PILE NUMBER FM-PD-017

LIMESTONE QUALITY CONTROL BY PILE LIME-B-201905-20


DATE PUBLISH 10/05/2019
REVISION 0
PT. TAMBANG SEMEN SUKABUMI Planning and Development Department DATE 10/05/2019 PAGE 1
PLAN ( QC 0 / QC 1 ) ESTIMATE ( QC 2 ) ACTUAL ( QC 3 )
Component oxide (%) TIME Component oxide (%) Component oxide (%)
DIG MINING SAMPLE
LEVEL TONS LAYER TONS LAYER TONS
FACE BLOCK NAME
SiO2 Al2O3 Fe2O3 CaO MgO SO3 Na2O K2O T/A H2O START STOP SiO2 Al2O3 Fe2O3 CaO MgO SO3 Na2O K2O T/A H2O SiO2 Al2O3 Fe2O3 CaO MgO SO3 Na2O K2O T/A H2O

A 443 2,500 6.12 2.54 1.43 48.07 1.55 0.45 0.05 0.05 0.09 7.50 00.00 04.00 1 927 6.20 2.16 1.97 47.15 1.75 0.44 0.06 0.07 0.11 6.40 1 915 5.23 2.57 1.45 46.51 1.51 0.50 0.07 0.09 0.12 6.34 LI-CR-01

B2 510 2,500 6.32 2.34 1.09 47.65 1.09 0.66 0.04 0.04 0.08 8.34 08.00 12.00 2 1,154 6.54 2.56 1.91 47.47 1.70 0.35 0.06 0.06 0.10 6.50 2 472 5.51 2.42 1.55 47.54 1.67 0.34 0.07 0.09 0.10 6.12 LI-CR-02

B4 547 2,500 5.98 2.65 1.30 47.32 1.21 0.51 0.06 0.05 0.07 7.98 12.00 16.00 3 1,225 5.88 2.56 1.69 47.40 1.62 0.58 0.08 0.08 0.10 5.80 3 1,056 5.12 2.12 1.43 47.42 1.98 0,45 0.06 0.08 0.09 6.42 LI-CR-03

C 557 2,500 6.04 2.78 1.54 48.54 1.65 0.56 0.06 0.06 0.08 6.70 16.00 20.00 4 1268 5.88 2.54 1,72 47.12 1.62 0.58 0.08 0.09 0.09 5.9 4 800 4.26 2.53 1.39 48.01 1.23 0.54 0.05 0.08 0.09 6.32 LI-CR-04

20.00 24.00 5 505 5.64 2.83 1.59 48.2 1.5 0.44 0.09 0.09 0.09 6.3 5 494 5.09 2.12 1.26 46.51 1.25 0.65 0.09 0.09 0.09 6.55 LI-CR-05

Average 10,000 6.12 2.58 1.34 47.90 1.38 0.55 0.05 0.05 0.08 7.63 Average 5,079 6.03 2.53 1.79 47.47 1.64 0.48 0.07 0.08 0.10 6.18 Average 3,737 5.04 2.35 1.42 47.20 1.53 0.51 0.07 0.09 0.10 6.35

Target %CaO 48 + 1 Target %CaO 48 + 1 Target %CaO 48 + 1


Abnormal Report 1 3
Make by Approve by Note :

Planner

Planner Engineer
Date Date Date
Approve 2
Note :

Engineer Engineer

Date Date