
23.63 m2 I 55
5.40 m2 I 55

1.00 unit I 2
1.00 unit I 3
2.00 unit I 4
1.00 unit I 5
1.00 unit I 6
4.00 unit I 9
1.00 unit I 38
11.55 m2 I 55
4.58 m2 I 55

RAB (RENCANA ANGGARAN BIAYA) page 349 of 1892


4.46 m2 I 55
4.05 m2 I 55
13.05 m2 I 55
5.55 m2 I 55

600 mm ( Terang ) 341.88 m2 J 3


127.07 m2 J 1
1036.19 m2 J 5
ng ( Area tangga ) 86.04 m2 J 8
1543.72 m1 J 6
106.24 m2 J 7
479.39 m2 J 9
396.30 m1 J 12
1215.24 m2 J 10
7.82 m2 J 10
2.67 m2 J 7
a baja siku 7.34 m2 J 19

RAB (RENCANA ANGGARAN BIAYA) page 350 of 1892


116.73 m2 J 1
684.12 m2 J 5
ng ( Area tangga ) 86.04 m2 J 8
1044.55 m1 J 6
104.97 m2 J 7
476.14 m2 J 9
2214.07 m2 J 10
7.82 m2 J 11
a baja siku 7.34 m2 J 19

116.73 m2 J 1
684.12 m2 J 5
ng ( Area tangga ) 86.04 m2 J 8
1044.55 m1 J 6
104.97 m2 J 7
476.14 m2 J 9
2214.07 m2 J 10
7.82 m2 J 11
RAB (RENCANA ANGGARAN BIAYA) page 351 of 1892
a baja siku 7.34 m2 J 19

142.23 m2 J 1
711.45 m2 J 5
ng ( Area tangga ) 86.04 m2 J 8
1440.35 m1 J 6
104.97 m2 J 7
476.14 m2 J 9
1169.57 m2 J 10
7.82 m2 J 11
a baja siku 7.34 m2 J 19

1380.89 m2 K 2
3570.88 m2 K 1
2467.16 m2 K 3

RAB (RENCANA ANGGARAN BIAYA) page 352 of 1892


81.68 m2 K 3

1670.83 m2 K 2
2616.03 m2 K 1
2620.11 m2 K 3
81.68 m2 K 3
30.00 m2 K 6
104.97 m2 K 5

1664.63 m2 K 2
2675.13 m2 K 1
2620.11 m2 K 3
81.68 m2 K 3
30.00 m2 K 6
104.97 m2 K 5

1249.41 m2 K 2
3823.87 m2 K 1
2715.39 m2 K 3

RAB (RENCANA ANGGARAN BIAYA) page 353 of 1892


81.68 m2 K 3
78.00 m2 K 6
104.97 m2 K 5

890.95 m2 K 2
481.08 m2 K 1
2744.76 m2 K 6

dengan aksesoris dan terpasang rapi.


0 x 20 mm tebal 1.2 mm

6.88 m1 O 1
5.46 m1 O 1
5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 354 of 1892


5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1
6.88 m1 O 1
5.47 m1 O 1

5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1
6.88 m1 O 1
5.47 m1 O 1

2.24 m1 O 1

6.88 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 355 of 1892


5.46 m1 O 1
5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1

5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1
2.26 m1 O 1
5.47 m1 O 1

5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1
2.26 m1 O 1
5.47 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 356 of 1892


2.24 m1 O 1

6.85 m1 O 1
5.46 m1 O 1
5.47 m1 O 1
6.86 m1 O 1
4.57 m1 O 1
1.39 m1 O 1

5.47 m1 O 1
6.86 m1 O 1
4.57 m1 O 1
1.39 m1 O 1
6.85 m1 O 1
5.47 m1 O 1

5.47 m1 O 1
6.86 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 357 of 1892


4.57 m1 O 1
1.39 m1 O 1
6.85 m1 O 1
5.47 m1 O 1

5.47 m1 O 1
6.86 m1 O 1
4.57 m1 O 1
1.39 m1 O 1
6.85 m1 O 1
5.47 m1 O 1

2.63 m1 O 1

28.56 m1 O 1
38.90 m1 O 1
7.51 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 358 of 1892


28.56 m1 O 1
38.90 m1 O 1
7.51 m1 O 1

28.56 m1 O 1
38.90 m1 O 1
7.51 m1 O 1

9.03 m1 O 2
4.20 m1 O 2

9.03 m1 O 2
4.20 m1 O 2

9.03 m1 O 2
4.20 m1 O 2

RAB (RENCANA ANGGARAN BIAYA) page 359 of 1892


4.57 m1 O 2

4.57 m1 O 2

4.57 m1 O 2

9.77 m1 O 2

14.02 m1 O 1
18.90 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 360 of 1892


14.02 m1 O 1
18.90 m1 O 1

14.02 m1 O 1
18.90 m1 O 1

7.01 m1 O 1
18.90 m1 O 1

7.01 m1 O 1
18.90 m1 O 1

7.01 m1 O 1
18.90 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 361 of 1892


19.40 m1 O 4
41.72 kg F 3
2.00 unit
2.00 bh
1.28 m2

19.40 m1 O 4
41.72 kg F 3
2.00 unit
2.00 bh
1.28 m2

engkap dengan aksesoris dan terpasang rapi.

15.80 m2 L 31

RAB (RENCANA ANGGARAN BIAYA) page 362 of 1892


15.80 m2 L 31
40.26 m2 L 31

15.80 m2 L 31
15.80 m2 L 31
40.26 m2 L 31

15.80 m2 L 31
15.80 m2 L 31
40.26 m2 L 31

15.80 m2 L 31
15.80 m2 L 31
40.26 m2 L 31

2.00 unit O 7

RAB (RENCANA ANGGARAN BIAYA) page 363 of 1892


4.00 unit O 8

2.00 unit O 9

3.00 unit O 15
0.18 m3
269.55 kg O 3
90.67 kg O 3
56.57 kg O 3
146.02 kg O 3
54.00 bh

12.00 bh O 12

117.96 m2 J 16

RAB (RENCANA ANGGARAN BIAYA) page 364 of 1892


67.74 m2 K 2

88.14 m2 K 2

94.34 m2 K 2

19.70 m2 K 2

13.50 m2 K 2

24.70 m2 K 2

24.70 m2 K 2

11.20 m2 K 2

RAB (RENCANA ANGGARAN BIAYA) page 365 of 1892


93.84 m2 K 2

46.96 m2 K 2

46.96 m2 K 2

32.40 m2 K 2

86.40 m1 C 11

27.00 m1 C 11

129.60 m1 C 11

RAB (RENCANA ANGGARAN BIAYA) page 366 of 1892


rpasang rapi

1.00 bh
1.00 bh
16.00 bh
8.00 bh
1.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
199.00 m'
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 367 of 1892


1.00 bh
1.00 bh
26.00 bh
9.00 bh
1.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
246.50 m'
1.00 ls

1.00 bh
1.00 bh
26.00 bh
8.00 bh
1.00 bh
1.00 bh
3.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 368 of 1892


3.00 bh
1.00 ls
1.00 ls
251.00 m'
1.00 ls

1.00 bh
1.00 bh
23.00 bh
9.00 bh
1.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
255.50 m'
1.00 ls

1.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 369 of 1892


1.00 bh
6.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
264.50 m'
1.00 ls

1.00 bh
1.00 bh
19.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n & daya lantai 01 2.00 m'
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 370 of 1892


1.00 bh
1.00 bh
4.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n & daya lantai 01 4.00 m'
1.00 ls

1.00 bh
1.00 bh
30.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 371 of 1892


n & daya lantai 02 2.00 m'
1.00 ls

1.00 bh
1.00 bh
4.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n & daya lantai 02 4.00 m'
1.00 ls

1.00 bh
1.00 bh
30.00 bh
3.00 bh
3.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 372 of 1892


1.00 ls
1.00 ls
n & daya lantai 03 2.00 m'
1.00 ls

1.00 bh
1.00 bh
4.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n & daya lantai 03 4.00 m'
1.00 ls

1.00 bh
1.00 bh
27.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 373 of 1892


3.00 bh
3.00 bh
1.00 ls
1.00 ls
n & daya lantai 04 2.00 m'
1.00 ls

1.00 bh
1.00 bh
4.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n & daya lantai 04 4.00 m'
1.00 ls

1.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 374 of 1892


1.00 bh
3.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n & daya lantai 05 266.50 m'
1.00 ls

rpasang rapi

199.00 m1 M x 3

246.50 m1 M x 3

251.00 m1 M x 3

255.50 m1 M x 3

RAB (RENCANA ANGGARAN BIAYA) page 375 of 1892


264.50 m1 M x 1

3.00 m1 M x 1

201.00 m1 M x 4

3.00 m1 M x 1

244.50 m1 M x 4

3.00 m1 M x 1

249.00 m1 M x 4

3.00 m1 M x 1

253.50 m1 M x 4

RAB (RENCANA ANGGARAN BIAYA) page 376 of 1892


266.50 m1 M x 2

rpasang rapi

236.00 titik M i 1
101.00 titik M i 2
13.00 titik M i 3
114.00 bh M i 4
49.00 bh M i 6
49.00 bh M i 7
18.00 bh M i 8
3.00 bh M i 9
3.00 bh M i 16
20.00 bh M i 22
24.00 bh M i 21
1.00 bh M i 23

RAB (RENCANA ANGGARAN BIAYA) page 377 of 1892


3.00 bh M i 25
13.00 bh M i 27
57.00 bh M i 18
12.00 bh M i 19
10.00 bh M i 20
52.00 m1 L 1

332.00 titik M i 1
180.00 titik M i 2
14.00 titik M i 3
82.00 bh M i 4
166.00 bh M i 6
45.00 bh M i 7
18.00 bh M i 8
3.00 bh M i 16
1.00 bh M i 14
4.00 bh M i 14
1.00 bh M i 14
6.00 bh M i 10
3.00 bh M i 12

RAB (RENCANA ANGGARAN BIAYA) page 378 of 1892


3.00 bh M i 13
23.00 bh M i 22
19.00 bh M i 21
7.00 bh M i 24
3.00 bh M i 26
14.00 bh M i 27
106.00 bh M i 18
23.00 bh M i 19
14.00 bh M i 20
56.00 m1 L 1

329.00 titik M i 1
219.00 titik M i 2
14.00 titik M i 3
82.00 bh M i 4
167.00 bh M i 6
44.00 bh M i 7
18.00 bh M i 8
3.00 bh M i 16
1.00 bh M i 14

RAB (RENCANA ANGGARAN BIAYA) page 379 of 1892


4.00 bh M i 14
1.00 bh M i 14
3.00 bh M i 11
3.00 bh M i 12
3.00 bh M i 13
24.00 bh M i 22
24.00 bh M i 21
7.00 bh M i 24
3.00 bh M i 26
14.00 bh M i 27
105.00 bh M i 18
24.00 bh M i 19
33.00 bh M i 20
56.00 m1 L 1

324.00 titik M i 1
223.00 titik M i 2
13.00 titik M i 3
82.00 bh M i 4
150.00 bh M i 6

RAB (RENCANA ANGGARAN BIAYA) page 380 of 1892


48.00 bh M i 7
18.00 bh M i 8
3.00 bh M i 16
4.00 bh M i 14
1.00 bh M i 14
12.00 bh M i 10
3.00 bh M i 12
3.00 bh M i 13
15.00 bh M i 22
16.00 bh M i 21
6.00 bh M i 24
3.00 bh M i 26
13.00 bh M i 27
67.00 bh M i 18
24.00 bh M i 19
54.00 bh M i 20
52.00 m1 L 1

9.00 titik M i 1
3.00 titik M i 2

RAB (RENCANA ANGGARAN BIAYA) page 381 of 1892


9.00 bh M i 5
4.00 bh M i 22
3.00 bh M i 18

1.00 ls

rpasang rapi

15.00 titik M ii 1
15.00 bh M ii 2
1.00 bh M ii 3
65.00 m'
15.00 bh

27.00 titik M ii 1
27.00 bh M ii 2
1.00 bh M ii 3
60.00 m'
27.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 382 of 1892


27.00 titik M ii 1
27.00 bh M ii 2
1.00 bh M ii 3
65.00 m'
27.00 bh

21.00 titik M ii 1
21.00 bh M ii 2
1.00 bh M ii 3
70.00 m'
21.00 bh

1.00 ls

rpasang rapi

14.00 titik M iii 1


12.00 bh M iii 2

RAB (RENCANA ANGGARAN BIAYA) page 383 of 1892


2.00 bh M iii 4
1.00 bh M iii 5
14.00 bh
1.00 bh M iii 8
1.00 bh M iii 11

31.00 titik M iii 1


29.00 bh M iii 2
2.00 bh M iii 4
2.00 bh M iii 5
31.00 bh
2.00 bh M iii 8
1.00 bh M iii 11

31.00 titik M iii 1


29.00 bh M iii 2
2.00 bh M iii 4
2.00 bh M iii 5

RAB (RENCANA ANGGARAN BIAYA) page 384 of 1892


31.00 bh
2.00 bh M iii 8
2.00 bh M iii 11

21.00 titik M iii 1


20.00 bh M iii 2
1.00 bh M iii 4
1.00 bh M iii 7
21.00 bh
1.00 bh M iii 9
1.00 bh M iii 11

1.00 ls

rpasang rapi

8.00 titik M iv 5

RAB (RENCANA ANGGARAN BIAYA) page 385 of 1892


7.00 bh M iv 1
1.00 bh M iv 3

8.00 titik M iv 5
7.00 bh M iv 1
1.00 bh M iv 3

8.00 titik M iv 5
7.00 bh M iv 1
1.00 bh
1.00 bh M iv 3
1.00 bh
27.00 bh
2.00 bh

8.00 titik M iv 5
7.00 bh M iv 1

RAB (RENCANA ANGGARAN BIAYA) page 386 of 1892


1.00 bh M iv 3

1.00 ls

rpasang rapi

dia. 20 mm
46.00 titik M v 1
43.00 bh M v 3
3.00 bh M v 2

dia. 20 mm
60.00 titik M v 1
48.00 bh M v 3
12.00 bh M v 2

dia. 20 mm

RAB (RENCANA ANGGARAN BIAYA) page 387 of 1892


60.00 titik M v 1
48.00 bh M v 3
12.00 bh M v 2

dia. 20 mm
55.00 titik M v 1
46.00 bh M v 3
9.00 bh M v 2

1.00 ls

rpasang rapi

135.00 m1 M vi 1
145.00 m1 M vi 2
1.00 bh M vi 3
1.00 bh M vi 4
1.00 bh M vi 5

RAB (RENCANA ANGGARAN BIAYA) page 388 of 1892


2.00 bh M vi 6

135.00 m1 M vi 1
145.00 m1 M vi 2
1.00 bh M vi 3
1.00 bh M vi 4
1.00 bh M vi 5
2.00 bh M vi 6

135.00 m1 M vi 1
145.00 m1 M vi 2
1.00 bh M vi 3
1.00 bh M vi 4
1.00 bh M vi 5
2.00 bh M vi 6

135.00 m1 M vi 1

RAB (RENCANA ANGGARAN BIAYA) page 389 of 1892


145.00 m1 M vi 2
1.00 bh M vi 3
1.00 bh M vi 4
1.00 bh M vi 5
2.00 bh M vi 6

47.00 m1 M vi 1
2.00 bh M vi 5

1.00 titik

RAB (RENCANA ANGGARAN BIAYA) page 390 of 1892


8.00 titik

8.00 titik

6.00 titik

RAB (RENCANA ANGGARAN BIAYA) page 391 of 1892


2.00 bh L 13
1.00 bh L 15
2.00 bh L 14
415.00 m1 L 8
4.50 m1 L 7
4.50 m1 L 8
13.50 m1 L 9
8.00 m1 L 8
24.00 m1 L 9
242.90 m1 L 10
2.00 unit

RAB (RENCANA ANGGARAN BIAYA) page 392 of 1892


1.00 unit
ve, gate valve, straner 1.00 ls

1.00 lot

2.00 bh L 13
1.00 bh L 15
2.00 bh L 14
4.50 m1 L 7
4.50 m1 L 8
13.50 m1 L 9
8.00 m1 L 8
24.00 m1 L 9
200.65 m1 L 10
1.00 lot

2.00 bh L 13
1.00 bh L 15
2.00 bh L 14

RAB (RENCANA ANGGARAN BIAYA) page 393 of 1892


4.50 m1 L 7
4.50 m1 L 8
13.50 m1 L 9
8.00 m1 L 8
24.00 m1 L 9
200.65 m1 L 10
1.00 lot

2.00 bh L 13
1.00 bh L 15
2.00 bh L 14
4.50 m1 L 7
4.50 m1 L 8
13.50 m1 L 9
8.00 m1 L 8
24.00 m1 L 9
200.65 m1 L 10
1.00 lot

12.00 bh L 17

RAB (RENCANA ANGGARAN BIAYA) page 394 of 1892


4.00 bh L 16
8.00 bh L 15
8.00 m1 L 4
103.00 m1 L 6
49.00 m1 L 7
12.00 m1 L 8
38.00 m1 L 9
38.20 m1 L 6
2.00 unit L 37
2.00 unit L 38
2.40 m3
750.00 m'
2.00 pkt

te valve,

1.00 lot

1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 395 of 1892


28.00 m1 L 8
24.00 m1 L 6
136.50 m1 L 4
22.50 m1 L 4
4.00 unit L 33
1.00 lot

30.00 m1 L 8
26.00 m1 L 6
51.50 m1 L 4
22.50 m1 L 4
1.00 lot

30.00 m1 L 8
26.00 m1 L 6
51.50 m1 L 4
22.50 m1 L 4
1.00 lot

RAB (RENCANA ANGGARAN BIAYA) page 396 of 1892


30.00 m1 L 8
26.00 m1 L 6
51.50 m1 L 4
40.00 m1 L 4
1.00 lot

20.00 m1 L 7
36.80 m1 L 6
149.00 m1 L 3
22.50 m1 L 3
2.00 unit L 33
2.00 unit L 42
1.00 lot

20.00 m1 L 7
19.50 m1 L 6
30.00 m1 L 3
22.50 m1 L 3

RAB (RENCANA ANGGARAN BIAYA) page 397 of 1892


1.00 lot

20.00 m1 L 7
19.50 m1 L 6
30.00 m1 L 3
22.50 m1 L 3
1.00 lot

20.00 m1 L 7
19.50 m1 L 6
30.00 m1 L 3
22.50 m1 L 3
1.00 lot

5.00 bh L 19
13.00 bh L 24
1.00 bh L 25
14.00 bh L 22
1.00 bh L 23
15.00 bh L 21
RAB (RENCANA ANGGARAN BIAYA) page 398 of 1892
15.00 bh L 20
8.00 bh L 26
7.00 bh L 27
2.00 bh L 23
2.00 set L 28

6.00 bh L 19
14.00 bh L 24
1.00 bh L 25
15.00 bh L 22
1.00 bh L 23
16.00 bh L 21
16.00 bh L 20
8.00 bh L 26
7.00 bh L 27
2.00 set L 28

6.00 bh L 19
14.00 bh L 24
1.00 bh L 25
15.00 bh L 22
RAB (RENCANA ANGGARAN BIAYA) page 399 of 1892
1.00 bh L 23
16.00 bh L 21
16.00 bh L 20
8.00 bh L 26
7.00 bh L 27
2.00 set L 28

11.00 bh L 19
13.00 bh L 24
1.00 bh L 25
14.00 bh L 22
1.00 bh L 23
15.00 bh L 21
17.00 bh L 20
8.00 bh L 26
7.00 bh L 27
2.00 set L 28

36.00 m1 L 6

RAB (RENCANA ANGGARAN BIAYA) page 400 of 1892


72.00 m1 L 3
49.50 m1 L 2
18.00 bh
152.00 m1

36.00 m1 L 6
72.00 m1 L 3
49.50 m1 L 2
18.00 bh
152.00 m1

36.00 m1 L 6
72.00 m1 L 3
49.50 m1 L 2
18.00 bh
152.00 m1

99.00 m1 L 3
49.50 m1 L 2
22.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 401 of 1892


11.00 bh
207.00 m1

198.00 m1 L 6
18.00 m1 L 3
4.00 bh
70.00 m1

rpasang rapi

2.00 titik M vii 2


17.00 titik M vii 1
1.00 unit M vii 11
1.00 unit M vii 12
1.00 unit M vii 14
2.00 unit M vii 4
3.00 unit M vii 5
1.00 unit M vii 6
10.00 unit M vii 7

RAB (RENCANA ANGGARAN BIAYA) page 402 of 1892


1.00 unit M vii 8
17.00 unit
17.00 bh
16.00 bh
136.00 m1 M vii 18

3.00 titik M vii 2


27.00 titik M vii 1
2.00 unit M vii 14
1.00 unit M vii 16
6.00 unit M vii 4
1.00 unit M vii 5
11.00 unit M vii 6
7.00 unit M vii 7
2.00 unit M vii 8
27.00 unit
27.00 bh
25.00 bh
240.00 m1 M vii 18

RAB (RENCANA ANGGARAN BIAYA) page 403 of 1892


3.00 titik M vii 2
27.00 titik M vii 1
2.00 unit M vii 14
1.00 unit M vii 16
6.00 unit M vii 4
1.00 unit M vii 5
11.00 unit M vii 6
7.00 unit M vii 7
2.00 unit M vii 8
27.00 unit
27.00 bh
25.00 bh
216.00 m1 M vii 18

2.00 titik M vii 2


23.00 titik M vii 1
1.00 unit M vii 13

RAB (RENCANA ANGGARAN BIAYA) page 404 of 1892


1.00 unit M vii 14
1.00 unit M vii 16
2.00 unit M vii 4
1.00 unit M vii 5
10.00 unit M vii 6
9.00 unit M vii 7
1.00 unit M vii 8
23.00 unit
23.00 bh
22.00 bh
184.00 m1 M vii 18

1.00 titik M vii 1


1.00 m1 M vii 10
8.00 m1 M vii 18
4.00 m1 M vii 19
4.00 m1 M vii 21

1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 405 of 1892


rpasang rapi
1.00 unit M viii 3

1.00 ls

mm sampai 1 m 906.50 m3 B 1
mm sampai 2 m 906.50 m3 B 2
mm sampai 3 m 906.50 m3 B 3
mm lebih dari 3 m 181.30 m3 B 4
mm sampai 1 m 76.88 m3 B 1
mm sampai 2 m 76.88 m3 B 2
RAB (RENCANA ANGGARAN BIAYA) page 406 of 1892
mm sampai 3 m 76.88 m3 B 3
mm lebih dari 3 m 15.38 m3 B 4
mm sampai 1 m 19.22 m3 B 1
mm sampai 2 m 19.22 m3 B 2
mm sampai 3 m 19.22 m3 B 3
mm lebih dari 3 m 3.84 m3 B 4
on, dipadatkan 1658.53 m3 B 7
100.26 m3 B 5

6.25 m3 B 1
6.25 m3 B 2

7.14 m3 B 1
7.14 m3 B 2
5.93 m3 B 3

7.14 m3 B 1
7.14 m3 B 2
5.93 m3 B 3

RAB (RENCANA ANGGARAN BIAYA) page 407 of 1892


316.01 m3 E i 2

100.26 m3 E i 2

10.00 m3 E iv 1
1.88 m3 E vi 6
33.65 m3 E xii 1
13.25 m3 E xii 2

11.42 m3 E iv 1
2.14 m3 E vi 6
72.89 m3 E xii 2

11.42 m3 E iv 1
2.14 m3 E vi 6
72.89 m3 E xii 2

RAB (RENCANA ANGGARAN BIAYA) page 408 of 1892


16.46 m3 E xii 3

pa + stek besi D13mm 906.50 m3 E iv 1


pa + stek besi D13 mm 76.88 m3 E iv 1
pa + stek besi D13 mm 19.22 m3 E iv 1
315.78 m3 E vi 1
24.71 m3 E vi 2
6.18 m3 E vi 3
244.88 m3 E viii 1
27.60 m3 E viii 2
5.11 m3 E viii 5
6.90 m3 E viii 7
Elev. - 4.350 12.57 m3 E vii 1
Elev. - 4.350 72.45 m3 E vii 2
Elev. - 4.270 15.35 m3 E vii 1
Elev. - 4.270 43.69 m3 E vii 2
Elev. - 2.050 5.22 m3 E ix 9
Elev. - 1.650 3.84 m3 E ix 1
Elev. - 1.650 6.26 m3 E ix 12
1.54 m3 E ix 4

RAB (RENCANA ANGGARAN BIAYA) page 409 of 1892


0.58 m3 E ix 7

AS (18-19) - (I-K) 15.73 m3 E xi 3

AS (12-13) - (G-I) 5.13 m3 E xi 1

AS (24-25) - (G-I) 5.13 m3 E xi 1


Elev. - 4.350 256.22 m3 E x 9

Elev. - 2.050 0.68 m3 E x 1

Elev. - 1.700 16.34 m3 E x 1

24.78 m2 K 4
9.35 m1

149.06 m3 E viii 9
16.80 m3 E viii 10
3.11 m3 E viii 15

RAB (RENCANA ANGGARAN BIAYA) page 410 of 1892


4.20 m3 E viii 17
Elev. - 0.050 56.35 m3 E ix 1
Elev. - 0.050 6.47 m3 E ix 2
Elev. - 0.050 5.53 m3 E ix 3
Elev. - 0.050 53.91 m3 E ix 4
Elev. - 0.050 1.03 m3 E ix 5
Elev. - 0.050 2.65 m3 E ix 6
Elev. - 0.050 29.15 m3 E ix 7
Elev. - 0.050 35.64 m3 E ix 9
Elev. - 0.050 14.07 m3 E ix 10
Elev. - 0.050 10.49 m3 E ix 14
Elev. - 0.050 1.80 m3 E ix 15
Elev. - 0.050 3.58 m3 E ix 16
Elev. - 0.050 16.32 m3 E ix 17
Elev. - 0.050 3.50 m3 E ix 18
Elev. - 0.050 1.44 m3 E ix 23
Elev. + 2.150 4.95 m3 E ix 9
Elev. - 0.050 438.20 m3 E x 1

AS (18-19) - (I-K) 15.73 m3 E xi 3

RAB (RENCANA ANGGARAN BIAYA) page 411 of 1892


AS (12-13) - (G-I) 5.03 m3 E xi 1

AS (24-25) - (G-I) 5.03 m3 E xi 1

AS (18-19) - (B-C) 7.44 m3 E xi 2

AS (16-21) - (A) 37.58 m3 E xi 2

0.12 m3 E xi 6

141.96 m3 E viii 9
16.80 m3 E viii 10
Elev. (+4.150) - (+6.250) 1.55 m3 E viii 15
4.20 m3 E viii 17
2.65 m3 E viii 18
Elev. + 4.150 51.13 m3 E ix 1
Elev. + 4.150 6.47 m3 E ix 2
Elev. + 4.150 4.55 m3 E ix 3
Elev. + 4.150 51.39 m3 E ix 4
Elev. + 4.150 1.03 m3 E ix 5
Elev. + 4.150 2.65 m3 E ix 6
RAB (RENCANA ANGGARAN BIAYA) page 412 of 1892
Elev. + 4.150 28.31 m3 E ix 7
Elev. + 4.150 6.38 m3 E ix 8
Elev. + 4.150 44.28 m3 E ix 9
Elev. + 4.150 15.69 m3 E ix 10
Elev. + 4.150 6.61 m3 E ix 11
Elev. + 4.150 1.71 m3 E ix 12
Elev. + 4.150 6.30 m3 E ix 14
Elev. + 4.150 1.34 m3 E ix 15
Elev. + 4.150 3.12 m3 E ix 16
Elev. + 4.150 22.17 m3 E ix 17
Elev. + 4.150 3.54 m3 E ix 18
Elev. + 4.150 1.41 m3 E ix 23
Elev. + 4.150 7.65 m3 E ix 24
Elev. + 4.150 3.39 m3 E ix 25
Elev. + 4.150 3.39 m3 E ix 35

Elev. + 6.250 1.33 m3 E ix 1


Elev. + 6.250 4.95 m3 E ix 9
Elev. + 6.250 37.80 m3 E ix 26

RAB (RENCANA ANGGARAN BIAYA) page 413 of 1892


AS (18-19) - (I-K) 15.73 m3 E xi 3

AS (12-13) - (G-I) 5.03 m3 E xi 1

AS (24-25) - (G-I) 5.03 m3 E xi 1

468.09 m3 E x 1

0.12 m3 E xi 6

124.22 m3 E viii 9
Elev. (+8.350) - (+11.600) 10.99 m3 E viii 9
16.80 m3 E viii 10
4.20 m3 E viii 17
2.65 m3 E viii 18
Elev. + 8.350 58.41 m3 E ix 1
Elev. + 8.350 6.47 m3 E ix 2
Elev. + 8.350 4.83 m3 E ix 3
Elev. + 8.350 60.53 m3 E ix 4
Elev. + 8.350 2.65 m3 E ix 6

RAB (RENCANA ANGGARAN BIAYA) page 414 of 1892


Elev. + 8.350 28.59 m3 E ix 7
Elev. + 8.350 1.30 m3 E ix 8
Elev. + 8.350 21.56 m3 E ix 9
Elev. + 8.350 5.89 m3 E ix 10
Elev. + 8.350 6.34 m3 E ix 11
Elev. + 8.350 1.71 m3 E ix 12
Elev. + 8.350 8.12 m3 E ix 14
Elev. + 8.350 0.15 m3 E ix 15
Elev. + 8.350 5.14 m3 E ix 16
Elev. + 8.350 10.73 m3 E ix 17
Elev. + 8.350 3.47 m3 E ix 18
Elev. + 8.350 1.25 m3 E ix 23
Elev. + 8.350 5.45 m3 E ix 36

Elev. + 10.450 4.95 m3 E ix 9


Elev. + 11.600 5.29 m3 E ix 1
Elev. + 11.600 7.94 m3 E ix 4
Elev. + 11.600 2.12 m3 E ix 7
Elev. + 11.600 4.73 m3 E ix 14
Elev. + 11.600 1.96 m3 E ix 16

RAB (RENCANA ANGGARAN BIAYA) page 415 of 1892


Elev. + 11.600 10.80 m3 E ix 19

AS (18-19) - (I-K) 15.73 m3 E xi 3

AS (12-13) - (G-I) 5.03 m3 E xi 1

AS (24-25) - (G-I) 5.03 m3 E xi 1

Elev. + 8.350 460.59 m3 E x 1

Elev. + 11.600 42.45 m3 E x 1

0.12 m3 E xi 6

117.12 m3 E viii 9
16.80 m3 E viii 10
4.20 m3 E viii 17
46.48 m3 E viii 9
lev. (+16.750) - (+18.650) 6.42 m3 E viii 9
20.00 m3 E viii 10
8.64 m3 E viii 14
RAB (RENCANA ANGGARAN BIAYA) page 416 of 1892
Elev. + 12.550 54.09 m3 E ix 1
Elev. + 12.550 9.70 m3 E ix 2
Elev. + 12.550 5.29 m3 E ix 3
Elev. + 12.550 59.20 m3 E ix 4
Elev. + 12.550 2.65 m3 E ix 6
Elev. + 12.550 28.04 m3 E ix 7
Elev. + 12.550 20.64 m3 E ix 9
Elev. + 12.550 8.24 m3 E ix 10
Elev. + 12.550 4.32 m3 E ix 14
Elev. + 12.550 0.22 m3 E ix 15
Elev. + 12.550 4.68 m3 E ix 16
Elev. + 12.550 1.93 m3 E ix 17
Elev. + 12.550 5.81 m3 E ix 18
Elev. + 12.550 10.00 m3 E ix 28
Elev. + 12.550 5.13 m3 E ix 36

Elev. + 13.650 2.57 m3 E ix 9

Elev. + 16.750 48.29 m3 E ix 1


Elev. + 16.750 5.29 m3 E ix 3

RAB (RENCANA ANGGARAN BIAYA) page 417 of 1892


Elev. + 16.750 40.68 m3 E ix 4
Elev. + 16.750 5.29 m3 E ix 6
Elev. + 16.750 14.16 m3 E ix 7
Elev. + 16.750 13.41 m3 E ix 9
Elev. + 16.750 4.31 m3 E ix 10
Elev. + 16.750 10.56 m3 E ix 14
Elev. + 16.750 7.35 m3 E ix 16
Elev. + 16.750 0.79 m3 E ix 17
Elev. + 16.750 17.24 m3 E ix 36

Elev. + 17.550 7.94 m3 E ix 1


Elev. + 17.550 6.26 m3 E ix 4
Elev. + 17.550 1.55 m3 E ix 7
Elev. + 17.550 0.65 m3 E ix 14
Elev. + 17.550 0.69 m3 E ix 16
Elev. + 17.550 0.27 m3 E ix 17

Elev. + 18.650 10.58 m3 E ix 1


Elev. + 18.650 15.88 m3 E ix 4
Elev. + 18.650 6.11 m3 E ix 7

RAB (RENCANA ANGGARAN BIAYA) page 418 of 1892


Elev. + 20.400 2.57 m3 E ix 9

Elev. + 21.750 16.11 m3 E ix 1


Elev. + 21.750 6.26 m3 E ix 4
Elev. + 21.750 8.61 m3 E ix 7
Elev. + 21.750 18.25 m3 E ix 9
Elev. + 21.750 14.73 m3 E ix 10
Elev. + 21.750 33.32 m3 E ix 13
Elev. + 21.750 4.94 m3 E ix 14
Elev. + 21.750 2.73 m3 E ix 16
Elev. + 21.750 0.01 m3 E ix 17
Elev. + 21.750 1.53 m3 E ix 21
Elev. + 21.750 5.57 m3 E ix 36

Elev. + 21.850 10.69 m3 E ix 30


Elev. + 22.050 18.02 m3 E ix 33
Elev. + 24.150 13.94 m3 E ix 31
Elev. + 26.250 7.99 m3 E ix 32

RAB (RENCANA ANGGARAN BIAYA) page 419 of 1892


AS (18-19) - (I-K) 15.73 m3 E xi 3

AS (18-19) - (F-G) 3.75 m3 E xi 3

Elev. + 12.550 429.12 m3 E x 1

Elev. + 16.750 278.35 m3 E x 1

Elev. + 17.550 30.39 m3 E x 1

Elev. + 17.550 5.00 m3 E x 4

Elev. + 18.650 63.15 m3 E x 1

Elev. + 20.400 184.77 m3 E x 1

Elev. + 21.750 75.05 m3 E x 1

Elev. + 21.750 103.96 m3 E x 2

Elev. + 21.750 5.00 m3 E x 4


28.10 m3 E xi 2

RAB (RENCANA ANGGARAN BIAYA) page 420 of 1892


0.12 m3 E xi 6

191.84 m3 B 1
57.55 m3 B 2
19.18 m3 B 5
36.60 m3 B 5
55.60 m3 B 7
863.40 m3 B 6
503.58 m2 D 1
19.18 m3 E i 2
36.60 m3 E i 2
43.16 m3 E vi 5
43.17 m3 E xii 4
25 MPa 59.04 m3 E xii 4
43.92 m3 E x 10
160.00 m1

24.00 bh
38.00 m1 F 5
143.64 kg F 3
RAB (RENCANA ANGGARAN BIAYA) page 421 of 1892
192.00 bh
39.90 m2 F 4

24.00 bh
38.00 m1 F 5
143.64 kg F 3
192.00 bh
39.90 m2 F 4

24.00 bh
38.00 m1 F 5
143.64 kg F 3
192.00 bh
39.90 m2 F 4

6.00 bh
19.00 m1 F 5
71.82 kg F 3
96.00 bh
19.95 m2 F 4

RAB (RENCANA ANGGARAN BIAYA) page 422 of 1892


540.12 m3 B 1
130.76 m3 B 5
316.01 m3 B 5
180.04 m3 B 7
galian + pemadatan 1527.89 m3 B 7
525.84 m3 B 6

2279.31 m2 D 1
3160.10 m2 D 1

524.80 m1 E v 1
64.13 m1 E v 2

RAB (RENCANA ANGGARAN BIAYA) page 423 of 1892


178.50 m1 E v 3
1602.25 m1 E v 4
446.84 m1 E v 5
185.00 m1 E v 6
434.96 m1 E v 7
19.87 m1 E v 8
48.80 m1 E v 9

613.20 m1 E v 3
1436.40 m1 E v 4
610.40 m1 E v 5
195.00 m1 E v 6
196.89 m1 E v 7
18.93 m1 E v 8
33.90 m1 E v 9

575.40 m1 E v 3
1722.00 m1 E v 4

RAB (RENCANA ANGGARAN BIAYA) page 424 of 1892


642.40 m1 E v 5
178.00 m1 E v 6
209.27 m1 E v 7
42.76 m1 E v 8
30.00 m1 E v 9

491.40 m1 E v 3
1419.60 m1 E v 4
622.90 m1 E v 5
168.50 m1 E v 6
272.32 m1 E v 7
50.82 m1 E v 8
4.80 m1 E v 9

310.80 m1 E v 3
1268.40 m1 E v 4
525.30 m1 E v 5
171.50 m1 E v 6

RAB (RENCANA ANGGARAN BIAYA) page 425 of 1892


159.98 m1 E v 7
33.54 m1 E v 8
9.60 m1 E v 9
71.28 m1 E v 10

429.60 m1 E v 4
248.10 m1 E v 5
22.90 m1 E v 7

1673.68 m3 C 1
5.55 m2 C 4
1003.22 m2 C 14
2006.43 m2 C 15
1812.96 m2 C 16
207.76 m2 C 3
207.76 m2 C 6
615.94 m2 C 2

RAB (RENCANA ANGGARAN BIAYA) page 426 of 1892


1231.87 m2 C 5
1439.64 m2 C 10
1162.60 m2 C 17
830.61 m1 C 9
1007.25 m1 C 7
753.44 m1 C 11
114.54 m2 C 8
1550.00 m2 C 8

1540.48 m2 C 14
2689.75 m2 C 15
2406.46 m2 C 16
572.12 m2 C 3
1144.25 m2 C 6
369.38 m2 C 2
738.75 m2 C 5
1883.00 m2 C 10
1503.11 m2 C 17
1002.70 m1 C 9

RAB (RENCANA ANGGARAN BIAYA) page 427 of 1892


499.46 m1 C 7
114.54 m2 C 8

1536.70 m2 C 14
2722.43 m2 C 15
2446.94 m2 C 16
586.54 m2 C 3
1173.08 m2 C 6
47.46 m2 C 2
94.93 m2 C 5
1268.00 m2 C 10
1186.26 m2 C 17
1146.22 m1 C 9
564.07 m1 C 7
114.54 m2 C 8
195.48 m2 C 18

1362.74 m2 C 14
2329.12 m2 C 15

RAB (RENCANA ANGGARAN BIAYA) page 428 of 1892


2133.49 m2 C 16
489.46 m2 C 3
978.93 m2 C 6
47.46 m2 C 2
94.93 m2 C 5
1073.85 m2 C 10
1291.46 m2 C 17
1076.46 m1 C 9
655.89 m1 C 7
114.54 m2 C 8
239.50 m2 C 8

218.23 m2 C 14
436.46 m2 C 15
436.46 m2 C 16
338.27 m2 C 3
676.54 m2 C 6
62.52 m2 C 2
125.04 m2 C 5

RAB (RENCANA ANGGARAN BIAYA) page 429 of 1892


801.59 m2 C 10
4266.52 m2 C 17
980.67 m1 C 9
548.82 m1 C 7
82.12 m2 C 8
214.30 m2 C 18

928.52 m2 C 14
1857.04 m2 C 15
1857.04 m2 C 16
62.52 m2 C 2
125.04 m2 C 5
125.04 m2 C 10
845.93 m2 C 17
232.21 m1 C 9
45.80 m1 C 7
89.00 m2 C 8
3492.14 m2 C 18

RAB (RENCANA ANGGARAN BIAYA) page 430 of 1892


7.00 unit G 11
5.00 unit G 12
7.00 unit G 15
2.00 unit G 18
1.00 unit G 19
5.00 unit G 21
1.00 unit G 5
4.00 unit G 29
2.00 unit G 30
2.00 unit G 31
4.00 unit G 39
2.00 unit G 40
1.00 unit G 41
8.00 unit G 42
4.00 unit G 43
2.00 unit G 54
2.00 unit G 55
2.00 unit G 58

RAB (RENCANA ANGGARAN BIAYA) page 431 of 1892


1.00 unit G 4
4.00 unit G 11
8.00 unit G 13
4.00 unit G 14
7.00 unit G 15
13.00 unit G 17
1.00 unit G 18
1.00 unit G 19
5.00 unit G 21
18.00 unit G 27
6.00 unit G 29
2.00 unit G 30
2.00 unit G 31
1.00 unit G 32
2.00 unit G 38
4.00 unit G 39
2.00 unit G 40
1.00 unit G 41

RAB (RENCANA ANGGARAN BIAYA) page 432 of 1892


6.00 unit G 42
4.00 unit G 43
2.00 unit G 44
4.00 unit G 45
4.00 unit G 46
2.00 unit G 59

4.00 unit G 11
1.00 unit G 12
6.00 unit G 13
4.00 unit G 14
7.00 unit G 15
13.00 unit G 17
1.00 unit G 18
1.00 unit G 19
5.00 unit G 21
18.00 unit G 27
6.00 unit G 29
2.00 unit G 30

RAB (RENCANA ANGGARAN BIAYA) page 433 of 1892


2.00 unit G 31
2.00 unit G 38
4.00 unit G 39
2.00 unit G 40
1.00 unit G 41
6.00 unit G 42
4.00 unit G 43
2.00 unit G 44
4.00 unit G 45
4.00 unit G 46
1.00 unit G 60

3.00 unit G 11
1.00 unit G 12
5.00 unit G 13
6.00 unit G 14
10.00 unit G 15
12.00 unit G 17
1.00 unit G 18

RAB (RENCANA ANGGARAN BIAYA) page 434 of 1892


1.00 unit G 19
1.00 unit G 20
5.00 unit G 21
25.00 unit G 27
2.00 unit G 28
2.00 unit G 29
2.00 unit G 30
2.00 unit G 31
12.00 unit G 34
4.00 unit G 37
2.00 unit G 38
4.00 unit G 39
2.00 unit G 40
1.00 unit G 41
2.00 unit G 42
4.00 unit G 43
2.00 unit G 47
1.00 unit G 47
1.00 unit G 49
1.00 unit G 50

RAB (RENCANA ANGGARAN BIAYA) page 435 of 1892


1.00 unit G 51
1.00 unit G 52
3.00 unit G 53
1.00 unit

4.00 unit G 11
1.00 unit G 12
4.00 unit G 14
8.00 unit G 15
3.00 unit G 17
1.00 unit G 18
1.00 unit G 19
3.00 unit G 22
9.00 unit G 23
5.00 unit G 21
1.00 unit G 10
2.00 unit G 7
2.00 unit G 8
8.00 unit G 27

RAB (RENCANA ANGGARAN BIAYA) page 436 of 1892


2.00 unit G 30
2.00 unit G 31
4.00 unit G 35
18.00 unit G 36
2.00 unit G 38
4.00 unit G 39
2.00 unit G 40
1.00 unit G 41

6.00 unit G 24
3.00 unit G 25
1.00 unit G 26
3.00 unit G 21
1.00 unit G 9
2.00 unit G 38
2.00 unit G 39

RAB (RENCANA ANGGARAN BIAYA) page 437 of 1892


- 1.000 1163.23 m2 H 1
- 0.750 21.00 m2 H 1
- 0.550 17.00 m2 H 1
(+ 3.450) - (+ 3.700) 33.75 m2 H 2
882.35 m1 H 4
1.00 bh H 5

2682.71 m2 H 1
+ 3.450 21.00 m2 H 1
+ 3.650 8.50 m2 H 1
+ 3.700 63.00 m2 H 2
1344.12 m1 H 4
1.00 bh H 5

2682.71 m2 H 1
+ 7.650 21.00 m2 H 1
+ 7.850 8.50 m2 H 1
1279.62 m1 H 4
1.00 bh H 5

RAB (RENCANA ANGGARAN BIAYA) page 438 of 1892


1754.30 m2 H 1
+ 11.850 21.00 m2 H 1
+ 12.050 8.50 m2 H 1
833.25 m1 H 4
1.00 bh H 5

1375.89 m2 H 1
+ 18.800 330.00 m2 H 1
+ 20.000 300.00 m2 H 1
36.00 m2 H 3
(+ 18.800) - (+ 20.000) 297.22 m2 H 7
1603.56 m1 H 4
1.00 bh H 5

282.70 m2 H 1
153.00 m1 H 4

1499.90 kh F 3

RAB (RENCANA ANGGARAN BIAYA) page 439 of 1892


1888.89 kh F 3
480.00 bh

K STATION

4.00 unit I 13
4.00 unit I 14
2.00 unit I 15
2.00 unit I 16
4.00 unit I 17
2.00 unit I 18
4.00 unit I 19
2.00 unit I 20
2.00 unit I 21
2.00 unit I 22
2.00 unit I 23
4.00 unit I 38
2.00 unit I 40
2.00 unit I 41

RAB (RENCANA ANGGARAN BIAYA) page 440 of 1892


4.00 unit I 42
22.50 m2 I 55
16.65 m2 I 55
17.25 m2 I 55
12.00 m2 I 55
26.70 m2 I 55
13.77 m2 I 55

4.00 unit I 13
4.00 unit I 14
2.00 unit I 15
2.00 unit I 16
4.00 unit I 17
2.00 unit I 18
4.00 unit I 19
2.00 unit I 20
2.00 unit I 21
2.00 unit I 22
2.00 unit I 23
4.00 unit I 38

RAB (RENCANA ANGGARAN BIAYA) page 441 of 1892


2.00 unit I 40
2.00 unit I 41
4.00 unit I 42
22.50 m2 I 55
16.65 m2 I 55
17.25 m2 I 55
12.00 m2 I 55
26.70 m2 I 55
13.77 m2 I 55

3.00 unit I 3
1.00 unit I 13
1.00 unit I 14
1.00 unit I 16
1.00 unit I 21
2.00 unit I 22
1.00 unit I 24
1.00 unit I 25
1.00 unit I 26
2.00 unit I 27

RAB (RENCANA ANGGARAN BIAYA) page 442 of 1892


2.00 unit I 28
2.00 unit I 29
1.00 unit I 30
1.00 unit I 31
1.00 unit I 32
2.00 unit I 33
2.00 unit I 34
1.00 unit I 35
1.00 unit I 36
3.00 unit I 38
2.00 unit I 42
1.00 unit I 43
1.00 unit I 44
2.00 unit I 45
2.00 unit I 46
2.00 unit I 47
1.00 unit I 48
1.00 unit I 49
1.00 unit I 50
1.00 unit I 51

RAB (RENCANA ANGGARAN BIAYA) page 443 of 1892


1.00 unit I 52
1.00 unit I 53
1.00 unit I 54
4.16 m2 I 55
4.31 m2 I 55
6.68 m2 I 55
3.44 m2 I 55
5.18 m2 I 55
5.40 m2 I 55

1.00 unit I 37
3.00 unit I 55
2.00 unit I 56
1.00 unit I 56

1684.78 m2 J 15
a hitam ) 34.90 m2 J 1

RAB (RENCANA ANGGARAN BIAYA) page 444 of 1892


600 mm ( Terang ) 357.10 m2 J 3
864.50 m2 J 5
ng ( Area tangga ) 81.98 m2 J 8
826.66 m1 J 6
54.72 m2 J 7
234.40 m2 J 9
25.30 m2 J 11
1.20 m2 J 7
a baja siku 2.98 m2 J 19

387.98 m2 J 15
a hitam ) 80.57 m2 J 1
600 mm ( Gelap ) 47.52 m2 J 2
600 mm ( Terang ) 189.73 m2 J 3
348.23 m2 J 4
1090.75 m2 J 5
ng ( Area tangga ) 81.98 m2 J 8
1031.94 m1 J 6
54.72 m2 J 7
RAB (RENCANA ANGGARAN BIAYA) page 445 of 1892
234.40 m2 J 9
63.65 m1 J 12
1378.61 m2 J 10
25.30 m2 J 11
1.20 m2 J 7
a baja siku 7.80 m2 J 19

a hitam ) 233.48 m2 J 1
600 mm ( Terang ) 326.85 m2 J 3
111.27 m2 J 4
833.96 m2 J 5
ng ( Area tangga ) 81.98 m2 J 8
1020.37 m1 J 6
106.29 m2 J 7
668.22 m2 J 9
1378.61 m2 J 10
25.30 m2 J 11
a baja siku 7.80 m2 J 19

RAB (RENCANA ANGGARAN BIAYA) page 446 of 1892


a hitam ) 233.48 m2 J 1
600 mm ( Terang ) 326.85 m2 J 3
111.27 m2 J 4
833.96 m2 J 5
ng ( Area tangga ) 81.98 m2 J 8
1020.37 m1 J 6
106.29 m2 J 7
668.22 m2 J 9
1378.61 m2 J 10
25.30 m2 J 11
a baja siku 7.80 m2 J 19

a hitam ) 39.35 m2 J 1
600 mm ( Terang ) 195.44 m2 J 3
105.72 m2 J 4
551.04 m2 J 5
ng ( Area tangga ) 81.98 m2 J 8
811.48 m1 J 6
RAB (RENCANA ANGGARAN BIAYA) page 447 of 1892
97.28 m2 J 7
573.12 m2 J 9
4.3 mm 604.55 m2 J 13
1038.00 m2 J 14
25.30 m2 J 11
1.20 m2 J 7
a baja siku 2.98 m2 J 19

68.51 m2 J 5
35.10 m1 J 6

1208.70 m2 K 2
2789.05 m2 K 1
1234.98 m2 K 3
1664.54 m2 K 3

RAB (RENCANA ANGGARAN BIAYA) page 448 of 1892


1557.03 m2 K 2
3961.94 m2 K 1
2775.21 m2 K 3
114.54 m2 K 3
54.72 m2 K 5

1640.63 m2 K 2
3070.57 m2 K 1
1783.80 m2 K 3
114.54 m2 K 3
195.48 m2 K 6
106.29 m2 K 5

1312.71 m2 K 2
3186.09 m2 K 1
1783.80 m2 K 3
354.04 m2 K 3
106.29 m2 K 5

RAB (RENCANA ANGGARAN BIAYA) page 449 of 1892


1270.77 m2 K 2
4233.80 m2 K 1
2339.11 m2 K 3
82.12 m2 K 3
214.30 m2 K 6
97.28 m2 K 5

852.60 m2 K 2
1975.42 m2 K 1
282.70 m2 K 3
89.00 m2 K 3
3492.14 m2 K 6

dengan aksesoris dan terpasang rapi.


0 x 20 mm tebal 1.2 mm

RAB (RENCANA ANGGARAN BIAYA) page 450 of 1892


14.07 m1 O 1
10.92 m1 O 1
10.93 m1 O 1
14.08 m1 O 1
7.04 m1 O 1
2.77 m1 O 1

10.93 m1 O 1
14.08 m1 O 1
7.04 m1 O 1
2.77 m1 O 1
14.07 m1 O 1
10.93 m1 O 1

10.93 m1 O 1
14.08 m1 O 1
7.04 m1 O 1
2.77 m1 O 1
14.07 m1 O 1
10.93 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 451 of 1892


10.93 m1 O 1
14.08 m1 O 1
7.04 m1 O 1
2.77 m1 O 1
14.07 m1 O 1
10.93 m1 O 1

4.21 m1 O 1

10.65 m1 O 1
2.84 m1 O 1
10.93 m1 O 1
9.72 m1 O 2
14.71 m1 O 2
1.27 m1 O 2

2.84 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 452 of 1892


10.93 m1 O 1
21.86 m1 O 1
9.72 m1 O 2
14.71 m1 O 2
1.27 m1 O 2

2.84 m1 O 1
10.93 m1 O 1
21.86 m1 O 1
9.72 m1 O 2
14.71 m1 O 2
1.27 m1 O 2

2.84 m1 O 1
10.93 m1 O 1
21.86 m1 O 1
9.72 m1 O 2
14.71 m1 O 2
1.27 m1 O 2

RAB (RENCANA ANGGARAN BIAYA) page 453 of 1892


2.84 m1 O 1
10.93 m1 O 1
21.86 m1 O 1
9.72 m1 O 2
14.71 m1 O 2
1.27 m1 O 2

5.65 m1 O 1

34.02 m1 O 3
10.50 m1 O 3

34.02 m1 O 3
10.50 m1 O 3

RAB (RENCANA ANGGARAN BIAYA) page 454 of 1892


17.20 m1 O 2

17.20 m1 O 2

17.20 m1 O 2

7.46 m1 O 2

7.46 m1 O 2

9.08 m1 O 2

RAB (RENCANA ANGGARAN BIAYA) page 455 of 1892


23.85 m1 O 4
41.72 kg F 3
2.00 unit
2.00 bh
1.28 m2

23.75 m1 O 4
1.28 m2

engkap dengan aksesoris dan terpasang rapi.

15.80 m2 L 31
21.06 m2 L 31

15.80 m2 L 31
21.06 m2 L 31

15.80 m2 L 31

RAB (RENCANA ANGGARAN BIAYA) page 456 of 1892


21.06 m2 L 31

15.80 m2 L 31
21.06 m2 L 31

15.80 m2 L 31
21.06 m2 L 31
8.50 m2

2.00 unit O 7

8.00 unit O 9

16.00 unit O 10

RAB (RENCANA ANGGARAN BIAYA) page 457 of 1892


8.00 unit O 13

6.00 unit O 11
1.00 unit O 6

6.00 unit O 14

10.00 unit O 15
0.60 m3
898.51 kg F 3
302.22 kg F 3
188.55 kg F 3
486.72 kg F 3
180.00 bh

498.87 m2 J 16

RAB (RENCANA ANGGARAN BIAYA) page 458 of 1892


1.00 unit

129.15 m1 C 9

22.00 unit

417.44 m2 K 2

273.60 m2 K 2

190.00 m2 K 2

gkap dengan aksesoris dan terpasang rapi.

RAB (RENCANA ANGGARAN BIAYA) page 459 of 1892


9918.87 kg F 3
1242.28 kg F 3
5776.00 bh
155.00 m2 O 16
155.00 m2 F 13
722.00 bh

87.58 m1
10.26 m2 O 16
10.26 m2 J 13

gkap dengan aksesoris dan terpasang rapi.

2400.55 m1

RAB (RENCANA ANGGARAN BIAYA) page 460 of 1892


270.20 kg F 3
514.16 m2
271.16 m2 O 17
243.00 m2
176.00 bh

492.44 m1
49.00 kg F 3
161.64 m2
161.64 m2 O 17
2.65 m2 O 18
8.97 m2 O 18
30.00 bh

1.00 unit

RAB (RENCANA ANGGARAN BIAYA) page 461 of 1892


236.00 m1
30.25 m2
30.25 m2

bar detail lengkap dengan aksesoris dan terpasang rapi.


1.00 unit I 57
1.00 unit I 58
2.00 unit I 59
2.00 unit I 60
1.00 unit I 61

RAB (RENCANA ANGGARAN BIAYA) page 462 of 1892


rpasang rapi
1.00 bh M xi 1

16.70 m1 M vi 7

2.00 bh M vi 5

32.00 bh

12.00 set

1.00 unit M xi 2

1.00 unit M xi 3

RAB (RENCANA ANGGARAN BIAYA) page 463 of 1892


4.00 unit

1.00 bh
16.00 bh
3.00 bh
15.00 bh
1.00 bh
3.00 bh
1.00 bh
1.00 bh
1.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 464 of 1892


1.00 bh
1.00 bh
3.00 bh
1.00 bh
10.00 bh
1.00 lot
1.00 lot
1.00 lot
1.00 bh
24.00 m'

1.00 bh

2.00 bh
2.00 bh
2.00 bh
2.00 bh
3.00 bh
5.00 bh
5.00 bh
RAB (RENCANA ANGGARAN BIAYA) page 465 of 1892
3.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
2.00 bh
4.00 bh
1.00 bh
1.00 ls
1.00 ls

2.00 bh

1.00 bh
1.00 bh
12.00 bh
12.00 bh
RAB (RENCANA ANGGARAN BIAYA) page 466 of 1892
12.00 bh
1.00 bh
12.00 bh
1.00 bh
2.00 bh
2.00 bh
2.00 bh
1.00 bh
1.00 bh
1.00 bh

1.00 bh
1.00 bh
6.00 bh
6.00 bh
3.00 bh
3.00 bh
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 467 of 1892


1.00 ls
58.00 m'
1.00 ls

1.00 bh
1.00 bh
25.00 bh
9.00 bh
1.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
66.50 m'
1.00 ls

1.00 bh
1.00 bh
25.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 468 of 1892


8.00 bh
1.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
71.00 m'
1.00 ls

1.00 bh
1.00 bh
19.00 bh
9.00 bh
1.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 469 of 1892


75.50 m'
1.00 ls

1.00 bh
1.00 bh
14.00 bh
6.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
80.00 m'
1.00 ls

1.00 bh
1.00 bh
7.00 bh
4.00 bh
3.00 bh
3.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 470 of 1892


1.00 ls
1.00 ls
84.50 m'
1.00 ls

1.00 bh
1.00 bh
42.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 02 2.00 m'
1.00 ls

1.00 bh
1.00 bh
3.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 471 of 1892


1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 02 4.00 m'
1.00 ls

1.00 bh
1.00 bh
42.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 03 2.00 m'
1.00 ls

1.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 472 of 1892


1.00 bh
3.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 03 4.00 m'
1.00 ls

1.00 bh
1.00 bh
35.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 04 2.00 m'
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 473 of 1892


1.00 bh
1.00 bh
3.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 04 4.00 m'
1.00 ls

1.00 bh
1.00 bh
21.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 474 of 1892


n dan daya lantai 05 2.00 m'
1.00 ls

1.00 bh
1.00 bh
3.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 05 4.00 m'
1.00 ls

1.00 bh
1.00 bh
5.00 bh
3.00 bh
3.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 475 of 1892


1.00 ls
1.00 ls
86.50 m'
1.00 ls

1.00 bh
1.00 bh
14.00 bh
3.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
2.00 m'
1.00 ls

1.00 bh
1.00 bh
` 2.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 476 of 1892


1.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
128.00 m'
1.00 ls

rpasang rapi

58.00 m1 M x 3

66.50 m1 M x 3

71.00 m1 M x 3

75.50 m1 M x 3

RAB (RENCANA ANGGARAN BIAYA) page 477 of 1892


80.00 m1 M x 3

84.50 m1 M x 2

3.00 m1 M x 1

68.50 m1 M x 4

3.00 m1 M x 1

73.00 m1 M x 4

3.00 m1 M x 1

77.50 m1 M x 4

3.00 m1 M x 1

82.00 m1 M x 4

RAB (RENCANA ANGGARAN BIAYA) page 478 of 1892


86.50 m1 M x 2

2.00 m1 M x 2

128.00 m1 M x 4

130.00 m1 M x 5

8.00 m1 M x 5

14.00 m1 M x 5

RAB (RENCANA ANGGARAN BIAYA) page 479 of 1892


165.76 m3 B 1
23.68 m3 B 5
100.26 m3 B 7
592.00 m1
56.00 bh
2.00 unit
use ke lvmdp gedung 2.00 btg

rpasang rapi

169.00 titik M i 1
12.00 titik M i 2
8.00 titik M i 3
11.00 bh M i 4
56.00 bh M i 5
75.00 bh M i 6
22.00 bh M i 7

RAB (RENCANA ANGGARAN BIAYA) page 480 of 1892


5.00 bh M i 16
13.00 bh M i 22
9.00 bh M i 21
4.00 bh M i 23
3.00 bh M i 25
8.00 bh M i 20
12.00 bh M i 18
32.00 m1 L 1

330.00 titik M i 1
160.00 titik M i 2
20.00 titik M i 3
72.00 bh M i 4
187.00 bh M i 6
43.00 bh M i 7
4.00 bh M i 16
12.00 bh M i 10
6.00 bh
3.00 bh M i 12
3.00 bh M i 13

RAB (RENCANA ANGGARAN BIAYA) page 481 of 1892


33.00 bh M i 22
30.00 bh M i 21
6.00 bh M i 23
3.00 bh M i 26
20.00 bh M i 20
102.00 bh M i 18
28.00 bh M i 19
1.00 bh M i 20
80.00 m1 L 1

333.00 titik M i 1
151.00 titik M i 2
20.00 titik M i 3
72.00 bh M i 4
176.00 bh M i 6
43.00 bh M i 7
18.00 bh M i 8
4.00 bh M i 16
10.00 bh M i 20
2.00 bh M i 17

RAB (RENCANA ANGGARAN BIAYA) page 482 of 1892


2.00 bh M i 10
3.00 bh M i 12
3.00 bh M i 13
33.00 bh M i 22
29.00 bh M i 21
6.00 bh M i 23
3.00 bh M i 26
20.00 bh M i 20
95.00 bh M i 18
28.00 bh M i 19
80.00 m1 L 1

320.00 titik M i 1
116.00 titik M i 2
19.00 titik M i 3
87.00 bh M i 4
148.00 bh M i 6
39.00 bh M i 7
4.00 bh M i 16
36.00 bh M i 10

RAB (RENCANA ANGGARAN BIAYA) page 483 of 1892


3.00 bh M i 12
3.00 bh M i 13
35.00 bh M i 22
23.00 bh M i 21
2.00 bh M i 23
1.00 bh M i 24
3.00 bh M i 26
19.00 bh M i 20
104.00 bh M i 18
2.00 bh M i 19
4.00 bh M i 20
76.00 m1 L 1

242.00 titik M i 1
83.00 titik M i 2
19.00 titik M i 3
29.00 bh M i 4
141.00 bh M i 6
28.00 bh M i 7
2.00 bh M i 16

RAB (RENCANA ANGGARAN BIAYA) page 484 of 1892


6.00 bh M i 14
6.00 bh M i 14
6.00 bh M i 14
6.00 bh M i 14
6.00 bh M i 14
6.00 bh M i 14
3.00 bh M i 12
3.00 bh M i 13
16.00 bh M i 22
18.00 bh M i 21
2.00 bh M i 23
1.00 bh M i 26
19.00 bh M i 20
83.00 bh M i 18
76.00 m1 L 1

44.00 titik M i 1
27.00 bh M i 6
4.00 bh M i 16
4.00 bh M i 17

RAB (RENCANA ANGGARAN BIAYA) page 485 of 1892


g 3065 mm 1.00 bh M i 15
g 3736 mm 1.00 bh M i 15
g 6350 mm 1.00 bh M i 15
g 8350 mm 1.00 bh M i 15
g 9894 mm 1.00 bh M i 15
g 11952 mm 1.00 bh M i 15
g 12556 mm 1.00 bh M i 15
g 13019 mm 1.00 bh M i 15
g 13835 mm 1.00 bh M i 15
5.00 bh M i 22
3.00 bh M i 21

1.00 ls

rpasang rapi

1.00 titik M ii 1
1.00 bh M ii 2
1.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 486 of 1892


25.00 titik M ii 1
25.00 bh M ii 2
1.00 bh M ii 3
10.00 m'
25.00 bh

24.00 titik M ii 1
24.00 bh M ii 2
1.00 bh M ii 3
20.00 m'
24.00 bh

18.00 titik M ii 1
18.00 bh M ii 2
1.00 bh M ii 3
30.00 m'
1.00 bh
1.00 bh
18.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 487 of 1892


9.00 titik M ii 1
9.00 bh M ii 2
1.00 bh M ii 3
20.00 m'
2.00 bh
2.00 bh
9.00 bh

1.00 ls

rpasang rapi

1.00 bh M ii 12
1.00 bh M ii 13
2.00 bh M ii 14
icence) 1.00 set M ii 15

RAB (RENCANA ANGGARAN BIAYA) page 488 of 1892


1.00 set M ii 16
2.00 bh M ii 17
1.00 ls M ii 18
1.00 bh M ii 19
1.00 bh M ii 20
1.00 bh M ii 21
1.00 set M ii 22
154.00 mtr M ii 25
1.00 ls
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 489 of 1892


4.00 bh M ii 23
4.00 bh M ii 24
550.00 mtr M ii 25
1.00 ls
1.00 ls
1.00 ls
4.00 bh

32.00 titik M iii 1


27.00 bh M iii 2
5.00 bh M iii 4
2.00 bh M iii 5
32.00 bh
2.00 bh M iii 8
2.00 bh M iii 11

5.00 bh M ii 23
5.00 bh M ii 24

RAB (RENCANA ANGGARAN BIAYA) page 490 of 1892


5.00 bh
670.00 mtr M ii 25
1.00 ls
1.00 ls
1.00 ls

31.00 titik M iii 1


26.00 bh M iii 2
5.00 bh M iii 4
2.00 bh M iii 5
2.00 bh M iii 8
31.00 bh
2.00 bh M iii 11

6.00 bh M ii 23
6.00 bh M ii 24
6.00 bh
820.00 mtr M ii 25
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 491 of 1892


1.00 ls
1.00 ls

29.00 titik M iii 1


26.00 bh M iii 2
3.00 bh M iii 4
2.00 bh M iii 5
2.00 bh M iii 8
29.00 bh
2.00 bh M iii 11

5.00 bh M ii 23
5.00 bh M ii 24
5.00 bh
700.00 mtr M ii 25
1.00 ls
1.00 ls
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 492 of 1892


21.00 titik M iii 1
13.00 bh M iii 2
8.00 bh M iii 4
1.00 bh M iii 7
1.00 bh M iii 9
21.00 bh
1.00 bh M iii 11

1.00 ls

rpasang rapi

7.00 titik M iv 5
5.00 bh M iv 2
2.00 bh M iv 3

RAB (RENCANA ANGGARAN BIAYA) page 493 of 1892


11.00 titik M iv 5
5.00 bh M iv 1
4.00 bh M iv 3
2.00 bh M iv 2

7.00 titik M iv 5
3.00 bh M iv 1
4.00 bh M iv 3
1.00 bh
1.00 bh
46.00 bh
2.00 bh

5.00 titik M iv 5
3.00 bh M iv 1
2.00 bh M iv 3

RAB (RENCANA ANGGARAN BIAYA) page 494 of 1892


7.00 titik M iv 5
7.00 bh M iv 1

1.00 ls

rpasang rapi

1.00 bh M v 4
1.00 bh M v 5
1.00 bh M v 6
1.00 bh M v 7
1.00 bh M v 8
2.00 bh M v 9
8.00 bh M v 10
1.00 bh M v 12
1.00 bh M v 14
1.00 bh M v 15
1.00 ls
755.00 mtr

RAB (RENCANA ANGGARAN BIAYA) page 495 of 1892


aker dan test koneksi 1.00 ls

dia. 20 mm
33.00 titik M v 1
23.00 bh M v 3
10.00 bh
1.00 bh

dia. 20 mm
57.00 titik M v 1
49.00 bh M v 3
8.00 bh M v 2
6.00 bh

dia. 20 mm
61.00 titik M v 1

RAB (RENCANA ANGGARAN BIAYA) page 496 of 1892


53.00 bh M v 3
8.00 bh M v 2
1.00 bh

dia. 20 mm
61.00 titik M v 1
54.00 bh M v 3
7.00 bh M v 2
1.00 bh

dia. 20 mm
50.00 titik M v 1
42.00 bh M v 3
8.00 bh M v 2
1.00 bh

1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 497 of 1892


rpasang rapi

1.00 unit M ix 1

1.00 unit M ix 2
9.00 unit M ix 3
2.00 unit M ix 4
5.00 unit M ix 5
110.00 unit M ix 6
89.00 unit M ix 7
9.00 unit M ix 8
9.00 unit M ix 9

1.00 titik M ix 15

RAB (RENCANA ANGGARAN BIAYA) page 498 of 1892


208.00 titik M ix 16

ow Switch 11.00 titik M ix 17

gan module 1.00 titik M ix 18

5.00 titik M ix 19
berikut hanger

1.00 unit M ix 2
1.00 unit M ix 10
11.00 unit M ix 3
3.00 unit M ix 4
1.00 unit M ix 5
155.00 unit M ix 6
65.00 unit M ix 7
10.00 unit M ix 8
1.00 unit M ix 11

RAB (RENCANA ANGGARAN BIAYA) page 499 of 1892


10.00 unit M ix 9
1.00 unit M ix 12
1.00 unit M ix 13
1.00 unit M ix 14

ort station 231.00 titik M ix 16

p, Switches 16.00 titik M ix 17

gan module 1.00 titik M ix 18

1.00 titik M ix 19
berikut hanger

1.00 unit M ix 2
9.00 unit M ix 3
1.00 unit M ix 4

RAB (RENCANA ANGGARAN BIAYA) page 500 of 1892


151.00 unit M ix 6
65.00 unit M ix 7
9.00 unit M ix 8
9.00 unit M ix 9

216.00 titik M ix 16

10.00 titik M ix 17

gan module 1.00 titik M ix 18

1.00 unit M ix 2
9.00 unit M ix 3
1.00 unit M ix 4
140.00 unit M ix 6
65.00 unit M ix 7

RAB (RENCANA ANGGARAN BIAYA) page 501 of 1892


9.00 unit M ix 8
9.00 unit M ix 9

205.00 titik M ix 16

10.00 titik M ix 17

gan module 1.00 titik M ix 18

1.00 unit M ix 2
3.00 unit M ix 3
1.00 unit M ix 4
37.00 unit M ix 6
27.00 unit M ix 7
3.00 unit M ix 8
3.00 unit M ix 9

RAB (RENCANA ANGGARAN BIAYA) page 502 of 1892


64.00 titik M ix 16

4.00 titik M ix 17

gan module 1.00 titik M ix 18

1.00 unit M ix 6
2.00 unit M ix 7

3.00 titik M ix 16

1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 503 of 1892


rpasang rapi

155.00 m1 M vi 1
223.00 m1 M vi 2
1.00 bh M vi 3
2.00 bh M vi 4
5.00 bh M vi 5

9.00 m1 M vi 7

9.00 m1 M vi 8

155.00 m1 M vi 1
193.00 m1 M vi 2
1.00 bh M vi 3
2.00 bh M vi 4
5.00 bh M vi 5
9.00 m1 M vi 7
9.00 m1 M vi 8

RAB (RENCANA ANGGARAN BIAYA) page 504 of 1892


155.00 m1 M vi 1
193.00 m1 M vi 2
1.00 bh M vi 3
2.00 bh M vi 4
5.00 bh M vi 5
9.00 m1 M vi 7
9.00 m1 M vi 8

155.00 m1 M vi 1
193.00 m1 M vi 2
1.00 bh M vi 3
2.00 bh M vi 4
5.00 bh M vi 5
9.00 m1 M vi 7
9.00 m1 M vi 8

RAB (RENCANA ANGGARAN BIAYA) page 505 of 1892


90.00 m1 M vi 1
96.00 m1 M vi 2
1.00 bh M vi 3
1.00 bh M vi 4
9.00 m1 M vi 7
9.00 m1 M vi 8

37.00 m1 M vi 1
4.00 bh M vi 5

4.00 titik

RAB (RENCANA ANGGARAN BIAYA) page 506 of 1892


4.00 titik

7.00 titik

3.00 titik

RAB (RENCANA ANGGARAN BIAYA) page 507 of 1892


1.00 titik

rpasang rapi
technology 1.00 unit
160.00 m1
1.00 bh
3.00 bh
1.00 btg
30.00 m1

RAB (RENCANA ANGGARAN BIAYA) page 508 of 1892


4.00 btg
2.00 bh
0.20 Kg
160.00 m1
1.00 ls
2.00 unit
2.00 unit
1.00 ls
1.00 unit

rpasang rapi
1000000.00 VA
1000000.00 VA
1000000.00 VA
1000000.00 VA
e PLN), meliputi

1.00 bh
1.00 bh
1.00 bh
RAB (RENCANA ANGGARAN BIAYA) page 509 of 1892
1.00 bh
1.00 unit
1.00 set
1.00 set

1.00 bh
1.00 unit
6.00 m
12.00 m

1.00 btg

1.00 Unit
3.00 Unit
1.00 Unit

RAB (RENCANA ANGGARAN BIAYA) page 510 of 1892


2.00 Unit

1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit

0.23 Kms
20.00 m
2.00 bh
3.00 bh

344.00 m'
1.00 bh
1.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 511 of 1892


2.00 kms
16.00 bh
4.00 bh

1.00 bh L 15
1.00 bh L 14
2.00 bh L 13
180.00 m1 L 9
435.00 m1 L 9
294.00 m1 L 8
4.50 m1 L 8
13.50 m1 L 9
4.00 m1 L 8
8.00 m1 L 9
116.25 m1 L 10

RAB (RENCANA ANGGARAN BIAYA) page 512 of 1892


2.00 kali
1.00 ls
1.00 ls
100.00 m1
100.00 m1
60.00 zak
25.00 btg
25.00 btg
1.00 ls
1.00 ls
1.00 ls
1.00 ls
1.00 ls
100.00 bh

1.00 unit
1.00 ls
1.00 unit
1.00 ls

2.00 unit

RAB (RENCANA ANGGARAN BIAYA) page 513 of 1892


ve, gate valve, straner 1.00 ls

1.00 unit
1.00 lot

1.00 bh L 15
5.00 bh L 14
5.00 bh L 13
9.00 m1 L 8
36.00 m1 L 9
8.00 m1 L 8
20.00 m1 L 9
228.95 m1 L 10
1.00 lot

1.00 bh L 15
5.00 bh L 14
5.00 bh L 13
9.00 m1 L 8

RAB (RENCANA ANGGARAN BIAYA) page 514 of 1892


36.00 m1 L 9
8.00 m1 L 8
32.00 m1 L 9
228.95 m1 L 10
1.00 lot

1.00 bh L 15
5.00 bh L 14
5.00 bh L 13
9.00 m1 L 8
36.00 m1 L 9
8.00 m1 L 8
36.00 m1 L 9
210.25 m1 L 10
1.00 lot

1.00 bh L 15
1.00 bh L 14
5.00 bh L 13
4.50 m1 L 7

RAB (RENCANA ANGGARAN BIAYA) page 515 of 1892


13.50 m1 L 8
13.50 m1 L 9
4.00 m1 L 8
8.00 m1 L 9
90.50 m1 L 10
8.00 m1
1.00 lot

10.00 bh L 18
4.00 bh L 17
10.00 bh L 15
8.00 m1 L 4
12.00 m1 L 5
80.00 m1 L 6
210.00 m1 L 8
140.00 m1 L 9
63.40 m1 L 6
4.00 unit L 37
2.40 m3
390.00 m'

RAB (RENCANA ANGGARAN BIAYA) page 516 of 1892


2.00 pkt

te valve,

1.00 lot

1.00 ls

15.00 m1 L 8
16.00 m1 L 6
218.00 m1 L 4
63.00 m1 L 4
6.00 unit L 33
1.00 lot

35.00 m1 L 8
24.00 m1 L 6

RAB (RENCANA ANGGARAN BIAYA) page 517 of 1892


52.00 m1 L 4
54.00 m1 L 4
1.00 lot

35.00 m1 L 8
24.00 m1 L 6
52.00 m1 L 4
54.00 m1 L 4
1.00 lot

30.00 m1 L 8
20.00 m1 L 6
84.00 m1 L 4
45.00 m1 L 4
1.00 lot

22.50 m1 L 8
48.00 m1 L 6
26.00 m1 L 4
84.00 m1 L 4

RAB (RENCANA ANGGARAN BIAYA) page 518 of 1892


1.00 lot

8.00 m1 L 7
8.00 m1 L 6
249.00 m1 L 3
45.00 m1 L 3
5.00 unit L 33
4.00 unit L 43
1.00 unit L 41
1.00 lot

8.00 m1 L 7
8.00 m1 L 6
49.50 m1 L 3
45.00 m1 L 3
1.00 lot

8.00 m1 L 7
8.00 m1 L 6

RAB (RENCANA ANGGARAN BIAYA) page 519 of 1892


49.50 m1 L 3
45.00 m1 L 3
1.00 lot

8.00 m1 L 7
8.00 m1 L 6
73.00 m1 L 3
18.00 m1 L 3
1.00 lot

8.00 m1 L 7
8.00 m1 L 6
31.00 m1 L 3
56.00 m1 L 12
1.00 lot

4.00 bh L 19
5.00 bh L 24
1.00 bh L 25

RAB (RENCANA ANGGARAN BIAYA) page 520 of 1892


7.00 bh L 22
1.00 bh L 23
8.00 bh L 21
7.00 bh L 20
3.00 bh L 26
3.00 bh L 27
1.00 bh L 23
2.00 set L 28

14.00 bh L 19
13.00 bh L 24
1.00 bh L 25
19.00 bh L 22
1.00 bh L 23
20.00 bh L 21
19.00 bh L 20
3.00 bh L 26
3.00 bh L 27
1.00 bh L 23
2.00 set L 28

RAB (RENCANA ANGGARAN BIAYA) page 521 of 1892


14.00 bh L 19
13.00 bh L 24
1.00 bh L 25
19.00 bh L 22
1.00 bh L 23
20.00 bh L 21
19.00 bh L 20
3.00 bh L 26
3.00 bh L 27
1.00 bh L 23
2.00 set L 28

13.00 bh L 19
10.00 bh L 24
1.00 bh L 25
18.00 bh L 22
1.00 bh L 23
19.00 bh L 21
18.00 bh L 20

RAB (RENCANA ANGGARAN BIAYA) page 522 of 1892


3.00 bh L 26
3.00 bh L 27
1.00 bh L 23
2.00 set L 28

4.00 bh L 19
7.00 bh L 24
1.00 bh L 25
9.00 bh L 22
1.00 bh L 23
2.00 bh L 29
10.00 bh L 21
11.00 bh L 20
3.00 bh L 26
3.00 bh L 27
1.00 bh L 23
2.00 set L 28
2.00 unit L 30

RAB (RENCANA ANGGARAN BIAYA) page 523 of 1892


20.00 m1 L 6
144.00 m1 L 3
36.00 m1 L 2
47.70 m1
8.00 set

5.00 m1 L 6
152.00 m1 L 3
36.00 m1 L 2
91.20 m1
8.00 set
2.00 set

20.00 m1 L 6
144.00 m1 L 3
36.00 m1 L 2
47.70 m1
8.00 set

10.00 m1 L 6

RAB (RENCANA ANGGARAN BIAYA) page 524 of 1892


144.00 m1 L 3
36.00 m1 L 2
47.70 m1
4.00 set

288.00 m1 L 3
48.00 m1 L 2
431.00 m1
36.00 set
6.00 set

796.00 m1 L 35
796.00 m1 L 36
33.00 bh L 32
24.00 bh L 33
182.00 m1 L 3
888.00 m1 L 2
473.00 m1 L 1

RAB (RENCANA ANGGARAN BIAYA) page 525 of 1892


rpasang rapi

2.00 titik M vii 2


32.00 titik M vii 1
2.00 unit M vii 17
4.00 unit M vii 3
4.00 unit M vii 4
16.00 unit M vii 5
4.00 unit M vii 6
4.00 unit M vii 9
32.00 unit
32.00 bh
28.00 bh
256.00 m1 M vii 18

2.00 titik M vii 2


29.00 titik M vii 1
2.00 unit M vii 16

RAB (RENCANA ANGGARAN BIAYA) page 526 of 1892


4.00 unit M vii 3
4.00 unit M vii 4
16.00 unit M vii 5
4.00 unit M vii 6
1.00 unit M vii 9
29.00 unit
29.00 bh
28.00 bh
232.00 m1 M vii 18

1.00 titik M vii 2


31.00 titik M vii 1
1.00 unit M vii 13
1.00 unit M vii 15
12.00 unit M vii 3
1.00 unit M vii 4
9.00 unit M vii 5
5.00 unit M vii 6
3.00 unit M vii 8

RAB (RENCANA ANGGARAN BIAYA) page 527 of 1892


1.00 unit M vii 9
31.00 unit
31.00 bh
27.00 bh
248.00 m1 M vii 18

2.00 titik M vii 2


26.00 titik M vii 1
2.00 unit M vii 17
4.00 unit M vii 4
8.00 unit M vii 5
5.00 unit M vii 6
6.00 unit M vii 7
2.00 unit M vii 8
1.00 unit M vii 9
26.00 unit
26.00 bh
23.00 bh
208.00 m1 M vii 18

RAB (RENCANA ANGGARAN BIAYA) page 528 of 1892


3.00 titik M vii 1
3.00 m1 M vii 10
16.00 m1 M vii 18
8.00 m1 M vii 19
8.00 m1 M vii 21

375.00 m1 M vii 19
730.00 m1 M vii 20
484.00 m1 M vii 21
766.00 m1 M vii 22
170.00 m1 M vii 23
257.00 m1 M vii 24
18.00 m1 M vii 25
140.00 m1 M vii 26
16.00 m1 M vii 27
107.00 m1 M vii 28

RAB (RENCANA ANGGARAN BIAYA) page 529 of 1892


200.00 m1 M vii 29
51.00 m1 M vii 30
22.00 tabung

3314.00 m1

1.00 unit
4.00 unt

1.00 ls

rpasang rapi

, Head 10 bar 1.00 unit M ix 20

d 10 bar 1.00 unit M ix 21

RAB (RENCANA ANGGARAN BIAYA) page 530 of 1892


1.00 unit M ix 22

1.00 unit M ix 23
1.00 unit
1.00 unit
1.00 unit
1.00 unit
1.00 unit
4.00 unit M ix 24
2.00 unit M ix 25
1.00 unit M ix 26
1.00 unit M ix 27
1.00 unit M ix 28
2.00 unit M ix 29
1.00 unit M ix 30
1.00 unit M ix 31
7.00 unit M ix 32
1.00 unit M ix 33
1.00 unit M ix 34
3.00 unit M ix 35

RAB (RENCANA ANGGARAN BIAYA) page 531 of 1892


3.00 unit M ix 36
1.00 unit M ix 37
3.00 unit M ix 38

18.00 m1 M ix 39
36.00 m1 M ix 40
12.00 m1 M ix 41
9.00 m1 M ix 43
11.00 m1 M ix 46
24.00 m1 M ix 47
4.00 m1

1.00 pcs M ix 48
7.00 pcs M ix 49
2.00 pcs M ix 50
1.00 pcs M ix 52
6.00 pcs M ix 53
12.00 pcs M ix 54

RAB (RENCANA ANGGARAN BIAYA) page 532 of 1892


1.00 pcs M ix 55
2.00 pcs M ix 56
2.00 pcs M ix 58
2.00 pcs M ix 62
2.00 pcs M ix 65
4.00 pcs M ix 66
1.00 pcs M ix 67
2.00 pcs M ix 68
2.00 pcs M ix 69
2.00 pcs M ix 70
18.00 pcs M ix 71
2.00 pcs M ix 72
3.00 pcs M ix 73
8.00 pcs M ix 74
2.00 pcs M ix 75
2.00 pcs M ix 76
2.00 pcs M ix 77
3.00 pcs M ix 78

RAB (RENCANA ANGGARAN BIAYA) page 533 of 1892


1.00 unit M ix 80

4.00 unit M ix 81
1.00 unit M ix 82
4.00 unit M ix 83

9.00 unit M ix 84

439.00 unit M ix 85
57.00 unit M ix 86
1.00 unit M ix 87
3.00 unit M ix 88
7.00 unit M ix 89
3.00 unit M ix 90

RAB (RENCANA ANGGARAN BIAYA) page 534 of 1892


3.00 unit M ix 91
3.00 unit M ix 92
3.00 unit M ix 93

616.50 m1 M ix 40
1034.50 m1 M ix 41
79.45 m1 M ix 42
230.00 m1 M ix 44
159.00 m1 M ix 45
1547.00 m1 M ix 46

27.00 pcs M ix 49
78.00 pcs M ix 50
24.00 pcs M ix 51
392.00 pcs M ix 53
78.00 pcs M ix 54
182.00 pcs M ix 53
5.00 pcs M ix 57

RAB (RENCANA ANGGARAN BIAYA) page 535 of 1892


52.00 pcs M ix 59
122.00 pcs M ix 60
52.00 pcs M ix 61
11.00 pcs M ix 63
83.00 pcs
176.00 pcs M ix 65
9.00 pcs M ix 67
4.00 pcs M ix 68
9.00 pcs M ix 69
14.00 pcs M ix 69
99.00 pcs M ix 70
91.00 pcs M ix 94
1.00 pcs M ix 95
68.00 pcs M ix 71
109.00 pcs M ix 72
11.00 pcs M ix 75
8.00 pcs M ix 79

9.00 unit M ix 96

RAB (RENCANA ANGGARAN BIAYA) page 536 of 1892


9.00 unit M ix 84

421.00 unit M ix 85
3.00 unit M ix 32
3.00 unit M ix 33
3.00 unit M ix 90
3.00 unit M ix 91
3.00 unit M ix 36
3.00 unit M ix 37

31.50 m1 M ix 40
810.00 m1 M ix 41
77.78 m1 M ix 42

RAB (RENCANA ANGGARAN BIAYA) page 537 of 1892


140.00 m1 M ix 47
236.00 m1 M ix 45
1448.00 m1 M ix 46

52.00 pcs M ix 50
28.00 pcs M ix 51
392.00 pcs M ix 53
86.00 pcs M ix 54
182.00 pcs M ix 53
5.00 pcs M ix 57
48.00 pcs M ix 59
122.00 pcs M ix 60
48.00 pcs M ix 61
11.00 pcs M ix 63
83.00 pcs
176.00 pcs M ix 65
6.00 pcs M ix 67
4.00 pcs M ix 68
9.00 pcs M ix 69
14.00 pcs M ix 69

RAB (RENCANA ANGGARAN BIAYA) page 538 of 1892


99.00 pcs M ix 70
91.00 pcs M ix 94
1.00 pcs M ix 95
9.00 pcs M ix 71
84.00 pcs M ix 72
8.00 pcs M ix 79

rapture disc 1.00 set M ix 97


164.00 lbs M ix 98
1.00 unit M ix 99
1.00 unit M ix 100
1.00 unit M ix 101

6.00 m1 M ix 43
6.00 m1 M ix 46

1.00 pcs M ix 102

RAB (RENCANA ANGGARAN BIAYA) page 539 of 1892


2.00 pcs M ix 103
1.00 pcs M ix 104
4.00 pcs M ix 105

9.00 unit M ix 96

9.00 unit M ix 84

425.00 unit M ix 85
3.00 unit M ix 32
3.00 unit M ix 33
3.00 unit M ix 90
3.00 unit M ix 91
3.00 unit M ix 36
3.00 unit M ix 37

RAB (RENCANA ANGGARAN BIAYA) page 540 of 1892


31.50 m1 M ix 40
810.00 m1 M ix 41
77.78 m1 M ix 42
146.00 m1 M ix 47
252.00 m1 M ix 45
1468.00 m1 M ix 46

48.00 pcs M ix 50
28.00 pcs M ix 51
392.00 pcs M ix 53
78.00 pcs M ix 54
185.00 pcs M ix 53
5.00 pcs M ix 57
52.00 pcs M ix 59
122.00 pcs M ix 60
52.00 pcs M ix 61
12.00 pcs M ix 63

RAB (RENCANA ANGGARAN BIAYA) page 541 of 1892


83.00 pcs
179.00 pcs M ix 65
6.00 pcs M ix 67
4.00 pcs M ix 68
9.00 pcs M ix 69
14.00 pcs M ix 69
101.00 pcs M ix 70
91.00 pcs M ix 94
1.00 pcs M ix 95
9.00 pcs M ix 71
84.00 pcs M ix 72
8.00 pcs M ix 79

9.00 unit M ix 97

9.00 unit M ix 84

RAB (RENCANA ANGGARAN BIAYA) page 542 of 1892


428.00 unit M ix 85
3.00 unit M ix 32
3.00 unit M ix 33
3.00 unit M ix 90
3.00 unit M ix 91
3.00 unit M ix 36
3.00 unit M ix 37

31.50 m1 M ix 40
810.00 m1 M ix 41
77.78 m1 M ix 42
146.00 m1 M ix 47
252.00 m1 M ix 45
1468.00 m1 M ix 46

48.00 pcs M ix 50

RAB (RENCANA ANGGARAN BIAYA) page 543 of 1892


28.00 pcs M ix 51
392.00 pcs M ix 53
78.00 pcs M ix 54
185.00 pcs M ix 53
5.00 pcs M ix 57
52.00 pcs M ix 59
122.00 pcs M ix 60
52.00 pcs M ix 61
12.00 pcs M ix 63
83.00 pcs
179.00 pcs M ix 65
6.00 pcs M ix 67
4.00 pcs M ix 68
9.00 pcs M ix 69
14.00 pcs M ix 69
101.00 pcs M ix 70
91.00 pcs M ix 94
1.00 pcs M ix 95
9.00 pcs M ix 71
84.00 pcs M ix 72

RAB (RENCANA ANGGARAN BIAYA) page 544 of 1892


8.00 pcs M ix 79

9.00 unit M ix 97

1.00 unit M ix 84

156.00 unit M ix 85
1.00 unit M ix 32
1.00 unit M ix 33
1.00 unit M ix 90
1.00 unit M ix 91
1.00 unit M ix 36
1.00 unit M ix 37

RAB (RENCANA ANGGARAN BIAYA) page 545 of 1892


22.50 m1 M ix 40
107.00 m1 M ix 41
20.00 m1 M ix 42
56.00 m1 M ix 47
208.00 m1 M ix 45
423.00 m1 M ix 46

16.00 pcs M ix 50
8.00 pcs M ix 51
98.00 pcs M ix 53
64.00 pcs M ix 54
24.00 pcs M ix 53
2.00 pcs M ix 57
5.00 pcs M ix 59
5.00 pcs M ix 61
2.00 pcs M ix 63
20.00 pcs
43.00 pcs M ix 65
2.00 pcs M ix 67

RAB (RENCANA ANGGARAN BIAYA) page 546 of 1892


1.00 pcs M ix 68
3.00 pcs M ix 69
6.00 pcs M ix 69
67.00 pcs M ix 70
20.00 pcs M ix 94
1.00 pcs M ix 95
5.00 pcs M ix 71
21.00 pcs M ix 72
2.00 pcs M ix 79

3.00 unit M ix 96

1.00 ls

rpasang rapi
1.00 unit M viii 2

RAB (RENCANA ANGGARAN BIAYA) page 547 of 1892


1.00 unit M viii 1

1.00 unit M viii 4

1.00 ls

mm sampai 1 m 698.25 m3 B 1
mm sampai 2 m 698.25 m3 B 2
mm sampai 3 m 698.25 m3 B 3
RAB (RENCANA ANGGARAN BIAYA) page 548 of 1892
mm lebih dari 3 m 139.65 m3 B 4
mm sampai 1 m 19.22 m3 B 1
mm sampai 2 m 19.22 m3 B 2
mm sampai 3 m 19.22 m3 B 3
mm lebih dari 3 m 3.84 m3 B 4
mm sampai 1 m 7.22 m3 B 1
mm sampai 2 m 7.22 m3 B 2
mm sampai 3 m 7.22 m3 B 3
mm lebih dari 3 m 1.44 m3 B 4
on, dipadatkan 1193.22 m3 B 7
72.47 m3 B 5

6.25 m3 B 1
6.25 m3 B 2

229.95 m3 E i 2

72.47 m3 E i 2
RAB (RENCANA ANGGARAN BIAYA) page 549 of 1892
10.00 m3 E iv 1
1.88 m3 E vi 6
33.65 m3 E xii 1
13.25 m3 E xii 2
pa + stek besi D13mm 698.25 m3 E iv 1
pa + stek besi D13 mm 19.22 m3 E iv 1
pa + stek besi D13 mm 7.22 m3 E iv 1
243.23 m3 E vi 1
6.18 m3 E vi 2
6.75 m3 E vi 4
162.56 m3 E viii 1
1.66 m3 E viii 3
7.18 m3 E viii 4
2.55 m3 E viii 5
5.80 m3 E viii 6
Elev. - 4.350 9.85 m3 E vii 2
Elev. - 4.270 106.73 m3 E vii 2
Elev. - 4.270 0.99 m3 E vii 3

RAB (RENCANA ANGGARAN BIAYA) page 550 of 1892


Elev. - 2.050 0.96 m3 E ix 1
Elev. - 2.050 1.51 m3 E ix 12
Elev. - 1.650 3.84 m3 E ix 1
Elev. - 1.650 5.18 m3 E ix 4
1.54 m3 E ix 4
0.58 m3 E ix 7
Elev. - 0.950 4.67 m3 E ix 22

AS (28-29) - (E-F) 4.22 m3 E xi 1

AS (35-36) - (D-E) 4.22 m3 E xi 1

AS (31-33) - (K-L) 4.98 m3 E xi 1

Elev. - 2.050 0.23 m3 E x 1

Elev. - 1.350 5.28 m3 E x 3

101.15 m3 E viii 9
RAB (RENCANA ANGGARAN BIAYA) page 551 of 1892
1.01 m3 E viii 11
4.37 m3 E viii 12
1.55 m3 E viii 15
3.53 m3 E viii 16
Elev. - 0.050 48.76 m3 E ix 1
Elev. - 0.050 8.20 m3 E ix 2
Elev. - 0.050 58.82 m3 E ix 4
Elev. - 0.050 36.73 m3 E ix 7
Elev. - 0.050 6.06 m3 E ix 9
Elev. - 0.050 2.56 m3 E ix 10
Elev. - 0.050 10.57 m3 E ix 14
Elev. - 0.050 3.95 m3 E ix 15
Elev. - 0.050 10.31 m3 E ix 16
Elev. - 0.050 18.92 m3 E ix 17
Elev. - 0.050 8.57 m3 E ix 18
Elev. - 0.050 6.36 m3 E ix 19
Elev. + 2.150 0.90 m3 E ix 1
Elev. + 2.150 1.41 m3 E ix 12
Elev. + 3.250 4.31 m3 E ix 22

RAB (RENCANA ANGGARAN BIAYA) page 552 of 1892


AS (28-29) - (E-F) 4.22 m3 E xi 1

AS (35-36) - (D-E) 4.22 m3 E xi 1

AS (31-33) - (K-L) 4.98 m3 E xi 1

Elev. - 0.050 395.89 m3 E x 1

Elev. + 2.850 5.28 m3 E x 3

101.15 m3 E viii 9
1.01 m3 E viii 11
4.37 m3 E viii 12
0.78 m3 E viii 15
3.53 m3 E viii 16
Elev. + 4.150 48.76 m3 E ix 1
Elev. + 4.150 8.20 m3 E ix 2
Elev. + 4.150 58.82 m3 E ix 4
Elev. + 4.150 36.73 m3 E ix 7
RAB (RENCANA ANGGARAN BIAYA) page 553 of 1892
Elev. + 4.150 6.06 m3 E ix 9
Elev. + 4.150 2.56 m3 E ix 10
Elev. + 4.150 10.57 m3 E ix 14
Elev. + 4.150 3.95 m3 E ix 15
Elev. + 4.150 10.18 m3 E ix 16
Elev. + 4.150 18.92 m3 E ix 17
Elev. + 4.150 8.57 m3 E ix 18
Elev. + 4.150 3.54 m3 E ix 19

Elev. + 6.250 1.40 m3 E ix 1


Elev. + 6.250 1.73 m3 E ix 12
Elev. + 7.450 6.15 m3 E ix 22
Elev. + 6.250 13.55 m3 E ix 26

AS (28-29) - (E-F) 4.22 m3 E xi 1

AS (35-36) - (D-E) 4.22 m3 E xi 1

RAB (RENCANA ANGGARAN BIAYA) page 554 of 1892


AS (31-33) - (K-L) 4.98 m3 E xi 1

Elev. + 4.150 395.89 m3 E x 1

Elev. + 7.050 5.28 m3 E x 3

101.15 m3 E viii 9
1.01 m3 E viii 11
4.37 m3 E viii 12
3.53 m3 E viii 16
Elev. + 8.350 48.76 m3 E ix 1
Elev. + 8.350 8.20 m3 E ix 2
Elev. + 8.350 58.82 m3 E ix 4
Elev. + 8.350 36.73 m3 E ix 7
Elev. + 8.350 10.57 m3 E ix 14
Elev. + 8.350 3.95 m3 E ix 15
Elev. + 8.350 10.07 m3 E ix 16
Elev. + 8.350 18.92 m3 E ix 17
Elev. + 8.350 8.57 m3 E ix 18
Elev. + 8.350 6.36 m3 E ix 19
Elev. + 8.350 10.01 m3 E ix 27

RAB (RENCANA ANGGARAN BIAYA) page 555 of 1892


Elev. + 10.450 0.90 m3 E ix 1
Elev. + 10.450 1.41 m3 E ix 12
Elev. + 11.650 4.31 m3 E ix 22

AS (31-33) - (K-L) 4.98 m3 E xi 1

Elev. + 8.350 407.37 m3 E x 1

Elev. + 11.250 5.28 m3 E x 3

Elev. + 12.550 48.76 m3 E ix 1


Elev. + 12.550 8.20 m3 E ix 2
Elev. + 12.550 58.82 m3 E ix 4
Elev. + 12.550 36.73 m3 E ix 7
Elev. + 12.550 17.67 m3 E ix 14
Elev. + 12.550 14.88 m3 E ix 16
Elev. + 12.550 18.92 m3 E ix 17
Elev. + 12.550 1.13 m3 E ix 18
Elev. + 12.550 6.84 m3 E ix 20
Elev. + 12.550 15.52 m3 E ix 36

RAB (RENCANA ANGGARAN BIAYA) page 556 of 1892


Elev. + 13.350 3.49 m3 E ix 1
Elev. + 13.350 5.29 m3 E ix 4
Elev. + 13.350 2.05 m3 E ix 7
Elev. + 14.000 0.90 m3 E ix 1
Elev. + 15.050 18.07 m3 E ix 29
Elev. + 15.500 5.60 m3 E ix 29
Elev. + 15.500 498.38 m3 E ix 37

AS (31-33) - (L-M) 1.89 m3 E xi 1

Elev. + 12.550 434.06 m3 E x 1

Elev. + 13.350 15.32 m3 E x 1

Elev. + 13.350 1.45 m3 E x 3

Elev. + 14.000 0.23 m3 E x 1

Elev. + 15.050 36.17 m3 E x 1

RAB (RENCANA ANGGARAN BIAYA) page 557 of 1892


lev. (+12.550) - (+17.550) 21.13 m3 E viii 9
lev. (+12.550) - (+15.500) 11.51 m3 E viii 13

Elev. + 17.550 6.31 m3 E ix 1


Elev. + 17.550 7.22 m3 E ix 4
Elev. + 17.550 4.32 m3 E ix 7
Elev. + 17.550 3.56 m3 E ix 14
Elev. + 17.550 1.91 m3 E ix 16
Elev. + 17.550 10.29 m3 E ix 38

Elev. + 17.550 38.82 m3 E x 1

Elev. + 17.550 1.44 m3 E x 4

153.28 m3 B 1
45.31 m3 B 5

RAB (RENCANA ANGGARAN BIAYA) page 558 of 1892


229.95 m3 B 5
51.09 m3 B 7
galian + pemadatan 804.81 m3 B 7

726.92 m2 D 1
2299.45 m2 D 1

425.03 m1 E v 1
132.09 m1 E v 2
323.00 m1 E v 3
1317.50 m1 E v 4
575.40 m1 E v 5
157.45 m1 E v 6
198.12 m1 E v 7
31.76 m1 E v 8
199.15 m1 E v 9

RAB (RENCANA ANGGARAN BIAYA) page 559 of 1892


331.80 m1 E v 3
1390.20 m1 E v 4
582.90 m1 E v 5
168.00 m1 E v 6
196.89 m1 E v 7
38.15 m1 E v 8
2.40 m1 E v 9

352.80 m1 E v 3
1381.80 m1 E v 4
582.90 m1 E v 5
165.50 m1 E v 6
196.89 m1 E v 7
20.63 m1 E v 8
2.40 m1 E v 9

357.00 m1 E v 3

RAB (RENCANA ANGGARAN BIAYA) page 560 of 1892


1411.20 m1 E v 4
582.90 m1 E v 5
158.50 m1 E v 6
210.09 m1 E v 7
38.65 m1 E v 8
2.40 m1 E v 9

248.45 m1 E v 3
75.60 m1 E v 4
119.45 m1 E v 5
7.41 m1 E v 7

375.50 m3 C 1
3.98 m2 C 4
1812.92 m2 C 14
3252.52 m2 C 15
3058.91 m2 C 16

RAB (RENCANA ANGGARAN BIAYA) page 561 of 1892


395.42 m2 C 3
790.85 m2 C 6
22.03 m2 C 2
44.07 m2 C 5
834.91 m2 C 10
834.99 m2 C 17
1560.05 m1 C 9
858.08 m1 C 7
254.77 m1 C 11
81.68 m2 C 8

1800.03 m2 C 14
3203.69 m2 C 15
2919.96 m2 C 16
452.46 m2 C 3
904.92 m2 C 6
904.92 m2 C 10
917.00 m2 C 17
1166.73 m1 C 9

RAB (RENCANA ANGGARAN BIAYA) page 562 of 1892


474.90 m1 C 7
81.68 m2 C 8
30.00 m2 C 13

1742.18 m2 C 14
3010.57 m2 C 15
2791.19 m2 C 16
408.90 m2 C 3
817.80 m2 C 6
817.80 m2 C 10
898.23 m2 C 17
1166.73 m1 C 9
474.90 m1 C 7
81.68 m2 C 8
30.00 m2 C 13

1882.53 m2 C 14
3292.69 m2 C 15
2954.15 m2 C 16
409.05 m2 C 3

RAB (RENCANA ANGGARAN BIAYA) page 563 of 1892


818.09 m2 C 6
818.09 m2 C 10
1893.83 m2 C 17
1166.73 m1 C 9
502.30 m1 C 7
81.68 m2 C 8
78.00 m2 C 13

546.23 m2 C 14
1092.46 m2 C 15
1092.46 m2 C 16
279.57 m2 C 17
24.95 m1 C 9
14.82 m1 C 7
2496.66 m2 C 13
248.10 m2 C 13

RAB (RENCANA ANGGARAN BIAYA) page 564 of 1892


2.00 unit G 11
19.00 unit G 13
4.00 unit G 14
3.00 unit G 15
2.00 unit G 16
5.00 unit G 17
1.00 unit G 18
4.00 unit G 21
48.00 unit G 27
6.00 unit G 37
4.00 unit G 38
4.00 unit G 42
1.00 unit G G 54
2.00 unit G G 56
1.00 unit G G 57

1.00 unit G 11
17.00 unit G 13
4.00 unit G 14

RAB (RENCANA ANGGARAN BIAYA) page 565 of 1892


5.00 unit G 15
1.00 unit G 16
5.00 unit G 17
1.00 unit G 18
4.00 unit G 21
48.00 unit G 27
1.00 unit G 33
6.00 unit G 37
7.00 unit G 38
4.00 unit G 42

1.00 unit G 11
17.00 unit G 13
3.00 unit G 14
5.00 unit G 15
2.00 unit G 16
5.00 unit G 17
1.00 unit G 18
4.00 unit G 21

RAB (RENCANA ANGGARAN BIAYA) page 566 of 1892


48.00 unit G 27
1.00 unit G 33
6.00 unit G 37
7.00 unit G 38
4.00 unit G 42

2.00 unit G 6
1.00 unit G 11
17.00 unit G 13
4.00 unit G 14
5.00 unit G 15
1.00 unit G 16
5.00 unit G 17
1.00 unit G 18
4.00 unit G 21
48.00 unit G 27
1.00 unit G 33
6.00 unit G 37
7.00 unit G 38

RAB (RENCANA ANGGARAN BIAYA) page 567 of 1892


4.00 unit G 42

1.00 unit G 12
3.00 unit G 24
1.00 unit G 25
1.00 unit G 21

2305.55 m2 H 1
16.10 m2 H 2
145.51 m2 H 6
1573.54 m1 H 4
1.00 bh H 5

2296.05 m2 H 1
178.72 m2 H 2
145.34 m2 H 6

RAB (RENCANA ANGGARAN BIAYA) page 568 of 1892


1752.86 m1 H 4
1.00 bh H 5

2296.05 m2 H 1
178.72 m2 H 2
145.34 m2 H 6
1752.86 m1 H 4
1.00 bh H 5

2411.09 m2 H 1
158.96 m2 H 2
145.34 m2 H 6
1362.04 m1 H 4
1.00 bh H 5

K STATION

1.00 unit I 2
1.00 unit I 3
2.00 unit I 4

RAB (RENCANA ANGGARAN BIAYA) page 569 of 1892


1.00 unit I 5
1.00 unit I 6
1.00 unit I 7
4.00 unit I 8
1.00 unit I 9
1.00 unit I 10
2.00 unit I 11
3.00 unit I 38
1.00 unit I 39
8.85 m2 I 55
11.55 m2 I 55
4.58 m2 I 55
4.46 m2 I 55
4.05 m2 I 55
30.45 m2 I 55
5.55 m2 I 55
28.35 m2 I 55

1.00 unit I 2

RAB (RENCANA ANGGARAN BIAYA) page 570 of 1892


1.00 unit I 3
2.00 unit I 4
1.00 unit I 5
1.00 unit I 6
1.00 unit I 7
4.00 unit I 8
1.00 unit I 10
2.00 unit I 11
3.00 unit I 38
1.00 unit I 39
8.85 m2 I 55
11.55 m2 I 55
4.58 m2 I 55
4.46 m2 I 55
4.05 m2 I 55
30.45 m2 I 55
5.55 m2 I 55
28.35 m2 I 55

RAB (RENCANA ANGGARAN BIAYA) page 571 of 1892


1.00 unit I 2
1.00 unit I 3
2.00 unit I 4
1.00 unit I 5
1.00 unit I 6
1.00 unit I 7
4.00 unit I 8
1.00 unit I 10
2.00 unit I 11
3.00 unit I 38
1.00 unit I 39
8.85 m2 I 55
11.55 m2 I 55
4.58 m2 I 55
4.46 m2 I 55
4.05 m2 I 55
30.45 m2 I 55
5.55 m2 I 55
28.35 m2 I 55

RAB (RENCANA ANGGARAN BIAYA) page 572 of 1892


1.00 unit I 2
1.00 unit I 3
2.00 unit I 4
1.00 unit I 5
1.00 unit I 6
1.00 unit I 7
4.00 unit I 8
1.00 unit I 10
2.00 unit I 11
3.00 unit I 38
1.00 unit I 39
11.55 m2 I 55
4.58 m2 I 55
4.46 m2 I 55
4.05 m2 I 55
39.15 m2 I 55
5.55 m2 I 55
28.35 m2 I 55

RAB (RENCANA ANGGARAN BIAYA) page 573 of 1892


126.48 m2 J 1
788.17 m2 J 5
ng ( Area tangga ) 86.04 m2 J 8
2105.50 m1 J 6
106.24 m2 J 7
479.39 m2 J 9
396.30 m1 J 12
1593.52 m2 J 10
7.82 m2 J 10
a baja siku 7.93 m2 J 19

116.73 m2 J 1
674.12 m2 J 5
ng ( Area tangga ) 86.04 m2 J 8
1397.85 m1 J 6
104.97 m2 J 7
RAB (RENCANA ANGGARAN BIAYA) page 574 of 1892
476.14 m2 J 9
1589.75 m2 J 10
7.82 m2 J 11
a baja siku 7.93 m2 J 19

116.73 m2 J 1
674.12 m2 J 5
ng ( Area tangga ) 86.04 m2 J 8
1397.85 m1 J 6
104.97 m2 J 7
476.14 m2 J 9
1589.75 m2 J 10
7.82 m2 J 11
a baja siku 7.93 m2 J 19

116.73 m2 J 1
674.12 m2 J 5
ng ( Area tangga ) 86.04 m2 J 8
RAB (RENCANA ANGGARAN BIAYA) page 575 of 1892
1397.85 m1 J 6
104.97 m2 J 7
476.14 m2 J 9
1589.76 m2 J 10
7.82 m2 J 11
a baja siku 7.93 m2 J 19

1380.89 m2 K 2
3172.84 m2 K 1
2467.16 m2 K 3
81.68 m2 K 3

1670.83 m2 K 2
2911.24 m2 K 1
2620.11 m2 K 3
81.68 m2 K 3

RAB (RENCANA ANGGARAN BIAYA) page 576 of 1892


30.00 m2 K 6
104.97 m2 K 5

1664.63 m2 K 2
2676.59 m2 K 1
2620.11 m2 K 3
81.68 m2 K 3
30.00 m2 K 6
104.97 m2 K 5

1249.41 m2 K 2
4353.37 m2 K 1
2715.39 m2 K 3
81.68 m2 K 3
78.00 m2 K 6
104.97 m2 K 5

890.95 m2 K 2
481.08 m2 K 1
2744.76 m2 K 6

RAB (RENCANA ANGGARAN BIAYA) page 577 of 1892


dengan aksesoris dan terpasang rapi.
0 x 20 mm tebal 1.2 mm

6.88 m1 O 1
5.46 m1 O 1
5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1

5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1
6.88 m1 O 1
5.47 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 578 of 1892


5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1
6.88 m1 O 1
5.47 m1 O 1

2.24 m1 O 1

6.88 m1 O 1
5.46 m1 O 1
5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1

5.47 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 579 of 1892


6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1
2.26 m1 O 1
5.47 m1 O 1

5.47 m1 O 1
6.88 m1 O 1
3.78 m1 O 1
1.39 m1 O 1
2.26 m1 O 1
5.47 m1 O 1

2.24 m1 O 1

6.85 m1 O 1
5.46 m1 O 1
5.47 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 580 of 1892


6.86 m1 O 1
4.57 m1 O 1
1.39 m1 O 1

5.47 m1 O 1
6.86 m1 O 1
4.57 m1 O 1
1.39 m1 O 1
6.85 m1 O 1
5.47 m1 O 1

5.47 m1 O 1
6.86 m1 O 1
4.57 m1 O 1
1.39 m1 O 1
6.85 m1 O 1
5.47 m1 O 1

5.47 m1 O 1
6.86 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 581 of 1892


4.57 m1 O 1
1.39 m1 O 1
6.85 m1 O 1
5.47 m1 O 1

2.63 m1 O 1

28.56 m1 O 1
38.90 m1 O 1
7.51 m1 O 1

28.56 m1 O 1
38.90 m1 O 1
7.51 m1 O 1

28.56 m1 O 1
38.90 m1 O 1
7.51 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 582 of 1892


9.03 m1 O 2
4.20 m1 O 2

9.03 m1 O 2
4.20 m1 O 2

9.03 m1 O 2
4.20 m1 O 2

4.57 m1 O 2

4.57 m1 O 2

RAB (RENCANA ANGGARAN BIAYA) page 583 of 1892


4.57 m1 O 2

9.77 m1 O 2

14.02 m1 O 1
18.90 m1 O 1

14.02 m1 O 1
18.90 m1 O 1

14.02 m1 O 1
18.90 m1 O 1

RAB (RENCANA ANGGARAN BIAYA) page 584 of 1892


7.01 m1 O 1
18.90 m1 O 1

7.01 m1 O 1
18.90 m1 O 1

7.01 m1 O 1
18.90 m1 O 1

19.40 m1 O 4
41.72 kg F 3
2.00 unit
2.00 bh
1.28 m2

RAB (RENCANA ANGGARAN BIAYA) page 585 of 1892


engkap dengan aksesoris dan terpasang rapi.

15.80 m2 L 31
15.80 m2 L 31
40.26 m2 L 31

15.80 m2 L 31
15.80 m2 L 31
40.26 m2 L 31

15.80 m2 L 31
15.80 m2 L 31
40.26 m2 L 31

15.80 m2 L 31
15.80 m2 L 31
40.26 m2 L 31

RAB (RENCANA ANGGARAN BIAYA) page 586 of 1892


2.00 unit O 7

4.00 unit O 8

2.00 unit O 9

3.00 unit O 15
0.18 m3
269.55 kg O 3
90.67 kg O 3
56.57 kg O 3
146.02 kg O 3

RAB (RENCANA ANGGARAN BIAYA) page 587 of 1892


54.00 bh

12.00 bh O 12

117.96 m2 J 16

67.74 m2 K 2

88.14 m2 K 2

94.34 m2 K 2

19.70 m2 K 2

13.50 m2 K 2

RAB (RENCANA ANGGARAN BIAYA) page 588 of 1892


24.70 m2 K 2

24.70 m2 K 2

11.20 m2 K 2

93.84 m2 K 2

46.96 m2 K 2

46.96 m2 K 2

32.40 m2 K 2

86.40 m1 C 11

RAB (RENCANA ANGGARAN BIAYA) page 589 of 1892


27.00 m1 C 11

129.60 m1 C 11

rpasang rapi

1.00 bh
1.00 bh
26.00 bh
8.00 bh
1.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 590 of 1892


1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
136.00 m'
1.00 ls

1.00 bh
1.00 bh
27.00 bh
9.00 bh
1.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
232.50 m'
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 591 of 1892


1.00 bh
1.00 bh
27.00 bh
8.00 bh
1.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
237.00 m'
1.00 ls

1.00 bh
1.00 bh
26.00 bh
9.00 bh
1.00 bh
1.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 592 of 1892


3.00 bh
3.00 bh
1.00 ls
1.00 ls
241.50 m'
1.00 ls

1.00 bh
1.00 bh
6.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
246.00 m'
1.00 ls

1.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 593 of 1892


1.00 bh
30.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 01 2.00 m'
1.00 ls

1.00 bh
1.00 bh
4.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 01 4.00 m'
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 594 of 1892


1.00 bh
1.00 bh
27.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 02 2.00 m'
1.00 ls

1.00 bh
1.00 bh
4.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 02 4.00 m'

RAB (RENCANA ANGGARAN BIAYA) page 595 of 1892


1.00 ls

1.00 bh
1.00 bh
27.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 03 2.00 m'
1.00 ls

1.00 bh
1.00 bh
4.00 bh
1.00 bh
3.00 bh
3.00 bh
1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 596 of 1892


1.00 ls
n dan daya lantai 03 4.00 m'
1.00 ls

1.00 bh
1.00 bh
39.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 04 2.00 m'
1.00 ls

1.00 bh
1.00 bh
4.00 bh
1.00 bh
3.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 597 of 1892


3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 04 4.00 m'
1.00 ls

1.00 bh
1.00 bh
3.00 bh
3.00 bh
3.00 bh
1.00 ls
1.00 ls
n dan daya lantai 05 250.00 m'
1.00 ls

rpasang rapi

RAB (RENCANA ANGGARAN BIAYA) page 598 of 1892


136.00 m1 M x 3

232.50 m1 M x 3

237.00 m1 M x 3

241.50 m1 M x 3

246.00 m1 M x 1

3.00 m1 M x 1

138.00 m1 M x 4

3.00 m1 M x 1

239.00 m1 M x 4

RAB (RENCANA ANGGARAN BIAYA) page 599 of 1892


3.00 m1 M x 1

243.50 m1 M x 4

3.00 m1 M x 1

248.00 m1 M x 4

250.00 m1 M x 2

rpasang rapi

323.00 titik M i 1
179.00 titik M i 2
14.00 titik M i 3
82.00 bh M i 4

RAB (RENCANA ANGGARAN BIAYA) page 600 of 1892


167.00 bh M i 6
44.00 bh M i 7
18.00 bh M i 8
3.00 bh M i 9
3.00 bh M i 16
1.00 bh M i 14
4.00 bh M i 14
1.00 bh M i 14
28.00 bh M i 22
19.00 bh M i 21
7.00 bh M i 24
3.00 bh M i 25
14.00 bh M i 27
103.00 bh M i 18
22.00 bh M i 19
16.00 bh M i 20
64.00 bh
56.00 m1 L 1

324.00 titik M i 1

RAB (RENCANA ANGGARAN BIAYA) page 601 of 1892


183.00 titik M i 2
11.00 titik M i 3
89.00 bh M i 4
149.00 bh M i 6
48.00 bh M i 7
18.00 bh M i 8
3.00 bh M i 16
4.00 bh M i 14
1.00 bh M i 14
6.00 bh M i 10
3.00 bh M i 12
3.00 bh M i 13
25.00 bh M i 22
19.00 bh M i 21
6.00 bh M i 24
3.00 bh M i 26
11.00 bh M i 27
103.00 bh M i 18
25.00 bh M i 19
15.00 bh M i 20

RAB (RENCANA ANGGARAN BIAYA) page 602 of 1892


44.00 m1 L 1

320.00 titik M i 1
185.00 titik M i 2
14.00 titik M i 3
91.00 bh M i 4
149.00 bh M i 6
45.00 bh M i 7
18.00 bh M i 8
3.00 bh M i 16
4.00 bh M i 14
1.00 bh M i 14
3.00 bh M i 11
3.00 bh M i 12
3.00 bh M i 13
25.00 bh M i 22
19.00 bh M i 21
5.00 bh M i 24
3.00 bh M i 26
14.00 bh M i 27

RAB (RENCANA ANGGARAN BIAYA) page 603 of 1892


103.00 bh M i 18
26.00 bh M i 19
15.00 bh M i 20
56.00 m1 L 1

340.00 titik M i 1
179.00 titik M i 2
13.00 titik M i 3
85.00 bh M i 4
166.00 bh M i 6
44.00 bh M i 7
18.00 bh M i 8
3.00 bh M i 16
1.00 bh M i 14
4.00 bh M i 14
1.00 bh M i 14
12.00 bh M i 10
3.00 bh M i 12
3.00 bh M i 13
24.00 bh M i 22

RAB (RENCANA ANGGARAN BIAYA) page 604 of 1892


20.00 bh M i 21
6.00 bh M i 24
3.00 bh M i 26
13.00 bh M i 27
103.00 bh M i 18
23.00 bh M i 19
15.00 bh M i 20
52.00 m1 L 1

9.00 titik M i 1
3.00 titik M i 2
9.00 bh M i 5
4.00 bh M i 22
3.00 bh M i 18

1.00 ls

rpasang rapi

RAB (RENCANA ANGGARAN BIAYA) page 605 of 1892


28.00 titik M ii 1
28.00 bh M ii 2
1.00 bh M ii 3
130.00 m'
28.00 bh

26.00 titik M ii 1
26.00 bh M ii 2
1.00 bh M ii 3
125.00 m'
26.00 bh

26.00 titik M ii 1
26.00 bh M ii 2
2.00 bh M ii 3
130.00 m'
26.00 bh

26.00 titik M ii 1
26.00 bh M ii 2

RAB (RENCANA ANGGARAN BIAYA) page 606 of 1892


2.00 bh M ii 3
135.00 m'
26.00 bh

1.00 ls

rpasang rapi

95.00 titik M iii 1


93.00 bh M iii 2
2.00 bh M iii 4
1.00 bh M iii 6
3.00 bh M iii 5
1.00 bh M iii 10
3.00 bh M iii 8
95.00 bh
2.00 bh M iii 11

RAB (RENCANA ANGGARAN BIAYA) page 607 of 1892


30.00 titik M iii 1
28.00 bh M iii 2
2.00 bh M iii 4
2.00 bh M iii 5
2.00 bh M iii 8
30.00 bh
2.00 bh M iii 11

30.00 titik M iii 1


28.00 bh M iii 2
2.00 bh M iii 4
2.00 bh M iii 5
2.00 bh M iii 8
30.00 bh
2.00 bh M iii 11

30.00 titik M iii 1


28.00 bh M iii 2

RAB (RENCANA ANGGARAN BIAYA) page 608 of 1892


2.00 bh M iii 4
2.00 bh M iii 5
2.00 bh M iii 8
30.00 bh
2.00 bh M iii 11

1.00 ls

rpasang rapi

11.00 titik M iv 5
9.00 bh M iv 1
1.00 bh M iv 3
1.00 bh M iv 4

7.00 titik M iv 5
6.00 bh M iv 1

RAB (RENCANA ANGGARAN BIAYA) page 609 of 1892


1.00 bh M iv 3

7.00 titik M iv 5
6.00 bh M iv 1
1.00 bh M iv 3
1.00 bh M iii 9
1.00 bh M iii 7
24.00 bh
1.00 bh

7.00 titik M iv 5
6.00 bh M iv 1
1.00 bh M iv 3

1.00 ls

rpasang rapi

RAB (RENCANA ANGGARAN BIAYA) page 610 of 1892


dia. 20 mm
59.00 titik M v 1
48.00 bh M v 3
11.00 bh M v 2

59.00 titik M v 1
48.00 bh M v 3
11.00 bh M v 2

59.00 titik M v 1
48.00 bh M v 3
11.00 bh M v 2

59.00 titik M v 1
48.00 bh M v 3
11.00 bh M v 2

RAB (RENCANA ANGGARAN BIAYA) page 611 of 1892


1.00 ls

rpasang rapi

135.00 m1 M vi 1
145.00 m1 M vi 2
1.00 bh M vi 3
1.00 bh M vi 4
1.00 bh M vi 5
2.00 bh M vi 6

135.00 m1 M vi 1
145.00 m1 M vi 2
1.00 bh M vi 3
1.00 bh M vi 4
1.00 bh M vi 5

RAB (RENCANA ANGGARAN BIAYA) page 612 of 1892


2.00 bh M vi 6

135.00 m1 M vi 1
145.00 m1 M vi 2
1.00 bh M vi 3
1.00 bh M vi 4
1.00 bh M vi 5
2.00 bh M vi 6

135.00 m1 M vi 1
145.00 m1 M vi 2
1.00 bh M vi 3
1.00 bh M vi 4
1.00 bh M vi 5
2.00 bh M vi 6

47.00 m1 M vi 1

RAB (RENCANA ANGGARAN BIAYA) page 613 of 1892


2.00 bh M vi 5

6.00 titik

7.00 titik

7.00 titik

RAB (RENCANA ANGGARAN BIAYA) page 614 of 1892


8.00 titik

2.00 bh L 13
1.00 bh L 15
2.00 bh L 14
255.00 m1 L 8

RAB (RENCANA ANGGARAN BIAYA) page 615 of 1892


4.50 m1 L 7
4.50 m1 L 8
13.50 m1 L 9
8.00 m1 L 8
24.00 m1 L 9
242.90 m1 L 10
2.00 unit

ve, gate valve, straner 1.00 ls

1.00 unit
1.00 lot

2.00 bh L 13
1.00 bh L 15
2.00 bh L 14
4.50 m1 L 7
4.50 m1 L 8
13.50 m1 L 9

RAB (RENCANA ANGGARAN BIAYA) page 616 of 1892


8.00 m1 L 8
24.00 m1 L 9
200.65 m1 L 10
1.00 lot

2.00 bh L 13
1.00 bh L 15
2.00 bh L 14
4.50 m1 L 7
4.50 m1 L 8
13.50 m1 L 9
8.00 m1 L 8
24.00 m1 L 9
200.65 m1 L 10
1.00 lot

2.00 bh L 13
1.00 bh L 15
2.00 bh L 14
4.50 m1 L 7

RAB (RENCANA ANGGARAN BIAYA) page 617 of 1892


4.50 m1 L 8
13.50 m1 L 9
8.00 m1 L 8
24.00 m1 L 9
200.65 m1 L 10
1.00 lot

12.00 bh L 17
4.00 bh L 16
8.00 bh L 15
8.00 m1 L 4
103.00 m1 L 6
49.00 m1 L 7
12.00 m1 L 8
38.00 m1 L 9
38.20 m1 L 6
2.00 unit L 37
2.00 unit L 38
2.40 m3
720.00 m'

RAB (RENCANA ANGGARAN BIAYA) page 618 of 1892


2.00 pkt

te valve,

1.00 lot

1.00 ls

28.00 m1 L 8
24.00 m1 L 6
136.50 m1 L 4
22.50 m1 L 4
4.00 unit L 33
1.00 lot

30.00 m1 L 8
26.00 m1 L 6
51.50 m1 L 4

RAB (RENCANA ANGGARAN BIAYA) page 619 of 1892


22.50 m1 L 4
1.00 lot

30.00 m1 L 8
26.00 m1 L 6
51.50 m1 L 4
22.50 m1 L 4
1.00 lot

30.00 m1 L 8
26.00 m1 L 6
51.50 m1 L 4
40.00 m1 L 4
1.00 lot

20.00 m1 L 7
36.80 m1 L 6
149.00 m1 L 3
22.50 m1 L 3

RAB (RENCANA ANGGARAN BIAYA) page 620 of 1892


2.00 unit L 33
2.00 unit L 42
1.00 lot

20.00 m1 L 7
19.50 m1 L 6
30.00 m1 L 3
22.50 m1 L 3
1.00 lot

20.00 m1 L 7
19.50 m1 L 6
30.00 m1 L 3
22.50 m1 L 3
1.00 lot

20.00 m1 L 7
19.50 m1 L 6
30.00 m1 L 3
22.50 m1 L 3

RAB (RENCANA ANGGARAN BIAYA) page 621 of 1892


1.00 lot

6.00 bh L 19
14.00 bh L 24
1.00 bh L 25
15.00 bh L 22
1.00 bh L 23
16.00 bh L 21
16.00 bh L 20
8.00 bh L 26
7.00 bh L 27
2.00 set L 28

6.00 bh L 19
14.00 bh L 24
1.00 bh L 25
15.00 bh L 22
1.00 bh L 23
16.00 bh L 21

RAB (RENCANA ANGGARAN BIAYA) page 622 of 1892


16.00 bh L 20
8.00 bh L 26
7.00 bh L 27
2.00 set L 28

6.00 bh L 19
14.00 bh L 24
1.00 bh L 25
15.00 bh L 22
1.00 bh L 23
16.00 bh L 21
16.00 bh L 20
8.00 bh L 26
7.00 bh L 27
2.00 set L 28

6.00 bh L 19
14.00 bh L 24
1.00 bh L 25
15.00 bh L 22

RAB (RENCANA ANGGARAN BIAYA) page 623 of 1892


1.00 bh L 23
16.00 bh L 21
16.00 bh L 20
8.00 bh L 26
7.00 bh L 27
2.00 set L 28

36.00 m1 L 6
72.00 m1 L 3
49.50 m1 L 2
18.00 bh
152.00 m1

36.00 m1 L 6
72.00 m1 L 3
49.50 m1 L 2
18.00 bh
152.00 m1

RAB (RENCANA ANGGARAN BIAYA) page 624 of 1892


36.00 m1 L 6
72.00 m1 L 3
49.50 m1 L 2
18.00 bh
152.00 m1

99.00 m1 L 3
49.50 m1 L 2
22.00 bh
11.00 bh
207.00 m1

198.00 m1 L 6
18.00 m1 L 3
4.00 bh
70.00 m1

rpasang rapi

RAB (RENCANA ANGGARAN BIAYA) page 625 of 1892


3.00 titik M vii 2
26.00 titik M vii 1
1.00 unit M vii 13
1.00 unit M vii 14
1.00 unit M vii 16
5.00 unit M vii 4
1.00 unit M vii 5
11.00 unit M vii 6
7.00 unit M vii 7
2.00 unit M vii 8
26.00 unit
26.00 bh
24.00 bh
208.00 m1 M vii 18

2.00 titik M vii 2


26.00 titik M vii 1
1.00 unit M vii 13
1.00 unit M vii 14

RAB (RENCANA ANGGARAN BIAYA) page 626 of 1892


1.00 unit M vii 16
5.00 unit M vii 4
1.00 unit M vii 5
11.00 unit M vii 6
7.00 unit M vii 7
2.00 unit M vii 8
26.00 unit
26.00 bh
24.00 bh
208.00 m1 M vii 18

3.00 titik M vii 2


26.00 titik M vii 1
1.00 unit M vii 13
1.00 unit M vii 14
1.00 unit M vii 16
5.00 unit M vii 4
1.00 unit M vii 5
11.00 unit M vii 6

RAB (RENCANA ANGGARAN BIAYA) page 627 of 1892


7.00 unit M vii 7
2.00 unit M vii 8
26.00 unit
26.00 bh
24.00 bh
208.00 m1 M vii 18

3.00 titik M vii 2


26.00 titik M vii 1
1.00 unit M vii 13
1.00 unit M vii 14
1.00 unit M vii 16
5.00 unit M vii 4
1.00 unit M vii 5
11.00 unit M vii 6
7.00 unit M vii 7
2.00 unit M vii 8
26.00 unit
26.00 bh

RAB (RENCANA ANGGARAN BIAYA) page 628 of 1892


24.00 bh
10.00 m1 M vii 18

1.00 titik M vii 1


1.00 m1 M vii 10
8.00 m1 M vii 18
4.00 m1 M vii 19
4.00 m1 M vii 21

1.00 ls

rpasang rapi
1.00 unit M viii 3

1.00 ls

RAB (RENCANA ANGGARAN BIAYA) page 629 of 1892


81.65 m3 N 2
243.75 m2 N 1
2.00 btg

2.02 m3 B 5
7.20 m3 C 1
0.63 m3 C 4
28.80 m1 E v 2
9.60 m1 E v 3
28.80 m1 E v 6
1.95 m3 E x 6
29.97 m2 C 2
59.94 m2 C 5
59.94 m2 C 10
29.97 m2 C 2

RAB (RENCANA ANGGARAN BIAYA) page 630 of 1892


44.64 m2

301.53 m3 N 2
1005.10 m2 N 1

81.65 m3 N 2
243.75 m2 N 1
2.00 btg N 3

2.02 m3 B 5
7.20 m3 C 1
0.63 m3 C 4
28.80 m1 E v 2
9.60 m1 E v 3
28.80 m1 E v 6
1.95 m3 E x 6
29.97 m2 C 2
59.94 m2 C 5
59.94 m2 C 10

RAB (RENCANA ANGGARAN BIAYA) page 631 of 1892


29.97 m2 C 2
44.64 m2

195.65 m2 C 12

195.65 m2 C 12

0.10 m3
Pekerjaan Tanah 1 m1

0.02 m3
0.08 m3
0.06 m3
Pekerjaan Pondasi batukali 1 m1

1.00 m1
Pekerjaan Panel Precast 1 m1

RAB (RENCANA ANGGARAN BIAYA) page 632 of 1892


1,305.00 m1

mm sampai 1 m 21.66 m3 B 1
mm sampai 2 m 21.66 m3 B 2
mm sampai 3 m 21.66 m3 B 3
mm lebih dari 3 m 4.33 m3 B 4
48.48 m3 B 7
2.17 m3 B 5
0.59 m3 B 5
5.37 m3 B 1
69.15 m3 B 1
69.15 m3 B 2
69.15 m3 B 3
38.03 m3 B 4
6.92 m3 B 5
RAB (RENCANA ANGGARAN BIAYA) page 633 of 1892
ndasi cor beton 167.58 m2 D 1
59.85 m2 D 1
200.50 m2 D 1

2.17 m3 E i 2

14.35 m3 E i 2
, t = 100 mm 6.92 m3 E i 2
0.59 m3 E i 2

pa + stek besi D13mm 10.83 m3 E iv 1


4.05 m3 E vi 7
8.42 m3 E viii 8
Elv. - 4.500 4.12 m3 E vii 4
Elv. - 4.500 0.35 m3 E ix 39.00
Elv. - 0.300 7.63 m3 E ix 39
Elv. - 0.300 1.69 m3 E ix 40
RAB (RENCANA ANGGARAN BIAYA) page 634 of 1892
Elv. - 0.300 5.94 m3 E ix 41
Elev. - 8.600 11.87 m3 E x 11
Elv. - 4.500 16.48 m3 E x 12.00
Elv. - 4.500 9.80 m3 E x 13
27.72 m3 E xii 3
Elv. - 0.300 30.24 m3 E x 12
4.97 m3 E vi 6
p dibawah pondasi genset 9.94 m3 E iv 2
28.00 m1
2.24 m2
2.00 unit
2.00 bh

7.83 m3 B 1
3.13 m3 B 5
14.35 m3 B 5
143.50 m3 B 7

RAB (RENCANA ANGGARAN BIAYA) page 635 of 1892


2.61 m3 B 7

213.20 m1 E v 3
26.18 m1 E v 1
126.00 m1 E v 7

9.98 m3 C 1
289.93 m2 C 2
579.85 m2 C 5
212.41 m2 C 17

335.90 m1 C 7
579.85 m2 C 10
252.00 m2 C 8
252.00 m2 C 18
4.35 m1

RAB (RENCANA ANGGARAN BIAYA) page 636 of 1892


2.00 unit
1.00 unit
10.00 unit

49.88 m2 J 17
161.60 m2 J 18
167.00 m2

412.60 m2 K 2
379.66 m2 K 1
252.00 m2 K 3
193.62 m2 K 5
252.00 m2 K 6

2.00 unit O 5

RAB (RENCANA ANGGARAN BIAYA) page 637 of 1892


14.00 titik M i 1
6.00 titik M i 2
9.00 bh M i 5
3.00 bh
2.00 bh M i 13
3.00 bh M i 21
10.00 bh M i 18
4.00 bh

6.00 bh
65.00 m1
36.00 m1 L 3

6,720.83 m3

RAB (RENCANA ANGGARAN BIAYA) page 638 of 1892


G ACCESORIES 1.00 Unit

1.00 unit
1.00 unit
1.00 unit
1.00 unit
1.00 unit

1.00 unit
1.00 unit
1.00 unit

5.00 m1
1.00 unit
1.00 unit

x 300mm2) 5.00 m1
5.00 m1

RAB (RENCANA ANGGARAN BIAYA) page 639 of 1892


1.00 unit
1.00 lot

RAB (RENCANA ANGGARAN BIAYA) page 640 of 1892


No
RAB Tanggal
Lokasi
ENCANA ANGGARAN BIAYA Owner

HARGA SATUAN SUB JUMLAH %

Rp 525,000.00 Rp 525,000.00 0.00000


Rp 262,500.00 Rp 1,312,500.00 0.00001
Rp 80,775.00 Rp 36,591,075.00 0.00019

Rp 59,700.00 Rp 43,581,000.00 0.00023


Rp 201,600,000.00 Rp 201,600,000.00 0.00106
Rp 26,250,000.00 Rp 26,250,000.00 0.00014
Rp 21,000,000.00 Rp 21,000,000.00 0.00011

RAB (RENCANA ANGGARAN BIAYA) page 641 of 1892


Rp 56,900.00 Rp 39,730,425.00 0.00021
Rp 68,950.00 Rp 48,144,337.50 0.00025
Rp 109,750.00 Rp 76,632,937.50 0.00040
Rp 161,650.00 Rp 22,574,422.50 0.00012
Rp 56,900.00 Rp 1,093,618.00 0.00001
Rp 68,950.00 Rp 1,325,219.00 0.00001
Rp 109,750.00 Rp 2,109,395.00 0.00001
Rp 161,650.00 Rp 621,382.60 0.00000
Rp 56,900.00 Rp 410,818.00 0.00000
Rp 68,950.00 Rp 497,819.00 0.00000
Rp 109,750.00 Rp 792,395.00 0.00000
Rp 161,650.00 Rp 233,422.60 0.00000
Rp 29,900.00 Rp 35,677,225.68 0.00019
Rp 111,200.00 Rp 8,058,552.80 0.00004

Rp 56,900.00 Rp 355,625.00 0.00000


Rp 68,950.00 Rp 430,937.50 0.00000
RAB (RENCANA ANGGARAN BIAYA) page 642 of 1892
Rp 899,700.00 Rp 206,881,516.50 0.00109

Rp 899,700.00 Rp 65,200,359.30 0.00034

Rp 878,500.00 Rp 8,785,000.00 0.00005


Rp 3,273,321.67 Rp 6,137,478.13 0.00003
Rp 5,634,160.81 Rp 189,606,413.67 0.00100
Rp 4,765,538.65 Rp 63,161,257.83 0.00033
Rp 878,500.00 Rp 613,412,625.00 0.00324
Rp 878,500.00 Rp 16,884,770.00 0.00009
Rp 878,500.00 Rp 6,342,770.00 0.00003
Rp 2,614,716.78 Rp 635,986,059.77 0.00336
Rp 2,719,354.23 Rp 16,801,530.11 0.00009
Rp 3,203,371.96 Rp 21,622,760.71 0.00011
Rp 5,469,654.02 Rp 889,129,864.34 0.00469

RAB (RENCANA ANGGARAN BIAYA) page 643 of 1892


Rp 5,581,914.07 Rp 9,243,649.71 0.00005
Rp 7,298,413.87 Rp 52,373,417.95 0.00028
Rp 7,065,408.66 Rp 18,037,988.32 0.00010
Rp 5,652,845.90 Rp 32,763,894.82 0.00017
Rp 5,181,609.91 Rp 51,051,811.65 0.00027
Rp 5,181,609.91 Rp 553,055,247.62 0.00292
Rp 5,846,707.33 Rp 5,799,933.67 0.00003

Rp 8,342,724.06 Rp 8,009,015.10 0.00004


Rp 8,265,982.13 Rp 12,458,488.27 0.00007
Rp 8,669,165.03 Rp 40,519,677.36 0.00021

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 36,971,895.36 0.00020

Rp 4,290,004.27 Rp 981,338.48 0.00001


RAB (RENCANA ANGGARAN BIAYA) page 644 of 1892
Rp 6,078,784.65 Rp 32,095,982.96 0.00017
Rp 4,946,851.14 Rp 1,318,335.83 0.00001

Rp 4,563,426.31 Rp 461,574,599.13 0.00244


Rp 5,509,628.74 Rp 5,553,705.77 0.00003
Rp 6,946,770.33 Rp 30,343,492.81 0.00016
Rp 6,707,203.03 Rp 10,422,993.50 0.00005
Rp 4,016,213.12 Rp 14,169,199.90 0.00007

Rp 8,342,724.06 Rp 406,807,910.52 0.00215


Rp 7,381,484.49 Rp 60,491,265.36 0.00032
Rp 6,653,176.05 Rp 391,306,549.66 0.00206
Rp 6,313,269.06 Rp 231,865,854.50 0.00122
Rp 7,124,410.37 Rp 43,200,643.37 0.00023
Rp 6,456,975.47 Rp 16,513,714.77 0.00009
Rp 9,390,770.97 Rp 99,222,886.08 0.00052
Rp 8,218,602.79 Rp 32,455,262.43 0.00017
Rp 6,451,376.51 Rp 66,495,950.49 0.00035
Rp 8,388,879.77 Rp 158,734,802.41 0.00084
Rp 9,125,546.30 Rp 78,187,680.67 0.00041

RAB (RENCANA ANGGARAN BIAYA) page 645 of 1892


Rp 7,619,354.73 Rp 48,481,954.12 0.00026

Rp 7,803,020.50 Rp 7,022,718.45 0.00004


Rp 8,265,982.13 Rp 11,679,832.75 0.00006

Rp 8,669,165.03 Rp 37,320,755.46 0.00020

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 36,971,895.36 0.00020


Rp 4,290,004.27 Rp 1,698,371,937.10 0.00896

Rp 6,078,784.65 Rp 32,095,982.96 0.00017

Rp 4,563,426.31 Rp 461,574,599.13 0.00244


Rp 5,509,628.74 Rp 5,553,705.77 0.00003
RAB (RENCANA ANGGARAN BIAYA) page 646 of 1892
Rp 6,946,770.33 Rp 30,343,492.81 0.00016
Rp 6,707,203.03 Rp 5,211,496.75 0.00003
Rp 4,016,213.12 Rp 14,169,199.90 0.00007

Rp 8,342,724.06 Rp 406,807,910.52 0.00215


Rp 7,381,484.49 Rp 60,491,265.36 0.00032
Rp 6,653,176.05 Rp 391,306,549.66 0.00206
Rp 6,313,269.06 Rp 231,865,854.50 0.00122
Rp 7,124,410.37 Rp 43,200,643.37 0.00023
Rp 6,456,975.47 Rp 16,513,714.77 0.00009
Rp 9,390,770.97 Rp 99,222,886.08 0.00052
Rp 8,218,602.79 Rp 32,455,262.43 0.00017
Rp 6,451,376.51 Rp 66,495,950.49 0.00035
Rp 8,388,879.77 Rp 158,734,802.41 0.00084
Rp 9,125,546.30 Rp 78,187,680.67 0.00041
Rp 7,619,354.73 Rp 26,983,944.76 0.00014

Rp 7,803,020.50 Rp 10,955,440.78 0.00006


Rp 8,265,982.13 Rp 14,275,351.14 0.00008
Rp 8,669,165.03 Rp 53,315,364.95 0.00028

RAB (RENCANA ANGGARAN BIAYA) page 647 of 1892


Rp 5,865,133.78 Rp 79,472,562.66 0.00042

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 36,971,895.36 0.00020

Rp 4,290,004.27 Rp 1,698,371,937.10 0.00896

Rp 6,078,784.65 Rp 32,095,982.96 0.00017

Rp 4,563,426.31 Rp 461,574,599.13 0.00244


Rp 5,509,628.74 Rp 5,553,705.77 0.00003
Rp 6,946,770.33 Rp 30,343,492.81 0.00016
Rp 4,016,213.12 Rp 14,169,199.90 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 648 of 1892


Rp 8,342,724.06 Rp 406,807,910.52 0.00215
Rp 7,381,484.49 Rp 60,491,265.36 0.00032
Rp 6,653,176.05 Rp 391,306,549.66 0.00206
Rp 6,313,269.06 Rp 231,865,854.50 0.00122
Rp 9,390,770.97 Rp 99,222,886.08 0.00052
Rp 8,218,602.79 Rp 32,455,262.43 0.00017
Rp 6,451,376.51 Rp 66,495,950.49 0.00035
Rp 8,388,879.77 Rp 158,734,802.41 0.00084
Rp 9,125,546.30 Rp 78,187,680.67 0.00041
Rp 7,619,354.73 Rp 48,481,954.12 0.00026
Rp 6,214,365.06 Rp 62,174,722.44 0.00033

Rp 7,803,020.50 Rp 7,022,718.45 0.00004


Rp 8,265,982.13 Rp 11,679,832.75 0.00006
Rp 8,669,165.03 Rp 37,320,755.46 0.00020

Rp 8,342,724.06 Rp 406,807,910.52 0.00215


Rp 7,381,484.49 Rp 60,491,265.36 0.00032
Rp 6,653,176.05 Rp 391,306,549.66 0.00206
Rp 6,313,269.06 Rp 231,865,854.50 0.00122

RAB (RENCANA ANGGARAN BIAYA) page 649 of 1892


Rp 9,390,770.97 Rp 165,932,105.82 0.00088
Rp 6,451,376.51 Rp 95,977,128.28 0.00051
Rp 8,388,879.77 Rp 158,734,802.41 0.00084
Rp 9,125,546.30 Rp 10,266,239.58 0.00005
Rp 7,694,463.73 Rp 52,595,506.80 0.00028
Rp 5,879,278.48 Rp 91,232,144.74 0.00048

Rp 8,342,724.06 Rp 29,132,792.41 0.00015


Rp 6,653,176.05 Rp 35,208,607.68 0.00019
Rp 6,313,269.06 Rp 12,954,828.11 0.00007
Rp 8,342,724.06 Rp 7,508,451.65 0.00004
Rp 6,996,425.82 Rp 126,447,278.33 0.00067
Rp 6,996,425.82 Rp 39,197,475.63 0.00021
Rp 6,026,555.01 Rp 55,796,106.26 0.00029

Rp 8,342,724.06 Rp 52,634,246.08 0.00028


Rp 6,653,176.05 Rp 48,022,624.76 0.00025
Rp 6,313,269.06 Rp 27,273,322.35 0.00014
Rp 9,390,770.97 Rp 33,384,190.80 0.00018
Rp 6,451,376.51 Rp 12,323,741.97 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 650 of 1892


Rp 6,129,412.25 Rp 63,062,457.93 0.00033

Rp 7,420,722.64 Rp 36,971,895.36 0.00020

Rp 7,420,722.64 Rp 14,002,903.62 0.00007

Rp 4,290,004.27 Rp 1,747,599,736.15 0.00922

Rp 6,078,784.65 Rp 32,095,982.96 0.00017

Rp 4,290,004.27 Rp 1,862,139,632.77 0.00982

Rp 4,290,004.27 Rp 65,733,590.49 0.00035

Rp 6,078,784.65 Rp 8,814,237.74 0.00005

Rp 4,290,004.27 Rp 978,120.97 0.00001

Rp 4,290,004.27 Rp 155,154,439.58 0.00082

Rp 4,563,426.31 Rp 96,402,380.77 0.00051

RAB (RENCANA ANGGARAN BIAYA) page 651 of 1892


Rp 6,196,684.44 Rp 71,292,854.47 0.00038

Rp 8,342,724.06 Rp 52,634,246.08 0.00028


Rp 6,653,176.05 Rp 48,022,624.76 0.00025
Rp 6,313,269.06 Rp 27,273,322.35 0.00014
Rp 9,390,770.97 Rp 33,384,190.80 0.00018
Rp 6,451,376.51 Rp 12,323,741.97 0.00007
Rp 6,129,412.25 Rp 63,062,457.93 0.00033

Rp 4,290,004.27 Rp 166,541,183.43 0.00088

Rp 4,013,765.49 Rp 5,769,787.89 0.00003

Rp 56,900.00 Rp 8,721,898.29 0.00005


Rp 111,200.00 Rp 5,038,185.10 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 652 of 1892


Rp 111,200.00 Rp 25,569,884.00 0.00013
Rp 29,900.00 Rp 1,527,737.31 0.00001
Rp 29,900.00 Rp 24,063,744.25 0.00013

Rp 28,700.00 Rp 20,862,701.58 0.00011


Rp 28,700.00 Rp 65,994,215.00 0.00035

Rp 94,500.00 Rp 40,165,335.00 0.00021


Rp 96,050.00 Rp 12,686,764.25 0.00007
Rp 88,950.00 Rp 32,889,262.50 0.00017
Rp 88,400.00 Rp 132,622,100.00 0.00070
Rp 105,800.00 Rp 60,877,320.00 0.00032
Rp 108,650.00 Rp 17,106,399.25 0.00009
Rp 104,750.00 Rp 19,321,556.50 0.00010
Rp 108,850.00 Rp 922,394.90 0.00000
Rp 110,950.00 Rp 266,280.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 653 of 1892


Rp 88,950.00 Rp 31,381,560.00 0.00017
Rp 88,400.00 Rp 124,378,800.00 0.00066
Rp 105,800.00 Rp 61,670,820.00 0.00033
Rp 108,650.00 Rp 18,253,200.00 0.00010
Rp 104,750.00 Rp 21,002,794.00 0.00011
Rp 108,850.00 Rp 4,035,504.90 0.00002
Rp 110,950.00 Rp 266,280.00 0.00000

Rp 88,950.00 Rp 31,381,560.00 0.00017


Rp 88,400.00 Rp 122,151,120.00 0.00064
Rp 105,800.00 Rp 61,670,820.00 0.00033
Rp 108,650.00 Rp 17,981,575.00 0.00009
Rp 104,750.00 Rp 21,002,794.00 0.00011
Rp 108,850.00 Rp 4,180,928.50 0.00002
Rp 110,950.00 Rp 266,280.00 0.00000

Rp 88,950.00 Rp 44,083,620.00 0.00023

RAB (RENCANA ANGGARAN BIAYA) page 654 of 1892


Rp 88,400.00 Rp 134,403,360.00 0.00071
Rp 105,800.00 Rp 84,293,399.20 0.00044
Rp 108,650.00 Rp 17,221,025.00 0.00009
Rp 104,750.00 Rp 22,398,064.00 0.00012
Rp 108,850.00 Rp 4,203,133.90 0.00002
Rp 110,950.00 Rp 1,730,820.00 0.00001

Rp 88,950.00 Rp 22,099,627.50 0.00012


Rp 88,400.00 Rp 6,683,040.00 0.00004
Rp 105,800.00 Rp 12,637,810.00 0.00007
Rp 104,750.00 Rp 776,197.50 0.00000

Rp 624,050.00 Rp 236,497,572.08 0.00125


Rp 956,000.00 Rp 3,807,422.96 0.00002
Rp 102,850.00 Rp 212,352,008.88 0.00112
Rp 54,900.00 Rp 206,206,683.84 0.00109
Rp 24,800.00 Rp 83,939,166.24 0.00044

RAB (RENCANA ANGGARAN BIAYA) page 655 of 1892


Rp 115,850.00 Rp 49,998,241.79 0.00026
Rp 67,600.00 Rp 58,349,264.48 0.00031
Rp 107,600.00 Rp 2,370,750.80 0.00001
Rp 50,550.00 Rp 2,227,536.30 0.00001
Rp 31,700.00 Rp 28,758,899.36 0.00015
Rp 79,700.00 Rp 66,548,703.00 0.00035
Rp 15,550.00 Rp 26,236,737.50 0.00014
Rp 19,700.00 Rp 7,695,923.20 0.00004
Rp 31,450.00 Rp 8,012,610.85 0.00004
Rp 39,200.00 Rp 3,201,906.96 0.00002

Rp 102,850.00 Rp 175,297,807.41 0.00092


Rp 54,900.00 Rp 165,665,976.48 0.00087
Rp 24,800.00 Rp 66,466,931.36 0.00035
Rp 115,850.00 Rp 49,209,789.86 0.00026
Rp 67,600.00 Rp 57,429,120.32 0.00030
Rp 31,700.00 Rp 26,930,519.44 0.00014
Rp 79,700.00 Rp 73,084,900.00 0.00039
Rp 15,550.00 Rp 26,236,737.50 0.00014

RAB (RENCANA ANGGARAN BIAYA) page 656 of 1892


Rp 19,700.00 Rp 18,447,080.00 0.00010
Rp 39,200.00 Rp 3,201,906.96 0.00002
Rp 24,400.00 Rp 732,000.00 0.00000

Rp 102,850.00 Rp 178,150,475.58 0.00094


Rp 54,900.00 Rp 166,221,322.92 0.00088
Rp 24,800.00 Rp 67,521,938.24 0.00036
Rp 115,850.00 Rp 51,256,419.13 0.00027
Rp 67,600.00 Rp 59,817,590.56 0.00032
Rp 31,700.00 Rp 28,050,556.52 0.00015
Rp 79,700.00 Rp 71,588,931.00 0.00038
Rp 15,550.00 Rp 18,142,682.60 0.00010
Rp 19,700.00 Rp 9,507,771.60 0.00005
Rp 39,200.00 Rp 3,201,906.96 0.00002
Rp 24,400.00 Rp 732,000.00 0.00000

Rp 102,850.00 Rp 162,410,578.99 0.00086


Rp 54,900.00 Rp 151,907,904.72 0.00080
Rp 24,800.00 Rp 61,062,803.04 0.00032
Rp 115,850.00 Rp 45,212,941.69 0.00024

RAB (RENCANA ANGGARAN BIAYA) page 657 of 1892


Rp 67,600.00 Rp 52,764,693.28 0.00028
Rp 31,700.00 Rp 24,743,206.76 0.00013
Rp 79,700.00 Rp 150,938,251.00 0.00080
Rp 15,550.00 Rp 18,142,682.60 0.00010
Rp 19,700.00 Rp 10,560,697.20 0.00006
Rp 39,200.00 Rp 3,201,906.96 0.00002
Rp 24,400.00 Rp 1,903,200.00 0.00001

Rp 102,850.00 Rp 56,179,776.07 0.00030


Rp 54,900.00 Rp 59,976,075.96 0.00032
Rp 24,800.00 Rp 27,093,017.92 0.00014
Rp 79,700.00 Rp 22,281,729.00 0.00012
Rp 15,550.00 Rp 387,972.50 0.00000
Rp 19,700.00 Rp 291,954.00 0.00000
Rp 24,400.00 Rp 60,918,504.00 0.00032
Rp 24,400.00 Rp 6,053,640.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 658 of 1892


Rp 12,469,050.00 Rp 12,469,050.00 0.00007
Rp 9,178,250.00 Rp 27,534,750.00 0.00015
Rp 11,834,750.00 Rp 213,025,500.00 0.00112
Rp 7,443,800.00 Rp 22,331,400.00 0.00012
Rp 5,925,800.00 Rp 11,851,600.00 0.00006
Rp 12,219,850.00 Rp 24,439,700.00 0.00013
Rp 6,813,000.00 Rp 27,252,000.00 0.00014
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 2,664,850.00 Rp 10,659,400.00 0.00006
Rp 6,535,050.00 Rp 274,472,100.00 0.00145
Rp 2,723,050.00 Rp 21,784,400.00 0.00011
Rp 2,029,800.00 Rp 12,178,800.00 0.00006
Rp 2,879,050.00 Rp 11,516,200.00 0.00006
Rp 1,143,100.00 Rp 4,572,400.00 0.00002
Rp 53,730,950.00 Rp 53,730,950.00 0.00028
Rp 42,865,600.00 Rp 85,731,200.00 0.00045
Rp 141,678,950.00 Rp 141,678,950.00 0.00075

Rp 12,469,050.00 Rp 12,469,050.00 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 659 of 1892


Rp 11,834,750.00 Rp 189,356,000.00 0.00100
Rp 7,443,800.00 Rp 29,775,200.00 0.00016
Rp 5,925,800.00 Rp 29,629,000.00 0.00016
Rp 12,219,850.00 Rp 12,219,850.00 0.00006
Rp 6,813,000.00 Rp 34,065,000.00 0.00018
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 2,664,850.00 Rp 10,659,400.00 0.00006
Rp 6,535,050.00 Rp 313,682,400.00 0.00165
Rp 11,561,750.00 Rp 11,561,750.00 0.00006
Rp 2,029,800.00 Rp 12,178,800.00 0.00006
Rp 2,879,050.00 Rp 20,153,350.00 0.00011
Rp 1,143,100.00 Rp 4,572,400.00 0.00002

Rp 12,469,050.00 Rp 12,469,050.00 0.00007


Rp 11,834,750.00 Rp 189,356,000.00 0.00100
Rp 7,443,800.00 Rp 29,775,200.00 0.00016
Rp 5,925,800.00 Rp 29,629,000.00 0.00016
Rp 12,219,850.00 Rp 12,219,850.00 0.00006
Rp 6,813,000.00 Rp 34,065,000.00 0.00018

RAB (RENCANA ANGGARAN BIAYA) page 660 of 1892


Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 2,664,850.00 Rp 10,659,400.00 0.00006
Rp 6,535,050.00 Rp 313,682,400.00 0.00165
Rp 11,561,750.00 Rp 11,561,750.00 0.00006
Rp 2,029,800.00 Rp 12,178,800.00 0.00006
Rp 2,879,050.00 Rp 20,153,350.00 0.00011
Rp 1,143,100.00 Rp 4,572,400.00 0.00002

Rp 20,150,400.00 Rp 40,300,800.00 0.00021


Rp 12,469,050.00 Rp 12,469,050.00 0.00007
Rp 11,834,750.00 Rp 165,686,500.00 0.00087
Rp 7,443,800.00 Rp 22,331,400.00 0.00012
Rp 5,925,800.00 Rp 23,703,200.00 0.00013
Rp 12,219,850.00 Rp 12,219,850.00 0.00006
Rp 6,813,000.00 Rp 27,252,000.00 0.00014
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 2,664,850.00 Rp 10,659,400.00 0.00006
Rp 6,535,050.00 Rp 300,612,300.00 0.00159
Rp 11,561,750.00 Rp 11,561,750.00 0.00006

RAB (RENCANA ANGGARAN BIAYA) page 661 of 1892


Rp 2,029,800.00 Rp 12,178,800.00 0.00006
Rp 2,879,050.00 Rp 20,153,350.00 0.00011
Rp 1,143,100.00 Rp 4,572,400.00 0.00002

Rp 9,178,250.00 Rp 9,178,250.00 0.00005


Rp 8,689,250.00 Rp 26,067,750.00 0.00014
Rp 5,921,850.00 Rp 5,921,850.00 0.00003
Rp 2,664,850.00 Rp 2,664,850.00 0.00001

Rp 118,050.00 Rp 272,170,177.50 0.00144


Rp 123,650.00 Rp 1,991,074.13 0.00001
Rp 127,950.00 Rp 18,618,004.50 0.00010
Rp 11,750.00 Rp 18,489,095.00 0.00010
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 271,048,230.30 0.00143

RAB (RENCANA ANGGARAN BIAYA) page 662 of 1892


Rp 123,650.00 Rp 22,099,284.43 0.00012
Rp 127,950.00 Rp 18,595,933.13 0.00010
Rp 11,750.00 Rp 20,596,105.00 0.00011
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 271,048,230.30 0.00143


Rp 123,650.00 Rp 22,099,284.43 0.00012
Rp 127,950.00 Rp 18,595,933.13 0.00010
Rp 11,750.00 Rp 20,596,105.00 0.00011
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 284,628,702.30 0.00150


Rp 123,650.00 Rp 19,655,651.30 0.00010
Rp 127,950.00 Rp 18,595,933.13 0.00010
Rp 11,750.00 Rp 16,003,934.75 0.00008
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 3,352,874.10 Rp 3,352,874.10 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 663 of 1892


Rp 6,135,234.00 Rp 6,135,234.00 0.00003
Rp 2,874,537.00 Rp 5,749,074.00 0.00003
Rp 2,240,658.90 Rp 2,240,658.90 0.00001
Rp 7,369,553.40 Rp 7,369,553.40 0.00004
Rp 20,167,700.00 Rp 20,167,700.00 0.00011
Rp 451,039.55 Rp 3,991,700.00 0.00002
Rp 451,039.55 Rp 5,209,506.78 0.00003
Rp 451,039.55 Rp 2,063,505.93 0.00001
Rp 451,039.55 Rp 2,012,763.98 0.00001
Rp 451,039.55 Rp 1,826,710.17 0.00001
Rp 451,039.55 Rp 1,962,022.03 0.00001
Rp 451,039.55 Rp 2,503,269.49 0.00001

Rp 3,352,874.10 Rp 6,705,748.20 0.00004


Rp 6,135,234.00 Rp 12,270,468.00 0.00006
Rp 2,874,537.00 Rp 5,749,074.00 0.00003
Rp 2,240,658.90 Rp 2,240,658.90 0.00001
Rp 7,369,553.40 Rp 7,369,553.40 0.00004
Rp 9,367,494.00 Rp 9,367,494.00 0.00005
Rp 5,219,105.40 Rp 20,876,421.60 0.00011

RAB (RENCANA ANGGARAN BIAYA) page 664 of 1892


Rp 20,167,700.00 Rp 60,503,100.00 0.00032
Rp 15,285,350.00 Rp 15,285,350.00 0.00008
Rp 451,039.55 Rp 3,991,700.00 0.00002
Rp 451,039.55 Rp 5,209,506.78 0.00003
Rp 451,039.55 Rp 2,063,505.93 0.00001
Rp 451,039.55 Rp 2,012,763.98 0.00001
Rp 451,039.55 Rp 1,826,710.17 0.00001
Rp 451,039.55 Rp 13,734,154.24 0.00007
Rp 451,039.55 Rp 2,503,269.49 0.00001
Rp 451,039.55 Rp 10,655,809.32 0.00006
Rp 451,039.55 Rp 2,435,613.56 0.00001

Rp 3,352,874.10 Rp 6,705,748.20 0.00004


Rp 6,135,234.00 Rp 12,270,468.00 0.00006
Rp 2,874,537.00 Rp 5,749,074.00 0.00003
Rp 2,240,658.90 Rp 2,240,658.90 0.00001
Rp 7,369,553.40 Rp 7,369,553.40 0.00004
Rp 9,367,494.00 Rp 9,367,494.00 0.00005
Rp 5,219,105.40 Rp 20,876,421.60 0.00011
Rp 20,167,700.00 Rp 60,503,100.00 0.00032

RAB (RENCANA ANGGARAN BIAYA) page 665 of 1892


Rp 15,285,350.00 Rp 15,285,350.00 0.00008
Rp 451,039.55 Rp 3,991,700.00 0.00002
Rp 451,039.55 Rp 5,209,506.78 0.00003
Rp 451,039.55 Rp 2,063,505.93 0.00001
Rp 451,039.55 Rp 2,012,763.98 0.00001
Rp 451,039.55 Rp 1,826,710.17 0.00001
Rp 451,039.55 Rp 13,734,154.24 0.00007
Rp 451,039.55 Rp 2,503,269.49 0.00001
Rp 451,039.55 Rp 10,655,809.32 0.00006
Rp 451,039.55 Rp 2,435,613.56 0.00001

Rp 3,352,874.10 Rp 3,352,874.10 0.00002


Rp 6,135,234.00 Rp 6,135,234.00 0.00003
Rp 2,874,537.00 Rp 5,749,074.00 0.00003
Rp 2,240,658.90 Rp 2,240,658.90 0.00001
Rp 7,369,553.40 Rp 7,369,553.40 0.00004
Rp 5,219,105.40 Rp 20,876,421.60 0.00011
Rp 20,167,700.00 Rp 20,167,700.00 0.00011
Rp 451,039.55 Rp 5,209,506.78 0.00003
Rp 451,039.55 Rp 2,063,505.93 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 666 of 1892


Rp 451,039.55 Rp 2,012,763.98 0.00001
Rp 451,039.55 Rp 1,826,710.17 0.00001
Rp 451,039.55 Rp 5,886,066.10 0.00003
Rp 451,039.55 Rp 2,503,269.49 0.00001

Rp 299,150.00 Rp 102,273,402.00 0.00054


Rp 322,700.00 Rp 41,003,875.50 0.00022
Rp 287,350.00 Rp 297,748,736.74 0.00157
Rp 397,450.00 Rp 34,196,598.00 0.00018
Rp 36,350.00 Rp 56,114,040.25 0.00030
Rp 287,350.00 Rp 30,528,064.00 0.00016
Rp 319,800.00 Rp 153,309,241.80 0.00081
Rp 66,500.00 Rp 26,353,684.00 0.00014
Rp 287,350.00 Rp 349,199,214.00 0.00184
Rp 287,350.00 Rp 2,247,077.00 0.00001
Rp 287,350.00 Rp 765,787.75 0.00000
Rp 861,800.00 Rp 6,323,888.40 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 667 of 1892


Rp 322,700.00 Rp 37,668,771.00 0.00020
Rp 322,700.00 Rp 220,765,524.00 0.00116
Rp 287,350.00 Rp 24,723,594.00 0.00013
Rp 36,350.00 Rp 37,969,392.50 0.00020
Rp 287,350.00 Rp 30,164,278.90 0.00016
Rp 287,350.00 Rp 136,818,024.42 0.00072
Rp 287,350.00 Rp 636,213,014.50 0.00336
Rp 424,350.00 Rp 3,318,417.00 0.00002
Rp 861,800.00 Rp 6,323,888.40 0.00003

Rp 322,700.00 Rp 37,668,771.00 0.00020


Rp 322,700.00 Rp 220,765,524.00 0.00116
Rp 287,350.00 Rp 24,723,594.00 0.00013
Rp 36,350.00 Rp 37,969,392.50 0.00020
Rp 287,350.00 Rp 30,164,278.90 0.00016
Rp 287,350.00 Rp 136,818,024.42 0.00072
Rp 287,350.00 Rp 636,213,014.50 0.00336
Rp 424,350.00 Rp 3,318,417.00 0.00002
RAB (RENCANA ANGGARAN BIAYA) page 668 of 1892
Rp 861,800.00 Rp 6,323,888.40 0.00003

Rp 322,700.00 Rp 45,897,621.00 0.00024


Rp 322,700.00 Rp 229,585,237.70 0.00121
Rp 287,350.00 Rp 24,723,594.00 0.00013
Rp 36,350.00 Rp 52,356,831.55 0.00028
Rp 287,350.00 Rp 30,164,278.90 0.00016
Rp 287,350.00 Rp 136,818,024.42 0.00072
Rp 287,350.00 Rp 336,075,939.50 0.00177
Rp 424,350.00 Rp 3,318,417.00 0.00002
Rp 861,800.00 Rp 6,323,888.40 0.00003

Rp 29,400.00 Rp 40,598,283.60 0.00021


Rp 23,100.00 Rp 82,487,341.86 0.00044
Rp 19,950.00 Rp 49,219,891.88 0.00026

RAB (RENCANA ANGGARAN BIAYA) page 669 of 1892


Rp 19,950.00 Rp 1,629,541.94 0.00001

Rp 29,400.00 Rp 49,122,490.20 0.00026


Rp 23,100.00 Rp 60,430,256.04 0.00032
Rp 19,950.00 Rp 52,271,154.60 0.00028
Rp 19,950.00 Rp 1,629,541.94 0.00001
Rp 74,350.00 Rp 2,230,500.00 0.00001
Rp 65,750.00 Rp 6,902,040.50 0.00004

Rp 29,400.00 Rp 48,940,210.20 0.00026


Rp 23,100.00 Rp 61,795,535.34 0.00033
Rp 19,950.00 Rp 52,271,154.60 0.00028
Rp 19,950.00 Rp 1,629,541.94 0.00001
Rp 74,350.00 Rp 2,230,500.00 0.00001
Rp 65,750.00 Rp 6,902,040.50 0.00004

Rp 29,400.00 Rp 36,732,654.00 0.00019


Rp 23,100.00 Rp 88,331,457.06 0.00047
Rp 19,950.00 Rp 54,171,940.73 0.00029

RAB (RENCANA ANGGARAN BIAYA) page 670 of 1892


Rp 19,950.00 Rp 1,629,541.94 0.00001
Rp 74,350.00 Rp 5,799,300.00 0.00003
Rp 65,750.00 Rp 6,902,040.50 0.00004

Rp 29,400.00 Rp 26,193,930.00 0.00014


Rp 23,100.00 Rp 11,112,957.24 0.00006
Rp 74,350.00 Rp 204,072,906.00 0.00108

Rp 146,541.67 Rp 1,007,840.31 0.00001


Rp 146,541.67 Rp 800,117.50 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000
Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 671 of 1892


Rp 146,541.67 Rp 800,886.84 0.00000
Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 327,740.44 0.00000

Rp 146,541.67 Rp 1,007,840.31 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 672 of 1892


Rp 146,541.67 Rp 800,117.50 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000
Rp 146,541.67 Rp 1,008,609.66 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,008,609.66 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 330,817.81 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,008,609.66 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 330,817.81 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 673 of 1892


Rp 146,541.67 Rp 327,740.44 0.00000

Rp 146,541.67 Rp 1,003,993.59 0.00001


Rp 146,541.67 Rp 800,117.50 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000
Rp 146,541.67 Rp 1,004,762.94 0.00001
Rp 146,541.67 Rp 669,329.06 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,004,762.94 0.00001
Rp 146,541.67 Rp 669,329.06 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,003,993.59 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,004,762.94 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 674 of 1892


Rp 146,541.67 Rp 669,329.06 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,003,993.59 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,004,762.94 0.00001
Rp 146,541.67 Rp 669,329.06 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,003,993.59 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 385,441.22 0.00000

Rp 146,541.67 Rp 4,185,230.00 0.00002


Rp 146,541.67 Rp 5,700,837.19 0.00003
Rp 146,541.67 Rp 1,100,161.56 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 675 of 1892


Rp 146,541.67 Rp 4,185,230.00 0.00002
Rp 146,541.67 Rp 5,700,837.19 0.00003
Rp 146,541.67 Rp 1,100,161.56 0.00001

Rp 146,541.67 Rp 4,185,230.00 0.00002


Rp 146,541.67 Rp 5,700,837.19 0.00003
Rp 146,541.67 Rp 1,100,161.56 0.00001

Rp 433,586.21 Rp 3,915,283.45 0.00002


Rp 433,586.21 Rp 1,821,062.07 0.00001

Rp 433,586.21 Rp 3,915,283.45 0.00002


Rp 433,586.21 Rp 1,821,062.07 0.00001

Rp 433,586.21 Rp 3,915,283.45 0.00002


Rp 433,586.21 Rp 1,821,062.07 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 676 of 1892


Rp 433,586.21 Rp 1,980,405.00 0.00001

Rp 433,586.21 Rp 1,980,405.00 0.00001

Rp 433,586.21 Rp 1,980,405.00 0.00001

Rp 433,586.21 Rp 4,233,969.31 0.00002

Rp 146,541.67 Rp 2,054,147.81 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 677 of 1892


Rp 146,541.67 Rp 2,054,147.81 0.00001
Rp 146,541.67 Rp 2,769,637.50 0.00001

Rp 146,541.67 Rp 2,054,147.81 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

Rp 146,541.67 Rp 1,027,073.91 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

Rp 146,541.67 Rp 1,027,073.91 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

Rp 146,541.67 Rp 1,027,073.91 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 678 of 1892


Rp 244,670.86 Rp 4,746,614.68 0.00003
Rp 23,650.00 Rp 986,595.23 0.00001
Rp 10,500.00 Rp 21,000.00 0.00000
Rp 31,500.00 Rp 63,000.00 0.00000
Rp 997,500.00 Rp 1,271,812.50 0.00001

Rp 244,670.86 Rp 4,746,614.68 0.00003


Rp 23,650.00 Rp 986,595.23 0.00001
Rp 10,500.00 Rp 21,000.00 0.00000
Rp 31,500.00 Rp 63,000.00 0.00000
Rp 997,500.00 Rp 1,271,812.50 0.00001

Rp 2,550,200.00 Rp 40,280,409.00 0.00021

RAB (RENCANA ANGGARAN BIAYA) page 679 of 1892


Rp 2,550,200.00 Rp 40,280,409.00 0.00021
Rp 2,550,200.00 Rp 102,665,314.05 0.00054

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 40,280,409.00 0.00021
Rp 2,550,200.00 Rp 102,665,314.05 0.00054

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 40,280,409.00 0.00021
Rp 2,550,200.00 Rp 102,665,314.05 0.00054

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 40,280,409.00 0.00021
Rp 2,550,200.00 Rp 102,665,314.05 0.00054

Rp 29,461,600.00 Rp 58,923,200.00 0.00031

RAB (RENCANA ANGGARAN BIAYA) page 680 of 1892


Rp 6,982,650.00 Rp 27,930,600.00 0.00015

Rp 36,106,300.00 Rp 72,212,600.00 0.00038

Rp 20,707,050.00 Rp 62,121,150.00 0.00033


Rp 5,775,000.00 Rp 1,039,500.00 0.00001
Rp 23,650.00 Rp 6,374,900.07 0.00003
Rp 23,650.00 Rp 2,144,267.93 0.00001
Rp 23,650.00 Rp 1,337,777.78 0.00001
Rp 23,650.00 Rp 3,453,278.40 0.00002
Rp 26,250.00 Rp 1,417,500.00 0.00001

Rp 537,650.00 Rp 6,451,800.00 0.00003

Rp 636,200.00 Rp 75,043,607.20 0.00040

RAB (RENCANA ANGGARAN BIAYA) page 681 of 1892


Rp 29,400.00 Rp 1,991,556.00 0.00001

Rp 29,400.00 Rp 2,591,316.00 0.00001

Rp 29,400.00 Rp 2,773,596.00 0.00001

Rp 29,400.00 Rp 579,180.00 0.00000

Rp 29,400.00 Rp 396,900.00 0.00000

Rp 29,400.00 Rp 726,180.00 0.00000

Rp 29,400.00 Rp 726,180.00 0.00000

Rp 29,400.00 Rp 329,280.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 682 of 1892


Rp 29,400.00 Rp 2,758,896.00 0.00001

Rp 29,400.00 Rp 1,380,624.00 0.00001

Rp 29,400.00 Rp 1,380,624.00 0.00001

Rp 29,400.00 Rp 952,560.00 0.00001

Rp 31,450.00 Rp 2,717,280.00 0.00001

Rp 31,450.00 Rp 849,150.00 0.00000

Rp 31,450.00 Rp 4,075,920.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 683 of 1892


Rp 1,828,127.22 Rp 1,828,127.22 0.00001
Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 1,719,963.58 0.00001
Rp 107,497.72 Rp 859,981.79 0.00000
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 10,071,300.02 0.00005
Rp 475,653.65 Rp 475,653.65 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 684 of 1892


Rp 1,828,127.22 Rp 1,828,127.22 0.00001
Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,794,940.82 0.00001
Rp 107,497.72 Rp 967,479.51 0.00001
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 12,475,253.54 0.00007
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,794,940.82 0.00001
Rp 107,497.72 Rp 859,981.79 0.00000
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 685 of 1892


Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 12,702,996.50 0.00007
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,203,403.72 Rp 1,203,403.72 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,472,447.65 0.00001
Rp 107,497.72 Rp 967,479.51 0.00001
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 12,930,739.47 0.00007
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,203,403.72 Rp 1,203,403.72 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 686 of 1892


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 107,497.72 Rp 644,986.34 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 7,848.29 Rp 2,075,871.42 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 948,929.02 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 687 of 1892


Rp 1,828,127.22 Rp 1,828,127.22 0.00001
Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 2,401,099.60 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 1,498,308.98 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 688 of 1892


Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 2,401,099.60 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 1,498,308.98 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 689 of 1892


Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,242,882.97 Rp 1,242,882.97 0.00001
Rp 600,274.90 Rp 2,401,099.60 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 1,348,478.08 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 690 of 1892


Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 2,401,099.60 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,203,403.72 Rp 1,203,403.72 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 691 of 1892


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 594,567.06 Rp 1,783,701.17 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 10,457,839.95 0.00006
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 195,650.00 Rp 38,934,350.00 0.00021

Rp 195,650.00 Rp 48,227,725.00 0.00025

Rp 195,650.00 Rp 49,108,150.00 0.00026

Rp 195,650.00 Rp 49,988,575.00 0.00026

RAB (RENCANA ANGGARAN BIAYA) page 692 of 1892


Rp 48,300.00 Rp 12,775,350.00 0.00007

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 102,721,050.00 0.00054

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 124,951,725.00 0.00066

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 127,251,450.00 0.00067

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 129,551,175.00 0.00068

RAB (RENCANA ANGGARAN BIAYA) page 693 of 1892


Rp 77,100.00 Rp 20,547,150.00 0.00011

Rp 239,240.61 Rp 56,460,784.70 0.00030


Rp 267,500.00 Rp 27,017,500.00 0.00014
Rp 239,240.61 Rp 3,110,127.97 0.00002
Rp 1,396,550.00 Rp 159,206,700.00 0.00084
Rp 679,650.00 Rp 33,302,850.00 0.00018
Rp 280,400.00 Rp 13,739,600.00 0.00007
Rp 257,550.00 Rp 4,635,900.00 0.00002
Rp 276,250.00 Rp 828,750.00 0.00000
Rp 242,050.00 Rp 726,150.00 0.00000
Rp 53,600.00 Rp 1,072,000.00 0.00001
Rp 76,300.00 Rp 1,831,200.00 0.00001
Rp 116,650.00 Rp 116,650.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 694 of 1892


Rp 64,150.00 Rp 192,450.00 0.00000
Rp 1,299,350.00 Rp 16,891,550.00 0.00009
Rp 66,300.00 Rp 3,779,100.00 0.00002
Rp 203,850.00 Rp 2,446,200.00 0.00001
Rp 925,550.00 Rp 9,255,500.00 0.00005
Rp 264,950.00 Rp 13,777,400.00 0.00007

Rp 239,240.61 Rp 79,427,883.57 0.00042


Rp 267,500.00 Rp 48,150,000.00 0.00025
Rp 239,240.61 Rp 3,349,368.58 0.00002
Rp 1,396,550.00 Rp 114,517,100.00 0.00060
Rp 679,650.00 Rp 112,821,900.00 0.00060
Rp 280,400.00 Rp 12,618,000.00 0.00007
Rp 257,550.00 Rp 4,635,900.00 0.00002
Rp 242,050.00 Rp 726,150.00 0.00000
Rp 1,667,600.00 Rp 1,667,600.00 0.00001
Rp 2,295,982.00 Rp 9,183,928.00 0.00005
Rp 2,637,840.00 Rp 2,637,840.00 0.00001
Rp 4,424,050.00 Rp 26,544,300.00 0.00014
Rp 638,250.00 Rp 1,914,750.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 695 of 1892


Rp 753,350.00 Rp 2,260,050.00 0.00001
Rp 53,600.00 Rp 1,232,800.00 0.00001
Rp 76,300.00 Rp 1,449,700.00 0.00001
Rp 167,650.00 Rp 1,173,550.00 0.00001
Rp 119,350.00 Rp 358,050.00 0.00000
Rp 1,299,350.00 Rp 18,190,900.00 0.00010
Rp 66,300.00 Rp 7,027,800.00 0.00004
Rp 203,850.00 Rp 4,688,550.00 0.00002
Rp 925,550.00 Rp 12,957,700.00 0.00007
Rp 264,950.00 Rp 14,837,200.00 0.00008

Rp 239,240.61 Rp 78,710,161.73 0.00042


Rp 267,500.00 Rp 58,582,500.00 0.00031
Rp 239,240.61 Rp 3,349,368.58 0.00002
Rp 1,396,550.00 Rp 114,517,100.00 0.00060
Rp 679,650.00 Rp 113,501,550.00 0.00060
Rp 280,400.00 Rp 12,337,600.00 0.00007
Rp 257,550.00 Rp 4,635,900.00 0.00002
Rp 242,050.00 Rp 726,150.00 0.00000
Rp 1,667,600.00 Rp 1,667,600.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 696 of 1892


Rp 2,295,982.00 Rp 9,183,928.00 0.00005
Rp 2,637,840.00 Rp 2,637,840.00 0.00001
Rp 489,350.00 Rp 1,468,050.00 0.00001
Rp 638,250.00 Rp 1,914,750.00 0.00001
Rp 753,350.00 Rp 2,260,050.00 0.00001
Rp 53,600.00 Rp 1,286,400.00 0.00001
Rp 76,300.00 Rp 1,831,200.00 0.00001
Rp 167,650.00 Rp 1,173,550.00 0.00001
Rp 119,350.00 Rp 358,050.00 0.00000
Rp 1,299,350.00 Rp 18,190,900.00 0.00010
Rp 66,300.00 Rp 6,961,500.00 0.00004
Rp 203,850.00 Rp 4,892,400.00 0.00003
Rp 925,550.00 Rp 30,543,150.00 0.00016
Rp 264,950.00 Rp 14,837,200.00 0.00008

Rp 239,240.61 Rp 77,513,958.66 0.00041


Rp 267,500.00 Rp 59,652,500.00 0.00031
Rp 239,240.61 Rp 3,110,127.97 0.00002
Rp 1,396,550.00 Rp 114,517,100.00 0.00060
Rp 679,650.00 Rp 101,947,500.00 0.00054

RAB (RENCANA ANGGARAN BIAYA) page 697 of 1892


Rp 280,400.00 Rp 13,459,200.00 0.00007
Rp 257,550.00 Rp 4,635,900.00 0.00002
Rp 242,050.00 Rp 726,150.00 0.00000
Rp 2,295,982.00 Rp 9,183,928.00 0.00005
Rp 2,637,840.00 Rp 2,637,840.00 0.00001
Rp 4,424,050.00 Rp 53,088,600.00 0.00028
Rp 638,250.00 Rp 1,914,750.00 0.00001
Rp 753,350.00 Rp 2,260,050.00 0.00001
Rp 53,600.00 Rp 804,000.00 0.00000
Rp 76,300.00 Rp 1,220,800.00 0.00001
Rp 167,650.00 Rp 1,005,900.00 0.00001
Rp 119,350.00 Rp 358,050.00 0.00000
Rp 1,299,350.00 Rp 16,891,550.00 0.00009
Rp 66,300.00 Rp 4,442,100.00 0.00002
Rp 203,850.00 Rp 4,892,400.00 0.00003
Rp 925,550.00 Rp 49,979,700.00 0.00026
Rp 264,950.00 Rp 13,777,400.00 0.00007

Rp 239,240.61 Rp 2,153,165.52 0.00001


Rp 267,500.00 Rp 802,500.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 698 of 1892


Rp 619,750.00 Rp 5,577,750.00 0.00003
Rp 53,600.00 Rp 214,400.00 0.00000
Rp 66,300.00 Rp 198,900.00 0.00000

Rp 1,902,614.58 Rp 1,902,614.58 0.00001

Rp 334,400.00 Rp 5,016,000.00 0.00003


Rp 87,800.00 Rp 1,317,000.00 0.00001
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 42,100.00 Rp 2,736,500.00 0.00001
Rp 409,062.13 Rp 6,135,932.02 0.00003

Rp 334,400.00 Rp 9,028,800.00 0.00005


Rp 87,800.00 Rp 2,370,600.00 0.00001
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 58,850.00 Rp 3,531,000.00 0.00002
Rp 409,062.13 Rp 11,044,677.64 0.00006

RAB (RENCANA ANGGARAN BIAYA) page 699 of 1892


Rp 334,400.00 Rp 9,028,800.00 0.00005
Rp 87,800.00 Rp 2,370,600.00 0.00001
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 58,850.00 Rp 3,825,250.00 0.00002
Rp 409,062.13 Rp 11,044,677.64 0.00006

Rp 334,400.00 Rp 7,022,400.00 0.00004


Rp 87,800.00 Rp 1,843,800.00 0.00001
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 58,850.00 Rp 4,119,500.00 0.00002
Rp 409,062.13 Rp 8,590,304.83 0.00005

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 405,550.00 Rp 5,677,700.00 0.00003


Rp 162,000.00 Rp 1,944,000.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 700 of 1892


Rp 2,234,100.00 Rp 4,468,200.00 0.00002
Rp 1,569,650.00 Rp 1,569,650.00 0.00001
Rp 63,737.59 Rp 892,326.24 0.00000
Rp 4,499,650.00 Rp 4,499,650.00 0.00002
Rp 1,308,000.00 Rp 1,308,000.00 0.00001

Rp 405,550.00 Rp 12,572,050.00 0.00007


Rp 162,000.00 Rp 4,698,000.00 0.00002
Rp 2,234,100.00 Rp 4,468,200.00 0.00002
Rp 1,569,650.00 Rp 3,139,300.00 0.00002
Rp 63,737.59 Rp 1,975,865.24 0.00001
Rp 4,499,650.00 Rp 8,999,300.00 0.00005
Rp 1,308,000.00 Rp 1,308,000.00 0.00001

Rp 405,550.00 Rp 12,572,050.00 0.00007


Rp 162,000.00 Rp 4,698,000.00 0.00002
Rp 2,234,100.00 Rp 4,468,200.00 0.00002
Rp 1,569,650.00 Rp 3,139,300.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 701 of 1892


Rp 63,737.59 Rp 1,975,865.24 0.00001
Rp 4,499,650.00 Rp 8,999,300.00 0.00005
Rp 1,308,000.00 Rp 2,616,000.00 0.00001

Rp 405,550.00 Rp 8,516,550.00 0.00004


Rp 162,000.00 Rp 3,240,000.00 0.00002
Rp 2,234,100.00 Rp 2,234,100.00 0.00001
Rp 2,302,150.00 Rp 2,302,150.00 0.00001
Rp 63,737.59 Rp 1,338,489.36 0.00001
Rp 6,278,600.00 Rp 6,278,600.00 0.00003
Rp 1,308,000.00 Rp 1,308,000.00 0.00001

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 759,550.00 Rp 6,076,400.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 702 of 1892


Rp 3,196,050.00 Rp 22,372,350.00 0.00012
Rp 6,173,400.00 Rp 6,173,400.00 0.00003

Rp 759,550.00 Rp 6,076,400.00 0.00003


Rp 3,196,050.00 Rp 22,372,350.00 0.00012
Rp 6,173,400.00 Rp 6,173,400.00 0.00003

Rp 759,550.00 Rp 6,076,400.00 0.00003


Rp 3,196,050.00 Rp 22,372,350.00 0.00012
Rp 12,609,550.00 Rp 12,609,550.00 0.00007
Rp 6,173,400.00 Rp 6,173,400.00 0.00003
Rp 4,290,350.00 Rp 4,290,350.00 0.00002
Rp 63,737.59 Rp 1,720,914.89 0.00001
Rp 237,826.82 Rp 475,653.65 0.00000

Rp 759,550.00 Rp 6,076,400.00 0.00003


Rp 3,196,050.00 Rp 22,372,350.00 0.00012

RAB (RENCANA ANGGARAN BIAYA) page 703 of 1892


Rp 6,173,400.00 Rp 6,173,400.00 0.00003

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 268,450.00 Rp 12,348,700.00 0.00007


Rp 124,950.00 Rp 5,372,850.00 0.00003
Rp 138,700.00 Rp 416,100.00 0.00000

Rp 268,450.00 Rp 16,107,000.00 0.00008


Rp 124,950.00 Rp 5,997,600.00 0.00003
Rp 138,700.00 Rp 1,664,400.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 704 of 1892


Rp 268,450.00 Rp 16,107,000.00 0.00008
Rp 124,950.00 Rp 5,997,600.00 0.00003
Rp 138,700.00 Rp 1,664,400.00 0.00001

Rp 268,450.00 Rp 14,764,750.00 0.00008


Rp 124,950.00 Rp 5,747,700.00 0.00003
Rp 138,700.00 Rp 1,248,300.00 0.00001

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 329,000.00 Rp 44,415,000.00 0.00023


Rp 275,900.00 Rp 40,005,500.00 0.00021
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 408,150.00 0.00000
Rp 371,700.00 Rp 371,700.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 705 of 1892


Rp 341,050.00 Rp 682,100.00 0.00000

Rp 329,000.00 Rp 44,415,000.00 0.00023


Rp 275,900.00 Rp 40,005,500.00 0.00021
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 408,150.00 0.00000
Rp 371,700.00 Rp 371,700.00 0.00000
Rp 341,050.00 Rp 682,100.00 0.00000

Rp 329,000.00 Rp 44,415,000.00 0.00023


Rp 275,900.00 Rp 40,005,500.00 0.00021
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 408,150.00 0.00000
Rp 371,700.00 Rp 371,700.00 0.00000
Rp 341,050.00 Rp 682,100.00 0.00000

Rp 329,000.00 Rp 44,415,000.00 0.00023

RAB (RENCANA ANGGARAN BIAYA) page 706 of 1892


Rp 275,900.00 Rp 40,005,500.00 0.00021
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 408,150.00 0.00000
Rp 371,700.00 Rp 371,700.00 0.00000
Rp 341,050.00 Rp 682,100.00 0.00000

Rp 329,000.00 Rp 15,463,000.00 0.00008


Rp 371,700.00 Rp 743,400.00 0.00000

Rp 1,075,652.67 Rp 1,075,652.67 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 707 of 1892


Rp 1,075,652.67 Rp 8,605,221.33 0.00005

Rp 1,075,652.67 Rp 8,605,221.33 0.00005

Rp 1,075,652.67 Rp 6,453,916.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 708 of 1892


Rp 209,300.00 Rp 418,600.00 0.00000
Rp 396,450.00 Rp 396,450.00 0.00000
Rp 291,450.00 Rp 582,900.00 0.00000
Rp 32,850.00 Rp 13,632,750.00 0.00007
Rp 36,350.00 Rp 163,575.00 0.00000
Rp 32,850.00 Rp 147,825.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 598,800.00 0.00000
Rp 12,850.00 Rp 3,121,265.00 0.00002
Rp 27,471,150.00 Rp 54,942,300.00 0.00029

RAB (RENCANA ANGGARAN BIAYA) page 709 of 1892


Rp 7,610,458.32 Rp 7,610,458.32 0.00004
Rp 12,366,994.77 Rp 12,366,994.77 0.00007

Rp 475,653.65 Rp 475,653.65 0.00000

Rp 209,300.00 Rp 418,600.00 0.00000


Rp 396,450.00 Rp 396,450.00 0.00000
Rp 291,450.00 Rp 582,900.00 0.00000
Rp 36,350.00 Rp 163,575.00 0.00000
Rp 32,850.00 Rp 147,825.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 598,800.00 0.00000
Rp 12,850.00 Rp 2,578,352.50 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 209,300.00 Rp 418,600.00 0.00000


Rp 396,450.00 Rp 396,450.00 0.00000
Rp 291,450.00 Rp 582,900.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 710 of 1892


Rp 36,350.00 Rp 163,575.00 0.00000
Rp 32,850.00 Rp 147,825.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 598,800.00 0.00000
Rp 12,850.00 Rp 2,578,352.50 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 209,300.00 Rp 418,600.00 0.00000


Rp 396,450.00 Rp 396,450.00 0.00000
Rp 291,450.00 Rp 582,900.00 0.00000
Rp 36,350.00 Rp 163,575.00 0.00000
Rp 32,850.00 Rp 147,825.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 598,800.00 0.00000
Rp 12,850.00 Rp 2,578,352.50 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 734,250.00 Rp 8,811,000.00 0.00005

RAB (RENCANA ANGGARAN BIAYA) page 711 of 1892


Rp 488,950.00 Rp 1,955,800.00 0.00001
Rp 396,450.00 Rp 3,171,600.00 0.00002
Rp 80,750.00 Rp 646,000.00 0.00000
Rp 44,000.00 Rp 4,532,000.00 0.00002
Rp 36,350.00 Rp 1,781,150.00 0.00001
Rp 32,850.00 Rp 394,200.00 0.00000
Rp 24,950.00 Rp 948,100.00 0.00001
Rp 44,000.00 Rp 1,680,800.00 0.00001
Rp 2,777,774.25 Rp 5,555,548.50 0.00003
Rp 1,399,397.25 Rp 2,798,794.50 0.00001
Rp 899,700.00 Rp 2,159,280.00 0.00001
Rp 9,200.00 Rp 6,900,000.00 0.00004
Rp 80,797,500.00 Rp 161,595,000.00 0.00085

Rp 475,653.65 Rp 475,653.65 0.00000

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 712 of 1892


Rp 32,850.00 Rp 919,800.00 0.00000
Rp 44,000.00 Rp 1,056,000.00 0.00001
Rp 80,750.00 Rp 11,022,375.00 0.00006
Rp 80,750.00 Rp 1,816,875.00 0.00001
Rp 1,638,750.00 Rp 6,555,000.00 0.00003
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 32,850.00 Rp 985,500.00 0.00001


Rp 44,000.00 Rp 1,144,000.00 0.00001
Rp 80,750.00 Rp 4,158,625.00 0.00002
Rp 80,750.00 Rp 1,816,875.00 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 32,850.00 Rp 985,500.00 0.00001


Rp 44,000.00 Rp 1,144,000.00 0.00001
Rp 80,750.00 Rp 4,158,625.00 0.00002
Rp 80,750.00 Rp 1,816,875.00 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 713 of 1892


Rp 32,850.00 Rp 985,500.00 0.00001
Rp 44,000.00 Rp 1,144,000.00 0.00001
Rp 80,750.00 Rp 4,158,625.00 0.00002
Rp 80,750.00 Rp 3,230,000.00 0.00002
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 36,350.00 Rp 727,000.00 0.00000


Rp 44,000.00 Rp 1,619,200.00 0.00001
Rp 127,800.00 Rp 19,042,200.00 0.00010
Rp 127,800.00 Rp 2,875,500.00 0.00002
Rp 1,638,750.00 Rp 3,277,500.00 0.00002
Rp 30,520,404.67 Rp 61,040,809.34 0.00032
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 36,350.00 Rp 727,000.00 0.00000


Rp 44,000.00 Rp 858,000.00 0.00000
Rp 127,800.00 Rp 3,834,000.00 0.00002
Rp 127,800.00 Rp 2,875,500.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 714 of 1892


Rp 475,653.65 Rp 475,653.65 0.00000

Rp 36,350.00 Rp 727,000.00 0.00000


Rp 44,000.00 Rp 858,000.00 0.00000
Rp 127,800.00 Rp 3,834,000.00 0.00002
Rp 127,800.00 Rp 2,875,500.00 0.00002
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 36,350.00 Rp 727,000.00 0.00000


Rp 44,000.00 Rp 858,000.00 0.00000
Rp 127,800.00 Rp 3,834,000.00 0.00002
Rp 127,800.00 Rp 2,875,500.00 0.00002
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 309,150.00 Rp 1,545,750.00 0.00001


Rp 3,569,300.00 Rp 46,400,900.00 0.00024
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 61,031,600.00 0.00032
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 6,359,250.00 0.00003
RAB (RENCANA ANGGARAN BIAYA) page 715 of 1892
Rp 403,150.00 Rp 6,047,250.00 0.00003
Rp 3,422,800.00 Rp 27,382,400.00 0.00014
Rp 1,618,500.00 Rp 11,329,500.00 0.00006
Rp 1,099,500.00 Rp 2,199,000.00 0.00001
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 309,150.00 Rp 1,854,900.00 0.00001


Rp 3,569,300.00 Rp 49,970,200.00 0.00026
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 65,391,000.00 0.00034
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 6,783,200.00 0.00004
Rp 403,150.00 Rp 6,450,400.00 0.00003
Rp 3,422,800.00 Rp 27,382,400.00 0.00014
Rp 1,618,500.00 Rp 11,329,500.00 0.00006
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 309,150.00 Rp 1,854,900.00 0.00001


Rp 3,569,300.00 Rp 49,970,200.00 0.00026
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 65,391,000.00 0.00034
RAB (RENCANA ANGGARAN BIAYA) page 716 of 1892
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 6,783,200.00 0.00004
Rp 403,150.00 Rp 6,450,400.00 0.00003
Rp 3,422,800.00 Rp 27,382,400.00 0.00014
Rp 1,618,500.00 Rp 11,329,500.00 0.00006
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 309,150.00 Rp 3,400,650.00 0.00002


Rp 3,569,300.00 Rp 46,400,900.00 0.00024
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 61,031,600.00 0.00032
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 6,359,250.00 0.00003
Rp 403,150.00 Rp 6,853,550.00 0.00004
Rp 3,422,800.00 Rp 27,382,400.00 0.00014
Rp 1,618,500.00 Rp 11,329,500.00 0.00006
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 44,000.00 Rp 1,584,000.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 717 of 1892


Rp 127,800.00 Rp 9,201,600.00 0.00005
Rp 197,150.00 Rp 9,758,925.00 0.00005
Rp 180,748.39 Rp 3,253,470.93 0.00002
Rp 14,269.61 Rp 2,168,980.62 0.00001

Rp 44,000.00 Rp 1,584,000.00 0.00001


Rp 127,800.00 Rp 9,201,600.00 0.00005
Rp 197,150.00 Rp 9,758,925.00 0.00005
Rp 180,748.39 Rp 3,253,470.93 0.00002
Rp 14,269.61 Rp 2,168,980.62 0.00001

Rp 44,000.00 Rp 1,584,000.00 0.00001


Rp 127,800.00 Rp 9,201,600.00 0.00005
Rp 197,150.00 Rp 9,758,925.00 0.00005
Rp 180,748.39 Rp 3,253,470.93 0.00002
Rp 14,269.61 Rp 2,168,980.62 0.00001

Rp 127,800.00 Rp 12,652,200.00 0.00007


Rp 197,150.00 Rp 9,758,925.00 0.00005
Rp 142,696.09 Rp 3,139,314.06 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 718 of 1892


Rp 190,261.46 Rp 2,092,876.04 0.00001
Rp 14,269.61 Rp 2,953,809.14 0.00002

Rp 44,000.00 Rp 8,712,000.00 0.00005


Rp 127,800.00 Rp 2,300,400.00 0.00001
Rp 142,696.09 Rp 570,784.37 0.00000
Rp 14,269.61 Rp 998,872.65 0.00001

Rp 1,274,000.00 Rp 2,548,000.00 0.00001


Rp 261,950.00 Rp 4,453,150.00 0.00002
Rp 126,506,300.00 Rp 126,506,300.00 0.00067
Rp 198,295,600.00 Rp 198,295,600.00 0.00105
Rp 225,682,300.00 Rp 225,682,300.00 0.00119
Rp 15,815,500.00 Rp 31,631,000.00 0.00017
Rp 17,686,650.00 Rp 53,059,950.00 0.00028
Rp 17,851,850.00 Rp 17,851,850.00 0.00009
Rp 18,051,100.00 Rp 180,511,000.00 0.00095

RAB (RENCANA ANGGARAN BIAYA) page 719 of 1892


Rp 12,773,400.00 Rp 12,773,400.00 0.00007
Rp 1,718,955.00 Rp 29,222,235.00 0.00015
Rp 926,100.00 Rp 15,743,700.00 0.00008
Rp 2,100,735.00 Rp 33,611,760.00 0.00018
Rp 34,050.00 Rp 4,630,800.00 0.00002

Rp 1,274,000.00 Rp 3,822,000.00 0.00002


Rp 261,950.00 Rp 7,072,650.00 0.00004
Rp 225,682,300.00 Rp 451,364,600.00 0.00238
Rp 292,291,900.00 Rp 292,291,900.00 0.00154
Rp 15,815,500.00 Rp 94,893,000.00 0.00050
Rp 17,686,650.00 Rp 17,686,650.00 0.00009
Rp 17,851,850.00 Rp 196,370,350.00 0.00104
Rp 18,051,100.00 Rp 126,357,700.00 0.00067
Rp 12,773,400.00 Rp 25,546,800.00 0.00013
Rp 1,718,955.00 Rp 46,411,785.00 0.00024
Rp 926,100.00 Rp 25,004,700.00 0.00013
Rp 2,100,735.00 Rp 52,518,375.00 0.00028
Rp 34,050.00 Rp 8,172,000.00 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 720 of 1892


Rp 1,274,000.00 Rp 3,822,000.00 0.00002
Rp 261,950.00 Rp 7,072,650.00 0.00004
Rp 225,682,300.00 Rp 451,364,600.00 0.00238
Rp 292,291,900.00 Rp 292,291,900.00 0.00154
Rp 15,815,500.00 Rp 94,893,000.00 0.00050
Rp 17,686,650.00 Rp 17,686,650.00 0.00009
Rp 17,851,850.00 Rp 196,370,350.00 0.00104
Rp 18,051,100.00 Rp 126,357,700.00 0.00067
Rp 12,773,400.00 Rp 25,546,800.00 0.00013
Rp 1,718,955.00 Rp 46,411,785.00 0.00024
Rp 926,100.00 Rp 25,004,700.00 0.00013
Rp 2,100,735.00 Rp 52,518,375.00 0.00028
Rp 34,050.00 Rp 7,354,800.00 0.00004

Rp 1,274,000.00 Rp 2,548,000.00 0.00001


Rp 261,950.00 Rp 6,024,850.00 0.00003
Rp 210,388,500.00 Rp 210,388,500.00 0.00111

RAB (RENCANA ANGGARAN BIAYA) page 721 of 1892


Rp 225,682,300.00 Rp 225,682,300.00 0.00119
Rp 292,291,900.00 Rp 292,291,900.00 0.00154
Rp 15,815,500.00 Rp 31,631,000.00 0.00017
Rp 17,686,650.00 Rp 17,686,650.00 0.00009
Rp 17,851,850.00 Rp 178,518,500.00 0.00094
Rp 18,051,100.00 Rp 162,459,900.00 0.00086
Rp 12,773,400.00 Rp 12,773,400.00 0.00007
Rp 1,718,955.00 Rp 39,535,965.00 0.00021
Rp 926,100.00 Rp 21,300,300.00 0.00011
Rp 2,100,735.00 Rp 46,216,170.00 0.00024
Rp 34,050.00 Rp 6,265,200.00 0.00003

Rp 261,950.00 Rp 261,950.00 0.00000


Rp 3,836,550.00 Rp 3,836,550.00 0.00002
Rp 34,050.00 Rp 272,400.00 0.00000
Rp 64,850.00 Rp 259,400.00 0.00000
Rp 112,350.00 Rp 449,400.00 0.00000

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 722 of 1892


Rp 519,261,100.00 Rp 519,261,100.00 0.00274

Rp 4,756,536.45 Rp 4,756,536.45 0.00003

Rp 56,900.00 Rp 51,579,850.00 0.00027


Rp 68,950.00 Rp 62,503,175.00 0.00033
Rp 109,750.00 Rp 99,488,375.00 0.00052
Rp 161,650.00 Rp 29,307,145.00 0.00015
Rp 56,900.00 Rp 4,374,472.00 0.00002
Rp 68,950.00 Rp 5,300,876.00 0.00003
RAB (RENCANA ANGGARAN BIAYA) page 723 of 1892
Rp 109,750.00 Rp 8,437,580.00 0.00004
Rp 161,650.00 Rp 2,485,530.40 0.00001
Rp 56,900.00 Rp 1,093,618.00 0.00001
Rp 68,950.00 Rp 1,325,219.00 0.00001
Rp 109,750.00 Rp 2,109,395.00 0.00001
Rp 161,650.00 Rp 621,382.60 0.00000
Rp 29,900.00 Rp 49,590,076.90 0.00026
Rp 111,200.00 Rp 11,148,912.00 0.00006

Rp 56,900.00 Rp 355,625.00 0.00000


Rp 68,950.00 Rp 430,937.50 0.00000

Rp 56,900.00 Rp 406,266.00 0.00000


Rp 68,950.00 Rp 492,303.00 0.00000
Rp 109,750.00 Rp 650,400.45 0.00000

Rp 56,900.00 Rp 406,266.00 0.00000


Rp 68,950.00 Rp 492,303.00 0.00000
Rp 109,750.00 Rp 650,400.45 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 724 of 1892


Rp 899,700.00 Rp 284,314,197.00 0.00150

Rp 899,700.00 Rp 90,203,922.00 0.00048

Rp 878,500.00 Rp 8,785,000.00 0.00005


Rp 3,273,321.67 Rp 6,137,478.13 0.00003
Rp 5,634,160.81 Rp 189,606,413.67 0.00100
Rp 4,765,538.65 Rp 63,161,257.83 0.00033

Rp 878,500.00 Rp 10,035,984.00 0.00005


Rp 3,273,321.67 Rp 7,011,455.02 0.00004
Rp 4,765,538.65 Rp 347,377,982.70 0.00183

Rp 878,500.00 Rp 10,035,984.00 0.00005


Rp 3,273,321.67 Rp 7,011,455.02 0.00004
Rp 4,765,538.65 Rp 347,377,982.70 0.00183

RAB (RENCANA ANGGARAN BIAYA) page 725 of 1892


Rp 6,085,345.39 Rp 100,140,443.72 0.00053

Rp 878,500.00 Rp 796,360,250.00 0.00420


Rp 878,500.00 Rp 67,539,080.00 0.00036
Rp 878,500.00 Rp 16,884,770.00 0.00009
Rp 2,614,716.78 Rp 825,666,112.68 0.00436
Rp 2,719,354.23 Rp 67,206,120.46 0.00035
Rp 2,728,414.46 Rp 16,857,508.73 0.00009
Rp 5,469,654.02 Rp 1,339,414,345.35 0.00707
Rp 4,691,338.00 Rp 129,480,928.89 0.00068
Rp 7,065,408.66 Rp 36,075,976.63 0.00019
Rp 5,181,071.28 Rp 35,749,391.80 0.00019
Rp 4,406,498.99 Rp 55,373,828.96 0.00029
Rp 5,181,609.91 Rp 375,402,197.35 0.00198
Rp 4,406,498.99 Rp 67,630,946.56 0.00036
Rp 5,181,609.91 Rp 226,400,729.53 0.00119
Rp 7,124,410.37 Rp 37,189,422.12 0.00020
Rp 8,342,724.06 Rp 32,036,060.38 0.00017
Rp 8,265,982.13 Rp 51,778,112.08 0.00027
Rp 6,653,176.05 Rp 10,219,278.42 0.00005

RAB (RENCANA ANGGARAN BIAYA) page 726 of 1892


Rp 6,313,269.06 Rp 3,636,442.98 0.00002

Rp 6,714,052.89 Rp 105,603,659.35 0.00056

Rp 7,420,722.64 Rp 38,086,858.94 0.00020

Rp 7,420,722.64 Rp 38,086,858.94 0.00020


Rp 1,970,500.00 Rp 504,881,115.90 0.00266

Rp 4,290,004.27 Rp 2,895,752.89 0.00002

Rp 4,290,004.27 Rp 70,109,394.85 0.00037

Rp 75,050.00 Rp 1,859,551.38 0.00001


Rp 126,000.00 Rp 1,178,100.00 0.00001

Rp 4,563,426.31 Rp 680,215,198.73 0.00359


Rp 4,424,988.53 Rp 74,339,807.29 0.00039
Rp 6,707,203.03 Rp 20,845,987.00 0.00011

RAB (RENCANA ANGGARAN BIAYA) page 727 of 1892


Rp 4,921,859.54 Rp 20,671,810.08 0.00011
Rp 8,342,724.06 Rp 470,104,157.94 0.00248
Rp 7,381,484.49 Rp 47,743,441.65 0.00025
Rp 7,803,020.50 Rp 43,119,491.28 0.00023
Rp 6,653,176.05 Rp 358,672,721.11 0.00189
Rp 6,981,402.61 Rp 7,218,770.30 0.00004
Rp 6,948,423.81 Rp 18,385,529.41 0.00010
Rp 6,313,269.06 Rp 184,009,696.70 0.00097
Rp 7,124,410.37 Rp 253,913,985.51 0.00134
Rp 6,456,975.47 Rp 90,878,701.27 0.00048
Rp 9,390,770.97 Rp 98,546,750.57 0.00052
Rp 8,218,602.79 Rp 14,826,359.44 0.00008
Rp 6,451,376.51 Rp 23,123,346.24 0.00012
Rp 8,388,879.77 Rp 136,900,226.15 0.00072
Rp 9,125,546.30 Rp 31,907,472.63 0.00017
Rp 8,151,459.16 Rp 11,738,101.19 0.00006
Rp 7,124,410.37 Rp 35,265,831.32 0.00019
Rp 4,290,004.27 Rp 1,879,871,292.93 0.00992

Rp 6,714,052.89 Rp 105,603,659.35 0.00056

RAB (RENCANA ANGGARAN BIAYA) page 728 of 1892


Rp 7,420,722.64 Rp 37,344,786.68 0.00020

Rp 7,420,722.64 Rp 37,344,786.68 0.00020

Rp 5,919,514.70 Rp 44,025,650.66 0.00023

Rp 5,919,514.70 Rp 222,425,764.96 0.00117

Rp 4,946,851.14 Rp 593,622.14 0.00000

Rp 4,563,426.31 Rp 647,823,998.79 0.00342


Rp 4,424,988.53 Rp 74,339,807.29 0.00039
Rp 6,707,203.03 Rp 10,422,993.50 0.00005
Rp 4,921,859.54 Rp 20,671,810.08 0.00011
Rp 5,277,435.89 Rp 13,964,095.35 0.00007
Rp 8,342,724.06 Rp 426,555,138.36 0.00225
Rp 7,381,484.49 Rp 47,743,441.65 0.00025
Rp 7,803,020.50 Rp 35,464,728.17 0.00019
Rp 6,653,176.05 Rp 341,909,112.60 0.00180
Rp 6,981,402.61 Rp 7,218,770.30 0.00004
Rp 6,948,423.81 Rp 18,385,529.41 0.00010
RAB (RENCANA ANGGARAN BIAYA) page 729 of 1892
Rp 6,313,269.06 Rp 178,725,490.49 0.00094
Rp 6,493,544.37 Rp 41,454,787.24 0.00022
Rp 7,124,410.37 Rp 315,433,269.03 0.00166
Rp 6,456,975.47 Rp 101,292,995.58 0.00053
Rp 6,311,969.92 Rp 41,711,075.22 0.00022
Rp 8,265,982.13 Rp 14,134,829.45 0.00007
Rp 9,390,770.97 Rp 59,161,857.12 0.00031
Rp 8,218,602.79 Rp 11,029,364.95 0.00006
Rp 6,451,376.51 Rp 20,118,617.63 0.00011
Rp 8,388,879.77 Rp 185,969,132.79 0.00098
Rp 9,125,546.30 Rp 32,297,589.73 0.00017
Rp 8,151,459.16 Rp 11,493,557.42 0.00006
Rp 9,154,158.70 Rp 70,022,723.04 0.00037
Rp 5,518,671.46 Rp 18,700,018.26 0.00010
Rp 6,088,674.80 Rp 20,645,174.08 0.00011

Rp 8,342,724.06 Rp 11,112,508.45 0.00006


Rp 7,124,410.37 Rp 35,265,831.32 0.00019
Rp 5,865,133.78 Rp 221,702,056.73 0.00117

RAB (RENCANA ANGGARAN BIAYA) page 730 of 1892


Rp 6,714,052.89 Rp 105,603,659.35 0.00056

Rp 7,420,722.64 Rp 37,344,786.68 0.00020

Rp 7,420,722.64 Rp 37,344,786.68 0.00020

Rp 4,290,004.27 Rp 2,008,120,970.71 0.01059

Rp 4,946,851.14 Rp 593,622.14 0.00000

Rp 4,563,426.31 Rp 566,845,998.94 0.00299


Rp 4,563,426.31 Rp 50,129,238.00 0.00026
Rp 6,707,203.03 Rp 112,681,010.82 0.00059
Rp 4,921,859.54 Rp 20,671,810.08 0.00011
Rp 5,277,435.89 Rp 13,964,095.35 0.00007
Rp 8,342,724.06 Rp 487,260,969.97 0.00257
Rp 7,381,484.49 Rp 47,743,441.65 0.00025
Rp 7,803,020.50 Rp 37,711,998.07 0.00020
Rp 6,653,176.05 Rp 402,683,480.71 0.00212
Rp 6,948,423.81 Rp 18,385,529.41 0.00010

RAB (RENCANA ANGGARAN BIAYA) page 731 of 1892


Rp 6,313,269.06 Rp 180,472,687.71 0.00095
Rp 6,493,544.37 Rp 8,410,763.34 0.00004
Rp 7,124,410.37 Rp 153,602,287.53 0.00081
Rp 6,456,975.47 Rp 38,008,178.99 0.00020
Rp 6,311,969.92 Rp 39,992,641.41 0.00021
Rp 8,265,982.13 Rp 14,134,829.45 0.00007
Rp 9,390,770.97 Rp 76,259,633.82 0.00040
Rp 8,218,602.79 Rp 1,220,462.51 0.00001
Rp 6,451,376.51 Rp 33,154,591.57 0.00017
Rp 8,388,879.77 Rp 89,994,392.15 0.00047
Rp 9,125,546.30 Rp 31,640,550.40 0.00017
Rp 8,151,459.16 Rp 10,189,323.95 0.00005
Rp 5,879,278.48 Rp 32,013,200.45 0.00017

Rp 7,124,410.37 Rp 35,265,831.32 0.00019


Rp 8,342,724.06 Rp 44,149,695.71 0.00023
Rp 6,653,176.05 Rp 52,812,911.52 0.00028
Rp 6,313,269.06 Rp 13,380,973.78 0.00007
Rp 9,390,770.97 Rp 44,455,909.78 0.00023
Rp 6,451,376.51 Rp 12,628,569.51 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 732 of 1892


Rp 7,619,354.73 Rp 82,289,031.04 0.00043

Rp 6,714,052.89 Rp 105,603,659.35 0.00056

Rp 7,420,722.64 Rp 37,344,786.68 0.00020

Rp 7,420,722.64 Rp 37,344,786.68 0.00020

Rp 4,290,004.27 Rp 1,975,945,938.65 0.01042

Rp 4,290,004.27 Rp 182,110,681.44 0.00096

Rp 4,946,851.14 Rp 593,622.14 0.00000

Rp 4,563,426.31 Rp 534,454,799.00 0.00282


Rp 6,707,203.03 Rp 112,681,010.82 0.00059
Rp 4,921,859.54 Rp 20,671,810.08 0.00011
Rp 4,563,426.31 Rp 212,085,237.70 0.00112
Rp 4,563,426.31 Rp 29,306,323.75 0.00015
Rp 6,707,203.03 Rp 134,144,060.50 0.00071
Rp 5,605,482.34 Rp 48,431,367.40 0.00026
RAB (RENCANA ANGGARAN BIAYA) page 733 of 1892
Rp 8,342,724.06 Rp 451,257,944.30 0.00238
Rp 7,381,484.49 Rp 71,615,162.48 0.00038
Rp 7,803,020.50 Rp 41,293,584.48 0.00022
Rp 6,653,176.05 Rp 393,881,328.79 0.00208
Rp 6,948,423.81 Rp 18,385,529.41 0.00010
Rp 6,313,269.06 Rp 176,999,600.57 0.00093
Rp 7,124,410.37 Rp 147,038,924.48 0.00078
Rp 6,456,975.47 Rp 53,216,777.59 0.00028
Rp 9,390,770.97 Rp 40,568,130.59 0.00021
Rp 8,218,602.79 Rp 1,808,092.61 0.00001
Rp 6,451,376.51 Rp 30,177,926.45 0.00016
Rp 8,388,879.77 Rp 16,156,982.43 0.00009
Rp 9,125,546.30 Rp 53,014,861.21 0.00028
Rp 5,545,589.20 Rp 55,455,892.05 0.00029
Rp 5,879,278.48 Rp 30,160,698.59 0.00016

Rp 7,124,410.37 Rp 18,318,640.16 0.00010

Rp 8,342,724.06 Rp 402,903,515.66 0.00213


Rp 7,803,020.50 Rp 41,293,584.48 0.00022

RAB (RENCANA ANGGARAN BIAYA) page 734 of 1892


Rp 6,653,176.05 Rp 270,651,201.91 0.00143
Rp 6,948,423.81 Rp 36,771,058.82 0.00019
Rp 6,313,269.06 Rp 89,405,359.81 0.00047
Rp 7,124,410.37 Rp 95,511,626.49 0.00050
Rp 6,456,975.47 Rp 27,860,234.91 0.00015
Rp 9,390,770.97 Rp 99,155,272.53 0.00052
Rp 6,451,376.51 Rp 47,431,165.21 0.00025
Rp 8,388,879.77 Rp 6,606,242.82 0.00003
Rp 5,879,278.48 Rp 101,355,821.33 0.00053

Rp 8,342,724.06 Rp 66,224,543.57 0.00035


Rp 6,653,176.05 Rp 41,675,494.81 0.00022
Rp 6,313,269.06 Rp 9,758,735.65 0.00005
Rp 9,390,770.97 Rp 6,085,219.59 0.00003
Rp 6,451,376.51 Rp 4,441,772.72 0.00002
Rp 8,388,879.77 Rp 2,302,747.50 0.00001

Rp 8,342,724.06 Rp 88,299,391.43 0.00047


Rp 6,653,176.05 Rp 105,625,823.05 0.00056
Rp 6,313,269.06 Rp 38,544,875.10 0.00020

RAB (RENCANA ANGGARAN BIAYA) page 735 of 1892


Rp 7,124,410.37 Rp 18,318,640.16 0.00010

Rp 8,342,724.06 Rp 134,401,284.57 0.00071


Rp 6,653,176.05 Rp 41,675,494.81 0.00022
Rp 6,313,269.06 Rp 54,380,447.88 0.00029
Rp 7,124,410.37 Rp 129,993,772.67 0.00069
Rp 6,456,975.47 Rp 95,087,035.03 0.00050
Rp 7,607,811.22 Rp 253,492,269.86 0.00134
Rp 9,390,770.97 Rp 46,374,444.29 0.00024
Rp 6,451,376.51 Rp 17,623,386.48 0.00009
Rp 8,388,879.77 Rp 75,499.92 0.00000
Rp 8,289,089.46 Rp 12,682,306.87 0.00007
Rp 5,879,278.48 Rp 32,720,389.46 0.00017

Rp 5,691,781.02 Rp 60,851,240.70 0.00032


Rp 5,804,827.95 Rp 104,617,511.64 0.00055
Rp 4,244,998.77 Rp 59,182,074.88 0.00031
Rp 4,740,835.15 Rp 37,894,367.68 0.00020

RAB (RENCANA ANGGARAN BIAYA) page 736 of 1892


Rp 6,714,052.89 Rp 105,603,659.35 0.00056

Rp 6,714,052.89 Rp 25,191,126.43 0.00013

Rp 4,290,004.27 Rp 1,840,926,634.13 0.00971

Rp 4,290,004.27 Rp 1,194,124,834.72 0.00630

Rp 4,290,004.27 Rp 130,373,229.89 0.00069

Rp 4,013,765.49 Rp 20,058,793.02 0.00011

Rp 4,290,004.27 Rp 270,913,769.91 0.00143

Rp 4,290,004.27 Rp 792,642,639.72 0.00418

Rp 4,290,004.27 Rp 321,943,370.75 0.00170

Rp 3,620,510.57 Rp 376,379,227.58 0.00199

Rp 4,013,765.49 Rp 20,058,793.02 0.00011


Rp 5,919,514.70 Rp 166,332,147.66 0.00088

RAB (RENCANA ANGGARAN BIAYA) page 737 of 1892


Rp 4,946,851.14 Rp 593,622.14 0.00000

Rp 56,900.00 Rp 10,915,696.00 0.00006


Rp 68,950.00 Rp 3,968,210.40 0.00002
Rp 111,200.00 Rp 2,133,260.80 0.00001
Rp 111,200.00 Rp 4,069,920.00 0.00002
Rp 29,900.00 Rp 1,662,440.00 0.00001
Rp 128,900.00 Rp 111,292,260.00 0.00059
Rp 28,700.00 Rp 14,452,746.00 0.00008
Rp 899,700.00 Rp 17,259,844.80 0.00009
Rp 899,700.00 Rp 32,929,020.00 0.00017
Rp 3,079,351.62 Rp 132,917,133.43 0.00070
Rp 7,335,771.31 Rp 316,685,247.40 0.00167
Rp 7,335,771.31 Rp 433,081,930.75 0.00228
Rp 4,620,978.00 Rp 202,953,353.93 0.00107
Rp 93,133.70 Rp 14,901,392.00 0.00008

Rp 1,260,000.00 Rp 30,240,000.00 0.00016


Rp 53,800.00 Rp 2,044,400.00 0.00001
Rp 23,650.00 Rp 3,397,086.00 0.00002
RAB (RENCANA ANGGARAN BIAYA) page 738 of 1892
Rp 4,410.00 Rp 846,720.00 0.00000
Rp 141,450.00 Rp 5,643,855.00 0.00003

Rp 1,260,000.00 Rp 30,240,000.00 0.00016


Rp 53,800.00 Rp 2,044,400.00 0.00001
Rp 23,650.00 Rp 3,397,086.00 0.00002
Rp 4,410.00 Rp 846,720.00 0.00000
Rp 141,450.00 Rp 5,643,855.00 0.00003

Rp 1,260,000.00 Rp 30,240,000.00 0.00016


Rp 53,800.00 Rp 2,044,400.00 0.00001
Rp 23,650.00 Rp 3,397,086.00 0.00002
Rp 4,410.00 Rp 846,720.00 0.00000
Rp 141,450.00 Rp 5,643,855.00 0.00003

Rp 1,260,000.00 Rp 7,560,000.00 0.00004


Rp 53,800.00 Rp 1,022,200.00 0.00001
Rp 23,650.00 Rp 1,698,543.00 0.00001
Rp 4,410.00 Rp 423,360.00 0.00000
Rp 141,450.00 Rp 2,821,927.50 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 739 of 1892


Rp 56,900.00 Rp 30,732,543.50 0.00016
Rp 111,200.00 Rp 14,540,705.49 0.00008
Rp 111,200.00 Rp 35,140,312.00 0.00019
Rp 29,900.00 Rp 5,383,146.17 0.00003
Rp 29,900.00 Rp 45,683,986.75 0.00024
Rp 128,900.00 Rp 67,781,093.95 0.00036

Rp 28,700.00 Rp 65,416,168.30 0.00035


Rp 28,700.00 Rp 90,694,870.00 0.00048

Rp 94,500.00 Rp 49,593,127.50 0.00026


Rp 96,050.00 Rp 6,159,206.25 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 740 of 1892


Rp 88,950.00 Rp 15,877,575.00 0.00008
Rp 88,400.00 Rp 141,638,900.00 0.00075
Rp 105,800.00 Rp 47,275,672.00 0.00025
Rp 108,650.00 Rp 20,100,250.00 0.00011
Rp 104,750.00 Rp 45,561,850.50 0.00024
Rp 108,850.00 Rp 2,162,414.10 0.00001
Rp 110,950.00 Rp 5,414,360.00 0.00003

Rp 88,950.00 Rp 54,544,140.00 0.00029


Rp 88,400.00 Rp 126,977,760.00 0.00067
Rp 105,800.00 Rp 64,579,791.00 0.00034
Rp 108,650.00 Rp 21,186,750.00 0.00011
Rp 104,750.00 Rp 20,624,646.50 0.00011
Rp 108,850.00 Rp 2,060,965.90 0.00001
Rp 110,950.00 Rp 3,761,205.00 0.00002

Rp 88,950.00 Rp 51,181,830.00 0.00027


Rp 88,400.00 Rp 152,224,800.00 0.00080

RAB (RENCANA ANGGARAN BIAYA) page 741 of 1892


Rp 105,800.00 Rp 67,965,391.00 0.00036
Rp 108,650.00 Rp 19,339,700.00 0.00010
Rp 104,750.00 Rp 21,921,451.50 0.00012
Rp 108,850.00 Rp 4,654,426.00 0.00002
Rp 110,950.00 Rp 3,328,500.00 0.00002

Rp 88,950.00 Rp 43,710,030.00 0.00023


Rp 88,400.00 Rp 125,492,640.00 0.00066
Rp 105,800.00 Rp 65,902,291.00 0.00035
Rp 108,650.00 Rp 18,307,525.00 0.00010
Rp 104,750.00 Rp 28,525,415.25 0.00015
Rp 108,850.00 Rp 5,532,192.40 0.00003
Rp 110,950.00 Rp 532,560.00 0.00000

Rp 88,950.00 Rp 27,645,660.00 0.00015


Rp 88,400.00 Rp 112,126,560.00 0.00059
Rp 105,800.00 Rp 55,576,211.00 0.00029
Rp 108,650.00 Rp 18,633,475.00 0.00010

RAB (RENCANA ANGGARAN BIAYA) page 742 of 1892


Rp 104,750.00 Rp 16,758,324.00 0.00009
Rp 108,850.00 Rp 3,651,264.40 0.00002
Rp 110,950.00 Rp 1,065,120.00 0.00001
Rp 109,350.00 Rp 7,794,468.00 0.00004

Rp 88,950.00 Rp 38,212,920.00 0.00020


Rp 105,800.00 Rp 26,248,980.00 0.00014
Rp 104,750.00 Rp 2,398,775.00 0.00001

Rp 624,050.00 Rp 1,044,460,848.03 0.00551


Rp 956,000.00 Rp 5,305,800.00 0.00003
Rp 102,850.00 Rp 103,180,683.32 0.00054
Rp 54,900.00 Rp 110,153,028.96 0.00058
Rp 24,800.00 Rp 44,961,288.96 0.00024
Rp 115,850.00 Rp 24,069,135.02 0.00013
Rp 67,600.00 Rp 14,044,657.12 0.00007
Rp 107,600.00 Rp 66,274,821.20 0.00035

RAB (RENCANA ANGGARAN BIAYA) page 743 of 1892


Rp 50,550.00 Rp 62,271,230.70 0.00033
Rp 31,700.00 Rp 45,636,435.84 0.00024
Rp 79,700.00 Rp 92,659,220.00 0.00049
Rp 15,550.00 Rp 12,915,923.30 0.00007
Rp 19,700.00 Rp 19,842,785.60 0.00010
Rp 31,450.00 Rp 23,695,625.10 0.00013
Rp 39,200.00 Rp 4,489,968.00 0.00002
Rp 39,200.00 Rp 60,760,000.00 0.00032

Rp 102,850.00 Rp 158,438,182.87 0.00084


Rp 54,900.00 Rp 147,667,077.36 0.00078
Rp 24,800.00 Rp 59,680,193.12 0.00031
Rp 115,850.00 Rp 66,280,588.57 0.00035
Rp 67,600.00 Rp 77,351,191.84 0.00041
Rp 107,600.00 Rp 39,744,857.60 0.00021
Rp 50,550.00 Rp 37,343,913.60 0.00020
Rp 31,700.00 Rp 59,691,112.68 0.00031
Rp 79,700.00 Rp 119,797,867.00 0.00063
Rp 15,550.00 Rp 15,592,031.65 0.00008

RAB (RENCANA ANGGARAN BIAYA) page 744 of 1892


Rp 19,700.00 Rp 9,839,283.20 0.00005
Rp 39,200.00 Rp 4,489,968.00 0.00002

Rp 102,850.00 Rp 158,049,697.85 0.00083


Rp 54,900.00 Rp 149,461,209.36 0.00079
Rp 24,800.00 Rp 60,683,997.92 0.00032
Rp 115,850.00 Rp 67,950,380.96 0.00036
Rp 67,600.00 Rp 79,299,883.52 0.00042
Rp 107,600.00 Rp 5,107,126.40 0.00003
Rp 50,550.00 Rp 4,798,610.40 0.00003
Rp 31,700.00 Rp 40,195,701.44 0.00021
Rp 79,700.00 Rp 94,544,922.00 0.00050
Rp 15,550.00 Rp 17,823,721.00 0.00009
Rp 19,700.00 Rp 11,112,139.60 0.00006
Rp 39,200.00 Rp 4,489,968.00 0.00002
Rp 34,550.00 Rp 6,753,661.25 0.00004

Rp 102,850.00 Rp 140,157,891.28 0.00074


Rp 54,900.00 Rp 127,868,413.50 0.00067

RAB (RENCANA ANGGARAN BIAYA) page 745 of 1892


Rp 24,800.00 Rp 52,910,497.44 0.00028
Rp 115,850.00 Rp 56,704,265.38 0.00030
Rp 67,600.00 Rp 66,175,370.56 0.00035
Rp 107,600.00 Rp 5,107,126.40 0.00003
Rp 50,550.00 Rp 4,798,610.40 0.00003
Rp 31,700.00 Rp 34,041,159.12 0.00018
Rp 79,700.00 Rp 102,929,362.00 0.00054
Rp 15,550.00 Rp 16,738,999.65 0.00009
Rp 19,700.00 Rp 12,920,954.20 0.00007
Rp 39,200.00 Rp 4,489,968.00 0.00002
Rp 39,200.00 Rp 9,388,400.00 0.00005

Rp 102,850.00 Rp 22,444,976.07 0.00012


Rp 54,900.00 Rp 23,961,675.96 0.00013
Rp 24,800.00 Rp 10,824,217.92 0.00006
Rp 115,850.00 Rp 39,188,834.37 0.00021
Rp 67,600.00 Rp 45,734,401.44 0.00024
Rp 107,600.00 Rp 6,727,367.20 0.00004
Rp 50,550.00 Rp 6,320,974.20 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 746 of 1892


Rp 31,700.00 Rp 25,410,352.28 0.00013
Rp 79,700.00 Rp 340,041,644.00 0.00179
Rp 15,550.00 Rp 15,249,449.60 0.00008
Rp 19,700.00 Rp 10,811,675.20 0.00006
Rp 39,200.00 Rp 3,218,908.00 0.00002
Rp 34,550.00 Rp 7,404,065.00 0.00004

Rp 102,850.00 Rp 95,498,138.01 0.00050


Rp 54,900.00 Rp 101,951,342.28 0.00054
Rp 24,800.00 Rp 46,054,522.56 0.00024
Rp 107,600.00 Rp 6,727,367.20 0.00004
Rp 50,550.00 Rp 6,320,974.20 0.00003
Rp 31,700.00 Rp 3,963,894.80 0.00002
Rp 79,700.00 Rp 67,420,932.41 0.00036
Rp 15,550.00 Rp 3,610,810.30 0.00002
Rp 19,700.00 Rp 902,260.00 0.00000
Rp 39,200.00 Rp 3,488,800.00 0.00002
Rp 34,550.00 Rp 120,653,437.00 0.00064

RAB (RENCANA ANGGARAN BIAYA) page 747 of 1892


Rp 12,469,050.00 Rp 87,283,350.00 0.00046
Rp 9,178,250.00 Rp 45,891,250.00 0.00024
Rp 5,925,800.00 Rp 41,480,600.00 0.00022
Rp 7,939,650.00 Rp 15,879,300.00 0.00008
Rp 13,612,950.00 Rp 13,612,950.00 0.00007
Rp 2,664,850.00 Rp 13,324,250.00 0.00007
Rp 40,666,700.00 Rp 40,666,700.00 0.00021
Rp 5,019,350.00 Rp 20,077,400.00 0.00011
Rp 4,679,100.00 Rp 9,358,200.00 0.00005
Rp 1,777,100.00 Rp 3,554,200.00 0.00002
Rp 2,302,000.00 Rp 9,208,000.00 0.00005
Rp 2,045,550.00 Rp 4,091,100.00 0.00002
Rp 2,764,500.00 Rp 2,764,500.00 0.00001
Rp 1,143,100.00 Rp 9,144,800.00 0.00005
Rp 2,463,050.00 Rp 9,852,200.00 0.00005
Rp 53,730,950.00 Rp 107,461,900.00 0.00057
Rp 74,202,200.00 Rp 148,404,400.00 0.00078
Rp 98,673,500.00 Rp 197,347,000.00 0.00104

RAB (RENCANA ANGGARAN BIAYA) page 748 of 1892


Rp 106,579,300.00 Rp 106,579,300.00 0.00056
Rp 12,469,050.00 Rp 49,876,200.00 0.00026
Rp 11,834,750.00 Rp 94,678,000.00 0.00050
Rp 7,443,800.00 Rp 29,775,200.00 0.00016
Rp 5,925,800.00 Rp 41,480,600.00 0.00022
Rp 6,813,000.00 Rp 88,569,000.00 0.00047
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 13,612,950.00 Rp 13,612,950.00 0.00007
Rp 2,664,850.00 Rp 13,324,250.00 0.00007
Rp 6,535,050.00 Rp 117,630,900.00 0.00062
Rp 5,019,350.00 Rp 30,116,100.00 0.00016
Rp 4,679,100.00 Rp 9,358,200.00 0.00005
Rp 1,777,100.00 Rp 3,554,200.00 0.00002
Rp 6,173,600.00 Rp 6,173,600.00 0.00003
Rp 2,879,050.00 Rp 5,758,100.00 0.00003
Rp 2,302,000.00 Rp 9,208,000.00 0.00005
Rp 2,045,550.00 Rp 4,091,100.00 0.00002
Rp 2,764,500.00 Rp 2,764,500.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 749 of 1892


Rp 1,143,100.00 Rp 6,858,600.00 0.00004
Rp 2,463,050.00 Rp 9,852,200.00 0.00005
Rp 6,997,750.00 Rp 13,995,500.00 0.00007
Rp 6,666,200.00 Rp 26,664,800.00 0.00014
Rp 6,922,550.00 Rp 27,690,200.00 0.00015
Rp 50,109,300.00 Rp 100,218,600.00 0.00053

Rp 12,469,050.00 Rp 49,876,200.00 0.00026


Rp 9,178,250.00 Rp 9,178,250.00 0.00005
Rp 11,834,750.00 Rp 71,008,500.00 0.00037
Rp 7,443,800.00 Rp 29,775,200.00 0.00016
Rp 5,925,800.00 Rp 41,480,600.00 0.00022
Rp 6,813,000.00 Rp 88,569,000.00 0.00047
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 13,612,950.00 Rp 13,612,950.00 0.00007
Rp 2,664,850.00 Rp 13,324,250.00 0.00007
Rp 6,535,050.00 Rp 117,630,900.00 0.00062
Rp 5,019,350.00 Rp 30,116,100.00 0.00016
Rp 4,679,100.00 Rp 9,358,200.00 0.00005

RAB (RENCANA ANGGARAN BIAYA) page 750 of 1892


Rp 1,777,100.00 Rp 3,554,200.00 0.00002
Rp 2,879,050.00 Rp 5,758,100.00 0.00003
Rp 2,302,000.00 Rp 9,208,000.00 0.00005
Rp 2,045,550.00 Rp 4,091,100.00 0.00002
Rp 2,764,500.00 Rp 2,764,500.00 0.00001
Rp 1,143,100.00 Rp 6,858,600.00 0.00004
Rp 2,463,050.00 Rp 9,852,200.00 0.00005
Rp 6,997,750.00 Rp 13,995,500.00 0.00007
Rp 6,666,200.00 Rp 26,664,800.00 0.00014
Rp 6,922,550.00 Rp 27,690,200.00 0.00015
Rp 71,545,550.00 Rp 71,545,550.00 0.00038

Rp 12,469,050.00 Rp 37,407,150.00 0.00020


Rp 9,178,250.00 Rp 9,178,250.00 0.00005
Rp 11,834,750.00 Rp 59,173,750.00 0.00031
Rp 7,443,800.00 Rp 44,662,800.00 0.00024
Rp 5,925,800.00 Rp 59,258,000.00 0.00031
Rp 6,813,000.00 Rp 81,756,000.00 0.00043
Rp 7,939,650.00 Rp 7,939,650.00 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 751 of 1892


Rp 13,612,950.00 Rp 13,612,950.00 0.00007
Rp 11,549,850.00 Rp 11,549,850.00 0.00006
Rp 2,664,850.00 Rp 13,324,250.00 0.00007
Rp 6,535,050.00 Rp 163,376,250.00 0.00086
Rp 2,723,050.00 Rp 5,446,100.00 0.00003
Rp 5,019,350.00 Rp 10,038,700.00 0.00005
Rp 4,679,100.00 Rp 9,358,200.00 0.00005
Rp 1,777,100.00 Rp 3,554,200.00 0.00002
Rp 6,677,750.00 Rp 80,133,000.00 0.00042
Rp 2,029,800.00 Rp 8,119,200.00 0.00004
Rp 2,879,050.00 Rp 5,758,100.00 0.00003
Rp 2,302,000.00 Rp 9,208,000.00 0.00005
Rp 2,045,550.00 Rp 4,091,100.00 0.00002
Rp 2,764,500.00 Rp 2,764,500.00 0.00001
Rp 1,143,100.00 Rp 2,286,200.00 0.00001
Rp 2,463,050.00 Rp 9,852,200.00 0.00005
Rp 8,125,250.00 Rp 16,250,500.00 0.00009
Rp 8,125,250.00 Rp 8,125,250.00 0.00004
Rp 6,511,800.00 Rp 6,511,800.00 0.00003
Rp 3,910,550.00 Rp 3,910,550.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 752 of 1892


Rp 3,429,950.00 Rp 3,429,950.00 0.00002
Rp 7,989,300.00 Rp 7,989,300.00 0.00004
Rp 7,797,450.00 Rp 23,392,350.00 0.00012
Rp 12,000,000.00 Rp 12,000,000.00 0.00006

Rp 12,469,050.00 Rp 49,876,200.00 0.00026


Rp 9,178,250.00 Rp 9,178,250.00 0.00005
Rp 7,443,800.00 Rp 29,775,200.00 0.00016
Rp 5,925,800.00 Rp 47,406,400.00 0.00025
Rp 6,813,000.00 Rp 20,439,000.00 0.00011
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 13,612,950.00 Rp 13,612,950.00 0.00007
Rp 5,081,500.00 Rp 15,244,500.00 0.00008
Rp 16,932,250.00 Rp 152,390,250.00 0.00080
Rp 2,664,850.00 Rp 13,324,250.00 0.00007
Rp 17,199,950.00 Rp 17,199,950.00 0.00009
Rp 54,198,850.00 Rp 108,397,700.00 0.00057
Rp 40,912,250.00 Rp 81,824,500.00 0.00043
Rp 6,535,050.00 Rp 52,280,400.00 0.00028

RAB (RENCANA ANGGARAN BIAYA) page 753 of 1892


Rp 4,679,100.00 Rp 9,358,200.00 0.00005
Rp 1,777,100.00 Rp 3,554,200.00 0.00002
Rp 17,619,500.00 Rp 70,478,000.00 0.00037
Rp 2,591,800.00 Rp 46,652,400.00 0.00025
Rp 2,879,050.00 Rp 5,758,100.00 0.00003
Rp 2,302,000.00 Rp 9,208,000.00 0.00005
Rp 2,045,550.00 Rp 4,091,100.00 0.00002
Rp 2,764,500.00 Rp 2,764,500.00 0.00001

Rp 8,689,250.00 Rp 52,135,500.00 0.00028


Rp 5,921,850.00 Rp 17,765,550.00 0.00009
Rp 5,230,900.00 Rp 5,230,900.00 0.00003
Rp 2,664,850.00 Rp 7,994,550.00 0.00004
Rp 20,692,950.00 Rp 20,692,950.00 0.00011
Rp 2,879,050.00 Rp 5,758,100.00 0.00003
Rp 2,302,000.00 Rp 4,604,000.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 754 of 1892


Rp 118,050.00 Rp 137,319,537.60 0.00072
Rp 118,050.00 Rp 2,479,050.00 0.00001
Rp 118,050.00 Rp 2,006,850.00 0.00001
Rp 123,650.00 Rp 4,173,187.50 0.00002
Rp 11,750.00 Rp 10,367,612.50 0.00005
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 316,694,151.60 0.00167


Rp 118,050.00 Rp 2,479,050.00 0.00001
Rp 118,050.00 Rp 1,003,425.00 0.00001
Rp 123,650.00 Rp 7,789,950.00 0.00004
Rp 11,750.00 Rp 15,793,410.00 0.00008
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 316,694,151.60 0.00167


Rp 118,050.00 Rp 2,479,050.00 0.00001
Rp 118,050.00 Rp 1,003,425.00 0.00001
Rp 11,750.00 Rp 15,035,535.00 0.00008
Rp 281,800.00 Rp 281,800.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 755 of 1892


Rp 118,050.00 Rp 207,095,115.00 0.00109
Rp 118,050.00 Rp 2,479,050.00 0.00001
Rp 118,050.00 Rp 1,003,425.00 0.00001
Rp 11,750.00 Rp 9,790,687.50 0.00005
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 162,423,814.50 0.00086


Rp 118,050.00 Rp 38,956,500.00 0.00021
Rp 118,050.00 Rp 35,415,000.00 0.00019
Rp 328,950.00 Rp 11,842,200.00 0.00006
Rp 334,050.00 Rp 99,285,004.80 0.00052
Rp 11,750.00 Rp 18,841,783.00 0.00010
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 33,372,735.00 0.00018


Rp 11,750.00 Rp 1,797,750.00 0.00001

Rp 23,650.00 Rp 35,472,729.60 0.00019

RAB (RENCANA ANGGARAN BIAYA) page 756 of 1892


Rp 23,650.00 Rp 44,672,248.50 0.00024
Rp 7,875.00 Rp 3,780,000.00 0.00002

Rp 3,135,459.00 Rp 12,541,836.00 0.00007


Rp 1,714,219.20 Rp 6,856,876.80 0.00004
Rp 3,322,494.00 Rp 6,644,988.00 0.00004
Rp 2,360,742.00 Rp 4,721,484.00 0.00002
Rp 1,140,919.20 Rp 4,563,676.80 0.00002
Rp 4,998,429.00 Rp 9,996,858.00 0.00005
Rp 4,516,036.50 Rp 18,064,146.00 0.00010
Rp 4,824,564.60 Rp 9,649,129.20 0.00005
Rp 5,023,476.00 Rp 10,046,952.00 0.00005
Rp 6,066,144.00 Rp 12,132,288.00 0.00006
Rp 4,833,444.00 Rp 9,666,888.00 0.00005
Rp 20,167,700.00 Rp 80,670,800.00 0.00043
Rp 12,823,100.00 Rp 25,646,200.00 0.00014
Rp 11,703,050.00 Rp 23,406,100.00 0.00012

RAB (RENCANA ANGGARAN BIAYA) page 757 of 1892


Rp 11,303,900.00 Rp 45,215,600.00 0.00024
Rp 451,039.55 Rp 10,148,389.83 0.00005
Rp 451,039.55 Rp 7,509,808.47 0.00004
Rp 451,039.55 Rp 7,780,432.20 0.00004
Rp 451,039.55 Rp 5,412,474.58 0.00003
Rp 451,039.55 Rp 12,042,755.93 0.00006
Rp 451,039.55 Rp 6,210,814.58 0.00003

Rp 3,135,459.00 Rp 12,541,836.00 0.00007


Rp 1,714,219.20 Rp 6,856,876.80 0.00004
Rp 3,322,494.00 Rp 6,644,988.00 0.00004
Rp 2,360,742.00 Rp 4,721,484.00 0.00002
Rp 1,140,919.20 Rp 4,563,676.80 0.00002
Rp 4,998,429.00 Rp 9,996,858.00 0.00005
Rp 4,516,036.50 Rp 18,064,146.00 0.00010
Rp 4,824,564.60 Rp 9,649,129.20 0.00005
Rp 5,023,476.00 Rp 10,046,952.00 0.00005
Rp 6,066,144.00 Rp 12,132,288.00 0.00006
Rp 4,833,444.00 Rp 9,666,888.00 0.00005
Rp 20,167,700.00 Rp 80,670,800.00 0.00043

RAB (RENCANA ANGGARAN BIAYA) page 758 of 1892


Rp 12,823,100.00 Rp 25,646,200.00 0.00014
Rp 11,703,050.00 Rp 23,406,100.00 0.00012
Rp 11,303,900.00 Rp 45,215,600.00 0.00024
Rp 451,039.55 Rp 10,148,389.83 0.00005
Rp 451,039.55 Rp 7,509,808.47 0.00004
Rp 451,039.55 Rp 7,780,432.20 0.00004
Rp 451,039.55 Rp 5,412,474.58 0.00003
Rp 451,039.55 Rp 12,042,755.93 0.00006
Rp 451,039.55 Rp 6,210,814.58 0.00003

Rp 6,135,234.00 Rp 18,405,702.00 0.00010


Rp 3,135,459.00 Rp 3,135,459.00 0.00002
Rp 1,714,219.20 Rp 1,714,219.20 0.00001
Rp 2,360,742.00 Rp 2,360,742.00 0.00001
Rp 5,023,476.00 Rp 5,023,476.00 0.00003
Rp 6,066,144.00 Rp 12,132,288.00 0.00006
Rp 3,117,744.00 Rp 3,117,744.00 0.00002
Rp 3,006,048.60 Rp 3,006,048.60 0.00002
Rp 5,917,038.00 Rp 5,917,038.00 0.00003
Rp 4,771,170.00 Rp 9,542,340.00 0.00005

RAB (RENCANA ANGGARAN BIAYA) page 759 of 1892


Rp 1,292,709.00 Rp 2,585,418.00 0.00001
Rp 4,034,400.00 Rp 8,068,800.00 0.00004
Rp 3,075,087.00 Rp 3,075,087.00 0.00002
Rp 4,550,994.00 Rp 4,550,994.00 0.00002
Rp 2,174,043.00 Rp 2,174,043.00 0.00001
Rp 2,983,317.00 Rp 5,966,634.00 0.00003
Rp 6,552,000.00 Rp 13,104,000.00 0.00007
Rp 5,369,994.00 Rp 5,369,994.00 0.00003
Rp 2,874,182.40 Rp 2,874,182.40 0.00002
Rp 20,167,700.00 Rp 60,503,100.00 0.00032
Rp 11,303,900.00 Rp 22,607,800.00 0.00012
Rp 10,698,400.00 Rp 10,698,400.00 0.00006
Rp 21,563,000.00 Rp 21,563,000.00 0.00011
Rp 11,252,050.00 Rp 22,504,100.00 0.00012
Rp 20,923,800.00 Rp 41,847,600.00 0.00022
Rp 21,798,200.00 Rp 43,596,400.00 0.00023
Rp 4,077,050.00 Rp 4,077,050.00 0.00002
Rp 10,678,950.00 Rp 10,678,950.00 0.00006
Rp 2,272,000.00 Rp 2,272,000.00 0.00001
Rp 3,650,900.00 Rp 3,650,900.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 760 of 1892


Rp 17,797,900.00 Rp 17,797,900.00 0.00009
Rp 19,278,700.00 Rp 19,278,700.00 0.00010
Rp 2,065,700.00 Rp 2,065,700.00 0.00001
Rp 451,039.55 Rp 1,877,452.12 0.00001
Rp 451,039.55 Rp 1,945,108.05 0.00001
Rp 451,039.55 Rp 3,010,688.98 0.00002
Rp 451,039.55 Rp 1,552,703.64 0.00001
Rp 451,039.55 Rp 2,334,129.66 0.00001
Rp 451,039.55 Rp 2,435,613.56 0.00001

Rp 3,379,007.40 Rp 3,379,007.40 0.00002


Rp 13,979,750.00 Rp 41,939,250.00 0.00022
Rp 15,700,600.00 Rp 31,401,200.00 0.00017
Rp 100,095,350.00 Rp 100,095,350.00 0.00053

Rp 229,300.00 Rp 386,320,054.00 0.00204


Rp 322,700.00 Rp 11,260,616.50 0.00006

RAB (RENCANA ANGGARAN BIAYA) page 761 of 1892


Rp 299,150.00 Rp 106,826,764.15 0.00056
Rp 287,350.00 Rp 248,415,224.40 0.00131
Rp 397,450.00 Rp 32,584,540.80 0.00017
Rp 36,350.00 Rp 30,048,909.25 0.00016
Rp 287,350.00 Rp 15,723,792.00 0.00008
Rp 319,800.00 Rp 74,960,800.20 0.00040
Rp 424,350.00 Rp 10,736,055.00 0.00006
Rp 287,350.00 Rp 344,820.00 0.00000
Rp 861,800.00 Rp 2,569,887.60 0.00001

Rp 229,300.00 Rp 88,963,672.04 0.00047


Rp 322,700.00 Rp 25,999,939.00 0.00014
Rp 299,150.00 Rp 14,215,608.00 0.00007
Rp 299,150.00 Rp 56,757,729.50 0.00030
Rp 287,350.00 Rp 100,063,028.45 0.00053
Rp 287,350.00 Rp 313,427,012.50 0.00165
Rp 397,450.00 Rp 32,584,540.80 0.00017
Rp 36,350.00 Rp 37,510,946.30 0.00020
Rp 287,350.00 Rp 15,723,792.00 0.00008
RAB (RENCANA ANGGARAN BIAYA) page 762 of 1892
Rp 319,800.00 Rp 74,960,800.20 0.00040
Rp 66,500.00 Rp 4,232,392.50 0.00002
Rp 287,350.00 Rp 396,143,583.50 0.00209
Rp 424,350.00 Rp 10,736,055.00 0.00006
Rp 287,350.00 Rp 344,820.00 0.00000
Rp 861,800.00 Rp 6,722,040.00 0.00004

Rp 322,700.00 Rp 75,343,996.00 0.00040


Rp 299,150.00 Rp 97,777,177.50 0.00052
Rp 287,350.00 Rp 31,974,583.90 0.00017
Rp 287,350.00 Rp 239,637,256.60 0.00126
Rp 397,450.00 Rp 32,584,540.80 0.00017
Rp 36,350.00 Rp 37,090,522.20 0.00020
Rp 287,350.00 Rp 30,542,431.50 0.00016
Rp 319,800.00 Rp 213,695,796.60 0.00113
Rp 287,350.00 Rp 396,143,583.50 0.00209
Rp 424,350.00 Rp 10,736,055.00 0.00006
Rp 861,800.00 Rp 6,722,040.00 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 763 of 1892


Rp 322,700.00 Rp 75,343,996.00 0.00040
Rp 299,150.00 Rp 97,777,177.50 0.00052
Rp 287,350.00 Rp 31,974,583.90 0.00017
Rp 287,350.00 Rp 239,637,256.60 0.00126
Rp 397,450.00 Rp 32,584,540.80 0.00017
Rp 36,350.00 Rp 37,090,522.20 0.00020
Rp 287,350.00 Rp 30,542,431.50 0.00016
Rp 319,800.00 Rp 213,695,796.60 0.00113
Rp 287,350.00 Rp 396,143,583.50 0.00209
Rp 424,350.00 Rp 10,736,055.00 0.00006
Rp 861,800.00 Rp 6,722,040.00 0.00004

Rp 322,700.00 Rp 12,697,276.90 0.00007


Rp 299,150.00 Rp 58,466,773.45 0.00031
Rp 287,350.00 Rp 30,378,642.00 0.00016
Rp 287,350.00 Rp 158,341,344.00 0.00084
Rp 397,450.00 Rp 32,584,540.80 0.00017
Rp 36,350.00 Rp 29,497,298.00 0.00016
RAB (RENCANA ANGGARAN BIAYA) page 764 of 1892
Rp 287,350.00 Rp 27,954,557.40 0.00015
Rp 319,800.00 Rp 183,285,119.16 0.00097
Rp 814,250.00 Rp 492,254,837.50 0.00260
Rp 865,050.00 Rp 897,921,900.00 0.00474
Rp 424,350.00 Rp 10,736,055.00 0.00006
Rp 287,350.00 Rp 344,820.00 0.00000
Rp 861,800.00 Rp 2,569,887.60 0.00001

Rp 287,350.00 Rp 19,686,348.50 0.00010


Rp 36,350.00 Rp 1,275,885.00 0.00001

Rp 29,400.00 Rp 35,535,879.96 0.00019


Rp 23,100.00 Rp 64,426,985.70 0.00034
Rp 19,950.00 Rp 24,637,890.90 0.00013
Rp 19,950.00 Rp 33,207,573.00 0.00018

RAB (RENCANA ANGGARAN BIAYA) page 765 of 1892


Rp 29,400.00 Rp 45,776,770.20 0.00024
Rp 23,100.00 Rp 91,520,740.08 0.00048
Rp 19,950.00 Rp 55,365,479.40 0.00029
Rp 19,950.00 Rp 2,285,073.00 0.00001
Rp 65,750.00 Rp 3,597,840.00 0.00002

Rp 29,400.00 Rp 48,234,610.20 0.00025


Rp 23,100.00 Rp 70,930,065.36 0.00037
Rp 19,950.00 Rp 35,586,810.00 0.00019
Rp 19,950.00 Rp 2,285,073.00 0.00001
Rp 74,350.00 Rp 14,533,566.25 0.00008
Rp 65,750.00 Rp 6,988,567.50 0.00004

Rp 29,400.00 Rp 38,593,674.00 0.00020


Rp 23,100.00 Rp 73,598,711.34 0.00039
Rp 19,950.00 Rp 35,586,810.00 0.00019
Rp 19,950.00 Rp 7,063,098.00 0.00004
Rp 65,750.00 Rp 6,988,567.50 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 766 of 1892


Rp 29,400.00 Rp 37,360,726.20 0.00020
Rp 23,100.00 Rp 97,800,682.98 0.00052
Rp 19,950.00 Rp 46,665,164.70 0.00025
Rp 19,950.00 Rp 1,638,194.25 0.00001
Rp 74,350.00 Rp 15,933,205.00 0.00008
Rp 65,750.00 Rp 6,396,423.00 0.00003

Rp 29,400.00 Rp 25,066,440.00 0.00013


Rp 23,100.00 Rp 45,632,088.98 0.00024
Rp 19,950.00 Rp 5,639,865.00 0.00003
Rp 19,950.00 Rp 1,775,550.00 0.00001
Rp 74,350.00 Rp 259,640,609.00 0.00137

RAB (RENCANA ANGGARAN BIAYA) page 767 of 1892


Rp 146,541.67 Rp 2,061,533.51 0.00001
Rp 146,541.67 Rp 1,600,235.00 0.00001
Rp 146,541.67 Rp 1,601,773.69 0.00001
Rp 146,541.67 Rp 2,063,379.94 0.00001
Rp 146,541.67 Rp 1,030,920.63 0.00001
Rp 146,541.67 Rp 406,213.50 0.00000

Rp 146,541.67 Rp 1,601,773.69 0.00001


Rp 146,541.67 Rp 2,063,379.94 0.00001
Rp 146,541.67 Rp 1,030,920.63 0.00001
Rp 146,541.67 Rp 406,213.50 0.00000
Rp 146,541.67 Rp 2,061,533.51 0.00001
Rp 146,541.67 Rp 1,601,773.69 0.00001

Rp 146,541.67 Rp 1,601,773.69 0.00001


Rp 146,541.67 Rp 2,063,379.94 0.00001
Rp 146,541.67 Rp 1,030,920.63 0.00001
Rp 146,541.67 Rp 406,213.50 0.00000
Rp 146,541.67 Rp 2,061,533.51 0.00001
Rp 146,541.67 Rp 1,601,773.69 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 768 of 1892


Rp 146,541.67 Rp 1,601,773.69 0.00001
Rp 146,541.67 Rp 2,063,379.94 0.00001
Rp 146,541.67 Rp 1,030,920.63 0.00001
Rp 146,541.67 Rp 406,213.50 0.00000
Rp 146,541.67 Rp 2,061,533.51 0.00001
Rp 146,541.67 Rp 1,601,773.69 0.00001

Rp 146,541.67 Rp 617,013.69 0.00000

Rp 146,541.67 Rp 1,560,229.13 0.00001


Rp 146,541.67 Rp 416,178.33 0.00000
Rp 146,541.67 Rp 1,601,773.69 0.00001
Rp 433,586.21 Rp 4,215,758.69 0.00002
Rp 433,586.21 Rp 6,380,090.96 0.00003
Rp 433,586.21 Rp 550,871.28 0.00000

Rp 146,541.67 Rp 416,178.33 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 769 of 1892


Rp 146,541.67 Rp 1,601,773.69 0.00001
Rp 146,541.67 Rp 3,203,547.38 0.00002
Rp 433,586.21 Rp 4,215,758.69 0.00002
Rp 433,586.21 Rp 6,380,090.96 0.00003
Rp 433,586.21 Rp 550,871.28 0.00000

Rp 146,541.67 Rp 416,178.33 0.00000


Rp 146,541.67 Rp 1,601,773.69 0.00001
Rp 146,541.67 Rp 3,203,547.38 0.00002
Rp 433,586.21 Rp 4,215,758.69 0.00002
Rp 433,586.21 Rp 6,380,090.96 0.00003
Rp 433,586.21 Rp 550,871.28 0.00000

Rp 146,541.67 Rp 416,178.33 0.00000


Rp 146,541.67 Rp 1,601,773.69 0.00001
Rp 146,541.67 Rp 3,203,547.38 0.00002
Rp 433,586.21 Rp 4,215,758.69 0.00002
Rp 433,586.21 Rp 6,380,090.96 0.00003
Rp 433,586.21 Rp 550,871.28 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 770 of 1892


Rp 146,541.67 Rp 416,178.33 0.00000
Rp 146,541.67 Rp 1,601,773.69 0.00001
Rp 146,541.67 Rp 3,203,547.38 0.00002
Rp 433,586.21 Rp 4,215,758.69 0.00002
Rp 433,586.21 Rp 6,380,090.96 0.00003
Rp 433,586.21 Rp 550,871.28 0.00000

Rp 146,541.67 Rp 828,583.22 0.00000

Rp 4,250,080.00 Rp 144,596,646.77 0.00076


Rp 4,250,080.00 Rp 44,625,840.00 0.00024

Rp 4,250,080.00 Rp 144,596,646.77 0.00076


Rp 4,250,080.00 Rp 44,625,840.00 0.00024

RAB (RENCANA ANGGARAN BIAYA) page 771 of 1892


Rp 433,586.21 Rp 7,457,682.76 0.00004

Rp 433,586.21 Rp 7,457,682.76 0.00004

Rp 433,586.21 Rp 7,457,682.76 0.00004

Rp 433,586.21 Rp 3,232,385.17 0.00002

Rp 433,586.21 Rp 3,232,385.17 0.00002

Rp 433,586.21 Rp 3,938,046.72 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 772 of 1892


Rp 244,670.86 Rp 5,835,400.00 0.00003
Rp 23,650.00 Rp 986,595.23 0.00001
Rp 10,570.08 Rp 21,140.16 0.00000
Rp 31,710.24 Rp 63,420.49 0.00000
Rp 1,004,157.70 Rp 1,280,301.06 0.00001

Rp 244,670.86 Rp 5,810,932.91 0.00003


Rp 1,004,157.70 Rp 1,280,301.06 0.00001

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 53,707,212.00 0.00028

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 53,707,212.00 0.00028

Rp 2,550,200.00 Rp 40,280,409.00 0.00021

RAB (RENCANA ANGGARAN BIAYA) page 773 of 1892


Rp 2,550,200.00 Rp 53,707,212.00 0.00028

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 53,707,212.00 0.00028

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 53,707,212.00 0.00028
Rp 1,890,000.00 Rp 16,059,592.71 0.00008

Rp 29,461,600.00 Rp 58,923,200.00 0.00031

Rp 36,106,300.00 Rp 288,850,400.00 0.00152

Rp 8,368,400.00 Rp 133,894,400.00 0.00071

RAB (RENCANA ANGGARAN BIAYA) page 774 of 1892


Rp 8,395,600.00 Rp 67,164,800.00 0.00035

Rp 9,933,150.00 Rp 59,598,900.00 0.00031


Rp 1,333,668,150.00 Rp 1,333,668,150.00 0.00704

Rp 87,765,800.00 Rp 526,594,800.00 0.00278

Rp 20,707,050.00 Rp 207,070,500.00 0.00109


Rp 5,775,000.00 Rp 3,465,000.00 0.00002
Rp 23,650.00 Rp 21,249,666.90 0.00011
Rp 23,650.00 Rp 7,147,559.76 0.00004
Rp 23,650.00 Rp 4,459,259.26 0.00002
Rp 23,650.00 Rp 11,510,928.00 0.00006
Rp 26,250.00 Rp 4,725,000.00 0.00002

Rp 636,200.00 Rp 317,379,503.50 0.00167

RAB (RENCANA ANGGARAN BIAYA) page 775 of 1892


Rp 7,875,000.00 Rp 7,875,000.00 0.00004

Rp 15,550.00 Rp 2,008,282.50 0.00001


Rp 627,243.75 Rp 13,799,362.50 0.00007

Rp 29,400.00 Rp 12,272,736.00 0.00006

Rp 29,400.00 Rp 8,043,840.00 0.00004

Rp 29,400.00 Rp 5,586,000.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 776 of 1892


Rp 23,650.00 Rp 234,581,303.88 0.00124
Rp 23,650.00 Rp 29,379,931.93 0.00016
Rp 3,675.00 Rp 21,226,800.00 0.00011
Rp 238,600.00 Rp 36,983,000.00 0.00020
Rp 814,250.00 Rp 126,208,750.00 0.00067
Rp 5,565.00 Rp 4,017,930.00 0.00002

Rp 38,808.00 Rp 3,398,804.64 0.00002


Rp 238,600.00 Rp 2,448,036.00 0.00001
Rp 814,250.00 Rp 8,354,205.00 0.00004

Rp 24,976.67 Rp 59,957,737.17 0.00032

RAB (RENCANA ANGGARAN BIAYA) page 777 of 1892


Rp 23,650.00 Rp 6,390,230.00 0.00003
Rp 75,584.52 Rp 38,862,536.95 0.00021
Rp 112,000.00 Rp 30,369,920.00 0.00016
Rp 180,000.00 Rp 43,740,000.00 0.00023
Rp 5,565.00 Rp 979,440.00 0.00001

Rp 24,976.67 Rp 12,299,509.73 0.00006


Rp 23,650.00 Rp 1,158,850.00 0.00001
Rp 75,584.52 Rp 12,217,481.86 0.00006
Rp 112,000.00 Rp 18,103,680.00 0.00010
Rp 1,469,900.00 Rp 3,895,235.00 0.00002
Rp 1,469,900.00 Rp 13,185,003.00 0.00007
Rp 5,565.00 Rp 166,950.00 0.00000

Rp 5,000,000.00 Rp 5,000,000.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 778 of 1892


Rp 24,976.67 Rp 5,894,493.33 0.00003
Rp 75,584.52 Rp 2,286,431.74 0.00001
Rp 92,381.08 Rp 2,794,527.68 0.00001

Rp 38,631,550.00 Rp 38,631,550.00 0.00020


Rp 38,246,150.00 Rp 38,246,150.00 0.00020
Rp 16,942,800.00 Rp 33,885,600.00 0.00018
Rp 6,601,050.00 Rp 13,202,100.00 0.00007
Rp 22,972,300.00 Rp 22,972,300.00 0.00012

RAB (RENCANA ANGGARAN BIAYA) page 779 of 1892


Rp 166,432,050.00 Rp 166,432,050.00 0.00088

Rp 228,100.00 Rp 3,809,270.00 0.00002

Rp 371,700.00 Rp 743,400.00 0.00000

Rp 57,078.44 Rp 1,826,510.00 0.00001

Rp 3,329,575.52 Rp 39,954,906.18 0.00021

Rp 37,462,450.00 Rp 37,462,450.00 0.00020

Rp 60,170,150.00 Rp 60,170,150.00 0.00032

RAB (RENCANA ANGGARAN BIAYA) page 780 of 1892


Rp 8,086,111.97 Rp 32,344,447.86 0.00017

Rp 34,522,941.55 Rp 34,522,941.55 0.00018


Rp 1,289,497.03 Rp 20,631,952.51 0.00011
Rp 693,503.01 Rp 2,080,509.04 0.00001
Rp 600,274.90 Rp 9,004,123.50 0.00005
Rp 3,891,711.64 Rp 3,891,711.64 0.00002
Rp 2,378,268.23 Rp 7,134,804.68 0.00004
Rp 237,826.82 Rp 237,826.82 0.00000
Rp 23,782.68 Rp 23,782.68 0.00000
Rp 23,782.68 Rp 23,782.68 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 781 of 1892


Rp 23,782.68 Rp 23,782.68 0.00000
Rp 23,782.68 Rp 23,782.68 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 23,782.68 0.00000
Rp 109,400.34 Rp 1,094,003.38 0.00001
Rp 903,741.93 Rp 903,741.93 0.00000
Rp 8,086,111.97 Rp 8,086,111.97 0.00004
Rp 2,853,921.87 Rp 2,853,921.87 0.00002
Rp 1,426,960.94 Rp 1,426,960.94 0.00001
Rp 130,995.01 Rp 3,143,880.33 0.00002

Rp 8,086,111.97 Rp 8,086,111.97 0.00004

Rp 57,837,321.17 Rp 115,674,642.34 0.00061


Rp 9,727,117.04 Rp 19,454,234.08 0.00010
Rp 986,505.66 Rp 1,973,011.32 0.00001
Rp 156,965.70 Rp 313,931.41 0.00000
Rp 56,127.13 Rp 168,381.39 0.00000
Rp 7,610.46 Rp 38,052.29 0.00000
Rp 7,610.46 Rp 38,052.29 0.00000
RAB (RENCANA ANGGARAN BIAYA) page 782 of 1892
Rp 61,834.97 Rp 185,504.92 0.00000
Rp 3,891,711.64 Rp 3,891,711.64 0.00002
Rp 61,834.97 Rp 61,834.97 0.00000
Rp 33,295.76 Rp 33,295.76 0.00000
Rp 33,295.76 Rp 33,295.76 0.00000
Rp 42,808.83 Rp 42,808.83 0.00000
Rp 1,664,787.76 Rp 1,664,787.76 0.00001
Rp 309,174.87 Rp 618,349.74 0.00000
Rp 80,861.12 Rp 323,444.48 0.00000
Rp 934,183.76 Rp 934,183.76 0.00000
Rp 4,756,536.45 Rp 4,756,536.45 0.00003
Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 8,086,111.97 Rp 16,172,223.93 0.00009

Rp 9,037,419.26 Rp 9,037,419.26 0.00005


Rp 6,183,497.39 Rp 6,183,497.39 0.00003
Rp 4,756,536.45 Rp 57,078,437.40 0.00030
Rp 3,329,575.52 Rp 39,954,906.18 0.00021
RAB (RENCANA ANGGARAN BIAYA) page 783 of 1892
Rp 1,213,392.45 Rp 14,560,709.38 0.00008
Rp 237,826.82 Rp 237,826.82 0.00000
Rp 23,782.68 Rp 285,392.19 0.00000
Rp 236,875.52 Rp 236,875.52 0.00000
Rp 236,875.52 Rp 473,751.03 0.00000
Rp 475,653.65 Rp 951,307.29 0.00001
Rp 237,826.82 Rp 475,653.65 0.00000
Rp 118,913.41 Rp 118,913.41 0.00000
Rp 4,756,536.45 Rp 4,756,536.45 0.00003
Rp 4,756,536.45 Rp 4,756,536.45 0.00003
Rp 155,279,986.33

Rp 1,203,403.72 Rp 1,203,403.72 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 644,986.34 0.00000
Rp 107,497.72 Rp 644,986.34 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 784 of 1892


Rp 142,696.09 Rp 142,696.09 0.00000
Rp 17,266.23 Rp 1,001,441.18 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,687,443.09 0.00001
Rp 107,497.72 Rp 967,479.51 0.00001
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 3,365,534.93 0.00002
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,687,443.09 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 785 of 1892


Rp 107,497.72 Rp 859,981.79 0.00000
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 3,593,277.90 0.00002
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,042,456.75 0.00001
Rp 107,497.72 Rp 967,479.51 0.00001
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 786 of 1892


Rp 50,609.55 Rp 3,821,020.86 0.00002
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 1,504,968.13 0.00001
Rp 107,497.72 Rp 644,986.34 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 4,048,763.83 0.00002
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,203,403.72 Rp 1,203,403.72 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 107,497.72 Rp 752,484.07 0.00000
Rp 107,497.72 Rp 429,990.90 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 787 of 1892


Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 16,077.09 Rp 1,358,514.38 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 2,097,632.57 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 1,800,824.70 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 788 of 1892


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 2,097,632.57 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 789 of 1892


Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 1,800,824.70 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 1,748,027.15 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 790 of 1892


Rp 1,828,127.22 Rp 1,828,127.22 0.00001
Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 1,800,824.70 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 1,048,816.29 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 791 of 1892


Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 1,800,824.70 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,203,403.72 Rp 1,203,403.72 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 594,852.45 Rp 2,974,262.24 0.00002
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 792 of 1892


Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 16,077.09 Rp 1,390,668.56 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 693,503.01 Rp 693,503.01 0.00000
Rp 495,631.10 Rp 6,938,835.37 0.00004
Rp 107,497.72 Rp 322,493.17 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 16,077.09 Rp 32,154.19 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 1,200,549.80 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 793 of 1892


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 5,022,902.49 0.00003
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 195,650.00 Rp 11,347,700.00 0.00006

Rp 195,650.00 Rp 13,010,725.00 0.00007

Rp 195,650.00 Rp 13,891,150.00 0.00007

Rp 195,650.00 Rp 14,771,575.00 0.00008

RAB (RENCANA ANGGARAN BIAYA) page 794 of 1892


Rp 195,650.00 Rp 15,652,000.00 0.00008

Rp 77,100.00 Rp 6,514,950.00 0.00003

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 35,006,925.00 0.00018

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 37,306,650.00 0.00020

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 39,606,375.00 0.00021

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 41,906,100.00 0.00022

RAB (RENCANA ANGGARAN BIAYA) page 795 of 1892


Rp 77,100.00 Rp 6,669,150.00 0.00004

Rp 77,100.00 Rp 154,200.00 0.00000

Rp 511,050.00 Rp 65,414,400.00 0.00035

Rp 3,585,850.00 Rp 466,160,500.00 0.00246

Rp 3,585,850.00 Rp 28,686,800.00 0.00015

Rp 3,585,850.00 Rp 50,201,900.00 0.00026

RAB (RENCANA ANGGARAN BIAYA) page 796 of 1892


Rp 56,900.00 Rp 9,431,744.00 0.00005
Rp 111,200.00 Rp 2,633,216.00 0.00001
Rp 29,900.00 Rp 2,997,630.48 0.00002
Rp 55,650.00 Rp 32,944,800.00 0.00017
Rp 23,782.68 Rp 1,331,830.21 0.00001
Rp 713,480.47 Rp 1,426,960.94 0.00001
Rp 171,403.45 Rp 342,806.90 0.00000

Rp 239,240.61 Rp 40,431,663.62 0.00021


Rp 267,500.00 Rp 3,210,000.00 0.00002
Rp 239,240.61 Rp 1,913,924.91 0.00001
Rp 1,396,550.00 Rp 15,362,050.00 0.00008
Rp 619,750.00 Rp 34,706,000.00 0.00018
Rp 679,650.00 Rp 50,973,750.00 0.00027
Rp 280,400.00 Rp 6,168,800.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 797 of 1892


Rp 242,050.00 Rp 1,210,250.00 0.00001
Rp 53,600.00 Rp 696,800.00 0.00000
Rp 76,300.00 Rp 686,700.00 0.00000
Rp 116,650.00 Rp 466,600.00 0.00000
Rp 64,150.00 Rp 192,450.00 0.00000
Rp 925,550.00 Rp 7,404,400.00 0.00004
Rp 66,300.00 Rp 795,600.00 0.00000
Rp 264,950.00 Rp 8,478,400.00 0.00004

Rp 239,240.61 Rp 78,949,402.34 0.00042


Rp 267,500.00 Rp 42,800,000.00 0.00023
Rp 239,240.61 Rp 4,784,812.26 0.00003
Rp 1,396,550.00 Rp 100,551,600.00 0.00053
Rp 679,650.00 Rp 127,094,550.00 0.00067
Rp 280,400.00 Rp 12,057,200.00 0.00006
Rp 242,050.00 Rp 968,200.00 0.00001
Rp 4,424,050.00 Rp 53,088,600.00 0.00028
Rp 233,308.11 Rp 1,399,848.68 0.00001
Rp 638,250.00 Rp 1,914,750.00 0.00001
Rp 753,350.00 Rp 2,260,050.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 798 of 1892


Rp 53,600.00 Rp 1,768,800.00 0.00001
Rp 76,300.00 Rp 2,289,000.00 0.00001
Rp 116,650.00 Rp 699,900.00 0.00000
Rp 119,350.00 Rp 358,050.00 0.00000
Rp 925,550.00 Rp 18,511,000.00 0.00010
Rp 66,300.00 Rp 6,762,600.00 0.00004
Rp 203,850.00 Rp 5,707,800.00 0.00003
Rp 925,550.00 Rp 925,550.00 0.00000
Rp 264,950.00 Rp 21,196,000.00 0.00011

Rp 239,240.61 Rp 79,667,124.18 0.00042


Rp 267,500.00 Rp 40,392,500.00 0.00021
Rp 239,240.61 Rp 4,784,812.26 0.00003
Rp 1,396,550.00 Rp 100,551,600.00 0.00053
Rp 679,650.00 Rp 119,618,400.00 0.00063
Rp 280,400.00 Rp 12,057,200.00 0.00006
Rp 257,550.00 Rp 4,635,900.00 0.00002
Rp 242,050.00 Rp 968,200.00 0.00001
Rp 925,550.00 Rp 9,255,500.00 0.00005
Rp 2,297,500.00 Rp 4,595,000.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 799 of 1892


Rp 4,424,050.00 Rp 8,848,100.00 0.00005
Rp 638,250.00 Rp 1,914,750.00 0.00001
Rp 753,350.00 Rp 2,260,050.00 0.00001
Rp 53,600.00 Rp 1,768,800.00 0.00001
Rp 76,300.00 Rp 2,212,700.00 0.00001
Rp 116,650.00 Rp 699,900.00 0.00000
Rp 119,350.00 Rp 358,050.00 0.00000
Rp 925,550.00 Rp 18,511,000.00 0.00010
Rp 66,300.00 Rp 6,298,500.00 0.00003
Rp 203,850.00 Rp 5,707,800.00 0.00003
Rp 264,950.00 Rp 21,196,000.00 0.00011

Rp 239,240.61 Rp 76,556,996.21 0.00040


Rp 267,500.00 Rp 31,030,000.00 0.00016
Rp 239,240.61 Rp 4,545,571.65 0.00002
Rp 1,396,550.00 Rp 121,499,850.00 0.00064
Rp 679,650.00 Rp 100,588,200.00 0.00053
Rp 280,400.00 Rp 10,935,600.00 0.00006
Rp 242,050.00 Rp 968,200.00 0.00001
Rp 4,424,050.00 Rp 159,265,800.00 0.00084

RAB (RENCANA ANGGARAN BIAYA) page 800 of 1892


Rp 638,250.00 Rp 1,914,750.00 0.00001
Rp 753,350.00 Rp 2,260,050.00 0.00001
Rp 53,600.00 Rp 1,876,000.00 0.00001
Rp 76,300.00 Rp 1,754,900.00 0.00001
Rp 116,650.00 Rp 233,300.00 0.00000
Rp 167,650.00 Rp 167,650.00 0.00000
Rp 119,350.00 Rp 358,050.00 0.00000
Rp 925,550.00 Rp 17,585,450.00 0.00009
Rp 66,300.00 Rp 6,895,200.00 0.00004
Rp 203,850.00 Rp 407,700.00 0.00000
Rp 925,550.00 Rp 3,702,200.00 0.00002
Rp 264,950.00 Rp 20,136,200.00 0.00011

Rp 239,240.61 Rp 57,896,228.38 0.00031


Rp 267,500.00 Rp 22,202,500.00 0.00012
Rp 239,240.61 Rp 4,545,571.65 0.00002
Rp 1,396,550.00 Rp 40,499,950.00 0.00021
Rp 679,650.00 Rp 95,830,650.00 0.00051
Rp 280,400.00 Rp 7,851,200.00 0.00004
Rp 242,050.00 Rp 484,100.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 801 of 1892


Rp 1,409,728.40 Rp 8,458,370.40 0.00004
Rp 1,288,448.40 Rp 7,730,690.40 0.00004
Rp 1,167,168.40 Rp 7,003,010.40 0.00004
Rp 1,045,888.40 Rp 6,275,330.40 0.00003
Rp 924,608.40 Rp 5,547,650.40 0.00003
Rp 803,328.40 Rp 4,819,970.40 0.00003
Rp 638,250.00 Rp 1,914,750.00 0.00001
Rp 753,350.00 Rp 2,260,050.00 0.00001
Rp 53,600.00 Rp 857,600.00 0.00000
Rp 76,300.00 Rp 1,373,400.00 0.00001
Rp 116,650.00 Rp 233,300.00 0.00000
Rp 119,350.00 Rp 119,350.00 0.00000
Rp 925,550.00 Rp 17,585,450.00 0.00009
Rp 66,300.00 Rp 5,502,900.00 0.00003
Rp 264,950.00 Rp 20,136,200.00 0.00011

Rp 239,240.61 Rp 10,526,586.98 0.00006


Rp 679,650.00 Rp 18,350,550.00 0.00010
Rp 242,050.00 Rp 968,200.00 0.00001
Rp 2,297,500.00 Rp 9,190,000.00 0.00005

RAB (RENCANA ANGGARAN BIAYA) page 802 of 1892


Rp 426,341.50 Rp 426,341.50 0.00000
Rp 519,677.60 Rp 519,677.60 0.00000
Rp 883,285.00 Rp 883,285.00 0.00000
Rp 1,161,485.00 Rp 1,161,485.00 0.00001
Rp 1,376,255.40 Rp 1,376,255.40 0.00001
Rp 1,662,523.20 Rp 1,662,523.20 0.00001
Rp 1,746,539.60 Rp 1,746,539.60 0.00001
Rp 1,810,942.90 Rp 1,810,942.90 0.00001
Rp 1,924,448.50 Rp 1,924,448.50 0.00001
Rp 53,600.00 Rp 268,000.00 0.00000
Rp 76,300.00 Rp 228,900.00 0.00000

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

Rp 334,400.00 Rp 334,400.00 0.00000


Rp 87,800.00 Rp 87,800.00 0.00000
Rp 409,062.13 Rp 409,062.13 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 803 of 1892


Rp 334,400.00 Rp 8,360,000.00 0.00004
Rp 87,800.00 Rp 2,195,000.00 0.00001
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 58,850.00 Rp 588,500.00 0.00000
Rp 409,062.13 Rp 10,226,553.37 0.00005

Rp 334,400.00 Rp 8,025,600.00 0.00004


Rp 87,800.00 Rp 2,107,200.00 0.00001
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 58,850.00 Rp 1,177,000.00 0.00001
Rp 409,062.13 Rp 9,817,491.23 0.00005

Rp 334,400.00 Rp 6,019,200.00 0.00003


Rp 87,800.00 Rp 1,580,400.00 0.00001
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 42,100.00 Rp 1,263,000.00 0.00001
Rp 6,477,213.51 Rp 6,477,213.51 0.00003
Rp 3,611,162.47 Rp 3,611,162.47 0.00002
Rp 409,062.13 Rp 7,363,118.42 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 804 of 1892


Rp 334,400.00 Rp 3,009,600.00 0.00002
Rp 87,800.00 Rp 790,200.00 0.00000
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 58,850.00 Rp 1,177,000.00 0.00001
Rp 6,477,213.51 Rp 12,954,427.02 0.00007
Rp 3,611,162.47 Rp 7,222,324.95 0.00004
Rp 409,062.13 Rp 3,681,559.21 0.00002

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 5,232,150.00 Rp 5,232,150.00 0.00003


Rp 11,809,450.00 Rp 11,809,450.00 0.00006
Rp 19,195,850.00 Rp 38,391,700.00 0.00020
Rp 604,730,550.00 Rp 604,730,550.00 0.00319

RAB (RENCANA ANGGARAN BIAYA) page 805 of 1892


Rp 49,405,200.00 Rp 49,405,200.00 0.00026
Rp 4,708,950.00 Rp 9,417,900.00 0.00005
Rp 5,232,150.00 Rp 5,232,150.00 0.00003
Rp 15,068,700.00 Rp 15,068,700.00 0.00008
Rp 72,204,200.00 Rp 72,204,200.00 0.00038
Rp 3,139,300.00 Rp 3,139,300.00 0.00002
Rp 7,848,250.00 Rp 7,848,250.00 0.00004
Rp 47,400.00 Rp 7,299,600.00 0.00004
Rp 28,539,218.70 Rp 28,539,218.70 0.00015
Rp 2,853,921.87 Rp 2,853,921.87 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 806 of 1892


Rp 5,925,750.00 Rp 23,703,000.00 0.00013
Rp 5,776,300.00 Rp 23,105,200.00 0.00012
Rp 47,400.00 Rp 26,070,000.00 0.00014
Rp 713,480.47 Rp 713,480.47 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000
Rp 1,902,614.58 Rp 1,902,614.58 0.00001
Rp 237,826.82 Rp 951,307.29 0.00001

Rp 405,550.00 Rp 12,977,600.00 0.00007


Rp 162,000.00 Rp 4,374,000.00 0.00002
Rp 2,234,100.00 Rp 11,170,500.00 0.00006
Rp 1,569,650.00 Rp 3,139,300.00 0.00002
Rp 63,737.59 Rp 2,039,602.83 0.00001
Rp 4,499,650.00 Rp 8,999,300.00 0.00005
Rp 1,308,000.00 Rp 2,616,000.00 0.00001

Rp 5,925,750.00 Rp 29,628,750.00 0.00016


Rp 5,776,300.00 Rp 28,881,500.00 0.00015

RAB (RENCANA ANGGARAN BIAYA) page 807 of 1892


Rp 237,826.82 Rp 1,189,134.11 0.00001
Rp 47,400.00 Rp 31,758,000.00 0.00017
Rp 713,480.47 Rp 713,480.47 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000
Rp 1,902,614.58 Rp 1,902,614.58 0.00001

Rp 405,550.00 Rp 12,572,050.00 0.00007


Rp 162,000.00 Rp 4,212,000.00 0.00002
Rp 2,234,100.00 Rp 11,170,500.00 0.00006
Rp 1,569,650.00 Rp 3,139,300.00 0.00002
Rp 4,499,650.00 Rp 8,999,300.00 0.00005
Rp 63,737.59 Rp 1,975,865.24 0.00001
Rp 1,308,000.00 Rp 2,616,000.00 0.00001

Rp 5,925,750.00 Rp 35,554,500.00 0.00019


Rp 5,776,300.00 Rp 34,657,800.00 0.00018
Rp 237,826.82 Rp 1,426,960.94 0.00001
Rp 47,400.00 Rp 38,868,000.00 0.00021
Rp 713,480.47 Rp 713,480.47 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 808 of 1892


Rp 475,653.65 Rp 475,653.65 0.00000
Rp 1,902,614.58 Rp 1,902,614.58 0.00001

Rp 405,550.00 Rp 11,760,950.00 0.00006


Rp 162,000.00 Rp 4,212,000.00 0.00002
Rp 2,234,100.00 Rp 6,702,300.00 0.00004
Rp 1,569,650.00 Rp 3,139,300.00 0.00002
Rp 4,499,650.00 Rp 8,999,300.00 0.00005
Rp 63,737.59 Rp 1,848,390.06 0.00001
Rp 1,308,000.00 Rp 2,616,000.00 0.00001

Rp 5,925,750.00 Rp 29,628,750.00 0.00016


Rp 5,776,300.00 Rp 28,881,500.00 0.00015
Rp 237,826.82 Rp 1,189,134.11 0.00001
Rp 47,400.00 Rp 33,180,000.00 0.00018
Rp 713,480.47 Rp 713,480.47 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000
Rp 1,902,614.58 Rp 1,902,614.58 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 809 of 1892


Rp 405,550.00 Rp 8,516,550.00 0.00004
Rp 162,000.00 Rp 2,106,000.00 0.00001
Rp 2,234,100.00 Rp 17,872,800.00 0.00009
Rp 2,302,150.00 Rp 2,302,150.00 0.00001
Rp 6,278,600.00 Rp 6,278,600.00 0.00003
Rp 63,737.59 Rp 1,338,489.36 0.00001
Rp 1,308,000.00 Rp 1,308,000.00 0.00001

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 759,550.00 Rp 5,316,850.00 0.00003


Rp 6,225,650.00 Rp 31,128,250.00 0.00016
Rp 6,173,400.00 Rp 12,346,800.00 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 810 of 1892


Rp 759,550.00 Rp 8,355,050.00 0.00004
Rp 3,196,050.00 Rp 15,980,250.00 0.00008
Rp 6,173,400.00 Rp 24,693,600.00 0.00013
Rp 6,225,650.00 Rp 12,451,300.00 0.00007

Rp 759,550.00 Rp 5,316,850.00 0.00003


Rp 3,196,050.00 Rp 9,588,150.00 0.00005
Rp 6,173,400.00 Rp 24,693,600.00 0.00013
Rp 12,609,550.00 Rp 12,609,550.00 0.00007
Rp 4,290,350.00 Rp 4,290,350.00 0.00002
Rp 63,737.59 Rp 2,931,929.07 0.00002
Rp 237,826.82 Rp 475,653.65 0.00000

Rp 759,550.00 Rp 3,797,750.00 0.00002


Rp 3,196,050.00 Rp 9,588,150.00 0.00005
Rp 6,173,400.00 Rp 12,346,800.00 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 811 of 1892


Rp 759,550.00 Rp 5,316,850.00 0.00003
Rp 3,196,050.00 Rp 22,372,350.00 0.00012

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 3,767,150.00 Rp 3,767,150.00 0.00002


Rp 9,463,450.00 Rp 9,463,450.00 0.00005
Rp 6,079,250.00 Rp 6,079,250.00 0.00003
Rp 3,644,700.00 Rp 3,644,700.00 0.00002
Rp 35,945,100.00 Rp 35,945,100.00 0.00019
Rp 31,916,350.00 Rp 63,832,700.00 0.00034
Rp 4,081,100.00 Rp 32,648,800.00 0.00017
Rp 9,417,900.00 Rp 9,417,900.00 0.00005
Rp 9,417,900.00 Rp 9,417,900.00 0.00005
Rp 9,417,900.00 Rp 9,417,900.00 0.00005
Rp 856,176.56 Rp 856,176.56 0.00000
Rp 25,114.51 Rp 18,961,456.90 0.00010

RAB (RENCANA ANGGARAN BIAYA) page 812 of 1892


Rp 14,269,609.35 Rp 14,269,609.35 0.00008

Rp 268,450.00 Rp 8,858,850.00 0.00005


Rp 124,950.00 Rp 2,873,850.00 0.00002
Rp 529,450.00 Rp 5,294,500.00 0.00003
Rp 361,496.77 Rp 361,496.77 0.00000

Rp 268,450.00 Rp 15,301,650.00 0.00008


Rp 124,950.00 Rp 6,122,550.00 0.00003
Rp 138,700.00 Rp 1,109,600.00 0.00001
Rp 361,496.77 Rp 2,168,980.62 0.00001

Rp 268,450.00 Rp 16,375,450.00 0.00009

RAB (RENCANA ANGGARAN BIAYA) page 813 of 1892


Rp 124,950.00 Rp 6,622,350.00 0.00003
Rp 138,700.00 Rp 1,109,600.00 0.00001
Rp 361,496.77 Rp 361,496.77 0.00000

Rp 268,450.00 Rp 16,375,450.00 0.00009


Rp 124,950.00 Rp 6,747,300.00 0.00004
Rp 138,700.00 Rp 970,900.00 0.00001
Rp 361,496.77 Rp 361,496.77 0.00000

Rp 268,450.00 Rp 13,422,500.00 0.00007


Rp 124,950.00 Rp 5,247,900.00 0.00003
Rp 138,700.00 Rp 1,109,600.00 0.00001
Rp 361,496.77 Rp 361,496.77 0.00000

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 814 of 1892


Rp 53,524,000.00 Rp 53,524,000.00 0.00028

Rp 4,583,550.00 Rp 4,583,550.00 0.00002


Rp 3,121,450.00 Rp 28,093,050.00 0.00015
Rp 1,426,400.00 Rp 2,852,800.00 0.00002
Rp 1,755,750.00 Rp 8,778,750.00 0.00005
Rp 1,516,000.00 Rp 166,760,000.00 0.00088
Rp 1,479,700.00 Rp 131,693,300.00 0.00069
Rp 2,691,650.00 Rp 24,224,850.00 0.00013
Rp 1,684,300.00 Rp 15,158,700.00 0.00008

Rp 1,816,100.00 Rp 1,816,100.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 815 of 1892


Rp 291,400.00 Rp 60,611,200.00 0.00032

Rp 1,167,500.00 Rp 12,842,500.00 0.00007

Rp 648,600.00 Rp 648,600.00 0.00000

Rp 2,464,750.00 Rp 12,323,750.00 0.00007

Rp 4,583,550.00 Rp 4,583,550.00 0.00002


Rp 6,317,500.00 Rp 6,317,500.00 0.00003
Rp 3,121,450.00 Rp 34,335,950.00 0.00018
Rp 1,426,400.00 Rp 4,279,200.00 0.00002
Rp 1,755,750.00 Rp 1,755,750.00 0.00001
Rp 1,516,000.00 Rp 234,980,000.00 0.00124
Rp 1,479,700.00 Rp 96,180,500.00 0.00051
Rp 2,691,650.00 Rp 26,916,500.00 0.00014
Rp 2,153,100.00 Rp 2,153,100.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 816 of 1892


Rp 1,684,300.00 Rp 16,843,000.00 0.00009
Rp 1,008,900.00 Rp 1,008,900.00 0.00001
Rp 1,081,000.00 Rp 1,081,000.00 0.00001
Rp 1,081,000.00 Rp 1,081,000.00 0.00001

Rp 291,400.00 Rp 67,313,400.00 0.00036

Rp 1,167,500.00 Rp 18,680,000.00 0.00010

Rp 648,600.00 Rp 648,600.00 0.00000

Rp 2,464,750.00 Rp 2,464,750.00 0.00001

Rp 4,583,550.00 Rp 4,583,550.00 0.00002


Rp 3,121,450.00 Rp 28,093,050.00 0.00015
Rp 1,426,400.00 Rp 1,426,400.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 817 of 1892


Rp 1,516,000.00 Rp 228,916,000.00 0.00121
Rp 1,479,700.00 Rp 96,180,500.00 0.00051
Rp 2,691,650.00 Rp 24,224,850.00 0.00013
Rp 1,684,300.00 Rp 15,158,700.00 0.00008

Rp 291,400.00 Rp 62,942,400.00 0.00033

Rp 1,167,500.00 Rp 11,675,000.00 0.00006

Rp 648,600.00 Rp 648,600.00 0.00000

Rp 4,583,550.00 Rp 4,583,550.00 0.00002


Rp 3,121,450.00 Rp 28,093,050.00 0.00015
Rp 1,426,400.00 Rp 1,426,400.00 0.00001
Rp 1,516,000.00 Rp 212,240,000.00 0.00112
Rp 1,479,700.00 Rp 96,180,500.00 0.00051

RAB (RENCANA ANGGARAN BIAYA) page 818 of 1892


Rp 2,691,650.00 Rp 24,224,850.00 0.00013
Rp 1,684,300.00 Rp 15,158,700.00 0.00008

Rp 291,400.00 Rp 59,737,000.00 0.00032

Rp 1,167,500.00 Rp 11,675,000.00 0.00006

Rp 648,600.00 Rp 648,600.00 0.00000

Rp 4,583,550.00 Rp 4,583,550.00 0.00002


Rp 3,121,450.00 Rp 9,364,350.00 0.00005
Rp 1,426,400.00 Rp 1,426,400.00 0.00001
Rp 1,516,000.00 Rp 56,092,000.00 0.00030
Rp 1,479,700.00 Rp 39,951,900.00 0.00021
Rp 2,691,650.00 Rp 8,074,950.00 0.00004
Rp 1,684,300.00 Rp 5,052,900.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 819 of 1892


Rp 291,400.00 Rp 18,649,600.00 0.00010

Rp 1,167,500.00 Rp 4,670,000.00 0.00002

Rp 648,600.00 Rp 648,600.00 0.00000

Rp 1,516,000.00 Rp 1,516,000.00 0.00001


Rp 1,479,700.00 Rp 2,959,400.00 0.00002

Rp 291,400.00 Rp 874,200.00 0.00000

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 820 of 1892


Rp 329,000.00 Rp 50,995,000.00 0.00027
Rp 275,900.00 Rp 61,525,700.00 0.00032
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 816,300.00 0.00000
Rp 371,700.00 Rp 1,858,500.00 0.00001

Rp 228,100.00 Rp 2,052,900.00 0.00001

Rp 205,750.00 Rp 1,851,750.00 0.00001

Rp 329,000.00 Rp 50,995,000.00 0.00027


Rp 275,900.00 Rp 53,248,700.00 0.00028
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 816,300.00 0.00000
Rp 371,700.00 Rp 1,858,500.00 0.00001
Rp 228,100.00 Rp 2,052,900.00 0.00001
Rp 205,750.00 Rp 1,851,750.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 821 of 1892


Rp 329,000.00 Rp 50,995,000.00 0.00027
Rp 275,900.00 Rp 53,248,700.00 0.00028
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 816,300.00 0.00000
Rp 371,700.00 Rp 1,858,500.00 0.00001
Rp 228,100.00 Rp 2,052,900.00 0.00001
Rp 205,750.00 Rp 1,851,750.00 0.00001

Rp 329,000.00 Rp 50,995,000.00 0.00027


Rp 275,900.00 Rp 53,248,700.00 0.00028
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 816,300.00 0.00000
Rp 371,700.00 Rp 1,858,500.00 0.00001
Rp 228,100.00 Rp 2,052,900.00 0.00001
Rp 205,750.00 Rp 1,851,750.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 822 of 1892


Rp 329,000.00 Rp 29,610,000.00 0.00016
Rp 275,900.00 Rp 26,486,400.00 0.00014
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 408,150.00 0.00000
Rp 228,100.00 Rp 2,052,900.00 0.00001
Rp 205,750.00 Rp 1,851,750.00 0.00001

Rp 329,000.00 Rp 12,173,000.00 0.00006


Rp 371,700.00 Rp 1,486,800.00 0.00001

Rp 1,075,652.67 Rp 4,302,610.66 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 823 of 1892


Rp 1,075,652.67 Rp 4,302,610.66 0.00002

Rp 1,075,652.67 Rp 7,529,568.66 0.00004

Rp 1,075,652.67 Rp 3,226,958.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 824 of 1892


Rp 1,075,652.67 Rp 1,075,652.67 0.00001

Rp 8,086,111.97 Rp 8,086,111.97 0.00004


Rp 93,228.11 Rp 14,916,498.31 0.00008
Rp 437,411.09 Rp 437,411.09 0.00000
Rp 23,021.64 Rp 69,064.91 0.00000
Rp 523,219.01 Rp 523,219.01 0.00000
Rp 52,940.25 Rp 1,588,207.52 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 825 of 1892


Rp 252,476.95 Rp 1,009,907.82 0.00001
Rp 989,930.37 Rp 1,979,860.73 0.00001
Rp 776,980.23 Rp 155,396.05 0.00000
Rp 8,561.77 Rp 1,369,882.50 0.00001
Rp 618,349.74 Rp 618,349.74 0.00000
Rp 2,877,704.55 Rp 5,755,409.10 0.00003
Rp 1,726,622.73 Rp 3,453,245.46 0.00002
Rp 1,902,614.58 Rp 1,902,614.58 0.00001
Rp 2,853,921.87 Rp 2,853,921.87 0.00002

Rp 772.67 Rp 772,672,921.10 0.00408


Rp 123.67 Rp 123,669,947.70 0.00065
Rp 79.28 Rp 79,275,607.50 0.00042
Rp 52.85 Rp 52,850,405.00 0.00028

Rp 7,559,563.38 Rp 7,559,563.38 0.00004


Rp 47,565.36 Rp 47,565.36 0.00000
Rp 347,227.16 Rp 347,227.16 0.00000
RAB (RENCANA ANGGARAN BIAYA) page 826 of 1892
Rp 2,031,849.68 Rp 2,031,849.68 0.00001
Rp 313,931.41 Rp 313,931.41 0.00000
Rp 3,496,054.29 Rp 3,496,054.29 0.00002
Rp 179,797,077.81 Rp 179,797,077.81 0.00095

Rp 23,639,986.16 Rp 23,639,986.16 0.00012


Rp 4,756,536.45 Rp 4,756,536.45 0.00003
Rp 16,172.22 Rp 97,033.34 0.00000
Rp 57,078.44 Rp 684,941.25 0.00000

Rp 6,254,845.43 Rp 6,254,845.43 0.00003

Rp 1,522,091.66 Rp 1,522,091.66 0.00001


Rp 3,657,776.53 Rp 10,973,329.59 0.00006
Rp 3,110,774.84 Rp 3,110,774.84 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 827 of 1892


Rp 975,089.97 Rp 1,950,179.94 0.00001

Rp 78,482.85 Rp 78,482.85 0.00000


Rp 87,044.62 Rp 87,044.62 0.00000
Rp 1,465,013.23 Rp 1,465,013.23 0.00001
Rp 1,874,075.36 Rp 1,874,075.36 0.00001
Rp 580,297.45 Rp 580,297.45 0.00000
Rp 699,210.86 Rp 699,210.86 0.00000
Rp 608,836.67 Rp 608,836.67 0.00000
Rp 413,818.67 Rp 413,818.67 0.00000
Rp 275,879.11 Rp 275,879.11 0.00000

Rp 6,640,124.88 Rp 1,527,228.72 0.00001


Rp 20,928.76 Rp 418,575.21 0.00000
Rp 33,295.76 Rp 66,591.51 0.00000
Rp 57,078.44 Rp 171,235.31 0.00000

Rp 356,740.23 Rp 122,718,640.41 0.00065


Rp 2,164,224.08 Rp 2,164,224.08 0.00001
Rp 1,641,005.08 Rp 1,641,005.08 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 828 of 1892


Rp 33,295.76 Rp 66,591.51 0.00000
Rp 57,078.44 Rp 913,255.00 0.00000
Rp 142,696.09 Rp 570,784.37 0.00000

Rp 396,450.00 Rp 396,450.00 0.00000


Rp 291,450.00 Rp 291,450.00 0.00000
Rp 209,300.00 Rp 418,600.00 0.00000
Rp 24,950.00 Rp 4,491,000.00 0.00002
Rp 24,950.00 Rp 10,853,250.00 0.00006
Rp 32,850.00 Rp 9,657,900.00 0.00005
Rp 32,850.00 Rp 147,825.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000
Rp 32,850.00 Rp 131,400.00 0.00000
Rp 24,950.00 Rp 199,600.00 0.00000
Rp 12,850.00 Rp 1,493,812.50 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 829 of 1892


Rp 1,189,134.11 Rp 2,378,268.23 0.00001
Rp 2,378,268.23 Rp 2,378,268.23 0.00001
Rp 951,307.29 Rp 951,307.29 0.00001
Rp 285,392.19 Rp 28,539,218.70 0.00015
Rp 332,957.55 Rp 33,295,755.15 0.00018
Rp 190,261.46 Rp 11,415,687.48 0.00006
Rp 523,219.01 Rp 13,080,475.24 0.00007
Rp 237,826.82 Rp 5,945,670.56 0.00003
Rp 4,280,882.81 Rp 4,280,882.81 0.00002
Rp 4,280,882.81 Rp 4,280,882.81 0.00002
Rp 2,378,268.23 Rp 2,378,268.23 0.00001
Rp 5,707,843.74 Rp 5,707,843.74 0.00003
Rp 5,707,843.74 Rp 5,707,843.74 0.00003
Rp 428,088.28 Rp 42,808,828.05 0.00023

Rp 47,565,364.50 Rp 47,565,364.50 0.00025


Rp 6,659,151.03 Rp 6,659,151.03 0.00004
Rp 4,756,536.45 Rp 4,756,536.45 0.00003
Rp 38,052,291.60 Rp 38,052,291.60 0.00020

Rp 27,471,150.00 Rp 54,942,300.00 0.00029

RAB (RENCANA ANGGARAN BIAYA) page 830 of 1892


Rp 9,513,072.90 Rp 9,513,072.90 0.00005

Rp 7,560,000.00 Rp 7,560,000.00 0.00004


Rp 475,653.65 Rp 475,653.65 0.00000

Rp 396,450.00 Rp 396,450.00 0.00000


Rp 291,450.00 Rp 1,457,250.00 0.00001
Rp 209,300.00 Rp 1,046,500.00 0.00001
Rp 32,850.00 Rp 295,650.00 0.00000
Rp 24,950.00 Rp 898,200.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 499,000.00 0.00000
Rp 12,850.00 Rp 2,942,007.50 0.00002
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 396,450.00 Rp 396,450.00 0.00000


Rp 291,450.00 Rp 1,457,250.00 0.00001
Rp 209,300.00 Rp 1,046,500.00 0.00001
Rp 32,850.00 Rp 295,650.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 831 of 1892


Rp 24,950.00 Rp 898,200.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 798,400.00 0.00000
Rp 12,850.00 Rp 2,942,007.50 0.00002
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 396,450.00 Rp 396,450.00 0.00000


Rp 291,450.00 Rp 1,457,250.00 0.00001
Rp 209,300.00 Rp 1,046,500.00 0.00001
Rp 32,850.00 Rp 295,650.00 0.00000
Rp 24,950.00 Rp 898,200.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 898,200.00 0.00000
Rp 12,850.00 Rp 2,701,712.50 0.00001
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 396,450.00 Rp 396,450.00 0.00000


Rp 291,450.00 Rp 291,450.00 0.00000
Rp 209,300.00 Rp 1,046,500.00 0.00001
Rp 36,350.00 Rp 163,575.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 832 of 1892


Rp 32,850.00 Rp 443,475.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000
Rp 32,850.00 Rp 131,400.00 0.00000
Rp 24,950.00 Rp 199,600.00 0.00000
Rp 12,850.00 Rp 1,162,925.00 0.00001
Rp 19,750.00 Rp 158,000.00 0.00000
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 1,549,250.00 Rp 15,492,500.00 0.00008


Rp 734,250.00 Rp 2,937,000.00 0.00002
Rp 396,450.00 Rp 3,964,500.00 0.00002
Rp 80,750.00 Rp 646,000.00 0.00000
Rp 60,000.00 Rp 720,000.00 0.00000
Rp 44,000.00 Rp 3,520,000.00 0.00002
Rp 32,850.00 Rp 6,898,500.00 0.00004
Rp 24,950.00 Rp 3,493,000.00 0.00002
Rp 44,000.00 Rp 2,789,600.00 0.00001
Rp 2,777,774.25 Rp 11,111,097.00 0.00006
Rp 899,700.00 Rp 2,159,280.00 0.00001
Rp 9,200.00 Rp 3,588,000.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 833 of 1892


Rp 80,797,500.00 Rp 161,595,000.00 0.00085

Rp 475,653.65 Rp 475,653.65 0.00000

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

Rp 32,850.00 Rp 492,750.00 0.00000


Rp 44,000.00 Rp 704,000.00 0.00000
Rp 80,750.00 Rp 17,603,500.00 0.00009
Rp 80,750.00 Rp 5,087,250.00 0.00003
Rp 1,638,750.00 Rp 9,832,500.00 0.00005
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 32,850.00 Rp 1,149,750.00 0.00001


Rp 44,000.00 Rp 1,056,000.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 834 of 1892


Rp 80,750.00 Rp 4,199,000.00 0.00002
Rp 80,750.00 Rp 4,360,500.00 0.00002
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 32,850.00 Rp 1,149,750.00 0.00001


Rp 44,000.00 Rp 1,056,000.00 0.00001
Rp 80,750.00 Rp 4,199,000.00 0.00002
Rp 80,750.00 Rp 4,360,500.00 0.00002
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 32,850.00 Rp 985,500.00 0.00001


Rp 44,000.00 Rp 880,000.00 0.00000
Rp 80,750.00 Rp 6,783,000.00 0.00004
Rp 80,750.00 Rp 3,633,750.00 0.00002
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 32,850.00 Rp 739,125.00 0.00000


Rp 44,000.00 Rp 2,112,000.00 0.00001
Rp 80,750.00 Rp 2,099,500.00 0.00001
Rp 30,750.00 Rp 2,583,000.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 835 of 1892


Rp 500,000.00 Rp 500,000.00 0.00000

Rp 36,350.00 Rp 290,800.00 0.00000


Rp 44,000.00 Rp 352,000.00 0.00000
Rp 127,800.00 Rp 31,822,200.00 0.00017
Rp 127,800.00 Rp 5,751,000.00 0.00003
Rp 1,638,750.00 Rp 8,193,750.00 0.00004
Rp 19,804,104.67 Rp 79,216,418.68 0.00042
Rp 47,388,654.67 Rp 47,388,654.67 0.00025
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 36,350.00 Rp 290,800.00 0.00000


Rp 44,000.00 Rp 352,000.00 0.00000
Rp 127,800.00 Rp 6,326,100.00 0.00003
Rp 127,800.00 Rp 5,751,000.00 0.00003
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 36,350.00 Rp 290,800.00 0.00000


Rp 44,000.00 Rp 352,000.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 836 of 1892


Rp 127,800.00 Rp 6,326,100.00 0.00003
Rp 127,800.00 Rp 5,751,000.00 0.00003
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 36,350.00 Rp 290,800.00 0.00000


Rp 44,000.00 Rp 352,000.00 0.00000
Rp 127,800.00 Rp 9,329,400.00 0.00005
Rp 127,800.00 Rp 2,300,400.00 0.00001
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 36,350.00 Rp 290,800.00 0.00000


Rp 44,000.00 Rp 352,000.00 0.00000
Rp 127,800.00 Rp 3,961,800.00 0.00002
Rp 38,300.00 Rp 2,144,800.00 0.00001
Rp 500,000.00 Rp 500,000.00 0.00000

Rp 309,150.00 Rp 1,236,600.00 0.00001


Rp 3,569,300.00 Rp 17,846,500.00 0.00009
Rp 2,266,900.00 Rp 2,266,900.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 837 of 1892


Rp 4,359,400.00 Rp 30,515,800.00 0.00016
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 3,391,600.00 0.00002
Rp 403,150.00 Rp 2,822,050.00 0.00001
Rp 3,422,800.00 Rp 10,268,400.00 0.00005
Rp 1,618,500.00 Rp 4,855,500.00 0.00003
Rp 1,099,500.00 Rp 1,099,500.00 0.00001
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 309,150.00 Rp 4,328,100.00 0.00002


Rp 3,569,300.00 Rp 46,400,900.00 0.00024
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 82,828,600.00 0.00044
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 8,479,000.00 0.00004
Rp 403,150.00 Rp 7,659,850.00 0.00004
Rp 3,422,800.00 Rp 10,268,400.00 0.00005
Rp 1,618,500.00 Rp 4,855,500.00 0.00003
Rp 1,099,500.00 Rp 1,099,500.00 0.00001
Rp 791,400.00 Rp 1,582,800.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 838 of 1892


Rp 309,150.00 Rp 4,328,100.00 0.00002
Rp 3,569,300.00 Rp 46,400,900.00 0.00024
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 82,828,600.00 0.00044
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 8,479,000.00 0.00004
Rp 403,150.00 Rp 7,659,850.00 0.00004
Rp 3,422,800.00 Rp 10,268,400.00 0.00005
Rp 1,618,500.00 Rp 4,855,500.00 0.00003
Rp 1,099,500.00 Rp 1,099,500.00 0.00001
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 309,150.00 Rp 4,018,950.00 0.00002


Rp 3,569,300.00 Rp 35,693,000.00 0.00019
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 78,469,200.00 0.00041
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 8,055,050.00 0.00004
Rp 403,150.00 Rp 7,256,700.00 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 839 of 1892


Rp 3,422,800.00 Rp 10,268,400.00 0.00005
Rp 1,618,500.00 Rp 4,855,500.00 0.00003
Rp 1,099,500.00 Rp 1,099,500.00 0.00001
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 309,150.00 Rp 1,236,600.00 0.00001


Rp 3,569,300.00 Rp 24,985,100.00 0.00013
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 39,234,600.00 0.00021
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 3,943,450.00 Rp 7,886,900.00 0.00004
Rp 423,950.00 Rp 4,239,500.00 0.00002
Rp 403,150.00 Rp 4,434,650.00 0.00002
Rp 3,422,800.00 Rp 10,268,400.00 0.00005
Rp 1,618,500.00 Rp 4,855,500.00 0.00003
Rp 1,099,500.00 Rp 1,099,500.00 0.00001
Rp 791,400.00 Rp 1,582,800.00 0.00001
Rp 10,199,300.00 Rp 20,398,600.00 0.00011

RAB (RENCANA ANGGARAN BIAYA) page 840 of 1892


Rp 114,650.00 Rp 2,293,000.00 0.00001
Rp 127,800.00 Rp 18,403,200.00 0.00010
Rp 197,150.00 Rp 7,097,400.00 0.00004
Rp 25,000.00 Rp 1,192,500.00 0.00001
Rp 190,000.00 Rp 1,520,000.00 0.00001

Rp 114,650.00 Rp 573,250.00 0.00000


Rp 127,800.00 Rp 19,425,600.00 0.00010
Rp 197,150.00 Rp 7,097,400.00 0.00004
Rp 15,000.00 Rp 1,368,000.00 0.00001
Rp 190,000.00 Rp 1,520,000.00 0.00001
Rp 150,000.00 Rp 300,000.00 0.00000

Rp 114,650.00 Rp 2,293,000.00 0.00001


Rp 127,800.00 Rp 18,403,200.00 0.00010
Rp 197,150.00 Rp 7,097,400.00 0.00004
Rp 25,000.00 Rp 1,192,500.00 0.00001
Rp 190,000.00 Rp 1,520,000.00 0.00001

Rp 114,650.00 Rp 1,146,500.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 841 of 1892


Rp 127,800.00 Rp 18,403,200.00 0.00010
Rp 197,150.00 Rp 7,097,400.00 0.00004
Rp 25,000.00 Rp 1,192,500.00 0.00001
Rp 190,000.00 Rp 760,000.00 0.00000

Rp 127,800.00 Rp 36,806,400.00 0.00019


Rp 197,150.00 Rp 9,463,200.00 0.00005
Rp 15,000.00 Rp 6,465,000.00 0.00003
Rp 150,000.00 Rp 5,400,000.00 0.00003
Rp 200,000.00 Rp 1,200,000.00 0.00001

Rp 583,212.00 Rp 464,236,752.00 0.00245


Rp 219,035.12 Rp 174,351,952.44 0.00092
Rp 1,077,209.65 Rp 35,547,918.45 0.00019
Rp 1,638,750.00 Rp 39,330,000.00 0.00021
Rp 127,800.00 Rp 23,259,600.00 0.00012
Rp 197,150.00 Rp 175,069,200.00 0.00092
Rp 264,950.00 Rp 125,321,350.00 0.00066

RAB (RENCANA ANGGARAN BIAYA) page 842 of 1892


Rp 1,274,000.00 Rp 2,548,000.00 0.00001
Rp 261,950.00 Rp 8,382,400.00 0.00004
Rp 336,894,850.00 Rp 673,789,700.00 0.00355
Rp 15,252,850.00 Rp 61,011,400.00 0.00032
Rp 15,815,500.00 Rp 63,262,000.00 0.00033
Rp 17,686,650.00 Rp 282,986,400.00 0.00149
Rp 17,851,850.00 Rp 71,407,400.00 0.00038
Rp 15,327,600.00 Rp 61,310,400.00 0.00032
Rp 1,718,955.00 Rp 55,006,560.00 0.00029
Rp 926,100.00 Rp 29,635,200.00 0.00016
Rp 2,100,735.00 Rp 58,820,580.00 0.00031
Rp 34,050.00 Rp 8,716,800.00 0.00005

Rp 1,274,000.00 Rp 2,548,000.00 0.00001


Rp 261,950.00 Rp 7,596,550.00 0.00004
Rp 292,291,900.00 Rp 584,583,800.00 0.00308

RAB (RENCANA ANGGARAN BIAYA) page 843 of 1892


Rp 15,252,850.00 Rp 61,011,400.00 0.00032
Rp 15,815,500.00 Rp 63,262,000.00 0.00033
Rp 17,686,650.00 Rp 282,986,400.00 0.00149
Rp 17,851,850.00 Rp 71,407,400.00 0.00038
Rp 15,327,600.00 Rp 15,327,600.00 0.00008
Rp 1,718,955.00 Rp 49,849,695.00 0.00026
Rp 926,100.00 Rp 26,856,900.00 0.00014
Rp 2,100,735.00 Rp 58,820,580.00 0.00031
Rp 34,050.00 Rp 7,899,600.00 0.00004

Rp 1,274,000.00 Rp 1,274,000.00 0.00001


Rp 261,950.00 Rp 8,120,450.00 0.00004
Rp 210,388,500.00 Rp 210,388,500.00 0.00111
Rp 268,874,200.00 Rp 268,874,200.00 0.00142
Rp 15,252,850.00 Rp 183,034,200.00 0.00097
Rp 15,815,500.00 Rp 15,815,500.00 0.00008
Rp 17,686,650.00 Rp 159,179,850.00 0.00084
Rp 17,851,850.00 Rp 89,259,250.00 0.00047
Rp 12,773,400.00 Rp 38,320,200.00 0.00020

RAB (RENCANA ANGGARAN BIAYA) page 844 of 1892


Rp 15,327,600.00 Rp 15,327,600.00 0.00008
Rp 1,718,955.00 Rp 53,287,605.00 0.00028
Rp 926,100.00 Rp 28,709,100.00 0.00015
Rp 2,100,735.00 Rp 56,719,845.00 0.00030
Rp 34,050.00 Rp 8,444,400.00 0.00004

Rp 1,274,000.00 Rp 2,548,000.00 0.00001


Rp 261,950.00 Rp 6,810,700.00 0.00004
Rp 336,894,850.00 Rp 673,789,700.00 0.00355
Rp 15,815,500.00 Rp 63,262,000.00 0.00033
Rp 17,686,650.00 Rp 141,493,200.00 0.00075
Rp 17,851,850.00 Rp 89,259,250.00 0.00047
Rp 18,051,100.00 Rp 108,306,600.00 0.00057
Rp 12,773,400.00 Rp 25,546,800.00 0.00013
Rp 15,327,600.00 Rp 15,327,600.00 0.00008
Rp 1,718,955.00 Rp 44,692,830.00 0.00024
Rp 926,100.00 Rp 24,078,600.00 0.00013
Rp 2,100,735.00 Rp 48,316,905.00 0.00025
Rp 34,050.00 Rp 7,082,400.00 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 845 of 1892


Rp 261,950.00 Rp 785,850.00 0.00000
Rp 3,836,550.00 Rp 11,509,650.00 0.00006
Rp 34,050.00 Rp 544,800.00 0.00000
Rp 64,850.00 Rp 518,800.00 0.00000
Rp 112,350.00 Rp 898,800.00 0.00000

Rp 64,850.00 Rp 24,318,750.00 0.00013


Rp 80,800.00 Rp 58,984,000.00 0.00031
Rp 112,350.00 Rp 54,377,400.00 0.00029
Rp 150,300.00 Rp 115,129,800.00 0.00061
Rp 185,200.00 Rp 31,484,000.00 0.00017
Rp 224,900.00 Rp 57,799,300.00 0.00030
Rp 277,250.00 Rp 4,990,500.00 0.00003
Rp 323,650.00 Rp 45,311,000.00 0.00024
Rp 376,850.00 Rp 6,029,600.00 0.00003
Rp 442,900.00 Rp 47,390,300.00 0.00025

RAB (RENCANA ANGGARAN BIAYA) page 846 of 1892


Rp 474,150.00 Rp 94,830,000.00 0.00050
Rp 560,900.00 Rp 28,605,900.00 0.00015
Rp 1,902,614.58 Rp 41,857,520.76 0.00022

Rp 22,250.00 Rp 73,736,500.00 0.00039

Rp 47,934,180.00 Rp 47,934,180.00 0.00025


Rp 14,187,285.00 Rp 56,749,140.00 0.00030

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

Rp 294,497,550.00 Rp 294,497,550.00 0.00155

Rp 188,068,650.00 Rp 188,068,650.00 0.00099

RAB (RENCANA ANGGARAN BIAYA) page 847 of 1892


Rp 43,902,800.00 Rp 43,902,800.00 0.00023

Rp 2,853,900.00 Rp 2,853,900.00 0.00002


Rp 665,915.10 Rp 665,915.10 0.00000
Rp 713,480.47 Rp 713,480.47 0.00000
Rp 903,741.93 Rp 903,741.93 0.00000
Rp 4,756,536.45 Rp 4,756,536.45 0.00003
Rp 570,784.37 Rp 570,784.37 0.00000
Rp 1,674,300.00 Rp 6,697,200.00 0.00004
Rp 736,200.00 Rp 1,472,400.00 0.00001
Rp 52,807,500.00 Rp 52,807,500.00 0.00028
Rp 11,715,050.00 Rp 11,715,050.00 0.00006
Rp 31,181,350.00 Rp 31,181,350.00 0.00016
Rp 16,281,750.00 Rp 32,563,500.00 0.00017
Rp 22,614,250.00 Rp 22,614,250.00 0.00012
Rp 15,137,350.00 Rp 15,137,350.00 0.00008
Rp 10,436,550.00 Rp 73,055,850.00 0.00039
Rp 7,512,800.00 Rp 7,512,800.00 0.00004
Rp 2,231,200.00 Rp 2,231,200.00 0.00001
Rp 3,404,100.00 Rp 10,212,300.00 0.00005

RAB (RENCANA ANGGARAN BIAYA) page 848 of 1892


Rp 1,322,600.00 Rp 3,967,800.00 0.00002
Rp 651,150.00 Rp 651,150.00 0.00000
Rp 343,800.00 Rp 1,031,400.00 0.00001

Rp 1,188,050.00 Rp 21,384,900.00 0.00011


Rp 716,900.00 Rp 25,808,400.00 0.00014
Rp 428,250.00 Rp 5,139,000.00 0.00003
Rp 165,700.00 Rp 1,491,300.00 0.00001
Rp 89,650.00 Rp 986,150.00 0.00001
Rp 45,300.00 Rp 1,087,200.00 0.00001
Rp 4,984.88 Rp 19,939.50 0.00000

Rp 1,341,600.00 Rp 1,341,600.00 0.00001


Rp 856,150.00 Rp 5,993,050.00 0.00003
Rp 437,600.00 Rp 875,200.00 0.00000
Rp 190,250.00 Rp 190,250.00 0.00000
Rp 86,450.00 Rp 518,700.00 0.00000
Rp 40,600.00 Rp 487,200.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 849 of 1892


Rp 934,000.00 Rp 934,000.00 0.00000
Rp 691,850.00 Rp 1,383,700.00 0.00001
Rp 168,600.00 Rp 337,200.00 0.00000
Rp 1,025,650.00 Rp 2,051,300.00 0.00001
Rp 123,650.00 Rp 247,300.00 0.00000
Rp 1,608,550.00 Rp 6,434,200.00 0.00003
Rp 977,250.00 Rp 977,250.00 0.00001
Rp 374,450.00 Rp 748,900.00 0.00000
Rp 159,950.00 Rp 319,900.00 0.00000
Rp 475,650.00 Rp 951,300.00 0.00001
Rp 415,100.00 Rp 7,471,800.00 0.00004
Rp 259,400.00 Rp 518,800.00 0.00000
Rp 830,200.00 Rp 2,490,600.00 0.00001
Rp 658,950.00 Rp 5,271,600.00 0.00003
Rp 447,500.00 Rp 895,000.00 0.00000
Rp 221,150.00 Rp 442,300.00 0.00000
Rp 188,050.00 Rp 376,100.00 0.00000
Rp 1,096,150.00 Rp 3,288,450.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 850 of 1892


Rp 20,469,200.00 Rp 20,469,200.00 0.00011

Rp 8,648,200.00 Rp 34,592,800.00 0.00018


Rp 6,486,150.00 Rp 6,486,150.00 0.00003
Rp 9,513,050.00 Rp 38,052,200.00 0.00020

Rp 8,215,800.00 Rp 73,942,200.00 0.00039

Rp 183,000.00 Rp 80,337,000.00 0.00042


Rp 183,000.00 Rp 10,431,000.00 0.00006
Rp 8,896,250.00 Rp 8,896,250.00 0.00005
Rp 10,933,550.00 Rp 32,800,650.00 0.00017
Rp 7,870,550.00 Rp 55,093,850.00 0.00029
Rp 2,770,250.00 Rp 8,310,750.00 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 851 of 1892


Rp 2,792,900.00 Rp 8,378,700.00 0.00004
Rp 1,385,600.00 Rp 4,156,800.00 0.00002
Rp 620,150.00 Rp 1,860,450.00 0.00001

Rp 716,900.00 Rp 441,968,850.00 0.00233


Rp 428,250.00 Rp 443,024,625.00 0.00234
Rp 243,350.00 Rp 19,334,157.50 0.00010
Rp 140,400.00 Rp 32,292,000.00 0.00017
Rp 117,700.00 Rp 18,714,300.00 0.00010
Rp 89,650.00 Rp 138,688,550.00 0.00073

Rp 856,150.00 Rp 23,116,050.00 0.00012


Rp 437,600.00 Rp 34,132,800.00 0.00018
Rp 216,200.00 Rp 5,188,800.00 0.00003
Rp 137,500.00 Rp 53,900,000.00 0.00028
Rp 110,650.00 Rp 8,630,700.00 0.00005
Rp 86,450.00 Rp 15,733,900.00 0.00008
Rp 198,900.00 Rp 994,500.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 852 of 1892


Rp 65,700.00 Rp 3,416,400.00 0.00002
Rp 63,950.00 Rp 7,801,900.00 0.00004
Rp 62,250.00 Rp 3,237,000.00 0.00002
Rp 517,150.00 Rp 5,688,650.00 0.00003
Rp 213,092.83 Rp 17,686,705.14 0.00009
Rp 123,650.00 Rp 21,762,400.00 0.00011
Rp 977,250.00 Rp 8,795,250.00 0.00005
Rp 187,450.00 Rp 749,800.00 0.00000
Rp 159,950.00 Rp 1,439,550.00 0.00001
Rp 161,700.00 Rp 2,263,800.00 0.00001
Rp 132,300.00 Rp 13,097,700.00 0.00007
Rp 614,250.00 Rp 55,896,750.00 0.00029
Rp 335,200.00 Rp 335,200.00 0.00000
Rp 415,100.00 Rp 28,226,800.00 0.00015
Rp 259,400.00 Rp 28,274,600.00 0.00015
Rp 447,500.00 Rp 4,922,500.00 0.00003
Rp 496,800.00 Rp 3,974,400.00 0.00002

Rp 856,150.00 Rp 7,705,350.00 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 853 of 1892


Rp 8,215,800.00 Rp 73,942,200.00 0.00039

Rp 183,000.00 Rp 77,043,000.00 0.00041


Rp 10,436,550.00 Rp 31,309,650.00 0.00017
Rp 7,512,800.00 Rp 22,538,400.00 0.00012
Rp 2,770,250.00 Rp 8,310,750.00 0.00004
Rp 2,792,900.00 Rp 8,378,700.00 0.00004
Rp 1,322,600.00 Rp 3,967,800.00 0.00002
Rp 651,150.00 Rp 1,953,450.00 0.00001

Rp 716,900.00 Rp 22,582,350.00 0.00012


Rp 428,250.00 Rp 346,882,500.00 0.00183
Rp 243,350.00 Rp 18,927,763.00 0.00010

RAB (RENCANA ANGGARAN BIAYA) page 854 of 1892


Rp 140,400.00 Rp 19,656,000.00 0.00010
Rp 117,700.00 Rp 27,777,200.00 0.00015
Rp 89,650.00 Rp 129,813,200.00 0.00068

Rp 437,600.00 Rp 22,755,200.00 0.00012


Rp 216,200.00 Rp 6,053,600.00 0.00003
Rp 137,500.00 Rp 53,900,000.00 0.00028
Rp 110,650.00 Rp 9,515,900.00 0.00005
Rp 86,450.00 Rp 15,733,900.00 0.00008
Rp 198,900.00 Rp 994,500.00 0.00001
Rp 65,700.00 Rp 3,153,600.00 0.00002
Rp 63,950.00 Rp 7,801,900.00 0.00004
Rp 62,250.00 Rp 2,988,000.00 0.00002
Rp 517,150.00 Rp 5,688,650.00 0.00003
Rp 213,092.83 Rp 17,686,705.14 0.00009
Rp 123,650.00 Rp 21,762,400.00 0.00011
Rp 977,250.00 Rp 5,863,500.00 0.00003
Rp 187,450.00 Rp 749,800.00 0.00000
Rp 159,950.00 Rp 1,439,550.00 0.00001
Rp 161,700.00 Rp 2,263,800.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 855 of 1892


Rp 132,300.00 Rp 13,097,700.00 0.00007
Rp 614,250.00 Rp 55,896,750.00 0.00029
Rp 335,200.00 Rp 335,200.00 0.00000
Rp 415,100.00 Rp 3,735,900.00 0.00002
Rp 259,400.00 Rp 21,789,600.00 0.00011
Rp 496,800.00 Rp 3,974,400.00 0.00002

Rp 43,958,550.00 Rp 43,958,550.00 0.00023


Rp 464,750.00 Rp 76,219,000.00 0.00040
Rp 7,937,950.00 Rp 7,937,950.00 0.00004
Rp 3,277,000.00 Rp 3,277,000.00 0.00002
Rp 2,115,950.00 Rp 2,115,950.00 0.00001

Rp 165,700.00 Rp 994,200.00 0.00001


Rp 89,650.00 Rp 537,900.00 0.00000

Rp 1,749,300.00 Rp 1,749,300.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 856 of 1892


Rp 690,350.00 Rp 1,380,700.00 0.00001
Rp 1,721,050.00 Rp 1,721,050.00 0.00001
Rp 208,350.00 Rp 833,400.00 0.00000

Rp 856,150.00 Rp 7,705,350.00 0.00004

Rp 8,215,800.00 Rp 73,942,200.00 0.00039

Rp 183,000.00 Rp 77,775,000.00 0.00041


Rp 10,436,550.00 Rp 31,309,650.00 0.00017
Rp 7,512,800.00 Rp 22,538,400.00 0.00012
Rp 2,770,250.00 Rp 8,310,750.00 0.00004
Rp 2,792,900.00 Rp 8,378,700.00 0.00004
Rp 1,322,600.00 Rp 3,967,800.00 0.00002
Rp 651,150.00 Rp 1,953,450.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 857 of 1892


Rp 716,900.00 Rp 22,582,350.00 0.00012
Rp 428,250.00 Rp 346,882,500.00 0.00183
Rp 243,350.00 Rp 18,927,763.00 0.00010
Rp 140,400.00 Rp 20,498,400.00 0.00011
Rp 117,700.00 Rp 29,660,400.00 0.00016
Rp 89,650.00 Rp 131,606,200.00 0.00069

Rp 437,600.00 Rp 21,004,800.00 0.00011


Rp 216,200.00 Rp 6,053,600.00 0.00003
Rp 137,500.00 Rp 53,900,000.00 0.00028
Rp 110,650.00 Rp 8,630,700.00 0.00005
Rp 86,450.00 Rp 15,993,250.00 0.00008
Rp 198,900.00 Rp 994,500.00 0.00001
Rp 65,700.00 Rp 3,416,400.00 0.00002
Rp 63,950.00 Rp 7,801,900.00 0.00004
Rp 62,250.00 Rp 3,237,000.00 0.00002
Rp 517,150.00 Rp 6,205,800.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 858 of 1892


Rp 213,092.83 Rp 17,686,705.14 0.00009
Rp 123,650.00 Rp 22,133,350.00 0.00012
Rp 977,250.00 Rp 5,863,500.00 0.00003
Rp 187,450.00 Rp 749,800.00 0.00000
Rp 159,950.00 Rp 1,439,550.00 0.00001
Rp 161,700.00 Rp 2,263,800.00 0.00001
Rp 132,300.00 Rp 13,362,300.00 0.00007
Rp 614,250.00 Rp 55,896,750.00 0.00029
Rp 335,200.00 Rp 335,200.00 0.00000
Rp 415,100.00 Rp 3,735,900.00 0.00002
Rp 259,400.00 Rp 21,789,600.00 0.00011
Rp 496,800.00 Rp 3,974,400.00 0.00002

Rp 856,150.00 Rp 7,705,350.00 0.00004

Rp 8,215,800.00 Rp 73,942,200.00 0.00039

RAB (RENCANA ANGGARAN BIAYA) page 859 of 1892


Rp 183,000.00 Rp 78,324,000.00 0.00041
Rp 10,436,550.00 Rp 31,309,650.00 0.00017
Rp 7,512,800.00 Rp 22,538,400.00 0.00012
Rp 2,770,250.00 Rp 8,310,750.00 0.00004
Rp 2,792,900.00 Rp 8,378,700.00 0.00004
Rp 1,322,600.00 Rp 3,967,800.00 0.00002
Rp 651,150.00 Rp 1,953,450.00 0.00001

Rp 716,900.00 Rp 22,582,350.00 0.00012


Rp 428,250.00 Rp 346,882,500.00 0.00183
Rp 243,350.00 Rp 18,927,763.00 0.00010
Rp 140,400.00 Rp 20,498,400.00 0.00011
Rp 117,700.00 Rp 29,660,400.00 0.00016
Rp 89,650.00 Rp 131,606,200.00 0.00069

Rp 437,600.00 Rp 21,004,800.00 0.00011

RAB (RENCANA ANGGARAN BIAYA) page 860 of 1892


Rp 216,200.00 Rp 6,053,600.00 0.00003
Rp 137,500.00 Rp 53,900,000.00 0.00028
Rp 110,650.00 Rp 8,630,700.00 0.00005
Rp 86,450.00 Rp 15,993,250.00 0.00008
Rp 198,900.00 Rp 994,500.00 0.00001
Rp 65,700.00 Rp 3,416,400.00 0.00002
Rp 63,950.00 Rp 7,801,900.00 0.00004
Rp 62,250.00 Rp 3,237,000.00 0.00002
Rp 517,150.00 Rp 6,205,800.00 0.00003
Rp 213,092.83 Rp 17,686,705.14 0.00009
Rp 123,650.00 Rp 22,133,350.00 0.00012
Rp 977,250.00 Rp 5,863,500.00 0.00003
Rp 187,450.00 Rp 749,800.00 0.00000
Rp 159,950.00 Rp 1,439,550.00 0.00001
Rp 161,700.00 Rp 2,263,800.00 0.00001
Rp 132,300.00 Rp 13,362,300.00 0.00007
Rp 614,250.00 Rp 55,896,750.00 0.00029
Rp 335,200.00 Rp 335,200.00 0.00000
Rp 415,100.00 Rp 3,735,900.00 0.00002
Rp 259,400.00 Rp 21,789,600.00 0.00011

RAB (RENCANA ANGGARAN BIAYA) page 861 of 1892


Rp 496,800.00 Rp 3,974,400.00 0.00002

Rp 856,150.00 Rp 7,705,350.00 0.00004

Rp 8,215,800.00 Rp 8,215,800.00 0.00004

Rp 183,000.00 Rp 28,548,000.00 0.00015


Rp 10,436,550.00 Rp 10,436,550.00 0.00006
Rp 7,512,800.00 Rp 7,512,800.00 0.00004
Rp 2,770,250.00 Rp 2,770,250.00 0.00001
Rp 2,792,900.00 Rp 2,792,900.00 0.00001
Rp 1,322,600.00 Rp 1,322,600.00 0.00001
Rp 651,150.00 Rp 651,150.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 862 of 1892


Rp 716,900.00 Rp 16,130,250.00 0.00009
Rp 428,250.00 Rp 45,822,750.00 0.00024
Rp 243,350.00 Rp 4,867,000.00 0.00003
Rp 140,400.00 Rp 7,862,400.00 0.00004
Rp 117,700.00 Rp 24,481,600.00 0.00013
Rp 89,650.00 Rp 37,921,950.00 0.00020

Rp 437,600.00 Rp 7,001,600.00 0.00004


Rp 216,200.00 Rp 1,729,600.00 0.00001
Rp 137,500.00 Rp 13,475,000.00 0.00007
Rp 110,650.00 Rp 7,081,600.00 0.00004
Rp 86,450.00 Rp 2,074,800.00 0.00001
Rp 198,900.00 Rp 397,800.00 0.00000
Rp 65,700.00 Rp 328,500.00 0.00000
Rp 62,250.00 Rp 311,250.00 0.00000
Rp 517,150.00 Rp 1,034,300.00 0.00001
Rp 213,092.83 Rp 4,261,856.66 0.00002
Rp 123,650.00 Rp 5,316,950.00 0.00003
Rp 977,250.00 Rp 1,954,500.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 863 of 1892


Rp 187,450.00 Rp 187,450.00 0.00000
Rp 159,950.00 Rp 479,850.00 0.00000
Rp 161,700.00 Rp 970,200.00 0.00001
Rp 132,300.00 Rp 8,864,100.00 0.00005
Rp 614,250.00 Rp 12,285,000.00 0.00006
Rp 335,200.00 Rp 335,200.00 0.00000
Rp 415,100.00 Rp 2,075,500.00 0.00001
Rp 259,400.00 Rp 5,447,400.00 0.00003
Rp 496,800.00 Rp 993,600.00 0.00001

Rp 856,150.00 Rp 2,568,450.00 0.00001

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

Rp 539,634,100.00 Rp 539,634,100.00 0.00285

RAB (RENCANA ANGGARAN BIAYA) page 864 of 1892


Rp 561,648,250.00 Rp 561,648,250.00 0.00296

Rp 618,103,000.00 Rp 618,103,000.00 0.00326

Rp 4,756,536.45 Rp 4,756,536.45 0.00003

Rp 56,900.00 Rp 39,730,425.00 0.00021


Rp 68,950.00 Rp 48,144,337.50 0.00025
Rp 109,750.00 Rp 76,632,937.50 0.00040
RAB (RENCANA ANGGARAN BIAYA) page 865 of 1892
Rp 161,650.00 Rp 22,574,422.50 0.00012
Rp 56,900.00 Rp 1,093,618.00 0.00001
Rp 68,950.00 Rp 1,325,219.00 0.00001
Rp 109,750.00 Rp 2,109,395.00 0.00001
Rp 161,650.00 Rp 621,382.60 0.00000
Rp 56,900.00 Rp 410,818.00 0.00000
Rp 68,950.00 Rp 497,819.00 0.00000
Rp 109,750.00 Rp 792,395.00 0.00000
Rp 161,650.00 Rp 233,422.60 0.00000
Rp 29,900.00 Rp 35,677,225.68 0.00019
Rp 111,200.00 Rp 8,058,552.80 0.00004

Rp 56,900.00 Rp 355,625.00 0.00000


Rp 68,950.00 Rp 430,937.50 0.00000

Rp 899,700.00 Rp 206,881,516.50 0.00109

Rp 899,700.00 Rp 65,200,359.30 0.00034


RAB (RENCANA ANGGARAN BIAYA) page 866 of 1892
Rp 878,500.00 Rp 8,785,000.00 0.00005
Rp 3,273,321.67 Rp 6,137,478.13 0.00003
Rp 5,634,160.81 Rp 189,606,413.67 0.00100
Rp 4,765,538.65 Rp 63,161,257.83 0.00033
Rp 878,500.00 Rp 613,412,625.00 0.00324
Rp 878,500.00 Rp 16,884,770.00 0.00009
Rp 878,500.00 Rp 6,342,770.00 0.00003
Rp 878,500.00 Rp 213,680,410.13 0.00113
Rp 2,719,354.23 Rp 16,801,530.11 0.00009
Rp 3,203,371.96 Rp 21,622,760.71 0.00011
Rp 5,469,654.02 Rp 889,129,864.34 0.00469
Rp 5,581,914.07 Rp 9,243,649.71 0.00005
Rp 7,298,413.87 Rp 52,373,417.95 0.00028
Rp 7,065,408.66 Rp 18,037,988.32 0.00010
Rp 5,652,845.90 Rp 32,763,894.82 0.00017
Rp 5,181,609.91 Rp 51,051,811.65 0.00027
Rp 5,181,609.91 Rp 553,055,247.62 0.00292
Rp 5,846,707.33 Rp 5,799,933.67 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 867 of 1892


Rp 8,342,724.06 Rp 8,009,015.10 0.00004
Rp 8,265,982.13 Rp 12,458,488.27 0.00007
Rp 8,342,724.06 Rp 32,036,060.38 0.00017
Rp 6,653,176.05 Rp 34,490,064.67 0.00018
Rp 6,653,176.05 Rp 10,219,278.42 0.00005
Rp 6,313,269.06 Rp 3,636,442.98 0.00002
Rp 8,669,165.03 Rp 40,519,677.36 0.00021

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 36,971,895.36 0.00020

Rp 4,290,004.27 Rp 981,338.48 0.00001

Rp 6,078,784.65 Rp 32,095,982.96 0.00017

Rp 4,563,426.31 Rp 461,574,599.13 0.00244


RAB (RENCANA ANGGARAN BIAYA) page 868 of 1892
Rp 5,509,628.74 Rp 5,553,705.77 0.00003
Rp 6,946,770.33 Rp 30,343,492.81 0.00016
Rp 6,707,203.03 Rp 10,422,993.50 0.00005
Rp 4,016,213.12 Rp 14,169,199.90 0.00007
Rp 8,342,724.06 Rp 406,807,910.52 0.00215
Rp 7,381,484.49 Rp 60,491,265.36 0.00032
Rp 6,653,176.05 Rp 391,306,549.66 0.00206
Rp 6,313,269.06 Rp 231,865,854.50 0.00122
Rp 7,124,410.37 Rp 43,200,643.37 0.00023
Rp 6,456,975.47 Rp 16,513,714.77 0.00009
Rp 9,390,770.97 Rp 99,222,886.08 0.00052
Rp 8,218,602.79 Rp 32,455,262.43 0.00017
Rp 6,451,376.51 Rp 66,495,950.49 0.00035
Rp 8,388,879.77 Rp 158,734,802.41 0.00084
Rp 9,125,546.30 Rp 78,187,680.67 0.00041
Rp 7,619,354.73 Rp 48,481,954.12 0.00026
Rp 7,803,020.50 Rp 7,022,718.45 0.00004
Rp 8,265,982.13 Rp 11,679,832.75 0.00006
Rp 8,669,165.03 Rp 37,320,755.46 0.00020

RAB (RENCANA ANGGARAN BIAYA) page 869 of 1892


Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 36,971,895.36 0.00020

Rp 4,290,004.27 Rp 1,698,371,937.10 0.00896

Rp 6,078,784.65 Rp 32,095,982.96 0.00017

Rp 4,563,426.31 Rp 461,574,599.13 0.00244


Rp 5,509,628.74 Rp 5,553,705.77 0.00003
Rp 6,946,770.33 Rp 30,343,492.81 0.00016
Rp 6,707,203.03 Rp 5,211,496.75 0.00003
Rp 4,016,213.12 Rp 14,169,199.90 0.00007
Rp 8,342,724.06 Rp 406,807,910.52 0.00215
Rp 7,381,484.49 Rp 60,491,265.36 0.00032
Rp 6,653,176.05 Rp 391,306,549.66 0.00206
Rp 6,313,269.06 Rp 231,865,854.50 0.00122
RAB (RENCANA ANGGARAN BIAYA) page 870 of 1892
Rp 7,124,410.37 Rp 43,200,643.37 0.00023
Rp 6,456,975.47 Rp 16,513,714.77 0.00009
Rp 9,390,770.97 Rp 99,222,886.08 0.00052
Rp 8,218,602.79 Rp 32,455,262.43 0.00017
Rp 6,451,376.51 Rp 65,668,561.45 0.00035
Rp 8,388,879.77 Rp 158,734,802.41 0.00084
Rp 9,125,546.30 Rp 78,187,680.67 0.00041
Rp 7,619,354.73 Rp 26,983,944.76 0.00014

Rp 7,803,020.50 Rp 10,955,440.78 0.00006


Rp 8,265,982.13 Rp 14,275,351.14 0.00008
Rp 8,669,165.03 Rp 53,315,364.95 0.00028
Rp 5,865,133.78 Rp 79,472,562.66 0.00042

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

Rp 7,420,722.64 Rp 31,278,345.92 0.00017

RAB (RENCANA ANGGARAN BIAYA) page 871 of 1892


Rp 7,420,722.64 Rp 36,971,895.36 0.00020

Rp 4,290,004.27 Rp 1,698,371,937.10 0.00896

Rp 6,078,784.65 Rp 32,095,982.96 0.00017

Rp 4,563,426.31 Rp 461,574,599.13 0.00244


Rp 5,509,628.74 Rp 5,553,705.77 0.00003
Rp 6,946,770.33 Rp 30,343,492.81 0.00016
Rp 4,016,213.12 Rp 14,169,199.90 0.00007
Rp 8,342,724.06 Rp 406,807,910.52 0.00215
Rp 7,381,484.49 Rp 60,491,265.36 0.00032
Rp 6,653,176.05 Rp 391,306,549.66 0.00206
Rp 6,313,269.06 Rp 231,865,854.50 0.00122
Rp 9,390,770.97 Rp 99,222,886.08 0.00052
Rp 8,218,602.79 Rp 32,455,262.43 0.00017
Rp 6,451,376.51 Rp 64,971,812.79 0.00034
Rp 8,388,879.77 Rp 158,734,802.41 0.00084
Rp 9,125,546.30 Rp 78,187,680.67 0.00041
Rp 7,619,354.73 Rp 48,481,954.12 0.00026
Rp 6,214,365.06 Rp 62,174,722.44 0.00033

RAB (RENCANA ANGGARAN BIAYA) page 872 of 1892


Rp 7,803,020.50 Rp 7,022,718.45 0.00004
Rp 8,265,982.13 Rp 11,679,832.75 0.00006
Rp 8,669,165.03 Rp 37,320,755.46 0.00020

Rp 7,420,722.64 Rp 36,971,895.36 0.00020

Rp 4,290,004.27 Rp 1,747,599,736.15 0.00922

Rp 6,078,784.65 Rp 32,095,982.96 0.00017

Rp 8,342,724.06 Rp 406,807,910.52 0.00215


Rp 7,381,484.49 Rp 60,491,265.36 0.00032
Rp 6,653,176.05 Rp 391,306,549.66 0.00206
Rp 6,313,269.06 Rp 231,865,854.50 0.00122
Rp 9,390,770.97 Rp 165,932,105.82 0.00088
Rp 6,451,376.51 Rp 95,977,128.28 0.00051
Rp 8,388,879.77 Rp 158,734,802.41 0.00084
Rp 9,125,546.30 Rp 10,266,239.58 0.00005
Rp 7,694,463.73 Rp 52,595,506.80 0.00028
Rp 5,879,278.48 Rp 91,232,144.74 0.00048

RAB (RENCANA ANGGARAN BIAYA) page 873 of 1892


Rp 8,342,724.06 Rp 29,132,792.41 0.00015
Rp 6,653,176.05 Rp 35,208,607.68 0.00019
Rp 6,313,269.06 Rp 12,954,828.11 0.00007
Rp 8,342,724.06 Rp 7,508,451.65 0.00004
Rp 6,996,425.82 Rp 126,447,278.33 0.00067
Rp 6,996,425.82 Rp 39,197,475.63 0.00021
Rp 6,026,555.01 Rp 3,003,497,160.53 0.01585

Rp 7,420,722.64 Rp 14,002,903.62 0.00007

Rp 4,290,004.27 Rp 1,862,139,632.77 0.00982

Rp 4,290,004.27 Rp 65,733,590.49 0.00035

Rp 6,078,784.65 Rp 8,814,237.74 0.00005

Rp 4,290,004.27 Rp 978,120.97 0.00001

Rp 4,290,004.27 Rp 155,154,439.58 0.00082

RAB (RENCANA ANGGARAN BIAYA) page 874 of 1892


Rp 4,563,426.31 Rp 96,402,380.77 0.00051
Rp 6,196,684.44 Rp 71,292,854.47 0.00038

Rp 8,342,724.06 Rp 52,634,246.08 0.00028


Rp 6,653,176.05 Rp 48,022,624.76 0.00025
Rp 6,313,269.06 Rp 27,273,322.35 0.00014
Rp 9,390,770.97 Rp 33,384,190.80 0.00018
Rp 6,451,376.51 Rp 12,323,741.97 0.00007
Rp 6,129,412.25 Rp 63,062,457.93 0.00033

Rp 4,290,004.27 Rp 166,541,183.43 0.00088

Rp 4,013,765.49 Rp 5,769,787.89 0.00003

Rp 56,900.00 Rp 8,721,898.29 0.00005


Rp 111,200.00 Rp 5,038,185.10 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 875 of 1892


Rp 111,200.00 Rp 25,569,884.00 0.00013
Rp 29,900.00 Rp 1,527,737.31 0.00001
Rp 29,900.00 Rp 24,063,744.25 0.00013

Rp 28,700.00 Rp 20,862,701.58 0.00011


Rp 28,700.00 Rp 65,994,215.00 0.00035

Rp 94,500.00 Rp 40,165,335.00 0.00021


Rp 96,050.00 Rp 12,686,764.25 0.00007
Rp 88,950.00 Rp 28,730,850.00 0.00015
Rp 88,400.00 Rp 116,467,000.00 0.00061
Rp 105,800.00 Rp 60,877,320.00 0.00032
Rp 108,650.00 Rp 17,106,399.25 0.00009
Rp 104,750.00 Rp 20,753,489.00 0.00011
Rp 108,850.00 Rp 3,457,511.40 0.00002
Rp 110,950.00 Rp 22,095,692.50 0.00012

RAB (RENCANA ANGGARAN BIAYA) page 876 of 1892


Rp 88,950.00 Rp 29,513,610.00 0.00016
Rp 88,400.00 Rp 122,893,680.00 0.00065
Rp 105,800.00 Rp 61,670,820.00 0.00033
Rp 108,650.00 Rp 18,253,200.00 0.00010
Rp 104,750.00 Rp 20,624,646.50 0.00011
Rp 108,850.00 Rp 4,153,062.90 0.00002
Rp 110,950.00 Rp 266,280.00 0.00000

Rp 88,950.00 Rp 31,381,560.00 0.00017


Rp 88,400.00 Rp 122,151,120.00 0.00064
Rp 105,800.00 Rp 61,670,820.00 0.00033
Rp 108,650.00 Rp 17,981,575.00 0.00009
Rp 104,750.00 Rp 20,624,646.50 0.00011
Rp 108,850.00 Rp 2,245,575.50 0.00001
Rp 110,950.00 Rp 266,280.00 0.00000

Rp 88,950.00 Rp 31,755,150.00 0.00017

RAB (RENCANA ANGGARAN BIAYA) page 877 of 1892


Rp 88,400.00 Rp 124,750,080.00 0.00066
Rp 105,800.00 Rp 61,670,820.00 0.00033
Rp 108,650.00 Rp 17,221,025.00 0.00009
Rp 104,750.00 Rp 22,007,346.50 0.00012
Rp 108,850.00 Rp 4,207,487.90 0.00002
Rp 110,950.00 Rp 266,280.00 0.00000

Rp 88,950.00 Rp 22,099,627.50 0.00012


Rp 88,400.00 Rp 6,683,040.00 0.00004
Rp 105,800.00 Rp 12,637,810.00 0.00007
Rp 104,750.00 Rp 776,197.50 0.00000

Rp 624,050.00 Rp 234,331,700.47 0.00124


Rp 956,000.00 Rp 3,807,422.96 0.00002
Rp 102,850.00 Rp 186,458,348.89 0.00098
Rp 54,900.00 Rp 178,563,282.12 0.00094
Rp 24,800.00 Rp 75,861,007.68 0.00040

RAB (RENCANA ANGGARAN BIAYA) page 878 of 1892


Rp 115,850.00 Rp 45,809,893.57 0.00024
Rp 67,600.00 Rp 53,461,351.84 0.00028
Rp 107,600.00 Rp 2,370,750.80 0.00001
Rp 50,550.00 Rp 2,227,536.30 0.00001
Rp 31,700.00 Rp 26,466,786.48 0.00014
Rp 79,700.00 Rp 66,548,703.00 0.00035
Rp 15,550.00 Rp 24,258,777.50 0.00013
Rp 19,700.00 Rp 16,904,097.20 0.00009
Rp 31,450.00 Rp 8,012,610.85 0.00004
Rp 39,200.00 Rp 3,201,906.96 0.00002

Rp 102,850.00 Rp 185,133,044.36 0.00098


Rp 54,900.00 Rp 175,882,723.74 0.00093
Rp 24,800.00 Rp 72,414,948.48 0.00038
Rp 115,850.00 Rp 52,417,305.64 0.00028
Rp 67,600.00 Rp 61,172,375.68 0.00032
Rp 31,700.00 Rp 28,685,862.56 0.00015
Rp 79,700.00 Rp 73,084,900.00 0.00039
Rp 15,550.00 Rp 18,142,682.60 0.00010

RAB (RENCANA ANGGARAN BIAYA) page 879 of 1892


Rp 19,700.00 Rp 9,355,451.20 0.00005
Rp 39,200.00 Rp 3,201,906.96 0.00002
Rp 24,400.00 Rp 732,000.00 0.00000

Rp 102,850.00 Rp 179,183,439.27 0.00095


Rp 54,900.00 Rp 165,280,238.10 0.00087
Rp 24,800.00 Rp 69,221,611.20 0.00037
Rp 115,850.00 Rp 47,370,949.15 0.00025
Rp 67,600.00 Rp 55,283,144.80 0.00029
Rp 31,700.00 Rp 25,924,196.60 0.00014
Rp 79,700.00 Rp 71,588,931.00 0.00038
Rp 15,550.00 Rp 18,142,682.60 0.00010
Rp 19,700.00 Rp 9,355,451.20 0.00005
Rp 39,200.00 Rp 3,201,906.96 0.00002
Rp 24,400.00 Rp 732,000.00 0.00000

Rp 102,850.00 Rp 193,618,354.49 0.00102


Rp 54,900.00 Rp 180,768,812.76 0.00095
Rp 24,800.00 Rp 73,262,979.52 0.00039
Rp 115,850.00 Rp 47,388,118.12 0.00025

RAB (RENCANA ANGGARAN BIAYA) page 880 of 1892


Rp 67,600.00 Rp 55,303,181.44 0.00029
Rp 31,700.00 Rp 25,933,592.48 0.00014
Rp 79,700.00 Rp 150,938,251.00 0.00080
Rp 15,550.00 Rp 18,142,682.60 0.00010
Rp 19,700.00 Rp 9,895,231.20 0.00005
Rp 39,200.00 Rp 3,201,906.96 0.00002
Rp 24,400.00 Rp 1,903,200.00 0.00001

Rp 102,850.00 Rp 56,179,776.07 0.00030


Rp 54,900.00 Rp 59,976,075.96 0.00032
Rp 24,800.00 Rp 27,093,017.92 0.00014
Rp 79,700.00 Rp 22,281,729.00 0.00012
Rp 15,550.00 Rp 387,972.50 0.00000
Rp 19,700.00 Rp 291,954.00 0.00000
Rp 24,400.00 Rp 60,918,504.00 0.00032
Rp 24,400.00 Rp 6,053,640.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 881 of 1892


Rp 12,469,050.00 Rp 24,938,100.00 0.00013
Rp 11,834,750.00 Rp 224,860,250.00 0.00119
Rp 7,443,800.00 Rp 29,775,200.00 0.00016
Rp 5,925,800.00 Rp 17,777,400.00 0.00009
Rp 12,219,850.00 Rp 24,439,700.00 0.00013
Rp 6,813,000.00 Rp 34,065,000.00 0.00018
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 2,664,850.00 Rp 10,659,400.00 0.00006
Rp 6,535,050.00 Rp 313,682,400.00 0.00165
Rp 2,029,800.00 Rp 12,178,800.00 0.00006
Rp 2,879,050.00 Rp 11,516,200.00 0.00006
Rp 1,143,100.00 Rp 4,572,400.00 0.00002
Rp 53,730,950.00 Rp 53,730,950.00 0.00028
Rp 42,865,600.00 Rp 85,731,200.00 0.00045
Rp 141,678,950.00 Rp 141,678,950.00 0.00075

Rp 12,469,050.00 Rp 12,469,050.00 0.00007


Rp 11,834,750.00 Rp 201,190,750.00 0.00106
Rp 7,443,800.00 Rp 29,775,200.00 0.00016

RAB (RENCANA ANGGARAN BIAYA) page 882 of 1892


Rp 5,925,800.00 Rp 29,629,000.00 0.00016
Rp 12,219,850.00 Rp 12,219,850.00 0.00006
Rp 6,813,000.00 Rp 34,065,000.00 0.00018
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 2,664,850.00 Rp 10,659,400.00 0.00006
Rp 6,535,050.00 Rp 313,682,400.00 0.00165
Rp 11,561,750.00 Rp 11,561,750.00 0.00006
Rp 2,029,800.00 Rp 12,178,800.00 0.00006
Rp 2,879,050.00 Rp 20,153,350.00 0.00011
Rp 1,143,100.00 Rp 4,572,400.00 0.00002

Rp 12,469,050.00 Rp 12,469,050.00 0.00007


Rp 11,834,750.00 Rp 201,190,750.00 0.00106
Rp 7,443,800.00 Rp 22,331,400.00 0.00012
Rp 5,925,800.00 Rp 29,629,000.00 0.00016
Rp 12,219,850.00 Rp 24,439,700.00 0.00013
Rp 6,813,000.00 Rp 34,065,000.00 0.00018
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 2,664,850.00 Rp 10,659,400.00 0.00006

RAB (RENCANA ANGGARAN BIAYA) page 883 of 1892


Rp 6,535,050.00 Rp 313,682,400.00 0.00165
Rp 11,561,750.00 Rp 11,561,750.00 0.00006
Rp 2,029,800.00 Rp 12,178,800.00 0.00006
Rp 2,879,050.00 Rp 20,153,350.00 0.00011
Rp 1,143,100.00 Rp 4,572,400.00 0.00002

Rp 20,150,400.00 Rp 40,300,800.00 0.00021


Rp 12,469,050.00 Rp 12,469,050.00 0.00007
Rp 11,834,750.00 Rp 201,190,750.00 0.00106
Rp 7,443,800.00 Rp 29,775,200.00 0.00016
Rp 5,925,800.00 Rp 29,629,000.00 0.00016
Rp 12,219,850.00 Rp 12,219,850.00 0.00006
Rp 6,813,000.00 Rp 34,065,000.00 0.00018
Rp 7,939,650.00 Rp 7,939,650.00 0.00004
Rp 2,664,850.00 Rp 10,659,400.00 0.00006
Rp 6,535,050.00 Rp 313,682,400.00 0.00165
Rp 11,561,750.00 Rp 11,561,750.00 0.00006
Rp 2,029,800.00 Rp 12,178,800.00 0.00006
Rp 2,879,050.00 Rp 20,153,350.00 0.00011

RAB (RENCANA ANGGARAN BIAYA) page 884 of 1892


Rp 1,143,100.00 Rp 4,572,400.00 0.00002

Rp 9,178,250.00 Rp 9,178,250.00 0.00005


Rp 8,689,250.00 Rp 26,067,750.00 0.00014
Rp 5,921,850.00 Rp 5,921,850.00 0.00003
Rp 2,664,850.00 Rp 2,664,850.00 0.00001

Rp 118,050.00 Rp 272,170,177.50 0.00144


Rp 123,650.00 Rp 1,991,074.13 0.00001
Rp 127,950.00 Rp 18,618,004.50 0.00010
Rp 11,750.00 Rp 18,489,095.00 0.00010
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 271,048,230.30 0.00143


Rp 123,650.00 Rp 22,099,284.43 0.00012
Rp 127,950.00 Rp 18,595,933.13 0.00010

RAB (RENCANA ANGGARAN BIAYA) page 885 of 1892


Rp 11,750.00 Rp 20,596,105.00 0.00011
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 271,048,230.30 0.00143


Rp 123,650.00 Rp 22,099,284.43 0.00012
Rp 127,950.00 Rp 18,595,933.13 0.00010
Rp 11,750.00 Rp 20,596,105.00 0.00011
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 118,050.00 Rp 284,628,702.30 0.00150


Rp 123,650.00 Rp 19,655,651.30 0.00010
Rp 127,950.00 Rp 18,595,933.13 0.00010
Rp 11,750.00 Rp 16,003,934.75 0.00008
Rp 281,800.00 Rp 281,800.00 0.00000

Rp 3,352,874.10 Rp 3,352,874.10 0.00002


Rp 6,135,234.00 Rp 6,135,234.00 0.00003
Rp 2,874,537.00 Rp 5,749,074.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 886 of 1892


Rp 2,240,658.90 Rp 2,240,658.90 0.00001
Rp 7,369,553.40 Rp 7,369,553.40 0.00004
Rp 7,320,245.40 Rp 7,320,245.40 0.00004
Rp 9,367,494.00 Rp 37,469,976.00 0.00020
Rp 5,219,105.40 Rp 5,219,105.40 0.00003
Rp 3,121,248.07 Rp 3,121,248.07 0.00002
Rp 2,533,219.20 Rp 5,066,438.40 0.00003
Rp 20,167,700.00 Rp 60,503,100.00 0.00032
Rp 15,285,350.00 Rp 15,285,350.00 0.00008
Rp 451,039.55 Rp 3,991,700.00 0.00002
Rp 451,039.55 Rp 5,209,506.78 0.00003
Rp 451,039.55 Rp 2,063,505.93 0.00001
Rp 451,039.55 Rp 2,012,763.98 0.00001
Rp 451,039.55 Rp 1,826,710.17 0.00001
Rp 451,039.55 Rp 13,734,154.24 0.00007
Rp 451,039.55 Rp 2,503,269.49 0.00001
Rp 451,039.55 Rp 12,786,971.19 0.00007

Rp 3,352,874.10 Rp 3,352,874.10 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 887 of 1892


Rp 6,135,234.00 Rp 6,135,234.00 0.00003
Rp 2,874,537.00 Rp 5,749,074.00 0.00003
Rp 2,240,658.90 Rp 2,240,658.90 0.00001
Rp 7,369,553.40 Rp 7,369,553.40 0.00004
Rp 7,320,245.40 Rp 7,320,245.40 0.00004
Rp 9,367,494.00 Rp 37,469,976.00 0.00020
Rp 3,121,248.07 Rp 3,121,248.07 0.00002
Rp 2,533,219.20 Rp 5,066,438.40 0.00003
Rp 20,167,700.00 Rp 60,503,100.00 0.00032
Rp 15,285,350.00 Rp 15,285,350.00 0.00008
Rp 451,039.55 Rp 3,991,700.00 0.00002
Rp 451,039.55 Rp 5,209,506.78 0.00003
Rp 451,039.55 Rp 2,063,505.93 0.00001
Rp 451,039.55 Rp 2,012,763.98 0.00001
Rp 451,039.55 Rp 1,826,710.17 0.00001
Rp 451,039.55 Rp 13,734,154.24 0.00007
Rp 451,039.55 Rp 2,503,269.49 0.00001
Rp 451,039.55 Rp 12,786,971.19 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 888 of 1892


Rp 3,352,874.10 Rp 3,352,874.10 0.00002
Rp 6,135,234.00 Rp 6,135,234.00 0.00003
Rp 2,874,537.00 Rp 5,749,074.00 0.00003
Rp 2,240,658.90 Rp 2,240,658.90 0.00001
Rp 7,369,553.40 Rp 7,369,553.40 0.00004
Rp 7,320,245.40 Rp 7,320,245.40 0.00004
Rp 9,367,494.00 Rp 37,469,976.00 0.00020
Rp 3,121,248.07 Rp 3,121,248.07 0.00002
Rp 2,533,219.20 Rp 5,066,438.40 0.00003
Rp 20,167,700.00 Rp 60,503,100.00 0.00032
Rp 15,285,350.00 Rp 15,285,350.00 0.00008
Rp 451,039.55 Rp 3,991,700.00 0.00002
Rp 451,039.55 Rp 5,209,506.78 0.00003
Rp 451,039.55 Rp 2,063,505.93 0.00001
Rp 451,039.55 Rp 2,012,763.98 0.00001
Rp 451,039.55 Rp 1,826,710.17 0.00001
Rp 451,039.55 Rp 13,734,154.24 0.00007
Rp 451,039.55 Rp 2,503,269.49 0.00001
Rp 451,039.55 Rp 12,786,971.19 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 889 of 1892


Rp 3,352,874.10 Rp 3,352,874.10 0.00002
Rp 6,135,234.00 Rp 6,135,234.00 0.00003
Rp 2,874,537.00 Rp 5,749,074.00 0.00003
Rp 2,240,658.90 Rp 2,240,658.90 0.00001
Rp 7,369,553.40 Rp 7,369,553.40 0.00004
Rp 7,320,245.40 Rp 7,320,245.40 0.00004
Rp 9,367,494.00 Rp 37,469,976.00 0.00020
Rp 3,121,248.07 Rp 3,121,248.07 0.00002
Rp 2,533,219.20 Rp 5,066,438.40 0.00003
Rp 20,167,700.00 Rp 60,503,100.00 0.00032
Rp 15,285,350.00 Rp 15,285,350.00 0.00008
Rp 451,039.55 Rp 5,209,506.78 0.00003
Rp 451,039.55 Rp 2,063,505.93 0.00001
Rp 451,039.55 Rp 2,012,763.98 0.00001
Rp 451,039.55 Rp 1,826,710.17 0.00001
Rp 451,039.55 Rp 17,658,198.31 0.00009
Rp 451,039.55 Rp 2,503,269.49 0.00001
Rp 451,039.55 Rp 12,786,971.19 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 890 of 1892


Rp 322,700.00 Rp 40,815,096.00 0.00022
Rp 287,350.00 Rp 226,481,339.14 0.00119
Rp 397,450.00 Rp 34,196,598.00 0.00018
Rp 36,350.00 Rp 76,534,743.25 0.00040
Rp 287,350.00 Rp 30,528,064.00 0.00016
Rp 319,800.00 Rp 153,309,241.80 0.00081
Rp 66,500.00 Rp 26,353,684.00 0.00014
Rp 287,350.00 Rp 457,898,546.70 0.00242
Rp 287,350.00 Rp 2,247,077.00 0.00001
Rp 861,800.00 Rp 6,830,626.80 0.00004

Rp 322,700.00 Rp 37,668,771.00 0.00020


Rp 287,350.00 Rp 193,708,382.00 0.00102
Rp 397,450.00 Rp 34,196,598.00 0.00018
Rp 36,350.00 Rp 50,811,811.15 0.00027
Rp 287,350.00 Rp 30,164,278.90 0.00016
RAB (RENCANA ANGGARAN BIAYA) page 891 of 1892
Rp 319,800.00 Rp 152,268,676.56 0.00080
Rp 287,350.00 Rp 456,814,662.50 0.00241
Rp 424,350.00 Rp 3,318,417.00 0.00002
Rp 861,800.00 Rp 6,830,626.80 0.00004

Rp 322,700.00 Rp 37,668,771.00 0.00020


Rp 287,350.00 Rp 193,708,382.00 0.00102
Rp 397,450.00 Rp 34,196,598.00 0.00018
Rp 36,350.00 Rp 50,811,811.15 0.00027
Rp 287,350.00 Rp 30,164,278.90 0.00016
Rp 319,800.00 Rp 152,268,676.56 0.00080
Rp 287,350.00 Rp 456,814,662.50 0.00241
Rp 424,350.00 Rp 3,318,417.00 0.00002
Rp 861,800.00 Rp 6,830,626.80 0.00004

Rp 322,700.00 Rp 37,668,771.00 0.00020


Rp 287,350.00 Rp 193,708,382.00 0.00102
Rp 397,450.00 Rp 34,196,598.00 0.00018
RAB (RENCANA ANGGARAN BIAYA) page 892 of 1892
Rp 36,350.00 Rp 50,811,811.15 0.00027
Rp 287,350.00 Rp 30,164,278.90 0.00016
Rp 319,800.00 Rp 152,268,676.56 0.00080
Rp 287,350.00 Rp 456,817,536.00 0.00241
Rp 424,350.00 Rp 3,318,417.00 0.00002
Rp 861,800.00 Rp 6,830,626.80 0.00004

Rp 29,400.00 Rp 40,598,283.60 0.00021


Rp 23,100.00 Rp 73,292,650.20 0.00039
Rp 19,950.00 Rp 49,219,891.88 0.00026
Rp 19,950.00 Rp 1,629,541.94 0.00001

Rp 29,400.00 Rp 49,122,490.20 0.00026


Rp 23,100.00 Rp 67,249,676.34 0.00035
Rp 19,950.00 Rp 52,271,154.60 0.00028
Rp 19,950.00 Rp 1,629,541.94 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 893 of 1892


Rp 74,350.00 Rp 2,230,500.00 0.00001
Rp 65,750.00 Rp 6,902,040.50 0.00004

Rp 29,400.00 Rp 48,940,210.20 0.00026


Rp 23,100.00 Rp 61,829,205.90 0.00033
Rp 19,950.00 Rp 52,271,154.60 0.00028
Rp 19,950.00 Rp 1,629,541.94 0.00001
Rp 74,350.00 Rp 2,230,500.00 0.00001
Rp 65,750.00 Rp 6,902,040.50 0.00004

Rp 29,400.00 Rp 36,732,654.00 0.00019


Rp 23,100.00 Rp 100,562,773.08 0.00053
Rp 19,950.00 Rp 54,171,940.73 0.00029
Rp 19,950.00 Rp 1,629,541.94 0.00001
Rp 74,350.00 Rp 5,799,300.00 0.00003
Rp 65,750.00 Rp 6,902,040.50 0.00004

Rp 29,400.00 Rp 26,193,930.00 0.00014


Rp 23,100.00 Rp 11,112,957.24 0.00006
Rp 74,350.00 Rp 204,072,906.00 0.00108

RAB (RENCANA ANGGARAN BIAYA) page 894 of 1892


Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 800,117.50 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000
Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 895 of 1892


Rp 146,541.67 Rp 800,886.84 0.00000
Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,007,840.31 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 327,740.44 0.00000

Rp 146,541.67 Rp 1,007,840.31 0.00001


Rp 146,541.67 Rp 800,117.50 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000
Rp 146,541.67 Rp 1,008,609.66 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 896 of 1892


Rp 146,541.67 Rp 1,008,609.66 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 330,817.81 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,008,609.66 0.00001
Rp 146,541.67 Rp 553,927.50 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 330,817.81 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 327,740.44 0.00000

Rp 146,541.67 Rp 1,003,993.59 0.00001


Rp 146,541.67 Rp 800,117.50 0.00000
Rp 146,541.67 Rp 800,886.84 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 897 of 1892


Rp 146,541.67 Rp 1,004,762.94 0.00001
Rp 146,541.67 Rp 669,329.06 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,004,762.94 0.00001
Rp 146,541.67 Rp 669,329.06 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,003,993.59 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,004,762.94 0.00001
Rp 146,541.67 Rp 669,329.06 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,003,993.59 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 800,886.84 0.00000


Rp 146,541.67 Rp 1,004,762.94 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 898 of 1892


Rp 146,541.67 Rp 669,329.06 0.00000
Rp 146,541.67 Rp 203,106.75 0.00000
Rp 146,541.67 Rp 1,003,993.59 0.00001
Rp 146,541.67 Rp 800,886.84 0.00000

Rp 146,541.67 Rp 385,441.22 0.00000

Rp 146,541.67 Rp 4,185,230.00 0.00002


Rp 146,541.67 Rp 5,700,837.19 0.00003
Rp 146,541.67 Rp 1,100,161.56 0.00001

Rp 146,541.67 Rp 4,185,230.00 0.00002


Rp 146,541.67 Rp 5,700,837.19 0.00003
Rp 146,541.67 Rp 1,100,161.56 0.00001
Rp 146,541.67
Rp 146,541.67 Rp 4,185,230.00 0.00002
Rp 146,541.67 Rp 5,700,837.19 0.00003
Rp 146,541.67 Rp 1,100,161.56 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 899 of 1892


Rp 433,586.21 Rp 3,915,283.45 0.00002
Rp 433,586.21 Rp 1,821,062.07 0.00001

Rp 433,586.21 Rp 3,915,283.45 0.00002


Rp 433,586.21 Rp 1,821,062.07 0.00001

Rp 433,586.21 Rp 3,915,283.45 0.00002


Rp 433,586.21 Rp 1,821,062.07 0.00001

Rp 433,586.21 Rp 1,980,405.00 0.00001

Rp 433,586.21 Rp 1,980,405.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 900 of 1892


Rp 433,586.21 Rp 1,980,405.00 0.00001

Rp 433,586.21 Rp 4,233,969.31 0.00002

Rp 146,541.67 Rp 2,054,147.81 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

Rp 146,541.67 Rp 2,054,147.81 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

Rp 146,541.67 Rp 2,054,147.81 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 901 of 1892


Rp 146,541.67 Rp 1,027,073.91 0.00001
Rp 146,541.67 Rp 2,769,637.50 0.00001

Rp 146,541.67 Rp 1,027,073.91 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

Rp 146,541.67 Rp 1,027,073.91 0.00001


Rp 146,541.67 Rp 2,769,637.50 0.00001

Rp 244,670.86 Rp 4,746,614.68 0.00003


23,650.0 Rp 986,595.23 0.00001
Rp 10,500.00 Rp 21,000.00 0.00000
Rp 31,500.00 Rp 63,000.00 0.00000
Rp 997,500.00 Rp 1,271,812.50 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 902 of 1892


Rp 2,550,200.00 Rp 40,280,409.00 0.00021
Rp 2,550,200.00 Rp 40,280,409.00 0.00021
Rp 2,550,200.00 Rp 102,665,314.05 0.00054

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 40,280,409.00 0.00021
Rp 2,550,200.00 Rp 102,665,314.05 0.00054

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 40,280,409.00 0.00021
Rp 2,550,200.00 Rp 102,665,314.05 0.00054

Rp 2,550,200.00 Rp 40,280,409.00 0.00021


Rp 2,550,200.00 Rp 40,280,409.00 0.00021
Rp 2,550,200.00 Rp 102,665,314.05 0.00054

RAB (RENCANA ANGGARAN BIAYA) page 903 of 1892


Rp 29,461,600.00 Rp 58,923,200.00 0.00031

Rp 6,982,650.00 Rp 27,930,600.00 0.00015

Rp 36,106,300.00 Rp 72,212,600.00 0.00038

Rp 20,707,050.00 Rp 62,121,150.00 0.00033


Rp 5,775,000.00 Rp 1,039,500.00 0.00001
23,650.0 Rp 6,374,900.07 0.00003
23,650.0 Rp 2,144,267.93 0.00001
23,650.0 Rp 1,337,777.78 0.00001
23,650.0 Rp 3,453,278.40 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 904 of 1892


Rp 26,250.00 Rp 1,417,500.00 0.00001

Rp 537,650.00 Rp 6,451,800.00 0.00003

Rp 636,200.00 Rp 75,043,607.20 0.00040

Rp 29,400.00 Rp 1,991,556.00 0.00001

Rp 29,400.00 Rp 2,591,316.00 0.00001

Rp 29,400.00 Rp 2,773,596.00 0.00001

Rp 29,400.00 Rp 579,180.00 0.00000

Rp 29,400.00 Rp 396,900.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 905 of 1892


Rp 29,400.00 Rp 726,180.00 0.00000

Rp 29,400.00 Rp 726,180.00 0.00000

Rp 29,400.00 Rp 329,280.00 0.00000

Rp 29,400.00 Rp 2,758,896.00 0.00001

Rp 29,400.00 Rp 1,380,624.00 0.00001

Rp 29,400.00 Rp 1,380,624.00 0.00001

Rp 29,400.00 Rp 952,560.00 0.00001

Rp 31,450.00 Rp 2,717,280.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 906 of 1892


Rp 31,450.00 Rp 849,150.00 0.00000

Rp 31,450.00 Rp 4,075,920.00 0.00002

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,794,940.82 0.00001
Rp 107,497.72 Rp 859,981.79 0.00000
Rp 1,714,255.74 Rp 1,714,255.74 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 907 of 1892


Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 6,882,898.50 0.00004
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,902,438.54 0.00002
Rp 107,497.72 Rp 967,479.51 0.00001
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 11,766,719.87 0.00006
Rp 475,653.65 Rp 475,653.65 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 908 of 1892


Rp 1,828,127.22 Rp 1,828,127.22 0.00001
Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,902,438.54 0.00002
Rp 107,497.72 Rp 859,981.79 0.00000
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 11,994,462.84 0.00006
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,203,403.72 Rp 1,203,403.72 0.00001


Rp 600,274.90 Rp 600,274.90 0.00000
Rp 107,497.72 Rp 2,794,940.82 0.00001
Rp 107,497.72 Rp 967,479.51 0.00001
Rp 1,714,255.74 Rp 1,714,255.74 0.00001
Rp 226,030.61 Rp 226,030.61 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 909 of 1892


Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 50,609.55 Rp 12,222,205.80 0.00006
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,203,403.72 Rp 1,203,403.72 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 107,497.72 Rp 644,986.34 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 7,848.29 Rp 1,930,678.15 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 910 of 1892


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 1,498,308.98 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 2,401,099.60 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 911 of 1892


Rp 1,828,127.22 Rp 1,828,127.22 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 1,348,478.08 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 2,401,099.60 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 912 of 1892


Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 1,348,478.08 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,242,882.97 Rp 1,242,882.97 0.00001
Rp 600,274.90 Rp 2,401,099.60 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 913 of 1892


Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 49,943.63 Rp 1,947,801.68 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 78,482.85 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,828,127.22 Rp 1,828,127.22 0.00001


Rp 1,289,497.03 Rp 1,289,497.03 0.00001
Rp 600,274.90 Rp 2,401,099.60 0.00001
Rp 547,953.00 Rp 547,953.00 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 914 of 1892


Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 156,965.70 0.00000
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 1,203,403.72 Rp 1,203,403.72 0.00001


Rp 547,953.00 Rp 547,953.00 0.00000
Rp 594,567.06 Rp 1,783,701.17 0.00001
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 23,782.68 Rp 71,348.05 0.00000
Rp 808,611.20 Rp 808,611.20 0.00000
Rp 142,696.09 Rp 142,696.09 0.00000
Rp 39,241.43 Rp 9,810,356.43 0.00005
Rp 475,653.65 Rp 475,653.65 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 915 of 1892


Rp 195,650.00 Rp 26,608,400.00 0.00014

Rp 195,650.00 Rp 45,488,625.00 0.00024

Rp 195,650.00 Rp 46,369,050.00 0.00024

Rp 195,650.00 Rp 47,249,475.00 0.00025

Rp 48,300.00 Rp 11,881,800.00 0.00006

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 70,524,900.00 0.00037

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 122,140,950.00 0.00064

RAB (RENCANA ANGGARAN BIAYA) page 916 of 1892


Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 124,440,675.00 0.00066

Rp 48,300.00 Rp 144,900.00 0.00000

Rp 511,050.00 Rp 126,740,400.00 0.00067

Rp 77,100.00 Rp 19,275,000.00 0.00010

Rp 239,240.61 Rp 77,274,718.05 0.00041


Rp 267,500.00 Rp 47,882,500.00 0.00025
Rp 239,240.61 Rp 3,349,368.58 0.00002
Rp 1,396,550.00 Rp 114,517,100.00 0.00060

RAB (RENCANA ANGGARAN BIAYA) page 917 of 1892


Rp 679,650.00 Rp 113,501,550.00 0.00060
Rp 280,400.00 Rp 12,337,600.00 0.00007
Rp 257,550.00 Rp 4,635,900.00 0.00002
Rp 276,250.00 Rp 828,750.00 0.00000
Rp 242,050.00 Rp 726,150.00 0.00000
Rp 1,667,600.00 Rp 1,667,600.00 0.00001
Rp 2,296,664.20 Rp 9,186,656.80 0.00005
Rp 2,637,840.00 Rp 2,637,840.00 0.00001
Rp 53,600.00 Rp 1,500,800.00 0.00001
Rp 76,300.00 Rp 1,449,700.00 0.00001
Rp 167,650.00 Rp 1,173,550.00 0.00001
Rp 64,150.00 Rp 192,450.00 0.00000
Rp 1,299,350.00 Rp 18,190,900.00 0.00010
Rp 66,300.00 Rp 6,828,900.00 0.00004
Rp 203,850.00 Rp 4,484,700.00 0.00002
Rp 925,550.00 Rp 14,808,800.00 0.00008
Rp 475,653.65 Rp 30,441,833.28 0.00016
Rp 264,950.00 Rp 14,837,200.00 0.00008

Rp 239,240.61 Rp 77,513,958.66 0.00041

RAB (RENCANA ANGGARAN BIAYA) page 918 of 1892


Rp 267,500.00 Rp 48,952,500.00 0.00026
Rp 239,240.61 Rp 2,631,646.74 0.00001
Rp 1,396,550.00 Rp 124,292,950.00 0.00066
Rp 679,650.00 Rp 101,267,850.00 0.00053
Rp 280,400.00 Rp 13,459,200.00 0.00007
Rp 257,550.00 Rp 4,635,900.00 0.00002
Rp 242,050.00 Rp 726,150.00 0.00000
Rp 2,296,664.20 Rp 9,186,656.80 0.00005
Rp 2,637,840.00 Rp 2,637,840.00 0.00001
Rp 4,424,050.00 Rp 26,544,300.00 0.00014
Rp 638,250.00 Rp 1,914,750.00 0.00001
Rp 753,350.00 Rp 2,260,050.00 0.00001
Rp 53,600.00 Rp 1,340,000.00 0.00001
Rp 76,300.00 Rp 1,449,700.00 0.00001
Rp 167,650.00 Rp 1,005,900.00 0.00001
Rp 119,350.00 Rp 358,050.00 0.00000
Rp 1,299,350.00 Rp 14,292,850.00 0.00008
Rp 66,300.00 Rp 6,828,900.00 0.00004
Rp 203,850.00 Rp 5,096,250.00 0.00003
Rp 925,550.00 Rp 13,883,250.00 0.00007

RAB (RENCANA ANGGARAN BIAYA) page 919 of 1892


Rp 264,950.00 Rp 11,657,800.00 0.00006

Rp 239,240.61 Rp 76,556,996.21 0.00040


Rp 267,500.00 Rp 49,487,500.00 0.00026
Rp 239,240.61 Rp 3,349,368.58 0.00002
Rp 1,396,550.00 Rp 127,086,050.00 0.00067
Rp 679,650.00 Rp 101,267,850.00 0.00053
Rp 280,400.00 Rp 12,618,000.00 0.00007
Rp 257,550.00 Rp 4,635,900.00 0.00002
Rp 242,050.00 Rp 726,150.00 0.00000
Rp 2,296,664.20 Rp 9,186,656.80 0.00005
Rp 2,643,904.00 Rp 2,643,904.00 0.00001
Rp 489,350.00 Rp 1,468,050.00 0.00001
Rp 638,250.00 Rp 1,914,750.00 0.00001
Rp 753,350.00 Rp 2,260,050.00 0.00001
Rp 53,600.00 Rp 1,340,000.00 0.00001
Rp 76,300.00 Rp 1,449,700.00 0.00001
Rp 167,650.00 Rp 838,250.00 0.00000
Rp 119,350.00 Rp 358,050.00 0.00000
Rp 1,299,350.00 Rp 18,190,900.00 0.00010

RAB (RENCANA ANGGARAN BIAYA) page 920 of 1892


Rp 66,300.00 Rp 6,828,900.00 0.00004
Rp 203,850.00 Rp 5,300,100.00 0.00003
Rp 925,550.00 Rp 13,883,250.00 0.00007
Rp 264,950.00 Rp 14,837,200.00 0.00008

Rp 239,240.61 Rp 81,341,808.47 0.00043


Rp 267,500.00 Rp 47,882,500.00 0.00025
Rp 239,240.61 Rp 3,110,127.97 0.00002
Rp 1,396,550.00 Rp 118,706,750.00 0.00063
Rp 679,650.00 Rp 112,821,900.00 0.00060
Rp 280,400.00 Rp 12,337,600.00 0.00007
Rp 257,550.00 Rp 4,635,900.00 0.00002
Rp 242,050.00 Rp 726,150.00 0.00000
Rp 1,667,600.00 Rp 1,667,600.00 0.00001
Rp 2,296,664.20 Rp 9,186,656.80 0.00005
Rp 2,637,840.00 Rp 2,637,840.00 0.00001
Rp 4,424,050.00 Rp 53,088,600.00 0.00028
Rp 638,250.00 Rp 1,914,750.00 0.00001
Rp 753,350.00 Rp 2,260,050.00 0.00001
Rp 53,600.00 Rp 1,286,400.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 921 of 1892


Rp 76,300.00 Rp 1,526,000.00 0.00001
Rp 167,650.00 Rp 1,005,900.00 0.00001
Rp 119,350.00 Rp 358,050.00 0.00000
Rp 1,299,350.00 Rp 16,891,550.00 0.00009
Rp 66,300.00 Rp 6,828,900.00 0.00004
Rp 203,850.00 Rp 4,688,550.00 0.00002
Rp 925,550.00 Rp 13,883,250.00 0.00007
Rp 264,950.00 Rp 13,777,400.00 0.00007

Rp 239,240.61 Rp 2,153,165.52 0.00001


Rp 267,500.00 Rp 802,500.00 0.00000
Rp 619,750.00 Rp 5,577,750.00 0.00003
Rp 53,600.00 Rp 214,400.00 0.00000
Rp 66,300.00 Rp 198,900.00 0.00000

Rp 1,902,614.58 Rp 1,902,614.58 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 922 of 1892


Rp 334,400.00 Rp 9,363,200.00 0.00005
Rp 87,800.00 Rp 2,458,400.00 0.00001
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 58,850.00 Rp 7,650,500.00 0.00004
Rp 409,062.13 Rp 11,453,739.77 0.00006

Rp 334,400.00 Rp 8,694,400.00 0.00005


Rp 87,800.00 Rp 2,282,800.00 0.00001
Rp 386,550.00 Rp 386,550.00 0.00000
Rp 58,850.00 Rp 7,356,250.00 0.00004
Rp 409,062.13 Rp 10,635,615.50 0.00006

Rp 334,400.00 Rp 8,694,400.00 0.00005


Rp 87,800.00 Rp 2,282,800.00 0.00001
Rp 386,550.00 Rp 773,100.00 0.00000
Rp 58,850.00 Rp 7,650,500.00 0.00004
Rp 409,062.13 Rp 10,635,615.50 0.00006

Rp 334,400.00 Rp 8,694,400.00 0.00005


Rp 87,800.00 Rp 2,282,800.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 923 of 1892


Rp 386,550.00 Rp 773,100.00 0.00000
Rp 58,850.00 Rp 7,944,750.00 0.00004
Rp 409,062.13 Rp 10,635,615.50 0.00006

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 405,550.00 Rp 38,527,250.00 0.00020


Rp 162,000.00 Rp 15,066,000.00 0.00008
Rp 2,234,100.00 Rp 4,468,200.00 0.00002
Rp 4,290,350.00 Rp 4,290,350.00 0.00002
Rp 1,569,650.00 Rp 4,708,950.00 0.00002
Rp 12,609,550.00 Rp 12,609,550.00 0.00007
Rp 4,499,650.00 Rp 13,498,950.00 0.00007
Rp 63,737.59 Rp 6,055,070.90 0.00003
Rp 1,308,000.00 Rp 2,616,000.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 924 of 1892


Rp 405,550.00 Rp 12,166,500.00 0.00006
Rp 162,000.00 Rp 4,536,000.00 0.00002
Rp 2,234,100.00 Rp 4,468,200.00 0.00002
Rp 1,569,650.00 Rp 3,139,300.00 0.00002
Rp 4,499,650.00 Rp 8,999,300.00 0.00005
Rp 63,737.59 Rp 1,912,127.65 0.00001
Rp 1,308,000.00 Rp 2,616,000.00 0.00001

Rp 405,550.00 Rp 12,166,500.00 0.00006


Rp 162,000.00 Rp 4,536,000.00 0.00002
Rp 2,234,100.00 Rp 4,468,200.00 0.00002
Rp 1,569,650.00 Rp 3,139,300.00 0.00002
Rp 4,499,650.00 Rp 8,999,300.00 0.00005
Rp 63,737.59 Rp 1,912,127.65 0.00001
Rp 1,308,000.00 Rp 2,616,000.00 0.00001

Rp 405,550.00 Rp 12,166,500.00 0.00006


Rp 162,000.00 Rp 4,536,000.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 925 of 1892


Rp 2,234,100.00 Rp 4,468,200.00 0.00002
Rp 1,569,650.00 Rp 3,139,300.00 0.00002
Rp 4,499,650.00 Rp 8,999,300.00 0.00005
Rp 63,737.59 Rp 1,912,127.65 0.00001
Rp 1,308,000.00 Rp 2,616,000.00 0.00001

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

Rp 759,550.00 Rp 8,355,050.00 0.00004


Rp 3,196,050.00 Rp 28,764,450.00 0.00015
Rp 6,173,400.00 Rp 6,173,400.00 0.00003
Rp 13,872,850.00 Rp 13,872,850.00 0.00007

Rp 759,550.00 Rp 5,316,850.00 0.00003


Rp 3,196,050.00 Rp 19,176,300.00 0.00010

RAB (RENCANA ANGGARAN BIAYA) page 926 of 1892


Rp 6,173,400.00 Rp 6,173,400.00 0.00003

Rp 759,550.00 Rp 5,316,850.00 0.00003


Rp 3,196,050.00 Rp 19,176,300.00 0.00010
Rp 6,173,400.00 Rp 6,173,400.00 0.00003
Rp 6,278,600.00 Rp 6,278,600.00 0.00003
Rp 2,302,150.00 Rp 2,302,150.00 0.00001
Rp 63,737.59 Rp 1,529,702.12 0.00001
Rp 237,826.82 Rp 237,826.82 0.00000

Rp 759,550.00 Rp 5,316,850.00 0.00003


Rp 3,196,050.00 Rp 19,176,300.00 0.00010
Rp 6,173,400.00 Rp 6,173,400.00 0.00003

Rp 1,426,960.94 Rp 1,426,960.94 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 927 of 1892


Rp 268,450.00 Rp 15,838,550.00 0.00008
Rp 124,950.00 Rp 5,997,600.00 0.00003
Rp 138,700.00 Rp 1,525,700.00 0.00001

Rp 268,450.00 Rp 15,838,550.00 0.00008


Rp 124,950.00 Rp 5,997,600.00 0.00003
Rp 138,700.00 Rp 1,525,700.00 0.00001

Rp 268,450.00 Rp 15,838,550.00 0.00008


Rp 124,950.00 Rp 5,997,600.00 0.00003
Rp 138,700.00 Rp 1,525,700.00 0.00001

Rp 268,450.00 Rp 15,838,550.00 0.00008


Rp 124,950.00 Rp 5,997,600.00 0.00003
Rp 138,700.00 Rp 1,525,700.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 928 of 1892


Rp 1,426,960.94 Rp 1,426,960.94 0.00001

Rp 329,000.00 Rp 44,415,000.00 0.00023


Rp 275,900.00 Rp 40,005,500.00 0.00021
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 408,150.00 0.00000
Rp 371,700.00 Rp 371,700.00 0.00000
Rp 341,050.00 Rp 682,100.00 0.00000

Rp 329,000.00 Rp 44,415,000.00 0.00023


Rp 275,900.00 Rp 40,005,500.00 0.00021
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 408,150.00 0.00000
Rp 371,700.00 Rp 371,700.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 929 of 1892


Rp 341,050.00 Rp 682,100.00 0.00000

Rp 329,000.00 Rp 44,415,000.00 0.00023


Rp 275,900.00 Rp 40,005,500.00 0.00021
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 408,150.00 0.00000
Rp 371,700.00 Rp 371,700.00 0.00000
Rp 341,050.00 Rp 682,100.00 0.00000

Rp 329,000.00 Rp 44,415,000.00 0.00023


Rp 275,900.00 Rp 40,005,500.00 0.00021
Rp 488,700.00 Rp 488,700.00 0.00000
Rp 408,150.00 Rp 408,150.00 0.00000
Rp 371,700.00 Rp 371,700.00 0.00000
Rp 341,050.00 Rp 682,100.00 0.00000

Rp 329,000.00 Rp 15,463,000.00 0.00008

RAB (RENCANA ANGGARAN BIAYA) page 930 of 1892


Rp 371,700.00 Rp 743,400.00 0.00000

Rp 1,075,652.67 Rp 6,453,916.00 0.00003

Rp 1,075,652.67 Rp 7,529,568.66 0.00004

Rp 1,075,652.67 Rp 7,529,568.66 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 931 of 1892


Rp 1,075,652.67 Rp 8,605,221.33 0.00005

Rp 209,300.00 Rp 418,600.00 0.00000


Rp 396,450.00 Rp 396,450.00 0.00000
Rp 291,450.00 Rp 582,900.00 0.00000
Rp 32,850.00 Rp 8,376,750.00 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 932 of 1892


Rp 36,350.00 Rp 163,575.00 0.00000
Rp 32,850.00 Rp 147,825.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 598,800.00 0.00000
Rp 12,850.00 Rp 3,121,265.00 0.00002
Rp 27,471,150.00 Rp 54,942,300.00 0.00029

Rp 9,513,072.90 Rp 9,513,072.90 0.00005


Rp -
Rp 7,610,458.32 Rp 7,610,458.32 0.00004
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 209,300.00 Rp 418,600.00 0.00000


Rp 396,450.00 Rp 396,450.00 0.00000
Rp 291,450.00 Rp 582,900.00 0.00000
Rp 36,350.00 Rp 163,575.00 0.00000
Rp 32,850.00 Rp 147,825.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 933 of 1892


Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 598,800.00 0.00000
Rp 12,850.00 Rp 2,578,352.50 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 209,300.00 Rp 418,600.00 0.00000


Rp 396,450.00 Rp 396,450.00 0.00000
Rp 291,450.00 Rp 582,900.00 0.00000
Rp 36,350.00 Rp 163,575.00 0.00000
Rp 32,850.00 Rp 147,825.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 598,800.00 0.00000
Rp 12,850.00 Rp 2,578,352.50 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 209,300.00 Rp 418,600.00 0.00000


Rp 396,450.00 Rp 396,450.00 0.00000
Rp 291,450.00 Rp 582,900.00 0.00000
Rp 36,350.00 Rp 163,575.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 934 of 1892


Rp 32,850.00 Rp 147,825.00 0.00000
Rp 24,950.00 Rp 336,825.00 0.00000
Rp 32,850.00 Rp 262,800.00 0.00000
Rp 24,950.00 Rp 598,800.00 0.00000
Rp 12,850.00 Rp 2,578,352.50 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 734,250.00 Rp 8,811,000.00 0.00005


Rp 488,950.00 Rp 1,955,800.00 0.00001
Rp 396,450.00 Rp 3,171,600.00 0.00002
Rp 80,750.00 Rp 646,000.00 0.00000
Rp 44,000.00 Rp 4,532,000.00 0.00002
Rp 36,350.00 Rp 1,781,150.00 0.00001
Rp 32,850.00 Rp 394,200.00 0.00000
Rp 24,950.00 Rp 948,100.00 0.00001
Rp 44,000.00 Rp 1,680,800.00 0.00001
Rp 2,777,774.25 Rp 5,555,548.50 0.00003
Rp 1,399,397.25 Rp 2,798,794.50 0.00001
Rp 899,700.00 Rp 2,159,280.00 0.00001
Rp 9,200.00 Rp 6,624,000.00 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 935 of 1892


Rp 80,797,500.00 Rp 161,595,000.00 0.00085

Rp 475,653.65 Rp 475,653.65 0.00000

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

Rp 32,850.00 Rp 919,800.00 0.00000


Rp 44,000.00 Rp 1,056,000.00 0.00001
Rp 80,750.00 Rp 11,022,375.00 0.00006
Rp 80,750.00 Rp 1,816,875.00 0.00001
Rp 1,638,750.00 Rp 6,555,000.00 0.00003
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 32,850.00 Rp 985,500.00 0.00001


Rp 44,000.00 Rp 1,144,000.00 0.00001
Rp 80,750.00 Rp 4,158,625.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 936 of 1892


Rp 80,750.00 Rp 1,816,875.00 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 32,850.00 Rp 985,500.00 0.00001


Rp 44,000.00 Rp 1,144,000.00 0.00001
Rp 80,750.00 Rp 4,158,625.00 0.00002
Rp 80,750.00 Rp 1,816,875.00 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 32,850.00 Rp 985,500.00 0.00001


Rp 44,000.00 Rp 1,144,000.00 0.00001
Rp 80,750.00 Rp 4,158,625.00 0.00002
Rp 44,000.00 Rp 1,760,000.00 0.00001
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 36,350.00 Rp 727,000.00 0.00000


Rp 44,000.00 Rp 1,619,200.00 0.00001
Rp 127,800.00 Rp 19,042,200.00 0.00010
Rp 127,800.00 Rp 2,875,500.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 937 of 1892


Rp 1,638,750.00 Rp 3,277,500.00 0.00002
Rp 30,520,404.67 Rp 61,040,809.34 0.00032
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 36,350.00 Rp 727,000.00 0.00000


Rp 44,000.00 Rp 858,000.00 0.00000
Rp 127,800.00 Rp 3,834,000.00 0.00002
Rp 127,800.00 Rp 2,875,500.00 0.00002
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 36,350.00 Rp 727,000.00 0.00000


Rp 44,000.00 Rp 858,000.00 0.00000
Rp 127,800.00 Rp 3,834,000.00 0.00002
Rp 127,800.00 Rp 2,875,500.00 0.00002
Rp 475,653.65 Rp 475,653.65 0.00000

Rp 36,350.00 Rp 727,000.00 0.00000


Rp 44,000.00 Rp 858,000.00 0.00000
Rp 127,800.00 Rp 3,834,000.00 0.00002
Rp 127,800.00 Rp 2,875,500.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 938 of 1892


Rp 475,653.65 Rp 475,653.65 0.00000

Rp 309,150.00 Rp 1,854,900.00 0.00001


Rp 3,569,300.00 Rp 49,970,200.00 0.00026
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 65,391,000.00 0.00034
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 6,783,200.00 0.00004
Rp 403,150.00 Rp 6,450,400.00 0.00003
Rp 3,422,800.00 Rp 27,382,400.00 0.00014
Rp 1,618,500.00 Rp 11,329,500.00 0.00006
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 309,150.00 Rp 1,854,900.00 0.00001


Rp 3,569,300.00 Rp 49,970,200.00 0.00026
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 65,391,000.00 0.00034
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 6,783,200.00 0.00004

RAB (RENCANA ANGGARAN BIAYA) page 939 of 1892


Rp 403,150.00 Rp 6,450,400.00 0.00003
Rp 3,422,800.00 Rp 27,382,400.00 0.00014
Rp 1,618,500.00 Rp 11,329,500.00 0.00006
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 309,150.00 Rp 1,854,900.00 0.00001


Rp 3,569,300.00 Rp 49,970,200.00 0.00026
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 65,391,000.00 0.00034
Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 6,783,200.00 0.00004
Rp 403,150.00 Rp 6,450,400.00 0.00003
Rp 3,422,800.00 Rp 27,382,400.00 0.00014
Rp 1,618,500.00 Rp 11,329,500.00 0.00006
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 309,150.00 Rp 1,854,900.00 0.00001


Rp 3,569,300.00 Rp 49,970,200.00 0.00026
Rp 2,266,900.00 Rp 2,266,900.00 0.00001
Rp 4,359,400.00 Rp 65,391,000.00 0.00034

RAB (RENCANA ANGGARAN BIAYA) page 940 of 1892


Rp 5,593,500.00 Rp 5,593,500.00 0.00003
Rp 423,950.00 Rp 6,783,200.00 0.00004
Rp 403,150.00 Rp 6,450,400.00 0.00003
Rp 3,422,800.00 Rp 27,382,400.00 0.00014
Rp 1,618,500.00 Rp 11,329,500.00 0.00006
Rp 791,400.00 Rp 1,582,800.00 0.00001

Rp 44,000.00 Rp 1,584,000.00 0.00001


Rp 127,800.00 Rp 9,201,600.00 0.00005
Rp 197,150.00 Rp 9,758,925.00 0.00005
Rp 180,748.39 Rp 3,253,470.93 0.00002
Rp 14,269.61 Rp 2,168,980.62 0.00001

Rp 44,000.00 Rp 1,584,000.00 0.00001


Rp 127,800.00 Rp 9,201,600.00 0.00005
Rp 197,150.00 Rp 9,758,925.00 0.00005
Rp 180,748.39 Rp 3,253,470.93 0.00002
Rp 14,269.61 Rp 2,168,980.62 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 941 of 1892


Rp 44,000.00 Rp 1,584,000.00 0.00001
Rp 127,800.00 Rp 9,201,600.00 0.00005
Rp 197,150.00 Rp 9,758,925.00 0.00005
Rp 180,748.39 Rp 3,253,470.93 0.00002
Rp 14,269.61 Rp 2,168,980.62 0.00001

Rp 127,800.00 Rp 12,652,200.00 0.00007


Rp 197,150.00 Rp 9,758,925.00 0.00005
Rp 142,696.09 Rp 3,139,314.06 0.00002
Rp 190,261.46 Rp 2,092,876.04 0.00001
Rp 14,269.61 Rp 2,953,809.14 0.00002

Rp 44,000.00 Rp 8,712,000.00 0.00005


Rp 127,800.00 Rp 2,300,400.00 0.00001
Rp 142,696.09 Rp 570,784.37 0.00000
Rp 14,269.61 Rp 998,872.65 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 942 of 1892


Rp 1,274,000.00 Rp 3,822,000.00 0.00002
Rp 261,950.00 Rp 6,810,700.00 0.00004
Rp 210,388,500.00 Rp 210,388,500.00 0.00111
Rp 225,682,300.00 Rp 225,682,300.00 0.00119
Rp 292,291,900.00 Rp 292,291,900.00 0.00154
Rp 15,815,500.00 Rp 79,077,500.00 0.00042
Rp 17,686,650.00 Rp 17,686,650.00 0.00009
Rp 17,851,850.00 Rp 196,370,350.00 0.00104
Rp 18,051,100.00 Rp 126,357,700.00 0.00067
Rp 12,773,400.00 Rp 25,546,800.00 0.00013
Rp 1,718,955.00 Rp 44,692,830.00 0.00024
Rp 926,100.00 Rp 24,078,600.00 0.00013
Rp 2,100,735.00 Rp 50,417,640.00 0.00027
Rp 34,050.00 Rp 7,082,400.00 0.00004

Rp 1,274,000.00 Rp 2,548,000.00 0.00001


Rp 261,950.00 Rp 6,810,700.00 0.00004
Rp 210,388,500.00 Rp 210,388,500.00 0.00111
Rp 225,682,300.00 Rp 225,682,300.00 0.00119

RAB (RENCANA ANGGARAN BIAYA) page 943 of 1892


Rp 292,291,900.00 Rp 292,291,900.00 0.00154
Rp 15,815,500.00 Rp 79,077,500.00 0.00042
Rp 17,686,650.00 Rp 17,686,650.00 0.00009
Rp 17,851,850.00 Rp 196,370,350.00 0.00104
Rp 18,051,100.00 Rp 126,357,700.00 0.00067
Rp 12,773,400.00 Rp 25,546,800.00 0.00013
Rp 1,718,955.00 Rp 44,692,830.00 0.00024
Rp 926,100.00 Rp 24,078,600.00 0.00013
Rp 2,100,735.00 Rp 50,417,640.00 0.00027
Rp 34,050.00 Rp 7,082,400.00 0.00004

Rp 1,274,000.00 Rp 3,822,000.00 0.00002


Rp 261,950.00 Rp 6,810,700.00 0.00004
Rp 210,388,500.00 Rp 210,388,500.00 0.00111
Rp 225,682,300.00 Rp 225,682,300.00 0.00119
Rp 292,291,900.00 Rp 292,291,900.00 0.00154
Rp 15,815,500.00 Rp 79,077,500.00 0.00042
Rp 17,686,650.00 Rp 17,686,650.00 0.00009
Rp 17,851,850.00 Rp 196,370,350.00 0.00104

RAB (RENCANA ANGGARAN BIAYA) page 944 of 1892


Rp 18,051,100.00 Rp 126,357,700.00 0.00067
Rp 12,773,400.00 Rp 25,546,800.00 0.00013
Rp 1,718,955.00 Rp 44,692,830.00 0.00024
Rp 926,100.00 Rp 24,078,600.00 0.00013
Rp 2,100,735.00 Rp 50,417,640.00 0.00027
Rp 34,050.00 Rp 7,082,400.00 0.00004

Rp 1,274,000.00 Rp 3,822,000.00 0.00002


Rp 261,950.00 Rp 6,810,700.00 0.00004
Rp 210,388,500.00 Rp 210,388,500.00 0.00111
Rp 225,682,300.00 Rp 225,682,300.00 0.00119
Rp 292,291,900.00 Rp 292,291,900.00 0.00154
Rp 15,815,500.00 Rp 79,077,500.00 0.00042
Rp 17,686,650.00 Rp 17,686,650.00 0.00009
Rp 17,851,850.00 Rp 196,370,350.00 0.00104
Rp 18,051,100.00 Rp 126,357,700.00 0.00067
Rp 12,773,400.00 Rp 25,546,800.00 0.00013
Rp 1,718,955.00 Rp 44,692,830.00 0.00024
Rp 926,100.00 Rp 24,078,600.00 0.00013

RAB (RENCANA ANGGARAN BIAYA) page 945 of 1892


Rp 2,100,735.00 Rp 50,417,640.00 0.00027
Rp 34,050.00 Rp 340,500.00 0.00000

Rp 261,950.00 Rp 261,950.00 0.00000


Rp 3,836,550.00 Rp 3,836,550.00 0.00002
Rp 34,050.00 Rp 272,400.00 0.00000
Rp 64,850.00 Rp 259,400.00 0.00000
Rp 112,350.00 Rp 449,400.00 0.00000

Rp 2,853,921.87 Rp 2,853,921.87 0.00002

Rp 519,261,100.00 Rp 519,261,100.00 0.00274

Rp 4,756,536.45 Rp 4,756,536.45 0.00003

RAB (RENCANA ANGGARAN BIAYA) page 946 of 1892


Rp 113,650.00 Rp 9,278,954.25 0.00005
Rp 30,900.00 Rp 7,531,875.00 0.00004
Rp 658,800.00 Rp 1,317,600.00 0.00001

Rp 111,200.00 Rp 224,179.20 0.00000


Rp 624,050.00 Rp 4,493,160.00 0.00002
Rp 956,000.00 Rp 602,280.00 0.00000
Rp 96,050.00 Rp 2,766,240.00 0.00001
Rp 88,950.00 Rp 853,920.00 0.00000
Rp 108,650.00 Rp 3,129,120.00 0.00002
Rp 4,946,851.14 Rp 9,646,359.72 0.00005
Rp 107,600.00 Rp 3,224,772.00 0.00002
Rp 50,550.00 Rp 3,029,967.00 0.00002
Rp 31,700.00 Rp 1,900,098.00 0.00001
Rp 29,400.00 Rp 881,118.00 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 947 of 1892


Rp 195,761.95 Rp 8,738,813.51 0.00005

Rp 113,650.00 Rp 34,268,884.50 0.00018


Rp 30,900.00 Rp 31,057,590.00 0.00016

Rp 113,650.00 Rp 9,278,954.25 0.00005


Rp 30,900.00 Rp 7,531,875.00 0.00004
Rp 658,800.00 Rp 1,317,600.00 0.00001

Rp 111,200.00 Rp 224,179.20 0.00000


Rp 624,050.00 Rp 4,493,160.00 0.00002
Rp 956,000.00 Rp 602,280.00 0.00000
Rp 96,050.00 Rp 2,766,240.00 0.00001
Rp 88,950.00 Rp 853,920.00 0.00000
Rp 108,650.00 Rp 3,129,120.00 0.00002
Rp 4,946,851.14 Rp 9,646,359.72 0.00005
Rp 107,600.00 Rp 3,224,772.00 0.00002
Rp 50,550.00 Rp 3,029,967.00 0.00002
Rp 31,700.00 Rp 1,900,098.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 948 of 1892


Rp 29,400.00 Rp 881,118.00 0.00000
Rp 195,761.95 Rp 8,738,813.51 0.00005

Rp 228,350.00 Rp 44,676,677.50 0.00024

Rp 228,350.00 Rp 44,676,677.50 0.00024

Rp 56,900.00 Rp 5,690.00

Rp 111,200.00 Rp 2,224.00
Rp 280,822.50 Rp 22,465.80 0.00000
Rp 624,050.00 Rp 37,443.00

Rp 262,500.00 Rp 262,500.00 0.00000


Rp 330,322.80

RAB (RENCANA ANGGARAN BIAYA) page 949 of 1892


Rp 262,500.00 Rp 342,562,500.00 0.00181

Rp 56,900.00 Rp 1,232,454.00 0.00001


Rp 68,950.00 Rp 1,493,457.00 0.00001
Rp 109,750.00 Rp 2,377,185.00 0.00001
Rp 161,650.00 Rp 700,267.80 0.00000
Rp 29,900.00 Rp 1,449,641.70 0.00001
Rp 111,200.00 Rp 240,859.20 0.00000
Rp 111,200.00 Rp 65,385.60 0.00000
Rp 56,900.00 Rp 305,268.50 0.00000
Rp 56,900.00 Rp 3,934,777.25 0.00002
Rp 68,950.00 Rp 4,768,064.88 0.00003
Rp 109,750.00 Rp 7,589,486.88 0.00004
Rp 161,650.00 Rp 6,148,175.89 0.00003
Rp 111,200.00 Rp 768,975.80 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 950 of 1892


Rp 28,700.00 Rp 4,809,546.00 0.00003
Rp 28,700.00 Rp 1,717,695.00 0.00001
Rp 28,700.00 Rp 5,754,350.00 0.00003

Rp 899,700.00 Rp 1,948,750.20 0.00001

Rp 899,700.00 Rp 12,910,695.00 0.00007


Rp 899,700.00 Rp 6,221,650.43 0.00003
Rp 899,700.00 Rp 529,023.60 0.00000

Rp 878,500.00 Rp 9,514,155.00 0.00005


Rp 3,648,505.78 Rp 14,776,448.41 0.00008
Rp 5,181,071.28 Rp 43,640,681.46 0.00023
Rp 6,767,162.65 Rp 27,853,641.46 0.00015
Rp 8,777,159.19 Rp 3,099,434.34 0.00002
Rp 8,777,159.19 Rp 66,939,004.58 0.00035
Rp 6,840,250.34 Rp 11,587,384.08 0.00006

RAB (RENCANA ANGGARAN BIAYA) page 951 of 1892


Rp 7,000,698.12 Rp 41,584,146.83 0.00022
Rp 3,855,095.08 Rp 45,777,326.57 0.00024
Rp 4,421,633.77 Rp 72,855,082.82 0.00038
Rp 3,740,860.11 Rp 36,641,724.74 0.00019
Rp 6,085,345.39 Rp 168,707,072.89 0.00089
Rp 4,421,633.77 Rp 133,710,205.31 0.00071
Rp 3,273,321.67 Rp 16,261,862.06 0.00009
Rp 878,500.00 Rp 8,728,776.00 0.00005
Rp 126,000.00 Rp 3,528,000.00 0.00002
Rp 136,500.00 Rp 305,760.00 0.00000
Rp 10,570.08 Rp 21,140.16 0.00000
Rp 31,710.24 Rp 63,420.49 0.00000

Rp 56,900.00 Rp 445,299.40 0.00000


Rp 111,200.00 Rp 348,100.48 0.00000
Rp 111,200.00 Rp 1,595,720.00 0.00001
Rp 29,900.00 Rp 4,290,650.00 0.00002

RAB (RENCANA ANGGARAN BIAYA) page 952 of 1892


Rp 29,900.00 Rp 77,999.13 0.00000

Rp 88,950.00 Rp 18,964,140.00 0.00010


Rp 94,500.00 Rp 2,474,010.00 0.00001
Rp 104,750.00 Rp 13,198,500.00 0.00007

Rp 624,050.00 Rp 6,226,864.51 0.00003


Rp 107,600.00 Rp 31,196,091.40 0.00016
Rp 50,550.00 Rp 29,311,569.15 0.00015
Rp 79,700.00 Rp 16,928,917.60 0.00009

Rp 19,700.00 Rp 6,617,230.00 0.00003


Rp 31,700.00 Rp 18,381,340.10 0.00010
Rp 39,200.00 Rp 9,878,400.00 0.00005
Rp 34,550.00 Rp 8,706,600.00 0.00005
Rp 475,653.65 Rp 2,069,093.36 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 953 of 1892


Rp 8,689,250.00 Rp 17,378,500.00 0.00009
Rp 9,693,609.88 Rp 9,693,609.88 0.00005
Rp 3,646,677.95 Rp 36,466,779.45 0.00019

Rp 174,850.00 Rp 8,721,518.00 0.00005


Rp 195,500.00 Rp 31,592,800.00 0.00017
Rp 42,000.00 Rp 7,014,000.00 0.00004

Rp 29,400.00 Rp 12,130,469.40 0.00006


Rp 23,100.00 Rp 8,770,146.00 0.00005
Rp 19,950.00 Rp 5,027,400.00 0.00003
Rp 65,750.00 Rp 12,730,186.25 0.00007
Rp 74,350.00 Rp 18,736,200.00 0.00010

Rp 854,500.00 Rp 1,709,000.00 0.00001

RAB (RENCANA ANGGARAN BIAYA) page 954 of 1892


Rp 239,240.61 Rp 3,349,368.58 0.00002
Rp 267,500.00 Rp 1,605,000.00 0.00001
Rp 619,750.00 Rp 5,577,750.00 0.00003
Rp 190,261.46 Rp 570,784.37 0.00000
Rp 753,350.00 Rp 1,506,700.00 0.00001
Rp 76,300.00 Rp 228,900.00 0.00000
Rp 66,300.00 Rp 663,000.00 0.00000
Rp 4,280,882.81 Rp 17,123,531.22 0.00009

Rp 142,696.09 Rp 856,176.56 0.00000


Rp 25,685.30 Rp 1,669,544.29 0.00001
Rp 197,150.00 Rp 7,097,400.00 0.00004

Rp 152,300.00 Rp 1,023,581,647.50 0.00540

RAB (RENCANA ANGGARAN BIAYA) page 955 of 1892


Rp 2,040,128,427.04 Rp 2,040,128,427.04 0.01076

Rp 1,493,552,445.30 Rp 1,493,552,445.30 0.00788


Rp 356,740,233.75 Rp 356,740,233.75 0.00188
Rp 5,137,059.37 Rp 5,137,059.37 0.00003
Rp 7,705,589.05 Rp 7,705,589.05 0.00004
Rp 7,705,589.05 Rp 7,705,589.05 0.00004

Rp 77,698,022.91 Rp 77,698,022.91 0.00041


Rp 20,548,237.46 Rp 20,548,237.46 0.00011
Rp 2,183,250.23 Rp 2,183,250.23 0.00001

Rp 77,055.89 Rp 385,279.45 0.00000


Rp 1,348,478.08 Rp 1,348,478.08 0.00001
Rp 1,412,691.33 Rp 1,412,691.33 0.00001

Rp 7,111,021.99 Rp 35,555,109.96 0.00019


Rp 33,295.76 Rp 166,478.78 0.00000

RAB (RENCANA ANGGARAN BIAYA) page 956 of 1892


Rp 8,347,721.47 Rp 8,347,721.47 0.00004
Rp 21,642,240.85 Rp 21,642,240.85 0.00011

RAB (RENCANA ANGGARAN BIAYA) page 957 of 1892


: 54/BA-DIVREG.3/SPH/XI/2017
: 13 November 2017
: LOMBOK TENGAH
: KABUPATEN LOMBOK TENGAH

TOTAL

Rp 330,859,575.00

RAB (RENCANA ANGGARAN BIAYA) page 958 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 959 of 1892
Rp 238,688,532.68

RAB (RENCANA ANGGARAN BIAYA) page 960 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 961 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 962 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 963 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 964 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 965 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 966 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 967 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 968 of 1892
Rp 20,728,414,344.60
Rp 20,967,102,877.28

RAB (RENCANA ANGGARAN BIAYA) page 969 of 1892


Rp 64,921,448.96

Rp 86,856,916.58

RAB (RENCANA ANGGARAN BIAYA) page 970 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 971 of 1892
Rp 1,187,011,545.90

RAB (RENCANA ANGGARAN BIAYA) page 972 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 973 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 974 of 1892
Rp 3,229,129,328.37

RAB (RENCANA ANGGARAN BIAYA) page 975 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 976 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 977 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 978 of 1892
Rp 3,055,164,900.00

RAB (RENCANA ANGGARAN BIAYA) page 979 of 1892


Rp 1,315,958,878.30

RAB (RENCANA ANGGARAN BIAYA) page 980 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 981 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 982 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 983 of 1892
Rp 519,579,714.40

RAB (RENCANA ANGGARAN BIAYA) page 984 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 985 of 1892
Rp 4,233,257,251.35

RAB (RENCANA ANGGARAN BIAYA) page 986 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 987 of 1892
Rp 955,236,752.58

RAB (RENCANA ANGGARAN BIAYA) page 988 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 989 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 990 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 991 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 992 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 993 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 994 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 995 of 1892
Rp 144,248,114.66

RAB (RENCANA ANGGARAN BIAYA) page 996 of 1892


Rp 732,904,528.20

RAB (RENCANA ANGGARAN BIAYA) page 997 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 998 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 999 of 1892
Rp 342,679,423.38

RAB (RENCANA ANGGARAN BIAYA) page 1000 of 1892


Rp 15,866,948,802.67

RAB (RENCANA ANGGARAN BIAYA) page 1001 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1002 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1003 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1004 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1005 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1006 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1007 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1008 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1009 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1010 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1011 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1012 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1013 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1014 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1015 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1016 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1017 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1018 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1019 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1020 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1021 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1022 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1023 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1024 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1025 of 1892
Rp 3,577,640,757.26

RAB (RENCANA ANGGARAN BIAYA) page 1026 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1027 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1028 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1029 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1030 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1031 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1032 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1033 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1034 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1035 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1036 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1037 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1038 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1039 of 1892
Rp 6,721,802,871.42
Rp 47,133,495,308.63

RAB (RENCANA ANGGARAN BIAYA) page 1040 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1041 of 1892
Rp 333,250,108.30

RAB (RENCANA ANGGARAN BIAYA) page 1042 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1043 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1044 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1045 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1046 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1047 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1048 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1049 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1050 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1051 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1052 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1053 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1054 of 1892
Rp 33,626,077,787.19

RAB (RENCANA ANGGARAN BIAYA) page 1055 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1056 of 1892
Rp 140,042,213.50
Rp 34,099,370,108.99

Rp 199,261,787.85

Rp 156,111,038.30

RAB (RENCANA ANGGARAN BIAYA) page 1057 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1058 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1059 of 1892
Rp 1,546,249,123.30

RAB (RENCANA ANGGARAN BIAYA) page 1060 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1061 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1062 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1063 of 1892
Rp 4,879,070,776.26

RAB (RENCANA ANGGARAN BIAYA) page 1064 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1065 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1066 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1067 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1068 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1069 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1070 of 1892
Rp 3,881,417,750.00

RAB (RENCANA ANGGARAN BIAYA) page 1071 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1072 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1073 of 1892
Rp 1,542,955,428.70

RAB (RENCANA ANGGARAN BIAYA) page 1074 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1075 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1076 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1077 of 1892
Rp 1,243,093,309.40

RAB (RENCANA ANGGARAN BIAYA) page 1078 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1079 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1080 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1081 of 1892
Rp 6,400,668,676.20

RAB (RENCANA ANGGARAN BIAYA) page 1082 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1083 of 1892
Rp 1,240,292,734.50

RAB (RENCANA ANGGARAN BIAYA) page 1084 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1085 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1086 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1087 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1088 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1089 of 1892
Rp 543,203,151.16

RAB (RENCANA ANGGARAN BIAYA) page 1090 of 1892


Rp 485,997,697.71

RAB (RENCANA ANGGARAN BIAYA) page 1091 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1092 of 1892
Rp 3,095,287,288.42

RAB (RENCANA ANGGARAN BIAYA) page 1093 of 1892


Rp 466,598,761.45

RAB (RENCANA ANGGARAN BIAYA) page 1094 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1095 of 1892
Rp 257,302,026.46

Rp 146,937,700.00
Rp 26,084,447,249.72

RAB (RENCANA ANGGARAN BIAYA) page 1096 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1097 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1098 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1099 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1100 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1101 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1102 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1103 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1104 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1105 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1106 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1107 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1108 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1109 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1110 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1111 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1112 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1113 of 1892
Rp 1,949,683,854.71

RAB (RENCANA ANGGARAN BIAYA) page 1114 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1115 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1116 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1117 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1118 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1119 of 1892
Rp 2,038,794,536.09

RAB (RENCANA ANGGARAN BIAYA) page 1120 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1121 of 1892
Rp 101,450,973.26

RAB (RENCANA ANGGARAN BIAYA) page 1122 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1123 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1124 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1125 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1126 of 1892
Rp 1,412,641,930.22

RAB (RENCANA ANGGARAN BIAYA) page 1127 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1128 of 1892
Rp 225,027,043.65

RAB (RENCANA ANGGARAN BIAYA) page 1129 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1130 of 1892
Rp 330,306,071.45

RAB (RENCANA ANGGARAN BIAYA) page 1131 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1132 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1133 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1134 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1135 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1136 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1137 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1138 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1139 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1140 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1141 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1142 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1143 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1144 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1145 of 1892
Rp 10,191,603,991.62

RAB (RENCANA ANGGARAN BIAYA) page 1146 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1147 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1148 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1149 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1150 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1151 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1152 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1153 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1154 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1155 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1156 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1157 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1158 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1159 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1160 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1161 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1162 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1163 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1164 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1165 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1166 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1167 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1168 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1169 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1170 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1171 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1172 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1173 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1174 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1175 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1176 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1177 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1178 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1179 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1180 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1181 of 1892
Rp 16,784,604,951.58
Rp 87,160,026,301.91

RAB (RENCANA ANGGARAN BIAYA) page 1182 of 1892


Rp 238,688,532.68

RAB (RENCANA ANGGARAN BIAYA) page 1183 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1184 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1185 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1186 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1187 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1188 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1189 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1190 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1191 of 1892
Rp 23,093,821,149.23
Rp 23,332,509,681.91

RAB (RENCANA ANGGARAN BIAYA) page 1192 of 1892


Rp 64,921,448.96

Rp 86,856,916.58

RAB (RENCANA ANGGARAN BIAYA) page 1193 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1194 of 1892
Rp 1,140,112,102.20

RAB (RENCANA ANGGARAN BIAYA) page 1195 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1196 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1197 of 1892
Rp 3,247,330,908.74

RAB (RENCANA ANGGARAN BIAYA) page 1198 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1199 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1200 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1201 of 1892
Rp 3,186,744,950.00

RAB (RENCANA ANGGARAN BIAYA) page 1202 of 1892


Rp 1,315,958,878.30

RAB (RENCANA ANGGARAN BIAYA) page 1203 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1204 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1205 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1206 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1207 of 1892
Rp 796,120,785.68

RAB (RENCANA ANGGARAN BIAYA) page 1208 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1209 of 1892
Rp 3,952,544,561.92

RAB (RENCANA ANGGARAN BIAYA) page 1210 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1211 of 1892
Rp 965,126,467.80

RAB (RENCANA ANGGARAN BIAYA) page 1212 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1213 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1214 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1215 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1216 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1217 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1218 of 1892
Rp 137,159,092.26
RAB (RENCANA ANGGARAN BIAYA) page 1219 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1220 of 1892
Rp 732,904,528.20

RAB (RENCANA ANGGARAN BIAYA) page 1221 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1222 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1223 of 1892
Rp 342,679,423.38
Rp 15,968,460,064.01

RAB (RENCANA ANGGARAN BIAYA) page 1224 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1225 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1226 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1227 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1228 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1229 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1230 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1231 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1232 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1233 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1234 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1235 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1236 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1237 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1238 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1239 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1240 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1241 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1242 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1243 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1244 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1245 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1246 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1247 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1248 of 1892
Rp 3,718,846,789.15

RAB (RENCANA ANGGARAN BIAYA) page 1249 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1250 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1251 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1252 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1253 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1254 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1255 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1256 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1257 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1258 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1259 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1260 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1261 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1262 of 1892
Rp 7,074,372,729.55
RAB (RENCANA ANGGARAN BIAYA) page 1263 of 1892
Rp 50,094,189,264.61

RAB (RENCANA ANGGARAN BIAYA) page 1264 of 1892


RAB (RENCANA ANGGARAN BIAYA) page 1265 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1266 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1267 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1268 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1269 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1270 of 1892
RAB (RENCANA ANGGARAN BIAYA) page 1271 of 1892
Rp 1,763,969,508.93

RAB (RENCANA ANGGARAN BIAYA) page 1272 of 1892


Rp 1,023,581,647.50

RAB (RENCANA ANGGARAN BIAYA) page 1273 of 1892


Rp 189,546,250,033.62

RAB (RENCANA ANGGARAN BIAYA) page 1274 of 1892


PEMBANGUNAN DAFTAR ANALISA HAR
GEDUNG KANTOR BUPATI PEKERJAA

KABUPATEN LOMBOK TENGAH

A PEKERJAAN PERSIAPAN

1 1m¹ Uitzet & Bouwplank

Bahan :

0.0200 kg Paku

0.0070 m3 Kayu papan kelas kuat III

0.0120 m3 Kayu 5/7 x 4m klas III

Upah :

0.1000 OH Pekerja

0.0050 OH Mandor

0.0100 OH Kepala tukang kayu

0.1000 OH Tukang kayu

2 1 m' Pagar sementara dari seng gelombang tinggi 2 meter (sewa)

1275 of 1892
Bahan :

1.2500 btg Dolken

1.1765 lbr Seng gelombang

2.5000 kg PC

0.0050 m3 Pasir beton

0.0090 m3 Kerikil beton

0.0001 m3 Kayu klas II 5/7 x 4m

0.0600 kg Paku biasa

0.4500 ltr Meni besi

Upah :

0.4000 OH Pekerja

0.2000 OH Tukang Kayu

0.0200 OH Kepala Tukang

0.0200 OH Mandor

B PEKERJAAN PERSIAPAN

1 1m³ Galian tanah sampai 1 meter

Upah :

1276 of 1892
0.0628 OH Pekerja

0.0157 OH Mandor

0.0500 OH Operator

Alat :

0.1099 jam Excavator (sewa)

2 1m³ Galian tanah sampai 2 meter

Upah :

0.1765 OH Pekerja

0.0294 OH Mandor

0.0600 OH Operator

Alat :

0.1099 jam Excavator (sewa)

3 1m³ Galian tanah sampai 3 meter

Upah :

0.1853 OH Pekerja

1277 of 1892
0.0309 OH Mandor

0.0700 OH Operator

Alat :

0.2059 jam Excavator (sewa)

4 1m³ Galian tanah lebih dari 3 meter

Upah :

0.2647 OH Pekerja

0.0331 OH Mandor

0.1000 OH Operator

Alat :

0.3088 jam Excavator (sewa)

5 1m³ Urugan pasir

Bahan :

1.2000 m3 Pasir Urug

Upah :

1278 of 1892
0.3000 OH Pekerja

0.0100 OH Mandor

6 1m³ Urugan tanah dengan mendatangkan tanah urug baru + pemadatan

Bahan :

1.2000 m3 Tanah urug

Alat :

0.1067 jam mesin stamper (sewa)

Upah :

0.3300 OH Pekerja

0.0120 OH Mandor

7 1M³ Urugan Tanah Kembali Pondasi + pemadatan

Bahan :

0.1067 jam mesin stamper (sewa)

Upah :

0.2500 OH Pekerja

1279 of 1892
0.0083 OH Mandor

C PEKERJAAN PASANGAN DAN PLESTERAN

1 1m³ Pasangan pondasi Batu Kali 1Pcc : 6 Ps

Bahan :

1.1000 m3 Batu Belah 15/20

117.0000 kg Portland Cemen (PCC)

0.5610 m3 Pasir Pasang

Upah :

0.7500 OH Tukang Batu

0.0750 OH Kepala Tukang Batu

1.2000 OH Pekerja

0.0750 OH Mandor

2 1m 2 Pas. Dinding 1/2 bata merah 1Pc : 6Ps

Bahan :

70.0000 bj Bata Merah

1280 of 1892
6.5000 kg Portland Cemen (PC)

0.0500 m3 Pasir Pasang

Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.2500 OH Pekerja

0.0150 OH Mandor

3 1m 2 Pas. Dinding 1/2 bata merah 1Pc : 3Ps

Bahan :

70.0000 bj Bata Merah

14.3700 kg Portland Cemen (PC)

0.0400 m3 Pasir Pasang

Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.2500 OH Pekerja

0.0150 OH Mandor

1281 of 1892
4 1m3 Pas. Rollag

Bahan :

510.0000 bj Bata Merah

160.0000 kg Portland Cemen (PCC)

0.3200 m3 Pasir Pasang

Upah :

1.0000 OH Tukang Batu

0.1000 OH Kepala Tukang Batu

2.0000 OH Pekerja

0.1000 OH Mandor

5 1m 2 Plesteran Dinding 1Pc : 6Ps

Bahan :

4.4160 kg Portland Cemen (PC)

0.0270 m3 Pasir Pasang

Upah :

0.1500 OH Tukang Batu

0.0150 OH Kepala Tukang Batu

0.3000 OH Pekerja

1282 of 1892
0.0150 OH Mandor

6 1m 2 Plesteran Dinding 1Pc : 3Ps

Bahan :

7.7760 kg Portland Cemen (PC)

0.0230 m3 Pasir Pasang

Upah :

0.3000 OH Tukang Batu

0.0150 OH Kepala Tukang Batu

0.3000 OH Pekerja

0.0150 OH Mandor

7 1m' Plesteran Skoning 1Pcc :2 Ps

Bahan :

0.5000 kg Portland Cemen (Pcc)

0.0130 m3 Pasir Pasang

Upah :

1283 of 1892
0.1000 OH Tukang Batu

0.0400 OH Kepala Tukang Batu

0.0500 OH Pekerja

0.0040 OH Mandor

8 1m 2 Finishing Wall Filler

Bahan :

0.2100 kg Wall filler (penutup 2x)

Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.1000 OH Pekerja

0.0100 OH Mandor

9 1m' Plesteran tali air 1Pc : 2Ps

Bahan :

0.7500 kg Portland Cemen (PC)

0.0180 m3 Pasir Pasang

1284 of 1892
Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.0250 OH Pekerja

0.0025 OH Mandor

10 1m 2 Acian

Bahan :

3.2500 kg Portland Cemen (PC)

Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.2000 OH Pekerja

0.0100 OH Mandor

11 1m' Plesteran ban-banan

Bahan :

4.5000 kg Portland Cement (PCC)

1285 of 1892
0.0500 m3 Pasir Pasang

Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.1000 OH Pekerja

0.0100 OH Mandor

12 1 m2 Pasangan Paving, t = 80 mm (mutu K - 400)

Bahan :

1.0500 m2 Paving blok K-400 t = 8 cm

0.0400 m3 Pasir Pasang

Upah :

0.2000 OH Tukang Batu

0.0200 OH Kepala Tukang Batu

0.2000 OH Pekerja

0.0200 OH Mandor

13 1m 2 Screeding

1286 of 1892
Bahan :

4.2000 kg Portland Cemen (PC)

Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.1000 OH Pekerja

0.0100 OH Mandor

14 1m 2 Pas. Dinding bata ringan

Bahan :

9.0000 bj Bata ringan

3.8000 kg Semen instant perekat bata ringan

Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.1000 OH Pekerja

0.0100 OH Mandor

1287 of 1892
15 1m 2 Plesteran dinding bata ringan tebal 10 mm

Bahan :

18.0000 kg Semen instan plesteran

Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.1000 OH Pekerja

0.0100 OH Mandor

16 1m 2 Acian_bata_ringan

Bahan :

2.0000 kg Semen instan acian

Upah :

0.1000 OH Tukang Batu

0.0100 OH Kepala Tukang Batu

0.1500 OH Pekerja

0.0100 OH Mandor

1288 of 1892
17 1m 2 Acian dan plesteran kolom dengan mortar instant

Bahan :

1.0000 m2 Plesteran

1.0000 m2 Acian

18 1m 2 Screeding + kawat ayam

1.0000 m2 Screeding

1.0000 m2 Kawat ayam

D PEKERJAAN ANTI RAYAP

1 1m2 pekerjaan anti rayap

Bahan

1.0000 m2 Anti rayap

Upah

1.0000 m2 Aplikator

1289 of 1892
E PEKERJAAN BETON BERTULANG

i Beton

1 1m 3 Beton 1 pcc : 2 ps : 3 sp

bahan :

326.0000 kg Semen portland (PCC)

0.5429 m3 Pasir beton

0.7622 m3 Split

upah :

0.2500 OH Tukang batu

0.0250 OH Kepala tukang batu

1.6500 OH Pekerja

0.0800 OH Mandor

2 1 m 3 Beton 1 pcc : 3 ps : 5 sp

bahan :

247.0000 kg Semen portland (PCC)

0.6207 m3 Pasir beton

0.7400 m3 Split 2/3

upah :

0.2500 OH Tukang batu

1290 of 1892
0.0250 OH Kepala tukang batu

1.6500 OH Pekerja

0.0800 OH Mandor

3 1 m3 PoMPa pump efisiensi 80%

1.0000 m3 sewa alat poMPa

4 Mengerjakan 1 m3 Beton Ready F'c 25 MPa

Bahan :

1.0000 m3 Alat Bantu PoMPa

1.0000 m3 Beton Ready Mix F'c 20 MPa

Upah :

1.3200 OH Pekerja

0.2500 OH Tukang batu

0.0200 OH Kepala tukang batu

0.0600 OH Mandor

1291 of 1892
ii Besi beton

1 10 Kg Pekerjaan Pembesian Besi Beton Polos

Bahan :

10.5000 kg Besi Beton

0.1500 kg Kawat Ikat Beton

Upah :

0.0700 OH Tukang Besi

0.0070 OH Kepala Tukang Besi

0.0700 OH Pekerja

0.0040 OH Mandor

iii Begesting

1 1m² Pekerjaan Bekisting pondasi

Bahan :

0.0400 m3 Kayu kelas kuat III

1292 of 1892
0.3000 kg Paku 5 cm - 12 cm

0.1000 ltr Minyak Bekisting

Upah :

0.2600 OH Tukang kayu

0.0260 OH Kepala tukang kayu

0.5200 OH Pekerja

0.0260 OH Mandor

2 1m² Pekerjaan Bekisting sloof

Bahan :

0.0450 m3 Kayu balok kelas kuat III

0.3000 kg Paku 5 cm - 12 cm

0.1000 ltr Minyak Bekisting

Upah :

0.2600 OH Tukang kayu

0.0260 OH Kepala tukang kayu

0.5200 OH Pekerja

0.0260 OH Mandor

1293 of 1892
3 1m² Pekerjaan Bekisting kolom

Bahan :

0.0400 m3 Kayu balok kelas kuat III

0.4000 kg Paku 5 cm - 12 cm

0.2000 ltr Minyak Bekisting

0.0150 m3 Kayu balok kelas kuat II

0.3500 lbr Plywood tbl : 9 mm

Upah :

0.3300 OH Tukang kayu

0.0330 OH Kepala tukang kayu

0.6600 OH Pekerja

0.0330 OH Mandor

4 1m² Pekerjaan Bekisting balok

Bahan :

1294 of 1892
0.0400 m3 Kayu balok kelas kuat III

0.4000 kg Paku 5 cm - 12 cm

0.2000 ltr Minyak Bekisting

0.0180 m3 Kayu balok kelas kuat II

0.3500 lbr Plywood tbl : 9 mm

Upah :

0.3300 OH Tukang kayu

0.0330 OH Kepala tukang kayu

0.6600 OH Pekerja

0.0330 OH Mandor

5 1m² Pekerjaan Bekisting lantai (plat)

Bahan :

0.0400 m3 Kayu balok kelas kuat III

0.4000 kg Paku 5 cm - 12 cm

0.2000 ltr Minyak Bekisting

0.0150 m3 Kayu balok kelas kuat II

0.3500 lbr Plywood tbl : 9 mm

1295 of 1892
Upah :

0.3300 OH Tukang kayu

0.0330 OH Kepala tukang kayu

0.6600 OH Pekerja

0.0330 OH Mandor

6 1m² Pekerjaan Bekisting dinding

Bahan :

0.0300 m3 Kayu balok kelas kuat III

0.4000 kg Paku 5 cm - 12 cm

0.2000 ltr Minyak Bekisting

0.0200 m3 Kayu balok kelas kuat II

4.0000 bh Spacer/Penjaga jarak Bekisting

0.3500 lbr Plywood tbl : 9 mm

Upah :

0.3300 OH Tukang kayu

0.0330 OH Kepala tukang kayu

0.6600 OH Pekerja

0.0330 OH Mandor

1296 of 1892
7 1m² Pekerjaan Bekisting tangga

Bahan :

0.0300 m3 Kayu balok kelas kuat III

0.4000 kg Paku 5 cm - 12 cm

0.1500 ltr Minyak Bekisting

0.0150 m3 Kayu balok kelas kuat II

0.3500 lbr Plywood tbl : 9 mm

Upah :

0.3300 OH Tukang kayu

0.0330 OH Kepala tukang kayu

0.6600 OH Pekerja

0.0330 OH Mandor

8 1 m2 Bongkar begesting

0.2000 OH Pekerja

1297 of 1892
0.0200 OH Mandor

9 1 m 3 stutwerk untuk kolom

Bahan :

2.0000 unt Skafolding

Upah :

0.6600 OH Pekerja

0.3300 OH Tukang kayu

0.0330 OH Kepala tukang kayu

0.0330 OH Mandor

10 1 m 3 stutwerk untuk balok

Bahan :

4.0000 unt Skafolding

Upah :

0.6600 OH Pekerja

0.3300 OH Tukang kayu

1298 of 1892
0.0330 OH Kepala tukang kayu

0.0330 OH Mandor

11 1 m3 stutwerk untuk plat

Bahan :

6.0000 unt Skafolding

Upah :

0.6600 OH Pekerja

0.3300 OH Tukang kayu

0.0330 OH Kepala tukang kayu

0.0330 OH Mandor

iv Cor Beton Ready Mix

1 1m 3 Cor Beton Ready Mix Mutu f'c 15 Mpa

bahan :

1.0000 m3 Alat Bantu PoMPa

1.5282 kg Besi stek D13 mm

1299 of 1892
1.0000 m3 Beton Ready Mix F'c 15 MPa

upah :

0.2500 OH Tukang batu

0.0200 OH Kepala tukang batu

1.3200 OH Pekerja

0.0600 OH Mandor

2 1m 3 CYCLOPE CY1 1 pcc : 3 ps : 5 kr + 40 % batu kali

bahan :

0.4000 m3 Batu kali

1.5471 kg Besi stek dia 13

0.6000 m3 Beton 1 pcc : 3 ps : 5 kr

upah :

0.8500 OH Tukang batu

0.0850 OH Kepala tukang batu

1.0000 OH Pekerja

0.1700 OH Mandor

1300 of 1892
v Sloof, Kolom, dan Balok Praktis

1 1 m' Sloof praktis SP1, ukuran = 100 x 200 mm

Bahan :

0.0015 m3 Kayu kelas III

0.0085 kg Paku biasa 2'-5"

3.5500 kg Besi beton

0.0475 kg Kawat beton

5.8250 kg Semen portland

0.0094 m3 Pasir beton

0.0139 m3 Split

Upah

0.0300 OH Tukang besi

0.0300 OH Tukang batu

0.0300 OH Tukang kayu

0.0100 OH Kepala tukang

0.2970 OH Pekerja

0.0150 OH Mandor

2 1m' Sloof praktis SP2, ukuran = 120 x 200 mm

Bahan :

0.0019 m3 Kayu kelas III

1301 of 1892
0.0095 kg Paku biasa 2'-5"

3.6000 kg Besi beton

0.0500 kg Kawat beton

5.8140 kg Semen portland

0.0094 m3 Pasir beton

0.0140 m3 Split

Upah

0.0300 OH Tukang besi

0.0300 OH Tukang batu

0.0300 OH Tukang kayu

0.0100 OH Kepala tukang

0.2970 OH Pekerja

0.0150 OH Mandor

3 1 m' Kolom praktis KP02, ukuran = 120 x 120 mm

Bahan :

0.0024 m3 Kayu kelas III

0.0119 kg Paku biasa 2'-5"

3.5702 kg Besi beton

0.5355 kg Kawat beton

4.7603 kg Semen portland

1302 of 1892
0.0071 m3 Pasir beton

0.0107 m3 Split

Upah

0.0200 OH Tukang besi

0.0200 OH Tukang batu

0.0200 OH Tukang kayu

0.0060 OH Kepala tukang

0.1800 OH Pekerja

0.0090 OH Mandor

4 1m' Kolom praktis KP01, ukuran = 100 x 100 mm

Bahan :

0.0020 m3 Kayu kelas III

0.0115 kg Paku biasa 2'-5"

3.6500 kg Besi beton

0.5200 kg Kawat beton

4.6500 kg Semen portland

0.0066 m3 Pasir beton

0.0106 m3 Split

Upah

0.0200 OH Tukang besi

1303 of 1892
0.0200 OH Tukang batu

0.0200 OH Tukang kayu

0.0060 OH Kepala tukang

0.1800 OH Pekerja

0.0090 OH Mandor

5 1 m' Balok praktis BP01, ukuran = 100 x 100 mm

Bahan :

0.0020 m3 Kayu kelas III

0.0215 kg Paku biasa 2'-5"

4.1500 kg Besi beton

0.0245 kg Kawat beton

5.0150 kg Semen portland

0.0115 m3 Pasir beton

0.0225 m3 Split

Upah

0.0330 OH Tukang besi

0.0330 OH Tukang batu

0.0330 OH Tukang kayu

0.0100 OH Kepala tukang

1304 of 1892
0.2970 OH Pekerja

0.0150 OH Mandor

6 1m' Balok praktis BP02, ukuran = 120 x 120 mm

Bahan :

0.0025 m3 Kayu kelas III

0.0225 kg Paku biasa 2'-5"

4.2500 kg Besi beton

0.0245 kg Kawat beton

5.1150 kg Semen portland

0.0118 m3 Pasir beton

0.0235 m3 Split

Upah

0.0330 OH Tukang besi

0.0330 OH Tukang batu

0.0330 OH Tukang kayu

0.0100 OH Kepala tukang

0.2970 OH Pekerja

0.0150 OH Mandor

1305 of 1892
7 1 m' Balok latiu BL1 100x100 mm

Bahan :

0.0015 m3 Kayu kelas III

0.0215 kg Paku biasa 2'-5"

4.1500 kg Besi beton

0.0245 kg Kawat beton

5.0150 kg Semen portland

0.0115 m3 Pasir beton

0.0225 m3 Split

Upah

0.0330 OH Tukang besi

0.0330 OH Tukang batu

0.0330 OH Tukang kayu

0.0100 OH Kepala tukang

0.2970 OH Pekerja

0.0150 OH Mandor

1306 of 1892
8 1m' Balok latiu BL2 120x120 mm

Bahan :

0.0024 m3 Kayu kelas III

0.0250 kg Paku biasa 2'-5"

4.2500 kg Besi beton

0.0255 kg Kawat beton

5.1250 kg Semen portland

0.0125 m3 Pasir beton

0.0240 m3 Split

Upah

0.0330 OH Tukang besi

0.0330 OH Tukang batu

0.0330 OH Tukang kayu

0.0100 OH Kepala tukang

0.2970 OH Pekerja

0.0150 OH Mandor

9 1m' Balok latiu BL3 100x400 mm

Bahan :

0.0028 m3 Kayu kelas III

1307 of 1892
0.0245 kg Paku biasa 2'-5"

4.2850 kg Besi beton

0.0265 kg Kawat beton

5.5450 kg Semen portland

0.0135 m3 Pasir beton

0.0245 m3 Split

Upah

0.0330 OH Tukang besi

0.0330 OH Tukang batu

0.0330 OH Tukang kayu

0.0100 OH Kepala tukang

0.2970 OH Pekerja

0.0150 OH Mandor

10 1 m' Balok latiu BL4 100x300 mm

Bahan :

0.0027 m3 Kayu kelas III

0.0239 kg Paku biasa 2'-5"

4.2150 kg Besi beton

0.0255 kg Kawat beton

1308 of 1892
5.5250 kg Semen portland

0.0130 m3 Pasir beton

0.0235 m3 Split

Upah

0.0330 OH Tukang besi

0.0330 OH Tukang batu

0.0330 OH Tukang kayu

0.0100 OH Kepala tukang

0.2970 OH Pekerja

0.0150 OH Mandor

vi Pondasi

1 1 m 3 beton Footplat F1

1.0000 m3 Beton 25 MPa

1.1460 m2 Bekisting

1.1460 m2 Membongkar Bekisting

97.9096 kg Besi beton

2 1 m 3 beton Footplat F2

1309 of 1892
1.0000 m3 Beton 25 MPa

1.3493 m2 Bekisting

1.3493 m2 Membongkar Bekisting

102.9370 kg Besi beton

3 1 m 3 beton footplat F3

1.0000 m3 Beton 25 MPa

1.5767 m2 Bekisting

1.5767 m2 Membongkar Bekisting

100.4796 kg Besi beton

4 1 m 3 beton footplat F4

1.0000 m3 Beton 25 MPa

2.6667 m2 Bekisting

2.6667 m2 Membongkar Bekisting

120.9984 kg Besi beton

5 1 m 3 beton footplat ramp

1.0000 m3 Beton 25 MPa

2.5000 m2 Bekisting

2.5000 m2 Membongkar Bekisting

114.0140 kg Besi beton

1310 of 1892
6 1 m 3 beton plat pitlift

1.0000 m3 Beton 25 MPa

3.3333 m2 Bekisting

3.3333 m2 Membongkar Bekisting

114.0336 kg Besi beton

7 1 m 3 beton Footplat F1 Power house

1.0000 m3 Beton 25 MPa

2.6667 m2 Bekisting

2.6667 m2 Membongkar Bekisting

154.3168 kg Besi beton

vii Sloof

1 1 m 3 beton Sloof S1 400 x 600

1.0000 m3 Beton 25 MPa

6.6667 m2 Bekisting 2 x pakai

1.0000 m3 stutwerk

6.6667 m2 Membongkar Bekisting

154.0294 kg Besi beton

2 1 m 3 beton Sloof S2 350 x 500

1.0000 m3 Beton 25 MPa

1311 of 1892
7.7143 m2 Bekisting 2 x pakai

1.0000 m3 stutwerk

7.7143 m2 Membongkar Bekisting

200.8294 kg Besi beton

3 1 m 3 beton Sloof S3 200 x 400

1.0000 m3 Beton 25 MPa

12.5000 m2 Bekisting 2 x pakai

1.0000 m3 stutwerk

12.5000 m2 Membongkar Bekisting

199.3699 kg Besi beton

4 1 m 3 beton Sloof S1 200 x 350 power house

1.0000 m3 Beton 25 MPa

12.8571 m2 Bekisting 2 x pakai

1.0000 m3 stutwerk

12.8571 m2 Membongkar Bekisting

264.4422 kg Besi beton

viii Kolom

LANTAI 1

1 1 m 3 beton kolom K1 650 x 650

1312 of 1892
1.0000 m3 Beton 25 MPa

6.1538 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.1538 m2 Membongkar Bekisting

222.3506 kg Besi beton

2 1 m 3 beton kolom K2 1000 x 1000

1.0000 m3 Beton 25 MPa

4.0000 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

4.0000 m2 Membongkar Bekisting

195.7401 kg Besi beton

3 1 m 3 beton kolom K3 300 x 400

1.0000 m3 Beton 25 MPa

11.6667 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

11.6667 m2 Membongkar Bekisting

149.7528 kg Besi beton

1313 of 1892
4 1 m 3 beton kolom K4 200 x 400

1.0000 m3 Beton 25 MPa

15.0000 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

15.0000 m2 Membongkar Bekisting

229.2563 kg Besi beton

5 1 m 3 beton kolom K7 Detail Khusus

1.0000 m3 Beton 25 MPa

10.8108 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

10.8108 m2 Membongkar Bekisting

273.3680 kg Besi beton

6 1 m 3 beton kolom K8 Detail Khusus

1.0000 m3 Beton 25 MPa

7.5120 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.5120 m2 Membongkar Bekisting

216.1076 kg Besi beton

1314 of 1892
7 1 m 3 beton kolom K9 Detail Khusus

1.0000 m3 Beton 25 MPa

6.8776 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.8776 m2 Membongkar Bekisting

190.1166 kg Besi beton

8 1 m 3 beton kolom K1 350 x 350 power house

1.0000 m3 Beton 25 MPa

6.8776 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.8776 m2 Membongkar Bekisting

190.1166 kg Besi beton

LANTAI 2 s/d LANTAI 5

9 1 m 3 beton kolom K1 650 x 650

1.0000 m3 Beton 25 MPa

6.1538 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.1538 m2 Membongkar Bekisting

1315 of 1892
154.5192 kg Besi beton

10 1 m 3 beton kolom K2 1000 x 1000

1.0000 m3 Beton 25 MPa

4.0000 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

4.0000 m2 Membongkar Bekisting

175.8038 kg Besi beton

11 1 m 3 beton kolom K3 300 x 400

1.0000 m3 Beton 25 MPa

11.6667 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

11.6667 m2 Membongkar Bekisting

144.3422 kg Besi beton

12 1 m 3 beton kolom K4 200 x 400

1.0000 m3 Beton 25 MPa

15.0000 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

1316 of 1892
15.0000 m2 Membongkar Bekisting

202.9357 kg Besi beton

13 1 m 3 beton kolom K5 250 x 400

1.0000 m3 Beton 25 MPa

13.0000 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

13.0000 m2 Membongkar Bekisting

176.1777 kg Besi beton

14 1 m 3 beton kolom K6 300 x 400

1.0000 m3 Beton 25 MPa

11.6667 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

11.6667 m2 Membongkar Bekisting

151.5169 kg Besi beton

15 1 m 3 beton kolom K7 Detail Khusus

1.0000 m3 Beton 25 MPa

10.8108 m2 Bekisting 2x pakai

1317 of 1892
1.0000 m3 stutwerk

10.8108 m2 Membongkar Bekisting

246.5562 kg Besi beton

16 1 m 3 beton kolom K8 Detail Khusus

1.0000 m3 Beton 25 MPa

7.5120 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.5120 m2 Membongkar Bekisting

193.3636 kg Besi beton

17 1 m 3 beton kolom K9 Detail Khusus

1.0000 m3 Beton 25 MPa

6.8776 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.8776 m2 Membongkar Bekisting

170.7145 kg Besi beton

18 1 m 3 beton kolom K10 Detail Khusus

1.0000 m3 Beton 25 MPa

1318 of 1892
7.9032 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.9032 m2 Membongkar Bekisting

182.2592 kg Besi beton

ix Balok

1 1 m 3 beton balok B1 400 x 600

1.0000 m3 Beton 25 MPa

7.2222 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.2222 m2 Membongkar Bekisting

411.9492 kg Besi beton

2 1 m 3 beton balok B1a 400 x 700

1.0000 m3 Beton 25 MPa

6.8182 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.8182 m2 Membongkar Bekisting

346.0471 kg Besi beton

3 1 m 3 beton balok B1b 400 x 600

1.0000 m3 Beton 25 MPa

1319 of 1892
9.1429 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

9.1429 m2 Membongkar Bekisting

342.8074 kg Besi beton

4 1 m 3 beton balok B2 400 x 600

1.0000 m3 Beton 25 MPa

7.2222 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.2222 m2 Membongkar Bekisting

285.4860 kg Besi beton

5 1 m 3 beton balok B2a 400 x 700

1.0000 m3 Beton 25 MPa

6.8182 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.8182 m2 Membongkar Bekisting

316.1008 kg Besi beton

6 1 m 3 beton balok B2b 400 x 600

1.0000 m3 Beton 25 MPa

9.1429 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

1320 of 1892
9.1429 m2 Membongkar Bekisting

278.8405 kg Besi beton

7 1 m 3 beton balok B3 300 x 600

1.0000 m3 Beton 25 MPa

8.8889 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

8.8889 m2 Membongkar Bekisting

235.1000 kg Besi beton

8 1 m 3 beton balok B3a 300 x 600

1.0000 m3 Beton 25 MPa

10.4762 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

10.4762 m2 Membongkar Bekisting

224.8376 kg Besi beton

9 1 m 3 beton balok B4 500 x 700

1.0000 m3 Beton 25 MPa

5.8182 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

5.8182 m2 Membongkar Bekisting

341.7713 kg Besi beton

1321 of 1892
10 1 m 3 beton balok B5 300 x 700

1.0000 m3 Beton 25 MPa

8.4848 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

8.4848 m2 Membongkar Bekisting

251.9034 kg Besi beton

11 1 m 3 beton balok B5a 300 x 700

1.0000 m3 Beton 25 MPa

9.1667 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

9.1667 m2 Membongkar Bekisting

230.8454 kg Besi beton

12 1 m 3 beton balok B6 400 x 600

1.0000 m3 Beton 25 MPa

7.2222 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.2222 m2 Membongkar Bekisting

406.2050 kg Besi beton

13 1 m 3 beton balok B7 700 x 1400/1000

1322 of 1892
1.0000 m3 Beton 25 MPa

7.6202 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.6202 m2 Membongkar Bekisting

350.9846 kg Besi beton

14 1 m 3 beton balok B8 400 x 600

1.0000 m3 Beton 25 MPa

7.2222 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.2222 m2 Membongkar Bekisting

490.3958 kg Besi beton

15 1 m 3 beton balok B8a 400 x 700

1.0000 m3 Beton 25 MPa

6.8182 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.8182 m2 Membongkar Bekisting

408.7056 kg Besi beton

16 1 m 3 beton balok B9 300 x 600

1.0000 m3 Beton 25 MPa

8.8889 m2 Bekisting 2x pakai

1323 of 1892
1.0000 m3 stutwerk

8.8889 m2 Membongkar Bekisting

245.4374 kg Besi beton

17 1 m 3 beton balok B10 200 x 600

1.0000 m3 Beton 25 MPa

12.2222 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

12.2222 m2 Membongkar Bekisting

340.5723 kg Besi beton

18 1 m 3 beton balok B10a 200 x 600

1.0000 m3 Beton 25 MPa

13.8095 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

13.8095 m2 Membongkar Bekisting

371.9560 kg Besi beton

19 1 m 3 beton balok B10b 200 x 600

1.0000 m3 Beton 25 MPa

12.7778 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

12.7778 m2 Membongkar Bekisting

1324 of 1892
274.6585 kg Besi beton

20 1 m 3 beton balok B10c 200 x 600

1.0000 m3 Beton 25 MPa

13.6111 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

13.6111 m2 Membongkar Bekisting

267.8085 kg Besi beton

21 1 m 3 beton balok B10d 200 x 600

1.0000 m3 Beton 25 MPa

13.7037 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

13.7037 m2 Membongkar Bekisting

310.9307 kg Besi beton

22 1 m 3 beton balok B11 150 x 500

1.0000 m3 Beton 25 MPa

15.8333 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

15.8333 m2 Membongkar Bekisting

307.5067 kg Besi beton

1325 of 1892
23 1 m 3 beton balok B12 200 x 400

1.0000 m3 Beton 25 MPa

14.0000 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

14.0000 m2 Membongkar Bekisting

296.1945 kg Besi beton

24 1 m 3 beton balok B13 400 x 700/450

1.0000 m3 Beton 25 MPa

7.5336 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.5336 m2 Membongkar Bekisting

468.0253 kg Besi beton

25 1 m 3 beton balok B14 300 x 450

1.0000 m3 Beton 25 MPa

9.1180 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

9.1180 m2 Membongkar Bekisting

172.1947 kg Besi beton

26 1 m 3 beton balok B15

1.0000 m3 Beton 25 MPa

1326 of 1892
8.4211 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

8.4211 m2 Membongkar Bekisting

208.5587 kg Besi beton

27 1 m 3 beton balok B16

1.0000 m3 Beton 25 MPa

6.6786 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.6786 m2 Membongkar Bekisting

260.7773 kg Besi beton

28 1 m 3 beton balok B17

1.0000 m3 Beton 25 MPa

7.5455 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.5455 m2 Membongkar Bekisting

197.7452 kg Besi beton

29 1 m 3 beton balok B18 250 x 600

1.0000 m3 Beton 25 MPa

10.2222 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

1327 of 1892
10.2222 m2 Membongkar Bekisting

266.2794 kg Besi beton

30 1 m 3 beton balok B19 800 x 400

1.0000 m3 Beton 25 MPa

5.0000 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

5.0000 m2 Membongkar Bekisting

246.7838 kg Besi beton

31 1 m 3 beton balok B20 400 x 750

1.0000 m3 Beton 25 MPa

6.3333 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.3333 m2 Membongkar Bekisting

118.5366 kg Besi beton

32 1 m 3 beton balok B21 400 x 550

1.0000 m3 Beton 25 MPa

6.8182 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

6.8182 m2 Membongkar Bekisting

148.3937 kg Besi beton

1328 of 1892
33 1 m 3 beton balok B22

1.0000 m3 Beton 25 MPa

7.3333 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

7.3333 m2 Membongkar Bekisting

220.3239 kg Besi beton

34 1 m 3 beton balok BT

1.0000 m3 Beton 25 MPa

10.6667 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

10.6667 m2 Membongkar Bekisting

309.2847 kg Besi beton

35 1 m 3 beton L1

1.0000 m3 Beton 25 MPa

14.3537 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

14.3537 m2 Membongkar Bekisting

136.5003 kg Besi beton

36 1 m 3 beton L2

1329 of 1892
1.0000 m3 Beton 25 MPa

14.2424 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

14.2424 m2 Membongkar Bekisting

122.4929 kg Besi beton

37 1 m 3 beton L3

1.0000 m3 Beton 25 MPa

14.1667 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

14.1667 m2 Membongkar Bekisting

134.6505 kg Besi beton

38 1 m 3 beton L4

1.0000 m3 Beton 25 MPa

14.3860 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

14.3860 m2 Membongkar Bekisting

139.0673 kg Besi beton

39 1 m 3 beton balok B1 250 x 400 power house

1.0000 m3 Beton 25 MPa

12.0000 m2 Bekisting 2x pakai

1330 of 1892
1.0000 m3 stutwerk

12.0000 m2 Membongkar Bekisting

372.9610 kg Besi beton

40 1 m 3 beton balok B2 250 x 400 power house

1.0000 m3 Beton 25 MPa

10.5000 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

10.5000 m2 Membongkar Bekisting

250.4323 kg Besi beton

41 1 m 3 beton L1 Power House

1.0000 m3 Beton 25 MPa

18.0000 m2 Bekisting 2x pakai

1.0000 m3 stutwerk

18.0000 m2 Membongkar Bekisting

150.1945 kg Besi beton

x Plat

1 1 m 3 beton plat lantai A1 t = 150 mm

1.0000 m3 Beton 25 MPa

6.6667 m2 Bekisting

1331 of 1892
1.0000 m3 stutwerk

6.6667 m2 Membongkar Bekisting

110.9572 kg Besi beton

2 1 m 3 beton plat lantai A2 t = 200mm

1.0000 m3 Beton 25 MPa

5.0000 m2 Bekisting

1.0000 m3 stutwerk

5.0000 m2 Membongkar Bekisting

85.3339 kg Besi beton

3 1 m 3 beton plat lantai A3 t = 100mm

1.0000 m3 Beton 25 MPa

10.0000 m2 Bekisting

1.0000 m3 stutwerk

10.0000 m2 Membongkar Bekisting

195.8709 kg Besi beton

4 1 m 3 beton plat lantai A4 t = 250mm

1.0000 m3 Beton 25 MPa

4.0000 m2 Bekisting

1.0000 m3 stutwerk

4.0000 m2 Membongkar Bekisting

1332 of 1892
129.4622 kg Besi beton

5 1 m 3 beton plat lantai A5 t = 300mm

1.0000 m3 Beton 25 MPa

3.3333 m2 Bekisting

1.0000 m3 stutwerk

3.3333 m2 Membongkar Bekisting

99.1875 kg Besi beton

6 1 m 3 beton plat meja beton, t = 100mm

1.0000 m3 Beton 1 : 2 : 3

10.0000 m2 Bekisting

1.0000 m3 stutwerk

10.0000 m2 Membongkar Bekisting

119.2928 kg Besi beton

7 1 m 3 beton plat topi, t =100mm

1.0000 m3 Beton 1 : 2 : 3

10.0000 m2 Bekisting

1.0000 m3 stutwerk

10.0000 m2 Membongkar Bekisting

119.2928 kg Besi beton

1333 of 1892
8 1 m 3 beton tutup saluran, t =150mm

1.0000 m3 Beton 1 : 2 : 3

3.3333 m2 Bekisting

3.3333 m2 Membongkar Bekisting

270.7668 kg Besi beton

9 1 m 3 Beton plat A0 tebal 120 mm

1.0000 m3 Beton 25 MPa

0.4500 m2 Begesting dipakai 2x

0.4500 m2 Membongkar begesting

3.9071 kg Besi dowel D13 mm

16.6667 m2 Wire mesh M8-150 mm 2 layers

10 1 m 3 Beton plat ramp tebal 120 mm

1.0000 m3 Beton 1 : 2 : 3

8.3333 m2 Bekisting

8.3333 m2 Membongkar Bekisting

157.1041 kg Besi beton

11 1 m 3 Beton plat lantai grountank tebal 200 mm

1.0000 m3 Beton 25 MPa

5.0000 m2 Bekisting

5.0000 m2 Membongkar Bekisting

1334 of 1892
145.7481 kg Besi beton

12 1 m 3 Beton plat A2 tebal 120 mm Power house

1.0000 m3 Beton 25 MPa

8.3333 m2 Bekisting

8.3333 m2 Membongkar Bekisting

142.1832 kg Besi beton

13 1 m 3 Beton plat A3 tebal 150 mm Power house

1.0000 m3 Beton 25 MPa

6.6667 m2 Bekisting

6.6667 m2 Membongkar Bekisting

114.2123 kg Besi beton

xi Tangga

1 1 m 3 beton tangga dalam gedung, tebal 150 mm

1.0000 m3 Beton 25 MPa

13.3333 m2 Bekisting

1.0000 m3 stutwerk

13.3333 m2 Membongkar Bekisting

273.9775 kg Besi beton

1335 of 1892
2 1 m 3 beton tangga depan gedung

1.0000 m3 Beton 25 MPa

10.0000 m2 Bekisting

1.0000 m3 stutwerk

10.0000 m2 Membongkar Bekisting

207.8192 kg Besi beton

3 1 m 3 beton tangga dalam gedung, tebal 200 mm

1.0000 m3 Beton 25 MPa

11.6667 m2 Bekisting

1.0000 m3 stutwerk

11.6667 m2 Membongkar Bekisting

244.1868 kg Besi beton

xii Dinding beton

1 1 m 3 beton dinding pit lift tebal 200 mm

1.0000 m3 Beton 25 MPa

10.0000 m2 Bekisting

1.0000 m3 stutwerk

10.0000 m2 Membongkar Bekisting

173.9978 kg Besi beton

1336 of 1892
2 1 m 3 beton dinding pit lift tebal 250 mm

1.0000 m3 Beton 25 MPa

8.0000 m2 Bekisting

1.0000 m3 stutwerk

8.0000 m2 Membongkar Bekisting

139.1983 kg Besi beton

3 1 m 3 beton dinding DB1 tebal 200 mm

1.0000 m3 Beton 25 MPa

10.0000 m2 Bekisting

1.0000 m3 stutwerk

10.0000 m2 Membongkar Bekisting

207.7691 kg Besi beton

4 1 m 3 beton dinding Ramp tebal 150 mm

1.0000 m3 Beton 25 MPa

13.3333 m2 Bekisting

1.0000 m3 stutwerk

13.3333 m2 Membongkar Bekisting

251.0021 kg Besi beton

1337 of 1892
5 1 m 3 beton dinding pondasi tangga tebal 200 mm

1.0000 m3 Beton 25 MPa

10.0000 m2 Bekisting

1.0000 m3 stutwerk

10.0000 m2 Membongkar Bekisting

174.6066 kg Besi beton

F PEKERJAAN BAJA

1 1 m 2 Pekerjaan cat baja

Bahan :

0.1000 kg Cat dasar 1 x (zincromate)

0.2600 kg Cat penutup 2 x (cat besi)

Upah :

0.0090 OH Tukang cat

0.0060 OH Kepala tukang cat

0.0700 OH Pekerja

0.0025 OH Mandor

1338 of 1892
2 Analisa 10 cm Mengerjakan las listrik

Bahan :

0.4000 kg kawat las

0.3000 ltr solar

0.0400 ltr minyak pelumas

Upah :

0.0200 OH Tukang besi / las konstruksi

0.0200 OH Kepala tukang Besi

0.0400 OH Pekerja

0.0020 OH Mandor

Alat :

0.1700 jam sewa alat

3 Analisa 1 kg Baja

Bahan :

1.0500 kg Besi Baja

1.0000 cm Las

0.0300 m2 Zincromate + cat finishing

Upah

0.0600 OH Tukang besi / las konstruksi

1339 of 1892
0.0060 OH Kepala tukang

0.0300 OH Pekerja

0.0030 OH Mandor

4 1m2 Pasangan Plat galvanis tebal 0.45 mm

Bahan :

1.0500 m2 Plat galvanis tebal 0.45 mm

1.0000 ls Material bantu

Upah :

1.0000 ls Upah pasang

5 1 m' Cairan pengisi Dilatasi

Bahan :

0.5000 kg Cairan pengisi dilatasi

1.0000 ls Material bantu

1340 of 1892
Upah :

1.0000 ls Upah pasang

G PEKERJAAN KUSEN PINTU DAN JENDELA

1 1 m' Kusen Alumunium

Bahan :

1.1000 m1 Kusen Alumunium

2.0000 bh Screw fixer

0.0600 tube Sealant

Upah :

0.0430 OH Tukang alumunium

0.0043 OH Kepala tukang alumunium

0.0430 OH Pekerja

0.0021 OH Mandor

2 1 m' Frame Jendela dan Boven Alumunium

Bahan :

1.1000 m1 Frame Alumunium

1341 of 1892
Upah :

0.0430 OH Tukang alumunium

0.0043 OH Kepala tukang alumunium

0.0430 OH Pekerja

0.0021 OH Mandor

3 1 m' Frame Pintu Alumunium

Bahan :

1.1000 m1 Frame Alumunium Pintu

Upah :

0.0430 OH Tukang alumunium

0.0043 OH Kepala tukang alumunium

0.0430 OH Pekerja

0.0021 OH Mandor

3 Analisa 1 m' Kusen Alumunium curtaint wall vertikal back mullion

Bahan :

1.1000 m1 Kusen Alumunium

2.0000 bh Screw fixer

1342 of 1892
0.0600 tube Sealant

Upah :

0.0430 OH Tukang alumunium

0.0043 OH Kepala tukang alumunium

0.0430 OH Pekerja

0.0021 OH Mandor

4 Analisa 1 m' Kusen Alumunium curtaint wall horisontal transome

Bahan :

1.1000 m1 Kusen Alumunium

2.0000 bh Screw fixer

0.0600 tube Sealant

Upah :

0.0430 OH Tukang alumunium

0.0043 OH Kepala tukang alumunium

0.0430 OH Pekerja

0.0021 OH Mandor

4 1 unit Pintu PU

1343 of 1892
Pintu :

14.7840 m2 Kaca tempered 12 mm

2.0000 bh Patch fitting ambang bawah

2.0000 bh Patch fitting ambang atas

2.0000 bh Patch fitting engsel

2.0000 bh Floor hinges

2.0000 bh Patch fitting kunci

1.0000 unit Automatic sliding

1.0000 ttk Instalasi automatic sliding

4.4800 m2 Cover stainless steel 1 mm

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

Jendela

14.3000 m1 Kusen profil "U" alumunium

14.3000 m1 Bongkaran dinding untuk dudukan profil "U"

18.3619 m2 Kaca tempered 12 polos mm

40.8000 m1 sealant

Upah :
1.0000 ls Aplikator

5 1 unit Pintu PJ01

1344 of 1892
Pintu :

10.8000 m2 Kaca tempered 12 mm

4.0000 bh Patch fitting ambang bawah

4.0000 bh Patch fitting ambang atas

4.0000 bh Patch fitting engsel

4.0000 bh Floor hinges

4.0000 bh Patch fitting kunci

4.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

Jendela

21.1000 m1 Kusen profil "U" alumunium

21.1000 m1 Bongkaran dinding untuk dudukan profil "U"

17.2500 m2 Kaca tempered 12 polos mm

57.8000 m1 sealant

Upah :
6.0000 OH Tukang alumunium
0.6000 OH Kepala tukang alumunium
3.0000 OH Pekerja
0.0300 OH Mandor

6 1 unit Pintu PJ02

1345 of 1892
Pintu :

39.6300 m1 Kusen alumunium

1.0000 unit Engineering Door Flush core + door viewer kaca 5mm dark grey

uk. 800x2365mm

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Jendela :

10.1520 m2 Kaca dark grey t: 5 mm

65.7600 m1 Karet

Boven :

20.5500 m1 Frame jendela/boven

3.1044 m2 Kaca dark grey t: 5 mm

7.0000 set Friction stay bouven

7.0000 set Casement handle

38.4400 m1 Karet

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1346 of 1892
1.5000 OH Pekerja

0.1500 OH Mandor

7 1 unit Pintu PJ03

Pintu :

256.5312 kg Lipped channel 150.50.20.2,3 mm


96.1224 kg Besi siku 40.40.4
2.3310 kg Angkur besi Ø 6 mm
0.0912 m3 Kusen kayu jati 100/120 mm untuk pintu
0.1112 m3 Papan kayu jati, tebal 40 mm untuk frame pintu
1.5504 m2 Kaca tempered 8 mm untuk daun pintu

0.0122 m3 List kayu jati 20/30 mm

2.7156 m2 Plat stainless steel hair line 0.25 mm cutting laser daun pintu

0.4022 m3 Kusen kayu jati 60/120 mm untuk jendela


0.4047 m3 Papan kayu jati, tebal 20 mm untuk frame jendela
8.9872 m2 Kaca tempered 12 mm

0.0254 m3 List kayu jati 20/20 mm

10.0998 m2 Plat stainless steel hair line 1 mm cutting laser daun jendela

0.2765 m3 List kayu jati 150/30 mm


0.1536 m3 List kayu jati 100/25 mm
0.0461 m3 List kayu jati 50/25 mm

1347 of 1892
43.0532 m2 Finishing melamin
3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 1530 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 bh Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Upah:

1.0000 ls Aplikator

8 1 unit Pintu PJ04

Pintu :

211.3952 kg Lipped channel 150.50.20.2,3 mm


74.1004 kg Besi siku 40.40.4
1.9980 kg Angkur besi Ø 6 mm
0.0912 m3 Kusen kayu jati 100/120 mm untuk pintu
0.1112 m3 Papan kayu jati, tebal 40 mm untuk frame pintu
1.5504 m2 Kaca tempered 8 mm untuk daun pintu

0.0122 m3 List kayu jati 20/30 mm

2.7156 m2 Plat stainless steel hair line 1 mm cutting laser daun pintu

1348 of 1892
0.3072 m3 Kusen kayu jati 60/120 mm untuk jendela
0.2336 m3 Papan kayu jati, tebal 20 mm untuk frame jendela
5.1496 m2 Kaca tempered 12 mm

0.0179 m3 List kayu jati 20/20 mm

5.8404 m2 Plat stainless steel hair line 0.25 mm cutting laser daun jendela

0.2387 m3 List kayu jati 150/30 mm


0.1326 m3 List kayu jati 100/25 mm
0.0398 m3 List kayu jati 50/25 mm
34.1904 m2 Finishing melamin
3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 1530 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 bh Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Upah:

1.0000 ls Aplikator

9 1 unit Pintu PJ05

1349 of 1892
Pintu :

26.2750 m1 Kusen alumunium

2.0000 unit Engineering Door Flush core + door viewer kaca 5mm dark grey

uk. 700x2365mm

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Jendela :

7.7782 m2 Kaca euro grey t: 8 mm

49.6320 m1 Karet

Boven :

16.4880 m1 Frame jendela/boven

2.3681 m2 Kaca dark grey t: 5 mm

6.0000 set Friction stay bouven

6.0000 set Casement handle

30.6960 m1 Karet

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1350 of 1892
1.5000 OH Pekerja

0.1500 OH Mandor

10 1 unit Pintu Bouvent PBV01

Pintu :

25.1450 m1 Kusen alumunium

2.0000 unit Engineering Door Flush core + door viewer kaca 5mm dark grey

uk. 700x2365mm

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Boven :

19.1570 m1 Frame jendela/boven

3.5339 m2 Kaca dark grey t: 5 mm

8.0000 set Friction stay bouven

8.0000 set Casement handle

1351 of 1892
52.9840 m1 Karet

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1.5000 OH Pekerja

0.1500 OH Mandor

11 1 unit Pintu P01

Pintu :

5.7600 m2 Kaca tempered 12 mm

2.0000 bh Patch fitting ambang bawah

2.0000 bh Patch fitting ambang atas

2.0000 bh Patch fitting engsel

2.0000 bh Floor hinges

2.0000 bh Patch fitting kunci

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

Upah :
4.0000 OH Tukang alumunium
0.4000 OH Kepala tukang alumunium
2.0000 OH Pekerja

1352 of 1892
0.0200 OH Mandor

12 1 unit Pintu P02

Pintu :

9.5750 m1 Kusen alumunium

2.0000 unit Engineering Door Flush core uk. 700x2365mm

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Boven :

5.0200 m1 Frame jendela/boven

0.6656 m2 Kaca dark grey t: 5 mm

2.0000 set Friction stay bouven

2.0000 set Casement handle

9.2800 m1 Karet

Upah:

1353 of 1892
3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1.5000 OH Pekerja

0.1500 OH Mandor

13 1 unit Pintu P03

Pintu :

9.5750 m1 Kusen alumunium

2.0000 unit Engineering Door Flush core + door viewer kaca 5mm dark grey

uk. 700x2365mm

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Boven :

5.0200 m1 Frame jendela/boven

0.6656 m2 Kaca dark grey t: 5 mm

1354 of 1892
2.0000 set Friction stay bouven

2.0000 set Casement handle

9.2800 m1 Karet

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1.5000 OH Pekerja

0.1500 OH Mandor

14 1 unit Pintu P04

Pintu :

7.7400 m1 Kusen alumunium

1.0000 unit Engineering Door Flush core + door viewer kaca 5mm dark grey

uk. 800x2365mm

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 bh Escutecheon

1.0000 set Door closer

1355 of 1892
Boven :

2.7400 m1 Frame jendela/boven

0.3900 m2 Kaca dark grey t: 5 mm

1.0000 set Friction stay bouven

1.0000 set Casement handle

5.0800 m1 Karet

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1.5000 OH Pekerja

0.1500 OH Mandor

15 1 unit Pintu P05

Pintu :

7.7400 m1 Kusen alumunium

1.0000 unit Engineering Door Flush core uk. 800x2365mm

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1356 of 1892
1.0000 bh Escutecheon

1.0000 set Door closer

Boven :

2.7400 m1 Frame jendela/boven

0.3900 m2 Kaca dark grey t: 5 mm

1.0000 set Friction stay bouven

1.0000 set Casement handle

5.0800 m1 Karet

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1.5000 OH Pekerja

0.1500 OH Mandor

16 1 unit Pintu P06

Pintu :

1.0000 unit Kusen dan daun pintu besi tangga darurat uk. 1100x2250 mm

1.0000 set Doorhandle/backplate

1.0000 bh Lockase pintu tahan api

1.0000 bh Cylinder pintu tahan api

1357 of 1892
1.0000 set Door closer pintu tahan api

Upah:

3.0000 OH Tukang

0.3000 OH Kepala tukang

1.5000 OH Pekerja

0.1500 OH Mandor

17 1 unit Pintu P07

Pintu :

5.5700 m1 Kusen alumunium

1.0000 unit Daun pintu alumunium, tebal 1.3 mm, uk. 800x2365 mm

1.5000 psg Engsel

1.0000 psg Lever Handle

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 bh Escutecheon

1.0000 set Door closer

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1358 of 1892
1.5000 OH Pekerja

0.1500 OH Mandor

18 1 unit Pintu P08

Pintu :

5.7740 m1 Kusen alumunium

1.0000 unit Daun pintu alumunium, tebal 1.3 mm, uk. 900x2365 mm

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 600 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 bh Escutecheon

1.0000 set Door closer

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1.5000 OH Pekerja

0.1500 OH Mandor

1359 of 1892
19 1 unit Pintu P09

Pintu :

9.5750 m1 Kusen alumunium

2.0000 unit Engineering Door Flush core + stainless steel, t= 0.25 mm

uk. 700x2365mm

2.0000 psg Floor hinges

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Boven :

5.0200 m1 Frame jendela/boven

0.6656 m2 Kaca dark grey t: 5 mm

2.0000 set Friction stay bouven

2.0000 set Casement handle

9.2800 m1 Karet

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1360 of 1892
1.5000 OH Pekerja

0.1500 OH Mandor

20 1 unit Pintu P10

Pintu :

9.4750 m1 Kusen alumunium

2.0000 unit Engineering Door Flush core + door viewer kaca 5mm dark grey

uk. 675x2365mm

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Boven :

4.9000 m1 Frame jendela/boven

0.6344 m2 Kaca dark grey t: 5 mm

2.0000 set Friction stay bouven

2.0000 set Casement handle

1361 of 1892
9.0400 m1 Karet

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1.5000 OH Pekerja

0.1500 OH Mandor

21 1 unit Pintu PSH

Pintu :

4.1800 m1 Kusen alumunium

1.0000 unit Engineering Door Flush core uk. 600x1430mm

1.5000 psg Engsel

1.0000 psg Lever Handle

1.0000 bh Escutecheon

1.0000 set Lockcase

1.0000 set Cylinder

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

1362 of 1892
0.1000 OH Mandor

22 1 unit Pintu P11

Pintu :

5.6700 m1 Kusen alumunium

1.0000 unit Engineering Door Flush core uk. 800x2365mm

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 set Lockcase

1.0000 set Cylinder

1.0000 bh Escutecheon

1.0000 set Door closer

Upah:

3.0000 OH Tukang alumunium

0.3000 OH Kepala tukang alumunium

1.5000 OH Pekerja

0.1500 OH Mandor

1363 of 1892
23 1 unit Pintu P12

Pintu :

64.4213 kg Lipped channel 100.50.20.2,3 mm


38.3328 kg Besi siku 40.40.4
1.0656 kg Angkur besi Ø 6 mm
0.0950 m3 Kusen kayu jati 100/120 mm
2.0000 unit Engineering Door Flush core uk. 750x2790mm

2.7824 m2 Plat stainless steel hair line cutting laser, tebal 1 mm

0.0713 m3 List kayu jati 150/30 mm


0.0396 m3 List kayu jati 100/25 mm
0.0119 m3 List kayu jati 50/25 mm
7.4448 m2 Finishing melamin
3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 1530 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 bh Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

Upah:

1.0000 ls Aplikator

1364 of 1892
24 1 unit Pintu PB01

Pintu :

37.6960 kg Kusen lipped channel 150 x 50 x 20 x 2.3 mm

finishing cat anti karat dan cat besi

107.8563 kg Plat besi tebal 1.2 mm double

finishing cat anti karat dan cat besi

33.7640 kg Hollow 40 x 40 x 1.2 mm

finishing cat anti karat dan cat besi

33.7640 kg Besi siku 40 x 40 x 4 mm

finishing cat anti karat dan cat besi

2.0000 psg Handle Pipa BS Ø 1"

1.0000 bh Flushbolt pintu besi

3.0000 set Engsel pintu besi

1.0000 set Lockcase pintu besi

1.0000 set Cylinder pintu besi

1.0000 ps Escutecheon pintu besi

1.0000 set Door closer pintu besi

Upah:

4.0000 OH Tukang

0.4000 OH Kepala tukang

4.0000 OH Pekerja

1365 of 1892
0.4000 OH Mandor

25 1 unit Pintu PB02

Pintu :

30.7520 kg Kusen lipped channel 150 x 50 x 20 x 2.3 mm

finishing cat anti karat dan cat besi

44.1230 kg Plat besi tebal 1.2 mm double

finishing cat anti karat dan cat besi

24.2220 kg Hollow 40 x 40 x 1.2 mm

finishing cat anti karat dan cat besi

24.2220 kg Besi siku 40 x 40 x 4 mm

finishing cat anti karat dan cat besi

1.0000 psg Handle Pipa BS Ø 1"

1.5000 set Engsel pintu besi

1.0000 set Lockcase pintu besi

1.0000 set Cylinder pintu besi

1.0000 ps Escutecheon pintu besi

1.0000 set Door closer pintu besi

Upah:

4.0000 OH Tukang

1366 of 1892
0.4000 OH Kepala tukang

4.0000 OH Pekerja

0.4000 OH Mandor

26 1 unit Pintu PB03

Pintu :

28.7680 kg Kusen lipped channel 150 x 50 x 20 x 2.3 mm

finishing cat anti karat dan cat besi

39.8804 kg Plat besi tebal 1.2 mm double

finishing cat anti karat dan cat besi

24.0752 kg Hollow 40 x 40 x 1.2 mm

finishing cat anti karat dan cat besi

4.0370 kg Besi siku 40 x 40 x 4 mm

finishing cat anti karat dan cat besi

1.0000 psg Handle Pipa BS Ø 1"

1.5000 set Engsel pintu besi

1.0000 set Lockcase pintu besi

1.0000 set Cylinder pintu besi

1.0000 ps Escutecheon pintu besi

1.0000 set Door closer pintu besi

1367 of 1892
Upah:

4.0000 OH Tukang

0.4000 OH Kepala tukang

4.0000 OH Pekerja

0.4000 OH Mandor

27 1 unit Jendela J01

Jendela :

15.6200 m1 Kusen alumunium

8.5200 m1 Frame jendela

2.9840 m2 Kaca dark grey t: 5 mm

2.0000 set Friction stay jendela

2.0000 bh Casement handle

24.7600 m1 Karet

Boven :

7.8900 m1 Frame jendela/boven

1.1700 m2 Kaca dark grey t: 5 mm

3.0000 set Friction stay bouven

3.0000 set Casement handle

15.2400 m1 Karet

1368 of 1892
Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

28 1 unit Jendela J02

Jendela :

6.6100 m1 Kusen alumunium

4.1200 m1 Frame jendela

0.8704 m2 Kaca dark grey t: 5 mm

1.0000 set Friction stay jendela

1.0000 bh Casement handle

7.8400 m1 Karet

Boven :

2.7720 m1 Frame jendela/boven

0.3536 m2 Kaca dark grey t: 5 mm

1.0000 set Friction stay bouven

1.0000 set Casement handle

4.8000 m1 Karet

1369 of 1892
Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

29 1 unit Jendela J03

Jendela :

11.1150 m1 Kusen alumunium

8.3200 m1 Frame jendela

1.9200 m2 Kaca dark grey t: 5 mm

2.0000 set Friction stay jendela

2.0000 bh Casement handle

16.2400 m1 Karet

Boven :

5.4600 m1 Frame jendela/boven

0.7800 m2 Kaca dark grey t: 5 mm

2.0000 set Friction stay bouven

2.0000 set Casement handle

5.0800 m1 Karet

1370 of 1892
Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

30 1 unit Jendela J04

Jendela :

15.6200 m1 Kusen alumunium

3.3210 m2 Kaca dark grey t: 5 mm

26.0400 m1 Karet

Boven :

7.8900 m1 Frame jendela/boven

1.1700 m2 Kaca dark grey t: 5 mm

3.0000 set Friction stay bouven

3.0000 set Casement handle

15.2400 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1371 of 1892
1.0000 OH Pekerja

0.1000 OH Mandor

31 1 unit Jendela J05

Jendela :

6.4000 m1 Kusen alumunium

1.0125 m2 Kaca dark grey t: 5 mm

8.4000 m1 Karet

Boven :

2.7720 m1 Frame jendela/boven

0.3536 m2 Kaca dark grey t: 5 mm

1.0000 set Friction stay bouven

1.0000 set Casement handle

4.8000 m1 Karet

Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

1372 of 1892
32 1 unit Jendela J06

Jendela :

21.0250 m1 Kusen alumunium

4.8330 m2 Kaca dark grey t: 5 mm

35.9200 m1 Karet

Boven :

9.8200 m1 Frame jendela/boven

1.7160 m2 Kaca dark grey t: 5 mm

4.0000 set Friction stay bouven

4.0000 set Casement handle

21.5200 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

1373 of 1892
33 1 unit Jendela J07

Jendela :

31.9000 m1 Kusen alumunium

2.5016 m2 Kaca dark grey t: 5 mm

6.9960 m2 Kaca euro grey t: 8 mm

69.7600 m1 Karet

Boven :

12.8800 m1 Frame jendela/boven

2.0696 m2 Kaca dark grey t: 5 mm

4.0000 set Friction stay bouven

4.0000 set Casement handle

24.2400 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

34 1 unit Jendela J08

Jendela :

1374 of 1892
19.9250 m1 Kusen alumunium

5.9400 m2 Kaca euro grey t: 8 mm

34.8000 m1 Karet

Boven :

1.9305 m2 Kaca dark grey t: 5 mm

20.2200 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

35 Analisa 1 unit Jendela J09

Pintu :

89.4740 kg Lipped channel 100.50.20.2,3 mm


83.1600 kg Besi siku 40.40.4
1.4652 kg Angkur besi Ø 6 mm
0.1229 m3 Kusen kayu jati 60/120 mm
0.0887 m3 Papan kayu jati, tebal 40 mm untuk frame jendela
4.4363 m2 Plat stainless steel hair line cutting laser, tebal 0.25 mm

1375 of 1892
4.0870 m2 Kaca tempered 12 mm

0.0157 m3 List kayu jati 20/30 mm

0.0990 m3 List kayu jati 150/30 mm


0.0550 m3 List kayu jati 100/25 mm
0.0165 m3 List kayu jati 50/25 mm
12.3516 m2 Finishing melamin
Upah:

1.0000 ls Aplikator

36 1 unit Jendela J10

Jendela :

6.9000 m1 Kusen alumunium

1.7898 m2 Kaca sunergy blue green t: 6 mm

15.1360 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

1376 of 1892
37 1 unit Boven BV01

Boven :

5.4050 m1 Kusen alumunium

5.5520 m1 Frame jendela/boven

0.8060 m2 Kaca dark grey t: 5 mm

2.0000 set Friction stay bouven

2.0000 set Casement handle

10.3600 m1 Karet

Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

38 1 unit Boven BV02

Boven :

1377 of 1892
7.6200 m1 Kusen alumunium

8.1900 m1 Frame jendela/boven

1.1700 m2 Kaca dark grey t: 5 mm

3.0000 set Friction stay bouven

3.0000 set Casement handle

15.2400 m1 Karet

Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

39 1 unit Boven BV03

Boven :

6.3050 m1 Kusen alumunium

6.4600 m1 Frame jendela/boven

1.0400 m2 Kaca dark grey t: 5 mm

2.0000 set Friction stay bouven

2.0000 set Casement handle

12.1600 m1 Karet

1378 of 1892
Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

40 1 unit Boven BV04

Boven :

5.3550 m1 Kusen alumunium

5.7000 m1 Frame jendela/boven

0.8424 m2 Kaca dark grey t: 5 mm

2.0000 set Friction stay bouven

2.0000 set Casement handle

10.6400 m1 Karet

Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

1379 of 1892
41 1 unit Boven BV05

Boven :

7.2400 m1 Kusen alumunium

7.8100 m1 Frame jendela/boven

1.0712 m2 Kaca dark grey t: 5 mm

3.0000 set Friction stay bouven

3.0000 set Casement handle

14.4800 m1 Karet

Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

42 1 unit Boven BV06

Boven :

3.0700 m1 Kusen alumunium

1380 of 1892
2.7900 m1 Frame jendela/boven

0.4056 m2 Kaca dark grey t: 5 mm

1.0000 set Friction stay bouven

1.0000 set Casement handle

5.2000 m1 Karet

Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

43 1 unit Boven BV07

Boven :

8.6900 m1 Kusen alumunium

2.7900 m1 Frame jendela/boven

1.5028 m2 Kaca dark grey t: 5 mm

3.0000 set Friction stay bouven

3.0000 set Casement handle

17.8000 m1 Karet

Upah:

1381 of 1892
1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

44 1 unit Boven BV08

Boven :

18.3800 m1 Kusen alumunium

20.6500 m1 Frame jendela/boven

3.1304 m2 Kaca dark grey t: 5 mm

7.0000 set Friction stay bouven

7.0000 set Casement handle

38.6400 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

1382 of 1892
45 1 unit Boven BV09

Boven :

17.2800 m1 Kusen alumunium

19.5500 m1 Frame jendela/boven

2.8444 m2 Kaca dark grey t: 5 mm

7.0000 set Friction stay bouven

7.0000 set Casement handle

36.4400 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

46 1 unit Boven BV10

Boven :

18.1300 m1 Kusen alumunium

20.4020 m1 Frame jendela/boven

1383 of 1892
3.0649 m2 Kaca dark grey t: 5 mm

7.0000 set Friction stay bouven

7.0000 set Casement handle

38.1360 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

47 1 unit Boven BV11

Boven :

21.5150 m1 Kusen alumunium

24.2120 m1 Frame jendela/boven

3.7367 m2 Kaca dark grey t: 5 mm

8.0000 set Friction stay bouven

8.0000 set Casement handle

45.3840 m1 Karet

Upah:

2.0000 OH Tukang alumunium

1384 of 1892
0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

48 1 unit Boven BV12

Boven :

17.7800 m1 Kusen alumunium

20.0500 m1 Frame jendela/boven

2.9744 m2 Kaca dark grey t: 5 mm

7.0000 set Friction stay bouven

7.0000 set Casement handle

37.4400 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

1385 of 1892
49 1 unit Boven BV13

Boven :

16.7400 m1 Kusen alumunium

19.0100 m1 Frame jendela/boven

2.7560 m2 Kaca dark grey t: 5 mm

7.0000 set Friction stay bouven

7.0000 set Casement handle

35.7600 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

50 1 unit Boven BV14

Boven :

10.4350 m1 Kusen alumunium

11.4400 m1 Frame jendela/boven

1.6900 m2 Kaca dark grey t: 5 mm

1386 of 1892
4.0000 set Friction stay bouven

4.0000 set Casement handle

21.3200 m1 Karet

Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

0.5000 OH Pekerja

0.0500 OH Mandor

51 1 unit Boven BV15

Boven :

9.4400 m1 Kusen alumunium

10.0300 m1 Frame jendela/boven

1.6432 m2 Kaca dark grey t: 5 mm

3.0000 set Friction stay bouven

3.0000 set Casement handle

18.8800 m1 Karet

Upah:

1.0000 OH Tukang alumunium

0.1000 OH Kepala tukang alumunium

1387 of 1892
0.5000 OH Pekerja

0.0500 OH Mandor

52 1 unit Boven BV16

Boven :

21.0650 m1 Kusen alumunium

23.7600 m1 Frame jendela/boven

3.6192 m2 Kaca dark grey t: 5 mm

8.0000 set Friction stay bouven

8.0000 set Casement handle

44.4800 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

1388 of 1892
53 1 unit Boven BV17

Boven :

20.4150 m1 Kusen alumunium

23.1120 m1 Frame jendela/boven

3.4507 m2 Kaca dark grey t: 5 mm

8.0000 set Friction stay bouven

8.0000 set Casement handle

44.4800 m1 Karet

Upah:

2.0000 OH Tukang alumunium

0.2000 OH Kepala tukang alumunium

1.0000 OH Pekerja

0.1000 OH Mandor

54 1 unit Curtainwall 01 dari elv. - 2.100 s/d elv + 13.850

Boven

63.8000 m1 Kusen Alumunium vertikal back mullion


39.2000 m1 Kusen Alumunium vertikal transome
39.0775 m2 Kaca sunergy blue green t: 8 mm

40.0000 bh Dynabolt Ø 12 mm

1389 of 1892
260.4000 m1 Karet

Upah :
10.0000 OH Tukang alumunium
0.1000 OH Kepala tukang alumunium
5.0000 OH Pekerja
0.0500 OH Mandor

55 1 unit Curtainwall 02 dari elv. - 2.100 s/d elv + 20.200

Boven

88.8000 m1 Kusen Alumunium vertikal back mullion


53.9000 m1 Kusen Alumunium vertikal transome
54.6350 m2 Kaca sunergy blue green t: 8 mm

48.0000 bh Dynabolt Ø 12 mm
311.2000 m1 Karet

Upah :
10.0000 OH Tukang alumunium
0.1000 OH Kepala tukang alumunium
5.0000 OH Pekerja
0.0500 OH Mandor

1390 of 1892
56 Curtainwall 03 dari elv. - 3.100 s/d elv + 11.400

Boven

58.5000 m1 Kusen Alumunium vertikal back mullion


33.5130 m1 Kusen Alumunium vertikal transome
29.5200 m2 Kaca sunergy blue green t: 8 mm

52.0000 bh Dynabolt Ø 12 mm
117.0000 m1 Karet

Upah :
10.0000 OH Tukang alumunium
0.1000 OH Kepala tukang alumunium
5.0000 OH Pekerja
0.0500 OH Mandor

57 Curtainwall 04 dari elv. - 3.100 s/d elv + 5.550

Boven

155.7000 m1 Kusen Alumunium vertikal back mullion


110.7000 m1 Kusen Alumunium vertikal transome

1391 of 1892
106.3950 m2 Kaca sunergy blue green t: 8 mm

144.0000 bh Dynabolt Ø 12 mm
532.8000 m1 Karet

Upah :
10.0000 OH Tukang alumunium
0.1000 OH Kepala tukang alumunium
5.0000 OH Pekerja
0.0500 OH Mandor

58 Curtainwall 05 dari elv. - 3.100 s/d elv + 5.550

Boven

103.8000 m1 Kusen Alumunium vertikal back mullion


77.4000 m1 Kusen Alumunium vertikal transome
74.3900 m2 Kaca sunergy blue green t: 8 mm

96.0000 bh Dynabolt Ø 12 mm
362.4000 m1 Karet

Upah :
10.0000 OH Tukang alumunium
0.1000 OH Kepala tukang alumunium
5.0000 OH Pekerja

1392 of 1892
0.0500 OH Mandor

59 Curtainwall 06 dari elv. 0.000 s/d elv + 12.400

Boven

48.5700 m1 Kusen Alumunium vertikal back mullion


40.7000 m1 Kusen Alumunium vertikal transome
37.6000 m2 Kaca sunergy blue green t: 8 mm

36.0000 bh Dynabolt Ø 12 mm
178.5400 m1 Karet

Upah :
10.0000 OH Tukang alumunium
0.1000 OH Kepala tukang alumunium
5.0000 OH Pekerja
0.0500 OH Mandor

60 Curtainwall 07 dari elv. +4.200 s/d elv + 11.950

Boven

1393 of 1892
54.9500 m1 Kusen Alumunium vertikal back mullion
63.9000 m1 Kusen Alumunium vertikal transome
55.7350 m2 Kaca sunergy blue green t: 8 mm

42.0000 bh Dynabolt Ø 12 mm
237.7000 m1 Karet

Upah :
10.0000 OH Tukang alumunium
0.1000 OH Kepala tukang alumunium
5.0000 OH Pekerja
0.0500 OH Mandor

H PEKERJAAN PLAFON

1 1m2 Plafond gypsum tebal 12 mm rangka metal furing

Bahan :

0.6500 pcs UFC-Frame 35/22/0,455 @ 4000

1.5300 pcs UFC-Clip

0.8100 pcs UFC-Bracket

0.0150 zak Compound @ 20 Kg

0.3500 lbr Gypsum board 12mm

0.1300 btg Angle Section

1394 of 1892
0.8100 bh Rod hanger Ø 4 mm

0.8100 bh Soffit Cleat + Paku + Misiu

0.0480 roll Cotton tape (25m)

15.0000 pcs Screw 25mm

0.7200 pcs Paku Beton

Upah :

1.0000 paket Aplikator plafon

2 1 m2 Drop ceiling plafond gypsum tebal 12 mm rangka metal furing

Bahan :

0.7800 pcs UFC-Frame 35/22/0,455 @ 4000

1.8360 pcs UFC-Clip

0.9720 pcs UFC-Bracket

0.0180 zak Compound @ 20 Kg

0.3500 lbr Gypsum board 12mm

0.1300 btg Angle Section

0.8100 bh Rod hanger Ø 4 mm

0.8100 bh Soffit Cleat + Paku + Misiu

0.0480 roll Cotton tape (25m)

15.0000 pcs Screw 25mm

0.7200 pcs Paku Beton

1395 of 1892
Upah :

1.0000 paket Aplikator plafon

3 1m2 Plafond akustik tebal 12,5 mm rangka metal furing

Bahan :

1.0500 pcs UFC-Frame 35/22/0,455 @ 4000

3.5200 pcs UFC-Clip

1.2100 pcs UFC-Bracket

0.0150 zak Compound @ 20 Kg

0.4500 lbr Akustik board 12,5 mm

0.1300 bh Angle Section

1.2100 bh Rod hanger Ø 4 mm

1.2100 bh Soffit Cleat + Paku + Misiu

25.0000 pcs Screw 25mm

0.7200 pcs Paku Beton

Upah :

1.0000 paket Aplikator plafon

1396 of 1892
4 1 m' Pekerjaan shadow line

Bahan :

1.1000 m1 Shadow line

Upah :

1.0000 m1 Aplikator plafon

5 1 unit Maintenance hole 600 x 600 mm

Bahan :

1.0000 unit Rangka Maintenance hole 600x600mm

0.3600 m2 Penutup plafond gypsum tebal 12 mm

Upah :

1.0000 m1 Aplikator plafon

6 1 m2 Pekerjaan plafon kalsium silikat metal furing t: 6mm

Bahan :

0.6500 pcs UFC-Frame 35/22/0,455 @ 4000

1.5300 pcs UFC-Clip

0.8100 pcs UFC-Bracket

1397 of 1892
0.0150 zak Compound @ 20 Kg

0.3500 lbr Kalsium silikat 6 mm

0.1300 btg Angle Section

0.8100 bh Rod hanger Ø 4 mm

0.8100 bh Soffit Cleat + Paku + Misiu

0.0480 roll Cotton tape (25m)

15.0000 pcs Screw 25mm

0.7200 pcs Paku Beton

Upah :

1.0000 paket Aplikator plafon

7 1m2 Drop Ceiling Plafond akustik tebal 12,5 mm rangka metal furing

Bahan :

1.2600 pcs UFC-Frame 35/22/0,455 @ 4000

4.2240 pcs UFC-Clip

1.4520 pcs UFC-Bracket

0.0180 zak Compound @ 20 Kg

0.4500 lbr Akustik board 12,5 mm

0.1300 bh Angle Section

1.2100 bh Rod hanger Ø 4 mm

1.2100 bh Soffit Cleat + Paku + Misiu

1398 of 1892
25.0000 pcs Screw 25mm

0.7200 pcs Paku Beton

Upah :

1.0000 paket Aplikator plafon

I PEKERJAAN PARTISI

1 1 m2 Pekerjaan partisi gypsum rangka metalstud

Bahan :

0.6000 pcs C-Stud 75 mm (0.5mm)

0.2300 btg U-Channel 75 mm ( 0.4 mm)

0.7000 lbr Gypsum board 12mm

0.0400 zak Compound @ 20 kg

26.8000 pcs Screw 25 mm

0.7300 pcs Paku beton

0.0310 roll Cotton tape (25mm)

Upah :

1.0000 m2 Apliikator

1399 of 1892
2 1 m' Memasang plin homogeneous 100 x 600 mm untuk partisi

bahan :

0.0960 m2 Homogeneous 600 x 600 mm

0.3840 kg Perekat semen instan

0.1000 m2 Kalsium silikat 6 mm

1.0000 ls Alat potong

Upah :

0.0900 OH Tukang batu

0.0090 OH Kepala tukang batu

0.0900 OH Pekerja

0.0050 OH Mandor

2 1 unit Pekerjaan partisi PR 01

Bahan :

15.8600 m2 Pekerjaan partisi

15.8600 m2 Finish cat

13.2700 m1 Stoping angle

15.6000 m1 Sealant

7.4600 m1 Plint homogeneous 100 x 600mm

1400 of 1892
3 1 unit Pekerjaan partisi PR 02

Bahan :

29.4000 m2 Pekerjaan partisi

29.4000 m2 Finish cat

12.8000 m1 Stoping angle

21.1000 m1 Sealant

14.7000 m1 Plint homogeneous 100 x 600mm

4 1 unit Pekerjaan partisi PR 03

Bahan :

13.7500 m2 Pekerjaan partisi

13.7500 m2 Finish cat

6.4000 m1 Stoping angle

10.1000 m1 Sealant

6.9000 m1 Plint homogeneous 100 x 600mm

5 1 unit Pekerjaan partisi PR 04

Bahan :

10.5090 m2 Pekerjaan partisi

1401 of 1892
10.5090 m2 Finish cat

6.8000 m1 Stoping angle

4.1000 m1 Sealant

6.6000 m1 Plint homogeneous 100 x 600mm

6 1 unit Pekerjaan partisi PR 05

Bahan :

35.4900 m2 Pekerjaan partisi

35.4900 m2 Finish cat

13.8800 m1 Stoping angle

26.3600 m1 Sealant

17.0000 m1 Plint homogeneous 100 x 600mm

7 1 unit Pekerjaan partisi PR 06

Bahan :

35.2100 m2 Pekerjaan partisi

35.2100 m2 Finish cat

13.8800 m1 Stoping angle

26.3600 m1 Sealant

17.0000 m1 Plint homogeneous 100 x 600mm

1402 of 1892
8 1 unit Pekerjaan partisi PR 07

Bahan :

47.8000 m2 Pekerjaan partisi

47.8000 m2 Finish cat

12.8000 m1 Stoping angle

20.1500 m1 Sealant

14.7000 m1 Plint homogeneous 100 x 600mm

9 1 unit Pekerjaan partisi PR 08

Bahan :

24.9900 m2 Pekerjaan partisi

24.9900 m2 Finish cat

13.8800 m1 Stoping angle

21.1000 m1 Sealant

11.7400 m1 Plint homogeneous 100 x 600mm

10 1 unit Pekerjaan partisi PR 09

Bahan :

15.4441 m2 Pekerjaan partisi

15.4441 m2 Finish cat

1403 of 1892
6.8000 m1 Stoping angle

7.8000 m1 Sealant

6.2000 m1 Plint homogeneous 100 x 600mm

11 1 unit Pekerjaan partisi PR 10

Bahan :

11.9520 m2 Pekerjaan partisi

11.9520 m2 Finish cat

6.4000 m1 Stoping angle

12.4000 m1 Sealant

6.0000 m1 Plint homogeneous 100 x 600mm

12 1 unit Pekerjaan partisi PR 10a

Bahan :

25.3600 m2 Pekerjaan partisi

25.3600 m2 Finish cat

12.8000 m1 Stoping angle

19.0800 m1 Sealant

12.6800 m1 Plint homogeneous 100 x 600mm

1404 of 1892
13 1 unit Pekerjaan partisi PR 11

Bahan :

14.7900 m2 Pekerjaan partisi

14.7900 m2 Finish cat

13.2000 m1 Stoping angle

15.1000 m1 Sealant

6.9600 m1 Plint homogeneous 100 x 600mm

14 1 unit Pekerjaan partisi PR 12

Bahan :

7.9520 m2 Pekerjaan partisi

7.9520 m2 Finish cat

6.4000 m1 Stoping angle

10.4000 m1 Sealant

4.0000 m1 Plint homogeneous 100 x 600mm

15 1 unit Pekerjaan partisi PR 13

Bahan :

15.4000 m2 Pekerjaan partisi

15.4000 m2 Finish cat

12.8000 m1 Stoping angle

1405 of 1892
20.5000 m1 Sealant

7.7000 m1 Plint homogeneous 100 x 600mm

16 1 unit Pekerjaan partisi PR 14

Bahan :

10.7000 m2 Pekerjaan partisi

10.7000 m2 Finish cat

12.8000 m1 Stoping angle

18.1600 m1 Sealant

5.3600 m1 Plint homogeneous 100 x 600mm

17 1 unit Pekerjaan partisi PR 15

Bahan :

5.1520 m2 Pekerjaan partisi

5.1520 m2 Finish cat

6.4000 m1 Stoping angle

9.0000 m1 Sealant

2.6000 m1 Plint homogeneous 100 x 600mm

18 1 unit Pekerjaan partisi PR 16

1406 of 1892
Bahan :

22.7700 m2 Pekerjaan partisi

22.7700 m2 Finish cat

33.4000 m1 Stoping angle

19.9000 m1 Sealant

13.5000 m1 Plint homogeneous 100 x 600mm

19 1 unit Pekerjaan partisi PR 17

Bahan :

20.5250 m2 Pekerjaan partisi

20.5250 m2 Finish cat

30.8000 m1 Stoping angle

18.6000 m1 Sealant

12.2000 m1 Plint homogeneous 100 x 600mm

20 1 unit Pekerjaan partisi PR 18

Bahan :

21.9500 m2 Pekerjaan partisi

21.9500 m2 Finish cat

32.5200 m1 Stoping angle

19.4600 m1 Sealant

1407 of 1892
13.0600 m1 Plint homogeneous 100 x 600mm

21 1 unit Pekerjaan partisi PR 19

Bahan :

22.9040 m2 Pekerjaan partisi

22.9040 m2 Finish cat

38.9200 m1 Stoping angle

19.4600 m1 Sealant

13.0600 m1 Plint homogeneous 100 x 600mm

22 1 unit Pekerjaan partisi PR 20

Bahan :

28.8000 m2 Pekerjaan partisi

28.8000 m2 Finish cat

12.8000 m1 Stoping angle

27.2000 m1 Sealant

14.4000 m1 Plint homogeneous 100 x 600mm

23 1 unit Pekerjaan partisi PR 21

Bahan :

1408 of 1892
21.8000 m2 Pekerjaan partisi

21.8000 m2 Finish cat

12.8000 m1 Stoping angle

27.2000 m1 Sealant

14.4000 m1 Plint homogeneous 100 x 600mm

24 1 unit Pekerjaan partisi PR 22

Bahan :

14.4000 m2 Pekerjaan partisi

14.4000 m2 Finish cat

12.8000 m1 Stoping angle

20.0000 m1 Sealant

7.2000 m1 Plint homogeneous 100 x 600mm

25 1 unit Pekerjaan partisi PR 23

Bahan :

13.9900 m2 Pekerjaan partisi

13.9900 m2 Finish cat

20.3200 m1 Stoping angle

14.7000 m1 Sealant

6.5600 m1 Plint homogeneous 100 x 600mm

1409 of 1892
26 1 unit Pekerjaan partisi PR 24

Bahan :

28.3000 m2 Pekerjaan partisi

28.3000 m2 Finish cat

13.6000 m1 Stoping angle

21.8000 m1 Sealant

14.0000 m1 Plint homogeneous 100 x 600mm

27 1 unit Pekerjaan partisi PR 25

Bahan :

22.3000 m2 Pekerjaan partisi

22.3000 m2 Finish cat

12.8000 m1 Stoping angle

24.4400 m1 Sealant

11.8000 m1 Plint homogeneous 100 x 600mm

28 1 unit Pekerjaan partisi PR 26

Bahan :

5.7900 m2 Pekerjaan partisi

1410 of 1892
5.7900 m2 Finish cat

13.2000 m1 Stoping angle

10.6000 m1 Sealant

2.4600 m1 Plint homogeneous 100 x 600mm

29 1 unit Pekerjaan partisi PR 27

Bahan :

19.1400 m2 Pekerjaan partisi

19.1400 m2 Finish cat

13.2000 m1 Stoping angle

17.3000 m1 Sealant

9.3000 m1 Plint homogeneous 100 x 600mm

30 1 unit Pekerjaan partisi PR 28

Bahan :

14.7500 m2 Pekerjaan partisi

14.7500 m2 Finish cat

6.4000 m1 Stoping angle

10.1000 m1 Sealant

7.4000 m1 Plint homogeneous 100 x 600mm

1411 of 1892
31 1 unit Pekerjaan partisi PR 29

Bahan :

21.4000 m2 Pekerjaan partisi

21.4000 m2 Finish cat

12.8000 m1 Stoping angle

23.5000 m1 Sealant

10.7000 m1 Plint homogeneous 100 x 600mm

32 1 unit Pekerjaan partisi PR 30

Bahan :

10.0900 m2 Pekerjaan partisi

10.0900 m2 Finish cat

13.2000 m1 Stoping angle

12.8000 m1 Sealant

4.6200 m1 Plint homogeneous 100 x 600mm

33 1 unit Pekerjaan partisi PR 31

Bahan :

14.1500 m2 Pekerjaan partisi

14.1500 m2 Finish cat

1412 of 1892
6.4000 m1 Stoping angle

13.5000 m1 Sealant

7.1000 m1 Plint homogeneous 100 x 600mm

34 1 unit Pekerjaan partisi PR 32

Bahan :

32.0000 m2 Pekerjaan partisi

32.0000 m2 Finish cat

16.0000 m1 Sealant

16.0000 m1 Plint homogeneous 100 x 600mm

35 1 unit Pekerjaan partisi PR 33

Bahan :

25.4000 m2 Pekerjaan partisi

25.4000 m2 Finish cat

12.8000 m1 Stoping angle

25.5000 m1 Sealant

12.7000 m1 Plint homogeneous 100 x 600mm

36 1 unit Pekerjaan partisi PR 34

1413 of 1892
Bahan :

12.0000 m2 Pekerjaan partisi

12.0000 m2 Finish cat

26.6800 m1 Stoping angle

27.4000 m1 Sealant

8.2200 m1 Plint homogeneous 100 x 600mm

37 1 unit Pekerjaan partisi PR 35

Bahan :

13.9100 m2 Pekerjaan partisi

13.9100 m2 Finish cat

36.8800 m1 Stoping angle

21.1000 m1 Sealant

11.7400 m1 Plint homogeneous 100 x 600mm

38 1 unit Partisi Kaca PK01

Pintu :

70.2450 m1 Kusen alumunium

12.2000 m1 Frame pintu alumunium

2.5078 m2 Kaca 8 mm bening

0.9136 m2 Sticker Sandblasting

1414 of 1892
3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

22.1360 m1 Karet

Jendela

13.2193 m2 Kaca 6 mm bening

4.5713 m2 Sticker Sandblasting

124.1760 m1 Karet

Bouvent

5.6567 m2 Kaca 6 mm bening

53.9440 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

1415 of 1892
39 1 unit Partisi Kaca PK02

Pintu :

43.4400 m1 Kusen alumunium

12.2000 m1 Frame pintu alumunium

2.5078 m2 Kaca 8 mm bening

0.9136 m2 Sticker Sandblasting

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

22.1360 m1 Karet

Jendela

6.8448 m2 Kaca 6 mm bening

2.4089 m2 Sticker Sandblasting

63.4680 m1 Karet

Bouvent

3.3629 m2 Kaca 6 mm bening

32.8840 m1 Karet

Upah:

1416 of 1892
4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

40 1 unit Partisi Kaca PK03

Pintu :

38.6950 m1 Kusen alumunium

12.2000 m1 Frame pintu alumunium

2.5078 m2 Kaca 8 mm bening

0.9136 m2 Sticker Sandblasting

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

22.1360 m1 Karet

Jendela

1417 of 1892
5.1053 m2 Kaca 6 mm bening

1.7967 m2 Sticker Sandblasting

54.2280 m1 Karet

Bouvent

2.7739 m2 Kaca 6 mm bening

29.8040 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

41 1 unit Partisi Kaca PK04

Pintu :

33.0950 m1 Kusen alumunium

12.2000 m1 Frame pintu alumunium

2.5078 m2 Kaca 8 mm bening

0.9136 m2 Sticker Sandblasting

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1418 of 1892
1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

22.1360 m1 Karet

Jendela

4.2605 m2 Kaca 6 mm bening

1.4994 m2 Sticker Sandblasting

40.7040 m1 Karet

Bouvent

2.4878 m2 Kaca 6 mm bening

25.2480 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

42 1 unit Partisi Kaca PK05

1419 of 1892
Pintu :

31.5950 m1 Kusen alumunium

12.2000 m1 Frame pintu alumunium

2.5078 m2 Kaca 8 mm bening

0.9136 m2 Sticker Sandblasting

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

22.1360 m1 Karet

Jendela

3.7048 m2 Kaca 6 mm bening

1.3038 m2 Sticker Sandblasting

37.7520 m1 Karet

Bouvent

2.2996 m2 Kaca 6 mm bening

24.2640 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

1420 of 1892
4.0000 OH Pekerja

0.4000 OH Mandor

43 1 unit Partisi Kaca PK06

Pintu :

35.1450 m1 Kusen alumunium

6.3000 m1 Frame pintu alumunium

1.4735 m2 Kaca 8 mm bening

0.5368 m2 Sticker Sandblasting

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

11.4680 m1 Karet

Jendela

5.9321 m2 Kaca 6 mm bening

2.0877 m2 Sticker Sandblasting

58.6200 m1 Karet

1421 of 1892
Bouvent

2.6209 m2 Kaca 6 mm bening

25.9440 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

44 1 unit Partisi Kaca PK07

Pintu :

67.8900 m1 Kusen alumunium

18.5000 m1 Frame pintu alumunium

3.9813 m2 Kaca 8 mm bening

1.4504 m2 Sticker Sandblasting

4.5000 psg Engsel

3.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

2.0000 bh Lockcase

2.0000 bh Cylinder

2.0000 set Door closer

1422 of 1892
2.0000 bh Escutecheon

1.0000 bh Flush bolt

33.6040 m1 Karet

Jendela

10.3598 m2 Kaca 6 mm bening

2.8509 m2 Sticker Sandblasting

100.2120 m1 Karet

Bouvent

5.1653 m2 Kaca 6 mm bening

51.4880 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

45 1 unit Partisi Kaca PK08

Pintu :

38.5020 m1 Kusen alumunium

6.3000 m1 Frame pintu alumunium

1423 of 1892
1.4735 m2 Kaca 8 mm bening

0.5368 m2 Sticker Sandblasting

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

11.4680 m1 Karet

Jendela

6.1445 m2 Kaca 6 mm bening

2.1624 m2 Sticker Sandblasting

59.7480 m1 Karet

Bouvent

2.6928 m2 Kaca 6 mm bening

26.3200 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

1424 of 1892
46 1 unit Partisi Kaca PK09

Pintu :

72.8550 m1 Kusen alumunium

12.6000 m1 Frame pintu alumunium

2.9470 m2 Kaca 8 mm bening

1.0736 m2 Sticker Sandblasting

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

2.0000 bh Lockcase

2.0000 bh Cylinder

2.0000 set Door closer

2.0000 bh Escutecheon

22.9360 m1 Karet

Jendela

11.6564 m2 Kaca 6 mm bening

4.1022 m2 Sticker Sandblasting

116.1360 m1 Karet

Bouvent

5.1714 m2 Kaca 6 mm bening

51.5200 m1 Karet

Upah:

1425 of 1892
4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

47 1 unit Partisi Kaca PK10

Pintu :

79.8800 m1 Kusen alumunium

12.2000 m1 Frame pintu alumunium

2.5078 m2 Kaca 8 mm bening

0.9136 m2 Sticker Sandblasting

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

22.1360 m1 Karet

Jendela

1426 of 1892
13.9154 m2 Kaca 6 mm bening

4.8972 m2 Sticker Sandblasting

137.1720 m1 Karet

Bouvent

5.7574 m2 Kaca 6 mm bening

57.6440 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

48 1 unit Partisi Kaca PK11

Jendela

49.1000 m1 Kusen alumunium

9.5014 m2 Kaca 6 mm bening

3.3438 m2 Sticker Sandblasting

95.6520 m1 Karet

Bouvent

3.2176 m2 Kaca 6 mm bening

1427 of 1892
32.1240 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

49 1 unit Partisi Kaca PK12

Pintu :

39.0900 m1 Kusen alumunium

6.3000 m1 Frame pintu alumunium

1.4735 m2 Kaca 8 mm bening

0.5368 m2 Sticker Sandblasting

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

11.4680 m1 Karet

1428 of 1892
Jendela

3.6013 m2 Kaca 6 mm bening

1.8603 m2 Sticker Sandblasting

46.5480 m1 Karet

Bouvent

2.4021 m2 Kaca 6 mm bening

24.8000 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

50 1 unit Partisi Kaca PK13

Jendela

24.3000 m1 Kusen alumunium

4.3373 m2 Kaca 6 mm bening

1.5264 m2 Sticker Sandblasting

41.1120 m1 Karet

Bouvent

1429 of 1892
1.4688 m2 Kaca 6 mm bening

13.8000 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

51 1 unit Partisi Kaca PK14

Jendela

41.5000 m1 Kusen alumunium

8.3131 m2 Kaca 6 mm bening

2.9256 m2 Sticker Sandblasting

80.3040 m1 Karet

Bouvent

2.8152 m2 Kaca 6 mm bening

26.9600 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

1430 of 1892
4.0000 OH Pekerja

0.4000 OH Mandor

52 1 unit Partisi Kaca PK15

Pintu :

46.5500 m1 Kusen alumunium

6.3000 m1 Frame pintu alumunium

1.4735 m2 Kaca 8 mm bening

0.5368 m2 Sticker Sandblasting

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

11.4680 m1 Karet

Jendela

6.2256 m2 Kaca 6 mm bening

63.1360 m2 Sticker Sandblasting

46.5480 m1 Karet

1431 of 1892
Bouvent

3.2161 m2 Kaca 6 mm bening

32.1160 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

53 1 unit Partisi Kaca PK16

Pintu :

74.8600 m1 Kusen alumunium

6.3000 m1 Frame pintu alumunium

1.4735 m2 Kaca 8 mm bening

0.5368 m2 Sticker Sandblasting

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1432 of 1892
1.0000 bh Escutecheon

11.4680 m1 Karet

Jendela

14.1865 m2 Kaca 6 mm bening

4.9926 m2 Sticker Sandblasting

138.6120 m1 Karet

Bouvent

5.4162 m2 Kaca 6 mm bening

52.8000 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

54 1 unit Partisi Kaca PK17

Jendela

21.4000 m1 Kusen alumunium

3.5240 m2 Kaca 6 mm bening

1.2402 m2 Sticker Sandblasting

1433 of 1892
36.7920 m1 Karet

Bouvent

1.4688 m2 Kaca 6 mm bening

13.8000 m1 Karet

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

55 1 unit Partisi Kaca PK18

Pintu :

37.7450 m1 Kusen alumunium

6.3000 m1 Frame pintu alumunium

1.4735 m2 Kaca 8 mm bening

0.5368 m2 Sticker Sandblasting

1.5000 psg Engsel

1.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1434 of 1892
1.0000 set Door closer

1.0000 bh Escutecheon

11.4680 m1 Karet

Jendela

5.4216 m2 Kaca 6 mm bening

1.9080 m2 Sticker Sandblasting

46.8720 m1 Karet

Bouvent

2.4480 m2 Kaca 6 mm bening

21.9800 m1 Karet

Partisi

12.7360 m2 Pekerjaan partisi

12.7360 m2 Finish cat

12.8000 m1 Stoping angle

16.7800 m1 Sealant

7.8000 m1 Plint homogeneous 100 x 600mm


Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

1435 of 1892
56 1 unit Partisi Kaca PK19

Pintu :

39.5300 m1 Kusen alumunium

12.2000 m1 Frame pintu alumunium

2.5078 m2 Kaca 8 mm bening

0.9136 m2 Sticker Sandblasting

3.0000 psg Engsel

2.0000 psg Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless steel

1.0000 bh Lockcase

1.0000 bh Cylinder

1.0000 set Door closer

1.0000 bh Escutecheon

1.0000 bh Flush bolt

22.1360 m1 Karet

Jendela

5.4216 m2 Kaca 6 mm bening

1.9080 m2 Sticker Sandblasting

46.8720 m1 Karet

Bouvent

2.9070 m2 Kaca 6 mm bening

24.3800 m1 Karet

1436 of 1892
Partisi

10.8800 m2 Pekerjaan partisi

10.8800 m2 Finish cat

12.8000 m1 Stoping angle

16.2000 m1 Sealant

6.8000 m1 Plint homogeneous 100 x 600mm

Upah:

4.0000 OH Tukang alumunium

0.4000 OH Kepala tukang alumunium

4.0000 OH Pekerja

0.4000 OH Mandor

55 1 m2 Pekerjaan Work Station

Modul 2950 x 1500 mm

Bahan :

3.0000 m1 Hollow besi 40x60x2 mm

2.3569 kg Plat plendes 6mm

4.0800 kg Besi siku 30x30x3

20.0000 bh Dinabolt Ø 10 mm

6.8850 m2 Multiplek 18 mm

1437 of 1892
7.6250 m2 Finish cat duco

0.8850 m2 Kaca tempered 8 mm


5.9000 m1 Karet

Upah :

1.0000 m2 Aplikator

56 1 unit Partisi Geser

Pintu :

23.5200 m2 Dinding partisi geser, ukuran. 7350x3200 mm

47.0400 m2 Finishing HPL motif kayu

7.3500 m1 Perkuatan partisi dengan besi siku 50.50.5


1.0000 ls Material bantu
Upah:

1.0000 ls Aplikator

57 1 unit Dinding Peredam type 01

1438 of 1892
Bahan :

101.1702 pcs Rangka metal furing

126.0737 pcs UFC Bracket

73.3600 m2 Rockwool 40 kg/m3 , tebal 50mm

63.2100 m2 AKUSTIK 1200x2000x12,5 mm

10.1500 m2 AKUSTIK 600x1200x15 mm

82.2865 m2 Plywood 15 mm

82.2865 m2 HPL tebal 0.7 mm

12.3430 kg lem kayu

16.7500 m1 plint cellulos and fiber cement mixture, tinggi 50 mm

33.5000 m1 plint cellulos and fiber cement mixture, tinggi 100 mm

4.1875 m2 Cat plint

312.0000 bh Dynabolt Ø 10

1300.0000 bh Screw

82.2865 m2 Anti rayap

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

58 1 unit Dinding Peredam type 02

1439 of 1892
Bahan :

100.7477 pcs Rangka metal furing

125.5472 pcs UFC Bracket

72.7100 m2 Rockwool 40 kg/m3 , tebal 50mm

62.5600 m2 AKUSTIK 1200x2000x12,5 mm

10.1500 m2 AKUSTIK 600x1200x15 mm

82.2865 m2 Plywood 15 mm

82.2865 m2 HPL tebal 0.7 mm

12.3430 kg lem kayu

15.0000 m1 plint cellulos and fiber cement mixture, tinggi 50 mm

30.0000 m1 plint cellulos and fiber cement mixture, tinggi 100 mm

3.7500 m2 Cat plint

312.0000 bh Dynabolt Ø 10

1300.0000 bh Screw

82.2865 m2 Anti rayap

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

59 1 unit Dinding Peredam type 03

1440 of 1892
Bahan :

44.1019 pcs Rangka metal furing

54.9577 pcs UFC Bracket

30.0000 m2 Rockwool 40 kg/m3 , tebal 50mm

25.6500 m2 AKUSTIK 1200x2000x12,5 mm

4.3500 m2 AKUSTIK 600x1200x15 mm

37.8490 m2 Plywood 15 mm

37.8490 m2 HPL tebal 0.7 mm

5.6774 kg lem kayu

8.1500 m1 plint cellulos and fiber cement mixture, tinggi 50 mm

16.3000 m1 plint cellulos and fiber cement mixture, tinggi 100 mm

2.0375 m2 Cat plint

126.0000 bh Dynabolt Ø 10

540.0000 bh Screw

37.8490 m2 Anti rayap

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1441 of 1892
60 1 unit Dinding Peredam type 04

Bahan :

16.4624 pcs Rangka metal furing

20.5147 pcs UFC Bracket

11.6500 m2 Rockwool 40 kg/m3 , tebal 50mm

10.2000 m2 AKUSTIK 1200x2000x12,5 mm

1.4500 m2 AKUSTIK 600x1200x15 mm

13.6768 m2 Plywood 15 mm

13.6768 m2 HPL tebal 0.7 mm

2.0515 kg lem kayu

4.5000 m1 plint cellulos and fiber cement mixture, tinggi 50 mm

9.0000 m1 plint cellulos and fiber cement mixture, tinggi 100 mm

1.1250 m2 Cat plint

60.0000 bh Dynabolt Ø 10

258.0000 bh Screw

13.6768 m2 Anti rayap

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1442 of 1892
61 1 unit Dinding Peredam type 05

Bahan :

60.5105 pcs Rangka metal furing

75.4053 pcs UFC Bracket

44.3000 m2 Rockwool 40 kg/m3 , tebal 50mm

38.5000 m2 AKUSTIK 1200x2000x12,5 mm

5.8000 m2 AKUSTIK 600x1200x15 mm

48.7930 m2 Plywood 15 mm

48.7930 m2 HPL tebal 0.7 mm

7.3190 kg lem kayu

10.1500 m1 plint cellulos and fiber cement mixture, tinggi 50 mm

20.3000 m1 plint cellulos and fiber cement mixture, tinggi 100 mm

2.5375 m2 Cat plint

162.0000 bh Dynabolt Ø 10

695.0000 bh Screw

48.7930 m2 Anti rayap

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1443 of 1892
J PEKERJAAN FINISHING

1 Homogeneous Tile Polished Tipe A 600 x 600 mm ( Warna hitam )

Bahan:

1.0200 m2 Homogenous 600 x 600 mm

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3000 OH Tukang batu

0.0300 OH Kepala tukang batu

0.6000 OH Pekerja

0.0300 OH Mandor

2 Homogeneous Tile Semipolished / Lappato Tipe B 600 x 600 mm ( Gelap )

Bahan:

1.0200 m2 Homogenous 600 x 600 mm

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3000 OH Tukang batu

1444 of 1892
0.0300 OH Kepala tukang batu

0.6000 OH Pekerja

0.0300 OH Mandor

3 Homogeneous Tile Semipolished / Lappato Tipe C 600 x 600 mm ( Terang )

Bahan:

1.0200 m2 Homogenous 600 x 600 mm

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3000 OH Tukang batu

0.0300 OH Kepala tukang batu

0.6000 OH Pekerja

0.0300 OH Mandor

4 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam )

Bahan:

1.0200 m2 Homogenous 600 x 600 mm

1445 of 1892
10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3000 OH Tukang batu

0.0300 OH Kepala tukang batu

0.6000 OH Pekerja

0.0300 OH Mandor

5 Homogeneous Tile Matt Tipe B 600 x 600 mm

Bahan:

1.0200 m2 Homogenous 600 x 600 mm

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3000 OH Tukang batu

0.0300 OH Kepala tukang batu

0.6000 OH Pekerja

0.0300 OH Mandor

1446 of 1892
6 1 m' Memasang plin homogenous 100 x 600 mm

Bahan:

0.0600 m2 Homogenous 600 x 600 mm

1.0000 ls Alat potong

0.5455 kg Portland Cement (PCC)

0.0818 kg Semen warna

0.0025 m3 Pasir Pasang

Upah:

0.0900 OH Tukang batu

0.0090 OH Kepala tukang batu

0.0900 OH Pekerja

0.0050 OH Mandor

7 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm

Bahan:

1.0200 m2 Homogenous 600 x 600 mm

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

1447 of 1892
Upah:

0.3000 OH Tukang batu

0.0300 OH Kepala tukang batu

0.6000 OH Pekerja

0.0300 OH Mandor

8 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area tangga )

Bahan:

1.0200 m2 Homogenous 600 x 600 mm

1.0000 m2 Grove step nosing

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3000 OH Tukang batu

0.0300 OH Kepala tukang batu

0.6000 OH Pekerja

0.0300 OH Mandor

1448 of 1892
9 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm

Bahan:

1.0200 m2 homogenous dinding 600 x 600 mm

1.0000 ls Alat potong

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3500 OH Tukang batu

0.0350 OH Kepala tukang batu

0.7000 OH Pekerja

0.0350 OH Mandor

10 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah )

Bahan:

1.0200 m2 Homogenous 600 x 600 mm

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3000 OH Tukang batu

1449 of 1892
0.0300 OH Kepala tukang batu

0.6000 OH Pekerja

0.0300 OH Mandor

11 Homogeneous Tile 300 x 600 jumplift

Bahan:

1.0200 m2 homogenous dinding 300 x 600 mm

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3500 OH Tukang batu

0.0350 OH Kepala tukang batu

0.7000 OH Pekerja

0.0350 OH Mandor

12 1 m' Pasang step nosing

Bahan:

1.5000 bh Stepnosing 80 x600 mm

1450 of 1892
1.0000 kg Portland Cement (PCC)

0.1483 kg Semen warna

0.0047 m3 Pasir Pasang

Upah:

0.1000 OH Tukang batu

0.0090 OH Kepala tukang batu

0.0900 OH Pekerja

0.1176 OH Mandor

13 1m2 Finishing karpet 4.3 mm

Bahan :

1.0000 m2 Karpet tebal 4.3 mm

Upah:

1.0000 m2 Biaya pemasangan

14 Finishing karpet tile 500x500 mm tebal 6.2 mm

Bahan :

1451 of 1892
1.0000 m2 Finishing karpet tile 500x500 mm tebal 6.2 mm

Upah:

1.0000 m2 Biaya pemasangan

15 1 m2 Floor hardener finishing trowel

Bahan:

1.0200 m2 Epoxy

1.0200 m2 Floor hardener 5 kg/m2

Upah :

1.0000 ls Aplikator

16 1 m2 Finishing Kulit Batu

Bahan:

0.2500 m2 Perekat

0.0200 m2 Plesteran dasar

1.0000 m2 Kulit batu

Upah:

1.0000 m2 Aplikator

1452 of 1892
17 Pasangan keramik lantai 300 x 300 mm grountank

Bahan:

1.0200 m2 Keramik 300x300 mm

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

Upah:

0.3000 OH Tukang batu

0.0300 OH Kepala tukang batu

0.6000 OH Pekerja

0.0300 OH Mandor

18 Pasangan keramik dinding 300 x 300 mm grountank

Bahan:

1.0200 m2 Keramik 300x300 mm

1.0000 ls Alat potong

10.0000 kg Portland Cement (PCC)

1.5000 kg Semen warna

0.0450 m3 Pasir Pasang

1453 of 1892
Upah:

0.3500 OH Tukang batu

0.0350 OH Kepala tukang batu

0.7000 OH Pekerja

0.0350 OH Mandor

19 1 m2 Granit custom tebal 28 mm untuk finishing meja beton

Bahan :

1.0500 m2 Granit custom

1.0500 m2 Rangka baja

Upah :

0.4000 OH Tukang batu

0.0400 OH Kepala tukang batu

0.8000 OH Pekerja

0.0400 OH Mandor

K PEKERJAAN PENGECATAN

1454 of 1892
1 1 m2 Pekerjaan cat dinding dalam

Bahan :

1.0000 m2 Cat dinding dalam (terpasang)

Cat dasar 1 x

Cat penutup 2 x

2 1 m2 Pekerjaan cat dinding luar

Bahan :

1.0000 m2 Cat dinding luar (terpasang)

Cat dasar 1 x

Cat penutup 2 x

3 1 m2 Pekerjaan cat plafon

Bahan :

1.0000 m2 Cat dinding plafond (terpasang)

Cat dasar 1 x

Cat penutup 2 x

1455 of 1892
4 1 m2 pekerjaan cat water proofing

Bahan :

1.0000 kg Waterprofing

5 1 m² Pekerjaan waterproofing coating untuk KM/WC dan groundtank

Bahan :

0.1250 ltr Lemkra TG 301

4.0000 kg Lemkra FK 103

Upah :

0.0630 OH Tukang cat

0.0063 OH Kepala tukang cat

0.0200 OH Pekerja

0.0025 OH Mandor

6 1 m² Pekerjaan waterproofing coating untuk basement dan plat beton

Bahan :

0.1250 ltr Lemkra TG 301

1456 of 1892
2.5000 kg Lemkra DS 105 Putih

1.5000 kg Lemkra DS 105 Abu

1.0000 m2 Fiberglass Mesh

Upah :

0.0630 OH Tukang cat

0.0063 OH Kepala tukang cat

0.0200 OH Pekerja

0.0025 OH Mandor

7 1 m² Pekerjaan cat melamin

Bahan :

0.3000 kg Wood filler

0.1500 ltr Wood stain

0.4000 ltr Melamine sanding sealer

0.2000 kg Melamine top coat

Upah :

0.1000 OH Tukang cat

0.0100 OH Kepala tukang cat

0.1000 OH Pekerja

0.0010 OH Mandor

1457 of 1892
L PEKERJAAN SANITASI

1 1m' Pipa PVC dia 6"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0030 OH Tukang batu

0.0030 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

2 1m' Pipa PVC dia 5"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

1458 of 1892
0.0600 OH Tukang batu

0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

3 1m' Pipa PVC dia 4"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0600 OH Tukang batu

0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

4 1m' Pipa PVC dia 3"

Bahan :

1459 of 1892
1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0600 OH Tukang batu

0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

5 1m' Pipa PVC dia 2 1/2"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0600 OH Tukang batu

0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

1460 of 1892
6 1m' Pipa PVC dia 2"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0600 OH Tukang batu

0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

7 1m' Pipa PVC dia 1 1 /2"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0600 OH Tukang batu

0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

1461 of 1892
8 1m' Pipa PVC dia 1 1 /4"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0600 OH Tukang batu

0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

9 1m' Pipa PVC dia 1"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0600 OH Tukang batu

1462 of 1892
0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

10 1m' Pipa PVC dia 3/4"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0030 OH Tukang batu

0.0030 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

11 1m' Pipa PVC D dia 2"

Bahan :

1.2000 m Pipa PVC

1463 of 1892
1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0600 OH Tukang batu

0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

12 1m' Pipa PVC D dia 2,5"

Bahan :

1.2000 m Pipa PVC

1.0000 ls Perlengkapan (35 % dari harga pipa)

Upah :

0.0600 OH Tukang batu

0.0360 OH Pekerja

0.0060 OH Kepala tukang batu

0.0018 OH Mandor

13 1 unit stop kran 3/4"

1464 of 1892
Bahan :

1.0000 bh Gate Valve 3/4"

0.2500 bh seal type

Upah

0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

0.0050 OH Mandor

14 1 unit stop kran 1"

Bahan :

1.0000 bh Gate Valve 1"

0.2500 bh seal type

Upah

0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

0.0050 OH Mandor

1465 of 1892
15 1 unit stop kran 1 1/4"

Bahan :

1.0000 bh Gate Valve 1 1/4"

0.2500 bh seal type

Upah

0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

0.0050 OH Mandor

16 1 unit stop kran 1 1/2"

Bahan :

1.0000 bh Gate Valve 1 1/2"

0.2500 bh seal type

Upah

0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

1466 of 1892
0.0050 OH Mandor

17 1 unit stop kran 2"

Bahan :

1.0000 bh Gate Valve 2"

0.2500 bh seal type

Upah

0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

0.0050 OH Mandor

18 1 unit stop kran 2 1/2"

Bahan :

1.0000 bh Gate Valve 2 1/2"

0.2500 bh seal type

Upah

1467 of 1892
0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

0.0050 OH Mandor

19 1 unit kran 1/2"

Bahan :

1.0000 bh Kran

0.2500 bh seal type

Upah

0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

0.0050 OH Mandor

20 1 unit floordrain

Bahan :

1468 of 1892
1.0000 bh Floor drain

Upah

0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

0.0050 OH Mandor

21 1 unit jetwasher

Bahan :

1.0000 bh jetwasher

Upah

0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

0.0050 OH Mandor

22 1 unit kloset duduk

Bahan :

1469 of 1892
1.0000 bh kloset duduk

1.0000 ls Perlengkapan (6 % dari harga kloset)

Upah :

1.1000 OH Tukang batu

3.3000 OH Pekerja

0.0010 OH Kepala tukang batu

0.1600 OH Mandor

23 1 unit Kloset duduk difable

Bahan :

1.0000 bh Kloset duduk difable

1.0000 ls Perlengkapan (6 % dari harga kloset)

Upah :

1.1000 OH Tukang batu

3.3000 OH Pekerja

0.0010 OH Kepala tukang batu

0.1600 OH Mandor

1470 of 1892
23 1 unit kitchen zink + kran zink

Bahan :

1.0000 unit Kitchen Zink + Aksesoris

1.0000 unit Kran

1.0000 ls Perlengkapan

Upah :

0.7500 OH Tukang batu

1.2000 OH Pekerja

0.0700 OH Kepala tukang batu

0.1100 OH Mandor

24 1 unit Wastafel meja + kran + cermin

Bahan :

1.0000 unit Wastafel meja + kran

0.4800 m2 Cermin

1.0000 ls Perlengkapan (6 % dari harga wastafel)

Upah :

0.7500 OH Tukang batu

1.2000 OH Pekerja

0.0700 OH Kepala tukang batu

1471 of 1892
0.1100 OH Mandor

25 1 unit Wastafel gantung + kran + cermin

Bahan :

1.0000 unit Wastafel gantung + kran

0.4800 m2 Cermin

1.0000 ls Perlengkapan (6 % dari harga wastafel)

Upah :

0.7500 OH Tukang batu

1.2000 OH Pekerja

0.0700 OH Kepala tukang batu

0.1100 OH Mandor

26 1 unit Urinoir + penutup protector

Bahan :

1.0000 bh Urinoir

1.0000 bh Penutup protector urinoir

1.0000 ls Perlengkapan

1472 of 1892
Upah :

1.1000 OH Tukang batu

3.3000 OH Pekerja

0.0010 OH Kepala tukang batu

0.1600 OH Mandor

27 1 unit Sekat urinoir

Bahan :

1.0000 unit Sekat urinoir

1.0000 ls Perlengkapan

Upah :

0.7500 OH Tukang batu

1.2000 OH Pekerja

0.0700 OH Kepala tukang batu

0.1100 OH Mandor

28 1 unit Pegangan stainless steel (untuk toilet difabel)

Bahan :

1473 of 1892
1.0000 bh Pegangan stainless steel (untuk toilet difabel)

1.0000 ls Perlengkapan

Upah

0.1000 OH Tukang batu

0.0100 OH Pekerja

0.0100 OH Kepala tukang batu

0.0050 OH Mandor

29 1 unit Shower

Bahan :

1.0000 bh Shower

1.0000 ls Perlengkapan (6 % dari harga kloset)

Upah :

0.7500 OH Tukang batu

1.2000 OH Pekerja

0.0700 OH Kepala tukang batu

0.1100 OH Mandor

1474 of 1892
30 1 unit Water Heater 15 liter

Bahan :

1.0000 bh Water Heater 15 liter

1.0000 ls Perlengkapan (6 % dari harga kloset)

Upah :

1.1000 OH Tukang batu

3.3000 OH Pekerja

0.0010 OH Kepala tukang batu

0.1600 OH Mandor

31 1 m2 Cubicle toilet

Bahan :

1.0000 m2 Cubicle toilet (terpasang)

32 1 unit Bak kontrol 1100 x 1100 mm

1475 of 1892
1.2100 m3 Galian tanah

4.4000 m2 Pasangan dinding 1 pcc : 3 ps

5.6100 m2 Plesteran dinding 1 pc : 3 ps

0.1210 m3 Beton 1 pcc : 2 ps : 3 sp

33 1 unit Sumur peresapan

Galian

3.1400 m3 Galian tanah

1.0626 m3 Pasir urugan

Bahan

7.0000 bh Buis beton 800

0.1346 m3 Batu koral

0.0402 m3 Plat beton penutup

10.0000 ikat Ijuk

Upah

0.4000 OH Tukang batu

0.0400 OH Kepala tukang batu

0.4000 OH Pekerja

0.0400 OH Mandor

34 1 m' saluran keliling bangunan pasangan bata

1476 of 1892
0.4550 m3 Galian tanah

0.1400 m3 Urugan pasir

1.0000 bh Buis beton 300

1.7000 m2 Pas. Tembok 1 pc : 3 ps

0.0400 m2 Rollag

0.9500 m2 Plesteran

0.9500 bh Acian

35 1 m' saluran keliling bangunan batu kali

1.6500 m3 Galian tanah

0.1500 m3 Urugan pasir

0.4650 m3 Pasangan pondasi batu kali

1.8375 m2 Plesteran 1 : 3

1.8375 bh Acian

36 1 m' penutup saluran

0.0720 m3 Beton 1 pcc : 2 ps : 3 sp

0.6000 m2 Begesting plat

1477 of 1892
8.3844 kg Besi beton

0.5000 m1 Pipa 1/2 "

37 1 unit rooftank 2000 liter

Bahan :

1.0000 unit Rooftank 2000 liter

1.0000 unit Radar (automatic switch)

Upah :

1.0000 ls Upah pasang

38 1 unit rooftank 1000 liter

Bahan :

1.0000 unit Rooftank 1000 liter

1.0000 unit Radar (automatic switch)

Upah :

1.0000 ls Upah pasang

39 1 unit Sumur air bersih

1478 of 1892
Bahan

4.7100 m3 Galian tanah

10.0000 m1 pipa 6"

1.0000 ls Alat bantu

Upah

5.0000 OH Tukang batu

0.5000 OH Kepala tukang batu

5.0000 OH Pekerja

0.5000 OH Mandor

40 1 unit Rumah biofil

10.0800 m3 Galian tanah 2 m

0.4160 m3 urugan pasir t =10 cm

0.4160 m3 rabat beton t = 10 cm

14.2800 m2 Pasangan dinding 1 pcc : 3 ps

14.2800 m2 Plesteran dinding 1 pc : 3 ps

8.4000 m1 Sloof praktis 120x200mm

8.0000 m1 Kolom praktis 120x120mm

8.4000 m1 balok praktis 120x200mm

1479 of 1892
0.3440 m3 Cor plat atas t =10 cm

0.0720 m3 Cor plat penutup t =10 cm

0.7416 kg besi pengait 10 mm

41 1 unit septictank 8 m3 + rumah

Bahan :

1.0000 bh Septictank

1.0000 bh Rumah biofil

Upah :

1.0000 ls Upah pasang

42 1 unit septictank 4 m3 + rumah

Bahan :

1.0000 bh Septictank

1.0000 bh Rumah biofil

Upah :

1.0000 ls Upah pasang

43 1 unit septictank 2 m3 + rumah

Bahan :

1.0000 bh Septictank

1.0000 bh Rumah biofil

Upah :

1480 of 1892
1.0000 ls Upah pasang

44 1 m' Penutup grill

Penutup Saluran

21.0000 kg Siku 50 x 50 x 5 mm

1.0000 ls Las

1.0000 ls Material bantu

Upah

0.1000 OH Tuka besi

0.0100 OH Kepala tukang besi

0.1000 OH Pekerja

0.0100 OH Mandor

45 Pompa transfer 70 liter/menit, head 50 m

Bahan :

1.0000 unit Pompa transfer 70 liter/menit, head 50 m

Upah :

1.0000 ls Upah pasang

1481 of 1892
46 Pompa booster 40 liter/menit, head 12 m

Bahan :

1.0000 unit Pompa booster 40 liter/menit, head 12 m, include : header,

flexible, pressure guage, pressure switch, check valve, gate valve,

base frame, panel kontrol, 1 set terdiri dari 2 pompa

Upah :

1.0000 ls Upah pasang

M PEKERJAAN ELEKTRIKAL

i Instalasi penerangan

1 1 Titik instalasi Penerangan

Bahan :

15.0000 m Kabel NYM 2 x 2.5 mm

15.0000 m Pipa PVC 20mm²

1.0000 ls Material bantu T doos, sock, lem

Upah :

1.0000 ls Pekerja listrik

1482 of 1892
2 1 Titik instalasi stop kontak 1 ph

Bahan :

15.0000 m Kabel NYM 3 x 2.5 mm

15.0000 m Pipa PVC 20mm²

1.0000 ls Material bantu, sock, lem

Upah :

1.0000 ls Pekerja listrik

3 1 Titik instalasi exhaust fan

Bahan :

15.0000 m Kabel NYM 2 x 2.5 mm

15.0000 m Pipa PVC 20mm²

1.0000 ls Material bantu T doos, sock, lem

Upah :

1.0000 ls Pekerja listrik

1483 of 1892
4 Lampu Led Panel 595 x 595mm 36W 4000K

Bahan :

1.0000 bh Led Panel 595 x 595mm 36W 4000K

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

5 Lampu TKO TL Led T8 1200mm 2 x 18W

Bahan :

1.0000 bh TKO TL Led T8 1200mm 2 x 18W

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

6 Lampu Flat Downlight ∅ 244mm 20W 4000K

Bahan :

1.0000 bh Flat Downlight ∅ 244mm 20W 4000K

1.0000 ls Material bantu

Upah :

1484 of 1892
1.0000 ls Pekerja listrik

7 Lampu Flat Downlight ∅ 95mm 7W 4000K

Bahan :

1.0000 bh Flat Downlight ∅ 95mm 7W 4000K

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

8 Lampu Spotlight Led 5W 4000K + Housing

Bahan :

1.0000 bh Spotlight Led 5W 4000K + Housing

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

9 Lampu Lampu Uplight Pohon 8W 3000K

1485 of 1892
Bahan :

1.0000 bh Lampu Uplight Pohon 8W 3000K

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

10 Wall Washer 1200mm Led 36W 3000K

Bahan :

1.0000 bh Wall Washer 1200mm Led 36W 3000K

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

11 Wall Light Up & Down 14.5W 3000K

Bahan :

1.0000 bh Wall Light Up & Down 14.5W 3000K

1.0000 ls Material bantu

Upah :

1486 of 1892
1.0000 ls Pekerja listrik

12 Exit Lamp LED

Bahan :

1.0000 pcs Ballast konvensional RA

1.0000 pcs Stater S10

1.0000 bh TL W / 54 Putih Phillips

Upah :

1.0000 ls Pekerja listrik

13 Emergency lamp

Bahan :

1.0000 pcs NVC NLED9305N 12W 3000K

1.0000 pcs NICAD Battrey

Upah :

1.0000 ls Pekerja listrik

1487 of 1892
14 1 m' LED Strip IP65 4 Watt/mtr c/w adaptor

Bahan :

1.0000 m1 LED Strip IP65 4 Watt/mtr c/w adaptor

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

15 1 m' LED Strip SMD5050 IP65 14.4 Watt/meter 3000K

Bahan :

1.0000 m1 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

1488 of 1892
16 Lampu Barret Led 17W 4000K

Bahan :

1.0000 pcs Lampu Barret Led 17W 4000K

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

17 Flood Light Led 40W IP65 4000K

Bahan :

1.0000 pcs Flood Light Led 40W IP65 4000K

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

18 Stop Kontak dinding

Bahan :

1.0000 bh Stop kontak dinding

1489 of 1892
1.0000 bh Inbowdoos seng

Upah :

1.0000 ls Pekerja listrik

19 Stop Kontak dinding 2 outlet

Bahan :

1.0000 bh 2 gang frame

1.0000 bh 2 gang wall box

1.0000 bh Outlet stop kontak

Upah :

1.0000 ls Pekerja listrik

20 Stop Kontak lantai 2 outlet

Bahan :

1.0000 bh Stop kontak lantai

1.0000 bh Inbowdoos seng

Upah :

1490 of 1892
1.0000 ls Pekerja listrik

21 Saklar Seri

Bahan :

1.0000 bh Saklar seri

1.0000 bh Inbowdoos seng

Upah :

1.0000 ls Pekerja listrik

22 Saklar Tunggal

Bahan :

1.0000 bh Saklar tunggal

1.0000 bh Inbowdoos seng

Upah :

1.0000 ls Pekerja listrik

1491 of 1892
23 Saklar 3 Gang Switch

Bahan :

1.0000 bh Saklar 3 Gang Switch

1.0000 bh Inbowdoos seng

Upah :

1.0000 ls Pekerja listrik

24 Saklar 4 Gang Switch

Bahan :

1.0000 bh Saklar 4 Gang Switch

1.0000 bh Inbowdoos seng

Upah :

0.1500 OH Pekerja listrik

25 Saklar Tukar Tunggal

1492 of 1892
Bahan :

1.0000 bh Saklar Tukar Tunggal

1.0000 bh Inbowdoos seng

Upah :

1.0000 ls Pekerja listrik

26 Saklar Tukar Ganda

Bahan :

1.0000 bh Saklar Tukar Ganda

1.0000 bh Inbowdoos seng

Upah :

1.0000 ls Pekerja listrik

27 1 bh Ekshaust Fan 140 CFM 23W

Bahan :

1.0000 bh Ekshaust Fan 140 CFM 23W

1493 of 1892
ii TELEPHONE

1 1 Titik Instalasi Telephone

Bahan :

35.0000 m Kabel ITC 2x2x0.6

35.0000 m Pipa PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

2 Outlet telpon

Bahan :

1.0000 bh Outlet telpon

Upah :

1.0000 ls Pekerja listrik

1494 of 1892
3 Telephone Terminal Box

Bahan :

1.0000 bh Box Uk. 30 x 20 x 20 cm (tebal 2mm)

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

4 Ceiling access point

Bahan :

1.0000 bh Ceiling Access point Long Range 5Ghz w/ POE

5 Patch panel 16 port

Bahan :

1.0000 bh Patch panel 16 port

1495 of 1892
6 Patch panel 48 port

Bahan :

1.0000 bh Patch panel 48 port

7 Patch panel 24 port

Bahan :

1.0000 bh Patch panel 24 port

8 Switch Hub POE 16 port Managable w/ SFP

Bahan :

1.0000 bh Switch Hub POE 16 port Managable w/ SFP

1496 of 1892
9 Switch Hub POE 24 port Managable w/ SFP

Bahan :

1.0000 bh Switch Hub POE 24 port Managable w/ SFP

10 Switch Hub POE 48 port Managable w/ SFP

Bahan :

1.0000 bh Switch Hub POE 48 port Managable w/ SFP

11 Optic Terminal Box

Bahan :

1.0000 bh Optic Terminal Box

12 Optical Line Terminal (OLT)

Bahan :

1497 of 1892
1.0000 bh Optical Line Terminal (OLT)

13 Security Gateway

Bahan :

1.0000 bh Security Gateway

14 10G 16-Port Managed Aggregation Switch

Bahan :

1.0000 bh 10G 16-Port Managed Aggregation Switch

15 IP PBX 350 Port (8 Co Analog, 280 Ext TDM, 5 IP Ext w/Licence)

Bahan :

1.0000 bh IP PBX 350 Port

1498 of 1892
16 NVR CCTV Kapasitas 128 Channel w/ Hard disk 24 Terabyte

Bahan :

1.0000 bh NVR CCTV Kapasitas 128 Channel

17 Monitor 32" dan aksesori

Bahan :

1.0000 bh Monitor 32" dan aksesori

18 Sambungan Internet dan Telepon

Bahan :

1.0000 bh Sambungan Internet dan Telepon

1499 of 1892
19 Cabinet Rack 45U ABBA

Bahan :

1.0000 bh Cabinet Rack 45U ABBA

20 UPS 10KVA APC SRT10KXLI

Bahan :

1.0000 bh UPS 10KVA APC SRT10KXLI

21 Surge protective device 10 kA

Bahan :

1.0000 bh Surge protective device 10 kA

22 MDF Telephone

Bahan :

1500 of 1892
1.0000 bh MDF Telephone

23 Wall Mounted Rack 15U-490mm

Bahan :

1.0000 bh Wall Mounted Rack 15U-490mm

24 UPS Rackmount 1KVA

Bahan :

1.0000 bh UPS Rackmount 1KVA

25 FO 8 core Singlemode 9/125um,OS2

Bahan :

1.0000 m' FO 8 core Singlemode 9/125um,OS2

1501 of 1892
26 1 m' Kabel ITC 2x10x0.6

Bahan :

1.1000 m Kabel ITC 2x10x0.6

1.1000 m Pipa PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

27 1 m' Kabel ITC 2x20x0.6

Bahan :

1.1000 m Kabel ITC 2x20x0.6

1.1000 m Pipa PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

28 1 m' Kabel ITC 2x30x0.6

1502 of 1892
Bahan :

1.1000 m Kabel ITC 2x30x0.6

1.1000 m Pipa PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

iii LAN

1 1 Titik Instalasi LAN

Bahan :

20.0000 m Kabel UTP Cat 6

20.0000 m Pipa Conduit PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

2 1 buah outlet LAN

1503 of 1892
Bahan :

1.0000 bh outlet LAN

1.0000 m Inbowdoos seng

Upah :

1.0000 ls Pekerja listrik

iv CCTV

1 Dome IP Camera

Bahan :

1.0000 set Dome IP Camera

Power adaptor + Bracket

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

2 IP Bullet Camera w/Vari-focal Lens 2MP 1080p

Bahan :

1.0000 set IP Bullet Camera w/Vari-focal Lens 2MP 1080p

1504 of 1892
Power adaptor + Bracket

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

3 IP Dome Camera w/Vari-focal Lens 2MP 1080p

Bahan :

1.0000 set IP Dome Camera w/Vari-focal Lens 2MP 1080p

Power adaptor + Bracket

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

4 IP Fisheye Camera 6MP

Bahan :

1.0000 set IP Fisheye Camera 6MP

Power adaptor + Bracket

1.0000 ls Material bantu

1505 of 1892
Upah :

1.0000 ls Pekerja listrik

5 Instalasi CCTV

Bahan :

40.0000 m Kabel UTP Cat 6

40.0000 m Pipa Conduit PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

6 Kabel feedeer UTP cat. 6

Bahan :

1.1000 m Kabel UTP Cat 6

1.1000 m Pipa Conduit PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

1506 of 1892
v TATA SUARA

1 1 Titik Instalasi Ceiling speaker dengan NYMHY

Bahan :

21.0000 m NYMHY 3x1,5mm

21.0000 m Pipa PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

2 1 unit volume control

Bahan :

1.0000 bh Attenuator

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

1507 of 1892
3 1 unit Ceiling speaker

Bahan :

1.0000 bh Ceiling speaker

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

4 CD/MMC/USB Player w/FM Tuner

Bahan :

1.0000 bh CD/MMC/USB Player w/FM Tuner

5 Emergency Microphone

Bahan :

1.0000 bh Emergency Microphone

6 Remote Paging Microphone 10 Channel (RM-200M)

1508 of 1892
Bahan :

1.0000 bh Remote Paging Microphone 10 Channel (RM-200M)

7 Remote Paging Microphone 10 Channel (RM-210)

Bahan :

1.0000 bh Remote Paging Microphone 10 Channel (RM-210)

8 Power Amplifier 360 Watt w/ EVAC System

Bahan :

1.0000 bh Power Amplifier 360 Watt w/ EVAC System

9 Power Amplifier 360 Watt w/ EVAC System Expansion

Bahan :

1.0000 bh Power Amplifier 360 Watt w/ EVAC System Expansion

1509 of 1892
10 Power Amplifier 240 Watt

Bahan :

1.0000 bh Power Amplifier 240 Watt

11 Power Supply Unit

Bahan :

1.0000 bh Power Supply Unit

12 Sound Repeater, Digital Voice Evacuation

Bahan :

1.0000 bh Sound Repeater, Digital Voice Evacuation

13 Speaker Selector 10 Zone w/Interface

Bahan :

1.0000 bh Speaker Selector 10 Zone w/Interface

1510 of 1892
14 Cabinet Rack w/accessories

Bahan :

1.0000 bh Cabinet Rack w/accessories

15 UPS 3KVA

Bahan :

1.0000 bh Cabinet Rack w/accessories

16 1 m' kabel feedeer dengan NYMHY

Bahan :

1.1000 m NYMHY 3x1,5mm

1.1000 m Pipa PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

1511 of 1892
17 Coloum Speaker 10 Watt

Bahan :

1.0000 bh Coloum Speaker 10 Watt

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

18 Wide Horn Speaker 15W

Bahan :

1.0000 bh Wide Horn Speaker 15W

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

vi KABEL TRAY

1512 of 1892
1 1 m' Kabel tray 400 mm x 100 mm

Bahan :

1.0000 m1 Kabel tray 400 mm x 100 mm

1.0000 ls Material bantu (penggantung+aksesoris)

Upah :

1.0000 ls Pekerja listrik

2 1 m' Kabel tray 300 mm x 100 mm

Bahan :

1.0000 m1 Kabel tray 300 mm x 100 mm

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

3 1 pcs TeeTray 400 mm x 100 mm

Bahan :

1.0000 bh TeeTray 400 mm x 100 mm

1513 of 1892
1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

4 1 pcs TeeTray 300 mm x 100 mm

Bahan :

1.0000 bh TeeTray 300 mm x 100 mm

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

5 1 pcs El Bow Tray 400 mm x 100 mm

Bahan :

1.0000 bh El Bow Tray 400 mm x 100 mm

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

1514 of 1892
6 1 pcs El Bow Tray 300 mm x 100 mm

Bahan :

1.0000 bh El Bow Tray 300 mm x 100 mm

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

7 1 m' Kabel Ladder 400 mm x 100 mm

Bahan :

1.0000 m1 Kabel Ladder 400 mm x 100 mm

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

1515 of 1892
8 1 m' Kabel Ladder 300 mm x 100 mm

Bahan :

1.0000 m1 Kabel Ladder 300 mm x 100 mm

1.0000 ls Material bantu

Upah :

1.0000 ls Pekerja listrik

vii AC

1 Instalasi Power AC 1 phase

Bahan :

15.0000 m NYM 3x2,5mm

15.0000 m Pipa PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1516 of 1892
2 1 titik instalasi power AC outdoor

Bahan :

15.0000 m1 NYY 4x10mm

15.0000 m1 Pipe of Conduit PVC 20mm

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

3 1 unit Ceiling Mounted Cassette kap 15.400 Btu/h

Bahan :

1.0000 unit Ceiling Mounted Cassette kap 15.400 Btu/h

1.0000 ls Material bantu (gantungan unit + aksesoris)

Upah :

1.0000 ls Aplikator

4 1 unit Ceiling Mounted Cassette kap 19.100 Btu/h

Bahan :

1517 of 1892
1.0000 unit Ceiling Mounted Cassette kap 19.100 Btu/h

1.0000 ls Material bantu (gantungan unit + aksesoris)

Upah :

1.0000 ls Aplikator

5 1 unit Ceiling Mounted Cassette kap 24.200 Btu/h

Bahan :

1.0000 unit Ceiling Mounted Cassette kap 24.200 Btu/h

1.0000 ls Material bantu (gantungan unit + aksesoris)

Upah :

1.0000 ls Aplikator

6 1 unit Ceiling Mounted Cassette kap 36.200 Btu/h

Bahan :

1.0000 unit Ceiling Mounted Cassette kap 36.200 Btu/h

1.0000 ls Material bantu (gantungan unit + aksesoris)

Upah :

1518 of 1892
1.0000 ls Aplikator

7 1 unit Ceiling Mounted Cassette kap 47.800 Btu/h

Bahan :

1.0000 unit Ceiling Mounted Cassette kap 47.800 Btu/h

1.0000 ls Material bantu (gantungan unit + aksesoris)

Upah :

1.0000 ls Aplikator

8 1 unit Slim Mounted Duct kap 7.500 Btu/h

Bahan :

1.0000 unit Slim Mounted Duct kap 7.500 Btu/h

1.0000 ls Material bantu (ducting + difuser)

Upah :

1.0000 ls Aplikator

1519 of 1892
9 1 unit Slim Mounted Duct kap 15.400 Btu/h

Bahan :

1.0000 unit Slim Mounted Duct kap 15.400 Btu/h

1.0000 ls Material bantu (ducting + difuser)

Upah :

1.0000 ls Aplikator

10 1 unit Indoor unit split type kap 1 PK

Bahan :

1.0000 unit Indoor unit split type kap 1 PK

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

11 1 unit Outdoor Unit 153.000 Btu/h

1520 of 1892
Bahan :

1.0000 unit Outdoor Unit 153.000 Btu/h

1.0000 ls Material bantu (Dudukan outdoor dan Rubber Pad)

Upah :

1.0000 ls Aplikator

12 1 unit Outdoor Unit 232.000 Btu/h

Bahan :

1.0000 unit Outdoor Unit 232.000 Btu/h

1.0000 ls Material bantu (Dudukan outdoor dan Rubber Pad)

Upah :

1.0000 ls Aplikator

13 1 unit Outdoor Unit 249.000 Btu/h

Bahan :

1.0000 unit Outdoor Unit 249.000 Btu/h

1.0000 ls Material bantu (Dudukan outdoor dan Rubber Pad)

1521 of 1892
Upah :

1.0000 ls Aplikator

14 1 unit Outdoor Unit 267.000 Btu/h

Bahan :

1.0000 unit Outdoor Unit 267.000 Btu/h

1.0000 ls Material bantu (Dudukan outdoor dan Rubber Pad)

Upah :

1.0000 ls Aplikator

15 1 unit Outdoor Unit 327.000 Btu/h

Bahan :

1.0000 unit Outdoor Unit 327.000 Btu/h

1.0000 ls Material bantu (Dudukan outdoor dan Rubber Pad)

Upah :

1.0000 ls Aplikator

1522 of 1892
16 1 unit Outdoor Unit 365.000 Btu/h

Bahan :

1.0000 unit Outdoor Unit 365.000 Btu/h

1.0000 ls Material bantu (Dudukan outdoor dan Rubber Pad)

Upah :

1.0000 ls Aplikator

17 1 unit Outdoor Unit 402.000 Btu/h

Bahan :

1.0000 unit Outdoor Unit 402.000 Btu/h

1.0000 ls Material bantu (Dudukan outdoor dan Rubber Pad)

Upah :

1.0000 ls Aplikator

1523 of 1892
18 1 m' Pipa Drain AC PVC Ø 32 mm

Bahan :

1.0500 m Pipa PVC 32 mm

1.0500 m1 insulation tube

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

19 1m' Pipa refrigerant Ø 1/4" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 1/4"

1.0000 m' Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1524 of 1892
20 1m' Pipa refrigerant Ø 3/8" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 3/8"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

21 1m' Pipa refrigerant Ø 1/2" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 1/2"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1525 of 1892
22 1m' Pipa refrigerant Ø 5/8" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 5/8"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

23 1m' Pipa refrigerant Ø 3/4" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 3/4"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1526 of 1892
24 1m' Pipa refrigerant Ø 7/8" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 7/8"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

25 1m' Pipa refrigerant Ø 1" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 1"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1527 of 1892
26 1m' Pipa refrigerant Ø 1 1/8" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 1 1/8"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

27 1m' Pipa refrigerant Ø 1 1/4" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 1 1/4"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1528 of 1892
28 1m' Pipa refrigerant Ø 1 3/8" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 1 3/8"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

29 1m' Pipa refrigerant Ø 1 1/2" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 1 1/2"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1529 of 1892
1.0000 ls Aplikator

30 1m' Pipa refrigerant Ø 1 5/8" + insulasi

Bahan :

1.0000 m1 Pipa copper Ø 1 5/8"

1.0000 ls Insulasi

1.0000 ls Hanger + dinabolt

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

31 Kontrol panel

Bahan :

1.0000 bh Kontrol panel

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

1530 of 1892
32 Kabel data ac AWG 18

Bahan :

1.0000 m Kabel awg 18

1.0000 m Pipa PVC 20mm²

1.0000 ls Material bantu

Upah :

1.0000 ls Aplikator

viii Pekerjaan Lift

1 Lift Kapasitas 15 orang, 5 lantai

Bahan :

1.0000 unit Lift include ARD

Upah :

1.0000 unit Biaya instalasi

1531 of 1892
2 Lift Kapasitas 11 orang, 5 lantai

Bahan :

1.0000 unit Lift include ARD

Upah :

1.0000 unit Biaya instalasi

3 Lift Kapasitas 11 orang, 4 lantai

Bahan :

1.0000 unit Lift include ARD

Upah :

1.0000 unit Biaya instalasi

4 Lift Barang Kapasitas 1000 kg, 5 lantai

Bahan :

1.0000 unit Lift include ARD

1532 of 1892
Upah :

1.0000 unit Biaya instalasi

ix Pekerjaan Fire alarm, Hydrant dan Splinker

1 Master Control Fire Alarm Panel cap. 2 loop

Bahan :

1.0000 unit Master Control Fire Alarm Panel cap. 2 loop

2 Terminal Box

Bahan :

1.0000 unit Terminal Box

3 Addressable Alarm Signal Module

Bahan :

1.0000 unit Addressable Alarm Signal Module

4 Addressable Monitor Module

1533 of 1892
Bahan :

1.0000 unit Addressable Monitor Module

5 Addressable Relay Module

Bahan :

1.0000 unit Addressable Relay Module

6 Addressable Photoelectric Smoke Detector lengkap dengan base

Bahan :

1.0000 unit Addressable Photoelectric Smoke Detector lengkap dengan base

7 Addressable Heat Detector lengkap dengan base

Bahan :

1.0000 unit Addressable Heat Detector lengkap dengan base

8 Addressable Manual Call Point lengkap dengan back box

Bahan :

1.0000 unit Addressable Manual Call Point lengkap dengan back box

1534 of 1892
9 Horn Strobe lengkap dengan back box

Bahan :

1.0000 unit Horn Strobe lengkap dengan back box

10 Addressable Release Module

Bahan :

1.0000 unit Addressable Release Module

11 Abort Station lengkap dengan back box

Bahan :

1.0000 unit Abort Station lengkap dengan back box

12 Alarm Bell

Bahan :

1.0000 unit Alarm Bell

13 Evacuate Sign Lamp

Bahan :

1535 of 1892
1.0000 unit Evacuate Sign Lamp

14 Gas Discharge Sign Lamp

Bahan :

1.0000 unit Gas Discharge Sign Lamp

15 Pekerjaan Pemasangan MCFA

Bahan :

1.0000 ttk Pekerjaan Pemasangan MCFA

16 Pengkabelan dan pemasangan detector dan call point

Bahan :

1.0000 ttk Pengkabelan dan pemasangan detector dan call point

17 Pengkabelan ke Multitone Strobe, Pressure Switch dan Flow Switch

Bahan :

1.0000 ttk Pengkabelan ke Multitone Strobe, Pressure Switch dan Flow Switch

1536 of 1892
18 Pengkabelan dan Pemasangan Terminal Box berikut dengan module

Bahan :

1.0000 ttk Pengkabelan dan Pemasangan Terminal Box berikut dengan module

19 Pekerjaan Interlock ke Lift, VAC Power & HVAC

Bahan :

1.0000 ttk Pekerjaan Interlock ke Lift, VAC Power & HVAC

20 Diesel Engine Fire Pump per NFPA 20, Cap. 500 USGPM, Head 10 bar

Bahan :

1.0000 unit Diesel Engine Fire Pump per NFPA 20, Cap. 500 USGPM, Head 10 bar

21 Electric Fire Pump per NFPA 20, Cap. 500 USGPM, Head 10 bar

Bahan :

1.0000 unit Electric Fire Pump per NFPA 20, Cap. 500 USGPM, Head 10 bar

22 Jockey Pump, Cap. 25 USGPM, Head 12 bar

Bahan :

1.0000 unit Jockey Pump, Cap. 25 USGPM, Head 12 bar

1537 of 1892
23 Primming Tank 300 ltr

Bahan :

1.0000 unit Primming Tank 300 ltr

24 Flexible Joint 6"

Bahan :

1.0000 unit Flexible Joint 6"

25 Flexible Joint 2"

Bahan :

1.0000 unit Flexible Joint 2"

26 Flow Meter 6"

Bahan :

1.0000 unit Flow Meter 6"

27 Foot Valve 8"

1538 of 1892
Bahan :

1.0000 unit Foot Valve 8"

28 Pressure Relief Valve 4", UL/FM

Bahan :

1.0000 unit Pressure Relief Valve 4", UL/FM

29 Check Valve 6", UL/FM

Bahan :

1.0000 unit Check Valve 6", UL/FM

30 Strainer 8", UL/FM

Bahan :

1.0000 unit Strainer 8", UL/FM

31 Butterfly Valve 8", grooved, UL/FM

Bahan :

1.0000 unit Butterfly Valve 8", grooved, UL/FM

1539 of 1892
32 Butterfly Valve 6", grooved, UL/FM

Bahan :

1.0000 unit Butterfly Valve 6", grooved, UL/FM

33 Butterfly Valve 4", grooved, UL/FM

Bahan :

1.0000 unit Butterfly Valve 4", grooved, UL/FM

34 Air Vent Valve 1"

Bahan :

1.0000 unit Air Vent Valve 1"

35 Pressure Switch, UL/FM

Bahan :

1.0000 unit Pressure Switch, UL/FM

36 Pressure Gauge 600 psig

Bahan :

1540 of 1892
1.0000 unit Pressure Gauge 600 psig

37 Ball Valve 1"

Bahan :

1.0000 unit Ball Valve 1"

38 Ball Valve 1/2"

Bahan :

1.0000 unit Ball Valve 1/2"

39 - Pipa Black Steel Sch. 40 ASTM A53, Size : 8"

Bahan :

1.0000 m - Pipa Black Steel Sch. 40 ASTM A53, Size : 8"

40 - Pipa Black Steel Sch. 40 ASTM A53, Size : 6"

Bahan :

1.0000 m - Pipa Black Steel Sch. 40 ASTM A53, Size : 6"

1541 of 1892
41 - Pipa Black Steel Sch. 40 ASTM A53, Size : 4"

Bahan :

1.0000 m - Pipa Black Steel Sch. 40 ASTM A53, Size : 4"

42 - Pipa Black Steel Sch. 40 ASTM A53, Size : 2-1/2"

Bahan :

1.0000 m - Pipa Black Steel Sch. 40 ASTM A53, Size : 2-1/2"

43 - Pipa Black Steel Sch. 40 ASTM A53, Size : 2"

Bahan :

1.0000 m - Pipa Black Steel Sch. 40 ASTM A53, Size : 2"

44 - Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/2"

Bahan :

1.0000 m - Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/2"

45 - Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/4"

Bahan :

1.0000 m - Pipa Black Steel Sch. 40 ASTM A53, Size : 1-1/4"

1542 of 1892
46 - Pipa Black Steel Sch. 40 ASTM A53, Size : 1"

Bahan :

1.0000 m - Pipa Black Steel Sch. 40 ASTM A53, Size : 1"

47 - Pipa Black Steel Sch. 40 ASTM A53, Size : 1/2"

Bahan :

1.0000 m - Pipa Black Steel Sch. 40 ASTM A53, Size : 1/2"

48 - Elbow 90 deg. Sch. 40, Size : 8"

Bahan :

1.0000 pcs - Elbow 90 deg. Sch. 40, Size : 8"

49 - Elbow 90 deg. Sch. 40, Size : 6"

Bahan :

1.0000 pcs - Elbow 90 deg. Sch. 40, Size : 6"

50 - Elbow 90 deg. Sch. 40, Size : 4"

1543 of 1892
Bahan :

1.0000 pcs - Elbow 90 deg. Sch. 40, Size : 4"

51 - Elbow 90 deg. Sch. 40, Size : 2-1/2"

Bahan :

1.0000 pcs - Elbow 90 deg. Sch. 40, Size : 2-1/2"

52 - Elbow 90 deg. Sch. 40, Size : 2"

Bahan :

1.0000 pcs - Elbow 90 deg. Sch. 40, Size : 2"

53 - Elbow 90 deg. Sch. 40, Size : 1-1/2"

Bahan :

1.0000 pcs - Elbow 90 deg. Sch. 40, Size : 1-1/2"

54 - Elbow 90 deg. Sch. 40, Size : 1-1/4"

Bahan :

1.0000 pcs - Elbow 90 deg. Sch. 40, Size : 1-1/4"

1544 of 1892
53 - Elbow 90 deg. Sch. 40, Size : 1"

Bahan :

1.0000 pcs - Elbow 90 deg. Sch. 40, Size : 1"

54 - Elbow 90 deg. Sch. 40, Size : 1/2"

Bahan :

1.0000 pcs - Elbow 90 deg. Sch. 40, Size : 1/2"

55 - Reducer Sch. 40, Size : 8" x 6"

Bahan :

1.0000 pcs - Reducer Sch. 40, Size : 8" x 6"

56 - Reducer Sch. 40, Size : 6" x 4"

Bahan :

1.0000 pcs - Reducer Sch. 40, Size : 6" x 4"

57 - Reducer Sch. 40, Size : 4" x 2-1/2"

Bahan :

1545 of 1892
1.0000 pcs - Reducer Sch. 40, Size : 4" x 2-1/2"

58 - Reducer Sch. 40, Size : 2" x 1-1/2"

Bahan :

1.0000 pcs - Reducer Sch. 40, Size : 2" x 1-1/2"

59 - Reducer Sch. 40, Size : 1-1/2" x 1-1/4"

Bahan :

1.0000 pcs - Reducer Sch. 40, Size : 1-1/2" x 1-1/4"

60 - Reducer Sch. 40, Size : 1-1/2" x 1"

Bahan :

1.0000 pcs - Reducer Sch. 40, Size : 1-1/2" x 1"

61 - Reducer Sch. 40, Size : 1-1/4" x 1"

Bahan :

1.0000 pcs - Reducer Sch. 40, Size : 1-1/2" x 1"

1546 of 1892
62 - Tee Sch. 40, Size : 6"

Bahan :

1.0000 pcs - Tee Sch. 40, Size : 6"

63 - Tee Sch. 40, Size : 4"

Bahan :

1.0000 pcs - Tee Sch. 40, Size : 4"

64 - Tee Sch. 40, Size : 1-1/2"

Bahan :

1.0000 pcs - Tee Sch. 40, Size : 1-1/2"

65 - Tee Sch. 40, Size : 1"

Bahan :

1.0000 pcs - Tee Sch. 40, Size : 1"

66 - Tee Reducer Sch. 40, Size : 8" x 6"

Bahan :

1.0000 pcs - Tee Reducer Sch. 40, Size : 8" x 6"

1547 of 1892
67 - Tee Reducer Sch. 40, Size : 6" x 4"

Bahan :

1.0000 pcs - Tee Reducer Sch. 40, Size : 6" x 4"

68 - Tee Reducer Sch. 40, Size : 4" x 2-1/2"

Bahan :

1.0000 pcs - Tee Reducer Sch. 40, Size : 4" x 2-1/2"

69 - Tee Reducer Sch. 40, Size : 2-1/2" - 1-1/2"

Bahan :

1.0000 pcs - Tee Reducer Sch. 40, Size : 2-1/2" - 1-1/2"

69 - Tee Reduce Sch. 40, Size : 1-1/2" x 1"

Bahan :

1.0000 pcs - Tee Reduce Sch. 40, Size : 1-1/2" x 1"

70 - Tee Reduce Sch. 40, Size : 1-1/4" x 1"

1548 of 1892
Bahan :

1.0000 pcs - Tee Reduce Sch. 40, Size : 1-1/4" x 1"

68 - Weld Outlet 2"

Bahan :

1.0000 pcs - Weld Outlet 2"

69 - Thread Outlet 1"

Bahan :

1.0000 pcs - Thread Outlet 1"

70 - Grooved Coupling 8"

Bahan :

1.0000 pcs - Grooved Coupling 8"

71 - Grooved Coupling 6"

Bahan :

1.0000 pcs - Grooved Coupling 6"

1549 of 1892
72 - Grooved Coupling 4"

Bahan :

1.0000 pcs - Grooved Coupling 4"

73 - Flange 8" ANSI 150 c/w gasket

Bahan :

1.0000 pcs - Flange 8" ANSI 150 c/w gasket

74 - Flange 6" ANSI 150 c/w gasket

Bahan :

1.0000 pcs - Flange 6" ANSI 150 c/w gasket

75 - Flange 4" ANSI 150 c/w gasket

Bahan :

1.0000 pcs - Flange 4" ANSI 150 c/w gasket

76 - Flange 2" ANSI 150 c/w gasket

Bahan :

1550 of 1892
1.0000 pcs - Flange 2" ANSI 150 c/w gasket

77 - Flange 1-1/2" ANSI 150 c/w gasket

Bahan :

1.0000 pcs - Flange 1-1/2" ANSI 150 c/w gasket

78 - Blinde Flange 8" ANSI 150 c/w gasket

Bahan :

1.0000 pcs - Blinde Flange 8" ANSI 150 c/w gasket

79 - Blind Flange 4" ANSI 150 c/w gasket

Bahan :

1.0000 pcs - Blind Flange 4" ANSI 150 c/w gasket

80 Alarm Check Valve 6", UL/FM

Bahan :

1.0000 unit Alarm Check Valve 6", UL/FM

1551 of 1892
81 Hydrant Pillar, 2 way

Bahan :

1.0000 unit Hydrant Pillar, 2 way

82 Siamese Connection

Bahan :

1.0000 unit Siamese Connection

83 Outdoor Hydrant Box

Bahan :

1.0000 unit Outdoor Hydrant Box

84 Indoor Hydrant Box

Bahan :

1.0000 unit Indoor Hydrant Box

85 Sprinkler Head, 1/2" NPT, Pendent, K5.6, 68 deg.C, UL/FM

Bahan :

1.0000 unit Sprinkler Head, 1/2" NPT, Pendent, K5.6, 68 deg.C, UL/FM

1552 of 1892
86 Sprinkler Head, 1/2" NPT, Upright, K5.6, 68 deg.C, UL/FM

Bahan :

1.0000 unit Sprinkler Head, 1/2" NPT, Upright, K5.6, 68 deg.C, UL/FM

87 Check Valve 4", UL/FM

Bahan :

1.0000 unit Check Valve 4", UL/FM

88 Butterfly Valve 6", grooved, UL/FM

Bahan :

1.0000 unit Butterfly Valve 6", grooved, UL/FM

89 Butterfly Valve 4", grooved, UL/FM

Bahan :

1.0000 unit Butterfly Valve 4", grooved, UL/FM

90 Test & Drain Valve 1", UL/FM

1553 of 1892
Bahan :

1.0000 unit Test & Drain Valve 1", UL/FM

91 Flow Switch 4", UL/FM

Bahan :

1.0000 unit Flow Switch 4", UL/FM

92 Pressure Gauge 300 psig

Bahan :

1.0000 unit Pressure Gauge 300 psig

93 Ball Valve 1"

Bahan :

1.0000 unit Ball Valve 1"

94 - Mechanical Tee Reducer Sch. 40, Size : 4" x 1-1/2"

Bahan :

1.0000 unit - Mechanical Tee Reducer Sch. 40, Size : 4" x 1-1/2"

1554 of 1892
95 - Mechanical Tee Reducer Sch. 40, Size : 4" x 1"

Bahan :

1.0000 unit - Mechanical Tee Reducer Sch. 40, Size : 4" x 1"

96 APAR typeABC Dry Chemical Powder, Kapasitas 6 kg

Bahan :

1.0000 unit APAR typeABC Dry Chemical Powder, Kapasitas 6 kg

97 FK-5-1-12 Container assembly Cap. 215 lb c/w strap and rapture disc

Bahan :

1.0000 unit FK-5-1-12 Container assembly Cap. 215 lb c/w strap and rapture disc

98 FK-5-1-12 Agent

Bahan :

1.0000 unit FK-5-1-12 Agent

99 Impulse Valve Operator Kit

Bahan :

1555 of 1892
1.0000 unit Impulse Valve Operator Kit

100 Discharge Pressure Switch

Bahan :

1.0000 unit Discharge Pressure Switch

101 FK-5-1-12 Nozzle

Bahan :

1.0000 unit FK-5-1-12 Nozzle

102 - Elbow 90 deg. Class 3000, Size : 2"

Bahan :

1.0000 unit - Elbow 90 deg. Class 3000, Size : 2"

103 - Elbow 90 deg. Class 300, Size : 1"

Bahan :

1.0000 unit - Elbow 90 deg. Class 300, Size : 1"

1556 of 1892
104 - Reducer Class 300, Size : 2" x 1"

Bahan :

1.0000 unit - Reducer Class 300, Size : 2" x 1"

105 - Grooved Coupling 2"

Bahan :

1.0000 unit - Grooved Coupling 2"

x Pekerjaan Pengkabelan

1 1 m' Kabel NYY 4 x 6 mm2

Bahan :

1.0000 m1 Kabel NYY 4 x 6 mm2

Upah :

1.0000 ls Pekerja listrik

2 1 m' Kabel NYY 4 x 10 mm2

Bahan :

1.0000 m1 Kabel NYY 4 x 10 mm2

1557 of 1892
Upah :

1.0000 ls Pekerja listrik

3 1 m' Kabel NYY 4 x 25 mm2

Bahan :

1.0000 m1 Kabel NYY 4 x 25 mm2

Upah :

1.0000 ls Pekerja listrik

4 1 m' Kabel NYY 4 x 70 mm2

Bahan :

1.0000 m1 Kabel NYY 4 x 70 mm2

Upah :

1.0000 ls Pekerja listrik

5 Kabel NYY 4x2x( 1 x 300 )mm2

Bahan :

1558 of 1892
1.0000 m1 Kabel NYY 4x2x( 1 x 300 )mm2

Upah :

1.0000 ls Pekerja listrik

6 1 m' Kabel NYY 2x2.5mm2

Bahan :

1.0000 m1 NYY 2X2.5 mm

Upah :

1.0000 ls Pekerja listrik

7 1m' Kabel BCC 6

Bahan :

1.0000 m1 Kabel BCC 6

Upah :

1.0000 ls Pekerja listrik

8 1m' Kabel BCC 10

1559 of 1892
Bahan :

1.0000 m1 Kabel BCC 10

Upah :

1.0000 ls Pekerja listrik

9 1m' Kabel BCC 16

Bahan :

1.0000 m1 Kabel BCC 16

Upah :

1.0000 ls Pekerja listrik

10 1m' Kabel BCC 35

Bahan :

1.0000 m1 Kabel BCC 35

Upah :

1.0000 ls Pekerja listrik

1560 of 1892
11 1m' Kabel BCC 50

Bahan :

1.0000 m1 Kabel BCC 50

Upah :

1.0000 ls Pekerja listrik

12 1m' Kabel BCC 120

Bahan :

1.0000 m1 Kabel BCC 120

Upah :

1.0000 ls Pekerja listrik

xi Pekerjaan Pengkabelan

1 1 unit trafo kVA

Bahan :

1.0000 unit Trafo 1000 kVA

1.0000 m1 Material bantu

Upah :

1561 of 1892
1.0000 ls Pekerja listrik

CUBICLE PELANGGAN
2 INCOMING CUBICLE IM-SM6

Upah :

1.0000 unit INCOMING CUBICLE IM-SM6

Upah :

1.0000 ls Ongkos pasang

3 OUTGOING CUBICLE QM-SM6

Upah :

1.0000 unit OUTGOING CUBICLE QM-SM6

Upah :

1.0000 ls Ongkos pasang

4 PANEL CAP. BANK 600 KVAR

Upah :

1562 of 1892
1.0000 unit PANEL CAP. BANK 600 KVAR

N PEKERJAAN TANAMAN

1 1m2 Rumput gajah mini

Bahan :

1.0000 m2 Rumput gajah mini

Upah :

0.1000 OH Pekerja

0.0100 OH Mandor

2 1m3 Urugan tanah subur

Bahan :

1.2000 m3 tanah subur

Upah :

0.2500 OH Pekerja

0.0250 OH Mandor

1563 of 1892
3 1 btg Pohon Ketapang Kencana (Terminalia Molineti)

Bahan :

1.0000 btg Pohon Ketapang Kencana (Terminalia Molineti)

Upah :

0.2500 OH Pekerja

0.0250 OH Mandor

O PEKERJAAN LAIN-LAIN

1 Analisa 1 m' Hand rail Pipa stainless

modul panjang 2400 mm

Bahan :

2.4000 m1 Hollow stainless steel 40x60x1.2 mm

0.6000 m1 Hollow stainless steel 20x20x1.2 mm

12.0000 bh Dinabolt 6 mm

1.0000 ls Las

1.0000 ls Material Bantu

Upah :

0.2000 OH Tukang

0.0200 OH Kepala tukang

0.2000 OH Pekerja

0.0200 OH Mandor

1564 of 1892
2 Analisa 1 m' railing Pipa stainless

modul panjang 4350 mm

Bahan :

4.3500 m1 Hollow stainless steel 40x60x1.2 mm

31.6000 m1 Hollow stainless steel 20x20x1.2 mm

5.4000 m1 Hollow stainless steel 50x50x1.2 mm

12.0000 bh Dinabolt

1.0000 ls Las

1.0000 ls Material Bantu

Upah :

0.4000 OH Tukang

0.0400 OH Kepala tukang

0.4000 OH Pekerja

0.0400 OH Mandor

1565 of 1892
3 1 m' Railing stainless steel dengan kaca tempered tebal 10 mm

Modul panjang 5000 mm

Bahan :

5.0000 m1 Hollow stainless steel 40x60x1.2 mm

0.7500 m1 Hollow stainless steel 20x20x1.2 mm

2.9240 m2 Plat stainless steel tebal 8 mm

4.4000 m2 Kaca bening tebal 10 mm tempered

6.0000 bh Spider fitting SP - 2002

4.0000 bh Spider fitting SP - 2001

10.0000 bh Dynabolt Ø 10 mm

5.0000 bh Aksesoris

1.0000 ls Material bantu

Upah :

0.5000 OH Tukang las

0.0500 OH Kepala tukang las

0.5000 OH Pekerja

0.0500 OH Mandor

4 Analisa 1 unit tangga maintenance type A

1566 of 1892
Modul 23850 mm

Bahan :

58.5000 m1 Pipa BS Ø 2" , tebal 1.6 mm

9.1845 m2 Finishing cat zincromate dan cat besi (plat dan pipa)

19.7980 kg Plat besi, tebal 6 mm

84.0000 bh Dynabolt Ø 12 mm

1.0000 ls Las

1.0000 ls Material bantu

Upah :

2.0000 OH Tukang las

0.2000 OH Kepala tukang las

0.4000 OH Pekerja

0.0200 OH Mandor

5 1 unit Tangga maintenance groundtank

Bahan

7.3000 m1 Pipa stainless steel Ø 2" , tebal 1.6 mm

0.0600 m2 Plat stainless steel tebal 1.6 mm

12.0000 bh Dynabolt Ø 12

1567 of 1892
1.0000 ls Aksesoris

1.0000 ls Material bantu

Upah :

2.0000 OH Tukang las

0.2000 OH Kepala tukang las

0.4000 OH Pekerja

0.0200 OH Mandor

6 1 unit Kubah bahan GRC dan plat stainless steel

Bahan :

483.0000 m2 GRC cetak tebal 30 mm

483.0000 m2 Rangka

483.0000 m2 Pengecatan

298.4000 m1 Pipa stainless steel (rangka plat stainless steel)

324.1200 m2 Bending plat stainless steel

24.0000 bh Connecting plat stainless steel

1.0000 ls las

324.1200 m2 Cutting stainless steel tebal 2 mm

1568 of 1892
7 1 unit Detail Motif 01

Bahan :

1.0000 unit Detail Motif 01

- Bahan papan fiber cement non silica tebal 25 mm

31.6800 m2 Rangka Motif 01

- Rangka utama 80x100x2 mm

- Rangka pembagi 40x40x 1.8 mm

1.0000 ls upah pasang

8 1 unit Detail Motif 02

Bahan :

2.0000 unit Detail Motif 02

- Bahan papan fiber cement non silica tebal 25 mm

14.4000 m2 Rangka Motif 01

- Rangka utama 40x60x2 mm

1.0000 ls upah pasang

1569 of 1892
9 1 unit Detail Motif 03

Bahan :

1.0000 unit Detail Motif 03

- Bahan papan fiber cement non silica tebal 11 mm

39.0000 m2 Rangka Motif 01

- Rangka utama 80x100x2 mm

- Rangka pembagi 40x40x 1.8 mm

1.0000 ls upah pasang

10 1 unit Detail Motif 04

Bahan :

1.0000 unit Detail Motif 04

1570 of 1892
- Bahan papan fiber cement non silica tebal 11 mm

8.4681 m2 Rangka Motif 01

- Rangka utama 80x100x2 mm

- Rangka pembagi 40x40x 1.8 mm

1.0000 ls upah pasang

11 1 unit Detail Motif 06

Bahan :

2.0000 unit Detail Motif 06

- Bahan papan fiber cement non silica tebal 25 mm

14.2500 m2 Rangka Motif 01

- Rangka utama 40x60x2 mm

1.0000 ls upah pasang

1571 of 1892
12 1 unit Detail Motif 11

Bahan :

1.0000 unit Detail Motif 11

- Bahan papan fiber cement non silica tebal 25 mm (100x150)

13 1 unit Detail Motif 5

Bahan :

3.7800 m2 GRC cetak tebal 30 mm

3.7800 m2 Rangka

3.7800 m2 Pengecatan

14 1 unit GRC Cetak Cover Kolom Detail Motif 9

Bahan :

1572 of 1892
59.2266 m2 GRC cetak tebal 50 mm

59.2266 ls Rangka

59.2266 m2 Pengecatan

15 1 unit GRC Cetak Cover Kolom Detail Motif 8

Bahan :

46.8099 m2 GRC cetak tebal 50 mm

46.8099 m2 Rangka

46.8099 m2 Pengecatan

16 1 m2 Kalsi floor tebal 20 mm

Bahan :

1.0000 m2 Kalsi floor tebal 20 mm

Upah :

1.0000 ls Upah pasang

1573 of 1892
17 1 m2 Finishing HPL

Bahan :

1.0000 m2 Finishing HPL

Upah :

1.0000 ls Upah pasang

18 1 m2 Lapis MDF Cutting 9 mm

Bahan :

1.0000 m2 Lapis MDF Cutting 9 mm

1.0000 m2 Anti rayap

Upah :

1.0000 ls Upah pasang

1574 of 1892
19 Pembentukan badan jalan

Alat :

0.0501 jam Vibrator Roller

0.0351 jam Excavator

0.0284 jam Buldozer

0.0401 jam Dump truck

Bahan :

1.0200 m3 Tanah Urug

Upah :

0.1204 oh Pekerja Biasa

0.0301 oh Mandor

1575 of 1892
No : 54/BA-DIVREG.3/SPH/XI/2017

TAR ANALISA HARGA SATUAN Tanggal : 13 November 2017


PEKERJAAN
Lokasi : LOMBOK TENGAH

Owner : KABUPATEN LOMBOK TENGAH

Rp 15,750.00 Rp 315.00

Rp 1,858,080.00 Rp 13,006.56

Rp 1,984,710.00 Rp 23,816.52 Rp 37,138.08

Rp 76,500.00 Rp 7,650.00

Rp 91,800.00 Rp 459.00

Rp 86,700.00 Rp 867.00

Rp 81,600.00 Rp 8,160.00 Rp 17,136.00

Jumlah Harga : Rp 54,274.08

Overhead + Profit 10% Rp 5,427.41

Jumlah total Rp 59,700.00

1576 of 1892
Rp 16,800.00 Rp 21,000.00

Rp 44,100.00 Rp 51,882.35

Rp 1,102.50 Rp 2,756.25

Rp 204,750.00 Rp 1,023.75

Rp 354,595.96 Rp 3,191.36

Rp 1,984,710.00 Rp 208.39

Rp 15,750.00 Rp 945.00

Rp 34,230.00 Rp 15,403.50 Rp 96,410.61

Rp 76,500.00 Rp 30,600.00

Rp 81,600.00 Rp 16,320.00

Rp 86,700.00 Rp 1,734.00

Rp 91,800.00 Rp 1,836.00 Rp 50,490.00

Jumlah Harga : Rp 146,900.61

Overhead + Profit 10% Rp 14,690.06

Jumlah total Rp 161,550.00

Jumlah total (sewa) Rp 80,775.00

1577 of 1892
Rp 76,500.00 Rp 4,805.29

Rp 91,800.00 Rp 1,441.26

Rp 102,000.00 Rp 5,100.00 Rp 11,346.55

Rp 367,500.00 Rp 40,388.25 Rp 40,388.25

Jumlah Harga : Rp 51,734.80

Overhead + Profit 10% Rp 5,173.48

Jumlah Harga : Rp 56,900.00

Rp 76,500.00 Rp 13,498.97

Rp 91,800.00 Rp 2,700.23

Rp 102,000.00 Rp 6,120.00 Rp 22,319.20

Rp 367,500.00 Rp 40,388.25 Rp 40,388.25

Jumlah Harga : Rp 62,707.45

Overhead + Profit 10% Rp 6,270.75

Jumlah Total : Rp 68,950.00

Rp 76,500.00 Rp 14,173.92

1578 of 1892
Rp 91,800.00 Rp 2,835.24

Rp 102,000.00 Rp 7,140.00 Rp 24,149.16

Rp 367,500.00 Rp 75,668.25 Rp 75,668.25

Jumlah Harga : Rp 99,817.41

Overhead + Profit 10% Rp 9,981.74

Jumlah Total : Rp 109,750.00

Rp 76,500.00 Rp 20,248.46

Rp 91,800.00 Rp 3,037.27

Rp 102,000.00 Rp 10,200.00 Rp 33,485.73

Rp 367,500.00 Rp 113,484.00 Rp 113,484.00

Jumlah Harga : Rp 146,969.73

Overhead + Profit 10% Rp 14,696.97

Jumlah Total : Rp 161,650.00

Rp 64,365.00 Rp 77,238.00 Rp 77,238.00

1579 of 1892
Rp 76,500.00 Rp 22,950.00

Rp 91,800.00 Rp 918.00 Rp 23,868.00

Jumlah : Rp 101,106.00

Overhead + Profit 10% Rp 10,110.60

Jumlah Harga : Rp 111,200.00

Rp 69,615.00 Rp 83,538.00 Rp 83,538.00

Rp 68,670.00 Rp 7,327.09 Rp 7,327.09

Rp 76,500.00 Rp 25,245.00

Rp 91,800.00 Rp 1,101.60 Rp 26,346.60

Jumlah : Rp 117,211.69

Overhead + Profit 10% Rp 11,721.17

Jumlah Total : Rp 128,900.00

Rp 68,670.00 Rp 7,327.09 Rp 7,327.09

Rp 76,500.00 Rp 19,125.00

1580 of 1892
Rp 91,800.00 Rp 761.94 Rp 19,886.94

Jumlah : Rp 27,214.03

Overhead + Profit 10% Rp 2,721.40

Jumlah Harga : Rp 29,900.00

Rp 185,659.09 Rp 204,225.00

Rp 1,102.50 Rp 128,992.50

Rp 120,750.00 Rp 67,740.75 Rp 400,958.25

Rp 81,600.00 Rp 61,200.00

Rp 86,700.00 Rp 6,502.50

Rp 76,500.00 Rp 91,800.00

Rp 91,800.00 Rp 6,885.00 Rp 166,387.50

Jumlah : Rp 567,345.75

Overhead + Profit 10% Rp 56,734.58

Jumlah Harga : Rp 624,050.00

Rp 787.50 Rp 55,125.00

1581 of 1892
Rp 1,102.50 Rp 7,166.25

Rp 120,750.00 Rp 6,037.50 Rp 68,328.75

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 19,125.00

Rp 91,800.00 Rp 1,377.00 Rp 29,529.00

Jumlah : Rp 97,857.75

Overhead + Profit 10% Rp 9,785.78

Jumlah Harga : Rp 107,600.00

Rp 787.50 Rp 55,125.00

Rp 1,102.50 Rp 15,842.93

Rp 120,750.00 Rp 4,830.00 Rp 75,797.93

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 19,125.00

Rp 91,800.00 Rp 1,377.00 Rp 29,529.00

Jumlah : Rp 105,326.93

Overhead + Profit 10% Rp 10,532.69

1582 of 1892
Jumlah Harga : Rp 115,850.00

Rp 787.50 Rp 401,625.00

Rp 1,102.50 Rp 176,400.00

Rp 120,750.00 Rp 38,640.00 Rp 616,665.00

Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 153,000.00

Rp 91,800.00 Rp 9,180.00 Rp 252,450.00

Jumlah : Rp 869,115.00

Overhead + Profit 10% Rp 86,911.50

Jumlah Harga : Rp 956,000.00

Rp 1,102.50 Rp 4,868.64

Rp 120,750.00 Rp 3,260.25 Rp 8,128.89

Rp 81,600.00 Rp 12,240.00

Rp 86,700.00 Rp 1,300.50

Rp 76,500.00 Rp 22,950.00

1583 of 1892
Rp 91,800.00 Rp 1,377.00 Rp 37,867.50

Jumlah : Rp 45,996.39

Overhead + Profit 10% Rp 4,599.64

Jumlah Harga : Rp 50,550.00

Rp 1,102.50 Rp 8,573.04

Rp 120,750.00 Rp 2,777.25 Rp 11,350.29

Rp 81,600.00 Rp 24,480.00

Rp 86,700.00 Rp 1,300.50

Rp 76,500.00 Rp 22,950.00

Rp 91,800.00 Rp 1,377.00 Rp 50,107.50

Jumlah : Rp 61,457.79

Overhead + Profit 10% Rp 6,145.78

Jumlah Harga : Rp 67,600.00

Rp 1,102.50 Rp 551.25

Rp 120,750.00 Rp 1,569.75 Rp 2,121.00

1584 of 1892
Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 3,468.00

Rp 76,500.00 Rp 3,825.00

Rp 91,800.00 Rp 367.20 Rp 15,820.20

Jumlah : Rp 17,941.20

Overhead + Profit 10% Rp 1,794.12

Jumlah Harga : Rp 19,700.00

Rp 86,100.00 Rp 18,081.00 Rp 18,081.00

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 7,650.00

Rp 91,800.00 Rp 918.00 Rp 17,595.00

Jumlah : Rp 35,676.00

Overhead + Profit 10% Rp 3,567.60

Jumlah Harga : Rp 39,200.00

Rp 1,102.50 Rp 826.88

Rp 120,750.00 Rp 2,173.50 Rp 3,000.38

1585 of 1892
Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 1,912.50

Rp 91,800.00 Rp 229.50 Rp 11,169.00

Jumlah : Rp 14,169.38

Overhead + Profit 10% Rp 1,416.94

Jumlah Harga : Rp 15,550.00

Rp 1,102.50 Rp 3,583.13 Rp 3,583.13

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 15,300.00

Rp 91,800.00 Rp 918.00 Rp 25,245.00

Jumlah : Rp 28,828.13

Overhead + Profit 10% Rp 2,882.81

Jumlah Harga : Rp 31,700.00

Rp 1,102.50 Rp 4,961.25

1586 of 1892
Rp 120,750.00 Rp 6,037.50 Rp 10,998.75

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 7,650.00

Rp 91,800.00 Rp 918.00 Rp 17,595.00

Jumlah : Rp 28,593.75

Overhead + Profit 10% Rp 2,859.38

Jumlah total Rp 31,450.00

Rp 159,600.00 Rp 167,580.00

Rp 120,750.00 Rp 4,830.00 Rp 172,410.00

Rp 81,600.00 Rp 16,320.00

Rp 86,700.00 Rp 1,734.00

Rp 76,500.00 Rp 15,300.00

Rp 91,800.00 Rp 1,836.00 Rp 35,190.00

Jumlah : Rp 207,600.00

Overhead + Profit 10% Rp 20,760.00

Jumlah total Rp 228,350.00

1587 of 1892
Rp 1,102.50 Rp 4,630.50 Rp 4,630.50

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 7,650.00

Rp 91,800.00 Rp 918.00 Rp 17,595.00

Jumlah : Rp 22,225.50

Overhead + Profit 10% Rp 2,222.55

Jumlah total Rp 24,400.00

Rp 7,875.00 Rp 70,875.00

Rp 1,325.63 Rp 5,037.38 Rp 75,912.38

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 7,650.00

Rp 91,800.00 Rp 918.00 Rp 17,595.00

Jumlah : Rp 93,507.38

Overhead + Profit 10% Rp 9,350.74

Jumlah Harga : Rp 102,850.00

1588 of 1892
Rp 1,795.50 Rp 32,319.00 Rp 32,319.00

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 7,650.00

Rp 91,800.00 Rp 918.00 Rp 17,595.00

Jumlah : Rp 49,914.00

Overhead + Profit 10% Rp 4,991.40

Jumlah Harga : Rp 54,900.00

Rp 564.38 Rp 1,128.75 Rp 1,128.75

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 11,475.00

Rp 91,800.00 Rp 918.00 Rp 21,420.00

Jumlah : Rp 22,548.75

Overhead + Profit 10% Rp 2,254.88

Jumlah Harga : Rp 24,800.00

1589 of 1892
Rp 54,900.00 Rp 54,900.00

Rp 24,800.00 Rp 24,800.00 Rp 79,700.00

Jumlah total Rp 79,700.00

Rp 24,400.00 Rp 24,400.00

Rp 10,185.00 Rp 10,185.00 Rp 34,585.00

Jumlah : Rp 34,585.00

Jumlah total Rp 34,550.00

Rp 21,000.00 Rp 21,000.00 Rp 21,000.00

Rp 5,100.00 Rp 5,100.00 Rp 5,100.00

Jumlah : Rp 26,100.00

Overhead + Profit 10% Rp 2,610.00

Jumlah total Rp 28,700.00

1590 of 1892
Rp 1,102.50 Rp 359,415.00

Rp 204,750.00 Rp 111,150.00

Rp 354,595.96 Rp 270,280.92 Rp 740,845.92

Rp 81,600.00 Rp 20,400.00

Rp 86,700.00 Rp 2,167.50

Rp 76,500.00 Rp 126,225.00

Rp 91,800.00 Rp 7,344.00 Rp 156,136.50

Jumlah : Rp 896,982.42

Overhead + Profit 10% Rp 89,698.24

Jumlah Harga : Rp 986,650.00

Rp 1,102.50 Rp 272,317.50

Rp 204,750.00 Rp 127,091.25

Rp 354,595.96 Rp 262,401.01 Rp 661,809.76

Rp 81,600.00 Rp 20,400.00

1591 of 1892
Rp 86,700.00 Rp 2,167.50

Rp 76,500.00 Rp 126,225.00

Rp 91,800.00 Rp 7,344.00 Rp 156,136.50

Jumlah : Rp 817,946.26

Overhead + Profit 10% Rp 81,794.63

Jumlah Harga : Rp 899,700.00

Rp 105,000.00 Rp 105,000.00 Rp 105,000.00

Jumlah Rp 105,000.00

Efiensi 60 % Rp 63,000.00

Overhead + Profit 10% Rp 6,300.00

Jumlah total Rp 69,300.00

Rp 69,300.00 Rp 69,300.00

Rp 798,000.00 Rp 798,000.00 Rp 867,300.00

Rp 76,500.00 Rp 100,980.00

Rp 81,600.00 Rp 20,400.00

Rp 86,700.00 Rp 1,734.00

Rp 91,800.00 Rp 5,508.00 Rp 128,622.00

1592 of 1892
Jumlah : Rp 995,922.00

Overhead + Profit 10% Rp 99,592.20

Jumlah Harga : Rp 1,095,500.00

Rp 10,185.00 Rp 106,942.50

Rp 16,590.00 Rp 2,488.50 Rp 109,431.00

Rp 81,600.00 Rp 5,712.00

Rp 86,700.00 Rp 606.90

Rp 76,500.00 Rp 5,355.00

Rp 91,800.00 Rp 367.20 Rp 12,041.10

Jumlah : Rp 121,472.10

Overhead + Profit 10% Rp 12,147.21

Jumlah Harga : Rp 133,600.00

Harga per 1 kg Rp 13,360.00

Rp 1,984,710.00 Rp 79,388.40

1593 of 1892
Rp 15,750.00 Rp 4,725.00

Rp 6,825.00 Rp 682.50 Rp 84,795.90

Rp 81,600.00 Rp 21,216.00

Rp 86,700.00 Rp 2,254.20

Rp 76,500.00 Rp 39,780.00

Rp 91,800.00 Rp 2,386.80 Rp 65,637.00

Jumlah : Rp 150,432.90

Overhead + Profit 10% Rp 15,043.29

Jumlah total Rp 165,450.00

Rp 1,984,710.00 Rp 89,311.95

Rp 15,750.00 Rp 4,725.00

Rp 6,825.00 Rp 682.50 Rp 94,719.45

dipakai 2x Rp 47,359.73

Rp 81,600.00 Rp 21,216.00

Rp 86,700.00 Rp 2,254.20

Rp 76,500.00 Rp 39,780.00

Rp 91,800.00 Rp 2,386.80 Rp 65,637.00

1594 of 1892
Jumlah : Rp 112,996.73

Overhead + Profit 10% Rp 11,299.67

Jumlah total Rp 124,250.00

Rp 1,984,710.00 Rp 79,388.40

Rp 15,750.00 Rp 6,300.00

Rp 6,825.00 Rp 1,365.00

Rp 2,205,000.00 Rp 33,075.00

Rp 102,900.00 Rp 36,015.00 Rp 156,143.40

dipakai 2x Rp 78,071.70

Rp 81,600.00 Rp 26,928.00

Rp 86,700.00 Rp 2,861.10

Rp 76,500.00 Rp 50,490.00

Rp 91,800.00 Rp 3,029.40 Rp 83,308.50

Jumlah : Rp 161,380.20

Overhead + Profit 10% Rp 16,138.02

Jumlah total Rp 177,500.00

1595 of 1892
Rp 1,984,710.00 Rp 79,388.40

Rp 15,750.00 Rp 6,300.00

Rp 6,825.00 Rp 1,365.00

Rp 2,205,000.00 Rp 39,690.00

Rp 102,900.00 Rp 36,015.00 Rp 162,758.40

dipakai 2x Rp 81,379.20

Rp 81,600.00 Rp 26,928.00

Rp 86,700.00 Rp 2,861.10

Rp 76,500.00 Rp 50,490.00

Rp 91,800.00 Rp 3,029.40 Rp 83,308.50

Jumlah : Rp 164,687.70

Overhead + Profit 10% Rp 16,468.77

Jumlah total Rp 181,150.00

Rp 1,984,710.00 Rp 79,388.40

Rp 15,750.00 Rp 6,300.00

Rp 6,825.00 Rp 1,365.00

Rp 2,205,000.00 Rp 33,075.00

Rp 102,900.00 Rp 36,015.00 Rp 156,143.40

dipakai 2x Rp 78,071.70

1596 of 1892
Rp 81,600.00 Rp 26,928.00

Rp 86,700.00 Rp 2,861.10

Rp 76,500.00 Rp 50,490.00

Rp 91,800.00 Rp 3,029.40 Rp 83,308.50

Jumlah : Rp 161,380.20

Overhead + Profit 10% Rp 16,138.02

Jumlah total Rp 177,500.00

Rp 1,984,710.00 Rp 59,541.30

Rp 15,750.00 Rp 6,300.00

Rp 6,825.00 Rp 1,365.00

Rp 2,205,000.00 Rp 44,100.00

Rp 4,725.00 Rp 18,900.00

Rp 102,900.00 Rp 36,015.00 Rp 166,221.30

dipakai 2x Rp 83,110.65

Rp 81,600.00 Rp 26,928.00

Rp 86,700.00 Rp 2,861.10

Rp 76,500.00 Rp 50,490.00

Rp 91,800.00 Rp 3,029.40 Rp 83,308.50

1597 of 1892
Jumlah : Rp 166,419.15

Overhead + Profit 10% Rp 16,641.92

Jumlah total Rp 183,050.00

Rp 1,984,710.00 Rp 59,541.30

Rp 15,750.00 Rp 6,300.00

Rp 6,825.00 Rp 1,023.75

Rp 2,205,000.00 Rp 33,075.00

Rp 102,900.00 Rp 36,015.00 Rp 135,955.05

dipakai 2x Rp 67,977.53

Rp 81,600.00 Rp 26,928.00

Rp 86,700.00 Rp 2,861.10

Rp 76,500.00 Rp 50,490.00

Rp 91,800.00 Rp 3,029.40 Rp 83,308.50

Jumlah : Rp 151,286.03

Overhead + Profit 10% Rp 15,128.60

Jumlah total Rp 166,400.00

Rp 76,500.00 Rp 15,300.00

1598 of 1892
Rp 91,800.00 Rp 1,836.00 Rp 17,136.00

Jumlah : Rp 17,136.00

Overhead + Profit 10% Rp 1,713.60

Jumlah Harga : Rp 18,800.00

Rp 47,250.00 Rp 94,500.00 Rp 94,500.00

Rp 76,500.00 Rp 50,490.00

Rp 81,600.00 Rp 26,928.00

Rp 86,700.00 Rp 2,861.10

Rp 91,800.00 Rp 3,029.40 Rp 83,308.50

Jumlah : Rp 177,808.50

Overhead + Profit 10% Rp 17,780.85

Jumlah total Rp 195,550.00

Rp 47,250.00 Rp 189,000.00 Rp 189,000.00

Rp 76,500.00 Rp 50,490.00

Rp 81,600.00 Rp 26,928.00

1599 of 1892
Rp 86,700.00 Rp 2,861.10

Rp 91,800.00 Rp 3,029.40 Rp 83,308.50

Jumlah : Rp 272,308.50

Overhead + Profit 10% Rp 27,230.85

Jumlah total Rp 299,500.00

Rp 47,250.00 Rp 283,500.00 Rp 283,500.00

Rp 76,500.00 Rp 50,490.00

Rp 81,600.00 Rp 26,928.00

Rp 86,700.00 Rp 2,861.10

Rp 91,800.00 Rp 3,029.40 Rp 83,308.50

Jumlah : Rp 366,808.50

Overhead + Profit 10% Rp 36,680.85

Jumlah total Rp 403,450.00

Rp 69,300.00 Rp 69,300.00

Rp 10,185.00 Rp 15,564.34

1600 of 1892
Rp 693,000.00 Rp 693,000.00 Rp 777,864.34

Rp 81,600.00 Rp 20,400.00

Rp 86,700.00 Rp 1,734.00

Rp 76,500.00 Rp 100,980.00

Rp 91,800.00 Rp 5,508.00 Rp 128,622.00

Jumlah : Rp 906,486.34

Overhead + Profit 10% Rp 90,648.63

Jumlah Harga : Rp 997,100.00

Rp 185,659.09 Rp 74,263.64

Rp 10,185.00 Rp 15,757.29

Rp 899,700.00 Rp 539,820.00 Rp 629,840.93

Rp 81,600.00 Rp 69,360.00

Rp 86,700.00 Rp 7,369.50

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 15,606.00 Rp 168,835.50

Jumlah : Rp 798,676.43

Overhead + Profit 10% Rp 79,867.64

Jumlah Harga : Rp 878,500.00

1601 of 1892
Rp 1,984,710.00 Rp 2,977.07

Rp 15,750.00 Rp 133.88

Rp 10,185.00 Rp 36,156.75

Rp 16,590.00 Rp 788.03

Rp 1,102.50 Rp 6,422.06

Rp 204,750.00 Rp 1,914.41

Rp 354,595.96 Rp 4,911.15 Rp 53,303.34

Rp 86,700.00 Rp 2,601.00

Rp 86,700.00 Rp 2,601.00

Rp 81,600.00 Rp 2,448.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 22,720.50

Rp 91,800.00 Rp 1,377.00 Rp 32,614.50

Jumlah : Rp 85,917.84

Overhead + Profit 10% Rp 8,591.78

Jumlah Harga : Rp 94,500.00

Rp 1,984,710.00 Rp 3,770.95

1602 of 1892
Rp 15,750.00 Rp 149.63

Rp 10,185.00 Rp 36,666.00

Rp 16,590.00 Rp 829.50

Rp 1,102.50 Rp 6,409.94

Rp 204,750.00 Rp 1,924.65

Rp 354,595.96 Rp 4,964.34 Rp 54,715.00

Rp 86,700.00 Rp 2,601.00

Rp 86,700.00 Rp 2,601.00

Rp 81,600.00 Rp 2,448.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 22,720.50

Rp 91,800.00 Rp 1,377.00 Rp 32,614.50

Jumlah : Rp 87,329.50

Overhead + Profit 10% Rp 8,732.95

Jumlah Harga : Rp 96,050.00

Rp 1,984,710.00 Rp 4,723.94

Rp 15,750.00 Rp 187.44

Rp 10,185.00 Rp 36,362.98

Rp 16,590.00 Rp 8,884.56

Rp 1,102.50 Rp 5,248.26

1603 of 1892
Rp 204,750.00 Rp 1,462.02

Rp 354,595.96 Rp 3,797.99 Rp 60,667.18

Rp 86,700.00 Rp 1,734.00

Rp 86,700.00 Rp 1,734.00

Rp 81,600.00 Rp 1,632.00

Rp 86,700.00 Rp 520.20

Rp 76,500.00 Rp 13,770.00

Rp 91,800.00 Rp 826.20 Rp 20,216.40

Jumlah : Rp 80,883.58

Overhead + Profit 10% Rp 8,088.36

Jumlah Harga : Rp 88,950.00

Rp 1,984,710.00 Rp 3,969.42

Rp 15,750.00 Rp 181.13

Rp 10,185.00 Rp 37,175.25

Rp 16,590.00 Rp 8,626.80

Rp 1,102.50 Rp 5,126.63

Rp 204,750.00 Rp 1,347.26

Rp 354,595.96 Rp 3,758.72 Rp 60,185.19

Rp 86,700.00 Rp 1,734.00

1604 of 1892
Rp 86,700.00 Rp 1,734.00

Rp 81,600.00 Rp 1,632.00

Rp 86,700.00 Rp 520.20

Rp 76,500.00 Rp 13,770.00

Rp 91,800.00 Rp 826.20 Rp 20,216.40

Jumlah : Rp 80,401.59

Overhead + Profit 10% Rp 8,040.16

Jumlah Harga : Rp 88,400.00

Rp 1,984,710.00 Rp 3,969.42

Rp 15,750.00 Rp 338.63

Rp 10,185.00 Rp 42,267.75

Rp 16,590.00 Rp 406.46

Rp 1,102.50 Rp 5,529.04

Rp 204,750.00 Rp 2,354.63

Rp 354,595.96 Rp 7,978.41 Rp 62,844.32

Rp 86,700.00 Rp 2,861.10

Rp 86,700.00 Rp 2,861.10

Rp 81,600.00 Rp 2,692.80

Rp 86,700.00 Rp 867.00

1605 of 1892
Rp 76,500.00 Rp 22,720.50

Rp 91,800.00 Rp 1,377.00 Rp 33,379.50

Jumlah : Rp 96,223.82

Overhead + Profit 10% Rp 9,622.38

Jumlah Harga : Rp 105,800.00

Rp 1,984,710.00 Rp 4,961.78

Rp 15,750.00 Rp 354.38

Rp 10,185.00 Rp 43,286.25

Rp 16,590.00 Rp 406.46

Rp 1,102.50 Rp 5,639.29

Rp 204,750.00 Rp 2,416.05

Rp 354,595.96 Rp 8,333.01 Rp 65,397.20

Rp 86,700.00 Rp 2,861.10

Rp 86,700.00 Rp 2,861.10

Rp 81,600.00 Rp 2,692.80

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 22,720.50

Rp 91,800.00 Rp 1,377.00 Rp 33,379.50

Jumlah : Rp 98,776.70

1606 of 1892
Overhead + Profit 10% Rp 9,877.67

Jumlah Harga : Rp 108,650.00

Rp 1,984,710.00 Rp 2,977.07

Rp 15,750.00 Rp 338.63

Rp 10,185.00 Rp 42,267.75

Rp 16,590.00 Rp 406.46

Rp 1,102.50 Rp 5,529.04

Rp 204,750.00 Rp 2,354.63

Rp 354,595.96 Rp 7,978.41 Rp 61,851.97

Rp 86,700.00 Rp 2,861.10

Rp 86,700.00 Rp 2,861.10

Rp 81,600.00 Rp 2,692.80

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 22,720.50

Rp 91,800.00 Rp 1,377.00 Rp 33,379.50

Jumlah : Rp 95,231.47

Overhead + Profit 10% Rp 9,523.15

Jumlah Harga : Rp 104,750.00

1607 of 1892
Rp 1,984,710.00 Rp 4,763.30

Rp 15,750.00 Rp 393.75

Rp 10,185.00 Rp 43,286.25

Rp 16,590.00 Rp 423.05

Rp 1,102.50 Rp 5,650.31

Rp 204,750.00 Rp 2,559.38

Rp 354,595.96 Rp 8,510.30 Rp 65,586.34

Rp 86,700.00 Rp 2,861.10

Rp 86,700.00 Rp 2,861.10

Rp 81,600.00 Rp 2,692.80

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 22,720.50

Rp 91,800.00 Rp 1,377.00 Rp 33,379.50

Jumlah : Rp 98,965.84

Overhead + Profit 10% Rp 9,896.58

Jumlah Harga : Rp 108,850.00

Rp 1,984,710.00 Rp 5,457.95

1608 of 1892
Rp 15,750.00 Rp 385.88

Rp 10,185.00 Rp 43,642.73

Rp 16,590.00 Rp 439.64

Rp 1,102.50 Rp 6,113.36

Rp 204,750.00 Rp 2,764.13

Rp 354,595.96 Rp 8,687.60 Rp 67,491.28

Rp 86,700.00 Rp 2,861.10

Rp 86,700.00 Rp 2,861.10

Rp 81,600.00 Rp 2,692.80

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 22,720.50

Rp 91,800.00 Rp 1,377.00 Rp 33,379.50

Jumlah : Rp 100,870.78

Overhead + Profit 10% Rp 10,087.08

Jumlah Harga : Rp 110,950.00

Rp 1,984,710.00 Rp 5,259.48

Rp 15,750.00 Rp 375.64

Rp 10,185.00 Rp 42,929.78

Rp 16,590.00 Rp 423.05

1609 of 1892
Rp 1,102.50 Rp 6,091.31

Rp 204,750.00 Rp 2,661.75

Rp 354,595.96 Rp 8,333.01 Rp 66,074.01

Rp 86,700.00 Rp 2,861.10

Rp 86,700.00 Rp 2,861.10

Rp 81,600.00 Rp 2,692.80

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 22,720.50

Rp 91,800.00 Rp 1,377.00 Rp 33,379.50

Jumlah : Rp 99,453.51

Overhead + Profit 10% Rp 9,945.35

Jumlah Harga : Rp 109,350.00

Rp 1,095,500.00 Rp 1,095,500.00

Rp 165,450.00 Rp 189,600.34

Rp 18,800.00 Rp 21,544.19

Rp 13,360.00 Rp 1,308,072.24 Rp 2,614,716.78

Jumlah : Rp 2,614,716.78

1610 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 165,450.00 Rp 223,248.54

Rp 18,800.00 Rp 25,367.62

Rp 13,360.00 Rp 1,375,238.07 Rp 2,719,354.23

Jumlah : Rp 2,719,354.23

Rp 1,095,500.00 Rp 1,095,500.00

Rp 165,450.00 Rp 260,864.85

Rp 18,800.00 Rp 29,641.94

Rp 13,360.00 Rp 1,342,407.66 Rp 2,728,414.46

Jumlah : Rp 2,728,414.46

Rp 1,095,500.00 Rp 1,095,500.00

Rp 165,450.00 Rp 441,200.00

Rp 18,800.00 Rp 50,133.33

Rp 13,360.00 Rp 1,616,538.62 Rp 3,203,371.96

Jumlah : Rp 3,203,371.96

Rp 1,095,500.00 Rp 1,095,500.00

Rp 165,450.00 Rp 413,625.00

Rp 18,800.00 Rp 47,000.00

Rp 13,360.00 Rp 1,523,226.62 Rp 3,079,351.62

Jumlah : Rp 3,079,351.62

1611 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 591,666.67

Rp 18,800.00 Rp 62,666.67

Rp 13,360.00 Rp 1,523,488.34 Rp 3,273,321.67

Jumlah : Rp 3,273,321.67

Rp 1,095,500.00 Rp 1,095,500.00

Rp 165,450.00 Rp 441,200.00

Rp 18,800.00 Rp 50,133.33

Rp 13,360.00 Rp 2,061,672.45 Rp 3,648,505.78

Jumlah : Rp 3,648,505.78

Rp 1,095,500.00 Rp 1,095,500.00

Rp 124,250.00 Rp 828,333.33

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 125,333.33

Rp 13,360.00 Rp 2,057,832.33 Rp 4,406,498.99

Jumlah : Rp 4,406,498.99

Rp 1,095,500.00 Rp 1,095,500.00

1612 of 1892
Rp 124,250.00 Rp 958,500.00

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 145,028.57

Rp 13,360.00 Rp 2,683,081.34 Rp 5,181,609.91

Jumlah : Rp 5,181,609.91

Rp 1,095,500.00 Rp 1,095,500.00

Rp 124,250.00 Rp 1,553,125.00

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 235,000.00

Rp 13,360.00 Rp 2,663,582.33 Rp 5,846,707.33

Jumlah : Rp 5,846,707.33

Rp 1,095,500.00 Rp 1,095,500.00

Rp 124,250.00 Rp 1,597,500.00

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 241,714.29

Rp 13,360.00 Rp 3,532,948.36 Rp 6,767,162.65

Jumlah : Rp 6,767,162.65

1613 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,092,307.69

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 115,692.31

Rp 13,360.00 Rp 2,970,604.02 Rp 5,469,654.02

Jumlah : Rp 5,469,654.02

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 710,000.00

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 75,200.00

Rp 13,360.00 Rp 2,615,088.00 Rp 4,691,338.00

Jumlah : Rp 4,691,338.00

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 2,070,833.33

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 219,333.33

Rp 13,360.00 Rp 2,000,697.41 Rp 5,581,914.07

Jumlah : Rp 5,581,914.07

1614 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 2,662,500.00

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 282,000.00

Rp 13,360.00 Rp 3,062,863.87 Rp 7,298,413.87

Jumlah : Rp 7,298,413.87

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,918,918.92

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 203,243.24

Rp 13,360.00 Rp 3,652,196.50 Rp 7,065,408.66

Jumlah : Rp 7,065,408.66

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,333,373.21

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 141,224.88

Rp 13,360.00 Rp 2,887,197.81 Rp 5,652,845.90

Jumlah : Rp 5,652,845.90

1615 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,220,765.31

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 129,297.96

Rp 13,360.00 Rp 2,539,958.01 Rp 5,181,071.28

Jumlah : Rp 5,181,071.28

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,220,765.31

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 129,297.96

Rp 13,360.00 Rp 2,539,958.01 Rp 5,181,071.28

Jumlah : Rp 5,181,071.28

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,092,307.69

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 115,692.31

1616 of 1892
Rp 13,360.00 Rp 2,064,376.31 Rp 4,563,426.31

Jumlah : Rp 4,563,426.31

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 710,000.00

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 75,200.00

Rp 13,360.00 Rp 2,348,738.53 Rp 4,424,988.53

Jumlah : Rp 4,424,988.53

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 2,070,833.33

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 219,333.33

Rp 13,360.00 Rp 1,928,412.08 Rp 5,509,628.74

Jumlah : Rp 5,509,628.74

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 2,662,500.00

Rp 195,550.00 Rp 195,550.00

1617 of 1892
Rp 18,800.00 Rp 282,000.00

Rp 13,360.00 Rp 2,711,220.33 Rp 6,946,770.33

Jumlah : Rp 6,946,770.33

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 2,307,500.00

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 244,400.00

Rp 13,360.00 Rp 2,353,734.44 Rp 6,196,684.44

Jumlah : Rp 6,196,684.44

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 2,070,833.33

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 219,333.33

Rp 13,360.00 Rp 2,024,265.67 Rp 5,605,482.34

Jumlah : Rp 5,605,482.34

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,918,918.92

1618 of 1892
Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 203,243.24

Rp 13,360.00 Rp 3,293,990.86 Rp 6,707,203.03

Jumlah : Rp 6,707,203.03

Rp 900,000.00 Rp 900,000.00

Rp 160,000.00 Rp 1,201,913.88

Rp - Rp -

Rp - Rp -

Rp 9,900.00 Rp 1,914,299.25 Rp 4,016,213.12

Jumlah : Rp 4,016,213.12

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,220,765.31

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 129,297.96

Rp 13,360.00 Rp 2,280,746.28 Rp 4,921,859.54

Jumlah : Rp 4,921,859.54

Rp 1,095,500.00 Rp 1,095,500.00

1619 of 1892
Rp 177,500.00 Rp 1,402,822.58

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 148,580.65

Rp 13,360.00 Rp 2,434,982.66 Rp 5,277,435.89

Jumlah : Rp 5,277,435.89

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,308,305.56

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 135,777.78

Rp 13,360.00 Rp 5,503,640.72 Rp 8,342,724.06

Jumlah : Rp 8,342,724.06

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,235,113.64

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 128,181.82

Rp 13,360.00 Rp 4,623,189.03 Rp 7,381,484.49

Jumlah : Rp 7,381,484.49

Rp 1,095,500.00 Rp 1,095,500.00

1620 of 1892
Rp 181,150.00 Rp 1,656,228.57

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 171,885.71

Rp 13,360.00 Rp 4,579,906.21 Rp 7,803,020.50

Jumlah : Rp 7,803,020.50

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,308,305.56

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 135,777.78

Rp 13,360.00 Rp 3,814,092.72 Rp 6,653,176.05

Jumlah : Rp 6,653,176.05

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,235,113.64

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 128,181.82

Rp 13,360.00 Rp 4,223,107.16 Rp 6,981,402.61

Jumlah : Rp 6,981,402.61

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,656,228.57

Rp 299,500.00 Rp 299,500.00

1621 of 1892
Rp 18,800.00 Rp 171,885.71

Rp 13,360.00 Rp 3,725,309.53 Rp 6,948,423.81

Jumlah : Rp 6,948,423.81

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,610,222.22

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 167,111.11

Rp 13,360.00 Rp 3,140,935.73 Rp 6,313,269.06

Jumlah : Rp 6,313,269.06

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,897,761.90

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 196,952.38

Rp 13,360.00 Rp 3,003,830.08 Rp 6,493,544.37

Jumlah : Rp 6,493,544.37

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,053,963.64

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 109,381.82

Rp 13,360.00 Rp 4,566,064.91 Rp 7,124,410.37

1622 of 1892
Jumlah : Rp 7,124,410.37

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,537,030.30

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 159,515.15

Rp 13,360.00 Rp 3,365,430.02 Rp 6,456,975.47

Jumlah : Rp 6,456,975.47

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,660,541.67

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 172,333.33

Rp 13,360.00 Rp 3,084,094.92 Rp 6,311,969.92

Jumlah : Rp 6,311,969.92

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,308,305.56

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 135,777.78

Rp 13,360.00 Rp 5,426,898.80 Rp 8,265,982.13

Jumlah : Rp 8,265,982.13

1623 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,380,397.09

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 143,259.54

Rp 13,360.00 Rp 4,689,154.59 Rp 7,607,811.22

Jumlah : Rp 7,607,811.22

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,308,305.56

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 135,777.78

Rp 13,360.00 Rp 6,551,687.64 Rp 9,390,770.97

Jumlah : Rp 9,390,770.97

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,235,113.64

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 128,181.82

Rp 13,360.00 Rp 5,460,307.34 Rp 8,218,602.79

Jumlah : Rp 8,218,602.79

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,610,222.22

1624 of 1892
Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 167,111.11

Rp 13,360.00 Rp 3,279,043.17 Rp 6,451,376.51

Jumlah : Rp 6,451,376.51

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,214,055.56

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 229,777.78

Rp 13,360.00 Rp 4,550,046.43 Rp 8,388,879.77

Jumlah : Rp 8,388,879.77

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,501,595.24

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 259,619.05

Rp 13,360.00 Rp 4,969,332.01 Rp 9,125,546.30

Jumlah : Rp 9,125,546.30

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,314,694.44

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 240,222.22

1625 of 1892
Rp 13,360.00 Rp 3,669,438.06 Rp 7,619,354.73

Jumlah : Rp 7,619,354.73

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,465,652.78

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 255,888.89

Rp 13,360.00 Rp 3,577,922.06 Rp 7,694,463.73

Jumlah : Rp 7,694,463.73

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,482,425.93

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 257,629.63

Rp 13,360.00 Rp 4,154,033.90 Rp 8,289,089.46

Jumlah : Rp 8,289,089.46

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,868,208.33

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 297,666.67

Rp 13,360.00 Rp 4,108,290.03 Rp 8,669,165.03

Jumlah : Rp 8,669,165.03

1626 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,536,100.00

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 263,200.00

Rp 13,360.00 Rp 3,957,159.16 Rp 8,151,459.16

Jumlah : Rp 8,151,459.16

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,364,709.69

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 141,631.48

Rp 13,360.00 Rp 6,252,817.53 Rp 9,154,158.70

Jumlah : Rp 9,154,158.70

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,651,730.87

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 171,418.94

Rp 13,360.00 Rp 2,300,521.66 Rp 5,518,671.46

Jumlah : Rp 5,518,671.46

Rp 1,095,500.00 Rp 1,095,500.00

1627 of 1892
Rp 181,150.00 Rp 1,525,473.68

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 158,315.79

Rp 13,360.00 Rp 2,786,344.30 Rp 5,865,133.78

Jumlah : Rp 5,865,133.78

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,209,823.21

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 125,557.14

Rp 13,360.00 Rp 3,483,984.70 Rp 6,214,365.06

Jumlah : Rp 6,214,365.06

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,366,859.09

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 141,854.55

Rp 13,360.00 Rp 2,641,875.57 Rp 5,545,589.20

Jumlah : Rp 5,545,589.20

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,851,755.56

Rp 299,500.00 Rp 299,500.00

1628 of 1892
Rp 18,800.00 Rp 192,177.78

Rp 13,360.00 Rp 3,557,492.48 Rp 6,996,425.82

Jumlah : Rp 6,996,425.82

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 905,750.00

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 94,000.00

Rp 13,360.00 Rp 3,297,031.02 Rp 5,691,781.02

Jumlah : Rp 5,691,781.02

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,147,283.33

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 119,066.67

Rp 13,360.00 Rp 1,583,648.77 Rp 4,244,998.77

Jumlah : Rp 4,244,998.77

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,235,113.64

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 128,181.82

Rp 13,360.00 Rp 1,982,539.70 Rp 4,740,835.15

1629 of 1892
Jumlah : Rp 4,740,835.15

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,328,433.33

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 137,866.67

Rp 13,360.00 Rp 2,943,527.95 Rp 5,804,827.95

Jumlah : Rp 5,804,827.95

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,932,266.67

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 200,533.33

Rp 13,360.00 Rp 4,132,043.85 Rp 7,659,843.85

Jumlah : Rp 7,659,843.85

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,600,180.27

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 269,850.34

Rp 13,360.00 Rp 1,823,644.19 Rp 6,088,674.80

Jumlah : Rp 6,088,674.80

1630 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,580,015.15

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 267,757.58

Rp 13,360.00 Rp 1,636,505.75 Rp 5,879,278.48

Jumlah : Rp 5,879,278.48

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,566,291.67

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 266,333.33

Rp 13,360.00 Rp 1,798,930.01 Rp 6,026,555.01

Jumlah : Rp 6,026,555.01

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,606,017.54

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 270,456.14

Rp 13,360.00 Rp 1,857,938.57 Rp 6,129,412.25

Jumlah : Rp 6,129,412.25

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 2,173,800.00

1631 of 1892
Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 225,600.00

Rp 13,360.00 Rp 4,982,759.19 Rp 8,777,159.19

Jumlah : Rp 8,777,159.19

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 1,902,075.00

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 197,400.00

Rp 13,360.00 Rp 3,345,775.34 Rp 6,840,250.34

Jumlah : Rp 6,840,250.34

Rp 1,095,500.00 Rp 1,095,500.00

Rp 181,150.00 Rp 3,260,700.00

Rp 299,500.00 Rp 299,500.00

Rp 18,800.00 Rp 338,400.00

Rp 13,360.00 Rp 2,006,598.12 Rp 7,000,698.12

Jumlah : Rp 7,000,698.12

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,183,333.33

1632 of 1892
Rp 403,450.00 Rp 403,450.00

Rp 18,800.00 Rp 125,333.33

Rp 13,360.00 Rp 1,482,387.61 Rp 4,290,004.27

Jumlah : Rp 4,290,004.27

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 887,500.00

Rp 403,450.00 Rp 403,450.00

Rp 18,800.00 Rp 94,000.00

Rp 13,360.00 Rp 1,140,060.57 Rp 3,620,510.57

Jumlah : Rp 3,620,510.57

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 1,775,000.00

Rp 403,450.00 Rp 403,450.00

Rp 18,800.00 Rp 188,000.00

Rp 13,360.00 Rp 2,616,834.65 Rp 6,078,784.65

Jumlah : Rp 6,078,784.65

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 710,000.00

Rp 403,450.00 Rp 403,450.00

Rp 18,800.00 Rp 75,200.00

1633 of 1892
Rp 13,360.00 Rp 1,729,615.49 Rp 4,013,765.49

Jumlah : Rp 4,013,765.49

Rp 1,095,500.00 Rp 1,095,500.00

Rp 177,500.00 Rp 591,666.67

Rp 403,450.00 Rp 403,450.00

Rp 18,800.00 Rp 62,666.67

Rp 13,360.00 Rp 1,325,144.36 Rp 3,478,427.69

Jumlah : Rp 3,478,427.69

Rp 986,650.00 Rp 986,650.00

Rp 177,500.00 Rp 1,775,000.00

Rp 403,450.00 Rp 403,450.00

Rp 18,800.00 Rp 188,000.00

Rp 13,360.00 Rp 1,593,751.14 Rp 4,946,851.14

Jumlah : Rp 4,946,851.14

Rp 986,650.00 Rp 986,650.00

Rp 177,500.00 Rp 1,775,000.00

Rp 403,450.00 Rp 403,450.00

Rp 18,800.00 Rp 188,000.00

Rp 13,360.00 Rp 1,593,751.14 Rp 4,946,851.14

Jumlah : Rp 4,946,851.14

1634 of 1892
Rp 986,650.00 Rp 986,650.00

Rp 177,500.00 Rp 591,666.67

Rp 18,800.00 Rp 62,666.67

Rp 13,360.00 Rp 3,617,444.45 Rp 5,258,427.78

Jumlah : Rp 5,258,427.78

Rp 986,650.00 Rp 986,650.00

Rp 165,450.00 Rp 74,452.50

Rp 18,800.00 Rp 8,460.00

Rp 13,360.00 Rp 52,198.44

Rp 50,925.93 Rp 848,765.43 Rp 1,970,526.37

Jumlah : Rp 1,970,500.00

Rp 986,650.00 Rp 986,650.00

Rp 165,450.00 Rp 1,378,750.00

Rp 18,800.00 Rp 156,666.67

Rp 13,360.00 Rp 2,098,911.34 Rp 4,620,978.00

Jumlah : Rp 4,620,978.00

Rp 986,650.00 Rp 986,650.00

Rp 165,450.00 Rp 827,250.00

Rp 18,800.00 Rp 94,000.00

1635 of 1892
Rp 13,360.00 Rp 1,947,195.08 Rp 3,855,095.08

Jumlah : Rp 3,855,095.08

Rp 986,650.00 Rp 986,650.00

Rp 165,450.00 Rp 1,378,750.00

Rp 18,800.00 Rp 156,666.67

Rp 13,360.00 Rp 1,899,567.11 Rp 4,421,633.77

Jumlah : Rp 4,421,633.77

Rp 986,650.00 Rp 986,650.00

Rp 165,450.00 Rp 1,103,000.00

Rp 18,800.00 Rp 125,333.33

Rp 13,360.00 Rp 1,525,876.77 Rp 3,740,860.11

Jumlah : Rp 3,740,860.11

Rp 1,095,500.00 Rp 1,095,500.00

Rp 166,400.00 Rp 2,218,666.67

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 250,666.67

Rp 13,360.00 Rp 3,660,339.30 Rp 7,420,722.64

Jumlah : Rp 7,420,722.64

1636 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 166,400.00 Rp 1,664,000.00

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 188,000.00

Rp 13,360.00 Rp 2,776,464.70 Rp 5,919,514.70

Jumlah : Rp 5,919,514.70

Rp 1,095,500.00 Rp 1,095,500.00

Rp 166,400.00 Rp 1,941,333.33

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 219,333.33

Rp 13,360.00 Rp 3,262,336.22 Rp 6,714,052.89

Jumlah : Rp 6,714,052.89

Rp 1,095,500.00 Rp 1,095,500.00

Rp 183,050.00 Rp 1,830,500.00

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 188,000.00

Rp 13,360.00 Rp 2,324,610.81 Rp 5,634,160.81

Jumlah : Rp 5,634,160.81

1637 of 1892
Rp 1,095,500.00 Rp 1,095,500.00

Rp 183,050.00 Rp 1,464,400.00

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 150,400.00

Rp 13,360.00 Rp 1,859,688.65 Rp 4,765,538.65

Jumlah : Rp 4,765,538.65

Rp 1,095,500.00 Rp 1,095,500.00

Rp 183,050.00 Rp 1,830,500.00

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 188,000.00

Rp 13,360.00 Rp 2,775,795.39 Rp 6,085,345.39

Jumlah : Rp 6,085,345.39

Rp 1,095,500.00 Rp 1,095,500.00

Rp 183,050.00 Rp 2,440,666.67

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 250,666.67

Rp 13,360.00 Rp 3,353,387.98 Rp 7,335,771.31

1638 of 1892
Jumlah : Rp 7,335,771.31

Rp 1,095,500.00 Rp 1,095,500.00

Rp 183,050.00 Rp 1,830,500.00

Rp 195,550.00 Rp 195,550.00

Rp 18,800.00 Rp 188,000.00

Rp 13,360.00 Rp 2,332,744.37 Rp 5,642,294.37

Jumlah : Rp 5,642,294.37

Rp 25,200.00 Rp 2,520.00

Rp 28,350.00 Rp 7,371.00 Rp 9,891.00

Rp 81,600.00 Rp 734.40

Rp 86,700.00 Rp 520.20

Rp 76,500.00 Rp 5,355.00

Rp 91,800.00 Rp 229.50 Rp 6,839.10

Jumlah : Rp 16,730.10

Overhead + Profit 10% Rp 1,673.01

Jumlah total Rp 18,400.00

1639 of 1892
Rp 39,900.00 Rp 15,960.00

Rp 6,825.00 Rp 2,047.50

Rp 6,825.00 Rp 273.00 Rp 18,280.50

Rp 81,600.00 Rp 1,632.00

Rp 86,700.00 Rp 1,734.00

Rp 76,500.00 Rp 3,060.00

Rp 91,800.00 Rp 183.60 Rp 6,609.60

Rp 89,250.00 Rp 15,172.50 Rp 15,172.50

Jumlah : Rp 40,062.60

Overhead + Profit 10% Rp 4,006.26

Jumlah total Rp 44,050.00

biaya per cm Rp 4,405.00

Rp 8,190.00 Rp 8,599.50

Rp 4,405.00 Rp 4,405.00

Rp 18,400.00 Rp 552.00 Rp 13,556.50

Rp 81,600.00 Rp 4,896.00

1640 of 1892
Rp 86,700.00 Rp 520.20

Rp 76,500.00 Rp 2,295.00

Rp 91,800.00 Rp 275.40 Rp 7,986.60

Jumlah : Rp 21,543.10

Overhead + Profit 10% Rp 2,154.31

Jumlah total Rp 23,650.00

Rp 106,050.00 Rp 111,352.50

Rp 5,567.63 Rp 5,567.63 Rp 116,920.13

Rp 11,692.01 Rp 11,692.01 Rp 11,692.01

Jumlah : Rp 128,612.14

Overhead + Profit 10% Rp 12,861.21

Jumlah total Rp 141,450.00

Rp 84,735.00 Rp 42,367.50

Rp 2,118.38 Rp 2,118.38 Rp 44,485.88

1641 of 1892
Rp 4,448.59 Rp 4,448.59 Rp 4,448.59

Jumlah : Rp 48,934.46

Overhead + Profit 10% Rp 4,893.45

Jumlah total Rp 53,800.00

Rp 110,250.00 Rp 121,275.00

Rp 178.50 Rp 357.00

Rp 33,600.00 Rp 2,016.00 Rp 123,648.00

Rp 81,600.00 Rp 3,508.80

Rp 86,700.00 Rp 372.81

Rp 76,500.00 Rp 3,289.50

Rp 91,800.00 Rp 192.78 Rp 7,363.89

Jumlah : Rp 131,011.89

Jumlah total : Rp 131,000.00

Rp 105,000.00 Rp 115,500.00 Rp 115,500.00

1642 of 1892
Rp 81,600.00 Rp 3,508.80

Rp 86,700.00 Rp 372.81

Rp 76,500.00 Rp 3,289.50

Rp 91,800.00 Rp 192.78 Rp 7,363.89

Jumlah : Rp 122,863.89

Jumlah total : Rp 122,850.00

Rp 105,000.00 Rp 115,500.00 Rp 115,500.00

Rp 81,600.00 Rp 3,508.80

Rp 86,700.00 Rp 372.81

Rp 76,500.00 Rp 3,289.50

Rp 91,800.00 Rp 192.78 Rp 7,363.89

Jumlah : Rp 122,863.89

Jumlah total : Rp 122,850.00

Rp 110,250.00 Rp 121,275.00

Rp 178.50 Rp 357.00

1643 of 1892
Rp 33,600.00 Rp 2,016.00 Rp 123,648.00

Rp 81,600.00 Rp 3,508.80

Rp 86,700.00 Rp 372.81

Rp 76,500.00 Rp 3,289.50

Rp 91,800.00 Rp 192.78 Rp 7,363.89

Jumlah : Rp 131,011.89

Jumlah total : Rp 131,000.00

Rp 110,250.00 Rp 121,275.00

Rp 178.50 Rp 357.00

Rp 33,600.00 Rp 2,016.00 Rp 123,648.00

Rp 81,600.00 Rp 3,508.80

Rp 86,700.00 Rp 372.81

Rp 76,500.00 Rp 3,289.50

Rp 91,800.00 Rp 192.78 Rp 7,363.89

Jumlah : Rp 131,011.89

Jumlah total : Rp 131,000.00

1644 of 1892
Rp 609,000.00 Rp 9,003,456.00

Rp 397,194.00 Rp 794,388.00

Rp 397,194.00 Rp 794,388.00

Rp 425,565.00 Rp 851,130.00

Rp 1,207,794.00 Rp 2,415,588.00

Rp 790,335.00 Rp 1,580,670.00

Rp 55,335,000.00 Rp 55,335,000.00

Rp 5,250,000.00 Rp 5,250,000.00

Rp 244,702.35 Rp 1,096,266.53

Rp 437,799.69 Rp 875,599.38 Rp 77,996,485.91

Rp 110,250.00 Rp 1,576,575.00

Rp 10,500.00 Rp 150,150.00

Rp 609,000.00 Rp 11,182,381.88

Rp 33,600.00 Rp 1,370,880.00 Rp 14,279,986.88

Rp 4,613,823.64 Rp 4,613,823.64 Rp 4,613,823.64

Jumlah : Rp 96,890,296.43

Overhead + Profit 10% Rp9689030

Jumlah total 106,579,300.00

1645 of 1892
Rp 609,000.00 Rp 6,577,200.00

Rp 397,194.00 Rp 1,588,776.00

Rp 397,194.00 Rp 1,588,776.00

Rp 425,565.00 Rp 1,702,260.00

Rp 1,207,794.00 Rp 4,831,176.00

Rp 790,335.00 Rp 3,161,340.00

Rp 437,799.69 Rp 1,751,198.76 Rp 21,200,726.76

Rp 110,250.00 Rp 2,326,275.00

Rp 10,500.00 Rp 221,550.00

Rp 609,000.00 Rp 10,505,250.00

Rp 33,600.00 Rp 1,942,080.00 Rp 14,995,155.00

Rp 81,600.00 Rp 489,600.00

Rp 86,700.00 Rp 52,020.00

Rp 76,500.00 Rp 229,500.00

Rp 91,800.00 Rp 2,754.00 Rp 773,874.00

Jumlah : Rp 36,969,755.76

Overhead + Profit 10% Rp3696976

Jumlah total 40,666,700.00

1646 of 1892
Rp 131,000.00 Rp 5,191,530.00

Rp 6,405,000.00 Rp 6,405,000.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 12,794,183.19

Rp 126,000.00 Rp 1,279,152.00

Rp 2,625.00 Rp 172,620.00 Rp 1,451,772.00

Rp 105,000.00 Rp 2,157,750.00

Rp 126,000.00 Rp 391,154.40

Rp 131,250.00 Rp 918,750.00

Rp 14,962.50 Rp 104,737.50

Rp 2,625.00 Rp 100,905.00 Rp 3,673,296.90

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

1647 of 1892
Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 18,318,582.09

Overhead + Profit 10% Rp 1,831,858.21

Jumlah total Rp 20,150,400.00

Rp 23,650.00 Rp 6,066,962.88

Rp 23,650.00 Rp 2,273,294.76

Rp 4,410.00 Rp 10,279.71

Rp 13,125,000.00 Rp 1,197,000.00

Rp 13,125,000.00 Rp 1,458,975.00

Rp 451,500.00 Rp 700,005.60

Rp 13,125,000.00 Rp 160,020.00

Rp 475,287.19 Rp 1,290,689.89

Rp 13,125,000.00 Rp 5,279,400.00

Rp 13,125,000.00 Rp 5,312,160.00

Rp 609,000.00 Rp 5,473,204.80

Rp 13,125,000.00 Rp 333,480.00

Rp 475,287.19 Rp 4,800,305.53

Rp 13,125,000.00 Rp 3,628,800.00

Rp 13,125,000.00 Rp 2,016,000.00

Rp 13,125,000.00 Rp 604,800.00

1648 of 1892
Rp 52,200.00 Rp 2,247,377.04

Rp 91,350.00 Rp 274,050.00

Rp 521,408.53 Rp 1,042,817.06

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 44,792,450.77

Rp 4,479,245.08 Rp 4,479,245.08 Rp 4,479,245.08

Jumlah : Rp 49,271,695.84

Overhead + Profit 10% Rp 4,927,169.58

Jumlah total Rp 54,198,850.00

Rp 23,650.00 Rp 4,999,496.48

Rp 23,650.00 Rp 1,752,474.46

Rp 10,185.00 Rp 20,349.63

Rp 13,125,000.00 Rp 1,197,000.00

Rp 13,125,000.00 Rp 1,458,975.00

Rp 451,500.00 Rp 700,005.60

Rp 13,125,000.00 Rp 160,020.00

Rp 475,287.19 Rp 1,290,689.89

1649 of 1892
Rp 13,125,000.00 Rp 4,032,000.00

Rp 13,125,000.00 Rp 3,066,210.00

Rp 609,000.00 Rp 3,136,106.40

Rp 13,125,000.00 Rp 235,200.00

Rp 452,654.46 Rp 2,643,683.13

Rp 13,125,000.00 Rp 3,132,675.00

Rp 13,125,000.00 Rp 1,740,375.00

Rp 13,125,000.00 Rp 522,112.50

Rp 52,200.00 Rp 1,784,738.88

Rp 91,350.00 Rp 274,050.00

Rp 521,408.53 Rp 1,042,817.06

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 33,811,807.53

Rp 3,381,180.75 Rp 3,381,180.75 Rp 3,381,180.75

Jumlah : Rp 37,192,988.28

Overhead + Profit 10% Rp 3,719,298.83

Jumlah total Rp 40,912,250.00

1650 of 1892
Rp 131,000.00 Rp 3,442,025.00

Rp 3,202,500.00 Rp 6,405,000.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 11,619,502.88

Rp 472,500.00 Rp 3,675,218.40

Rp 2,625.00 Rp 130,284.00 Rp 3,805,502.40

Rp 105,000.00 Rp 1,731,240.00

Rp 126,000.00 Rp 298,378.08

Rp 131,250.00 Rp 787,500.00

Rp 14,962.50 Rp 89,775.00

Rp 2,625.00 Rp 80,577.00 Rp 2,987,470.08

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

1651 of 1892
Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 18,811,805.36

Overhead + Profit 10% Rp 1,881,180.54

Jumlah total Rp 20,692,950.00

Rp 131,000.00 Rp 3,293,995.00

Rp 3,202,500.00 Rp 6,405,000.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 11,471,472.88

Rp 105,000.00 Rp 2,011,485.00

Rp 126,000.00 Rp 445,273.92

Rp 131,250.00 Rp 1,050,000.00

Rp 14,962.50 Rp 119,700.00

1652 of 1892
Rp 2,625.00 Rp 139,083.00 Rp 3,765,541.92

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 15,636,344.80

Overhead + Profit 10% Rp 1,563,634.48

Jumlah total Rp 17,199,950.00

Rp 609,000.00 Rp 3,507,840.00

Rp 397,194.00 Rp 794,388.00

Rp 397,194.00 Rp 794,388.00

Rp 425,565.00 Rp 851,130.00

Rp 1,207,794.00 Rp 2,415,588.00

Rp 790,335.00 Rp 1,580,670.00

Rp 437,799.69 Rp 875,599.38 Rp 10,819,603.38

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 153,000.00

1653 of 1892
Rp 91,800.00 Rp 1,836.00 Rp 515,916.00

Jumlah : Rp11,335,519

Overhead + Profit 10% Rp1133552

Jumlah total 12,469,050.00

Rp 131,000.00 Rp 1,254,325.00

Rp 1,995,000.00 Rp 3,990,000.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 7,016,802.88

Rp 105,000.00 Rp 527,100.00

Rp 126,000.00 Rp 83,865.60

Rp 131,250.00 Rp 262,500.00

Rp 14,962.50 Rp 29,925.00

Rp 2,625.00 Rp 24,360.00 Rp 927,750.60

1654 of 1892
Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 8,343,883.48

Overhead + Profit 10% Rp 834,388.35

Jumlah total Rp 9,178,250.00

Rp 131,000.00 Rp 1,254,325.00

Rp 3,202,500.00 Rp 6,405,000.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 9,431,802.88

Rp 105,000.00 Rp 527,100.00

Rp 126,000.00 Rp 83,865.60

1655 of 1892
Rp 131,250.00 Rp 262,500.00

Rp 14,962.50 Rp 29,925.00

Rp 2,625.00 Rp 24,360.00 Rp 927,750.60

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 10,758,883.48

Overhead + Profit 10% Rp 1,075,888.35

Jumlah total Rp 11,834,750.00

Rp 131,000.00 Rp 1,013,940.00

Rp 3,660,000.00 Rp 3,660,000.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 33,600.00 Rp 33,600.00

Rp 342,300.00 Rp 342,300.00 Rp 5,871,414.69

1656 of 1892
Rp 105,000.00 Rp 287,700.00

Rp 126,000.00 Rp 49,140.00

Rp 131,250.00 Rp 131,250.00

Rp 14,962.50 Rp 14,962.50

Rp 2,625.00 Rp 13,335.00 Rp 496,387.50

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 6,767,132.19

Overhead + Profit 10% Rp 676,713.22

Jumlah total Rp 7,443,800.00

Rp 131,000.00 Rp 1,013,940.00

Rp 2,280,000.00 Rp 2,280,000.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

1657 of 1892
Rp 33,600.00 Rp 33,600.00

Rp 342,300.00 Rp 342,300.00 Rp 4,491,414.69

Rp 105,000.00 Rp 287,700.00

Rp 126,000.00 Rp 49,140.00

Rp 131,250.00 Rp 131,250.00

Rp 14,962.50 Rp 14,962.50

Rp 2,625.00 Rp 13,335.00 Rp 496,387.50

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 5,387,132.19

Overhead + Profit 10% Rp 538,713.22

Jumlah total Rp 5,925,800.00

Rp 6,274,044.00 Rp 6,274,044.00

Rp 2,634,450.00 Rp 2,634,450.00

Rp 850,319.40 Rp 850,319.40

Rp 235,074.00 Rp 235,074.00

1658 of 1892
Rp 715,759.80 Rp 715,759.80 Rp 10,709,647.20

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 11,108,977.20

Overhead + Profit 10% Rp 1,110,897.72

Jumlah total Rp 12,219,850.00

Rp 131,000.00 Rp 729,670.00

Rp 4,147,500.00 Rp 4,147,500.00

Rp 91,350.00 Rp 137,025.00

Rp 157,500.00 Rp 157,500.00

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 33,600.00 Rp 33,600.00

Rp 342,300.00 Rp 342,300.00 Rp 5,794,345.00

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

1659 of 1892
Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 6,193,675.00

Overhead + Profit 10% Rp 619,367.50

Jumlah total Rp 6,813,000.00

Rp 131,000.00 Rp 756,394.00

Rp 5,145,000.00 Rp 5,145,000.00

Rp 91,350.00 Rp 137,025.00

Rp 157,500.00 Rp 157,500.00

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 33,600.00 Rp 33,600.00

Rp 342,300.00 Rp 342,300.00 Rp 6,818,569.00

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 7,217,899.00

Overhead + Profit 10% Rp 721,789.90

1660 of 1892
Jumlah total Rp 7,939,650.00

Rp 131,000.00 Rp 1,254,325.00

Rp 2,940,000.00 Rp 5,880,000.00

Rp 1,207,794.00 Rp 2,415,588.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 11,048,340.88

Rp 105,000.00 Rp 527,100.00

Rp 126,000.00 Rp 83,865.60

Rp 131,250.00 Rp 262,500.00

Rp 14,962.50 Rp 29,925.00

Rp 2,625.00 Rp 24,360.00 Rp 927,750.60

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

1661 of 1892
Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 12,375,421.48

Overhead + Profit 10% Rp 1,237,542.15

Jumlah total Rp 13,612,950.00

Rp 131,000.00 Rp 1,241,225.00

Rp 3,088,125.00 Rp 6,176,250.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 9,189,952.88

Rp 105,000.00 Rp 514,500.00

Rp 126,000.00 Rp 79,934.40

Rp 131,250.00 Rp 262,500.00

Rp 14,962.50 Rp 29,925.00

1662 of 1892
Rp 2,625.00 Rp 23,730.00 Rp 910,589.40

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 10,499,872.28

Overhead + Profit 10% Rp 1,049,987.23

Jumlah total Rp 11,549,850.00

Rp 131,000.00 Rp 547,580.00

Rp 1,033,953.49 Rp 1,033,953.49

Rp 91,350.00 Rp 137,025.00

Rp 157,500.00 Rp 157,500.00

Rp 33,600.00 Rp 33,600.00

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00 Rp 2,156,408.49

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

1663 of 1892
Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 2,422,628.49

Overhead + Profit 10% Rp 242,262.85

Jumlah total Rp 2,664,850.00

Rp 131,000.00 Rp 742,770.00

Rp 2,280,000.00 Rp 2,280,000.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 33,600.00 Rp 33,600.00

Rp 342,300.00 Rp 342,300.00 Rp 4,220,244.69

Rp 81,600.00 Rp 244,800.00

Rp 86,700.00 Rp 26,010.00

Rp 76,500.00 Rp 114,750.00

Rp 91,800.00 Rp 13,770.00 Rp 399,330.00

Jumlah : Rp 4,619,574.69

Overhead + Profit 10% Rp 461,957.47

Jumlah total Rp 5,081,500.00

1664 of 1892
Rp 23,650.00 Rp 1,523,563.27

Rp 23,650.00 Rp 906,570.72

Rp 10,185.00 Rp 10,853.14

Rp 13,125,000.00 Rp 1,247,400.00

Rp 2,521,617.34 Rp 5,043,234.67

Rp 475,287.19 Rp 1,322,439.07

Rp 13,125,000.00 Rp 935,550.00

Rp 13,125,000.00 Rp 519,750.00

Rp 13,125,000.00 Rp 155,925.00

Rp 52,200.00 Rp 388,618.56

Rp 91,350.00 Rp 274,050.00

Rp 521,408.53 Rp 1,042,817.06

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50 Rp 13,993,599.99

Rp 1,399,360.00 Rp 1,399,360.00 Rp 1,399,360.00

Jumlah : Rp 15,392,959.99

Overhead + Profit 10% Rp 1,539,296.00

1665 of 1892
Jumlah total Rp 16,932,250.00

Rp 23,650.00 Rp 891,510.40

Rp 23,650.00 Rp 2,550,801.97

Rp 23,650.00 Rp 798,518.60

Rp 23,650.00 Rp 798,518.60

Rp 94,500.00 Rp 189,000.00

Rp 91,875.00 Rp 91,875.00

Rp 155,400.00 Rp 466,200.00

Rp 271,950.00 Rp 271,950.00

Rp 137,550.00 Rp 137,550.00

Rp 33,600.00 Rp 33,600.00

Rp 966,000.00 Rp 966,000.00 Rp 7,195,524.57

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

1666 of 1892
Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 7,899,324.57

Overhead + Profit 10% Rp 789,932.46

Jumlah total Rp 8,689,250.00

Rp 23,650.00 Rp 727,284.80

Rp 23,650.00 Rp 1,043,509.90

Rp 23,650.00 Rp 572,850.30

Rp 23,650.00 Rp 572,850.30

Rp 94,500.00 Rp 94,500.00

Rp 91,875.00 Rp 137,812.50

Rp 155,400.00 Rp 155,400.00

Rp 271,950.00 Rp 271,950.00

Rp 137,550.00 Rp 137,550.00

Rp 966,000.00 Rp 966,000.00 Rp 4,679,707.80

Rp 81,600.00 Rp 326,400.00

1667 of 1892
Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 5,383,507.80

Overhead + Profit 10% Rp 538,350.78

Jumlah total Rp 5,921,850.00

Rp 23,650.00 Rp 680,363.20

Rp 23,650.00 Rp 943,172.41

Rp 23,650.00 Rp 569,378.48

Rp 23,650.00 Rp 95,475.05

Rp 94,500.00 Rp 94,500.00

Rp 91,875.00 Rp 137,812.50

Rp 155,400.00 Rp 155,400.00

Rp 271,950.00 Rp 271,950.00

Rp 137,550.00 Rp 137,550.00

Rp 966,000.00 Rp 966,000.00 Rp 4,051,601.64

1668 of 1892
Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 4,755,401.64

Overhead + Profit 10% Rp 475,540.16

Jumlah total Rp 5,230,900.00

Rp 131,000.00 Rp 2,046,220.00

Rp 105,000.00 Rp 894,600.00

Rp 126,000.00 Rp 375,984.00

Rp 404,250.00 Rp 808,500.00

Rp 14,962.50 Rp 29,925.00

Rp 2,625.00 Rp 64,995.00 Rp 4,220,224.00

Rp 105,000.00 Rp 828,450.00

Rp 126,000.00 Rp 147,420.00

Rp 131,250.00 Rp 393,750.00

Rp 14,962.50 Rp 44,887.50

Rp 2,625.00 Rp 40,005.00 Rp 1,454,512.50

1669 of 1892
Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 5,940,956.50

Overhead + Profit 10% Rp 594,095.65

Jumlah total Rp 6,535,050.00

Rp 131,000.00 Rp 865,910.00

Rp 105,000.00 Rp 432,600.00

Rp 126,000.00 Rp 109,670.40

Rp 404,250.00 Rp 404,250.00

Rp 14,962.50 Rp 14,962.50

Rp 2,625.00 Rp 20,580.00 Rp 1,847,972.90

Rp 105,000.00 Rp 291,060.00

Rp 126,000.00 Rp 44,553.60

Rp 131,250.00 Rp 131,250.00

Rp 14,962.50 Rp 14,962.50

Rp 2,625.00 Rp 12,600.00 Rp 494,426.10

1670 of 1892
Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 2,475,509.00

Overhead + Profit 10% Rp 247,550.90

Jumlah total Rp 2,723,050.00

Rp 131,000.00 Rp 1,456,065.00

Rp 105,000.00 Rp 873,600.00

Rp 126,000.00 Rp 241,920.00

Rp 404,250.00 Rp 808,500.00

Rp 14,962.50 Rp 29,925.00

Rp 2,625.00 Rp 42,630.00 Rp 3,452,640.00

Rp 105,000.00 Rp 573,300.00

Rp 126,000.00 Rp 98,280.00

Rp 131,250.00 Rp 262,500.00

Rp 14,962.50 Rp 29,925.00

Rp 2,625.00 Rp 13,335.00 Rp 977,340.00

1671 of 1892
Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 4,563,090.00

Overhead + Profit 10% Rp 456,309.00

Jumlah total Rp 5,019,350.00

Rp 131,000.00 Rp 2,046,220.00

Rp 126,000.00 Rp 418,446.00

Rp 2,625.00 Rp 68,355.00 Rp 2,533,021.00

Rp 105,000.00 Rp 828,450.00

Rp 126,000.00 Rp 147,420.00

Rp 131,250.00 Rp 393,750.00

Rp 14,962.50 Rp 44,887.50

Rp 2,625.00 Rp 40,005.00 Rp 1,454,512.50

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

1672 of 1892
Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 4,253,753.50

Overhead + Profit 10% Rp 425,375.35

Jumlah total Rp 4,679,100.00

Rp 131,000.00 Rp 838,400.00

Rp 126,000.00 Rp 127,575.00

Rp 2,625.00 Rp 22,050.00 Rp 988,025.00

Rp 105,000.00 Rp 291,060.00

Rp 126,000.00 Rp 44,553.60

Rp 131,250.00 Rp 131,250.00

Rp 14,962.50 Rp 14,962.50

Rp 2,625.00 Rp 12,600.00 Rp 494,426.10

Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 1,615,561.10

1673 of 1892
Overhead + Profit 10% Rp 161,556.11

Jumlah total Rp 1,777,100.00

Rp 131,000.00 Rp 2,754,275.00

Rp 126,000.00 Rp 608,958.00

Rp 2,625.00 Rp 94,290.00 Rp 3,457,523.00

Rp 105,000.00 Rp 1,031,100.00

Rp 126,000.00 Rp 216,216.00

Rp 131,250.00 Rp 525,000.00

Rp 14,962.50 Rp 59,850.00

Rp 2,625.00 Rp 56,490.00 Rp 1,888,656.00

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 5,612,399.00

Overhead + Profit 10% Rp 561,239.90

Jumlah total Rp 6,173,600.00

1674 of 1892
Rp 131,000.00 Rp 4,178,900.00

Rp 126,000.00 Rp 315,201.60

Rp 472,500.00 Rp 3,305,610.00

Rp 2,625.00 Rp 183,120.00 Rp 7,982,831.60

Rp 105,000.00 Rp 1,352,400.00

Rp 126,000.00 Rp 260,769.60

Rp 131,250.00 Rp 525,000.00

Rp 14,962.50 Rp 59,850.00

Rp 2,625.00 Rp 63,630.00 Rp 2,261,649.60

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 10,510,701.20

Overhead + Profit 10% Rp 1,051,070.12

Jumlah total Rp 11,561,750.00

1675 of 1892
Rp 131,000.00 Rp 2,610,175.00

Rp 472,500.00 Rp 2,806,650.00

Rp 2,625.00 Rp 91,350.00 Rp 5,508,175.00

Rp 126,000.00 Rp 243,243.00

Rp 2,625.00 Rp 53,077.50 Rp 296,320.50

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 6,070,715.50

Overhead + Profit 10% Rp 607,071.55

Jumlah total Rp 6,677,750.00

Rp 23,650.00 Rp 2,116,060.10

Rp 23,650.00 Rp 1,966,734.00

Rp 10,185.00 Rp 14,923.06

Rp 13,125,000.00 Rp 1,612,800.00

Rp 13,125,000.00 Rp 1,164,534.00

Rp 475,287.19 Rp 2,108,526.05

1676 of 1892
Rp 609,000.00 Rp 2,488,983.00

Rp 13,125,000.00 Rp 206,482.50

Rp 13,125,000.00 Rp 1,299,375.00

Rp 13,125,000.00 Rp 721,875.00

Rp 13,125,000.00 Rp 216,562.50

Rp 52,200.00 Rp 644,751.43 Rp 14,561,606.65

Rp 1,456,160.66 Rp 1,456,160.66 Rp 1,456,160.66

Jumlah : Rp 16,017,767.31

Overhead + Profit 10% Rp 1,601,776.73

Jumlah total Rp 17,619,500.00

Rp 131,000.00 Rp 903,900.00

Rp 640,500.00 Rp 1,146,366.90

Rp 2,625.00 Rp 39,732.00 Rp 2,089,998.90

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 2,356,218.90

1677 of 1892
Overhead + Profit 10% Rp 235,621.89

Jumlah total Rp 2,591,800.00

Rp 131,000.00 Rp 708,055.00

Rp 105,000.00 Rp 582,960.00

Rp 126,000.00 Rp 101,556.00

Rp 131,250.00 Rp 262,500.00

Rp 14,962.50 Rp 29,925.00

Rp 2,625.00 Rp 27,195.00 Rp 1,712,191.00

Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 1,845,301.00

Overhead + Profit 10% Rp 184,530.10

Jumlah total Rp 2,029,800.00

1678 of 1892
Rp 131,000.00 Rp 998,220.00

Rp 105,000.00 Rp 859,950.00

Rp 126,000.00 Rp 147,420.00

Rp 131,250.00 Rp 393,750.00

Rp 14,962.50 Rp 44,887.50

Rp 2,625.00 Rp 40,005.00 Rp 2,484,232.50

Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 2,617,342.50

Overhead + Profit 10% Rp 261,734.25

Jumlah total Rp 2,879,050.00

Rp 131,000.00 Rp 825,955.00

Rp 105,000.00 Rp 678,300.00

Rp 126,000.00 Rp 131,040.00

Rp 131,250.00 Rp 262,500.00

Rp 14,962.50 Rp 29,925.00

Rp 2,625.00 Rp 31,920.00 Rp 1,959,640.00

1679 of 1892
Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 2,092,750.00

Overhead + Profit 10% Rp 209,275.00

Jumlah total Rp 2,302,000.00

Rp 131,000.00 Rp 701,505.00

Rp 105,000.00 Rp 598,500.00

Rp 126,000.00 Rp 106,142.40

Rp 131,250.00 Rp 262,500.00

Rp 14,962.50 Rp 29,925.00

Rp 2,625.00 Rp 27,930.00 Rp 1,726,502.40

Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 1,859,612.40

1680 of 1892
Overhead + Profit 10% Rp 185,961.24

Jumlah total Rp 2,045,550.00

Rp 131,000.00 Rp 948,440.00

Rp 105,000.00 Rp 820,050.00

Rp 126,000.00 Rp 134,971.20

Rp 131,250.00 Rp 393,750.00

Rp 14,962.50 Rp 44,887.50

Rp 2,625.00 Rp 38,010.00 Rp 2,380,108.70

Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 2,513,218.70

Overhead + Profit 10% Rp 251,321.87

Jumlah total Rp 2,764,500.00

Rp 131,000.00 Rp 402,170.00

1681 of 1892
Rp 105,000.00 Rp 292,950.00

Rp 126,000.00 Rp 51,105.60

Rp 131,250.00 Rp 131,250.00

Rp 14,962.50 Rp 14,962.50

Rp 2,625.00 Rp 13,650.00 Rp 906,088.10

Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 1,039,198.10

Overhead + Profit 10% Rp 103,919.81

Jumlah total Rp 1,143,100.00

Rp 131,000.00 Rp 1,138,390.00

Rp 105,000.00 Rp 292,950.00

Rp 126,000.00 Rp 189,352.80

Rp 131,250.00 Rp 393,750.00

Rp 14,962.50 Rp 44,887.50

Rp 2,625.00 Rp 46,725.00 Rp 2,106,055.30

1682 of 1892
Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 2,239,165.30

Overhead + Profit 10% Rp 223,916.53

Jumlah total Rp 2,463,050.00

Rp 131,000.00 Rp 2,407,780.00

Rp 105,000.00 Rp 2,168,250.00

Rp 126,000.00 Rp 394,430.40

Rp 131,250.00 Rp 918,750.00

Rp 14,962.50 Rp 104,737.50

Rp 2,625.00 Rp 101,430.00 Rp 6,095,377.90

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 6,361,597.90

Overhead + Profit 10% Rp 636,159.79

1683 of 1892
Jumlah total Rp 6,997,750.00

Rp 131,000.00 Rp 2,263,680.00

Rp 105,000.00 Rp 2,052,750.00

Rp 126,000.00 Rp 358,394.40

Rp 131,250.00 Rp 918,750.00

Rp 14,962.50 Rp 104,737.50

Rp 2,625.00 Rp 95,655.00 Rp 5,793,966.90

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 6,060,186.90

Overhead + Profit 10% Rp 606,018.69

Jumlah total Rp 6,666,200.00

Rp 131,000.00 Rp 2,375,030.00

Rp 105,000.00 Rp 2,142,210.00

1684 of 1892
Rp 126,000.00 Rp 386,174.88

Rp 131,250.00 Rp 918,750.00

Rp 14,962.50 Rp 104,737.50

Rp 2,625.00 Rp 100,107.00 Rp 6,027,009.38

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 6,293,229.38

Overhead + Profit 10% Rp 629,322.94

Jumlah total Rp 6,922,550.00

Rp 131,000.00 Rp 2,818,465.00

Rp 105,000.00 Rp 2,542,260.00

Rp 126,000.00 Rp 470,826.72

Rp 131,250.00 Rp 1,050,000.00

Rp 14,962.50 Rp 119,700.00

Rp 2,625.00 Rp 119,133.00 Rp 7,120,384.72

Rp 81,600.00 Rp 163,200.00

1685 of 1892
Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 7,386,604.72

Overhead + Profit 10% Rp 738,660.47

Jumlah total Rp 8,125,250.00

Rp 131,000.00 Rp 2,329,180.00

Rp 105,000.00 Rp 2,105,250.00

Rp 126,000.00 Rp 374,774.40

Rp 131,250.00 Rp 918,750.00

Rp 14,962.50 Rp 104,737.50

Rp 2,625.00 Rp 98,280.00 Rp 5,930,971.90

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 6,197,191.90

Overhead + Profit 10% Rp 619,719.19

Jumlah total Rp 6,816,900.00

1686 of 1892
Rp 131,000.00 Rp 2,192,940.00

Rp 105,000.00 Rp 1,996,050.00

Rp 126,000.00 Rp 347,256.00

Rp 131,250.00 Rp 918,750.00

Rp 14,962.50 Rp 104,737.50

Rp 2,625.00 Rp 93,870.00 Rp 5,653,603.50

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 5,919,823.50

Overhead + Profit 10% Rp 591,982.35

Jumlah total Rp 6,511,800.00

Rp 131,000.00 Rp 1,366,985.00

Rp 105,000.00 Rp 1,201,200.00

Rp 126,000.00 Rp 212,940.00

1687 of 1892
Rp 131,250.00 Rp 525,000.00

Rp 14,962.50 Rp 59,850.00

Rp 2,625.00 Rp 55,965.00 Rp 3,421,940.00

Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 3,555,050.00

Overhead + Profit 10% Rp 355,505.00

Jumlah total Rp 3,910,550.00

Rp 131,000.00 Rp 1,236,640.00

Rp 105,000.00 Rp 1,053,150.00

Rp 126,000.00 Rp 207,043.20

Rp 131,250.00 Rp 393,750.00

Rp 14,962.50 Rp 44,887.50

Rp 2,625.00 Rp 49,560.00 Rp 2,985,030.70

Rp 81,600.00 Rp 81,600.00

Rp 86,700.00 Rp 8,670.00

1688 of 1892
Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 133,110.00

Jumlah : Rp 3,118,140.70

Overhead + Profit 10% Rp 311,814.07

Jumlah total Rp 3,429,950.00

Rp 131,000.00 Rp 2,759,515.00

Rp 105,000.00 Rp 2,494,800.00

Rp 126,000.00 Rp 456,019.20

Rp 131,250.00 Rp 1,050,000.00

Rp 14,962.50 Rp 119,700.00

Rp 2,625.00 Rp 116,760.00 Rp 6,996,794.20

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 7,263,014.20

Overhead + Profit 10% Rp 726,301.42

Jumlah total Rp 7,989,300.00

1689 of 1892
Rp 131,000.00 Rp 2,674,365.00

Rp 105,000.00 Rp 2,426,760.00

Rp 126,000.00 Rp 434,790.72

Rp 131,250.00 Rp 1,050,000.00

Rp 14,962.50 Rp 119,700.00

Rp 2,625.00 Rp 116,760.00 Rp 6,822,375.72

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 76,500.00

Rp 91,800.00 Rp 9,180.00 Rp 266,220.00

Jumlah : Rp 7,088,595.72

Overhead + Profit 10% Rp 708,859.57

Jumlah total Rp 7,797,450.00

Rp 131,000.00 Rp 8,357,800.00

Rp 131,000.00 Rp 5,135,200.00

Rp 850,500.00 Rp 33,235,413.75

Rp 5,565.00 Rp 222,600.00

1690 of 1892
Rp 2,625.00 Rp 683,550.00 Rp 47,634,563.75

Rp 81,600.00 Rp 816,000.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 382,500.00

Rp 91,800.00 Rp 4,590.00 Rp 1,211,760.00

Jumlah : Rp 48,846,323.75

Overhead + Profit 10% Rp 4,884,632.38

Jumlah total : Rp 53,730,950.00

Rp 131,000.00 Rp 11,632,800.00

Rp 131,000.00 Rp 7,060,900.00

Rp 850,500.00 Rp 46,467,067.50

Rp 5,565.00 Rp 267,120.00

Rp 2,625.00 Rp 816,900.00 Rp 66,244,787.50

Rp 81,600.00 Rp 816,000.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 382,500.00

Rp 91,800.00 Rp 4,590.00 Rp 1,211,760.00

Jumlah : Rp 67,456,547.50

1691 of 1892
Overhead + Profit 10% Rp 6,745,654.75

Jumlah total : Rp 74,202,200.00

Rp 131,000.00 Rp 7,663,500.00

Rp 131,000.00 Rp 4,390,203.00

Rp 850,500.00 Rp 25,106,760.00

Rp 5,565.00 Rp 289,380.00

Rp 2,625.00 Rp 307,125.00 Rp 37,756,968.00

Rp 81,600.00 Rp 816,000.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 382,500.00

Rp 91,800.00 Rp 4,590.00 Rp 1,211,760.00

Jumlah : Rp 38,968,728.00

Overhead + Profit 10% Rp 3,896,872.80

Jumlah total : Rp 42,865,600.00

Rp 131,000.00 Rp 20,396,700.00

Rp 131,000.00 Rp 14,501,700.00

1692 of 1892
Rp 850,500.00 Rp 90,488,947.50

Rp 5,565.00 Rp 801,360.00

Rp 2,625.00 Rp 1,398,600.00 Rp 127,587,307.50

Rp 81,600.00 Rp 816,000.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 382,500.00

Rp 91,800.00 Rp 4,590.00 Rp 1,211,760.00

Jumlah : Rp 128,799,067.50

Overhead + Profit 10% Rp 12,879,906.75

Jumlah total : Rp 141,678,950.00

Rp 131,000.00 Rp 13,597,800.00

Rp 131,000.00 Rp 10,139,400.00

Rp 850,500.00 Rp 63,268,695.00

Rp 5,565.00 Rp 534,240.00

Rp 2,625.00 Rp 951,300.00 Rp 88,491,435.00

Rp 81,600.00 Rp 816,000.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 382,500.00

1693 of 1892
Rp 91,800.00 Rp 4,590.00 Rp 1,211,760.00

Jumlah : Rp 89,703,195.00

Overhead + Profit 10% Rp 8,970,319.50

Jumlah total : Rp 98,673,500.00

Rp 131,000.00 Rp 6,362,670.00

Rp 131,000.00 Rp 5,331,700.00

Rp 850,500.00 Rp 31,978,800.00

Rp 5,565.00 Rp 200,340.00

Rp 2,625.00 Rp 468,667.50 Rp 44,342,177.50

Rp 81,600.00 Rp 816,000.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 382,500.00

Rp 91,800.00 Rp 4,590.00 Rp 1,211,760.00

Jumlah : Rp 45,553,937.50

Overhead + Profit 10% Rp 4,555,393.75

Jumlah total : Rp 50,109,300.00

1694 of 1892
Rp 131,000.00 Rp 7,198,450.00

Rp 131,000.00 Rp 8,370,900.00

Rp 850,500.00 Rp 47,402,617.50

Rp 5,565.00 Rp 233,730.00

Rp 2,625.00 Rp 623,962.50 Rp 63,829,660.00

Rp 81,600.00 Rp 816,000.00

Rp 86,700.00 Rp 8,670.00

Rp 76,500.00 Rp 382,500.00

Rp 91,800.00 Rp 4,590.00 Rp 1,211,760.00

Jumlah : Rp 65,041,420.00

Overhead + Profit 10% Rp 6,504,142.00

Jumlah total : Rp 71,545,550.00

Rp 32,261.88 Rp 20,970.22

Rp 1,134.84 Rp 1,736.31

Rp 2,512.86 Rp 2,035.42

Rp 46,200.00 Rp 693.00

Rp 92,505.00 Rp 32,376.75

Rp 16,941.54 Rp 2,202.40

1695 of 1892
Rp 2,210.51 Rp 1,790.51

Rp 2,579.33 Rp 2,089.26

Rp 5,880.00 Rp 282.24

Rp 73.50 Rp 1,102.50

Rp 109.20 Rp 78.62 Rp 65,357.22

Rp 42,000.00 Rp 42,000.00 Rp 42,000.00

Jumlah : Rp 107,357.22

Overhead + Profit 10% Rp 10,735.72

Jumlah total Rp 118,050.00

Rp 32,261.88 Rp 25,164.27

Rp 1,134.84 Rp 2,083.57

Rp 2,512.86 Rp 2,442.50

Rp 46,200.00 Rp 831.60

Rp 92,505.00 Rp 32,376.75

Rp 16,941.54 Rp 2,202.40

Rp 2,210.51 Rp 1,790.51

Rp 2,579.33 Rp 2,089.26

Rp 5,880.00 Rp 282.24

Rp 73.50 Rp 1,102.50

Rp 109.20 Rp 78.62 Rp 70,444.21

1696 of 1892
Rp 42,000.00 Rp 42,000.00 Rp 42,000.00

Jumlah : Rp 112,444.21

Overhead + Profit 10% Rp 11,244.42

Jumlah total Rp 123,650.00

Rp 32,261.88 Rp 33,874.97

Rp 1,134.84 Rp 3,994.64

Rp 2,512.86 Rp 3,040.56

Rp 46,200.00 Rp 693.00

Rp 456,750.00 Rp 205,537.50

Rp 16,941.54 Rp 2,202.40

Rp 2,210.51 Rp 2,674.71

Rp 2,579.33 Rp 3,120.99

Rp 73.50 Rp 1,837.50

Rp 109.20 Rp 78.62 Rp 257,054.90

Rp 42,000.00 Rp 42,000.00 Rp 42,000.00

Jumlah : Rp 299,054.90

Overhead + Profit 10% Rp 29,905.49

Jumlah total Rp 328,950.00

1697 of 1892
Rp 5,932.50 Rp 6,525.75 Rp 6,525.75

Rp 4,200.00 Rp 4,200.00 Rp 4,200.00

Jumlah : Rp 10,725.75

Overhead + Profit 10% Rp 1,072.58

Jumlah total Rp 11,750.00

Rp 236,250.00 Rp 236,250.00

Rp 32,119.79 Rp 11,563.13 Rp 247,813.13

Rp 8,400.00 Rp 8,400.00 Rp 8,400.00

Jumlah : Rp 256,213.13

Overhead + Profit 10% Rp 25,621.31

Jumlah total Rp 281,800.00

Rp 32,261.88 Rp 20,970.22

Rp 1,134.84 Rp 1,736.31

Rp 2,512.86 Rp 2,035.42

1698 of 1892
Rp 46,200.00 Rp 693.00

Rp 118,230.00 Rp 41,380.50

Rp 16,941.54 Rp 2,202.40

Rp 2,210.51 Rp 1,790.51

Rp 2,579.33 Rp 2,089.26

Rp 5,880.00 Rp 282.24

Rp 73.50 Rp 1,102.50

Rp 109.20 Rp 78.62 Rp 74,360.97

Rp 42,000.00 Rp 42,000.00 Rp 42,000.00

Jumlah : Rp 116,360.97

Overhead + Profit 10% Rp 11,636.10

Jumlah total Rp 127,950.00

Rp 32,261.88 Rp 40,649.97

Rp 1,134.84 Rp 4,793.56

Rp - Rp -

Rp 46,200.00 Rp 831.60

Rp 456,750.00 Rp 205,537.50

Rp 16,941.54 Rp 2,202.40

Rp 2,210.51 Rp 2,674.71

Rp 2,579.33 Rp 3,120.99

1699 of 1892
Rp 73.50 Rp 1,837.50

Rp 109.20 Rp 78.62 Rp 261,726.86

Rp 42,000.00 Rp 42,000.00 Rp 42,000.00

Jumlah : Rp 303,726.86

Overhead + Profit 10% Rp 30,372.69

Jumlah total Rp 334,050.00

Rp 34,020.00 Rp 20,412.00

Rp 34,230.00 Rp 7,872.90

Rp 92,505.00 Rp 64,753.50

Rp 46,200.00 Rp 1,848.00

Rp 73.50 Rp 1,969.80

Rp 109.20 Rp 79.72

Rp 5,880.00 Rp 182.28 Rp 97,118.20

Rp 42,000.00 Rp 42,000.00 Rp 42,000.00

Jumlah : Rp 139,118.20

Overhead + Profit 10% Rp 13,911.82

Jumlah total Rp 153,000.00

1700 of 1892
Rp 168,525.00 Rp 16,178.40

Rp 6,699.00 Rp 2,572.42

Rp 41,052.08 Rp 4,105.21

Rp 6,174.00 Rp 6,174.00 Rp 29,030.02

Rp 81,600.00 Rp 7,344.00

Rp 86,700.00 Rp 780.30

Rp 76,500.00 Rp 6,885.00

Rp 91,800.00 Rp 459.00 Rp 15,468.30

Jumlah : Rp 44,498.32

Overhead + Profit 10% Rp 4,449.83

Jumlah total Rp 48,900.00

Rp 153,000.00 Rp 2,426,580.00

Rp 23,100.00 Rp 366,366.00

Rp 4,830.00 Rp 64,094.10

Rp 8,400.00 Rp 131,040.00

Rp 48,900.00 Rp 364,794.00

1701 of 1892
Jumlah : Rp 3,352,874.10

Rp 153,000.00 Rp 4,498,200.00

Rp 23,100.00 Rp 679,140.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 177,240.00

Rp 48,900.00 Rp 718,830.00

Jumlah : Rp 6,135,234.00

Rp 153,000.00 Rp 2,103,750.00

Rp 23,100.00 Rp 317,625.00

Rp 4,830.00 Rp 30,912.00

Rp 8,400.00 Rp 84,840.00

Rp 48,900.00 Rp 337,410.00

Jumlah : Rp 2,874,537.00

Rp 153,000.00 Rp 1,607,877.00

1702 of 1892
Rp 23,100.00 Rp 242,757.90

Rp 4,830.00 Rp 32,844.00

Rp 8,400.00 Rp 34,440.00

Rp 48,900.00 Rp 322,740.00

Jumlah : Rp 2,240,658.90

Rp 153,000.00 Rp 5,429,970.00

Rp 23,100.00 Rp 819,819.00

Rp 4,830.00 Rp 67,040.40

Rp 8,400.00 Rp 221,424.00

Rp 48,900.00 Rp 831,300.00

Jumlah : Rp 7,369,553.40

Rp 153,000.00 Rp 5,387,130.00

Rp 23,100.00 Rp 813,351.00

Rp 4,830.00 Rp 67,040.40

Rp 8,400.00 Rp 221,424.00

Rp 48,900.00 Rp 831,300.00

Jumlah : Rp 7,320,245.40

1703 of 1892
Rp 153,000.00 Rp 7,313,400.00

Rp 23,100.00 Rp 1,104,180.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 169,260.00

Rp 48,900.00 Rp 718,830.00

Jumlah : Rp 9,367,494.00

Rp 153,000.00 Rp 3,823,470.00

Rp 23,100.00 Rp 577,269.00

Rp 4,830.00 Rp 67,040.40

Rp 8,400.00 Rp 177,240.00

Rp 48,900.00 Rp 574,086.00

Jumlah : Rp 5,219,105.40

Rp 153,000.00 Rp 2,362,945.62

Rp 23,100.00 Rp 356,758.46

1704 of 1892
Rp 4,830.00 Rp 32,844.00

Rp 8,400.00 Rp 65,520.00

Rp 48,900.00 Rp 303,180.00

Jumlah : Rp 3,121,248.07

Rp 153,000.00 Rp 1,828,656.00

Rp 23,100.00 Rp 276,091.20

Rp 4,830.00 Rp 30,912.00

Rp 8,400.00 Rp 104,160.00

Rp 48,900.00 Rp 293,400.00

Jumlah : Rp 2,533,219.20

Rp 153,000.00 Rp 3,880,080.00

Rp 23,100.00 Rp 585,816.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 160,272.00

Rp 48,900.00 Rp 620,052.00

Jumlah : Rp 5,308,044.00

1705 of 1892
Rp 153,000.00 Rp 2,262,870.00

Rp 23,100.00 Rp 341,649.00

Rp 4,830.00 Rp 63,756.00

Rp 8,400.00 Rp 126,840.00

Rp 48,900.00 Rp 340,344.00

Jumlah : Rp 3,135,459.00

Rp 153,000.00 Rp 1,216,656.00

Rp 23,100.00 Rp 183,691.20

Rp 4,830.00 Rp 30,912.00

Rp 8,400.00 Rp 87,360.00

Rp 48,900.00 Rp 195,600.00

Jumlah : Rp 1,714,219.20

Rp 153,000.00 Rp 2,356,200.00

Rp 23,100.00 Rp 355,740.00

Rp 4,830.00 Rp 61,824.00

1706 of 1892
Rp 8,400.00 Rp 172,200.00

Rp 48,900.00 Rp 376,530.00

Jumlah : Rp 3,322,494.00

Rp 153,000.00 Rp 1,637,100.00

Rp 23,100.00 Rp 247,170.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 152,544.00

Rp 48,900.00 Rp 262,104.00

Jumlah : Rp 2,360,742.00

Rp 153,000.00 Rp 788,256.00

Rp 23,100.00 Rp 119,011.20

Rp 4,830.00 Rp 30,912.00

Rp 8,400.00 Rp 75,600.00

Rp 48,900.00 Rp 127,140.00

Jumlah : Rp 1,140,919.20

1707 of 1892
Rp 153,000.00 Rp 3,483,810.00

Rp 23,100.00 Rp 525,987.00

Rp 4,830.00 Rp 161,322.00

Rp 8,400.00 Rp 167,160.00

Rp 48,900.00 Rp 660,150.00

Jumlah : Rp 4,998,429.00

Rp 153,000.00 Rp 3,140,325.00

Rp 23,100.00 Rp 474,127.50

Rp 4,830.00 Rp 148,764.00

Rp 8,400.00 Rp 156,240.00

Rp 48,900.00 Rp 596,580.00

Jumlah : Rp 4,516,036.50

Rp 153,000.00 Rp 3,358,350.00

Rp 23,100.00 Rp 507,045.00

Rp 4,830.00 Rp 157,071.60

Rp 8,400.00 Rp 163,464.00

1708 of 1892
Rp 48,900.00 Rp 638,634.00

Jumlah : Rp 4,824,564.60

Rp 153,000.00 Rp 3,504,312.00

Rp 23,100.00 Rp 529,082.40

Rp 4,830.00 Rp 187,983.60

Rp 8,400.00 Rp 163,464.00

Rp 48,900.00 Rp 638,634.00

Jumlah : Rp 5,023,476.00

Rp 153,000.00 Rp 4,406,400.00

Rp 23,100.00 Rp 665,280.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 228,480.00

Rp 48,900.00 Rp 704,160.00

Jumlah : Rp 6,066,144.00

1709 of 1892
Rp 153,000.00 Rp 3,335,400.00

Rp 23,100.00 Rp 503,580.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 228,480.00

Rp 48,900.00 Rp 704,160.00

Jumlah : Rp 4,833,444.00

Rp 153,000.00 Rp 2,203,200.00

Rp 23,100.00 Rp 332,640.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 168,000.00

Rp 48,900.00 Rp 352,080.00

Jumlah : Rp 3,117,744.00

Rp 153,000.00 Rp 2,140,470.00

Rp 23,100.00 Rp 323,169.00

Rp 4,830.00 Rp 98,145.60

Rp 8,400.00 Rp 123,480.00

Rp 48,900.00 Rp 320,784.00

1710 of 1892
Jumlah : Rp 3,006,048.60

Rp 153,000.00 Rp 4,329,900.00

Rp 23,100.00 Rp 653,730.00

Rp 4,830.00 Rp 65,688.00

Rp 8,400.00 Rp 183,120.00

Rp 48,900.00 Rp 684,600.00

Jumlah : Rp 5,917,038.00

Rp 153,000.00 Rp 3,411,900.00

Rp 23,100.00 Rp 515,130.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 205,296.00

Rp 48,900.00 Rp 577,020.00

Jumlah : Rp 4,771,170.00

Rp 153,000.00 Rp 885,870.00

1711 of 1892
Rp 23,100.00 Rp 133,749.00

Rp 4,830.00 Rp 63,756.00

Rp 8,400.00 Rp 89,040.00

Rp 48,900.00 Rp 120,294.00

Jumlah : Rp 1,292,709.00

Rp 153,000.00 Rp 2,928,420.00

Rp 23,100.00 Rp 442,134.00

Rp 4,830.00 Rp 63,756.00

Rp 8,400.00 Rp 145,320.00

Rp 48,900.00 Rp 454,770.00

Jumlah : Rp 4,034,400.00

Rp 153,000.00 Rp 2,256,750.00

Rp 23,100.00 Rp 340,725.00

Rp 4,830.00 Rp 30,912.00

Rp 8,400.00 Rp 84,840.00

Rp 48,900.00 Rp 361,860.00

Jumlah : Rp 3,075,087.00

1712 of 1892
Rp 153,000.00 Rp 3,274,200.00

Rp 23,100.00 Rp 494,340.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 197,400.00

Rp 48,900.00 Rp 523,230.00

Jumlah : Rp 4,550,994.00

Rp 153,000.00 Rp 1,543,770.00

Rp 23,100.00 Rp 233,079.00

Rp 4,830.00 Rp 63,756.00

Rp 8,400.00 Rp 107,520.00

Rp 48,900.00 Rp 225,918.00

Jumlah : Rp 2,174,043.00

Rp 153,000.00 Rp 2,164,950.00

Rp 23,100.00 Rp 326,865.00

1713 of 1892
Rp 4,830.00 Rp 30,912.00

Rp 8,400.00 Rp 113,400.00

Rp 48,900.00 Rp 347,190.00

Jumlah : Rp 2,983,317.00

Rp 153,000.00 Rp 4,896,000.00

Rp 23,100.00 Rp 739,200.00

Rp 8,400.00 Rp 134,400.00

Rp 48,900.00 Rp 782,400.00

Jumlah : Rp 6,552,000.00

Rp 153,000.00 Rp 3,886,200.00

Rp 23,100.00 Rp 586,740.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 214,200.00

Rp 48,900.00 Rp 621,030.00

Jumlah : Rp 5,369,994.00

1714 of 1892
Rp 153,000.00 Rp 1,836,000.00

Rp 23,100.00 Rp 277,200.00

Rp 4,830.00 Rp 128,864.40

Rp 8,400.00 Rp 230,160.00

Rp 48,900.00 Rp 401,958.00

Jumlah : Rp 2,874,182.40

Rp 153,000.00 Rp 2,128,230.00

Rp 23,100.00 Rp 321,321.00

Rp 4,830.00 Rp 178,130.40

Rp 8,400.00 Rp 177,240.00

Rp 48,900.00 Rp 574,086.00

Jumlah : Rp 3,379,007.40

Rp 131,000.00 Rp 9,202,095.00

Rp 122,850.00 Rp 1,498,770.00

Rp 252,000.00 Rp 631,973.66

Rp 78,750.00 Rp 71,946.00

1715 of 1892
Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50

Rp 2,625.00 Rp 58,107.00 Rp 13,235,369.54

Rp 189,000.00 Rp 2,498,438.25

Rp 78,750.00 Rp 359,985.94

Rp 2,625.00 Rp 325,962.00 Rp 3,184,386.19

Rp 189,000.00 Rp 1,069,118.19

Rp 2,625.00 Rp 141,603.00 Rp 1,210,721.19

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 18,334,276.92

Overhead + Profit 10% Rp 1,833,427.69

Jumlah total Rp 20,167,700.00

1716 of 1892
Rp 131,000.00 Rp 5,690,640.00

Rp 122,850.00 Rp 1,498,770.00

Rp 252,000.00 Rp 631,973.66

Rp 78,750.00 Rp 71,946.00

Rp 456,750.00 Rp 1,370,250.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50

Rp 2,625.00 Rp 58,107.00 Rp 10,820,114.54

Rp 189,000.00 Rp 1,293,661.53

Rp 78,750.00 Rp 189,696.94

Rp 2,625.00 Rp 166,603.50 Rp 1,649,961.97

Rp 189,000.00 Rp 635,595.66

Rp 2,625.00 Rp 86,320.50 Rp 721,916.16

1717 of 1892
Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 13,895,792.67

Overhead + Profit 10% Rp 1,389,579.27

Jumlah total Rp 15,285,350.00

Rp 131,000.00 Rp 5,069,045.00

Rp 122,850.00 Rp 1,498,770.00

Rp 252,000.00 Rp 631,973.66

Rp 78,750.00 Rp 71,946.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50

Rp 2,625.00 Rp 58,107.00 Rp 9,102,319.54

1718 of 1892
Rp 189,000.00 Rp 964,909.26

Rp 78,750.00 Rp 141,490.13

Rp 2,625.00 Rp 142,348.50 Rp 1,248,747.89

Rp 189,000.00 Rp 524,265.21

Rp 2,625.00 Rp 78,235.50 Rp 602,500.71

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 11,657,368.14

Overhead + Profit 10% Rp 1,165,736.81

Jumlah total Rp 12,823,100.00

Rp 131,000.00 Rp 4,335,445.00

Rp 122,850.00 Rp 1,498,770.00

Rp 252,000.00 Rp 631,973.66

Rp 78,750.00 Rp 71,946.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

1719 of 1892
Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50

Rp 2,625.00 Rp 58,107.00 Rp 8,368,719.54

Rp 189,000.00 Rp 805,229.59

Rp 78,750.00 Rp 118,075.39

Rp 2,625.00 Rp 106,848.00 Rp 1,030,152.97

Rp 189,000.00 Rp 470,190.42

Rp 2,625.00 Rp 66,276.00 Rp 536,466.42

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 10,639,138.94

Overhead + Profit 10% Rp 1,063,913.89

Jumlah total Rp 11,703,050.00

1720 of 1892
Rp 131,000.00 Rp 4,138,945.00

Rp 122,850.00 Rp 1,498,770.00

Rp 252,000.00 Rp 631,973.66

Rp 78,750.00 Rp 71,946.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50

Rp 2,625.00 Rp 58,107.00 Rp 8,172,219.54

Rp 189,000.00 Rp 700,199.64

Rp 78,750.00 Rp 102,674.25

Rp 2,625.00 Rp 99,099.00 Rp 901,972.89

Rp 189,000.00 Rp 434,622.51

Rp 2,625.00 Rp 63,693.00 Rp 498,315.51

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

1721 of 1892
Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 10,276,307.94

Overhead + Profit 10% Rp 1,027,630.79

Jumlah total Rp 11,303,900.00

Rp 131,000.00 Rp 4,603,995.00

Rp 122,850.00 Rp 773,955.00

Rp 252,000.00 Rp 371,326.03

Rp 78,750.00 Rp 42,273.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 2,625.00 Rp 30,103.50 Rp 7,019,127.22

Rp 189,000.00 Rp 1,121,173.33

Rp 78,750.00 Rp 164,404.01

Rp 2,625.00 Rp 153,877.50 Rp 1,439,454.84

1722 of 1892
Rp 189,000.00 Rp 495,348.21

Rp 2,625.00 Rp 68,103.00 Rp 563,451.21

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 9,725,833.27

Overhead + Profit 10% Rp 972,583.33

Jumlah total Rp 10,698,400.00

Rp 131,000.00 Rp 8,893,590.00

Rp 122,850.00 Rp 2,272,725.00

Rp 252,000.00 Rp 1,003,299.70

Rp 78,750.00 Rp 114,219.00

Rp 91,350.00 Rp 411,075.00

Rp 437,799.69 Rp 1,313,399.07

Rp 136,500.00 Rp 273,000.00

Rp 110,250.00 Rp 220,500.00

Rp 342,300.00 Rp 684,600.00

1723 of 1892
Rp 33,600.00 Rp 67,200.00

Rp 178.50 Rp 178.50

Rp 2,625.00 Rp 88,210.50 Rp 15,341,996.77

Rp 189,000.00 Rp 1,957,997.29

Rp 78,750.00 Rp 224,506.01

Rp 2,625.00 Rp 263,056.50 Rp 2,445,559.80

Rp 189,000.00 Rp 976,237.92

Rp 2,625.00 Rp 135,156.00 Rp 1,111,393.92

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 19,602,750.48

Overhead + Profit 10% Rp 1,960,275.05

Jumlah total Rp 21,563,000.00

Rp 131,000.00 Rp 5,043,762.00

Rp 122,850.00 Rp 773,955.00

1724 of 1892
Rp 252,000.00 Rp 371,326.03

Rp 78,750.00 Rp 42,273.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 2,625.00 Rp 30,103.50 Rp 7,458,894.22

Rp 189,000.00 Rp 1,161,306.72

Rp 78,750.00 Rp 170,289.00

Rp 2,625.00 Rp 156,838.50 Rp 1,488,434.22

Rp 189,000.00 Rp 508,939.20

Rp 2,625.00 Rp 69,090.00 Rp 578,029.20

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 10,229,157.64

Overhead + Profit 10% Rp 1,022,915.76

1725 of 1892
Jumlah total Rp 11,252,050.00

Rp 131,000.00 Rp 9,544,005.00

Rp 122,850.00 Rp 1,547,910.00

Rp 252,000.00 Rp 742,652.06

Rp 78,750.00 Rp 84,546.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 273,000.00

Rp 110,250.00 Rp 220,500.00

Rp 342,300.00 Rp 684,600.00

Rp 33,600.00 Rp 67,200.00

Rp 2,625.00 Rp 60,207.00 Rp 14,374,269.44

Rp 189,000.00 Rp 2,203,067.16

Rp 78,750.00 Rp 323,048.25

Rp 2,625.00 Rp 304,857.00 Rp 2,830,972.41

Rp 189,000.00 Rp 977,394.60

Rp 2,625.00 Rp 135,240.00 Rp 1,112,634.60

1726 of 1892
Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 19,021,676.45

Overhead + Profit 10% Rp 1,902,167.65

Jumlah total Rp 20,923,800.00

Rp 131,000.00 Rp 10,464,280.00

Rp 122,850.00 Rp 1,498,770.00

Rp 252,000.00 Rp 631,973.66

Rp 78,750.00 Rp 71,946.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50

Rp 2,625.00 Rp 58,107.00 Rp 14,497,554.54

1727 of 1892
Rp 189,000.00 Rp 2,630,018.16

Rp 78,750.00 Rp 385,654.50

Rp 2,625.00 Rp 360,076.50 Rp 3,375,749.16

Rp 189,000.00 Rp 1,088,146.71

Rp 2,625.00 Rp 151,315.50 Rp 1,239,462.21

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 19,816,565.91

Overhead + Profit 10% Rp 1,981,656.59

Jumlah total Rp 21,798,200.00

Rp 131,000.00 Rp 6,432,100.00

Rp 189,000.00 Rp 1,795,755.91

Rp 78,750.00 Rp 263,321.89

Rp 2,625.00 Rp 251,086.50 Rp 2,310,164.29

Rp 189,000.00 Rp 608,124.51

1728 of 1892
Rp 2,625.00 Rp 84,325.50 Rp 692,450.01

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 3,706,414.30

Overhead + Profit 10% Rp 370,641.43

Jumlah total Rp 4,077,050.00

Rp 131,000.00 Rp 5,120,790.00

Rp 122,850.00 Rp 773,955.00

Rp 252,000.00 Rp 371,326.03

Rp 78,750.00 Rp 42,273.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 2,625.00 Rp 30,103.50 Rp 7,535,922.22

1729 of 1892
Rp 189,000.00 Rp 680,638.14

Rp 78,750.00 Rp 146,498.63

Rp 2,625.00 Rp 122,188.50 Rp 949,325.27

Rp 189,000.00 Rp 453,996.90

Rp 2,625.00 Rp 65,100.00 Rp 519,096.90

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 9,708,144.39

Overhead + Profit 10% Rp 970,814.44

Jumlah total Rp 10,678,950.00

Rp 131,000.00 Rp 3,183,300.00

Rp 189,000.00 Rp 819,745.92

Rp 78,750.00 Rp 120,204.00

Rp 2,625.00 Rp 107,919.00 Rp 1,047,868.92

1730 of 1892
Rp 189,000.00 Rp 277,603.20

Rp 2,625.00 Rp 36,225.00 Rp 313,828.20

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 2,065,497.12

Overhead + Profit 10% Rp 206,549.71

Jumlah total Rp 2,272,000.00

Rp 131,000.00 Rp 5,436,500.00

Rp 189,000.00 Rp 1,571,179.68

Rp 78,750.00 Rp 230,391.00

Rp 2,625.00 Rp 210,798.00 Rp 2,012,368.68

Rp 189,000.00 Rp 532,072.80

Rp 2,625.00 Rp 70,770.00 Rp 602,842.80

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

1731 of 1892
Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 3,319,011.48

Overhead + Profit 10% Rp 331,901.15

Jumlah total Rp 3,650,900.00

Rp 131,000.00 Rp 6,098,050.00

Rp 122,850.00 Rp 773,955.00

Rp 252,000.00 Rp 371,326.03

Rp 78,750.00 Rp 42,273.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 2,625.00 Rp 30,103.50 Rp 8,513,182.22

Rp 189,000.00 Rp 1,176,645.20

Rp 78,750.00 Rp 4,971,960.00

Rp 2,625.00 Rp 122,188.50 Rp 6,270,793.70

1732 of 1892
Rp 189,000.00 Rp 607,835.34

Rp 2,625.00 Rp 84,304.50 Rp 692,139.84

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 16,179,915.77

Overhead + Profit 10% Rp 1,617,991.58

Jumlah total Rp 17,797,900.00

Rp 131,000.00 Rp 9,806,660.00

Rp 122,850.00 Rp 773,955.00

Rp 252,000.00 Rp 371,326.03

Rp 78,750.00 Rp 42,273.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

1733 of 1892
Rp 33,600.00 Rp 33,600.00

Rp 2,625.00 Rp 30,103.50 Rp 12,221,792.22

Rp 189,000.00 Rp 2,681,252.28

Rp 78,750.00 Rp 393,167.25

Rp 2,625.00 Rp 363,856.50 Rp 3,438,276.03

Rp 189,000.00 Rp 1,023,661.80

Rp 2,625.00 Rp 138,600.00 Rp 1,162,261.80

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 17,526,130.05

Overhead + Profit 10% Rp 1,752,613.01

Jumlah total Rp 19,278,700.00

Rp 131,000.00 Rp 2,803,400.00

Rp 189,000.00 Rp 666,043.56

Rp 78,750.00 Rp 97,665.75

1734 of 1892
Rp 2,625.00 Rp 96,579.00 Rp 860,288.31

Rp 189,000.00 Rp 277,603.20

Rp 2,625.00 Rp 36,225.00 Rp 313,828.20

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 1,877,916.51

Overhead + Profit 10% Rp 187,791.65

Jumlah total Rp 2,065,700.00

Rp 131,000.00 Rp 4,944,595.00

Rp 122,850.00 Rp 773,955.00

Rp 252,000.00 Rp 371,326.03

Rp 78,750.00 Rp 42,273.00

Rp 91,350.00 Rp 137,025.00

Rp 437,799.69 Rp 437,799.69

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

1735 of 1892
Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 2,625.00 Rp 30,103.50 Rp 7,359,727.22

Rp 189,000.00 Rp 1,024,682.40

Rp 78,750.00 Rp 150,255.00

Rp 2,625.00 Rp 123,039.00 Rp 1,297,976.40

Rp 189,000.00 Rp 462,672.00

Rp 2,625.00 Rp 57,697.50 Rp 520,369.50

Rp 153,000.00 Rp 1,948,608.00

Rp 23,100.00 Rp 294,201.60

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 140,952.00

Rp 48,900.00 Rp 381,420.00 Rp 2,827,005.60

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 12,708,878.72

Overhead + Profit 10% Rp 1,270,887.87

1736 of 1892
Jumlah total Rp 13,979,750.00

Rp 131,000.00 Rp 5,178,430.00

Rp 122,850.00 Rp 1,498,770.00

Rp 252,000.00 Rp 631,973.66

Rp 78,750.00 Rp 71,946.00

Rp 91,350.00 Rp 274,050.00

Rp 437,799.69 Rp 875,599.38

Rp 136,500.00 Rp 136,500.00

Rp 110,250.00 Rp 110,250.00

Rp 342,300.00 Rp 342,300.00

Rp 33,600.00 Rp 33,600.00

Rp 178.50 Rp 178.50

Rp 2,625.00 Rp 58,107.00 Rp 9,211,704.54

Rp 189,000.00 Rp 1,024,682.40

Rp 78,750.00 Rp 150,255.00

Rp 2,625.00 Rp 123,039.00 Rp 1,297,976.40

Rp 189,000.00 Rp 549,423.00

Rp 2,625.00 Rp 63,997.50 Rp 613,420.50

1737 of 1892
Rp 153,000.00 Rp 1,664,640.00

Rp 23,100.00 Rp 251,328.00

Rp 4,830.00 Rp 61,824.00

Rp 8,400.00 Rp 136,080.00

Rp 48,900.00 Rp 332,520.00 Rp 2,446,392.00

Rp 81,600.00 Rp 326,400.00

Rp 86,700.00 Rp 34,680.00

Rp 76,500.00 Rp 306,000.00

Rp 91,800.00 Rp 36,720.00 Rp 703,800.00

Jumlah : Rp 14,273,293.44

Overhead + Profit 10% Rp 1,427,329.34

Jumlah total Rp 15,700,600.00

Rp 38,416.00 Rp 115,248.00

Rp 23,650.00 Rp 55,740.69

Rp 23,650.00 Rp 96,492.00

Rp 4,410.00 Rp 88,200.00

Rp 69,270.83 Rp 476,929.69

1738 of 1892
Rp 63,000.00 Rp 480,375.00

Rp 451,500.00 Rp 399,577.50

Rp 2,625.00 Rp 15,487.50 Rp 1,728,050.37

Rp 86,402.52 Rp 86,402.52 Rp 86,402.52

Jumlah : Rp 1,814,452.89

Overhead + Profit 10% Rp 181,445.29

Jumlah total Rp 1,995,850.00

harga per m2 Rp 451,039.55

Rp 3,150,000.00 Rp 74,088,000.00

Rp 210,000.00 Rp 9,878,400.00

Rp 892,500.00 Rp 6,559,875.00

Rp 16,800.00 Rp 16,800.00 Rp 90,543,075.00

Rp 452,715.38 Rp 452,715.38 Rp 452,715.38

Jumlah : Rp 90,995,790.38

Overhead + Profit 10% Rp 9,099,579.04

Jumlah total Rp 100,095,350.00

1739 of 1892
Rp 32,261.88 Rp 3,263,941.66

Rp 2,512.86 Rp 316,805.47

Rp 51,041.67 Rp 3,744,416.67

Rp 106,312.50 Rp 6,720,013.13

Rp 106,312.50 Rp 1,079,071.88

Rp 58,333.33 Rp 4,800,045.83

Rp 86,100.00 Rp 7,084,867.65

Rp 7,875.00 Rp 97,200.93

Rp 23,205.00 Rp 388,683.75

Rp 46,410.00 Rp 1,554,735.00

Rp 23,100.00 Rp 96,731.25

Rp 4,410.00 Rp 1,375,920.00

Rp 178.50 Rp 232,050.00

Rp 28,700.00 Rp 2,361,622.55

Rp 331,161.06 Rp 331,161.06 Rp 33,447,266.81

Rp 1,672,363.34 Rp 1,672,363.34 Rp 1,672,363.34

Jumlah : Rp 35,119,630.15

Overhead + Profit 10% Rp 3,511,963.02

Jumlah total Rp 38,631,550.00

1740 of 1892
Rp 32,261.88 Rp 3,250,311.01

Rp 2,512.86 Rp 315,482.45

Rp 51,041.67 Rp 3,711,239.58

Rp 106,312.50 Rp 6,650,910.00

Rp 106,312.50 Rp 1,079,071.88

Rp 58,333.33 Rp 4,800,045.83

Rp 86,100.00 Rp 7,084,867.65

Rp 7,875.00 Rp 97,200.93

Rp 23,205.00 Rp 348,075.00

Rp 46,410.00 Rp 1,392,300.00

Rp 23,100.00 Rp 86,625.00

Rp 4,410.00 Rp 1,375,920.00

Rp 178.50 Rp 232,050.00

Rp 28,700.00 Rp 2,361,622.55

Rp 327,857.22 Rp 327,857.22 Rp 33,113,579.10

Rp 1,655,678.96 Rp 1,655,678.96 Rp 1,655,678.96

Jumlah : Rp 34,769,258.06

Overhead + Profit 10% Rp 3,476,925.81

Jumlah total Rp 38,246,150.00

1741 of 1892
Rp 32,261.88 Rp 1,422,808.59

Rp 2,512.86 Rp 138,100.98

Rp 51,041.67 Rp 1,531,250.00

Rp 106,312.50 Rp 2,726,915.63

Rp 106,312.50 Rp 462,459.38

Rp 58,333.33 Rp 2,207,858.33

Rp 86,100.00 Rp 3,258,798.90

Rp 7,875.00 Rp 44,709.13

Rp 23,205.00 Rp 189,120.75

Rp 46,410.00 Rp 756,483.00

Rp 23,100.00 Rp 47,066.25

Rp 4,410.00 Rp 555,660.00

Rp 178.50 Rp 96,390.00

Rp 28,700.00 Rp 1,086,266.30

Rp 145,238.87 Rp 145,238.87 Rp 14,669,126.11

Rp 733,456.31 Rp 733,456.31 Rp 733,456.31

Jumlah : Rp 15,402,582.42

Overhead + Profit 10% Rp 1,540,258.24

Jumlah total Rp 16,942,800.00

Harga / m2 Rp 1,275,064.34

1742 of 1892
Rp 32,261.88 Rp 531,107.57

Rp 2,512.86 Rp 51,550.49

Rp 51,041.67 Rp 594,635.42

Rp 106,312.50 Rp 1,084,387.50

Rp 106,312.50 Rp 154,153.13

Rp 58,333.33 Rp 797,810.42

Rp 86,100.00 Rp 1,177,568.18

Rp 7,875.00 Rp 16,155.66

Rp 23,205.00 Rp 104,422.50

Rp 46,410.00 Rp 417,690.00

Rp 23,100.00 Rp 25,987.50

Rp 4,410.00 Rp 264,600.00

Rp 178.50 Rp 46,053.00

Rp 28,700.00 Rp 392,522.73

Rp 56,586.44 Rp 56,586.44 Rp 5,715,230.52

Rp 285,761.53 Rp 285,761.53 Rp 285,761.53

Jumlah : Rp 6,000,992.04

Overhead + Profit 10% Rp 600,099.20

Jumlah total Rp 6,601,050.00

1743 of 1892
Rp 32,261.88 Rp 1,952,180.88

Rp 2,512.86 Rp 189,483.04

Rp 51,041.67 Rp 2,261,145.83

Rp 106,312.50 Rp 4,093,031.25

Rp 106,312.50 Rp 616,612.50

Rp 58,333.33 Rp 2,846,258.33

Rp 86,100.00 Rp 4,201,077.30

Rp 7,875.00 Rp 57,636.73

Rp 23,205.00 Rp 235,530.75

Rp 46,410.00 Rp 942,123.00

Rp 23,100.00 Rp 58,616.25

Rp 4,410.00 Rp 714,420.00

Rp 178.50 Rp 124,057.50

Rp 28,700.00 Rp 1,400,359.10

Rp 196,925.32 Rp 196,925.32 Rp 19,889,457.79

Rp 994,472.89 Rp 994,472.89 Rp 994,472.89

Jumlah : Rp 20,883,930.68

Overhead + Profit 10% Rp 2,088,393.07

Jumlah total Rp 22,972,300.00

1744 of 1892
Rp 189,525.00 Rp 193,315.50

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 217,649.25

Rp 81,600.00 Rp 24,480.00

Rp 86,700.00 Rp 2,601.00

Rp 76,500.00 Rp 45,900.00

Rp 91,800.00 Rp 2,754.00 Rp 75,735.00

Jumlah : Rp 293,384.25

Overhead + Profit 10% Rp 29,338.43

Jumlah total Rp 322,700.00

Rp 168,525.00 Rp 171,895.50

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 196,229.25

Rp 81,600.00 Rp 24,480.00

1745 of 1892
Rp 86,700.00 Rp 2,601.00

Rp 76,500.00 Rp 45,900.00

Rp 91,800.00 Rp 2,754.00 Rp 75,735.00

Jumlah : Rp 271,964.25

Overhead + Profit 10% Rp 27,196.43

Jumlah total Rp 299,150.00

Rp 168,525.00 Rp 171,895.50

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 196,229.25

Rp 81,600.00 Rp 24,480.00

Rp 86,700.00 Rp 2,601.00

Rp 76,500.00 Rp 45,900.00

Rp 91,800.00 Rp 2,754.00 Rp 75,735.00

Jumlah : Rp 271,964.25

Overhead + Profit 10% Rp 27,196.43

Jumlah total Rp 299,150.00

Rp 158,025.00 Rp 161,185.50

1746 of 1892
Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 185,519.25

Rp 81,600.00 Rp 24,480.00

Rp 86,700.00 Rp 2,601.00

Rp 76,500.00 Rp 45,900.00

Rp 91,800.00 Rp 2,754.00 Rp 75,735.00

Jumlah : Rp 261,254.25

Overhead + Profit 10% Rp 26,125.43

Jumlah total Rp 287,350.00

Rp 158,025.00 Rp 161,185.50

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 185,519.25

Rp 81,600.00 Rp 24,480.00

Rp 86,700.00 Rp 2,601.00

Rp 76,500.00 Rp 45,900.00

Rp 91,800.00 Rp 2,754.00 Rp 75,735.00

Jumlah : Rp 261,254.25

1747 of 1892
Overhead + Profit 10% Rp 26,125.43

Jumlah total Rp 287,350.00

Rp 168,525.00 Rp 10,111.50

Rp 6,174.00 Rp 6,174.00

Rp 1,102.50 Rp 601.36

Rp 5,250.00 Rp 429.55

Rp 120,750.00 Rp 296.39 Rp 17,612.80

Rp 81,600.00 Rp 7,344.00

Rp 86,700.00 Rp 780.30

Rp 76,500.00 Rp 6,885.00

Rp 91,800.00 Rp 459.00 Rp 15,468.30

Jumlah : Rp 33,081.10

Overhead + Profit 10% Rp 3,308.11

Jumlah total Rp 36,350.00

Rp 158,025.00 Rp 161,185.50

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 185,519.25

1748 of 1892
Rp 81,600.00 Rp 24,480.00

Rp 86,700.00 Rp 2,601.00

Rp 76,500.00 Rp 45,900.00

Rp 91,800.00 Rp 2,754.00 Rp 75,735.00

Jumlah : Rp 261,254.25

Overhead + Profit 10% Rp 26,125.43

Jumlah total Rp 287,350.00

Rp 173,775.00 Rp 177,250.50

Rp 84,000.00 Rp 84,000.00

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 285,584.25

Rp 81,600.00 Rp 24,480.00

Rp 86,700.00 Rp 2,601.00

Rp 76,500.00 Rp 45,900.00

Rp 91,800.00 Rp 2,754.00 Rp 75,735.00

Jumlah : Rp 361,319.25

Overhead + Profit 10% Rp 36,131.93

Jumlah total Rp 397,450.00

1749 of 1892
Rp 168,525.00 Rp 171,895.50

Rp 6,174.00 Rp 6,174.00

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 202,403.25

Rp 81,600.00 Rp 28,560.00

Rp 86,700.00 Rp 3,034.50

Rp 76,500.00 Rp 53,550.00

Rp 91,800.00 Rp 3,213.00 Rp 88,357.50

Jumlah : Rp 290,760.75

Overhead + Profit 10% Rp 29,076.08

Jumlah total Rp 319,800.00

Rp 158,025.00 Rp 161,185.50

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 185,519.25

Rp 81,600.00 Rp 24,480.00

1750 of 1892
Rp 86,700.00 Rp 2,601.00

Rp 76,500.00 Rp 45,900.00

Rp 91,800.00 Rp 2,754.00 Rp 75,735.00

Jumlah : Rp 261,254.25

Overhead + Profit 10% Rp 26,125.43

Jumlah total Rp 287,350.00

Rp 267,750.00 Rp 273,105.00

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 297,438.75

Rp 81,600.00 Rp 28,560.00

Rp 86,700.00 Rp 3,034.50

Rp 76,500.00 Rp 53,550.00

Rp 91,800.00 Rp 3,213.00 Rp 88,357.50

Jumlah : Rp 385,796.25

Overhead + Profit 10% Rp 38,579.63

Jumlah total Rp 424,350.00

Rp 20,941.20 Rp 31,411.80

1751 of 1892
Rp 1,102.50 Rp 1,102.50

Rp 5,250.00 Rp 778.58

Rp 120,750.00 Rp 567.53 Rp 33,860.40

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 780.30

Rp 76,500.00 Rp 6,885.00

Rp 91,800.00 Rp 10,795.68 Rp 26,620.98

Jumlah : Rp 60,481.38

Overhead + Profit 10% Rp 6,048.14

Jumlah total Rp 66,500.00

Rp 682,500.00 Rp 682,500.00 Rp 682,500.00

Rp 57,750.00 Rp 57,750.00 Rp 57,750.00

Jumlah : Rp 740,250.00

Overhead + Profit 10% Rp 74,025.00

Jumlah total : Rp 814,250.00

1752 of 1892
Rp 728,700.00 Rp 728,700.00 Rp 728,700.00

Rp 57,750.00 Rp 57,750.00 Rp 57,750.00

Jumlah : Rp 786,450.00

Overhead + Profit 10% Rp 78,645.00

Jumlah total : Rp 865,050.00

Rp 157,500.00 Rp 160,650.00

Rp 42,000.00 Rp 42,840.00 Rp 203,490.00

Rp 5,000.00 Rp 5,000.00 Rp 5,000.00

Jumlah : Rp 208,490.00

Overhead + Profit 10% Rp 20,849.00

Jumlah total Rp 229,300.00

Rp 210,000.00 Rp 52,500.00

Rp 1,575,000.00 Rp 31,500.00

Rp 418,950.00 Rp 418,950.00 Rp 502,950.00

Rp 75,442.50 Rp 75,442.50 Rp 75,442.50

Jumlah : Rp 578,392.50

1753 of 1892
Overhead + Profit 10% Rp 57,839.25

Jumlah total Rp 636,200.00

Rp 57,750.00 Rp 58,905.00

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 83,238.75

Rp 81,600.00 Rp 24,480.00

Rp 86,700.00 Rp 2,601.00

Rp 76,500.00 Rp 45,900.00

Rp 91,800.00 Rp 2,754.00 Rp 75,735.00

Jumlah : Rp 158,973.75

Overhead + Profit 10% Rp 15,897.38

Jumlah total Rp 174,850.00

Rp 57,750.00 Rp 58,905.00

Rp 6,174.00 Rp 6,174.00

Rp 1,102.50 Rp 11,025.00

Rp 5,250.00 Rp 7,875.00

Rp 120,750.00 Rp 5,433.75 Rp 89,412.75

1754 of 1892
Rp 81,600.00 Rp 28,560.00

Rp 86,700.00 Rp 3,034.50

Rp 76,500.00 Rp 53,550.00

Rp 91,800.00 Rp 3,213.00 Rp 88,357.50

Jumlah : Rp 177,770.25

Overhead + Profit 10% Rp 17,777.03

Jumlah total Rp 195,500.00

Rp 500,000.00 Rp 525,000.00

Rp 150,000.00 Rp 157,500.00 Rp 682,500.00

Rp 81,600.00 Rp 32,640.00

Rp 86,700.00 Rp 3,468.00

Rp 76,500.00 Rp 61,200.00

Rp 91,800.00 Rp 3,672.00 Rp 100,980.00

Jumlah : Rp 783,480.00

Overhead + Profit 10% Rp 78,348.00

Jumlah total : Rp 861,800.00

1755 of 1892
Rp 23,100.00 Rp 23,100.00

Rp 23,100.00

Jumlah : Rp 23,100.00

Jumlah total Rp 23,100.00

Rp 29,400.00 Rp 29,400.00

Rp 29,400.00

Jumlah : Rp 29,400.00

Jumlah total Rp 29,400.00

Rp 19,950.00 Rp 19,950.00

Rp 19,950.00

Jumlah : Rp 19,950.00

Jumlah total Rp 19,950.00

1756 of 1892
Rp 68,250.00 Rp 68,250.00 Rp 68,250.00

Jumlah : Rp 68,250.00

Overhead + Profit 10% Rp 6,825.00

Jumlah total Rp 75,050.00

Rp 18,900.00 Rp 2,362.50

Rp 12,495.00 Rp 49,980.00 Rp 52,342.50

Rp 81,600.00 Rp 5,140.80

Rp 86,700.00 Rp 546.21

Rp 76,500.00 Rp 1,530.00

Rp 91,800.00 Rp 229.50 Rp 7,446.51

Jumlah : Rp 59,789.01

Overhead + Profit 10% Rp 5,978.90

Jumlah total : Rp 65,750.00

Rp 18,900.00 Rp 2,362.50

1757 of 1892
Rp 10,920.00 Rp 27,300.00

Rp 9,765.00 Rp 14,647.50

Rp 15,879.82 Rp 15,879.82 Rp 60,189.82

Rp 81,600.00 Rp 5,140.80

Rp 86,700.00 Rp 546.21

Rp 76,500.00 Rp 1,530.00

Rp 91,800.00 Rp 229.50 Rp 7,446.51

Jumlah : Rp 67,636.33

Overhead + Profit 10% Rp 6,763.63

Jumlah total : Rp 74,350.00

Rp 34,650.00 Rp 10,395.00

Rp 64,050.00 Rp 9,607.50

Rp 4,462.50 Rp 1,785.00

Rp 44,625.00 Rp 8,925.00 Rp 30,712.50

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 7,650.00

Rp 91,800.00 Rp 91.80 Rp 16,768.80

1758 of 1892
Jumlah : Rp 47,481.30

Overhead + Profit 10% Rp 4,748.13

Jumlah total Rp 52,200.00

Rp 154,672.88 Rp 185,607.45

Rp 54,135.51 Rp 54,135.51 Rp 239,742.96

Rp 81,600.00 Rp 244.80

Rp 76,500.00 Rp 229.50

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 1,159.74

Jumlah : Rp 240,902.70

Overhead + Profit 10% Rp 24,090.27

Jumlah total Rp 264,950.00

Rp 110,281.50 Rp 132,337.80

Rp 38,598.53 Rp 38,598.53 Rp 170,936.33

1759 of 1892
Rp 81,600.00 Rp 4,896.00

Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

Jumlah : Rp 179,271.77

Overhead + Profit 10% Rp 17,927.18

Jumlah total Rp 197,150.00

Rp 69,599.25 Rp 83,519.10

Rp 24,359.74 Rp 24,359.74 Rp 107,878.84

Rp 81,600.00 Rp 4,896.00

Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

Jumlah : Rp 116,214.28

Overhead + Profit 10% Rp 11,621.43

Jumlah total Rp 127,800.00

1760 of 1892
Rp 42,005.25 Rp 50,406.30

Rp 14,701.84 Rp 14,701.84 Rp 65,108.14

Rp 81,600.00 Rp 4,896.00

Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

Jumlah : Rp 73,443.58

Overhead + Profit 10% Rp 7,344.36

Jumlah total Rp 80,750.00

Rp 29,814.75 Rp 35,777.70

Rp 10,435.16 Rp 10,435.16 Rp 46,212.86

Rp 81,600.00 Rp 4,896.00

Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

Jumlah : Rp 54,548.30

Overhead + Profit 10% Rp 5,454.83

Jumlah total Rp 60,000.00

1761 of 1892
Rp 20,435.63 Rp 24,522.75

Rp 7,152.47 Rp 7,152.47 Rp 31,675.22

Rp 81,600.00 Rp 4,896.00

Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

Jumlah : Rp 40,010.66

Overhead + Profit 10% Rp 4,001.07

Jumlah total Rp 44,000.00

Rp 15,970.50 Rp 19,164.60

Rp 5,589.68 Rp 5,589.68 Rp 24,754.28

Rp 81,600.00 Rp 4,896.00

Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

1762 of 1892
Jumlah : Rp 33,089.72

Overhead + Profit 10% Rp 3,308.97

Jumlah total Rp 36,350.00

Rp 13,915.13 Rp 16,698.15

Rp 4,870.29 Rp 4,870.29 Rp 21,568.44

Rp 81,600.00 Rp 4,896.00

Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

Jumlah : Rp 29,903.88

Overhead + Profit 10% Rp 2,990.39

Jumlah total Rp 32,850.00

Rp 9,284.63 Rp 11,141.55

Rp 3,249.62 Rp 3,249.62 Rp 14,391.17

Rp 81,600.00 Rp 4,896.00

1763 of 1892
Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

Jumlah : Rp 22,726.61

Overhead + Profit 10% Rp 2,272.66

Jumlah total Rp 24,950.00

Rp 6,804.00 Rp 8,164.80

Rp 2,381.40 Rp 2,381.40 Rp 10,546.20

Rp 81,600.00 Rp 244.80

Rp 76,500.00 Rp 229.50

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 1,159.74

Jumlah : Rp 11,705.94

Overhead + Profit 10% Rp 1,170.59

Jumlah total Rp 12,850.00

Rp 12,663.00 Rp 15,195.60

1764 of 1892
Rp 4,432.05 Rp 4,432.05 Rp 19,627.65

Rp 81,600.00 Rp 4,896.00

Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

Jumlah : Rp 27,963.09

Overhead + Profit 10% Rp 2,796.31

Jumlah total Rp 30,750.00

Rp 17,104.50 Rp 20,525.40

Rp 5,986.58 Rp 5,986.58 Rp 26,511.98

Rp 81,600.00 Rp 4,896.00

Rp 76,500.00 Rp 2,754.00

Rp 86,700.00 Rp 520.20

Rp 91,800.00 Rp 165.24 Rp 8,335.44

Jumlah : Rp 34,847.42

Overhead + Profit 10% Rp 3,484.74

Jumlah total Rp 38,300.00

1765 of 1892
Rp 198,544.50 Rp 198,544.50

Rp 2,199.49 Rp 549.87 Rp 199,094.37

Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 209,345.37

Overhead + Profit 10% Rp 20,934.54

Jumlah total Rp 209,300.00

Rp 280,665.00 Rp 280,665.00

Rp 2,199.49 Rp 549.87 Rp 281,214.87

Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 291,465.87

Overhead + Profit 10% Rp 29,146.59

1766 of 1892
Jumlah total Rp 291,450.00

Rp 385,654.50 Rp 385,654.50

Rp 2,199.49 Rp 549.87 Rp 386,204.37

Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 396,455.37

Overhead + Profit 10% Rp 39,645.54

Jumlah total Rp 396,450.00

Rp 478,170.00 Rp 478,170.00

Rp 2,199.49 Rp 549.87 Rp 478,719.87

Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

1767 of 1892
Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 488,970.87

Overhead + Profit 10% Rp 48,897.09

Jumlah total Rp 488,950.00

Rp 723,492.00 Rp 723,492.00

Rp 2,199.49 Rp 549.87 Rp 724,041.87

Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 734,292.87

Overhead + Profit 10% Rp 73,429.29

Jumlah total Rp 734,250.00

Rp 1,538,460.00 Rp 1,538,460.00

Rp 2,199.49 Rp 549.87 Rp 1,539,009.87

1768 of 1892
Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 1,549,260.87

Overhead + Profit 10% Rp 154,926.09

Jumlah total Rp 1,549,250.00

Rp 270,270.00 Rp 270,270.00

Rp 2,199.49 Rp 549.87 Rp 270,819.87

Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 281,070.87

Overhead + Profit 10% Rp 28,107.09

Jumlah total Rp 309,150.00

1769 of 1892
Rp 356,265.00 Rp 356,265.00 Rp 356,265.00

Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 366,516.00

Overhead + Profit 10% Rp 36,651.60

Jumlah total Rp 403,150.00

Rp 375,165.00 Rp 375,165.00 Rp 375,165.00

Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 385,416.00

Overhead + Profit 10% Rp 38,541.60

Jumlah total Rp 423,950.00

1770 of 1892
Rp 3,402,000.00 Rp 3,402,000.00

Rp 204,120.00 Rp 204,120.00 Rp 3,606,120.00

Rp 81,600.00 Rp 89,760.00

Rp 76,500.00 Rp 252,450.00

Rp 86,700.00 Rp 86.70

Rp 91,800.00 Rp 14,688.00 Rp 356,984.70

Jumlah : Rp 3,963,104.70

Overhead + Profit 10% Rp 396,310.47

Jumlah total Rp 4,359,400.00

Rp 4,460,400.00 Rp 4,460,400.00

Rp 267,624.00 Rp 267,624.00 Rp 4,728,024.00

Rp 81,600.00 Rp 89,760.00

Rp 76,500.00 Rp 252,450.00

Rp 86,700.00 Rp 86.70

Rp 91,800.00 Rp 14,688.00 Rp 356,984.70

Jumlah : Rp 5,085,008.70

Overhead + Profit 10% Rp 508,500.87

Jumlah total Rp 5,593,500.00

1771 of 1892
Rp 337,365.00 Rp 337,365.00

Rp 446,040.00 Rp 446,040.00

Rp 47,004.30 Rp 47,004.30 Rp 830,409.30

Rp 81,600.00 Rp 61,200.00

Rp 76,500.00 Rp 91,800.00

Rp 86,700.00 Rp 6,069.00

Rp 91,800.00 Rp 10,098.00 Rp 169,167.00

Jumlah : Rp 999,576.30

Overhead + Profit 10% Rp 99,957.63

Jumlah total Rp 1,099,500.00

Rp 2,830,275.00 Rp 2,830,275.00

Rp 157,500.00 Rp 75,600.00

Rp 169,816.50 Rp 169,816.50 Rp 3,075,691.50

Rp 81,600.00 Rp 61,200.00

Rp 76,500.00 Rp 91,800.00

Rp 86,700.00 Rp 6,069.00

1772 of 1892
Rp 91,800.00 Rp 10,098.00 Rp 169,167.00

Jumlah : Rp 3,244,858.50

Overhead + Profit 10% Rp 324,485.85

Jumlah total Rp 3,569,300.00

Rp 1,713,285.00 Rp 1,713,285.00

Rp 157,500.00 Rp 75,600.00

Rp 102,797.10 Rp 102,797.10 Rp 1,891,682.10

Rp 81,600.00 Rp 61,200.00

Rp 76,500.00 Rp 91,800.00

Rp 86,700.00 Rp 6,069.00

Rp 91,800.00 Rp 10,098.00 Rp 169,167.00

Jumlah : Rp 2,060,849.10

Overhead + Profit 10% Rp 206,084.91

Jumlah total Rp 2,266,900.00

Rp 2,598,750.00 Rp 2,598,750.00

Rp - Rp -

Rp 155,925.00 Rp 155,925.00 Rp 2,754,675.00

1773 of 1892
Rp 81,600.00 Rp 89,760.00

Rp 76,500.00 Rp 252,450.00

Rp 86,700.00 Rp 86.70

Rp 91,800.00 Rp 14,688.00 Rp 356,984.70

Jumlah : Rp 3,111,659.70

Overhead + Profit 10% Rp 311,165.97

Jumlah total Rp 3,422,800.00

Rp 1,228,500.00 Rp 1,228,500.00

Rp 73,710.00 Rp 73,710.00 Rp 1,302,210.00

Rp 81,600.00 Rp 61,200.00

Rp 76,500.00 Rp 91,800.00

Rp 86,700.00 Rp 6,069.00

Rp 91,800.00 Rp 10,098.00 Rp 169,167.00

Jumlah : Rp 1,471,377.00

Overhead + Profit 10% Rp 147,137.70

Jumlah total Rp 1,618,500.00

1774 of 1892
Rp 669,060.00 Rp 669,060.00

Rp 40,143.60 Rp 40,143.60 Rp 709,203.60

Rp 81,600.00 Rp 8,160.00

Rp 76,500.00 Rp 765.00

Rp 86,700.00 Rp 867.00

Rp 91,800.00 Rp 459.00 Rp 10,251.00

Jumlah : Rp 719,454.60

Overhead + Profit 10% Rp 71,945.46

Jumlah total Rp 791,400.00

Rp 3,222,450.00 Rp 3,222,450.00

Rp 193,347.00 Rp 193,347.00 Rp 3,415,797.00

Rp 81,600.00 Rp 61,200.00

Rp 76,500.00 Rp 91,800.00

Rp 86,700.00 Rp 6,069.00

Rp 91,800.00 Rp 10,098.00 Rp 169,167.00

Jumlah : Rp 3,584,964.00

Overhead + Profit 10% Rp 358,496.40

Jumlah total Rp 3,943,450.00

1775 of 1892
Rp 8,410,500.00 Rp 8,410,500.00

Rp 504,630.00 Rp 504,630.00 Rp 8,915,130.00

Rp 81,600.00 Rp 89,760.00

Rp 76,500.00 Rp 252,450.00

Rp 86,700.00 Rp 86.70

Rp 91,800.00 Rp 14,688.00 Rp 356,984.70

Jumlah : Rp 9,272,114.70

Overhead + Profit 10% Rp 927,211.47

Jumlah total Rp 10,199,300.00

Rp 2,318,400.00 Rp 2,318,400.00 Rp 2,318,400.00

Jumlah : Rp 2,318,400.00

Overhead + Profit 10% Rp 231,840.00

Jumlah total Rp 2,550,200.00

1776 of 1892
Rp 56,900.00 Rp 68,849.00

Rp 115,850.00 Rp 509,740.00

Rp 67,600.00 Rp 379,236.00

Rp 986,650.00 Rp 119,384.65 Rp 1,077,209.65

Jumlah : Rp 1,077,209.65

Rp 109,750.00 Rp 344,615.00

Rp 111,200.00 Rp 118,158.45 Rp 462,773.45

Rp 111,300.00 Rp 779,100.00

Rp 192,340.91 Rp 25,894.38

Rp 899,700.00 Rp 36,160.74

Rp 11,550.00 Rp 115,500.00 Rp 956,655.12

Rp 81,600.00 Rp 32,640.00

Rp 86,700.00 Rp 3,468.00

Rp 76,500.00 Rp 30,600.00

Rp 91,800.00 Rp 3,672.00 Rp 70,380.00

Jumlah : Rp 1,489,808.57

Overhead + Profit 10% Rp 148,980.86

Jumlah total Rp 1,638,750.00

1777 of 1892
Rp 56,900.00 Rp 25,889.50

Rp 111,200.00 Rp 15,568.00

Rp 55,650.00 Rp 55,650.00

Rp 115,850.00 Rp 196,945.00

Rp 956,000.00 Rp 38,240.00

Rp 67,600.00 Rp 64,220.00

Rp 31,700.00 Rp 30,115.00 Rp 426,627.50

Jumlah : Rp 383,964.75

Rp 56,900.00 Rp 93,885.00

Rp 111,200.00 Rp 16,680.00

Rp 624,050.00 Rp 290,183.25

Rp 67,600.00 Rp 124,215.00

Rp 31,700.00 Rp 58,248.75 Rp 583,212.00

Jumlah : Rp 583,212.00

Rp 986,650.00 Rp 71,038.80

Rp 177,500.00 Rp 106,500.00

1778 of 1892
Rp 13,360.00 Rp 112,015.58 Rp 289,554.38

Rp 4,984.88 Rp 2,492.44 Rp 292,046.82

Jumlah : Rp 262,842.14

1 m' Rp 219,035.12

Rp 2,409,750.00 Rp 2,409,750.00

Rp 65,984.63 Rp 65,984.63 Rp 2,475,734.63

Rp 49,514.69 Rp 49,514.69 Rp 49,514.69

Jumlah : Rp 2,525,249.32

Overhead + Profit 10% Rp 252,524.93

Jumlah total Rp 2,777,774.25

Rp 1,181,250.00 Rp 1,181,250.00

Rp 65,984.63 Rp 65,984.63 Rp 1,247,234.63

Rp 24,944.69 Rp 24,944.69 Rp 24,944.69

Jumlah : Rp 1,272,179.32

Overhead + Profit 10% Rp 127,217.93

Jumlah total Rp 1,399,397.25

1779 of 1892
Rp 109,750.00 Rp 516,922.50

Rp 154,672.88 Rp 1,546,728.75

Rp 206,365.13 Rp 206,365.13 Rp 2,270,016.38

Rp 81,600.00 Rp 408,000.00

Rp 86,700.00 Rp 43,350.00

Rp 76,500.00 Rp 382,500.00

Rp 91,800.00 Rp 45,900.00 Rp 879,750.00

Jumlah : Rp 3,149,766.38

Overhead + Profit 10% Rp 314,976.64

Jumlah total Rp 3,464,743.01

Rp 68,950.00 Rp 695,016.00

Rp 111,200.00 Rp 46,259.20

Rp 899,700.00 Rp 374,275.20

Rp 115,850.00 Rp 1,654,338.00

Rp 67,600.00 Rp 965,328.00

Rp 94,500.00 Rp 793,800.00

Rp 88,950.00 Rp 711,600.00

Rp 105,800.00 Rp 888,720.00

1780 of 1892
Rp 4,946,851.14 Rp 1,701,716.79

Rp 4,946,851.14 Rp 356,173.28

Rp 10,185.00 Rp 7,553.20 Rp 8,194,779.67

Jumlah : Rp 8,194,779.67

Rp 37,327,500.00 Rp 37,327,500.00

Rp 8,194,779.67 Rp 8,194,779.67 Rp 45,522,279.67

Rp 1,866,375.00 Rp 1,866,375.00 Rp 1,866,375.00

Jumlah : Rp 47,388,654.67

Rp 21,262,500.00 Rp 21,262,500.00

Rp 8,194,779.67 Rp 8,194,779.67 Rp 29,457,279.67

Rp 1,063,125.00 Rp 1,063,125.00 Rp 1,063,125.00

Jumlah : Rp 30,520,404.67

Rp 11,056,500.00 Rp 11,056,500.00

Rp 8,194,779.67 Rp 8,194,779.67 Rp 19,251,279.67

1781 of 1892
Rp 552,825.00 Rp 552,825.00 Rp 552,825.00

Jumlah : Rp 19,804,104.67

Rp 23,650.00 Rp 496,650.00

Rp - Rp -

Rp 24,832.50 Rp 24,832.50 Rp 521,482.50

Rp 81,600.00 Rp 8,160.00

Rp 86,700.00 Rp 867.00

Rp 76,500.00 Rp 7,650.00

Rp 91,800.00 Rp 918.00 Rp 17,595.00

Jumlah : Rp 539,077.50

Overhead + Profit 10% Rp 53,907.75

Jumlah total Rp 592,985.25

Rp 26,932,500.00 Rp 26,932,500.00 Rp 26,932,500.00

Rp 538,650.00 Rp 538,650.00 Rp 538,650.00

Jumlah : Rp 27,471,150.00

Jumlah total Rp 27,471,150.00

1782 of 1892
Rp 80,325,000.00 Rp 80,325,000.00 Rp 80,325,000.00

Rp 472,500.00 Rp 472,500.00 Rp 472,500.00

Jumlah : Rp 80,797,500.00

Jumlah total Rp 80,797,500.00

Rp 9,251.55 Rp 138,773.25

Rp 3,343.22 Rp 50,148.32

Rp 8,797.95 Rp 8,797.95 Rp 197,719.52

Rp 19,771.95 Rp 19,771.95 Rp 19,771.95

Jumlah Harga : Rp 217,491.47

1783 of 1892
Overhead + Profit 10% Rp 21,749.15

Jumlah total Rp 239,240.61

Rp 10,810.80 Rp 162,162.00

Rp 3,343.22 Rp 50,148.32

Rp 8,797.95 Rp 8,797.95 Rp 221,108.27

Rp 22,110.83 Rp 22,110.83 Rp 22,110.83

Jumlah Harga : Rp 243,219.09

Overhead + Profit 10% Rp 24,321.91

Jumlah total Rp 267,500.00

Rp 9,251.55 Rp 138,773.25

Rp 3,343.22 Rp 50,148.32

Rp 8,797.95 Rp 8,797.95 Rp 197,719.52

Rp 19,771.95 Rp 19,771.95 Rp 19,771.95

Jumlah Harga : Rp 217,491.47

Overhead + Profit 10% Rp 21,749.15

Jumlah total Rp 239,240.61

1784 of 1892
Rp 1,229,850.00 Rp 1,229,850.00

Rp 8,797.95 Rp 8,797.95 Rp 1,238,647.95

Rp 30,966.20 Rp 30,966.20 Rp 30,966.20

Jumlah Harga : Rp 1,269,614.15

Overhead + Profit 10% Rp 126,961.41

Jumlah total Rp 1,396,550.00

Rp 540,883.64 Rp 540,883.64

Rp 8,797.95 Rp 8,797.95 Rp 549,681.59

Rp 13,742.04 Rp 13,742.04 Rp 13,742.04

Jumlah Harga : Rp 563,423.63

Overhead + Profit 10% Rp 56,342.36

Jumlah total Rp 619,750.00

Rp 594,000.00 Rp 594,000.00

Rp 8,797.95 Rp 8,797.95 Rp 602,797.95

1785 of 1892
Rp 15,069.95 Rp 15,069.95 Rp 15,069.95

Jumlah Harga : Rp 617,867.90

Overhead + Profit 10% Rp 61,786.79

Jumlah total Rp 679,650.00

Rp 234,000.00 Rp 234,000.00

Rp 8,797.95 Rp 8,797.95 Rp 242,797.95

Rp 12,139.90 Rp 12,139.90 Rp 12,139.90

Jumlah Harga : Rp 254,937.85

Overhead + Profit 10% Rp 25,493.78

Jumlah total Rp 280,400.00

Rp 214,200.00 Rp 214,200.00

Rp 8,797.95 Rp 8,797.95 Rp 222,997.95

Rp 11,149.90 Rp 11,149.90 Rp 11,149.90

Jumlah Harga : Rp 234,147.85

Overhead + Profit 10% Rp 23,414.78

Jumlah total Rp 257,550.00

1786 of 1892
Rp 230,400.00 Rp 230,400.00

Rp 8,797.95 Rp 8,797.95 Rp 239,197.95

Rp 11,959.90 Rp 11,959.90 Rp 11,959.90

Jumlah Harga : Rp 251,157.85

Overhead + Profit 10% Rp 25,115.78

Jumlah total Rp 276,250.00

Rp 3,915,000.00 Rp 3,915,000.00

Rp 8,797.95 Rp 8,797.95 Rp 3,923,797.95

Rp 98,094.95 Rp 98,094.95 Rp 98,094.95

Jumlah Harga : Rp 4,021,892.90

Overhead + Profit 10% Rp 402,189.29

Jumlah total Rp 4,424,050.00

Rp 425,250.00 Rp 425,250.00

Rp 8,797.95 Rp 8,797.95 Rp 434,047.95

1787 of 1892
Rp 10,851.20 Rp 10,851.20 Rp 10,851.20

Jumlah Harga : Rp 444,899.15

Overhead + Profit 10% Rp 44,489.91

Jumlah total Rp 489,350.00

Rp 566,100.00 Rp 566,100.00

Rp 566,100.00

Rp 14,152.50 Rp 14,152.50 Rp 14,152.50

Jumlah Harga : Rp 580,252.50

Overhead + Profit 10% Rp 58,025.25

Jumlah total Rp 638,250.00

Rp 159,090.91 Rp 159,090.91

Rp 509,090.91 Rp 509,090.91 Rp 668,181.82

Rp 16,704.55 Rp 16,704.55 Rp 16,704.55

Jumlah Harga : Rp 684,886.36

1788 of 1892
Overhead + Profit 10% Rp 68,488.64

Jumlah total Rp 753,350.00

Rp 53,865.00 Rp 53,865.00

Rp 8,797.95 Rp 8,797.95 Rp 62,662.95

Rp 6,266.30 Rp 6,266.30 Rp 6,266.30

Jumlah harga : Rp 68,929.25

Overhead + Profit 10% Rp 6,892.92

Jumlah total : Rp 75,800.00

Rp 106,200.00 Rp 106,200.00

Rp 8,797.95 Rp 8,797.95 Rp 114,997.95

Rp 11,499.80 Rp 11,499.80 Rp 11,499.80

Jumlah harga : Rp 126,497.75

Overhead + Profit 10% Rp 12,649.77

Jumlah total : Rp 139,100.00

1789 of 1892
Rp 191,268.00 Rp 191,268.00

Rp 8,797.95 Rp 8,797.95 Rp 200,065.95

Rp 20,006.60 Rp 20,006.60 Rp 20,006.60

Jumlah Harga : Rp 220,072.55

Overhead + Profit 10% Rp 22,007.25

Jumlah total Rp 242,050.00

Rp 1,890,000.00 Rp 1,890,000.00

Rp 8,797.95 Rp 8,797.95 Rp 1,898,797.95

Rp 189,879.80 Rp 189,879.80 Rp 189,879.80

Jumlah Harga : Rp 2,088,677.75

Overhead + Profit 10% Rp 208,867.77

Jumlah total Rp 2,297,500.00

Rp 35,831.65 Rp 35,831.65

1790 of 1892
Rp 10,557.54 Rp 10,557.54 Rp 46,389.19

Rp 13,916.76 Rp 13,916.76 Rp 13,916.76

Jumlah Harga : Rp 60,305.95

Overhead + Profit 10% Rp 6,030.59

Jumlah total Rp 66,300.00

Rp 20,016.82 Rp 20,016.82

Rp 45,703.64 Rp 45,703.64

Rp 88,744.09 Rp 88,744.09 Rp 154,464.55

Rp 30,892.91 Rp 30,892.91 Rp 30,892.91

Jumlah Harga : Rp 185,357.45

Overhead + Profit 10% Rp 18,535.75

Jumlah total Rp 203,850.00

Rp 754,367.73 Rp 754,367.73

Rp 10,557.54 Rp 10,557.54 Rp 764,925.27

1791 of 1892
Rp 76,492.53 Rp 76,492.53 Rp 76,492.53

Jumlah Harga : Rp 841,417.79

Overhead + Profit 10% Rp 84,141.78

Jumlah total Rp 925,550.00

Rp 47,250.00 Rp 47,250.00

Rp 10,557.54 Rp 10,557.54 Rp 57,807.54

Rp 11,561.51 Rp 11,561.51 Rp 11,561.51

Jumlah Harga : Rp 69,369.05

Overhead + Profit 10% Rp 6,936.90

Jumlah total Rp 76,300.00

Rp 30,068.18 Rp 30,068.18

Rp 10,557.54 Rp 10,557.54 Rp 40,625.72

Rp 8,125.14 Rp 8,125.14 Rp 8,125.14

Jumlah Harga : Rp 48,750.87

Overhead + Profit 10% Rp 4,875.09

1792 of 1892
Jumlah total Rp 53,600.00

Rp 77,833.64 Rp 77,833.64

Rp 10,557.54 Rp 10,557.54 Rp 88,391.18

Rp 17,678.24 Rp 17,678.24 Rp 17,678.24

Jumlah Harga : Rp 106,069.41

Overhead + Profit 10% Rp 10,606.94

Jumlah total Rp 116,650.00

Rp 137,454.55 Rp 137,454.55

Rp 10,557.54 Rp 10,557.54 Rp 148,012.09

Rp 29,602.42 Rp 4,440.36 Rp 4,440.36

Jumlah Harga : Rp 152,452.45

Overhead + Profit 10% Rp 15,245.24

Jumlah total Rp 167,650.00

1793 of 1892
Rp 38,057.73 Rp 38,057.73

Rp 10,557.54 Rp 10,557.54 Rp 48,615.27

Rp 9,723.05 Rp 9,723.05 Rp 9,723.05

Jumlah Harga : Rp 58,338.32

Overhead + Profit 10% Rp 5,833.83

Jumlah total Rp 64,150.00

Rp 79,895.45 Rp 79,895.45

Rp 10,557.54 Rp 10,557.54 Rp 90,452.99

Rp 18,090.60 Rp 18,090.60 Rp 18,090.60

Jumlah Harga : Rp 108,543.59

Overhead + Profit 10% Rp 10,854.36

Jumlah total Rp 119,350.00

Rp 1,181,250.00 Rp 1,181,250.00 Rp 1,181,250.00

Jumlah Harga : Rp 1,181,250.00

1794 of 1892
Overhead + Profit 10% Rp 118,125.00

Jumlah total Rp 1,299,350.00

Rp 3,959.08 Rp 138,567.71

Rp 3,343.22 Rp 117,012.74

Rp 8,797.95 Rp 8,797.95 Rp 264,378.40

Rp 39,656.76 Rp 39,656.76 Rp 39,656.76

Jumlah Harga : Rp 304,035.16

Overhead + Profit 10% Rp 30,403.52

Jumlah total Rp 334,400.00

Rp 72,593 Rp 72,593.18 Rp 72,593.18

Rp 7,259.32 Rp 7,259.32 Rp 7,259.32

Jumlah Harga : Rp 79,852.50

Overhead + Profit 10% Rp 7,985.25

Jumlah total Rp 87,800.00

1795 of 1892
Rp 309,983.48 Rp 309,983.48

Rp 9,513.07 Rp 9,513.07 Rp 319,496.55

Rp 31,949.66 Rp 31,949.66 Rp 31,949.66

Jumlah Harga : Rp 351,446.21

Overhead + Profit 10% Rp 35,144.62

Jumlah total Rp 386,550.00

Rp 2,031,041.06 Rp 2,031,041.06 Rp 2,031,041.06

Jumlah Harga : Rp 2,031,041.06

Overhead + Profit 10% Rp 203,104.11

Jumlah total Rp 2,234,100.00

Rp 1,426,960.94 Rp 1,426,960.94 Rp 1,426,960.94

Jumlah Harga : Rp 1,426,960.94

Overhead + Profit 10% Rp 142,696.09

1796 of 1892
Jumlah total Rp 1,569,650.00

Rp 3,900,359.89 Rp 3,900,359.89 Rp 3,900,359.89

Jumlah Harga : Rp 3,900,359.89

Overhead + Profit 10% Rp 390,035.99

Jumlah total Rp 4,290,350.00

Rp 2,092,876.04 Rp 2,092,876.04 Rp 2,092,876.04

Jumlah Harga : Rp 2,092,876.04

Overhead + Profit 10% Rp 209,287.60

Jumlah total Rp 2,302,150.00

Rp 4,090,621.35 Rp 4,090,621.35 Rp 4,090,621.35

Jumlah Harga : Rp 4,090,621.35

Overhead + Profit 10% Rp 409,062.13

Jumlah total Rp 4,499,650.00

1797 of 1892
Rp 5,707,843.74 Rp 5,707,843.74 Rp 5,707,843.74

Jumlah Harga : Rp 5,707,843.74

Overhead + Profit 10% Rp 570,784.37

Jumlah total Rp 6,278,600.00

Rp 11,463,252.84 Rp 11,463,252.84 Rp 11,463,252.84

Jumlah Harga : Rp 11,463,252.84

Overhead + Profit 10% Rp 1,146,325.28

Jumlah total Rp 12,609,550.00

Rp 1,189,134.11 Rp 1,189,134.11 Rp 1,189,134.11

Jumlah Harga : Rp 1,189,134.11

Overhead + Profit 10% Rp 118,913.41

Jumlah total Rp 1,308,000.00

1798 of 1892
Rp 4,756,536.45 Rp 4,756,536.45 Rp 4,756,536.45

Jumlah Harga : Rp 4,756,536.45

Overhead + Profit 10% Rp 475,653.65

Jumlah total Rp 5,232,150.00

Rp 10,735,883.29 Rp 10,735,883.29 Rp 10,735,883.29

Jumlah Harga : Rp 10,735,883.29

Overhead + Profit 10% Rp 1,073,588.33

Jumlah total Rp 11,809,450.00

Rp 17,450,780.93 Rp 17,450,780.93 Rp 17,450,780.93

Jumlah Harga : Rp 17,450,780.93

Overhead + Profit 10% Rp 1,745,078.09

Jumlah total Rp 19,195,850.00

Rp 604,730,585.51 Rp 604,730,585.51 Rp 604,730,585.51

Jumlah Harga : Rp 604,730,585.51

1799 of 1892
Jumlah total Rp 604,730,550.00

Rp 44,913,823.74 Rp 44,913,823.74 Rp 44,913,823.74

Jumlah Harga : Rp 44,913,823.74

Overhead + Profit 10% Rp 4,491,382.37

Jumlah total Rp 49,405,200.00

Rp 4,280,882.81 Rp 4,280,882.81 Rp 4,280,882.81

Jumlah Harga : Rp 4,280,882.81

Overhead + Profit 10% Rp 428,088.28

Jumlah total Rp 4,708,950.00

Rp 4,756,536.45 Rp 4,756,536.45 Rp 4,756,536.45

Jumlah Harga : Rp 4,756,536.45

Overhead + Profit 10% Rp 475,653.65

Jumlah total Rp 5,232,150.00

1800 of 1892
Rp 13,698,824.98 Rp 13,698,824.98 Rp 13,698,824.98

Jumlah Harga : Rp 13,698,824.98

Overhead + Profit 10% Rp 1,369,882.50

Jumlah total Rp 15,068,700.00

Rp 65,640,203.01 Rp 65,640,203.01 Rp 65,640,203.01

Jumlah Harga : Rp 65,640,203.01

Overhead + Profit 10% Rp 6,564,020.30

Jumlah total Rp 72,204,200.00

Rp 2,853,921.87 Rp 2,853,921.87 Rp 2,853,921.87

Jumlah Harga : Rp 2,853,921.87

Overhead + Profit 10% Rp 285,392.19

Jumlah total Rp 3,139,300.00

1801 of 1892
Rp 7,134,804.68 Rp 7,134,804.68 Rp 7,134,804.68

Jumlah Harga : Rp 7,134,804.68

Overhead + Profit 10% Rp 713,480.47

Jumlah total Rp 7,848,250.00

Rp 5,387,062.92 Rp 5,387,062.92 Rp 5,387,062.92

Jumlah Harga : Rp 5,387,062.92

Overhead + Profit 10% Rp 538,706.29

Jumlah total Rp 5,925,750.00

Rp 5,251,216.24 Rp 5,251,216.24 Rp 5,251,216.24

Jumlah Harga : Rp 5,251,216.24

Overhead + Profit 10% Rp 525,121.62

Jumlah total Rp 5,776,300.00

Rp 43,094.22 Rp 43,094.22 Rp 43,094.22

Jumlah Harga : Rp 43,094.22

1802 of 1892
Overhead + Profit 10% Rp 4,309.42

Jumlah total Rp 47,400.00

Rp 16,065.00 Rp 17,671.50

Rp 3,343.22 Rp 3,677.54

Rp 1,000.00 Rp 1,000.00 Rp 22,349.04

Rp 3,352.36 Rp 3,352.36 Rp 3,352.36

Jumlah Harga : Rp 25,701.40

Overhead + Profit 10% Rp 2,570.14

Jumlah total Rp 28,250.00

Rp 27,405.00 Rp 30,145.50

Rp 3,343.22 Rp 3,677.54

Rp 1,000.00 Rp 1,000.00 Rp 34,823.04

Rp 3,482.30 Rp 3,482.30 Rp 3,482.30

Jumlah Harga : Rp 38,305.35

Overhead + Profit 10% Rp 3,830.53

Jumlah total Rp 42,100.00

1803 of 1892
Rp 41,000.00 Rp 45,100.00

Rp 3,343.22 Rp 3,677.54

Rp 1,000.00 Rp 1,000.00 Rp 49,777.54

Rp 3,733.32 Rp 3,733.32 Rp 3,733.32

Jumlah Harga : Rp 53,510.86

Overhead + Profit 10% Rp 5,351.09

Jumlah total Rp 58,850.00

Rp 13,196.93 Rp 263,938.50

Rp 3,343.22 Rp 66,864.42

Rp 4,398.98 Rp 4,398.98 Rp 335,201.90

Rp 33,520.19 Rp 33,520.19 Rp 33,520.19

Jumlah Harga : Rp 368,722.08

Overhead + Profit 10% Rp 36,872.21

Jumlah total Rp 405,550.00

1804 of 1892
Rp 123,365.45 Rp 123,365.45

Rp 10,557.54 Rp 10,557.54 Rp 133,922.99

Rp 13,392.30 Rp 13,392.30 Rp 13,392.30

Jumlah Harga : Rp 147,315.29

Overhead + Profit 10% Rp 14,731.53

Jumlah total Rp 162,000.00

Rp 2,882,250.00 Rp 2,882,250.00

include

Rp 8,797.95 Rp 8,797.95 Rp 2,891,047.95

Rp 14,455.24 Rp 14,455.24 Rp 14,455.24

Jumlah Harga : Rp 2,905,503.19

Overhead + Profit 10% Rp 290,550.32

Jumlah total Rp 3,196,050.00

Rp 5,622,750.00 Rp 5,622,750.00

1805 of 1892
include

Rp 8,797.95 Rp 8,797.95 Rp 5,631,547.95

Rp 28,157.74 Rp 28,157.74 Rp 28,157.74

Jumlah Harga : Rp 5,659,705.69

Overhead + Profit 10% Rp 565,970.57

Jumlah total Rp 6,225,650.00

Rp 5,575,500.00 Rp 5,575,500.00

include

Rp 8,797.95 Rp 8,797.95 Rp 5,584,297.95

Rp 27,921.49 Rp 27,921.49 Rp 27,921.49

Jumlah Harga : Rp 5,612,219.44

Overhead + Profit 10% Rp 561,221.94

Jumlah total Rp 6,173,400.00

Rp 12,540,150.00 Rp 12,540,150.00

include

Rp 8,797.95 Rp 8,797.95 Rp 12,548,947.95

1806 of 1892
Rp 62,744.74 Rp 62,744.74 Rp 62,744.74

Jumlah Harga : Rp 12,611,692.69

Overhead + Profit 10% Rp 1,261,169.27

Jumlah total Rp 13,872,850.00

Rp 13,196.93 Rp 527,877.00

Rp 3,343.22 Rp 133,728.84

Rp 8,797.95 Rp 670,403.79

Rp 20,112.11 Rp 20,112.11 Rp 20,112.11

Jumlah Harga : Rp 690,515.90

Overhead + Profit 10% Rp 69,051.59

Jumlah total Rp 759,550.00

Rp 13,196.93 Rp 14,516.62

Rp 3,343.22 Rp 3,677.54

Rp 5,458.25 Rp 5,458.25 Rp 23,652.41

Rp 709.57 Rp 709.57 Rp 709.57

1807 of 1892
Jumlah Harga : Rp 24,361.98

Overhead + Profit 10% Rp 2,436.20

Jumlah total Rp 26,750.00

Rp 7,305.82 Rp 153,422.17

Rp 3,343.22 Rp 70,207.64

Rp 8,797.95 Rp 8,797.95 Rp 232,427.76

Rp 11,621.39 Rp 11,621.39 Rp 11,621.39

Jumlah Harga : Rp 244,049.15

Overhead + Profit 10% Rp 24,404.92

Jumlah total Rp 268,450.00

Rp 105,840.00 Rp 105,840.00

Rp 8,797.95 Rp 8,797.95 Rp 114,637.95

Rp 11,463.80 Rp 11,463.80 Rp 11,463.80

Jumlah Harga : Rp 126,101.75

Overhead + Profit 10% Rp 12,610.17

1808 of 1892
Jumlah total Rp 138,700.00

Rp 94,500.00 Rp 94,500.00

Rp 8,797.95 Rp 8,797.95 Rp 103,297.95

Rp 10,329.80 Rp 10,329.80 Rp 10,329.80

Jumlah Harga : Rp 113,627.75

Overhead + Profit 10% Rp 11,362.77

Jumlah total Rp 124,950.00

Rp 3,424,706.24 Rp 3,424,706.24 Rp 3,424,706.24

Jumlah Harga : Rp 3,424,706.24

Overhead + Profit 10% Rp 342,470.62

Jumlah total Rp 3,767,150.00

Rp 8,603,147.48 Rp 8,603,147.48 Rp 8,603,147.48

Jumlah Harga : Rp 8,603,147.48

Overhead + Profit 10% Rp 860,314.75

Jumlah total Rp 9,463,450.00

1809 of 1892
Rp 5,526,619.70 Rp 5,526,619.70 Rp 5,526,619.70

Jumlah Harga : Rp 5,526,619.70

Overhead + Profit 10% Rp 552,661.97

Jumlah total Rp 6,079,250.00

Rp 3,313,403.29 Rp 3,313,403.29 Rp 3,313,403.29

Jumlah Harga : Rp 3,313,403.29

Overhead + Profit 10% Rp 331,340.33

Jumlah total Rp 3,644,700.00

Rp 32,677,405.41 Rp 32,677,405.41 Rp 32,677,405.41

Jumlah Harga : Rp 32,677,405.41

Overhead + Profit 10% Rp 3,267,740.54

Jumlah total Rp 35,945,100.00

Rp 29,014,872.35 Rp 29,014,872.35 Rp 29,014,872.35

Jumlah Harga : Rp 29,014,872.35

Overhead + Profit 10% Rp 2,901,487.23

Jumlah total Rp 31,916,350.00

1810 of 1892
Rp 3,710,098.43 Rp 3,710,098.43 Rp 3,710,098.43

Jumlah Harga : Rp 3,710,098.43

Overhead + Profit 10% Rp 371,009.84

Jumlah total Rp 4,081,100.00

Rp 13,508,563.52 Rp 13,508,563.52 Rp 13,508,563.52

Jumlah Harga : Rp 13,508,563.52

Overhead + Profit 10% Rp 1,350,856.35

Jumlah total Rp 14,859,400.00

Rp 8,561,765.61 Rp 8,561,765.61 Rp 8,561,765.61

Jumlah Harga : Rp 8,561,765.61

Overhead + Profit 10% Rp 856,176.56

Jumlah total Rp 9,417,900.00

Rp 8,561,765.61 Rp 8,561,765.61 Rp 8,561,765.61

Jumlah Harga : Rp 8,561,765.61

Overhead + Profit 10% Rp 856,176.56

1811 of 1892
Jumlah total Rp 9,417,900.00

Rp 8,561,765.61 Rp 8,561,765.61 Rp 8,561,765.61

Jumlah Harga : Rp 8,561,765.61

Overhead + Profit 10% Rp 856,176.56

Jumlah total Rp 9,417,900.00

Rp 8,561,765.61 Rp 8,561,765.61 Rp 8,561,765.61

Jumlah Harga : Rp 8,561,765.61

Overhead + Profit 10% Rp 856,176.56

Jumlah total Rp 9,417,900.00

Rp 7,305.82 Rp 8,036.40

Rp 3,343.22 Rp 3,677.54

Rp 3,514.18 Rp 3,514.18 Rp 15,228.13

Rp 761.41 Rp 761.41 Rp 761.41

Jumlah Harga : Rp 15,989.53

Overhead + Profit 10% Rp 1,598.95

1812 of 1892
Jumlah total Rp 17,550.00

Rp 475,653.65 Rp 475,653.65

Rp 9,513.07 Rp 9,513.07 Rp 485,166.72

Rp 48,516.67 Rp 48,516.67 Rp 48,516.67

Jumlah Harga : Rp 533,683.39

Overhead + Profit 10% Rp 53,368.34

Jumlah total Rp 587,050.00

Rp 428,088.28 Rp 428,088.28

Rp 9,513.07 Rp 9,513.07 Rp 437,601.35

Rp 43,760.14 Rp 43,760.14 Rp 43,760.14

Jumlah Harga : Rp 481,361.49

Overhead + Profit 10% Rp 48,136.15

Jumlah total Rp 529,450.00

1813 of 1892
Rp 275,335.51 Rp 275,335.51 Rp 275,335.51

Rp 9,513.07 Rp 9,513.07 Rp 9,513.07

Rp 14,242.43 Rp 14,242.43 Rp 14,242.43

Jumlah harga : Rp 299,091.01

Overhead + Profit 10% Rp 29,909.10

Jumlah total : Rp 329,000.00

Rp 229,400.96 Rp 229,400.96

Rp 9,513.07 Rp 9,513.07 Rp 238,914.03

Rp 11,945.70 Rp 11,945.70 Rp 11,945.70

Jumlah harga : Rp 250,859.73

Overhead + Profit 10% Rp 25,085.97

Jumlah total : Rp 275,900.00

Rp 418,394.01 Rp 418,394.01

1814 of 1892
Rp 4,756.54 Rp 4,756.54 Rp 423,150.54

Rp 21,157.53 Rp 21,157.53 Rp 21,157.53

Jumlah harga : Rp 444,308.07

Overhead + Profit 10% Rp 44,430.81

Jumlah total : Rp 488,700.00

Rp 348,631.47 Rp 348,631.47

Rp 4,756.54 Rp 4,756.54 Rp 353,388.01

Rp 17,669.40 Rp 17,669.40 Rp 17,669.40

Jumlah harga : Rp 371,057.41

Overhead + Profit 10% Rp 37,105.74

Jumlah total : Rp 408,150.00

Rp 317,102.43 Rp 317,102.43

Rp 4,756.54 Rp 4,756.54 Rp 321,858.97

Rp 16,092.95 Rp 16,092.95 Rp 16,092.95

1815 of 1892
Jumlah harga : Rp 337,951.91

Overhead + Profit 10% Rp 33,795.19

Jumlah total : Rp 371,700.00

Rp 290,556.43 Rp 290,556.43

Rp 4,756.54 Rp 4,756.54 Rp 295,312.96

Rp 14,765.65 Rp 14,765.65 Rp 14,765.65

Jumlah harga : Rp 310,078.61

Overhead + Profit 10% Rp 31,007.86

Jumlah total : Rp 341,050.00

Rp 192,734.86 Rp 192,734.86

Rp 4,756.54 Rp 4,756.54 Rp 197,491.39

Rp 9,874.57 Rp 9,874.57 Rp 9,874.57

Jumlah harga : Rp 207,365.96

Overhead + Profit 10% Rp 20,736.60

Jumlah total : Rp 228,100.00

1816 of 1892
Rp 173,423.32 Rp 173,423.32

Rp 4,756.54 Rp 4,756.54 Rp 178,179.86

Rp 8,908.99 Rp 8,908.99 Rp 8,908.99

Jumlah harga : Rp 187,088.85

Overhead + Profit 10% Rp 18,708.88

Jumlah total : Rp 205,750.00

Rp 10,810.80 Rp 162,162.00

Rp 2,988.56 Rp 44,828.44

Rp 9,513.07 Rp 9,513.07 Rp 216,503.51

Rp 21,650.35 Rp 21,650.35 Rp 21,650.35

Jumlah Harga : Rp 238,153.86

Overhead + Profit 10% Rp 23,815.39

Jumlah total Rp 261,950.00

1817 of 1892
Rp 66,528.00 Rp 997,920.00

Rp 2,988.56 Rp 44,828.44

Rp 9,513.07 Rp 9,513.07 Rp 1,052,261.51

Rp 105,922.12 Rp 105,922.12 Rp 105,922.12

Jumlah harga : Rp 1,158,183.63

Overhead + Profit 10% Rp 115,818.36

Jumlah total : Rp 1,274,000.00

Rp 13,526,730.00 Rp 13,526,730.00

Rp 270,534.60 Rp 270,534.60 Rp 13,797,264.60

Rp 68,986.32 Rp 68,986.32 Rp 68,986.32

Jumlah harga : Rp 13,866,250.92

Overhead + Profit 10% Rp 1,386,625.09

Jumlah total : Rp 15,252,850.00

1818 of 1892
Rp 14,025,690.00 Rp 14,025,690.00

Rp 280,513.80 Rp 280,513.80 Rp 14,306,203.80

Rp 71,531.02 Rp 71,531.02 Rp 71,531.02

Jumlah harga : Rp 14,377,734.82

Overhead + Profit 10% Rp 1,437,773.48

Jumlah total : Rp 15,815,500.00

Rp 15,685,110.00 Rp 15,685,110.00

Rp 313,702.20 Rp 313,702.20 Rp 15,998,812.20

Rp 79,994.06 Rp 79,994.06 Rp 79,994.06

Jumlah harga : Rp 16,078,806.26

Overhead + Profit 10% Rp 1,607,880.63

Jumlah total : Rp 17,686,650.00

Rp 15,831,585.00 Rp 15,831,585.00

Rp 316,631.70 Rp 316,631.70 Rp 16,148,216.70

1819 of 1892
Rp 80,741.08 Rp 80,741.08 Rp 80,741.08

Jumlah harga : Rp 16,228,957.78

Overhead + Profit 10% Rp 1,622,895.78

Jumlah total : Rp 17,851,850.00

Rp 16,008,300.00 Rp 16,008,300.00

Rp 320,166.00 Rp 320,166.00 Rp 16,328,466.00

Rp 81,642.33 Rp 81,642.33 Rp 81,642.33

Jumlah harga : Rp 16,410,108.33

Overhead + Profit 10% Rp 1,641,010.83

Jumlah total : Rp 18,051,100.00

Rp 11,162,340.00 Rp 11,162,340.00

Rp 334,870.20 Rp 334,870.20 Rp 11,497,210.20

Rp 114,972.10 Rp 114,972.10 Rp 114,972.10

Jumlah harga : Rp 11,612,182.30

Overhead + Profit 10% Rp 1,161,218.23

1820 of 1892
Jumlah total : Rp 12,773,400.00

Rp 13,394,430.00 Rp 13,394,430.00

Rp 401,832.90 Rp 401,832.90 Rp 13,796,262.90

Rp 137,962.63 Rp 137,962.63 Rp 137,962.63

Jumlah harga : Rp 13,934,225.53

Overhead + Profit 10% Rp 1,393,422.55

Jumlah total : Rp 15,327,600.00

Rp 3,453,245.46 Rp 3,453,245.46

Rp 34,532.45 Rp 34,532.45 Rp 3,487,777.92

Rp - Rp -

Jumlah harga : Rp 3,487,777.92

Overhead + Profit 10% Rp 348,777.79

Jumlah total : Rp 3,836,550.00

1821 of 1892
Rp 114,547,230.00 Rp 114,547,230.00

Rp 343,641.69 Rp 343,641.69 Rp 114,890,871.69

Rp 114,890.87 Rp 114,890.87 Rp 114,890.87

Jumlah harga : Rp 115,005,762.56

Overhead + Profit 10% Rp 11,500,576.26

Jumlah total : Rp 126,506,300.00

Rp 179,550,000.00 Rp 179,550,000.00

Rp 538,650.00 Rp 538,650.00 Rp 180,088,650.00

Rp 180,088.65 Rp 180,088.65 Rp 180,088.65

Jumlah harga : Rp 180,268,738.65

Overhead + Profit 10% Rp 18,026,873.87

Jumlah total : Rp 198,295,600.00

Rp 190,499,715.00 Rp 190,499,715.00

Rp 571,499.15 Rp 571,499.15 Rp 191,071,214.15

1822 of 1892
Rp 191,071.21 Rp 191,071.21 Rp 191,071.21

Jumlah harga : Rp 191,262,285.36

Overhead + Profit 10% Rp 19,126,228.54

Jumlah total : Rp 210,388,500.00

Rp 204,347,745.00 Rp 204,347,745.00

Rp 613,043.24 Rp 613,043.24 Rp 204,960,788.24

Rp 204,960.79 Rp 204,960.79 Rp 204,960.79

Jumlah harga : Rp 205,165,749.02

Overhead + Profit 10% Rp 20,516,574.90

Jumlah total : Rp 225,682,300.00

Rp 243,456,570.00 Rp 243,456,570.00

Rp 730,369.71 Rp 730,369.71 Rp 244,186,939.71

Rp 244,186.94 Rp 244,186.94 Rp 244,186.94

Jumlah harga : Rp 244,431,126.65

1823 of 1892
Overhead + Profit 10% Rp 24,443,112.66

Jumlah total : Rp 268,874,200.00

Rp 264,660,480.00 Rp 264,660,480.00

Rp 793,981.44 Rp 793,981.44 Rp 265,454,461.44

Rp 265,454.46 Rp 265,454.46 Rp 265,454.46

Jumlah harga : Rp 265,719,915.90

Overhead + Profit 10% Rp 26,571,991.59

Jumlah total : Rp 292,291,900.00

Rp 305,046,945.00 Rp 305,046,945.00

Rp 915,140.84 Rp 915,140.84 Rp 305,962,085.84

Rp 305,962.09 Rp 305,962.09 Rp 305,962.09

Jumlah harga : Rp 306,268,047.92

Overhead + Profit 10% Rp 30,626,804.79

Jumlah total : Rp 336,894,850.00

1824 of 1892
Rp 15,970.50 Rp 16,769.03

Rp 2,199.49 Rp 2,309.46

Rp 4,756.54 Rp 4,756.54 Rp 23,835.02

Rp 7,150.51 Rp 7,150.51 Rp 7,150.51

Jumlah Harga : Rp 30,985.53

Overhead + Profit 10% Rp 3,098.55

Jumlah total Rp 34,050.00

Rp 27,209.48 Rp 27,209.48

Rp 8,656.90 Rp 8,656.90

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 45,379.45

Rp 13,613.84 Rp 13,613.84 Rp 13,613.84

Jumlah harga : Rp 58,993.29

Overhead + Profit 10% Rp 5,899.33

Jumlah total Rp 64,850.00

1825 of 1892
Rp 37,637.07 Rp 37,637.07

Rp 9,370.38 Rp 9,370.38

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 56,520.52

Rp 16,956.16 Rp 16,956.16 Rp 16,956.16

Jumlah harga : Rp 73,476.67

Overhead + Profit 10% Rp 7,347.67

Jumlah total Rp 80,800.00

Rp 59,306.90 Rp 59,306.90

Rp 9,750.90 Rp 9,750.90

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 78,570.87

Rp 23,571.26 Rp 23,571.26 Rp 23,571.26

Jumlah harga : Rp 102,142.13

Overhead + Profit 10% Rp 10,214.21

Jumlah total Rp 112,350.00

1826 of 1892
Rp 85,538.79 Rp 85,538.79

Rp 10,083.86 Rp 10,083.86

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 105,135.72

Rp 31,540.72 Rp 31,540.72 Rp 31,540.72

Jumlah harga : Rp 136,676.44

Overhead + Profit 10% Rp 13,667.64

Jumlah total Rp 150,300.00

Rp 108,512.07 Rp 108,512.07

Rp 11,510.82 Rp 11,510.82

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 129,535.96

Rp 38,860.79 Rp 38,860.79 Rp 38,860.79

Jumlah harga : Rp 168,396.75

Overhead + Profit 10% Rp 16,839.67

1827 of 1892
Jumlah total Rp 185,200.00

Rp 135,558.62 Rp 135,558.62

Rp 12,224.30 Rp 12,224.30

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 157,295.99

Rp 47,188.80 Rp 47,188.80 Rp 47,188.80

Jumlah harga : Rp 204,484.79

Overhead + Profit 10% Rp 20,448.48

Jumlah total Rp 224,900.00

Rp 171,403.45 Rp 171,403.45

Rp 12,985.34 Rp 12,985.34

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 193,901.87

Rp 58,170.56 Rp 58,170.56 Rp 58,170.56

Jumlah harga : Rp 252,072.43

1828 of 1892
Overhead + Profit 10% Rp 25,207.24

Jumlah total Rp 277,250.00

Rp 201,708.62 Rp 201,708.62

Rp 15,125.79 Rp 15,125.79

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 226,347.48

Rp 67,904.24 Rp 67,904.24 Rp 67,904.24

Jumlah harga : Rp 294,251.72

Overhead + Profit 10% Rp 29,425.17

Jumlah total Rp 323,650.00

Rp 237,826.82 Rp 237,826.82

Rp 16,219.79 Rp 16,219.79

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 263,559.68

Rp 79,067.91 Rp 79,067.91 Rp 79,067.91

1829 of 1892
Jumlah harga : Rp 342,627.59

Overhead + Profit 10% Rp 34,262.76

Jumlah total Rp 376,850.00

Rp 283,095.93 Rp 283,095.93

Rp 17,123.53 Rp 17,123.53

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 309,732.53

Rp 92,919.76 Rp 92,919.76 Rp 92,919.76

Jumlah harga : Rp 402,652.29

Overhead + Profit 10% Rp 40,265.23

Jumlah total Rp 442,900.00

Rp 304,418.33 Rp 304,418.33

Rp 17,646.75 Rp 17,646.75

Rp 6,659.15 Rp 6,659.15

Rp 2,853.92 Rp 2,853.92 Rp 331,578.16

1830 of 1892
Rp 99,473.45 Rp 99,473.45 Rp 99,473.45

Jumlah harga : Rp 431,051.60

Overhead + Profit 10% Rp 43,105.16

Jumlah total Rp 474,150.00

Rp 365,105.18 Rp 365,105.18

Rp 17,646.75 Rp 17,646.75

Rp 6,659.15 Rp 6,659.15 Rp 389,411.08

Rp 2,853.92 Rp 2,853.92 Rp 392,265.00

Rp 117,679.50 Rp 117,679.50 Rp 117,679.50

Jumlah harga : Rp 509,944.50

Overhead + Profit 10% Rp 50,994.45

Jumlah total Rp 560,900.00

Rp 51,808,195.01 Rp 51,808,195.01

Rp 4,756.54 Rp 4,756.54 Rp 51,812,951.55

Rp 1,554,388.55 Rp 1,554,388.55 Rp 1,554,388.55

1831 of 1892
Jumlah harga : Rp 53,367,340.10

Overhead + Profit 10% Rp 5,336,734.01

Jumlah total Rp 58,704,050.00

Rp 10,635.93 Rp 10,635.93

Rp 3,008.51 Rp 3,008.51

Rp 4,756.54 Rp 4,756.54 Rp 18,400.97

Rp 1,840.10 Rp 1,840.10 Rp 1,840.10

Jumlah Harga : Rp 20,241.07

Overhead + Profit 10% Rp 2,024.11

Jumlah total Rp 22,250.00

Rp 476,342,285.78 Rp 476,342,285.78 Rp 476,342,285.78

Rp 34,247,062.44 Rp 34,247,062.44 Rp 34,247,062.44

Jumlah Harga : Rp 510,589,348.22

Overhead + Profit 10% Rp 51,058,934.82

1832 of 1892
Jumlah total Rp 561,648,250.00

Rp 456,329,422.92 Rp 456,329,422.92 Rp 456,329,422.92

Rp 34,247,062.44 Rp 34,247,062.44 Rp 34,247,062.44

Jumlah Harga : Rp 490,576,485.36

Overhead + Profit 10% Rp 49,057,648.54

Jumlah total Rp 539,634,100.00

Rp 443,516,370.73 Rp 443,516,370.73 Rp 443,516,370.73

Rp 28,539,218.70 Rp 28,539,218.70 Rp 28,539,218.70

Jumlah Harga : Rp 472,055,589.43

Overhead + Profit 10% Rp 47,205,558.94

Jumlah total Rp 519,261,100.00

Rp 527,664,785.57 Rp 527,664,785.57 Rp 527,664,785.57

1833 of 1892
Rp 34,247,062.44 Rp 34,247,062.44 Rp 34,247,062.44

Jumlah Harga : Rp 561,911,848.01

Overhead + Profit 10% Rp 56,191,184.80

Jumlah total Rp 618,103,000.00

Rp 53,524,007.43 Rp 53,524,007.43 Rp 53,524,007.43

Jumlah Harga : Rp 53,524,007.43

Jumlah total Rp 53,524,000.00

Rp 4,583,571.49 Rp 4,583,571.49 Rp 4,583,571.49

Jumlah Harga : Rp 4,583,571.49

Jumlah total Rp 4,583,550.00

Rp 3,121,498.67 Rp 3,121,498.67 Rp 3,121,498.67

Jumlah Harga : Rp 3,121,498.67

Jumlah total Rp 3,121,450.00

1834 of 1892
Rp 1,426,442.04 Rp 1,426,442.04 Rp 1,426,442.04

Jumlah Harga : Rp 1,426,442.04

Jumlah total Rp 1,426,400.00

Rp 1,755,767.33 Rp 1,755,767.33 Rp 1,755,767.33

Jumlah Harga : Rp 1,755,767.33

Jumlah total Rp 1,755,750.00

Rp 1,516,037.89 Rp 1,516,037.89 Rp 1,516,037.89

Jumlah Harga : Rp 1,516,037.89

Jumlah total Rp 1,516,000.00

Rp 1,479,715.25 Rp 1,479,715.25 Rp 1,479,715.25

Jumlah Harga : Rp 1,479,715.25

Jumlah total Rp 1,479,700.00

Rp 2,691,680.74 Rp 2,691,680.74 Rp 2,691,680.74

Jumlah Harga : Rp 2,691,680.74

1835 of 1892
Jumlah total Rp 2,691,650.00

Rp 1,684,332.80 Rp 1,684,332.80 Rp 1,684,332.80

Jumlah Harga : Rp 1,684,332.80

Jumlah total Rp 1,684,300.00

Rp 6,317,545.23 Rp 6,317,545.23 Rp 6,317,545.23

Jumlah Harga : Rp 6,317,545.23

Jumlah total Rp 6,317,500.00

Rp 2,153,111.09 Rp 2,153,111.09 Rp 2,153,111.09

Jumlah Harga : Rp 2,153,111.09

Jumlah total Rp 2,153,100.00

Rp 1,008,947.86 Rp 1,008,947.86 Rp 1,008,947.86

Jumlah Harga : Rp 1,008,947.86

Jumlah total Rp 1,008,900.00

1836 of 1892
Rp 1,081,031.01 Rp 1,081,031.01 Rp 1,081,031.01

Jumlah Harga : Rp 1,081,031.01

Jumlah total Rp 1,081,000.00

Rp 1,081,031.01 Rp 1,081,031.01 Rp 1,081,031.01

Jumlah Harga : Rp 1,081,031.01

Jumlah total Rp 1,081,000.00

Rp 1,816,132.10 Rp 1,816,132.10 Rp 1,816,132.10

Jumlah Harga : Rp 1,816,132.10

Jumlah total Rp 1,816,100.00

Rp 291,445.96 Rp 291,445.96 Rp 291,445.96

Jumlah Harga : Rp 291,445.96

Jumlah total Rp 291,400.00

Rp 1,167,513.49 Rp 1,167,513.49 Rp 1,167,513.49

Jumlah Harga : Rp 1,167,513.49

Jumlah total Rp 1,167,500.00

1837 of 1892
Rp 648,618.61 Rp 648,618.61 Rp 648,618.61

Jumlah Harga : Rp 648,618.61

Jumlah total Rp 648,600.00

Rp 2,464,750.71 Rp 2,464,750.71 Rp 2,464,750.71

Jumlah Harga : Rp 2,464,750.71

Jumlah total Rp 2,464,750.00

Rp 294,497,577.16 Rp 294,497,577.16 Rp 294,497,577.16

Jumlah Harga : Rp 294,497,577.16

Jumlah total Rp 294,497,550.00

Rp 188,068,694.70 Rp 188,068,694.70 Rp 188,068,694.70

Jumlah Harga : Rp 188,068,694.70

Jumlah total Rp 188,068,650.00

Rp 43,902,831.43 Rp 43,902,831.43 Rp 43,902,831.43

1838 of 1892
Jumlah Harga : Rp 43,902,831.43

Jumlah total Rp 43,902,800.00

Rp 2,853,921.87 Rp 2,853,921.87 Rp 2,853,921.87

Jumlah Harga : Rp 2,853,921.87

Jumlah total Rp 2,853,900.00

Rp 1,674,300.83 Rp 1,674,300.83 Rp 1,674,300.83

Jumlah Harga : Rp 1,674,300.83

Jumlah total Rp 1,674,300.00

Rp 736,225.36 Rp 736,225.36 Rp 736,225.36

Jumlah Harga : Rp 736,225.36

Jumlah total Rp 736,200.00

Rp 52,807,543.32 Rp 52,807,543.32 Rp 52,807,543.32

Jumlah Harga : Rp 52,807,543.32

Jumlah total Rp 52,807,500.00

1839 of 1892
Rp 11,715,089.83 Rp 11,715,089.83 Rp 11,715,089.83

Jumlah Harga : Rp 11,715,089.83

Jumlah total Rp 11,715,050.00

Rp 31,181,370.92 Rp 31,181,370.92 Rp 31,181,370.92

Jumlah Harga : Rp 31,181,370.92

Jumlah total Rp 31,181,350.00

Rp 16,281,753.99 Rp 16,281,753.99 Rp 16,281,753.99

Jumlah Harga : Rp 16,281,753.99

Jumlah total Rp 16,281,750.00

Rp 22,614,260.69 Rp 22,614,260.69 Rp 22,614,260.69

Jumlah Harga : Rp 22,614,260.69

Jumlah total Rp 22,614,250.00

Rp 15,137,374.56 Rp 15,137,374.56 Rp 15,137,374.56

Jumlah Harga : Rp 15,137,374.56

1840 of 1892
Jumlah total Rp 15,137,350.00

Rp 10,436,576.07 Rp 10,436,576.07 Rp 10,436,576.07

Jumlah Harga : Rp 10,436,576.07

Jumlah total Rp 10,436,550.00

Rp 7,512,819.60 Rp 7,512,819.60 Rp 7,512,819.60

Jumlah Harga : Rp 7,512,819.60

Jumlah total Rp 7,512,800.00

Rp 2,231,248.01 Rp 2,231,248.01 Rp 2,231,248.01

Jumlah Harga : Rp 2,231,248.01

Jumlah total Rp 2,231,200.00

Rp 3,404,123.41 Rp 3,404,123.41 Rp 3,404,123.41

Jumlah Harga : Rp 3,404,123.41

Jumlah total Rp 3,404,100.00

1841 of 1892
Rp 1,322,619.82 Rp 1,322,619.82 Rp 1,322,619.82

Jumlah Harga : Rp 1,322,619.82

Jumlah total Rp 1,322,600.00

Rp 651,169.84 Rp 651,169.84 Rp 651,169.84

Jumlah Harga : Rp 651,169.84

Jumlah total Rp 651,150.00

Rp 343,802.45 Rp 343,802.45 Rp 343,802.45

Jumlah Harga : Rp 343,802.45

Jumlah total Rp 343,800.00

Rp 1,188,053.08 Rp 1,188,053.08 Rp 1,188,053.08

Jumlah Harga : Rp 1,188,053.08

Jumlah total Rp 1,188,050.00

Rp 716,939.77 Rp 716,939.77 Rp 716,939.77

Jumlah Harga : Rp 716,939.77

Jumlah total Rp 716,900.00

1842 of 1892
Rp 428,261.25 Rp 428,261.25 Rp 428,261.25

Jumlah Harga : Rp 428,261.25

Jumlah total Rp 428,250.00

Rp 243,368.19 Rp 243,368.19 Rp 243,368.19

Jumlah Harga : Rp 243,368.19

Jumlah total Rp 243,350.00

Rp 165,700.43 Rp 165,700.43 Rp 165,700.43

Jumlah Harga : Rp 165,700.43

Jumlah total Rp 165,700.00

Rp 140,447.55 Rp 140,447.55 Rp 140,447.55

Jumlah Harga : Rp 140,447.55

Jumlah total Rp 140,400.00

Rp 117,702.66 Rp 117,702.66 Rp 117,702.66

1843 of 1892
Jumlah Harga : Rp 117,702.66

Jumlah total Rp 117,700.00

Rp 89,682.33 Rp 89,682.33 Rp 89,682.33

Jumlah Harga : Rp 89,682.33

Jumlah total Rp 89,650.00

Rp 45,316.82 Rp 45,316.82 Rp 45,316.82

Jumlah Harga : Rp 45,316.82

Jumlah total Rp 45,300.00

Rp 1,341,602.73 Rp 1,341,602.73 Rp 1,341,602.73

Jumlah Harga : Rp 1,341,602.73

Jumlah total Rp 1,341,600.00

Rp 856,176.56 Rp 856,176.56 Rp 856,176.56

Jumlah Harga : Rp 856,176.56

Jumlah total Rp 856,150.00

1844 of 1892
Rp 437,601.35 Rp 437,601.35 Rp 437,601.35

Jumlah Harga : Rp 437,601.35

Jumlah total Rp 437,600.00

Rp 216,206.20 Rp 216,206.20 Rp 216,206.20

Jumlah Harga : Rp 216,206.20

Jumlah total Rp 216,200.00

Rp 190,261.46 Rp 190,261.46 Rp 190,261.46

Jumlah Harga : Rp 190,261.46

Jumlah total Rp 190,250.00

Rp 137,507.14 Rp 137,507.14 Rp 137,507.14

Jumlah Harga : Rp 137,507.14

Jumlah total Rp 137,500.00

Rp 110,697.58 Rp 110,697.58 Rp 110,697.58

Jumlah Harga : Rp 110,697.58

1845 of 1892
Jumlah total Rp 110,650.00

Rp 86,482.48 Rp 86,482.48 Rp 86,482.48

Jumlah Harga : Rp 86,482.48

Jumlah total Rp 86,450.00

Rp 40,646.77 Rp 40,646.77 Rp 40,646.77

Jumlah Harga : Rp 40,646.77

Jumlah total Rp 40,600.00

Rp 934,010.79 Rp 934,010.79 Rp 934,010.79

Jumlah Harga : Rp 934,010.79

Jumlah total Rp 934,000.00

Rp 691,859.85 Rp 691,859.85 Rp 691,859.85

Jumlah Harga : Rp 691,859.85

Jumlah total Rp 691,850.00

1846 of 1892
Rp 198,909.71 Rp 198,909.71 Rp 198,909.71

Jumlah Harga : Rp 198,909.71

Jumlah total Rp 198,900.00

Rp 168,640.84 Rp 168,640.84 Rp 168,640.84

Jumlah Harga : Rp 168,640.84

Jumlah total Rp 168,600.00

Rp 65,726.69 Rp 65,726.69 Rp 65,726.69

Jumlah Harga : Rp 65,726.69

Jumlah total Rp 65,700.00

Rp 63,997.04 Rp 63,997.04 Rp 63,997.04

Jumlah Harga : Rp 63,997.04

Jumlah total Rp 63,950.00

Rp 62,267.39 Rp 62,267.39 Rp 62,267.39

Jumlah Harga : Rp 62,267.39

Jumlah total Rp 62,250.00

1847 of 1892
Rp 1,025,682.22 Rp 1,025,682.22 Rp 1,025,682.22

Jumlah Harga : Rp 1,025,682.22

Jumlah total Rp 1,025,650.00

Rp 517,165.24 Rp 517,165.24 Rp 517,165.24

Jumlah Harga : Rp 517,165.24

Jumlah total Rp 517,150.00

Rp 193,720.76 Rp 193,720.76 Rp 193,720.76

Jumlah Harga : Rp 193,720.76

Jumlah total Rp 193,700.00

Rp 123,669.95 Rp 123,669.95 Rp 123,669.95

Jumlah Harga : Rp 123,669.95

Jumlah total Rp 123,650.00

Rp 1,608,574.14 Rp 1,608,574.14 Rp 1,608,574.14

1848 of 1892
Jumlah Harga : Rp 1,608,574.14

Jumlah total Rp 1,608,550.00

Rp 977,252.03 Rp 977,252.03 Rp 977,252.03

Jumlah Harga : Rp 977,252.03

Jumlah total Rp 977,250.00

Rp 187,494.02 Rp 187,494.02 Rp 187,494.02

Jumlah Harga : Rp 187,494.02

Jumlah total Rp 187,450.00

Rp 159,992.59 Rp 159,992.59 Rp 159,992.59

Jumlah Harga : Rp 159,992.59

Jumlah total Rp 159,950.00

Rp 161,722.24 Rp 161,722.24 Rp 161,722.24

Jumlah Harga : Rp 161,722.24

Jumlah total Rp 161,700.00

1849 of 1892
Rp 132,318.20 Rp 132,318.20 Rp 132,318.20

Jumlah Harga : Rp 132,318.20

Jumlah total Rp 132,300.00

Rp 374,469.14 Rp 374,469.14 Rp 374,469.14

Jumlah Harga : Rp 374,469.14

Jumlah total Rp 374,450.00

Rp 142,696.09 Rp 142,696.09 Rp 142,696.09

Jumlah Harga : Rp 142,696.09

Jumlah total Rp 142,650.00

Rp 475,653.65 Rp 475,653.65 Rp 475,653.65

Jumlah Harga : Rp 475,653.65

Jumlah total Rp 475,650.00

Rp 415,115.91 Rp 415,115.91 Rp 415,115.91

Jumlah Harga : Rp 415,115.91

1850 of 1892
Jumlah total Rp 415,100.00

Rp 259,447.44 Rp 259,447.44 Rp 259,447.44

Jumlah Harga : Rp 259,447.44

Jumlah total Rp 259,400.00

Rp 830,231.82 Rp 830,231.82 Rp 830,231.82

Jumlah Harga : Rp 830,231.82

Jumlah total Rp 830,200.00

Rp 658,996.50 Rp 658,996.50 Rp 658,996.50

Jumlah Harga : Rp 658,996.50

Jumlah total Rp 658,950.00

Rp 447,546.84 Rp 447,546.84 Rp 447,546.84

Jumlah Harga : Rp 447,546.84

Jumlah total Rp 447,500.00

1851 of 1892
Rp 221,178.94 Rp 221,178.94 Rp 221,178.94

Jumlah Harga : Rp 221,178.94

Jumlah total Rp 221,150.00

Rp 188,099.40 Rp 188,099.40 Rp 188,099.40

Jumlah Harga : Rp 188,099.40

Jumlah total Rp 188,050.00

Rp 1,096,165.45 Rp 1,096,165.45 Rp 1,096,165.45

Jumlah Harga : Rp 1,096,165.45

Jumlah total Rp 1,096,150.00

Rp 496,841.85 Rp 496,841.85 Rp 496,841.85

Jumlah Harga : Rp 496,841.85

Jumlah total Rp 496,800.00

Rp 20,469,235.72 Rp 20,469,235.72 Rp 20,469,235.72

Jumlah Harga : Rp 20,469,235.72

Jumlah total Rp 20,469,200.00

1852 of 1892
Rp 8,648,248.09 Rp 8,648,248.09 Rp 8,648,248.09

Jumlah Harga : Rp 8,648,248.09

Jumlah total Rp 8,648,200.00

Rp 6,486,186.07 Rp 6,486,186.07 Rp 6,486,186.07

Jumlah Harga : Rp 6,486,186.07

Jumlah total Rp 6,486,150.00

Rp 9,513,072.90 Rp 9,513,072.90 Rp 9,513,072.90

Jumlah Harga : Rp 9,513,072.90

Jumlah total Rp 9,513,050.00

Rp 8,215,835.69 Rp 8,215,835.69 Rp 8,215,835.69

Jumlah Harga : Rp 8,215,835.69

Jumlah total Rp 8,215,800.00

Rp 183,013.40 Rp 183,013.40 Rp 183,013.40

1853 of 1892
Jumlah Harga : Rp 183,013.40

Jumlah total Rp 183,000.00

Rp 183,013.40 Rp 183,013.40 Rp 183,013.40

Jumlah Harga : Rp 183,013.40

Jumlah total Rp 183,000.00

Rp 8,896,279.85 Rp 8,896,279.85 Rp 8,896,279.85

Jumlah Harga : Rp 8,896,279.85

Jumlah total Rp 8,896,250.00

Rp 10,933,555.89 Rp 10,933,555.89 Rp 10,933,555.89

Jumlah Harga : Rp 10,933,555.89

Jumlah total Rp 10,933,550.00

Rp 7,870,572.91 Rp 7,870,572.91 Rp 7,870,572.91

Jumlah Harga : Rp 7,870,572.91

Jumlah total Rp 7,870,550.00

1854 of 1892
Rp 2,770,297.43 Rp 2,770,297.43 Rp 2,770,297.43

Jumlah Harga : Rp 2,770,297.43

Jumlah total Rp 2,770,250.00

Rp 2,792,947.60 Rp 2,792,947.60 Rp 2,792,947.60

Jumlah Harga : Rp 2,792,947.60

Jumlah total Rp 2,792,900.00

Rp 1,385,601.72 Rp 1,385,601.72 Rp 1,385,601.72

Jumlah Harga : Rp 1,385,601.72

Jumlah total Rp 1,385,600.00

Rp 620,161.75 Rp 620,161.75 Rp 620,161.75

Jumlah Harga : Rp 620,161.75

Jumlah total Rp 620,150.00

Rp 614,272.71 Rp 614,272.71 Rp 614,272.71

Jumlah Harga : Rp 614,272.71

1855 of 1892
Jumlah total Rp 614,250.00

Rp 335,222.57 Rp 335,222.57 Rp 335,222.57

Jumlah Harga : Rp 335,222.57

Jumlah total Rp 335,200.00

Rp 856,176.56 Rp 856,176.56 Rp 856,176.56

Jumlah Harga : Rp 856,176.56

Jumlah total Rp 856,150.00

Rp 43,958,550.86 Rp 43,958,550.86 Rp 43,958,550.86

Jumlah Harga : Rp 43,958,550.86

Jumlah total Rp 43,958,550.00

Rp 464,781.56 Rp 464,781.56 Rp 464,781.56

Jumlah Harga : Rp 464,781.56

Jumlah total Rp 464,750.00

1856 of 1892
Rp 7,937,979.83 Rp 7,937,979.83 Rp 7,937,979.83

Jumlah Harga : Rp 7,937,979.83

Jumlah total Rp 7,937,950.00

Rp 3,277,027.11 Rp 3,277,027.11 Rp 3,277,027.11

Jumlah Harga : Rp 3,277,027.11

Jumlah total Rp 3,277,000.00

Rp 2,115,979.22 Rp 2,115,979.22 Rp 2,115,979.22

Jumlah Harga : Rp 2,115,979.22

Jumlah total Rp 2,115,950.00

Rp 1,749,318.21 Rp 1,749,318.21 Rp 1,749,318.21

Jumlah Harga : Rp 1,749,318.21

Jumlah total Rp 1,749,300.00

Rp 690,377.29 Rp 690,377.29 Rp 690,377.29

Jumlah Harga : Rp 690,377.29

Jumlah total Rp 690,350.00

1857 of 1892
Rp 1,721,050.79 Rp 1,721,050.79 Rp 1,721,050.79

Jumlah Harga : Rp 1,721,050.79

Jumlah total Rp 1,721,050.00

Rp 208,381.60 Rp 208,381.60 Rp 208,381.60

Jumlah Harga : Rp 208,381.60

Jumlah total Rp 208,350.00

Rp 39,954.91 Rp 39,954.91 Rp 39,954.91

Rp 3,995.49 Rp 3,995.49 Rp 3,995.49

Jumlah harga : Rp 43,950.40

Overhead + Profit 10% Rp 4,395.04

Jumlah total : Rp 48,300.00

Rp 63,737.59 Rp 63,737.59 Rp 63,737.59

1858 of 1892
Rp 6,373.76 Rp 6,373.76 Rp 6,373.76

Jumlah harga : Rp 70,111.35

Overhead + Profit 10% Rp 7,011.13

Jumlah total : Rp 77,100.00

Rp 161,722.24 Rp 161,722.24 Rp 161,722.24

Rp 16,172.22 Rp 16,172.22 Rp 16,172.22

Jumlah harga : Rp 177,894.46

Overhead + Profit 10% Rp 17,789.45

Jumlah total : Rp 195,650.00

Rp 422,380.44 Rp 422,380.44 Rp 422,380.44

Rp 42,238.04 Rp 42,238.04 Rp 42,238.04

Jumlah harga : Rp 464,618.48

Overhead + Profit 10% Rp 46,461.85

Jumlah total : Rp 511,050.00

1859 of 1892
Rp 2,963,512.47 Rp 2,963,512.47 Rp 2,963,512.47

Rp 296,351.25 Rp 296,351.25 Rp 296,351.25

Jumlah harga : Rp 3,259,863.72

Overhead + Profit 10% Rp 325,986.37

Jumlah total : Rp 3,585,850.00

Rp 7,610.46 Rp 7,610.46 Rp 7,610.46

Rp 761.05 Rp 761.05 Rp 761.05

Jumlah harga : Rp 8,371.50

Overhead + Profit 10% Rp 837.15

Jumlah total : Rp 9,200.00

Rp 7,134.80 Rp 7,134.80 Rp 7,134.80

Rp 713.48 Rp 713.48 Rp 713.48

Jumlah harga : Rp 7,848.29

Overhead + Profit 10% Rp 784.83

Jumlah total : Rp 8,600.00

1860 of 1892
Rp 14,650.13 Rp 14,650.13 Rp 14,650.13

Rp 1,465.01 Rp 1,465.01 Rp 1,465.01

Jumlah harga : Rp 16,115.15

Overhead + Profit 10% Rp 1,611.51

Jumlah total : Rp 17,700.00

Rp 15,696.57 Rp 15,696.57 Rp 15,696.57

Rp 1,569.66 Rp 1,569.66 Rp 1,569.66

Jumlah harga : Rp 17,266.23

Overhead + Profit 10% Rp 1,726.62

Jumlah total : Rp 18,950.00

Rp 35,674.02 Rp 35,674.02 Rp 35,674.02

Rp 3,567.40 Rp 3,567.40 Rp 3,567.40

Jumlah harga : Rp 39,241.43

Overhead + Profit 10% Rp 3,924.14

Jumlah total : Rp 43,150.00

1861 of 1892
Rp 46,043.27 Rp 46,043.27 Rp 46,043.27

Rp 4,604.33 Rp 4,604.33 Rp 4,604.33

Jumlah harga : Rp 50,647.60

Overhead + Profit 10% Rp 5,064.76

Jumlah total : Rp 55,700.00

Rp 119,103.67 Rp 119,103.67 Rp 119,103.67

Rp 11,910.37 Rp 11,910.37 Rp 11,910.37

Jumlah harga : Rp 131,014.04

Overhead + Profit 10% Rp 13,101.40

Jumlah total : Rp 144,100.00

Rp 147,452,629.95 Rp 147,452,629.95

Rp 3,096,505.23 Rp 3,096,505.23 Rp 150,549,135.18

1862 of 1892
Rp 752,745.68 Rp 752,745.68 Rp 752,745.68

Jumlah harga : Rp 151,301,880.85

Overhead + Profit 10% Rp 15,130,188.09

Jumlah total : Rp 166,432,050.00

Rp 34,056,800.98 Rp 34,056,800.98 Rp 34,056,800.98

Rp 3,405,680.10 Rp 3,405,680.10 Rp 3,405,680.10

Jumlah harga : Rp 37,462,481.08

Jumlah total : Rp 37,462,450.00

Rp 54,700,169.18 Rp 54,700,169.18 Rp 54,700,169.18

Rp 5,470,016.92 Rp 5,470,016.92 Rp 5,470,016.92

Jumlah harga : Rp 60,170,186.09

Jumlah total : Rp 60,170,150.00

1863 of 1892
Rp 184,467,045.30 Rp 184,467,045.30 Rp 184,467,045.30

Jumlah harga : Rp 184,467,045.30

Jumlah total : Rp 184,467,000.00

Rp 19,530.00 Rp 19,530.00 Rp 19,530.00

Rp 76,500.00 Rp 7,650.00

Rp 91,800.00 Rp 918.00 Rp 8,568.00

Jumlah : Rp 28,098.00

Overhead + Profit 10% Rp 2,809.80

Jumlah Harga : Rp 30,900.00

Rp 68,250.00 Rp 81,900.00 Rp 81,900.00

Rp 76,500.00 Rp 19,125.00

Rp 91,800.00 Rp 2,295.00 Rp 21,420.00

Jumlah : Rp 103,320.00

Overhead + Profit 10% Rp 10,332.00

Jumlah Harga : Rp 113,650.00

1864 of 1892
Rp 577,500.00 Rp 577,500.00 Rp 577,500.00

Rp 76,500.00 Rp 19,125.00

Rp 91,800.00 Rp 2,295.00 Rp 21,420.00

Jumlah : Rp 598,920.00

Overhead + Profit 10% Rp 59,892.00

Jumlah Harga : Rp 658,800.00

Rp 67,918.20 Rp 163,003.68

Rp 32,829.30 Rp 19,697.58

Rp 3,675.00 Rp 44,100.00

Rp 26,250.00 Rp 26,250.00

Rp 31,500.00 Rp 31,500.00 Rp 284,551.26

Rp 81,600.00 Rp 16,320.00

Rp 86,700.00 Rp 1,734.00

Rp 76,500.00 Rp 15,300.00

Rp 91,800.00 Rp 1,836.00 Rp 35,190.00

1865 of 1892
Jumlah : Rp 319,741.26

Overhead + Profit 10% Rp 31,974.13

Jumlah total Rp 351,700.00

per m' Rp 146,541.67

Rp 67,918.20 Rp 295,444.17

Rp 32,829.30 Rp 1,037,405.88

Rp 38,808.00 Rp 209,563.20

Rp 3,675.00 Rp 44,100.00

Rp 26,250.00 Rp 26,250.00

Rp 31,500.00 Rp 31,500.00 Rp 1,644,263.25

Rp 81,600.00 Rp 32,640.00

Rp 86,700.00 Rp 3,468.00

Rp 76,500.00 Rp 30,600.00

Rp 91,800.00 Rp 3,672.00 Rp 70,380.00

Jumlah : Rp 1,714,643.25

Overhead + Profit 10% Rp 171,464.33

Jumlah total Rp 1,886,100.00

per m' Rp 433,586.21

1866 of 1892
Rp 67,918.20 Rp 339,591.00

Rp 32,829.30 Rp 24,621.98

Rp 1,953,000.00 Rp 5,710,572.00

Rp 126,000.00 Rp 554,400.00

Rp 588,000.00 Rp 3,528,000.00

Rp 462,000.00 Rp 1,848,000.00

Rp 693,000.00 Rp 6,930,000.00

Rp 21,000.00 Rp 105,000.00

Rp 190,401.85 Rp 190,401.85 Rp 19,230,586.82

Rp 81,600.00 Rp 40,800.00

Rp 86,700.00 Rp 4,335.00

Rp 76,500.00 Rp 38,250.00

Rp 91,800.00 Rp 4,590.00 Rp 87,975.00

Jumlah : Rp 19,318,561.82

Overhead + Profit 10% Rp 1,931,856.18

Jumlah total : Rp 21,250,400.00

Per m' Rp 4,250,080.00

1867 of 1892
Rp 46,567.50 Rp 2,724,198.75

Rp 18,400.00 Rp 168,994.80

Rp 23,650.00 Rp 468,221.75

Rp 10,185.00 Rp 855,540.00

Rp 632,543.30 Rp 632,543.30

Rp 242,474.93 Rp 242,474.93 Rp 5,091,973.53

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 30,600.00

Rp 91,800.00 Rp 1,836.00 Rp 212,976.00

Jumlah : Rp 5,304,949.53

Overhead + Profit 10% Rp 530,494.95

Jumlah total : Rp 5,835,400.00

harga per m' Rp 244,670.86

Rp 42,000.00 Rp 306,600.00

Rp 136,500.00 Rp 8,190.00

Rp 10,185.00 Rp 122,220.00

1868 of 1892
Rp 100,000.00 Rp 100,000.00

Rp 26,850.50 Rp 26,850.50 Rp 563,860.50

Rp 81,600.00 Rp 163,200.00

Rp 86,700.00 Rp 17,340.00

Rp 76,500.00 Rp 30,600.00

Rp 91,800.00 Rp 1,836.00 Rp 212,976.00

Jumlah : Rp 776,836.50

Overhead + Profit 10% Rp 77,683.65

Jumlah total Rp 854,500.00

Rp 577,500.00 Rp 278,932,500.00

Rp 157,500.00 Rp 76,072,500.00

Rp 29,400.00 Rp 14,200,200.00

Rp 88,550.00 Rp 26,423,320.00

Rp 157,500.00 Rp 51,048,900.00

Rp 556,500.00 Rp 13,356,000.00

Rp 3,675,000.00 Rp 3,675,000.00

Rp 2,310,000.00 Rp 748,717,200.00

Jumlah : Rp 1,212,425,620.00

Overhead + Profit 10% Rp 121,242,562.00

1869 of 1892
Jumlah total Rp 1,333,668,150.00

Rp 16,032,450.00 Rp 16,032,450.00

Rp 262,500.00 Rp 8,316,000.00

Rp 2,434,845.00 Rp 2,434,845.00

Rp 26,783,295.00

Jumlah : Rp 26,783,295.00

Overhead + Profit 10% Rp 2,678,329.50

Jumlah total Rp 29,461,600.00

Rp 1,751,400.00 Rp 3,502,800.00

Rp 157,500.00 Rp 2,268,000.00

Rp 577,080.00 Rp 577,080.00

1870 of 1892
Rp 6,347,880.00

Jumlah : Rp 6,347,880.00

Overhead + Profit 10% Rp 634,788.00

Jumlah total Rp 6,982,650.00

Rp 19,602,450.00 Rp 19,602,450.00

Rp 262,500.00 Rp 10,237,500.00

Rp 2,983,995.00 Rp 2,983,995.00

Rp 32,823,945.00

Jumlah : Rp 32,823,945.00

Overhead + Profit 10% Rp 3,282,394.50

Jumlah total Rp 36,106,300.00

Rp 4,693,185.00 Rp 4,693,185.00

1871 of 1892
Rp 262,500.00 Rp 2,222,876.25

Rp 691,606.13 Rp 691,606.13

Rp 7,607,667.38

Jumlah : Rp 7,607,667.38

Overhead + Profit 10% Rp 760,766.74

Jumlah total Rp 8,368,400.00

Rp 2,982,420.00 Rp 5,964,840.00

Rp 157,500.00 Rp 2,244,375.00

Rp 820,921.50 Rp 820,921.50

Rp 9,030,136.50

Jumlah : Rp 9,030,136.50

Overhead + Profit 10% Rp 903,013.65

1872 of 1892
Jumlah total Rp 9,933,150.00

Rp 488,775.00 Rp 488,775.00

Rp 488,775.00

Jumlah : Rp 488,775.00

Overhead + Profit 10% Rp 48,877.50

Jumlah total Rp 537,650.00

Rp 1,911,000.00 Rp 7,223,580.00

Rp 78,750.00 Rp 297,675.00

Rp 29,400.00 Rp 111,132.00

Jumlah : Rp 7,632,387.00

Overhead + Profit 10% Rp 763,238.70

Jumlah total Rp 8,395,600.00

1873 of 1892
Rp 1,239,000.00 Rp 73,381,757.40

Rp 78,750.00 Rp 4,664,094.75

Rp 29,400.00 Rp 1,741,262.04

Jumlah : Rp 79,787,114.19

Overhead + Profit 10% Rp 7,978,711.42

Jumlah total Rp 87,765,800.00

Rp 294,000.00 Rp 13,762,110.60

Rp 78,750.00 Rp 3,686,279.63

Rp 29,400.00 Rp 1,376,211.06

Jumlah : Rp 18,824,601.29

Overhead + Profit 10% Rp 1,882,460.13

Jumlah total Rp 20,707,050.00

Rp 206,609.38 Rp 206,609.38 Rp 206,609.38

Rp 10,330.47 Rp 10,330.47 Rp 10,330.47

1874 of 1892
Jumlah : Rp 216,939.84

Overhead + Profit 10% Rp 21,693.98

Jumlah total Rp 238,600.00

Rp 97,000.13 Rp 97,000.13 Rp 97,000.13

Rp 4,850.01 Rp 4,850.01 Rp 4,850.01

Jumlah : Rp 101,850.14

Overhead + Profit 10% Rp 10,185.01

Jumlah total Rp 112,000.00

Rp 1,243,958.33 Rp 1,243,958.33

Rp 28,700.00 Rp 28,700.00 Rp 1,272,658.33

Rp 63,632.92 Rp 63,632.92 Rp 63,632.92

Jumlah : Rp 1,336,291.25

Overhead + Profit 10% Rp 133,629.13

Jumlah total Rp 1,469,900.00

1875 of 1892
Rp 360,000.00 Rp 18,036.00

Rp 367,500.00 Rp 12,899.25

Rp 513,000.00 Rp 14,553.81

Rp 250,000.00 Rp 10,025.00 Rp 55,514.06

Rp 69,615.00 Rp 71,007.30 Rp 71,007.30

Rp 76,500.00 Rp 9,210.60

Rp 91,800.00 Rp 2,763.18 Rp 11,973.78

Jumlah : Rp 138,495.14

Overhead + Profit 10% Rp 13,849.51

Jumlah total Rp 152,300.00

1876 of 1892
PEMBANGUNAN No
GEDUNG KANTOR BUPATI DAFTAR HARGA Tanggal
KABUPATEN LOMBOK TENGAH UPAH DAN BAHAN Lokasi
Owner

SPESIFIKASI BAHAN /
NO URAIAN SATUAN
MERK SEKUALITAS

UPAH TENAGA :
1 Tukang batu Org/Hari
2 Tukang kayu Org/Hari
3 Tukang besi Org/Hari
4 Tukang cat Org/Hari
5 Tukang las Org/Hari
6 Tukang almunium Org/Hari
7 Tukang listrik Org/Hari
8 Kepala tukang batu Org/Hari
9 Kepala tukang kayu Org/Hari
10 Kepala tukang besi Org/Hari
11 Kepala tukang cat Org/Hari
12 Kepala tukang almunium Org/Hari
13 Kepala tukang listrik Org/Hari
14 Pekerja Org/Hari
15 Operator Org/Hari
16 Mandor Org/Hari
HARGA BAHAN :
1 Pasir cor / pasir beton m3
2 Pasir pasang m3
3 Pasir urug m3
4 Rumput gajah mini m2
5 Split 2/3 (mesin) m3
6 Batu koral m3
7 Batu belah m3
8 Bata merah bh
9 Semen portland (PCC) kg
10 Tanah urug m3
11 Ijuk ikat
12 Bata ringan pcs
13 Paving blok K-400 t = 8 cm m2
14 Semen instan untuk pasangan bata ringan kg
15 Semen instan untuk plesteran kg
16 Semen instan untuk acian kg
17 Anti rayap m2
18 Plat galvanis tebal 0.45 mm m2
1877 of 1892
19 Buis beton Ø 800 mm tinggi 500 mm bh

20 Homogeneous Tile Polished Tipe A 600 x 600 mm ( Warna hitam ) m2


21 Homogeneous Tile Semipolished / Lappato Tipe B 600 x 600 mm ( Gelap ) m2
22 Homogeneous Tile Semipolished / Lappato Tipe C 600 x 600 mm ( Terang ) m2
23 Homogeneous Tile Matt Tipe A 600 x 600 mm ( Warna Hitam ) m2
24 Homogeneous Tile Matt Tipe B 600 x 600 mm m2
25 Homogeneous Tile Unpolished lantai Km/Wc 300 x 600 mm m2
26 Homogeneous Tile Matt Tipe B 300 x 600 mm + step nosing ( Area tangga ) m2
27 Homogeneous Tile Polished dinding Km/Wc 300 x 600 mm m2
28 Homogeneous Tile Polished 600 x 600 mm ( Warna cerah ) m2
29 Homogeneous Tile 300 x 600 jumplift m2
30 Keramik 300x300 mm m2
31 Karpet tebal 4.3 mm m2
32 Finishing karpet tile 500x500 mm tebal 6.2 mm m2
33 Stepnosing 80x600mm matt pcs
34 Epoxy m2
35 Floor hardener 5 kg/m2 m2
36 Kulit batu m2
37 Alat bantu potong keramik ls
38 Cairan dilatasi kg
39 Perekat semen instan kg
40 Semen warna kg

41 Kayu kelas III (begesting) m3


42 Kayu 5/7 x 4m klas III m3
43 Paku biasa 2'-5" kg
44 Minyak begesting ltr
45 Balok Kayu kelas II m3
46 Plywood tbl : 9 mm lbr
47 Kayu Dolken Ø 8-10/ 4 m bh
48 Spacer penjaga jarak bh
49 Scafolding (sewa) bh
50 Stamper (sewa) jam
51 Excavator (sewa) jam
52 Beton readymix f'c 25 MPa m3
53 Beton readymix f'c 15 MPa m3
54 Besi beton kg
55 Baja kg
56 Plat Baja kg
57 Angkur Ø 10 mm bh
58 Angkur Ø 12 mm bh
59 Buis beton Ø 300 mm bh
60 Seng Glb BJLS 0,2 210x85 cm lbr
61 Multiplek 18 mm m2

1878 of 1892
62 Plywood 15 mm m2
63 HPL tebal 0.7 mm m2
64 lem kayu kg
65 plint cellulos and fiber cement mixture, tinggi 50 mm m1
66 plint cellulos and fiber cement mixture, tinggi 100 mm m1
67 Kawat ayam m2
68 Dynabolt Ø 12 mm bh
69 Kawat beton kg

70 Frame alumunium jendela dan boven m1


71 Frame alumunium pintu m1
72 Kusen alumunium pintu dan jendela 35x70 mm, tebal 1.2 mm m1
73 Back mulion curtaint wall 50x100mm, tebal 2 mm m1
74 Back transome curtaint wall 28x50mm, tebal 1.2 mm m1
75 Karet m1
76 Sealant tube
77 Kaca cermin m2
78 Kaca 6 mm bening m2
79 Kaca 8 mm bening m2
80 Kaca dark grey t: 5 mm m2
81 Kaca euro grey t: 8 mm m2
82 Kaca tempered 12 polos mm + heat soak m2
83 Kaca tempered 8 polos mm + heat soak m2
84 Kaca tempered 10 polos mm + heat soak m2
85 Kaca sunergy blue green t: 6 mm m2
86 Kaca sunergy blue green t: 8 mm m2
87 Engineering Door Flush core uk. 1400x2365mm unit
88 Engineering Door Flush core + door viewer kaca 5mm dark grey uk. 1400x2365mm unit
89 Engineering Door Flush core + stainless steel, t= 1 mm uk. 1400x2365mm unit
90 Lever Handle psg

1879 of 1892
91 Engsel bh
92 Lockcase bh
93 Cylinder bh
94 Door closer bh
95 Escutecheon psg
96 Flush bolt bh
97 Friction stay bouven set
98 Friction stay jendela set
99 Casement handle bh
100 Patch fitting ambang bawah bh
101 Patch fitting ambang atas bh
102 Patch fitting engsel bh
103 Patch fitting kunci bh
104 Floor hinges bh
105 Pull handle uk.30x30x1.2mm, panjang 900 mm, stainless st psg
106 Pull handle uk.30x30x1.2mm, panjang 1530 mm, stainless steel psg
107 Kusen dan daun pintu besi tahan api 2200x1100mm unit
108 Doorhandle/backplate set
109 Lockase pintu tahan api bh
110 Cylinder pintu tahan api bh
111 Door closer pintu tahan api set

112 UFC-Frame 35/22/0,455 @ 4000 pcs


113 UFC-Clip bh
114 UFC-Bracket bh
115 Angle Section btg
116 Rod hanger Ø 4 mm bh
117 Soffit cleat bh
118 Gypsum board 12 mm Lbr
119 Kalsium silikat 6 mm Lbr
120 Akustik board 12,5 mm Lbr
121 Rockwool 40 kg/m3 , tebal 50mm m2
122 AKUSTIK 1200x2000x12,5 mm m2
123 AKUSTIK 600x1200x15 mm m2
124 Sticker sandblasting m2
125 Compound @ 20 Kg zak
126 Cotton tape (25mm) roll
127 Screw 25 mm bh
128 Paku beton pcs
129 Shadow line btg
130 C-Stud 75 mm (0.5mm) pcs
131 U-Channel 75 mm ( 0.4 mm) btg
132 Stoping angle m1
133 Aplikator plafon m2

1880 of 1892
134 Cat zincromate kg
135 Cat besi kg
136 Cat dinding luar (terpasang) m2
137 Cat dinding dalam (terpasang) m2
138 Cat dinding plafond (terpasang) m2
139 Wall filler (penutup 2x) kg
140 Lemkra TG 301 ltr
141 Lemkra FK 103 kg
142 Lemkra DS 105 Putih kg
143 Lemkra DS 105 Abu kg
144 Fiberglass Mesh m2
145 Wood filler kg
146 Wood stain ltr
147 Melamine sanding sealer ltr
148 Melamine top coat kg
149 Waterproofing (terpasang) m2

1881 of 1892
150 Pipa PVC AW dia 6" m1
151 Pipa PVC AW dia 5" m1
152 Pipa PVC AW dia 4" m1
153 Pipa PVC AW dia 3" m1
154 Pipa PVC AW dia 2 1/2" m1
155 Pipa PVC AW dia 2" m1
156 Pipa PVC AW dia 1 1/2" m1
157 Pipa PVC AW dia 1 1/4" m1
158 Pipa PVC AW dia 1" m1
159 Pipa PVC AW dia 3/4" m1
160 Pipa PVC AW dia 1/2" m1
161 Pipa PVC D dia 2" m1
162 Pipa PVC D dia 2,5" m1

161 Inbow doos seng bh


162 Pipa Conduit PVC dia. 20 mm2 m1
163 Led Panel 595 x 595mm 36W 4000K bh
164 TKO TL Led T8 1200mm 2 x 18W bh
165 Flat Downlight ∅ 244mm 20W 4000K bh
166 Flat Downlight ∅ 95mm 7W 4000K bh
167 Spotlight Led 5W 4000K + Housing bh
168 Lampu Uplight Pohon 8W 3000K bh
169 Wall Washer 1200mm Led 36W 3000K bh
170 Exit Lamp LED bh
171 LED Strip IP65 4 Watt/mtr c/w adaptor m1
172 LED Strip SMD5050 IP65 14.4 Watt/meter 3000K m1
173 Lampu Barret Led 17W 4000K bh
174 Flood Light Led 40W IP65 4000K bh
175 Stop kontak dinding bh
176 2 gang frame bh
177 2 gang wall box bh
178 Outlet stop kontak bh
179 Stop kontak lantai 2 outlet bh
180 Saklar seri bh
181 Saklar tunggal bh
182 Saklar 3 Gang Switch bh
183 Saklar 4 Gang Switch bh
184 Saklar Tukar Tunggal bh
185 Saklar Tukar Ganda bh
186 Kabel ITC 2x2x0.6 m1
187 Kabel ITC 2x10x0.6 m1
188 Kabel ITC 2x20x0.6 m1
189 Kabel ITC 2x30x0.6 m1
190 Outlet telpon bh
1882 of 1892
191 Meterial bantu instalasi ls
192 Material bantu LAN ls
193 Kabel UTP Cath 6 m1
194 Outlet data komputer bh
195 Bullet Camera set
196 Dome IP Camera set
197 NYMHY 3 x 1,5 mm m1
198 Ceiling speaker bh
199 Wall speaker bh
200 Attenuator bh
201 Kabel tray 400 mm x 100 mm m1
202 Kabel tray 300 mm x 100 mm m1
203 TeeTray 400 mm x 100 mm bh
204 TeeTray 300 mm x 100 mm bh
205 El Bow Tray 400 mm x 100 mm bh
206 El Bow Tray 300 mm x 100 mm bh
207 Kabel Ladder 400 mm x 100 mm m1
208 Kabel Ladder 300 mm x 100 mm m1
209 Gate Valve 3/4" bh
210 Gate Valve 1" bh
211 Gate Valve 1 1/4" bh
212 Gate Valve 1 1/2" bh
213 Gate Valve 2" bh
214 Gate Valve 2 1/2" bh
215 Floor drain bh
216 Kran 1/2 " bh
217 Kloset duduk bh
218 Kloset duduk difable bh
219 Jet washer bh
220 Kitchen Zink + Aksesoris bh
221 Wastafel meja + kran set
222 Wastafel gantung + kran set
223 Kran zink bh
224 Pegangan stainless steel (untuk toilet difabel) bh
225 Urinoir bh
226 Sekat urinoir bh
227 Shower + faucet mix panas dingin set
228 Water Heater 15 liter set
229 Rooftank 2000 Liter PE bh
230 Rooftank 1000 Liter PE bh
231 Autoswitch bh
232 Instalasi bh
233 Septictank kap. 8 m3 bh
234 Septictank kap. 4 m3 bh
235 Septictank kap. 2 m3 bh

1883 of 1892
236 Pompa transfer 70 liter/menit, head 50 m unit
237 Panel kontrol pompa transfer unit
238 Pompa booster 40 liter/menit, head 12 m, include : header, unit
flexible, pressure guage, pressure switch, check valve, gate valve,
base frame, panel kontrol, 1 set terdiri dari 2 pompa
239 Seal tape bh

240 Kabel NYM 3 x 2.5 mm² m1


241 Kabel NYM 2 x 2.5 mm² m1
242 Kabel NYY 4 x 10 mm² m1
243 Kabel NYY 4x2x( 1 x 300 )mm2 m1
244 Material bantu ls
245 Pipa Conduit PVC dia. 20 mm2 m1
246 Ceiling Mounted Cassette kap 15.400 Btu/h unit
247 Ceiling Mounted Cassette kap 19.100 Btu/h unit
248 Ceiling Mounted Cassette kap 24.200 Btu/h unit
249 Ceiling Mounted Cassette kap 36.200 Btu/h unit
250 Ceiling Mounted Cassette kap 47.800 Btu/h unit
251 Slim Mounted Duct kap 7.500 Btu/h unit
252 Slim Mounted Duct kap 15.400 Btu/h unit
253 Outdoor Unit 153.000 Btu/h unit
254 Outdoor Unit 232.000 Btu/h unit
255 Outdoor Unit 249.000 Btu/h unit
256 Outdoor Unit 267.000 Btu/h unit
257 Outdoor Unit 327.000 Btu/h unit
258 Outdoor Unit 365.000 Btu/h unit
259 Outdoor Unit 402.000 Btu/h unit
260 Pipa copper Ø 1/4" m1
261 Pipa copper Ø 3/8" m1
262 Pipa copper Ø 1/2" m1
263 Pipa copper Ø 5/8" m1
264 Pipa copper Ø 3/4" m1
265 Pipa copper Ø 7/8" m1
266 Pipa copper Ø 1" m1
267 Pipa copper Ø 1 1/8" m1
268 Pipa copper Ø 1 3/8" m1
269 Pipa copper Ø 1 5/8" m1
270 Pipa galvanis Ø 8" btg
271 Refrigerant Joint Pipe unit
272 Wired Remote Controller bh
273 Aksesoris cover panel bh
274 P-AIMS BASIC SOFT unit
275 Communication Adaptor conector unt
276 Telephone Terminal Box /TTB bh

1884 of 1892
: 54/BA-DIVREG.3/SPH/XI/2017
: 13 November 2017
: LOMBOK TENGAH
: KABUPATEN LOMBOK TENGAH

HARGA SATUAN

Rp 81,600.00
Rp 81,600.00
Rp 81,600.00
Rp 81,600.00
Rp 81,600.00
Rp 81,600.00
Rp 81,600.00
Rp 86,700.00
Rp 86,700.00
Rp 86,700.00
Rp 86,700.00
Rp 86,700.00
Rp 86,700.00
Rp 76,500.00
Rp 102,000.00
Rp 91,800.00

Rp 204,750.00
Rp 120,750.00
Rp 64,365.00
Rp 19,530.00
Rp 354,595.96
Rp 192,340.91
Rp 185,659.09
Rp 787.50
Rp 1,102.50
Rp 69,615.00
Rp 11,550.00
Rp 7,875.00
Rp 159,600.00
Rp 1,325.63
Rp 1,795.50
Rp 564.38
Rp 21,000.00
Rp 106,050.00
1885 of 1892
Rp 111,300.00

Rp 189,525.00
Rp 168,525.00
Rp 168,525.00
Rp 158,025.00
Rp 158,025.00
Rp 158,025.00
Rp 173,775.00
Rp 168,525.00
Rp 158,025.00
Rp 267,750.00
Rp 57,750.00
Rp 682,500.00
Rp 728,700.00
Rp 20,941.20
Rp 157,500.00
Rp 42,000.00
Rp 418,950.00
Rp 6,174.00
Rp 84,735.00
Rp 6,699.00
Rp 5,250.00

Rp 1,858,080.00
Rp 1,984,710.00
Rp 15,750.00
Rp 6,825.00
Rp 2,205,000.00
Rp 102,900.00
Rp 16,800.00
Rp 4,725.00
Rp 47,250.00
Rp 68,670.00
Rp 367,500.00
Rp 798,000.00
Rp 693,000.00
Rp 10,185.00
Rp 8,190.00
Rp 8,190.00
Rp 4,410.00
Rp 5,565.00
Rp 55,650.00
Rp 44,100.00
Rp 69,270.83

1886 of 1892
Rp 58,333.33
Rp 86,100.00
Rp 7,875.00
Rp 23,205.00
Rp 46,410.00
Rp 10,185.00
Rp 5,565.00
Rp 16,590.00

Rp 105,000.00
Rp 105,000.00
Rp 110,250.00
Rp 201,600.00
Rp 168,000.00
Rp 2,625.00
Rp 33,600.00
Rp 157,500.00
Rp 189,000.00
Rp 252,000.00
Rp 126,000.00
Rp 472,500.00
Rp 609,000.00
Rp 451,500.00
Rp 546,000.00
Rp 640,500.00
Rp 850,500.00
Rp 3,990,000.00
Rp 6,405,000.00
Rp 5,880,000.00
Rp 157,500.00

1887 of 1892
Rp 91,350.00
Rp 136,500.00
Rp 110,250.00
Rp 342,300.00
Rp 33,600.00
Rp 178.50
Rp 131,250.00
Rp 404,250.00
Rp 14,962.50
Rp 397,194.00
Rp 397,194.00
Rp 425,565.00
Rp 790,335.00
Rp 1,207,794.00
Rp 437,799.69
Rp 521,408.53
Rp 5,855,774.40
Rp 2,634,450.00
Rp 850,319.40
Rp 235,074.00
Rp 715,759.80

Rp 32,261.88
Rp 1,134.84
Rp 2,512.86
Rp 16,941.54
Rp 2,210.51
Rp 2,579.33
Rp 92,505.00
Rp 118,230.00
Rp 456,750.00
Rp 51,041.67
Rp 106,312.50
Rp 106,312.50
Rp 78,750.00
Rp 46,200.00
Rp 5,880.00
Rp 73.50
Rp 109.20
Rp 5,932.50
Rp 34,020.00
Rp 34,230.00
Rp 4,830.00
Rp 42,000.00

1888 of 1892
Rp 25,200.00
Rp 28,350.00
Rp 29,400.00
Rp 23,100.00
Rp 19,950.00
Rp 86,100.00
Rp 18,900.00
Rp 12,495.00
Rp 10,920.00
Rp 9,765.00
Rp 15,879.82
Rp 34,650.00
Rp 64,050.00
Rp 4,462.50
Rp 44,625.00
Rp 68,250.00

1889 of 1892
Rp 154,672.88
Rp 110,281.50
Rp 69,599.25
Rp 42,005.25
Rp 29,814.75
Rp 20,435.63
Rp 15,970.50
Rp 13,915.13
Rp 9,284.63
Rp 6,804.00
Rp 4,984.88
Rp 12,663.00
Rp 17,104.50

Rp 10,557.54
Rp 3,343.22
Rp 1,229,850.00
Rp 540,883.64
Rp 594,000.00
Rp 234,000.00
Rp 214,200.00
Rp 230,400.00
Rp 3,915,000.00
Rp 566,100.00
Rp 53,865.00
Rp 106,200.00
Rp 191,268.00
Rp 1,890,000.00
Rp 35,831.65
Rp 20,016.82
Rp 45,703.64
Rp 88,744.09
Rp 754,367.73
Rp 47,250.00
Rp 30,068.18
Rp 77,833.64
Rp 137,454.55
Rp 38,057.73
Rp 79,895.45
Rp 3,959.08
Rp 16,065.00
Rp 27,405.00
Rp 39,690.00
Rp 72,593.18
1890 of 1892
Rp 8,797.95
Rp 4,398.98
Rp 13,196.93
Rp 123,365.45
Rp 5,622,750.00
Rp 2,882,250.00
Rp 7,305.82
Rp 94,500.00
Rp 567,000.00
Rp 105,840.00
Rp 273,510.00
Rp 227,880.00
Rp 415,620.00
Rp 346,320.00
Rp 315,000.00
Rp 288,630.00
Rp 191,457.00
Rp 172,273.50
Rp 198,544.50
Rp 280,665.00
Rp 385,654.50
Rp 478,170.00
Rp 723,492.00
Rp 1,538,460.00
Rp 356,265.00
Rp 270,270.00
Rp 3,402,000.00
Rp 4,460,400.00
Rp 375,165.00
Rp 337,365.00
Rp 2,830,275.00
Rp 1,713,285.00
Rp 446,040.00
Rp 669,060.00
Rp 2,598,750.00
Rp 1,228,500.00
Rp 3,222,450.00
Rp 8,410,500.00
Rp 2,409,750.00
Rp 1,181,250.00
Rp 65,984.63
Rp 197,953.88
Rp 37,327,500.00
Rp 21,262,500.00
Rp 11,056,500.00

1891 of 1892
Rp 26,932,500.00
Rp 7,560,000.00
Rp 80,325,000.00

Rp 2,199.49

Rp 10,810.80
Rp 9,251.55
Rp 66,528.00
Rp 367,983.00
Rp 8,797.95
Rp 2,988.56
Rp 13,526,730.00
Rp 14,025,690.00
Rp 15,685,110.00
Rp 15,831,585.00
Rp 16,008,300.00
Rp 11,162,340.00
Rp 13,394,430.00
Rp 114,547,230.00
Rp 179,550,000.00
Rp 190,499,715.00
Rp 204,347,745.00
Rp 243,456,570.00
Rp 264,660,480.00
Rp 305,046,945.00
Rp 27,209.48
Rp 37,637.07
Rp 59,306.90
Rp 85,538.79
Rp 108,512.07
Rp 135,558.62
Rp 171,403.45
Rp 201,708.62
Rp 281,218.97
Rp 362,684.48
Rp 2,403,135.00
Rp 1,718,955.00
Rp 926,100.00
Rp 2,100,735.00
Rp 47,934,180.00
Rp 14,187,285.00
Rp 307,928.25

1892 of 1892

Anda mungkin juga menyukai