Anda di halaman 1dari 1

Training Black Out

1. Saat terjadi Trip Total/Black Out, setelah MB13/14 Para & 1 Set TG di P.9 Para
apa yang dilakukan di area PG-3 ?
Ans :
- Start Compressor & Dryer 1 set
- Start Polisher 1 set
- Start Cooling Tower Pump TG 21, 23, 24, 25 satu set
- Start MB 21 atau 23
- Start TG 21 atau 23
- Start Paper Machine atau Tissue Machine setelah TG 21 atau 23 Syncronizing

2. Tuliskan kegiatan tambahan setelah Power Emergency tersedia di area PG 3 !


Ans :
- Switch On Breaker TG 21 Emergency Source
- Start Auxillary Oil (AC pump) & Jacking Oil Pump TG 21, 23, 24, 25
- Start Turning Gear TG 21, 23, 24, 25
- Stop Emergency Oil Pump (DC pump) TG 21, 23, 24, 25
- Berikan informasi untuk start peralatan vital MB 21
- Switch OFF Main Breaker Normal Source di panel 1054-CP-001
- Switch ON Main Breaker Emergency Source di panel 1054-CP-001
- Pastikan/Check automatic Change Over di panel 1054-ELA-21 Operate

3. Pada phase 3, setelah 1 TG di P.8 Paralel di jaringan, apa yang dilakukan di area
PG 3 !
Ans :
- Setelah GCB F11 di ON di PG 2 maka ON kan GCB F.216 (No.4)
- ON kan GCB F.603 (No.5)
- ON kan GCB F.604 (No.6)
- ON kan GCB F.217 (No.7)

4. Pada saat Black Out Total apa yang dilakukan Kepala Shift ?
Ans :
- Pastikan Emergency Oil Pump (DC Pump) sudah start/start manual
Note :
GCB (Generator Circuit Breaker)
Kenapa harus MB13/14 yang para?
P.9 dan P.8 apa?
Kenapa yang di start MB/TG 21 atau 23? Knp tidak 24/25?
Cara Start Manual DC Pump?

Anda mungkin juga menyukai