Project Balok Anak

Job Number
Engineer
SAP2000
AISC 360-10 STEEL SECTION CHECK (Summary for Combo and Station)
Units : N, mm, C

Frame : 30 X Mid: 11125.000 Combo: 1,2D+1,6L Design Type: Beam


Length: 5000.000 Y Mid: -7500.000 Shape: W150X13 Frame Type: OMF
Loc : 2200.000 Z Mid: 4000.000 Class: Compact Princpl Rot: 0.000 degrees

Provision: LRFD Analysis: Direct Analysis


D/C Limit=0.950 2nd Order: General 2nd Order Reduction: Tau-b Fixed
AlphaPr/Py=0.001 AlphaPr/Pe=0.005 Tau_b=1.000 EA factor=0.800 EI factor=0.800
Ignore Seismic Code? No Ignore Special EQ Load? No D/P Plug Welded? Yes

SDC: D I=1.000 Rho=1.000 Sds=0.500


R=8.000 Omega0=3.000 Cd=5.500
PhiB=0.900 PhiC=0.900 PhiTY=0.900 PhiTF=0.750
PhiS=0.900 PhiS-RI=1.000 PhiST=0.900

A=1630.000 I33=6200000.000 r33=61.674 S33=83783.784 Av3=825.000


J=13900.000 I22=828000.000 r22=22.538 S22=16560.000 Av2=639.360
E=199947.979 fy=250.000 Ry=1.517 z33=93900.000 Cw=4235903629
RLLF=1.000 Fu=410.000 z22=25600.000

STRESS CHECK FORCES & MOMENTS (Combo 1,2D+1,6L)


Location Pu Mu33 Mu22 Vu2 Vu3 Tu
2200.000 316.130 3353710.624 -4797.514 73.195 45.985 222.838

PMM DEMAND/CAPACITY RATIO (H1.2,H1-1b)


D/C Ratio: 0.318 = 0.000 + 0.317 + 0.000
= (1/2)(Pr/Pc) + (Mr33/Mc33) + (Mr22/Mc22)

AXIAL FORCE & BIAXIAL MOMENT DESIGN (H1.2,H1-1b)


Factor L K1 K2 B1 B2 Cm
Major Bending 1.000 1.000 1.000 1.000 1.000 1.000
Minor Bending 1.000 1.000 1.000 1.000 1.000 1.000

Lltb Kltb Cb
LTB 1.000 1.000 1.227

Pu phi*Pnc phi*Pnt
Force Capacity Capacity
Axial 316.130 51588.060 366750.000

Mu phi*Mn phi*Mn phi*Mn


Moment Capacity No LTB Cb=1
Major Moment 3353710.624 10576516.75 21127500.00 8621898.791
Minor Moment -4797.514 5760000.000

SHEAR CHECK
Vu phi*Vn Stress Status
Force Capacity Ratio Check
Major Shear 73.195 95904.004 0.001 OK
Minor Shear 45.985 133649.995 0.000 OK

CONNECTION SHEAR FORCES FOR BEAMS


VMajor VMajor
Left Right
Major (V2) 643.341 8829.733

D:\DIAN PSB\sap2000\2-11-2017 coba 4.sdb 11/27/2017 9:00 PM


Project Balok Induk Arah X
Job Number
Engineer
SAP2000
AISC 360-10 STEEL SECTION CHECK (Summary for Combo and Station)
Units : N, mm, C

Frame : 55 X Mid: 11125.000 Combo: 1,2D+1,6L Design Type: Beam


Length: 6250.000 Y Mid: -5000.000 Shape: W250X49.1 Frame Type: OMF
Loc : 6250.000 Z Mid: 4000.000 Class: Compact Princpl Rot: 0.000 degrees

Provision: LRFD Analysis: Direct Analysis


D/C Limit=0.950 2nd Order: General 2nd Order Reduction: Tau-b Fixed
AlphaPr/Py=0.003 AlphaPr/Pe=0.002 Tau_b=1.000 EA factor=0.800 EI factor=0.800
Ignore Seismic Code? No Ignore Special EQ Load? No D/P Plug Welded? Yes

SDC: D I=1.000 Rho=1.000 Sds=0.500


R=8.000 Omega0=3.000 Cd=5.500
PhiB=0.900 PhiC=0.900 PhiTY=0.900 PhiTF=0.750
PhiS=0.900 PhiS-RI=1.000 PhiST=0.900

A=6260.000 I33=71200000.0 r33=106.648 S33=576518.219 Av3=3703.333


J=243000.000 I22=15200000.00 r22=49.276 S22=150495.050 Av2=1820.390
E=199947.979 fy=250.000 Ry=1.517 z33=636000.000 Cw=2.116E+11
RLLF=1.000 Fu=410.000 z22=229000.000

STRESS CHECK FORCES & MOMENTS (Combo 1,2D+1,6L)


Location Pu Mu33 Mu22 Vu2 Vu3 Tu
6250.000 5441.612 -122769815 32329.047 116801.158 -160.812 -15792.977

PMM DEMAND/CAPACITY RATIO (H1.2,H1-1b)


D/C Ratio: 0.860 = 0.002 + 0.858 + 0.000
= (1/2)(Pr/Pc) + (Mr33/Mc33) + (Mr22/Mc22)

AXIAL FORCE & BIAXIAL MOMENT DESIGN (H1.2,H1-1b)


Factor L K1 K2 B1 B2 Cm
Major Bending 1.000 1.000 1.000 1.000 1.000 1.000
Minor Bending 0.500 1.000 1.000 1.000 1.000 1.000

Lltb Kltb Cb
LTB 0.500 1.000 1.076

Pu phi*Pnc phi*Pnt
Force Capacity Capacity
Axial 5441.612 1137996.286 1408500.000

Mu phi*Mn phi*Mn phi*Mn


Moment Capacity No LTB Cb=1
Major Moment -122769815 143100000.0 143100000.0 137285741.0
Minor Moment 32329.047 51525000.0

SHEAR CHECK
Vu phi*Vn Stress Status
Force Capacity Ratio Check
Major Shear 116801.158 273058.496 0.428 OK
Minor Shear 160.812 599940.000 0.000 OK

CONNECTION SHEAR FORCES FOR BEAMS


VMajor VMajor
Left Right
Major (V2) 83752.028 116801.158

D:\DIAN PSB\sap2000\2-11-2017 coba 4.sdb 11/27/2017 11:21 PM


Project Balok Induk Arah Y
Job Number
Engineer
SAP2000
AISC 360-10 STEEL SECTION CHECK (Summary for Combo and Station)
Units : N, mm, C

Frame : 94 X Mid: 8000.000 Combo: 1,2D+1,6L Design Type: Beam


Length: 5000.000 Y Mid: 2500.000 Shape: W250X38.5 Frame Type: OMF
Loc : 0.000 Z Mid: 4000.000 Class: Compact Princpl Rot: 0.000 degrees

Provision: LRFD Analysis: Direct Analysis


D/C Limit=0.950 2nd Order: General 2nd Order Reduction: Tau-b Fixed
AlphaPr/Py=0.001 AlphaPr/Pe=0.003 Tau_b=1.000 EA factor=0.800 EI factor=0.800
Ignore Seismic Code? No Ignore Special EQ Load? No D/P Plug Welded? Yes

SDC: D I=1.000 Rho=1.000 Sds=0.500


R=8.000 Omega0=3.000 Cd=5.500
PhiB=0.900 PhiC=0.900 PhiTY=0.900 PhiTF=0.750
PhiS=0.900 PhiS-RI=1.000 PhiST=0.900

A=4910.000 I33=59900000.0 r33=110.452 S33=457251.908 Av3=2744.000


J=167000.000 I22=5870000.000 r22=34.576 S22=79863.946 Av2=1729.200
E=199947.979 fy=250.000 Ry=1.517 z33=513000.000 Cw=92306689340
RLLF=1.000 Fu=410.000 z22=123000.000

STRESS CHECK FORCES & MOMENTS (Combo 1,2D+1,6L)


Location Pu Mu33 Mu22 Vu2 Vu3 Tu
0.000 -1263.923 -79198990 10178.161 -53895.440 67.875 -234.462

PMM DEMAND/CAPACITY RATIO (H1-1b)


D/C Ratio: 0.688 = 0.002 + 0.686 + 0.000
= (1/2)(Pr/Pc) + (Mr33/Mc33) + (Mr22/Mc22)

AXIAL FORCE & BIAXIAL MOMENT DESIGN (H1-1b)


Factor L K1 K2 B1 B2 Cm
Major Bending 1.000 1.000 1.000 1.000 1.000 1.000
Minor Bending 1.000 1.000 1.000 1.000 1.000 1.000

Lltb Kltb Cb
LTB 1.000 1.000 2.349

Pu phi*Pnc phi*Pnt
Force Capacity Capacity
Axial -1263.923 365726.946 1104750.000

Mu phi*Mn phi*Mn phi*Mn


Moment Capacity No LTB Cb=1
Major Moment -79198990 115425000.0 115425000.0 80221807.1
Minor Moment 10178.161 27675000.00

SHEAR CHECK
Vu phi*Vn Stress Status
Force Capacity Ratio Check
Major Shear 53895.440 259379.996 0.208 OK
Minor Shear 67.875 444527.992 0.000 OK

CONNECTION SHEAR FORCES FOR BEAMS


VMajor VMajor
Left Right
Major (V2) 53895.440 53492.918

D:\DIAN PSB\sap2000\2-11-2017 coba 4.sdb 11/27/2017 11:23 PM


Project Gording
Job Number
Engineer
SAP2000
AISC 360-10 STEEL SECTION CHECK (Summary for Combo and Station)
Units : N, mm, C

Frame : 296 X Mid: 15021.272 Combo: 1,2D+W+L Design Type: Beam


Length: 5000.000 Y Mid: -7500.000 Shape: GORDING 150X65X20Frame Type: OMF
Loc : 5000.000 Z Mid: 11684.950 Class: Non-Compact Princpl Rot: 0.000 degrees

Provision: LRFD Analysis: Direct Analysis


D/C Limit=0.950 2nd Order: General 2nd Order Reduction: Tau-b Fixed
AlphaPr/Py=0.003 AlphaPr/Pe=0.016 Tau_b=1.000 EA factor=0.800 EI factor=0.800
Ignore Seismic Code? No Ignore Special EQ Load? No D/P Plug Welded? Yes

SDC: D I=1.000 Rho=1.000 Sds=0.500


R=8.000 Omega0=3.000 Cd=5.500
PhiB=0.900 PhiC=0.900 PhiTY=0.900 PhiTF=0.750
PhiS=0.900 PhiS-RI=1.000 PhiST=0.900

A=983.040 I33=3465937.203 r33=59.378 S33=46212.496 Av3=400.809


J=3378.788 I22=568020.159 r22=24.038 S22=13038.616 Av2=503.415
E=199947.979 fy=250.000 Ry=1.517 z33=53847.936
RLLF=1.000 Fu=410.000 z22=19441.536

DESIGN MESSAGES
Warning: kl/r > 200 (AISC E2)

STRESS CHECK FORCES & MOMENTS (Combo 1,2D+W+L)


Location Pu Mu33 Mu22 Vu2 Vu3 Tu
5000.000 -704.061 -3966345.0 -1130488.28 2112.585 4317.298 -1113.110

PMM DEMAND/CAPACITY RATIO (H1-1b)


D/C Ratio: 0.777 = 0.010 + 0.381 + 0.385
= (1/2)(Pr/Pc) + (Mr33/Mc33) + (Mr22/Mc22)

AXIAL FORCE & BIAXIAL MOMENT DESIGN (H1-1b)


Factor L K1 K2 B1 B2 Cm
Major Bending 1.000 1.000 1.000 1.000 1.000 1.000
Minor Bending 1.000 1.000 1.000 1.000 1.000 1.000

Lltb Kltb Cb
LTB 1.000 1.000 2.045

Pu phi*Pnc phi*Pnt
Force Capacity Capacity
Axial -704.061 35390.167 221184.000

Mu phi*Mn phi*Mn phi*Mn


Moment Capacity No LTB Cb=1
Major Moment -3966345.0 10397811.61 10397811.61 10397811.61
Minor Moment -1130488.28 2933688.517

SHEAR CHECK
Vu phi*Vn Stress Status
Force Capacity Ratio Check
Major Shear 2112.585 67960.972 0.031 OK
Minor Shear 4317.298 54109.221 0.080 OK

CONNECTION SHEAR FORCES FOR BEAMS


VMajor VMajor
Left Right
Major (V2) 1798.731 2112.585

D:\DIAN PSB\sap2000\1-11-2017 coba 2.sdb 11/5/2017 3:35 PM


Project Kolom
Job Number
Engineer
SAP2000
AISC 360-10 STEEL SECTION CHECK (Summary for Combo and Station)
Units : N, mm, C

Frame : 34 X Mid: 14250.000 Combo: 1,2D+1,6L Design Type: Column


Length: 4000.000 Y Mid: -5000.000 Shape: HP250X85 Frame Type: OMF
Loc : 4000.000 Z Mid: 2000.000 Class: Compact Princpl Rot: 0.000 degrees

Provision: LRFD Analysis: Direct Analysis


D/C Limit=0.950 2nd Order: General 2nd Order Reduction: Tau-b Fixed
AlphaPr/Py=0.357 AlphaPr/Pe=0.186 Tau_b=1.000 EA factor=0.800 EI factor=0.800
Ignore Seismic Code? No Ignore Special EQ Load? No D/P Plug Welded? Yes

SDC: D I=1.000 Rho=1.000 Sds=0.500


R=8.000 Omega0=3.000 Cd=5.500
PhiB=0.900 PhiC=0.900 PhiTY=0.900 PhiTF=0.750
PhiS=0.900 PhiS-RI=1.000 PhiST=0.900

A=10800.000 I33=122000000.0 r33=106.284 S33=960629.921 Av3=6216.000


J=820000.000 I22=42000000.0 r22=62.361 S22=324324.324 Av2=3657.600
E=199947.979 fy=250.000 Ry=1.517 z33=1090000.000 Cw=6.028E+11
RLLF=1.000 Fu=410.000 z22=497000.000

STRESS CHECK FORCES & MOMENTS (Combo 1,2D+1,6L)


Location Pu Mu33 Mu22 Vu2 Vu3 Tu
4000.000 -963129.650 -43734252 -10380917.0 10933.563 2595.229 0.000

PMM DEMAND/CAPACITY RATIO (H1-1a)


D/C Ratio: 0.734 = 0.493 + 0.159 + 0.083
= (Pr/Pc) + (8/9)(Mr33/Mc33) + (8/9)(Mr22/Mc22)

AXIAL FORCE & BIAXIAL MOMENT DESIGN (H1-1a)


Factor L K1 K2 B1 B2 Cm
Major Bending 1.000 1.000 1.000 1.000 1.000 0.600
Minor Bending 1.000 1.000 1.000 1.000 1.000 0.600

Lltb Kltb Cb
LTB 1.000 1.000 1.667

Pu phi*Pnc phi*Pnt
Force Capacity Capacity
Axial -963129.650 1953721.749 2430000.000

Mu phi*Mn phi*Mn phi*Mn


Moment Capacity No LTB Cb=1
Major Moment -43734252 245250000.0 245250000.0 237684684.9
Minor Moment -10380917.0 111825000.0

SHEAR CHECK
Vu phi*Vn Stress Status
Force Capacity Ratio Check
Major Shear 10933.563 493775.987 0.022 OK
Minor Shear 2595.229 1006991.973 0.003 OK

CONTINUITY PLATE, DOUBLER PLATE AND BEAM/COLUMN RATIOS


Cont Pl Dbl Pl BC Ratio BC Ratio
Area Thick Major Minor
Joint Design 1023.286 3.130 N/C N/C

D:\DIAN PSB\sap2000\2-11-2017 coba 4.sdb 11/27/2017 8:11 PM


Project Kuda-Kuda
Job Number
Engineer
SAP2000
AISC 360-10 STEEL SECTION CHECK (Summary for Combo and Station)
Units : N, mm, C

Frame : 207 X Mid: 12125.000 Combo: 1,2D+W+L Design Type: Brace


Length: 10071.390 Y Mid: -10000.000 Shape: W200X52 Frame Type: OMF
Loc : 7629.841 Z Mid: 13487.941 Class: Compact Princpl Rot: 0.000 degrees

Provision: LRFD Analysis: Direct Analysis


D/C Limit=0.950 2nd Order: General 2nd Order Reduction: Tau-b Fixed
AlphaPr/Py=0.082 AlphaPr/Pe=0.229 Tau_b=1.000 EA factor=0.800 EI factor=0.800
Ignore Seismic Code? No Ignore Special EQ Load? No D/P Plug Welded? Yes

SDC: D I=1.000 Rho=1.000 Sds=0.500


R=8.000 Omega0=3.000 Cd=5.500
PhiB=0.900 PhiC=0.900 PhiTY=0.900 PhiTF=0.750
PhiS=0.900 PhiS-RI=1.000 PhiST=0.900

A=6650.000 I33=52900000.0 r33=89.190 S33=513592.233 Av3=4284.000


J=320000.000 I22=17700000.00 r22=51.591 S22=173529.412 Av2=1621.220
E=199947.979 fy=250.000 Ry=1.517 z33=569000.000 Cw=1.655E+11
RLLF=1.000 Fu=410.000 z22=264000.000

STRESS CHECK FORCES & MOMENTS (Combo 1,2D+W+L)


Location Pu Mu33 Mu22 Vu2 Vu3 Tu
7629.841 -137137.390 -23337498.6 6479142.476 24489.928 -13953.947 278142.767

PMM DEMAND/CAPACITY RATIO (H1-1a)


D/C Ratio: 0.549 = 0.290 + 0.162 + 0.097
= (Pr/Pc) + (8/9)(Mr33/Mc33) + (8/9)(Mr22/Mc22)

AXIAL FORCE & BIAXIAL MOMENT DESIGN (H1-1a)


Factor L K1 K2 B1 B2 Cm
Major Bending 0.149 1.000 1.000 1.000 1.000 1.000
Minor Bending 0.758 1.000 1.000 1.000 1.000 1.000

Lltb Kltb Cb
LTB 0.758 1.000 1.751

Pu phi*Pnc phi*Pnt
Force Capacity Capacity
Axial -137137.390 473588.488 1496250.000

Mu phi*Mn phi*Mn phi*Mn


Moment Capacity No LTB Cb=1
Major Moment -23337498.6 128025000.0 128025000.0 99347794.7
Minor Moment 6479142.476 59400000.0

SHEAR CHECK
Vu phi*Vn Stress Status
Force Capacity Ratio Check
Major Shear 24489.928 243182.996 0.101 OK
Minor Shear 13953.947 694008.021 0.020 OK

D:\DIAN PSB\sap2000\2-11-2017 coba 3.sdb 11/6/2017 6:48 PM


Project Ring Balok
Job Number
Engineer
SAP2000
AISC 360-10 STEEL SECTION CHECK (Summary for Combo and Station)
Units : N, mm, C

Frame : 140 X Mid: 1750.000 Combo: 1,2D+EY+0,3EX+L Design Type: Beam


Length: 5000.000 Y Mid: 7500.000 Shape: W200X15 Frame Type: OMF
Loc : 5000.000 Z Mid: 12000.000 Class: Seismic MD Princpl Rot: 0.000 degrees

Provision: LRFD Analysis: Direct Analysis


D/C Limit=0.950 2nd Order: General 2nd Order Reduction: Tau-b Fixed
AlphaPr/Py=0.024 AlphaPr/Pe=2.702 Tau_b=1.000 EA factor=0.800 EI factor=0.800
Ignore Seismic Code? No Ignore Special EQ Load? No D/P Plug Welded? Yes

SDC: D I=1.000 Rho=1.000 Sds=0.500


R=8.000 Omega0=3.000 Cd=5.500
PhiB=0.900 PhiC=0.900 PhiTY=0.900 PhiTF=0.750
PhiS=0.900 PhiS-RI=1.000 PhiST=0.900

A=1910.000 I33=12800000.00 r33=81.863 S33=128000.000 Av3=868.333


J=17700.000 I22=870000.000 r22=21.342 S22=17400.000 Av2=864.000
E=199947.979 fy=250.000 Ry=1.517 z33=145000.000 Cw=8252633839
RLLF=1.000 Fu=410.000 z22=27200.000

DESIGN MESSAGES
Warning: l/r > 300 (AISC D1)

STRESS CHECK FORCES & MOMENTS (Combo 1,2D+EY+0,3EX+L)


Location Pu Mu33 Mu22 Vu2 Vu3 Tu
5000.000 11595.869 -6428637.9 256520.999 2523.209 -88.356 -79.809

PMM DEMAND/CAPACITY RATIO (H1.2,H1-1b)


D/C Ratio: 0.674 = 0.013 + 0.619 + 0.042
= (1/2)(Pr/Pc) + (Mr33/Mc33) + (Mr22/Mc22)

AXIAL FORCE & BIAXIAL MOMENT DESIGN (H1.2,H1-1b)


Factor L K1 K2 B1 B2 Cm
Major Bending 1.000 1.000 1.000 1.000 1.000 1.000
Minor Bending 4.000 1.000 1.000 1.000 1.000 1.000

Lltb Kltb Cb
LTB 4.000 1.000 4.703

Pu phi*Pnc phi*Pnt
Force Capacity Capacity
Axial 11595.869 3387.803 429750.000

Mu phi*Mn phi*Mn phi*Mn


Moment Capacity No LTB Cb=1
Major Moment -6428637.9 10387011.79 32625000.0 2208527.485
Minor Moment 256520.999 6120000.000

SHEAR CHECK
Vu phi*Vn Stress Status
Force Capacity Ratio Check
Major Shear 2523.209 129600.005 0.019 OK
Minor Shear 88.356 140670.001 0.001 OK

CONNECTION SHEAR FORCES FOR BEAMS


VMajor VMajor
Left Right
Major (V2) 5632.271 6587.889

D:\DIAN PSB\sap2000\2-11-2017 coba 3.sdb 11/6/2017 10:10 PM