Anda di halaman 1dari 4

DAFTAR PUSTAKA

Aji, P. I., 2015. “Analisis Faktor-Faktor Yang Mempengaruhi Kinerja Biaya


Proyek Subkontraktor Pada Pt X”. Tesis Program Magister. Institut
Teknologi Sepuluh Nopember.

Alinaitwe, Mwanaki, H., Jackson A., Mwakali, & Hansson, B. 2008. “Factors
Affecting The Productivity of Building Craftsmen: Studies of Uganda”,
Journal of Civil Engineering and Management, Volume 8, Number 3 (169-
176).

Amusan, L. M. 2011. “Study of Factors Affecting Construction Cost Performance


in Nigerian Construction Sites”. Building Technology of Science and
Technology.

Arcila, S. G. 2012. Avoiding Cost Overrun in Construction Project in the United


Kingdom. Science in Programme and Project Management.

Atkinson, R. 1999. Project Management: Cost, Time, and Quality, Two Best
Guesses and Phenomenon, its Time to Accept Other Success Criteria.
International Journal of Project Management, vol. 17, no. 6, 337-342.

Atmaja, J., Wijaya, P. Y., & Hartati. 2016. ” Pengendalian Biaya Dan Waktu Pada
Proyek Konstruksi Dengan Konsep Earned Value (Studi Kasus Proyek
Pembangunan Jembatan Beringin – Kota Padang”. Jurusan Teknik Sipil.
Politeknik Negeri Padang.

Azhar, N., Farooqui, R. U., & Ahmed, S. M. 2008. “Cost Overrun Factors in
Construction Education, Research and Practice, 499. Construction in
Nigeria”. Interdiciplinary Journal of Contemporary. Construction Industry
of Pakistan”. Advancing and Integrating

Barrie, D. S. 1995. Manajemen Konstruksi Profesional, Jakarta: Penerbit


Erlangga.

Cleland, D. L. 1995. Project Management Strategic Design and Implementation,


Singapore : Mc. GrawHill, Inc.
Dimyati Hamdan, H. A., dan Nurjaman, K. 2016. Manajemen Proyek. Bandung:
Pustaka Setia.
Dipohusodo, I. 1996. Manajemen Proyek dan Konstruksi (Jilid 1 ed.).
Yogyakarta: Kanisius.

Enhassi, A., Mohamed, S., & Abushaban, S. 2009. “Factor Affecting the
Performance of Construction Project in Gaza Strip”. Journal of Civil
Engineering and Management.269.

Ervianto, W. I. 2004. Teori - Aplikasi Manajemen Proyek Konstruksi. Penerbit


Andi, Yogyakarta.

Fahirah, F., Adi, T. J. W., & Anwar, N. 2016. “Model Pengukuran Faktor
Singnifikan yang Mempengaruhi Kinerja Biaya dan Waktu Proyek
Kontruksi”. Konferensi Nasional Teknik Sipil 10. Universitas Atma Jaya
Yogyakarta.

Frimpong, Y., Oluwoye, J., & Crawford, L. 2003. “Cause of Delay and Cost
Overrun in Construction of Groundwater Project in Developing Country:
Ghana a Case Study”. International Journal of Project Management 21.

Gujarati, Damodar. 1978. Ekonometrika Dasar, Jakarta: Erlangga

Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. 1997. “Factors
Influencing Construction Time and Cost Overrun on High-rise Project in
Indonesia”. Construction Management and Economics.

Kamus Besar Bahasa Indonesia. 2013. Pusat Bahasa Departemen Pendidikan


Nasional Republik Indonesia, Jakarta, http://bahasa.kemdiknas.go.id

Kasimu, M. A. 2012. “Significant Factors That Causes Cost Overruns in Building


Kingdom”. Science in Programme and Project Management.

Mantel, S. J., Meredith, J. R., Shafer, S. M. dan Sutton, M. M. 2011. Project


Management Practice, John Wiley & Sons, Inc.

Memon, A. H., Rahman, I. A., Abdullah, M. R., & Azis, A. A. 2010. “Factors
Affecting Construction Cost Performance in Project Management Project:
Case of MARA Large Project”. Engineering, Technology and Social
Science. Malaysia: UTHM.
Merinda, Poppy. 2017. “Faktor-Faktor Yang Mempengaruhi Penilaian
Perumahan”. Tugas Akhir Fakultas Teknik Universitas Palangka Raya.
Palangka Raya

Mulyawan, H. 2001. “Pengaruh Kualitas Pengawasan Terhadap Kinerja Proyek


Pada Tahap Pelaksanaan Konstruksi Bangunan Industri di Indonesia”.
Thesis, University of Indonesia, Jakarta.

Nazeni, I. 2010. Manajemen Proyek, Penerbit Universitas Indonesia, Jakarta

Purnomo, Angga, H. A. 2016. “Analisa Faktor-Faktor Yang Mempengaruhi


Kinerja Waktu Pelaksanaan Proyek Konstruksi Di Wilayah Surabaya”.
Fakultas Teknik Sipil Universitas Negeri Surabaya.

Riduwan, 2006. Metode dan Teknik Menyusun Tesis, cetakan keempat, Bandung:
CV Alfabeta

Riduwan. 2007. Skala Pengukuran Variable-Variabel Penelitian. Alfabeta.


Bandung

Sarno, R. 2012. Analisis dan Desain Berorientasi Servis Untuk Aplikasi


Manajemen Proyek. Yogyakarta: Andi.

Setyadharma, A. 2010. Modul Uji Asumsi Klasik Dengan SPSS 16.0. Fakultas
Ekonomi Universitas Negeri Semarang, Semarang.

Soeharto, Imam. 2001. Manajemen Proyek, Jilid 2, Erlangga, Semarang.

Sugiyono. 2010. Metode Penelitian Kuantitatif Kualitatif dan R&D. Alfabeta.


Bandung

Sugiyono. 1999. Statistika untuk Penelitian. Bandung: CV Alfabeta.

Susanto. 2009. “Evaluasi Kinerja Waktu dan Biaya pada Proyek Bangunan
Bertingkat dengan Pendekatan Metode Earned Value (Studi Kasus : Proyek
ABC di PT. X)”. Program Studi Teknik Sipil, Fakultas Teknik, Universitas
Indonesia. Depok.

Anda mungkin juga menyukai