Anda di halaman 1dari 4

CYRUS RINGNAP A.

BRUNO
Unit E-11, Bldg.8, PTS Bahay Caridad, Bayani St.,
Dona Imelda, Quezon City, Philippines
Mobile : +639272961912 (Philippines)
Email Address: cyrus.ringnap.a.bruno@gmail.com

Objective: o To become a member of a highly regarded organization where I can apply my expertise
and work experience, as well as to enhance my knowledge, skills and potential as a
Professional.

Qualifications: o A Civil Engineer, with more than fourteen (14) years of significant work experiences
on building construction project management, project site supervision, design
coordination, and quantity surveying both local (Philippines) and abroad.
o Ability to comprehend, produce and interpret construction drawings, cost estimates,
and work schedules. Can understand and handle contracts administration works. Ability
to work under minimal supervision. Fast learner.
o Working knowledge of AutoCAD, Microsoft Office (Word, Excel, etc.) software.
o Has broad knowledge and extensive hands on experience on application of FIDIC
contracts on building construction particularly FIDIC Red Book (Construction), Yellow
Book (Design and Build), and Silver Book (EPC/Turnkey).

Professional o Cost planning and commercial management during the entire life cycle of the project
Experience: from inception to completion.
o Value Engineering and Cost Control.
o Project Monthly Financial Status Reports, Tender Schedules, Bills of Quantities,
Change/Variation Orders, Billing Evaluations, Construction Contracts.
o Procurement advice, assistance during the tendering procedures, and negotiating
contract prices.
o Preparing & finalizing contract documents, oversee contracts from inception to
completion of projects, performing contract administration.
o Quantity take-off, Pre-tender estimates, and Cost Studies.
o Construction Claims, Project Management, Project Site Supervision and Coordination.
o Final account preparation, settlement of contractual claims.
o On site construction project management and project supervision.
o Supervise and oversee team of quantity surveyors, estimators and technical assistants.

Work and QUANTITY SURVEY MANAGER / CONTRACTS ADMINISTRATOR


Project BLUE OCEAN DESIGN CO., LTD.
Experiences: Head Office: Shiba Matsushita Building 3F, 3-3-12, Shiba Minatoku, Tokyo, 105-0014,
Japan
Th
Manila office (Temporary): 7 Floor Adamson Center, L.P.Leviste St.,, Salcedo Village,
Makati City, Philippines
PERIOD: OCTOBER 01, 2017 UP TO PRESENT
PROJECTS INVOLVED:
- SHERATON PALAU RESORT, Koror City, Republic of Palau
PROJECT COST: 80 Million US Dollars
CLIENT: PALAU MAJESTY DEVELOPMENT, INC.

SENIOR QUANTITY SURVEYOR (SQS) / CONTRACTS ADMINISTRATOR


TAISEI (THAILAND) CO., LTD.
Th
1550 Thanapoom Tower, 9 Floor New Petchburi Rd., Makkasan, Rachtavee, Bangkok,
Thailand
PERIOD: JANUARY 27, 2016 UP TO AUGUST 31, 2017
PROJECTS INVOLVED:
- YOMA CENTRAL (LANDMARK) PROJECT, Yangon, Myanmar
BOUYGUES CONSTRUCTION – TAISEI CORPORATION JOINT VENTURE
PROJECT COST: 500 Million US Dollars
CLIENT: YOMA Strategic Holdings Yangon Myanmar
- YUSEN LOGISTICS NEW STEEL WAREHOUSE PROJECT
PROJECT COST: 5.6 Million US Dollars
CLIENT: YUSEN Logistics (Thailand) Co., Ltd.
- SNP PIPE FACTORY EXTENSION AND OFFICE
PROJECT COST: 2.9 Million US Dollars
CLIENT: SNP Pipe Co., Ltd.
- FURUKAWA FITEL FACTORY AND WAREHOUSE
PROJECT COST: 2.6 Million US Dollars
CLIENT: FURUKAWA Fitel (Thailand) Co., Ltd.
- MEIKO ASIA NEW WAREHOUSE AND FACTORY
PROJECT COST: 7.1 Million US Dollars
CLIENT: Meiko Asia Co., Ltd.

QUANTITY SURVEYING MANAGER (QSM)


TAIKISHA (THAILAND) CO., LTD.
Th
6 Floor, Thaniya Building, 62 Silom Road, Suriyawong,
Bangrak, Bangkok 10500, Thailand
PERIOD: JANUARY 21, 2015 UP TO JANUARY 20, 2016
PROJECTS INVOLVED:
- OLIC CHIYO NEW FACTORY AND WAREHOUSE BUILDING PROJECT (One of
biggest Pharmaceutical Factory Project in South East Asia)
PROJECT COST: 14 Million US Dollars
CLIENT: OLIC (Thailand) Ltd.

PROJECTS QUANTITY SURVEYOR (PQS) – CIVIL ENGINEER (TEAM LEADER)


RIDER LEVETT BUCKNALL PHILIPPINES, INC.
Building 3 Corazon Clemena Compound, #54 Danny Floro St.,
Bagong Ilog, Pasig City, Philippines
PERIOD: JANUARY 27, 2011 UP TO JANUARY 17, 2015
PROJECTS INVOLVED:
- SHANGRI-LA HOTEL AT THE FORT
PROJECT COST: 163 Million US Dollars
CLIENT: SHANGRI-LA PROPERTIES
- ONE SHANGRI-LA PLACE
PROJECT COST: 165 Million US Dollars
CLIENT: SHANGRI-LA PROPERTIES
- SHANGRI-LA MALL RE-DEVELOPMENT
PROJECT COST: 44 Million US Dollars
CLIENT: SHANGRI-LA PROPERTIES
- JOHNSON AND JOHNSON SINGAPORE PTE LTD. - GFS BUILDING
PROJECT COST: 16 Million US Dollars
CLIENT: JOHNSON AND JOHNSON
- WORLD TRADE CENTER METRO MANILA RENOVATION PROJECT
PROJECT COST: 1.50 Million US Dollars
- CLIENT: WORLD TRADE CENTER METRO MANILA
- WORLDHOTEL AND RESIDENCES MAKATI
PROJECT COST: 44 Million US Dollars
CLIENT: H20 VENTURES, INC.
- AQUIFER HOTEL & RESIDENCES BORACAY
PROJECT COST: 77 Million US Dollars
CLIENT: CORREOS INTERNATIONALE, INC.

QUANTITY SURVEYOR – CIVIL ENGINEER


SAUDI OGER LTD.
GENERAL PROJECTS CONSTRUCTION DIVISION ESTIMATING DEPARTMENT
P.O. Box 1449, Riyadh 11431,
Saudi Arabia, K.S.A.
PERIOD: JULY 12, 2009 TO AUGUST 03, 2010
PROJECTS INVOLVED:
- 70 STOREY BURJ RAFAL
PROJECT COST: 320 Million US Dollars
- PRINCE SULTAN UNIVERSITY
- M.O.I. SPECIAL FORCES BARRACKS
- KING ABDULLAH FINANCIAL DISTRICT MONORAIL
PROJECT COST: 241 Million US Dollars
- K.J.O.
- SARAYA AL AQABA
- AL KHOZAMA CENTER
PROJECT COST: 18 Million US Dollars
- 77 STOREY CAPITAL MARKET AUTHORITY TOWER
- MINISTRY OF EDUCATION NEW HEADQUARTERS
- KING ABDULLAH PETROLEUM STUDIES AND RESEARCH CENTER UTILITY
PACKAGE
KING ABDULLAH PETROLEUM STUDIES AND RESEARCH CENTER
COMMUNITY AND RESIDENTIAL PACKAGE
- KING ABDULLAH INTERNATIONAL AIRPORT
PROJECT COST: 1.20 Billion US Dollars
- HARAMAIN HIGH SPEED RAIL (PHASE 1 & PHASE 2)
PROJECT COST: 1.84 Billion US Dollars
- KING ABDULLAH/KING ABDUL AZIZ ROAD INTERSECTION

QUANTITY SURVEYING ASSISTANT


CPG CONSULTANTS PTE LTD. (Philippine Branch)
Unit 505, Taipan Place Building, Emerald Avenue,
Ortigas Center, Pasig City, Philippines
PERIOD: SEPTEMBER 01, 2008 TO JUNE 27, 2009
PROJECT INVOLVED:
- 168 MALL (PHASE 5) AND RESIDENTIAL TOWERS
PROJECT COST: 81 Million US Dollars)
CLIENT: YEELOOFA DEVELOPMENT CORPORATION

CIVIL ENGINEER
JFE ENGINEERING CORPORATION (Philippine Branch)
ENVIRONMENT AND WATER INDUSTRIES SECTION
Emerald Place Building No. 604 Shaw Blvd.
Pasig City, Philippines
PERIOD: APRIL 28, 2008 TO AUGUST 31, 2008
PROJECTS INVOLVED:
- Sewage Treatment Plants and Facilities Of Makati City, Philippines
- Sewage Treatment Plants and Facilities Of Pasig City, Philippines

PROJECT ENGINEER
WILFREDO L. SEGOVIA AND ASSOCIATES, INC.
Suite 202 Heart Building, 7461 Bagtikan Street,
Makati City, Philippines
PERIOD: AUGUST 30, 2004 TO APRIL 25, 2008
PROJECT INVOLVED:
- ST. LUKE’S MEDICAL CENTER HOSPITAL - FORT BONIFACIO, GLOBAL CITY,
TAGUIG, PHILIPPINES
PROJECT COST: 217 Million US Dollars
CLIENT: ST. LUKE’S MEDICAL CENTER QUEZON CITY PHILIPPINES
- ST. LUKE’S MEDICAL CENTER HOSPITAL STEEL BRIDGEWAYS, PARKING
BUILDINGS, INTERIOR FIT-OUTS, AND VARIOUS RENOVATION WORKS
PROJECT COST: 1.20 Million US Dollars
CLIENT: ST. LUKE’S MEDICAL CENTER QUEZON CITY PHILIPPINES

Education: BACHELOR OF SCIENCE IN CIVIL ENGINEERING


ADAMSON UNIVERSITY
MANILA , PHILIPPINES
1998 – 2004

Trainings / SAFETY AND HEALTH ON CONSTRUCTION SEMINAR


Certifications: ADAMSON UNIVERSITY
October 2002
AUTOCAD 2006 WITH COLOR RENDERING
MICROCADD TECHNOLOGIES
MANILA, PHILIPPINES
July, 2005

DESIGN OF LATTICE TOWER STRUCTURES


ASSOCIATION OF STRUCTURAL ENGINEERS OF THE PHILIPPINES (ASEP)
March 2007

PRIMAVERA SIX
SAUDI OGER LTD. (Head Office – Al Babtain Bldg.)
Al Babtain Building
Malaz, Riyadh
Saudi Arabia
November, 2009

CONSTRUCTION CONTRACTS ADMINISTRATION AND COMMERCIAL AND CLAIM


MANAGEMENT SEMINAR AND WORKSHOP
RIDER LEVETT BUCKNALL PHILIPPINES
District 13, Corazon Clemena Compound, #54 Danny Floro St.,
Bagong Ilog, Pasig City, Philippines
May, 2014

Affiliations: PHILIPPINE INSTITUTE Of CIVIL ENGINEERS (PICE)


ADAMSON UNIVERSITY ALUMNI ASSOCIATION
SOCIETY OF FILIPINO QUANTITY SURVEYORS (SOFIQS) Riyadh, Saudi Arabia
Chapter

References: MS. CORAZON CLEMENA BALLARD


President
Rider Levett Bucknall Philippines
Building 3 Corazon Clemena Compound, #54 Danny Floro St.,
Bagong Ilog, Pasig City, Philippines
Telephone No. 234-0129

MR. YEK LAI FATT


President and Principal Consultant
YLF Contracts and Costs Solutions, Inc.
Th
4005, 40 Floor, Summit One Tower, 530 Shaw Blvd.,
Mandaluyong City, Philippines
Telephone No. 501-4019

MS. CRISTINA BATALLA


Admin Manager
CPGCorp Philippines
Unit 505, Taipan Place Building, Emerald Avenue,
Ortigas Center, Pasig City, Philippines
Telephone No. 910-8001

Anda mungkin juga menyukai