Anda di halaman 1dari 5

DATA KEBUTUHAN SEMEN DAN/ATAU CONCRETE (BETON) UNTUK PEKERJAAN KONSTRUKSI SIPIL TA

LOKASI
No. NAMA PROYEK TAHAP
PROVINSI
1 GIS Duren Tiga II KONSTRUKSI Jaksel
2 GIS Gandaria II KONSTRUKSI Jaktim
3 GIS AGP II PRAKONSTRUKSI Jaksel
4 SKTT 150 kV Tomang - Grogol PRAKONSTRUKSI Jakbar

Concrete
GIS Duren Tiga II 453
control building 55.44 GIS 150 kV Building
25.04
125.49
74.1
52.8
66.88
5.6
273.47 Foundation
11.7
7.87
1151.39
GIS Gandaria II 453
control building 33
321.94 GIS 150 kV Building
61.49
192.22
255.89
63.78
132 Foundation
41.62
380.49
10.22
6.43
87.07
1586.15

GIS AGP II 453


control building 33 GIS 150 kV Building
55.44
25.04
125.49
74.1
52.8
66.88
5.6 Foundation
273.47
11.7
7.87
87.07
1271.46

SKTT AGP - Mampang 2.3 12 precast


27.6 1 jp
4 jp
110.4

Pancang 453.76
3 gis
PEKERJAAN KONSTRUKSI SIPIL TAHAP SUDAH TERKONTRAK, PRAKONSTRUKSI DAN KONSTRUKSI PROYEK PEMBANGKIT & TRANSMISI PL

LOKASI vol Jumlah VOLUME KEBUTUHAN


KECAMATAN KELURAHAN 1 JP JP SEMEN (Ton) CONCRETE BETON (m3)
Pasar minggu Kebagusan 470.71 1151.39
Ciracas Susukan 562.01 1586.15
Setiabudi Kuningan Timur 675.67 1271.46
Petamburan 27.6 4 110.4

Total 1708.39 4119.4

semen
brick wall 8.67
half brick 1:4 11.50
half brick 1:2 1.46
plester 1:4 6.24
acian 3.25
brafend 4.3
lean concrete 230
stone mansonry 1:2 98.374
granite floor 40
half brick wall 66.92
470.71

half brick 1:2 2.24


plester 1:4 6.24
acian 3.25
brafend 4.3
lean concrete 230
stone mansonry 1:2 252
granite floor 40
glazed plint 1.14
stepnosing 1.24
wash basin 6
sink complete 6
bath basin 9.6
562.01

fire wall 78
half brick 1:4 18.95
half brick 1:2 18.95
plester 1:4 6.24
acian 3.25
brafend 4.3
lean concrete 230
stone mansonry 1:2 252
granite floor 40
glazed plint 1.14
stepnosing 1.24
wash basin 6
sink complete 6
bath basin 9.6
675.67
PEMBANGKIT & TRANSMISI PLN

KETERANGAN

relokasi