1-1
IMPACT ON PROJECT MANAGER
Defining the Project
Scope Creep:
The tendency for the project scope to expand over
time due to changing requirements, specifications,
and priorities.
Project Scope Statement
A scope statement is one of the most critical pieces of a
project, and writing one can be a difficult task for a project
manager – no matter what type of project management
methodology is being used.
But, an effectively written scope statement can help the rest
of the project flow along with minimal problems
A successful project scope statement should be:
• concise and clear.
• Anyone reading the statement should have a good idea of what
the project consists of (and what will not be part of the project).
• This statement will give a view of the project.
• It is also important to be specific in a project scope statement.
Defining the Project Scope
Project Scope
Scope refers to all the work involved in creating the products
of the project and the processes used to create them.
A definition of the end result or mission of the project (e.g.
product/service for the client)—in specific, tangible, and
measurable terms.
achieved.
How does this sound??????
University X will upgrade the library, dormitories, offices, and
then all campus buildings to IEEE 802.11 technology, starting at
the north side of campus with the library. This project will
facilitate productivity (via computer) of faculty, staff, and
students. The project will be complete by June, 2013.
Good scope statement will also make it clear as to what project will
not attempt to do. It not only keeps things in, it also keeps things out
2. Once the scope of the project is defined, hold firm because any
deviation from original plan is a sign that project is out of control.
The project nit get off track while the scope change committee
reviews a particular change.
They may not be listening -> focus on the benefit of the system
6. You can always make up schedules and budgets later on if they slip
a little bit.
Budget (optional)
Acceptance Criteria
Communication requirements
Why Have a Project Charter?
Document project Measurable Organizational Value (MOV)
Assignable
Project Constraints
Realistic See Project Priority Matrix in Appendix. List any other constrain
Project Phases
Time-framed Indicate the phases of the proposed project.
Milestones
List major milestones for project identified so far. (Include at
least five throughout the life of the project.)
Project Risks
Attach Risk Identification Worksheets and Risk Priority
Stakeholders
Attach Potential Stakeholders Worksheet.
Signature Page Granting Authority to Proceed
Obtain signatures of Project Sponsor and Project Manager.
Project Sponsor Signature:
Project Manager Signature:
Project Charter TEMPLATE-III
Project Charter TEMPLATE-III
Establishing Project Priorities
Times of India,NewDelhi, April 8, 2010
Establishing Project Priorities
Causes of Project Trade-offs
Shifts in the relative importance of Scope
criterions related to cost, time, and
performance parameters
• Budget–Cost
• Schedule–Time
• Performance–Scope
Performance
is critical
It has to be
attained
Try as much as
possible to quickly
finish the project Going over
budget though
Don’t have to have 1 in each, but is the most typical. not desirable is
Don’t make mistake of having all be enhance. acceptable
Typically we have at least 1 accept.
Project Priority Matrix:
Examples