0%(1)0% menganggap dokumen ini bermanfaat (1 suara)
399 tayangan1 halaman
This document is an accomplishment report from the Gigalaman Elementary School detailing the installation of a solar PV energy system. It provides an itemized list of the electrical components installed in each of the school's 8 classrooms, including LED lights, solar wall fans, solar panels, charge controllers, batteries, and other equipment. While most of the work is complete, some shortfalls are noted, such as only 11 of the 12 planned solar panels being functional in each classroom and a lack of certain electrical boxes and protective devices.
This document is an accomplishment report from the Gigalaman Elementary School detailing the installation of a solar PV energy system. It provides an itemized list of the electrical components installed in each of the school's 8 classrooms, including LED lights, solar wall fans, solar panels, charge controllers, batteries, and other equipment. While most of the work is complete, some shortfalls are noted, such as only 11 of the 12 planned solar panels being functional in each classroom and a lack of certain electrical boxes and protective devices.
This document is an accomplishment report from the Gigalaman Elementary School detailing the installation of a solar PV energy system. It provides an itemized list of the electrical components installed in each of the school's 8 classrooms, including LED lights, solar wall fans, solar panels, charge controllers, batteries, and other equipment. While most of the work is complete, some shortfalls are noted, such as only 11 of the 12 planned solar panels being functional in each classroom and a lack of certain electrical boxes and protective devices.
Division of San Carlos City San Carlos City, Negros Occidental District II – Cluster 4 GIGALAMAN ELEMENTARY SCHOOL
ALLAN B. YAP, Ph.D., CESO VI
Schools Division Superintendent
Thru: MARIA CRISTINA F. BAHINTING
CES – SGOD
Submitting herewith is the actual status of accomplishment of works of Gigalaman ES pertaining
to the installation of off-grid solar energy system.
For your information and guidance.
Thank you very much and God bless.
JOVITO P. LIMOT ESHT-III
ACCOMPLISHMENT OF WORKS REPORT
Project: INSTALLATION OF SOLAR PV ENERGY SYSTEM School: GIGALAMAN ELEMENTARY SCHOOL - 117759 Location: SITIO GIGALAMAN, BRGY. GUADALUPE, SCC, NEG. OCC. Electricals per classroom (8 classrooms) Quantity based on Quantity based on # Description Unit Remarks ABC actual installations 1x18 W (T8) Led Fluorescent Lighting Fixture (Box 1 set 48 32 Lacking of 16 sets Type-Surfaced Ceiling Mounted) Complete and 2 Solar DC Wall Fan (Energy Efficient Fan) set 16 16 functional Solar PV System per Classroom 1.2 KW off-grid solar panels (complete set including installation (1 set per classroom) Complete but only 11 1 12x100 W monocrystalline Solar Panels panel 12 12 is functional 1440 Max. PV Capacity PWM Solar Charge Complete but 1 is not 2 Controller box 8 8 functional (defective) 1000 watts PSW Inverter Complete but the actual storage 3 9600 WH Max. Capacity Lead Acid Battery bat 16 16 capacity per battery is 200 AH Gel Battery 4 Complete Roof Mounting Kit complete 5 PV Combiner Box box 8 8 complete 6 MC4 Connectors cannot define 7 12 way CB Distribution Box box 8 7 Lacking of 1 box 8 AC circuit breaker cannot define 9 DC circuit breaker cannot define 10 AC Surge and Lighting Protective Device cannot define 11 DC Surge and Lighting Protective Device cannot define 12 20 meters Single Core AWG 8 Stranded Wire cannot define