1
+ The administrative and health division, which is responsible for runing all
administrative procedures with the Site-PMU and organizations in the
surrounding areas on electric power and water supplying, equipments
ans heavy trucks transfer on road systems. There are health wokers in
the division to take care the workers and staffs and to to give emergency
aid in case of accidents.
Bé phËn hμnh chÝnh y tÕ: gi¶i quyÕt c¸c thñ tôc vÒ hμnh chÝnh víi Ban
qu¶n lý vμ c¸c khu vùc l©n cËn, c¸c thñ tôc vÒ xin phÐp ®Êu ®iÖn, ®Êu
n−íc, ho¹t ®éng cña c¸c ph−¬ng tiÖn trªn ®−êng, cã c¸n bé y tÕ kh¸m
søc khoÎ cho CBCNV, cÊp cøu tai n¹n...
+ The team to execute the works belongs to the site-PMU, who is
responsible for doing the the concrete missions assigned by site-PMU
and cooperating with the other teams to implement the works in the
construction site when necessary. The team leaders have to report to the
chief of site-PMU for the quality and the progress of the project.
C¸c ®éi thi c«ng trùc thuéc ®¶m nhËn nh÷ng c«ng viÖc ®−îc ph©n c«ng,
phèi hîp víi nh÷ng ®éi kh¸c thùc hiÖn nh÷ng c«ng viÖc trªn c«ng tr−êng,
c¸c ®éi tr−ëng chÞu tr¸ch nhiÖm tr−íc ChØ huy tr−ëng vÒ chÊt l−îng, tiÕn
®é c«ng tr×nh.
+ The softwares used to make the tender document and all the documents
of the project are Microsoft word, Excel and Autocad, etc.
C¸c phÇn mÒm vi tÝnh ®−îc sö dông trong qu¸ tr×nh lËp hå s¬ dù thÇu vμ
trong suèt qu¸ tr×nh qu¶n lý dù ¸n lμ Microsoft Word, Excel vμ Autocad,
Microsoft Project...
To supervise the quality of the whole project and the works objectively,accurately as
well as to ensure the quality in accordence with the requirement of the design, the
contructor establishs two divisions, which are:
Nh»m thùc hiÖn c«ng t¸c kiÓm tra chÊt l−îng c«ng tr×nh, h¹ng môc ®−îc thi c«ng trªn
c«ng tr−êng mét c¸ch kh¸ch quan, chÝnh x¸c, b¶o ®¶m chÊt l−îng ®óng yªu cÇu thiÕt
kÕ. Nhμ thÇu tiÕn hμnh tæ chøc c«ng t¸c kiÓm tra lμm hai bé phËn:
The division in the company:
Bé phËn kiÓm tra chÊt l−îng cña C«ng ty:
Which includes:
Thμnh phÇn gåm cã:
- The quality inspectation engineer, who belongs to technical department.
Kü s− kiÓm tra chÊt l−îng cña phßng kü thuËt C«ng ty.
2
Quan hÖ víi Chñ ®Çu t− ®Ó thèng nhÊt l¹i lÇn cuèi c¸c tiªu chuÈn chÊt
l−îng, nguån gèc, quy c¸ch cña c¸c lo¹i vËt liÖu, c¸c h¹ng môc sÏ thi
c«ng.
+ Being together with the leaders of site PMU to supervise the works in
formwork, concrete placing, bricking up, installing and equipment before
the Client checks out and takes over
Cïng Ban chØ huy c«ng tr−êng kiÓm tra c¸c c«ng t¸c cèp pha, gia c«ng
thÐp, ®æ bª t«ng, x©y, l¾p ®Æt vμ c¸c thiÕt bÞ... ®Ó mêi Chñ ®Çu t− nghiÖm
thu.
+ Defining the liance of the origin, specification of the materials to submit to
the Client.
X¸c ®Þnh vμ tr×nh Chñ ®Çu t− c¸c chøng chØ, nguån gèc, quy c¸ch... cña
c¸c lo¹i vËt liÖu ®ã.
3
tr¸ch, b¸o c¸o khèi l−îng vμ chÊt l−îng thùc hiÖn cho Kü s− KCS vμ Kü
s− phô tr¸ch.
+ Group leader, being responsible to implement works following the
layouts, the assignment, supervision and do the job with other members
of the group.
Tæ tr−ëng: thùc hiÖn c«ng t¸c ®óng theo b¶n vÏ, ®iÒu ®éng, ph©n c«ng,
kiÓm tra vμ cïng lμm viÖc víi tõng tæ viªn.
4
to be done and filled in acceptance forms everyday. Before concrete
placing, it is recommended that the fluid sample in the level 0.5m from
the bottom up has its own volume mass smaller than 1.15g/ml, sand
proportion smaller or equal to 6%, viscosity from 18 to 45.
KiÓm tra dung dÞch khoan b»ng c¸c thiÕt bÞ thÝch hîp. Dung träng cña
dung dÞch trén míi ®−îc kiÓm tra hμng ngμy ®Ó biÕt chÊt l−îng, viÖc ®o
l−êng dung träng nªn ®¹t tíi ®é chÝnh x¸c 0,005g/ml. C¸c thÝ nghiÖm
kiÓm tra dung dÞch tiÕn hμnh theo quy ®Þnh t¹i B¶ng 1 cho mçi l«
Bentonite trén míi. ViÖc kiÓm tra dung träng, ®é nhít, hμm l−îng c¸t vμ
®é pH ph¶i ®−îc kiÓm tra cho tõng cäc, hμng ngμy vμ ghi vμo biÓu
nghiÖm thu. Tr−íc khi ®æ bª t«ng nÕu kiÓm tra mÉu dung dÞch t¹i ®é s©u
kho¶ng 0,5m tõ ®¸y lªn cã khèi l−îng riªng < 1,15 g/ml, hμm l−îng c¸t ≤
6%, ®é nhít tõ 18 ®Õn 45 gi©y.
1. Viscosity 18 - 45s
§é nhít
3. pH 7-9
§é pH
Test the drilling hole according to the parameter in the table no.2, the error of pile
hole is set by design, according to the table no.3
KiÓm tra lç khoan theo c¸c th«ng sè trong B¶ng 2, sai sè cho phÐp vÒ lç cäc do thiÕt
kÕ quy ®Þnh vμ ®−îc lÊy theo B¶ng 3.
5
Table no.2 - The parameters of pile hole need to be tested
B¶ng 2- C¸c th«ng sè cÇn kiÓm tra vÒ lç cäc
The dimension of the hole -Capip, folding ruler which can be used to
KÝch th−íc lç mesure diameter
Calip, th−íc xÕp më vμ tù ghi ®−êng kÝnh
-According to the open of the wings of the
drill
Theo ®é më cña c¸nh mòi khoan khi më
réng ®¸y
Deposit in the bottom of the hole -Use pyramid falling body 2kg.
§é l¾ng ®¸y lç Th¶ chuú (h×nh chãp nÆng 2kg)
-Compare the depths by string ruler after
and before scraping,blowing anf cleaning
So s¸nh ®é s©u ®o b»ng th−íc d©y
tr−íc vμ sau khi vÐt, thæi röa
6
Table 3. Acceptable error on drill hole of pile
B¶ng 3 - Sai sè cho phÐp vÒ lç khoan cäc
7
- Test the quality of concrete of pile.
KiÓm tra chÊt l−îng bª t«ng th©n cäc
+ Before concrete placing, take 3 samples to test. From each pile, take one
sample in the heah of pile, one sample in the middle of pile and one
sample in the end point of pile.the sample of aggregation, water and
cement is tested according to the regulations of concrete works. The
results of Sample pressing is enclosed with pile documents.
Bª t«ng tr−íc khi ®æ ph¶i lÊy mÉu, mçi cäc 3 tæ mÉu lÊy cho ba phÇn,
®Çu, gi÷a vμ mòi cäc, mçi tæ 3 mÉu. Cèt liÖu, n−íc vμ xi m¨ng ®−îc thö
mÉu, kiÓm tra theo quy ®Þnh cho c«ng t¸c bª t«ng. KÕt qu¶ Ðp mÉu kÌm
theo lý lÞch cäc.
+ Many method such as ultrasonic wave, gamma scattering, small
deformation stress wave, etc. And the other method which does not harm
the constructions can be used to appreciate the quality of the concrete
pile after placing. The number of piles need to be tested depends on the
level of the importance of the construction and it is required by designer.
To the civil and common industrial project, the works to test quality of
concrete is regulated in the table no.5. It is needed to combine 2
methods or more to test. If the length of the pile is 30 times longer than
diameter (L/D>30), the main way to test is used the tube that has been
placed before. If flaws is detected and suspected the sample is needed
to be taken by drilling or the other methods need to be applied to test
their capacity before deciding to repair them or to replace them. The final
decision is approved by investor according to the report of the designer.
Ph−¬ng ph¸p siªu ©m, t¸n x¹ gamma, ph−¬ng ph¸p sãng øng suÊt biÕn
d¹ng nhá...vμ c¸c ph−¬ng ph¸p thö kh«ng ph¸ ho¹i kh¸c ®−îc dïng ®Ó
®¸nh gi¸ chÊt l−îng bª t«ng cäc ®· thi c«ng, tuú theo møc ®é quan träng
cña c«ng tr×nh, thiÕt kÕ chØ ®Þnh sè l−îng cäc cÇn kiÓm tra. §èi víi c¸c
c«ng tr×nh d©n dông vμ c«ng nghiÖp th«ng th−êng, khèi l−îng kiÓm tra
chÊt l−îng bª t«ng cäc tèi thiÓu theo b¶ng 5. CÇn kÕt hîp tõ 2 ph−¬ng
ph¸p kh¸c nhau trë lªn ®Ó kiÓm tra. Khi cäc cã chiÒu s©u lín h¬n 30 lÇn
®−êng kÝnh (L/D > 30) th× ph−¬ng ph¸p kiÓm tra qua èng ®Æt s½n lμ chñ
yÕu. Khi ph¸t hiÖn khuyÕt tËt, nÕu cßn nghi ngê cÇn kiÓm tra b»ng khoan
lÊy mÉu vμ c¸c biÖn ph¸p kh¸c ®Ó kh¼ng ®Þnh kh¶ n¨ng chÞu t¶i l©u dμi
cña nã tr−íc khi cã quyÕt ®Þnh xö lý söa ch÷a hoÆc ph¶i thay thÕ b»ng
c¸c cäc kh¸c. QuyÕt ®Þnh cuèi cïng do ThiÕt kÕ kiÕn nghÞ, Chñ ®Çu t−
chÊp thuËn.
+ The method that test the contact between pile and soild is carried out in
the tube that has been placed before. The diameter of the tuber is 114
mm, the and point of the tube is higher than the end point of pile 1-2 m.
The number of the tube is required by designer and regulations. If the
end point of pile contact with a big stone, cement water may be lose in
the contact point, therefore the test to appreciate the quality of pile
concrete needs to be done carefully.
Ph−¬ng ph¸p khoan kiÓm tra tiÕp xóc ®¸y cäc víi ®Êt tiÕn hμnh trong èng
®Æt s½n, ®−êng kÝnh 114mm cao h¬n mòi cäc 1 ÷ 2m, sè l−îng èng ®Æt
s½n ®Ó khoan lÊy lâi ®¸y cäc theo quy ®Þnh cña thiÕt kÕ vμ quy ph¹m.
NÕu mòi cäc tùa vμo cuéi sái hßn lín cã thÓ x¶y ra hiÖn t−îng mÊt n−íc
xi m¨ng ë phÇn tiÕp xóc ®¸y cäc – cuéi sái, cho nªn khi ®¸nh gi¸ chÊt
l−îng bª t«ng cäc cÇn xem xÐt thËn träng.
8
- The acceptance of execute the work is implemented and based on the
following documents:
NghiÖm thu c«ng t¸c thi c«ng tiÕn hμnh dùa trªn c¬ së c¸c hå s¬ sau:
+ Design document
Hå s¬ thiÕt kÕ d−îc duyÖt;
+ The acceptance certificate of located geodetic for bored piles
Biªn b¶n nghiÖm thu tr¾c ®¹c ®Þnh vÞ cäc nhåi
+ The result of material quality test.certificate of steel and the other
products manufactured in factories. Certificate of concrete and aggregate
mix.
KÕt qu¶ kiÓm ®Þnh chÊt l−îng vËt liÖu, chøng chØ xuÊt x−ëng cña cèt thÐp
vμ c¸c lo¹i vËt liÖu chÕ t¹o trong nhμ m¸y; chøng chØ bª t«ng, thμnh phÇn
cÊp phèi
+ The result of concrete sample test.
KÕt qu¶ thÝ nghiÖm mÉu bª t«ng;
+ The acceptance document of each pile, records about pile works.
Hå s¬ nghiÖm thu tõng cäc; Lý lÞch c¸c cäc thi c«ng
+ The acceptance document of each panel, records about panel work.
Hå s¬ nghiÖm thu tõng ®o¹n t−êng; Lý lÞch c¸c ®o¹n t−êng thi c«ng
+ The finished pile work document with the explanation about the position
and depth error, the piles have been added and the approved changes.
B¶n vÏ hoμn c«ng cäc cã thuyÕt minh sai lÖch theo mÆt b»ng vμ chiÒu
s©u cïng c¸c cäc bæ sung vμ c¸c thay ®æi thiÕt kÕ ®· ®−îc chÊp thuËn;
+ The results of the tests on quality of piles ( P.I.T test) based on the
requirement of the Client and the design (if any).
C¸c kÕt qu¶ thÝ nghiÖm kiÓm tra ®é toμn khèi cña c©y cäc (thÝ nghiÖm
biÕn d¹ng nhá PIT..,) theo quy ®Þnh cña ThiÕt kÕ (nÕu cã);
+ The results of pile capacity tests .
C¸c kÕt qu¶ thÝ nghiÖm kiÓm tra søc chÞu t¶i cña cäc.
9
Kü s− phô tr¸ch: kiÓm tra vμ tiÕn hμnh mêi Kü s− KCS nghiÖm thu,
chuÈn bÞ c¸c hå s¬ vμ thñ tôc ®Ó ChØ huy tr−ëng c«ng tr−êng thay mÆt
Nhμ thÇu lμm viÖc víi Chñ ®Çu t−.
+ The KCS engineer inspects the completed items, if its quality is good,
proposes construction site leader board send the invitition to the Client.
Kü s− KCS: kiÓm tra thÊy b¶o ®¶m chÊt l−îng sÏ ®Ò nghÞ Ban chØ huy
c«ng tr−êng lμm giÊy mêi Chñ ®Çu t− nghiÖm thu.
+ The leader of construction site implements all procedures and proposes
the client together with the constructor to make the documents on
acceptance.
ChØ huy tr−ëng c«ng tr−êng: tiÕn hμnh c¸c thñ tôc vμ mêi Chñ ®Çu t−
nghiÖm thu cïng tËp thÓ bªn Nhμ thÇu vμ bªn Chñ ®Çu t− thiÕt lËp c¸c
v¨n b¶n nghiÖm thu chÊt l−îng c«ng tr×nh.
+ The supervising engineer of the client cooperates with the engineer of
constructor implement all necessary procedures.
Kü s− gi¸m s¸t c«ng tr×nh cña Chñ ®Çu t−: kiÓm tra, nghiÖm thu cïng Kü
s− phô tr¸ch kü thuËt cña Nhμ thÇu tiÕn hμnh lËp c¸c thñ tôc cÇn thiÕt.
+ The project manager of the client carries out the procedure on quality of
construction in accordance with the laws and together with the
constructor to make the necessary documents on quality of the
construction.
Gi¸m ®èc dù ¸n cña Chñ ®Çu t−: tiÕn hμnh c¸c thñ tôc kiÓm tra chÊt
l−îng x©y dùng c¬ b¶n theo c¸c v¨n b¶n hiÖn hμnh vμ thiÕt lËp c¸c v¨n
b¶n cÇn thiÕt vÒ chÊt l−îng c«ng tr×nh cïng Nhμ thÇu.
+ The acceptance proposed forms would be sent to the supervise engineer
belonged to client by the time 24-hour earlier than the time the
acceptance meeting is carried out.
C¸c biÓu mÉu mêi nghiÖm thu sÏ ®−îc göi cho Kü s− gi¸m s¸t c«ng tr×nh
cña Chñ ®Çu t− tr−íc 24 giê.
- To ensure that the test is done objectively, independently and exactly. The test
to inspect quality of material is done by the test centre. These are the tests that
would be done:
§Ó ®¶m b¶o tÝnh ®éc lËp, kh¸ch quan, chÝnh x¸c vμ hiÖu qu¶ cña c«ng t¸c
kiÓm tra chÊt l−îng c¸c chñng lo¹i vËt t− vμ c¸c thμnh phÈm cña c«ng t¸c thi
c«ng c¸c h¹ng môc, c«ng t¸c kiÓm tra chÊt l−îng vËt liÖu giao cho trung t©m
thÝ nghiÖm thùc hiÖn c¸c thÝ nghiÖm sau ®©y:
+ Strength of extension and compression of steel.
C−êng ®é kÐo, nÐn cña cèt thÐp.
+ Strength of extension and compression of 7-day and 28-day concrete
sample.
C−êng ®é kÐo, nÐn cña mÉu thö bª t«ng 7 ngμy, 28 ngμy.
+ The other tests according to the requirement of the client.
C¸c thÝ nghiÖm kiÓm tra kh¸c cña Chñ ®Çu t−.
10
- If the other test centre is appointed by the client,the constructor completely
agree.
NÕu Chñ ®Çu t− chØ ®Þnh mét phßng thÝ nghiÖm kh¸c, Nhμ thÇu ®ång ý chÊp
hμnh theo ý kiÕn cña Chñ ®Çu t−.
5. Inspection in laboratory.
C¸c vËt t− vμ c«ng viÖc ®−îc kiÓm tra vμ nghiÖm thu
+ The first type: the internal acceptance is implemented for the material
bought to produce in large scale. These materials are sand, stone,
cement, steel, concrete, etc.
Lo¹i 1: C«ng tr−êng tiÕn hμnh nghiÖm thu néi bé ®Ó s¶n xuÊt ®¹i trμ lμ
c¸c chñng lo¹i vËt t− nhËp vÒ nh−: c¸t, ®¸, xi m¨ng, thÐp, bª t«ng v.v...
+ The second type: the acceptance is done by the client.
Lo¹i 2: C«ng tr−êng tiÕn hμnh nghiÖm thu víi Chñ ®Çu t− nghiÖm thu.
- The material test centre would be chosen by the client. These organizations
have worked for permission and equipments to ensure that the results are
accurate.
ViÖc thÝ nghiÖm vËt liÖu sÏ ®−îc trung t©m thÝ nghiÖm do Chñ ®Çu t− chän. C¸c
c¬ së nμy ®Òu cã chøng chØ hμnh nghÒ c¸c trang thiÕt bÞ ®¶m b¶o cho c¸c kÕt
qu¶ chÝnh x¸c.
11
+ Round steel bar : compression and extension strength, permit
deformation index.
ThÐp trßn : C−êng ®é kÐo, nÐn vμ hÖ sè biÕn d¹ng cho phÐp.
+ Concrete samples : compression and bend strength
MÉu bª t«ng : C−êng ®é chÞu nÐn uèn.
+ Concrete : the cone slump of the mix is enough according to
design.
Bª t«ng : CÊp phèi BT ®ñ ®é sôt vμ thμnh phÇn cÊp phèi
thiÕt kÕ.
- All materials used in the construction such as concrete, steel, drilling fluid,
ultrasound tube, water stop, etc. Client would supervise them. We guarantee
they are good quality and specification.
TÊt c¶ c¸c vËt t− ®−a vμo thi c«ng x©y dùng c«ng tr×nh nh−: Bª t«ng, s¾t thÐp,
dung dÞch khoan, èng siªu ©m... ®Òu th«ng qua sù gi¸m s¸t cña Chñ ®Çu t−
®óng quy c¸ch ®óng chñng lo¹i ®¶m b¶o chÊt l−îng.
- The plan of the progress work is made and submit to client weekly and
monthly.
12
Thèng nhÊt tiÕn ®é thi c«ng trong tuÇn, th¸ng víi Chñ ®Çu t− ®Ó thùc hiÖn.
- All completed items must be accepted by client before continuing the next
items.
TÊt c¶ c¸c c«ng viÖc lμm xong ®Òu mêi Chñ ®Çu t− nghiÖm thu kü thuËt míi
®−îc lμm c«ng viÖc tiÕp theo.
- All the changes of the design must have the agreement of the designer, the
client in writting.
Mäi thay ®æi thiÕt kÕ trong qu¸ tr×nh thi c«ng ®Òu ph¶i cã sù nhÊt trÝ cña c¬
quan thiÕt kÕ, Chñ ®Çu t− vμ Nhμ thÇu vμ ph¶i ®−îc thÓ hiÖn b»ng v¨n b¶n.
9. Methods to reduce the impact of errors and the way to repair them.
BiÖn ph¸p h¹n chÕ nh÷ng ¶nh h−ëng sai sãt vμ c¸ch kh¾c phôc nh÷ng
sai sãt trong thi c«ng
- The survey of distance between the web of axises and the distance between
the piles is very important, the distance error is not permitted. To do this work
well, we will remove the web of width and long axises to the fix place.
C«ng t¸c ®o kho¶ng c¸ch gi÷a c¸c l−íi trôc, c¸c cäc khoan nhåi lμ rÊt quan
träng, kh«ng cho phÐp sai lÖch kho¶ng c¸ch. §Ó c«ng t¸c x¸c ®Þnh l−íi trôc
®−îc chÝnh x¸c trong qu¸ tr×nh thi c«ng, chóng t«i sÏ chuyÓn c¸c tim cäc, l−íi
c¸c trôc ngang, däc ra xa ngoμi c«ng tr×nh ®Õn nh÷ng chç cè ®Þnh.
- The way to repair the errors (if any): If unfortunately, there would be some
errors in works. It is needed to find the causes then make the reasonable
14
solution for each error according to the laws and the standard as well as
technical methods for each work.
C¸ch kh¾c phôc nh÷ng sai sãt (nÕu cã): NÕu kh«ng may cã nh÷ng sai sãt
trong thi c«ng, ph¶i t×m nguyªn nh©n vμ ®Æt ra c¸c c¸ch gi¶i quyÕt tõng sai sãt
mét c¸ch hîp lý, nh−ng trong ph¹m vi cho phÐp vμ dùa vμo c¸c tiªu chuÈn, qui
ph¹m vμ ph−¬ng ph¸p kü thuËt cho tõng phÇn viÖc ®Ó xö lý cho phï hîp.
15
An toμn vÒ ch¸y. Yªu cÇu chung.
15. Concrete structures.
TCVN 5574:1991
KÕt cÊu bª t«ng cèt thÐp.
16. Cement. The standard for cement test.
TCVN 139:1991
Xi m¨ng. C¸c tiªu chuÈn ®Ó thö xi m¨ng.
17. Concrete. Strength appreciating test. General regulation.
TCVN 5540:1991
Bª t«ng. KiÓm tra ®¸nh gi¸ ®é bÒn. Quy ®Þnh chung.
18. Heavy concrete - taking samples and maintaining.
TCVN 3105:1993
Bª t«ng nÆng - LÊy mÉu chÕ t¹o vμ b¶o d−ìng mÉu.
19. Heavy concrete - slump test method.
TCVN 3106:1993
Bª t«ng nÆng - Ph−¬ng ph¸p thö ®é sôt.
20. Cast in place concrete structure. Procedures on
executing and accepting.
TCVN 4453:1995
KÕt cÊu bª t«ng vμ bª t«ng cèt thÐp toμn khèi. Quy ph¹m
thi c«ng vμ nghiÖm thu.
21. The guideline of mixing and using mortar in construction.
TCVN 4459:1997
H−íng dÉn pha trén vμ sö dông v÷a trong x©y dùng.
22. Pile – Methods of Static load testing.
Cäc - Ph−¬ng ph¸p thÝ nghiÖm b»ng t¶i träng tÜnh Ðp däc TCXDVN 269:2002
trôc
23. Filling pile. The requirement on quality.
TCXDVN 326:2004
Cäc khoan nhåi. Yªu cÇu vÒ chÊt l−îng thi c«ng.
24. Bored piles – methods of sonic pulse to define the
characteristics of homogenous of concrete
TCXDVN 358: 2005
Cäc khoan nhåi - ph−¬ng ph¸p xung siªu ©m x¸c ®Þnh
tÝnh chÊt ®ång nhÊt cña bªt«ng
25. Foundation Piles – Method of detection of defects by
dynamic low – strain testing
TCXDVN 359: 2005
Cäc – ThÝ nghiÖm kiÓm tra khuyÕt tËt b»ng ph−¬ng ph¸p
®éng biÕn d¹ng nhá
16