ASSURE THERMAL ENERGY Work Address - Assure Thermal Energy Solutions LLP (ATES),Aadarsh Nagar,Tapkir

Nagar,Moshi,Pimpri Chinchwad,Maharashtra,412105

SOLUTIONS LLP Office Address - Assure Thermal Energy Solutions LLP (ATES),Safe Air House,2nd
Floor,Plot No:.118/119,Ramtekdi Industrial Area,Hadapsar,Pune-411013

Powering Innovative Solutions Email - kailasn@ates.net.in, mail@ates.net.in


Strainers,Filter Seperators,Silencers,Waste Heat (90'C to 250'C) to Power
Generation,(ORC)Back Pressure Turbine replace PRV,ORC Consultancy

FILTER BUSINESS UNIT


Feature Y-Strainer Conical Strainer Tee Strainer Basket Strainer Duplex Basket Strainer Self Cleaning Strainer

Design

Size ½” to 24” 2” to 72” 2” to 72” 2” to 30” 2” to 30” 2” to 30”


Manufacturing Forged, Cast, Fabricated Fabricated Cast , Fabricated Cast , Fabricated Cast , Fabricated Cast , Fabricated
End Connection SW, BW, Flanged Sandwiched BW, Flanged BW, Flanged BW ,Flanged BW, Flanged
#600, #800 –
#150 – Sandwitch #150 – BW, Flanged
NPT,BSPT,SW,BW
#300 – BW, Flanged
#150 – Flanged #300 – Sandwitch
#600 - BW, Flanged
Class Rating #300 – Flanged #600 – Sandwitch
#900 - BW, Flanged
#600 – Flanged
#1500 - BW, Flanged
#1500 – BW, Flanged
#2500 - BW, Flanged
#2500 - BW, Flanged
Carbon steel
Body Material Low temperature Carbon steel
Stainless steel
Screen Material Stainless Steel, Alloy Steel, Duplex Stainless Steel, Monel Metal
Cleaning Manual Manual Manual Manual Manual Automatic
Use Permanent Temporary Permanent Permanent Permanent Permanent
150%,200%,300%,
Free Flow Area 300% Max 150%,200% 150%,200%,300% 150%,200%,300% 150%,200%,300%
500%,800%,1000%
Delivery 2 Weeks to 4 Weeks 2 Weeks 4 Weeks to 8 Weeks 4 Weeks to 8 Weeks 4 Weeks to 8 Weeks 8 Weeks to 12 Weeks
Application Process Industry , Pharmaceutical Industry , Commercial Infrastructure , Chemical Industry , Oil and Gas Industry , Pulp and Paper Industry , Water and Waste Management
Notes
1. The list is indicative of our standard offerings. It is subject to change.
2. Material combinations other than mentioned above can also be offered. Consult factory.
Optional Accessories and Spares
Additional
1. Differential pressure indicator/inlet and outlet pressure gauges to indicate clogged screen (time for cleaning)
2. Special cover arrangements to ease maintenance operation
3. Spare screens, gaskets, and fasteners to reduce process downtime
4. Mesh Size is based on customer’s requirement
Indian Boiler Regulation Act.(IBR)
Lloyds Ltd.
Chief Controller of Explosives (CCE).
Engineers India Ltd.(EIL).
Third Party Metallurgical & Engg. Consultant India Ltd.(MECON).
KPG.
Inspections Toyo Engineering Ltd.
H & G (Humphreys & Glasgow).
Udhe India Ltd.
Fischer Consulting Engg.
Tata Consulting Engg.
Hydro test ( Leak testing)
Magnetic particle test
Radiographic examination
Ultrasonic Examination
Dye penetrate testing
Inspection & Pneumatic testing
Pressure Drop Testing
Testings Seismic Testing
Ultimate tensile test.
Yield point & elongation
Microscopic examination
Bend test
Impact testing.
Solid Edge – for solid modelling, screening area calculations.
Advanced In house software for pressure drop calculations.
ANSYS for stress analysis.
Technologies PV Ellite – Pressure Vessel Calculations.
Finite Element Analysis