BHARAT CONSTRUCTION
BHARAT CONSTRUCTION
PROJECT START
8+900
8+975
9+050
9+125
9+200
9+275
9+350
9+425
9+500
378+900
378+975
RH S
379+050
PROJECT START
379+125
379+200
379+275
379+350
379+425
379+500
DESIGN CHAINAGE FROM KM 37
DESIGN CHAINAGE FROM KM 37
CONSTRUCTION
L H S
9+575
9+650
9+725
9+800
9+875
9+950
0+075
379+575
379+650
379+725
379+875
379+950
380+075
PROJECT END
L H S
FROM KM 378.900 TO 380.075
BHARAT CONSTRUCTION
Project - Construction and Upgradation including specialized slope treatment of existing road to 2-lane with
paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch 456.800) of Patalganga
Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length =
0.600 km).
Safety and Traffic management systems are implimented at all required locations as per the safety
and traffic management plan finalized for execution of the project. Atmost care is being taken for
safety of the work force as well as road users while carring out the various activities.
Road work under construction are baricated with sand bags and deliniators, cuasion tape along the
stretch for affective night vision.
Identification of activity based PPE requirement and provided to all workman and enforced to use
it , like nose mask, spectacles, gumboots, Hard Hat, fluorescent jackets, safety belts, safety shoes
etc.
Provison of water tanker for sptinckling water to dust control in / along works on the highway,
access road, plant site and sprinkling system at cruesher sites.
The awareness / tranning programme on HSE for workes, conducted periodically like fire safety /
Flagmen/ safe driving dra/traffic control & movement etc. and tool box talk conducted at site on
reguar bassis.
All the structural work / form work / scaffolding taken up as per approved drawing and
mathodology and being assured by concerened enginners.
Bushes has been removed from the road edge side to enhanced better visibility wherever is
required.
Project - Construction and Upgradation including specialized slope treatment of existing road to 2-
lane with paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch
456.800) of Patalganga Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of
Uttarakhand. (Design Length = 0.600 km).
NAME OF CLIENT : National Highways & Infrastructure Development Corporation Limited Ministry of
Road Transport & Highways
NAME OF EPC CONTRACTOR : BHARAT CONSTRUCTION
Construction and Upgradation including specialized slope treatment of existing road to 2-lane with
paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch 456.800) of
Patalganga Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand.
(Design Length = 0.600 km).
FYNANCIAL PROGRESS UPTO 28 MAY 2019 FROM THE DATE OF 0.00% 0.00% 0.00%
START
BHARAT CONSTRUCTION
PROJECT: Construction and Upgradation including specialized slope treatment of existing road to 2-lane with paved shoulder from Exisiting Km. 458.900 to
Km. 459.475 (Design Ch 456.200 to Ch 456.800) of Patalganga Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand.
(Design Length = 0.600 km).
FINANCIAL PROGRESS
UPTO PREVIOUS
BILL NO. DESCRIPTION AMOUNT (RS) THIS BILL UP TO DATE REMARK
BILL
Earthwork upto top of the Sub-grade 4,883,807.60 - - -
Non Bituminous base course 9,395,121.40 - - -
Road work Bituminous base course (DBM) 4,815,638.80 - - -
Bituminous Concrete 2,906,912.40 - - -
Culverts 2,344,519.80 - - -
Road Side drains 1,970,227.80 - - -
Other Engineering Utility Duct 172,827.00 - - -
Works W Beam Crash Barrier 3,110,886.00 - - -
Road Signs, Marking, Safety Devices etc. 1,278,919.80 - - -
Slope Protection including Secured Dapery 137,190,072.60 - - -
system on hill with Retaining wall
Protection work
Rockfall barrier 53,922,024.00 - - -
Cast- in- situ Arch Shaped Concrete Tunnel 148,009,042.80 - - -
PHYSICAL PROGRESS
ROAD WORK
1 0.600 _ _ 0.600
Plan & profile
km
2 0.600 _ _ 0.600
Typical cross-section
3 Dumpin Yard m _
STRUCTURE
1 Tunnel km 0.150 _ _ 0.150
2 Portal m _
4 Culvert NOS. 1 _ _ 1
TOTAL>> 0.600 km
BHARAT CONSTRUCTION
PROJECT: Construction and Upgradation including specialized slope treatment of existing road to
2-lane with paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch
456.800) of Patalganga Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of
Uttarakhand. (Design Length = 0.600 km).
PLANNED
DAYS FROM SHEDULED PROPORTION OF
SR NO. MILESTONE DESCRIPTION REMARK
APPOINTED DATE MILESTONE DATE TPC TO BE
EXPENDED (%)
PROJECT: Construction and Upgradation including specialized slope treatment of existing road to 2-lane with
paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch 456.800) of Patalganga
Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length = 0.600
km).
UNRESOLVED ISSUES
ELECTRICAL UTILITY
2 Yet to be shifted
SHIFTING
PROJECT: Construction and Upgradation including specialized slope treatment of existing road to
2-lane with paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch
456.800) of Patalganga Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of
Uttarakhand. (Design Length = 0.600 km).
1
TOTAL LAND REQUIREMENT
2
LAND AVAILABLE EROW (Ha)
TOTAL LAND (Govt. & Pvt.) TO BE ACQUIRED AS PER
3 JMS (HA)
4
GOVT. LAND TO BE ACQUIRED AS PER JMS (HA)
5
PVT. LAND TO BE ACQUIRED AS PER JMS (HA)
6
3-D NOTIFIED (HA) (PVT. + GOVT. LAND)
7
3-D NOTIFIED (HA) (PVT.. LAND ONLY)
8
3-D NOTIFIED (HA) (GOVT. LAND ONLY)
9
3-G AWARD APPROVED
10 POSSESSION SLIP
PROJECT: Construction and Upgradation including specialized slope treatment of existing road to 2-lane with paved
shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch 456.800) of Patalganga Landslide of NH-07
under Chardham Pariyojna on EPC basis in the state of Uttarakhand. (Design Length = 0.600 km).
2 TREES NOS. _ _ _
PERMANENT STRUCTURE
4 NOS. 0 0 0
(HOUSES & SHOPS)
__
BHARAT CONSTRUCTION
PROJECT: Construction and Upgradation including specialized slope treatment of existing road to 2-lane
with paved shoulder from Exisiting Km. 458.900 to Km. 459.475 (Design Ch 456.200 to Ch 456.800) of
Patalganga Landslide of NH-07 under Chardham Pariyojna on EPC basis in the state of Uttarakhand.
(Design Length = 0.600 km).