Anda di halaman 1dari 2

API 580 RISK-BASED INSPECTION

READING CHECKLISTS

 1 Purpose  7 Planning the RBI Assessment


 1.1 General  7.1 Getting Started
 1.2 RBI Benefits and Limitations  7.2 Establishing Objectives and Goals of an
 1.3 Using RBI as a Continuous Improvement RBI Assessment
Tool  7.3 Initial Screening
 1.4 RBI as an Integrated Management Tool  7.4 Establish Operating Boundaries
 2 Scope  7.5 Selecting a Type of RBI Assessment
 2.1 Industry Scope  7.6 Estimating Resources and Time
 2.2 Flexibility in Application Required
 2.3 Mechanical Integrity Focused  8 Data and Information Collection for RBI
 2.4 Equipment Covered Assessment
 2.5 Equipment Not Covered  8.1 General
 2.6 Target Audience  8.2 RBI Data Needs
 3 Normative References  8.3 Data Quality
 4 Terms, Definitions, Acronyms, and  8.4 Codes and Standards—National and
Abbreviations International
 4.1 Terms and Definitions  8.5 Sources of Site Specific Data and
 4.2 Acronyms and Abbreviations Information
 5 Basic Risk Assessment Concepts  9 Damage Mechanisms and Failure Modes
 5.1 What is Risk?  9.1 Introduction
 5.2 Risk Management and Risk Reduction  9.2 Damage Mechanisms
 5.3 The Evolution of Inspection  9.3 Failure Modes
Intervals/Due Dates  9.4 Accumulated Damage
 5.4 Overview of Risk Analysis  9.5 Tabulating Results
 5.5 Inspection Optimization  10 Assessing Probability of Failure
 5.6 Relative Risk vs Absolute Risk  10.1 Introduction to Probability Analysis
 6 Introduction to Risk-Based Inspection  10.2 Units of Measure in the POF Analysis
 6.1 Key Elements of an RBI Program  10.3 Types of Probability Analysis
 6.2 Consequence and Probability for RBI  10.4 Determination of POF
 6.3 Types of RBI Assessment  11 Assessing Consequences of Failure
 6.4 Precision vs Accuracy  11.1 Introduction to Consequence Analysis
 6.5 Understanding How RBI Can Help to  11.2 Types of Consequence Analysis
Manage Operating Risks  11.3 Units of Measure in Consequence
 6.6 Management of Risks Analysis
 6.7 Relationship Between RBI and Other  11.4 Volume of Fluid Released
Risk-Based and Safety Initiatives  11.5 Consequence Effect Categories
 6.8 Relationship with Jurisdictional  11.6 Determination of Consequence of
Requirements Failure

1 of 2
 12 Risk Determination, Assessment, and  15 Reassessment and Updating RBI
Management Assessments
 12.1 Purpose  15.1 RBI Reassessments
 12.2 Determination of Risk  15.2 Why Conduct an RBI Reassessment?
 12.3 Risk Management Decisions and  15.3 When to Conduct an RBI
Acceptable Levels of Risk Reassessment
 12.4 Sensitivity Analysis  16 Roles, Responsibilities, Training, and
 12.5 Assumptions Qualifications
 12.6 Risk Presentation  16.1 Team Approach
 12.7 Establishing Acceptable Risk  16.2 Team Members, Roles, and
Thresholds Responsibilities
 12.8 Risk Management  16.3 Training and Qualifications for RBI
 13 Risk Management with Inspection Application
Activities  17 RBI Documentation and Recordkeeping
 13.1 Managing Risk by Reducing  17.1 General
Uncertainty Through Inspection  17.2 RBI Methodology
 13.2 Identifying Risk Management  17.3 RBI Personnel
Opportunities from RBI Results  17.4 Time Frame
 13.3 Establishing an Inspection Strategy  17.5 Basis for the Assignment of Risk
Based on Risk Assessment  17.6 Assumptions Made to Assess Risk
 13.4 Managing Risk with Inspection  17.7 Risk Assessment Results
Activities  17.8 Mitigation and Follow-up
 13.5 Managing Inspection Costs with RBI  17.9 Applicable Codes, Standards, and
 13.6 Assessing Inspection Results and Government Regulations
Determining Corrective Action  18 Summary of RBI Pitfalls
 13.7 Achieving Lowest Life Cycle Costs with  18.1 General
RBI  18.2 Planning
 14 Other Risk Mitigation Activities  18.3 Data and Information Collection
 14.1 General  18.4 Damage Mechanisms and Failure
 14.2 Equipment Replacement and Repair Modes
 14.3 Evaluating Flaws for Fitness-For-  18.5 Assessing POF
Service  18.6 Assessing Consequence of Failure
 14.4 Equipment Modification, Redesign,  18.7 Risk Determination, Assessment, and
and Rerating Management
 14.5 Emergency Isolation  18.8 Risk Management with Inspection
 14.6 Emergency Activities
Depressurizing/Deinventorying  18.9 Other Risk Management Activities
 14.7 Modify Process  18.10 Reassessment and Updating RBI
 14.8 Establish Integrity Operating Windows Assessment
 14.9 Reduce Inventory  18.11 Roles, Responsibilities, Training, and
 14.10 Water Spray/Deluge Qualifications for RBI Team Members
 14.11 Water Curtain  18.12 RBI Documentation and
 14.12 Blast-resistant Construction Recordkeeping
 14.13 Others

2 of 2

Anda mungkin juga menyukai