Anda di halaman 1dari 7

Inline Static Mixer: Rapid Mix:

Flowmeter: FM Streaming Current Monitor: SCM

Gate Valves: Globe Valves:

Check Valves:

Centrifugal Pump: Several Pumps:

Vertical Turbine Pump/Can:

Ground Level Tanks: Standpipe: Plan View:

Elevated Tanks:

Reservoir: Plan View: 1 MG Baffled:


Reservoir

Well: River/Creek: Spring or raw water reservoir:

Cartridge Filter:

Pressure Tank:

60° Tube Settlers: Distribution System:

Parallel Plate Settlers: Generic Treatment Plant: WTP-A

Flocculation Basin (single and two stage):

Pressure Gage:

Note: All symbols should be labeled on schematics as shown in the following examples.
Water System Schematic

Blue Bird Spring Pringle Spring

Well #8

Well #10 Lafayette Springs Area

Well #3

(disconnected)

Well #2

Well #1

● Flow meter

Sodium hypochlorite
Test
Soda ash building

500,000 gallon
reservoir

City Park Well


pH
(Chlorination/
Cl pressure sand
● EP A ● EP C filtration for Fe/Mn
removal)

● EP D
Well #7 ● EP B
(emergency) Dayton/Lafayette
Wellfield
Water System Schematic

(both springs are captured as surface water)


SRC-AA
SRC-AB SRC-AC
Graham
Creek Spring #1 Spring #2

Settling
Basin

NALCO 8105

Flocculation

Filter

Bypass Line with


valves (normally
closed)

1,900 gallon
Clearwell

Two 175-gpm pumps


Sodium Hypochlorite

42,000
gallon
Reservoir

Distribution
Construction of Big La Toutena Mary Spring

Concrete structure with metal roof, bolted hatch. Water flows up


through rock in the bottom.
Topsoil

Rock

To Main Collection Box

Construction of Kegbine Springs #1 and #2


(Similar for Both)
Concrete casing with collection holes at the bottom

Topsoil
Plastic Barrier
Rock

To Upper Collection Box

Construction of Little La Toutena Mary Spring

Subsurface perforated piping under plastic barrier captures water

Topsoil
Plastic Barrier
Rock

To Main Collection Box


(Potential Soda Ash)

KMnO4 (taste & odor)

Variable Speed

Tube Settlers
floc basins
South Yamhill River

Filter

NTU
67.5% flow FM
Alum

NTU
Flowmeter Plant #2 – 0.8 MGD Res #1

Splitter

NTU
FM (1990) 0.25 MG

Box
Inline
Intake Pump mixer

Hypochlorite
Soda Ash

F-
Station 32.5% flow
Plant #1 – 0.5 MGD
(1982)

From pump station


to the water
treatment plant 60-inch screening
pump station manhole South Yamhill River
wet well 71-in x 47-in corrugated
metal pipe diversion
9 Services
SRC-BA
Res #1
SRC-BB 0.317 MG
EP-B WTP-A
Clearwell
SRC-BC
WTP-B
Res #2
SRC-BE 0.5 MG
SRC-BD
Stoney Mt. Spring
Sources Res #3
(Approx. 9 miles 1.83 MG
from Res #2)

EP-A

14” Bridge St Main

SRC-AA

S. Yamhill River

Res #4 14” Main


“Ballston Reservoir”
1.5 MG
Surface Scatter 6 (NTU)

To Distribution
Raw water sample tap

Upflow Clarifier

Downflow Filter
NTU (1720D)
floc basins
FM

NTU (1720E)
SCM

NTU
Static CL2, pH, Temp
mixer

26,785-gal
Train #1
Soda Ash

(PASS-C)

Clearwell
NTU
PAC

FM 0.288 MGD (c. 2002)


(1990)
Flowmeter
Intake Pump (Total flow and
Hypochlorite

Station gpm) Static


Train #2
mixer
0.288 MGD 20 Hp, 200 gpm
SCM pumps
NTU (1720D)
11,725-gal
Clearwell
(c. 1973)

Anda mungkin juga menyukai