VALORIZACION N° 05

PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE NIVEL PRIMARIO DE LAS I.E. NRO 50346, 50372 y 50374, EN LAS
DE PARURO - PARURO - CUSCO

FECHA DE INICIO 9/10/2018


PERIODO 12/1/2018 AL 12/31/2018

Item Descripción II EE Parcial S/. - Contrato

01 VALORIZADO COSTO DIRECTO II.EE. NRO. 50374 - MACCARAN (MASKA) 1,949,351.77

02 VALORIZADO COSTO DIRECTO II.EE. NRO. 50346 - MAYUMBAMBA 1,821,229.63

03 VALORIZADO COSTO DIRECTO II.EE. NRO. 50372 - CUSIBAMBA 1,385,112.51

COSTO DIRECTO S/. 5,155,693.91


GASTOS GENERALES (12%) 12.00% S/. 618,683.27
UTILIDAD (9.00%) 9.00% S/. 464,012.45
SUB TOTAL S/. 6,238,389.63
FACTOR DE RELACIÓN (FR) 1.0000 S/. 6,238,389.63
TOTAL DE OBRA S/. 6,238,389.63
I.G.V. 18.00% S/. 1,122,910.13
TOTAL DE PRESUPUESTO VALORIZADO S/. 7,361,299.76
CION N° 05
0346, 50372 y 50374, EN LAS COMUNIDADES DE: MAYUMBAMBA; CUSIBAMBA Y MASKA DEL DISTRITO
O - PARURO - CUSCO
CONTRATISTA: CONSORCIO WIRACOCHA

ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL

Parcial S/. Parcial S/. Parcial S/. Parcial S/. %

1,781,735.06 33,568.89 1,815,303.95 134,047.82 6.88%

1,694,732.32 48,128.66 1,742,860.98 78,368.65 4.30%

1,191,833.07 23,698.58 1,215,531.65 169,580.86 12.24%

4,668,300.45 105,396.13 4,773,696.58 381,997.33 7.41%

560,196.05 12,647.54 572,843.59 45,839.68


420,147.04 9,485.65 429,632.69 34,379.76
5,648,643.55 127,529.32 5,776,172.86 462,216.77
5,648,643.55 127,529.32 5,776,172.86 462,216.77
5,648,643.55 127,529.32 5,776,172.86 462,216.77
1,016,755.84 22,955.28 1,039,711.12 83,199.02
6,665,399.39 150,484.60 6,815,883.98 545,415.78
VALORIZACION N° 05
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE NIVEL PRIMARIO DE LAS I.E. NRO 50346, 50372 y 50374, EN LAS COM
- PARURO - CUSCO
Subpresupuesto II.EE. NRO. 50374 - MACARAN CONTRATISTA
FECHA DE INICIO 9/10/2018
PERIODO 12/1/2018 AL 12/31/2018
CONTRATO ACUMULADO ANTERIOR PRESENTE
Item Descripción Und.
Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 233,401.17


01.01 OBRAS PRELIMINARES 27,083.85
01.01.01 CARTEL DE OBRA TIPO GIGANTOGRAFÍA 6.00x3.60m und 1.00 1,007.85 1,007.85 1.00 1,007.85
01.01.02 CERCO PROVISIONAL DE CALAMINA, H=3.00m m 120.00 87.30 10,476.00 120.00 10,476.00
01.01.03 OFICINAS m2 30.00 60.00 1,800.00 30.00 1,800.00
01.01.04 COMEDOR m2 60.00 60.00 3,600.00 60.00 3,600.00
01.01.05 ALMACÉN m2 100.00 60.00 6,000.00 100.00 6,000.00
01.01.06 VESTUARIOS m2 60.00 60.00 3,600.00 20.00 1,200.00 40.00
01.01.07 CASETA DE GUARDIANÍA m2 10.00 60.00 600.00 0.00 0.00 10.00
01.02 INSTALACIONES PROVISIONALES 4,500.00 0.00 0.00
01.02.01 INSTALACIONES PROVISIONALES DE AGUA Y DESAGÜE glb 1.00 2,000.00 2,000.00 1.00 2,000.00
01.02.02 INSTALACIÓN PROVISIONAL DE ENERGÍA ELÉCTRICA glb 1.00 1,500.00 1,500.00 1.00 1,500.00
01.02.03 INSTALACIÓN PROVISIONAL DE TELEFONÍA E INTERNET glb 1.00 1,000.00 1,000.00 1.00 1,000.00
01.03 TRABAJOS PRELIMINARES 3,800.00 0.00 0.00
01.03.01 LIMPIEZA DE TERRENO MANUAL m2 5,000.00 0.76 3,800.00 5,000.00 3,800.00
01.04 TRAZO, NIVELES Y REPLANTEO 18,550.00 0.00 0.00
01.04.01 TRAZO Y REPLANTEO C/EQ. TOPOGRÁFICO* m2 7,000.00 2.65 18,550.00 7,000.00 18,550.00
01.05 TRANSPORTE DE MATERIALES, EQUIPO Y HERRAMIENTAS 151,607.52 0.00 0.00
01.05.01 FLETE TERRESTRE (TRANSPORTE DE MATERIALES).1 glb 1.00 130,000.00 130,000.00 1.00 130,000.00
01.05.02 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO Y MAQUINARIA.1 glb 1.00 10,500.00 10,500.00 0.80 8,400.00 0.20
01.05.03 MANIPULEO Y TRANSP. INTERNO DE MATERIALES, HERRAM. Y EQUIPmes 4.00 2,776.88 11,107.52 3.00 8,330.64 1.00
01.06 SEGURIDAD Y SALUD 27,859.80 0.00 0.00
01.06.01 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO (INC. ELABORACIÓN glb 1.00 10,000.00 10,000.00 0.20 2,000.00 0.40
01.06.02 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD glb 1.00 2,000.00 2,000.00 0.50 1,000.00 0.50
01.06.03 VESTUARIO GENERAL und 50.00 200.00 10,000.00 40.00 8,000.00 10.00
01.06.04 IMPLEMENTOS DE PROTECCIÓN DE MANOS Y PIES und 50.00 35.73 1,786.50 40.00 1,429.20 10.00
01.06.05 IMPLEMENTOS DE PROTECCIÓN DE BOCA, OJOS Y OÍDOS und 50.00 22.62 1,131.00 40.00 904.80 10.00
01.06.06 IMPLEMENTOS DE SEGURIDAD PARA TRABAJOS EN ALTURA und 10.00 218.13 2,181.30 0.00 0.00 10.00
01.06.07 IMPLEMENTOS DE SEGURIDAD PARA TRABAJOS ELÉCTRICOS und 10.00 76.10 761.00 0.00 0.00 8.00
02 ESTRUCTURAS 478,092.85 0.00 0.00
02.01 ESTRUCTURAS - BLOQUE A 170,427.14 0.00 0.00
02.01.01 MOVIMIENTO DE TIERRAS 6,950.96 0.00 0.00
02.01.01.01 EXCAVACION MASIVA EN TERRENO COMPACTO PARA CIMENTACIO m3 61.57 2.67 164.39 61.57 164.39
02.01.01.02 EXCAVACION MANUAL DE TERRENO m3 95.18 31.73 3,020.06 95.18 3,020.06
02.01.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON PLANCHA m3 85.80 10.30 883.74 85.80 883.74
02.01.01.04 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 38.48 2.93 112.75 38.48 112.75
02.01.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON EQUIPO 2 m3 110.14 25.15 2,770.02 110.14 2,770.02
02.01.02 OBRAS DE CONCRETO SIMPLE 46,065.82 0.00 0.00
02.01.02.01 SOLADOS 1,052.81 0.00 0.00
02.01.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 38.48 27.36 1,052.81 38.48 1,052.81
02.01.02.02 FALSA ZAPATA / SUB ZAPATA 22,728.41 0.00 0.00
02.01.02.02.01 SUB ZAPATA DE CONCRETO CICLÓPEO F'C=100 KG/CM2 + 30% m3 57.72 236.46 13,648.47 57.72 13,648.47
02.01.02.02.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 189.60 47.89 9,079.94 189.60 9,079.94
02.01.02.03 CIMIENTOS CORRIDOS 12,931.96 0.00 0.00
02.01.02.03.01 CIMIENTOS CORRIDOS 1:10+30% PG m3 49.50 221.76 10,977.12 49.50 10,977.12
02.01.02.03.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 50.06 39.05 1,954.84 50.06 1,954.84
02.01.02.04 SOBRECIMIENTOS 9,352.64 0.00 0.00
02.01.02.04.01 SOBRECIMIENTOS 1:8+25% PM m3 16.04 246.07 3,946.96 16.04 3,946.96
02.01.02.04.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 128.34 42.12 5,405.68 128.34 5,405.68
02.01.03 OBRAS DE CONCRETO ARMADO 117,410.36 0.00 0.00
02.01.03.01 ZAPATAS 8,772.14 0.00 0.00
02.01.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 19.24 325.03 6,253.58 19.24 6,253.58
02.01.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 618.81 4.07 2,518.56 618.81 2,518.56
02.01.03.02 VIGAS DE CONEXIÓN 21,448.26 0.00 0.00
02.01.03.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTACIÓN / CONE m3 15.35 325.03 4,989.21 15.35 4,989.21
02.01.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACIÓN / m2 122.76 38.31 4,702.94 122.76 4,702.94
02.01.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACIÓ kg 2,888.48 4.07 11,756.11 2,888.48 11,756.11
02.01.03.03 COLUMNAS 25,553.10 0.00 0.00
02.01.03.03.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 12.88 380.77 4,904.32 12.88 4,904.32
02.01.03.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 147.80 44.10 6,517.98 147.80 6,517.98
02.01.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 3,471.94 4.07 14,130.80 3,471.94 14,130.80
02.01.03.04 COLUMNETAS DE AMARRE 4,227.37 0.00 0.00
02.01.03.04.01 CONCRETO F'C=210 KG/CM2 PARA COLUMNETAS m3 2.50 356.39 890.98 2.50 890.98
02.01.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 52.36 44.10 2,309.08 52.36 2,309.08
02.01.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETAS kg 252.41 4.07 1,027.31 252.41 1,027.31
02.01.03.05 VIGAS 30,106.83 0.00 0.00
02.01.03.05.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 21.48 357.35 7,675.88 21.48 7,675.88
02.01.03.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 216.69 50.66 10,977.52 216.69 10,977.52
02.01.03.05.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 2,814.11 4.07 11,453.43 2,814.11 11,453.43
02.01.03.06 LOSAS ALIGERADAS 17,841.24 0.00 0.00
02.01.03.06.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 13.60 341.75 4,647.80 13.60 4,647.80
02.01.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAm2 161.04 40.99 6,601.03 161.04 6,601.03
02.01.03.06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 1,200.47 4.07 4,885.91 1,200.47 4,885.91
02.01.03.06.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H=15CM m 422.40 4.04 1,706.50 422.40 1,706.50
02.01.03.07 CANALETAS 9,461.42 0.00 0.00
02.01.03.07.01 CONCRETO f'c=210kg/cm2 PARA CANALETAS m3 9.43 357.35 3,369.81 9.43 3,369.81
02.01.03.07.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS m2 63.87 50.66 3,235.65 63.87 3,235.65
02.01.03.07.03 ACERO ESTRUCTURAL TRABAJADO PARA CANALETAS kg 701.71 4.07 2,855.96 701.71 2,855.96
02.02 ESTRUCTURAS - BLOQUE B 150,447.74 0.00 0.00
02.02.01 MOVIMIENTO DE TIERRAS 4,379.47 0.00 0.00
02.02.01.01 EXCAVACION MASIVA EN TERRENO COMPACTO PARA CIMENTACIO m3 78.67 2.67 210.05 78.67 210.05
02.02.01.02 EXCAVACION MANUAL DE TERRENO m3 47.31 31.73 1,501.15 47.31 1,501.15
02.02.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON PLANCHA m3 104.74 10.30 1,078.82 104.74 1,078.82
02.02.01.04 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 89.86 2.93 263.29 89.86 263.29
02.02.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON EQUIPO 2 m3 52.73 25.15 1,326.16 52.73 1,326.16
02.02.02 OBRAS DE CONCRETO SIMPLE 13,889.38 0.00 0.00
02.02.02.01 SOLADOS 1,345.29 0.00 0.00
02.02.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 49.17 27.36 1,345.29 49.17 1,345.29
02.02.02.02 CIMIENTOS CORRIDOS 11,038.77 0.00 0.00
02.02.02.02.01 CIMIENTOS CORRIDOS 1:10+30% PG m3 24.28 221.76 5,384.33 24.28 5,384.33
02.02.02.02.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 144.80 39.05 5,654.44 144.80 5,654.44
02.02.02.03 SOBRECIMIENTOS 1,505.32 0.00 0.00
02.02.02.03.01 SOBRECIMIENTOS 1:8+25% PM m3 1.21 246.07 297.74 1.21 297.74
02.02.02.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 28.67 42.12 1,207.58 28.67 1,207.58
02.02.03 OBRAS DE CONCRETO ARMADO 132,178.89 0.00 0.00
02.02.03.01 ZAPATAS 12,100.63 0.00 0.00
02.02.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 24.58 325.03 7,989.24 24.58 7,989.24
02.02.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 1,010.17 4.07 4,111.39 1,010.17 4,111.39
02.02.03.02 VIGAS DE CONEXIÓN 24,444.25 0.00 0.00
02.02.03.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTACIÓN / CONE m3 16.99 325.03 5,522.26 16.99 5,522.26
02.02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACIÓN / m2 135.90 38.31 5,206.33 135.90 5,206.33
02.02.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACIÓ kg 3,369.94 4.07 13,715.66 3,369.94 13,715.66
02.02.03.03 COLUMNAS 29,044.41 0.00 0.00
02.02.03.03.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 14.19 380.77 5,403.13 14.19 5,403.13
02.02.03.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 162.87 44.10 7,182.57 162.87 7,182.57
02.02.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 4,043.91 4.07 16,458.71 4,043.91 16,458.71
02.02.03.04 COLUMNETAS DE AMARRE 4,508.82 0.00 0.00
02.02.03.04.01 CONCRETO F'C=210 KG/CM2 PARA COLUMNETAS m3 2.55 356.39 908.79 2.55 908.79
02.02.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 57.60 44.10 2,540.16 57.60 2,540.16
02.02.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETAS kg 260.41 4.07 1,059.87 260.41 1,059.87
02.02.03.05 VIGAS 30,211.47 0.00 0.00
02.02.03.05.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 22.44 357.35 8,018.93 22.44 8,018.93
02.02.03.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 206.84 50.66 10,478.51 206.84 10,478.51
02.02.03.05.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 2,878.14 4.07 11,714.03 2,878.14 11,714.03
02.02.03.06 LOSAS ALIGERADAS 21,407.03 0.00 0.00
02.02.03.06.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 15.44 341.75 5,276.62 15.44 5,276.62
02.02.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAm2 182.16 40.99 7,466.74 182.16 7,466.74
02.02.03.06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 1,663.52 4.07 6,770.53 1,663.52 6,770.53
02.02.03.06.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H=15CM m 468.60 4.04 1,893.14 468.60 1,893.14
02.02.03.07 CANALETAS 10,462.28 0.00 0.00
02.02.03.07.01 CONCRETO f'c=210kg/cm2 PARA CANALETAS m3 10.44 357.35 3,730.73 10.44 3,730.73
02.02.03.07.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS m2 70.54 50.66 3,573.56 70.54 3,573.56
02.02.03.07.03 ACERO ESTRUCTURAL TRABAJADO PARA CANALETAS kg 775.92 4.07 3,157.99 775.92 3,157.99
02.03 ESTRUCTURAS - BLOQUE C 45,086.11 0.00 0.00
02.03.01 MOVIMIENTO DE TIERRAS 1,168.38 0.00 0.00
02.03.01.01 EXCAVACION MASIVA EN TERRENO COMPACTO PARA CIMENTACIO m3 18.43 2.67 49.21 18.43 49.21
02.03.01.02 EXCAVACION MANUAL DE TERRENO m3 15.65 31.73 496.57 15.65 496.57
02.03.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON PLANCHA m3 34.72 10.30 357.62 34.72 357.62
02.03.01.04 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 22.80 2.93 66.80 22.80 66.80
02.03.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON EQUIPO 2 m3 7.88 25.15 198.18 7.88 198.18
02.03.02 OBRAS DE CONCRETO SIMPLE 5,364.28 0.00 0.00
02.03.02.01 SOLADOS 315.19 0.00 0.00
02.03.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 11.52 27.36 315.19 11.52 315.19
02.03.02.02 CIMIENTOS CORRIDOS 4,361.95 0.00 0.00
02.03.02.02.01 CIMIENTOS CORRIDOS 1:10+30% PG m3 10.24 221.76 2,270.82 10.24 2,270.82
02.03.02.02.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 53.55 39.05 2,091.13 53.55 2,091.13
02.03.02.03 SOBRECIMIENTOS 687.14 0.00 0.00
02.03.02.03.01 SOBRECIMIENTOS 1:8+25% PM m3 0.80 246.07 196.86 0.80 196.86
02.03.02.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 11.64 42.12 490.28 11.64 490.28
02.03.03 OBRAS DE CONCRETO ARMADO 38,553.45 0.00 0.00
02.03.03.01 ZAPATAS 2,636.23 0.00 0.00
02.03.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 5.76 325.03 1,872.17 5.76 1,872.17
02.03.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 187.73 4.07 764.06 187.73 764.06
02.03.03.02 VIGAS DE CONEXIÓN 6,951.34 0.00 0.00
02.03.03.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTACIÓN / CONE m3 5.20 325.03 1,690.16 5.20 1,690.16
02.03.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACIÓN / m2 37.80 38.31 1,448.12 37.80 1,448.12
02.03.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACIÓ kg 936.87 4.07 3,813.06 936.87 3,813.06
02.03.03.03 COLUMNAS 9,005.93 0.00 0.00
02.03.03.03.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 4.63 380.77 1,762.97 4.63 1,762.97
02.03.03.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 53.04 44.10 2,339.06 53.04 2,339.06
02.03.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 1,204.89 4.07 4,903.90 1,204.89 4,903.90
02.03.03.04 COLUMNETAS DE AMARRE 2,637.15 0.00 0.00
02.03.03.04.01 CONCRETO F'C=210 KG/CM2 PARA COLUMNETAS m3 1.43 356.39 509.64 1.43 509.64
02.03.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 33.66 44.10 1,484.41 33.66 1,484.41
02.03.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETAS kg 158.01 4.07 643.10 158.01 643.10
02.03.03.05 VIGAS 10,581.72 0.00 0.00
02.03.03.05.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 6.36 357.35 2,272.75 6.36 2,272.75
02.03.03.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 69.43 50.66 3,517.32 69.43 3,517.32
02.03.03.05.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 1,177.31 4.07 4,791.65 1,177.31 4,791.65
02.03.03.06 LOSAS ALIGERADAS 4,629.21 0.00 0.00
02.03.03.06.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 3.39 341.75 1,158.53 3.39 1,158.53
02.03.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAm2 38.85 40.99 1,592.46 38.85 1,592.46
02.03.03.06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 356.44 4.07 1,450.71 356.44 1,450.71
02.03.03.06.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H=15CM m 105.82 4.04 427.51 105.82 427.51
02.03.03.07 CANALETAS 2,111.87 0.00 0.00
02.03.03.07.01 CONCRETO f'c=210kg/cm2 PARA CANALETAS m3 2.06 357.35 736.14 2.06 736.14
02.03.03.07.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS m2 14.53 50.66 736.09 14.53 736.09
02.03.03.07.03 ACERO ESTRUCTURAL TRABAJADO PARA CANALETAS kg 157.16 4.07 639.64 157.16 639.64
02.04 MUROS DE SOSTENIMIENTO 101,196.87 0.00 0.00
02.04.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 400.47 2.93 1,173.38 400.47 1,173.38
02.04.02 SOLADO DE CONCRETO f'c=100 kg/cm2, E=2" / 5cm (Mezcla 1:8) m2 400.47 14.76 5,910.94 400.47 5,910.94
02.04.03 CONCRETO CICLÓPEO F'C=140 KG/CM2 + 50% DE PIEDRA CON EQUI m3 392.39 214.33 84,100.95 392.39 84,100.95
02.04.04 EMBOQUILLADO CON CEMENTO/ARENA, 1:3, HASTA E=2" m2 406.50 16.88 6,861.72 406.50 6,861.72
02.04.05 JUNTAS DE TECNOPORT DE E=1" - MUROS DE SOSTENIMIENTO m2 111.96 12.60 1,410.70 111.96 1,410.70
02.04.06 SUMINISTRO E INSTALACIÓN DE LLORADEROS CON TUBERÍA DE PVCm 337.05 5.16 1,739.18 337.05 1,739.18
02.05 ESTRUCTURA - TANQUE ELEVADO DE AGUA 10,934.99 0.00 0.00
02.05.01 MOVIMIENTO DE TIERRAS 88.55 0.00 0.00
02.05.01.01 EXCAVACION MANUAL DE TERRENO m3 1.60 31.73 50.77 1.60 50.77
02.05.01.02 RELLENO CON MATERIAL PROPIO COMPACTADO CON PLANCHA m3 1.04 10.30 10.71 1.04 10.71
02.05.01.03 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 1.00 2.93 2.93 1.00 2.93
02.05.01.04 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON EQUIPO 2 m3 0.96 25.15 24.14 0.96 24.14
02.05.02 OBRAS DE CONCRETO SIMPLE 27.36 0.00 0.00
02.05.02.01 SOLADOS 27.36 0.00 0.00
02.05.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 1.00 27.36 27.36 1.00 27.36
02.05.03 OBRAS DE CONCRETO ARMADO 5,504.84 0.00 0.00
02.05.03.01 ZAPATAS 271.82 0.00 0.00
02.05.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 0.60 325.03 195.02 0.60 195.02
02.05.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 18.87 4.07 76.80 18.87 76.80
02.05.03.02 COLUMNAS 2,763.52 0.00 0.00
02.05.03.02.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 1.70 380.77 647.31 1.70 647.31
02.05.03.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 27.20 44.10 1,199.52 27.20 1,199.52
02.05.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 225.23 4.07 916.69 225.23 916.69
02.05.03.03 VIGAS 1,766.94 0.00 0.00
02.05.03.03.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 1.56 357.35 557.47 1.56 557.47
02.05.03.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 17.68 50.66 895.67 17.68 895.67
02.05.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 77.10 4.07 313.80 77.10 313.80
02.05.03.04 LOSAS ALIGERADAS 702.56 0.00 0.00
02.05.03.04.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.57 341.75 194.80 0.57 194.80
02.05.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAm2 6.76 40.99 277.09 6.76 277.09
02.05.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 31.66 4.07 128.86 31.66 128.86
02.05.03.04.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H=15CM m 25.20 4.04 101.81 25.20 101.81
02.05.04 ACABADOS 5,314.24 0.00 0.00
02.05.04.01 CONTRAPISO DE 48 mm m2 10.09 26.94 271.82 0.00 10.09
02.05.04.02 CIELORRASO CON MEZCLA CEMENTO ARENA / 1:5 m2 10.09 44.24 446.38 0.00 10.09
02.05.04.03 TARRAJEO DE COLUMNAS-COLUMNETAS-PLACAS C:A/1:5 (INC. ARI m2 24.36 39.65 965.87 0.00 24.36
02.05.04.04 TARRAJEO DE VIGAS-CANALES C:A/1:5 (INC. ARISTAS) m2 28.64 46.87 1,342.36 0.00 28.64
02.05.04.05 BRUÑAS m 17.64 5.14 90.67 0.00 17.64
02.05.04.06 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 63.09 11.05 697.14 0.00 63.09
02.05.04.07 ESCALERA METÁLICA TIPO GATO DE L=5.80m (INC. GUARDA HOM und 1.00 1,500.00 1,500.00 0.00
03 ARQUITECTURA 378,124.48 0.00 0.00
03.01 ARQUITECTURA - BLOQUE A 156,589.07 0.00 0.00
03.01.01 MUROS Y TABIQUES ALBAÑILERIA 20,745.84 0.00 0.00
03.01.01.01 MUROS DE LADRILLO 20,227.44 0.00 0.00
03.01.01.01.01 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE 9x14x24c m2 145.78 119.04 17,353.65 145.78 17,353.65
03.01.01.01.02 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE 9x14x24cmm2 1.39 79.08 109.92 1.39 109.92
03.01.01.01.03 MURO CARAVISTA DE SOGA (E=15CM) CON LADRILLO MECANIZADm2 39.45 70.06 2,763.87 39.45 2,763.87
03.01.01.02 MUROS CON SISTEMA DE CONSTRUCCION EN SECO (DRYWALL) 256.26 0.00 0.00
03.01.01.02.01 SISTEMA DRYWALL DE UNA CARA SB 10mm, E=4.50cm m2 4.53 56.57 256.26 0.00 0.00
03.01.01.03 JUNTAS EN MUROS 262.14 0.00 0.00
03.01.01.03.01 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZA (E=25cm) m 60.11 2.84 170.71 60.11 170.71
03.01.01.03.02 JUNTAS DE TECNOPORT DE E=1" - MURO DE SOGA (E=15cm) m 53.78 1.70 91.43 53.78 91.43
03.01.02 REVOQUES Y REVESTIMIENTOS 30,503.22 0.00 0.00
03.01.02.01 TARRAJEOS 29,781.34 0.00 0.00
03.01.02.01.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 75.22 18.60 1,399.09 75.22 1,399.09
03.01.02.01.02 TARRAJEO EN INTERIORES CON MORTERO CEMENTO-ARENA / 1:m2 224.67 22.88 5,140.45 224.67 5,140.45
03.01.02.01.03 TARRAJEO EN EXTERIORES CON MORTERO CEMENTO-ARENA / 1m2 62.47 45.30 2,829.89 62.47 2,829.89
03.01.02.01.04 TARRAJEO DE SUPERFICIE DE COLUMNAS-COLUMNETAS-PLACASm2
C 89.64 39.65 3,554.23 89.64 3,554.23
03.01.02.01.05 TARRAJEO DE SUPERFICIE DE VIGAS-CANALES-GARGOLAS C:A/1:m2 242.81 46.87 11,380.50 242.81 11,380.50
03.01.02.01.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 102.65 13.40 1,375.51 102.65 1,375.51
03.01.02.01.07 BRUÑAS m 797.99 5.14 4,101.67 797.99 4,101.67
03.01.02.02 JUNTAS DE CONSTRUCCIÓN 721.88 0.00 0.00
03.01.02.02.01 TAPAJUNTAS EN JUNTA DE DILATACIÓN DE TECHO (INC. POLIEST m 10.21 52.69 537.96 10.21 537.96
03.01.02.02.02 TAPAJUNTAS EN JUNTA DE DILATACIÓN VERTICAL (INC. POLIESTI m 6.34 29.01 183.92 6.34 183.92
03.01.03 CIELORRASOS 4,463.01 0.00 0.00
03.01.03.01 CIELORRASOS CON YESO m2 179.96 24.80 4,463.01 179.96 4,463.01
03.01.04 PISOS Y PAVIMENTOS 29,119.85 0.00 0.00
03.01.04.01 FALSO PISO 8,040.59 0.00 0.00
03.01.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 175.10 2.93 513.04 175.10 513.04
03.01.04.01.02 FALSO PISO MEZCLA C:H-1:6, E=8" (INCLUYE CAMA DE PIEDRA) m2 175.10 42.99 7,527.55 175.10 7,527.55
03.01.04.02 CONTRAPISO 7,135.87 0.00 0.00
03.01.04.02.01 CONTRAPISO DE 48 mm m2 264.88 26.94 7,135.87 264.88 7,135.87
03.01.04.03 PISOS 13,943.39 0.00 0.00
03.01.04.03.01 PISO DE CEMENTO PULIDO 1:2, E=1CM m2 11.64 48.49 564.42 11.64 564.42
03.01.04.03.02 PISO DE CERAMICO DE 40X40CM m2 35.66 49.84 1,777.29 0.00 0.00 35.66
03.01.04.03.03 PISO DE MADERA MACHIMBRADA DE 4"x1"x10' (INC. LACA SELLA m2 127.80 90.78 11,601.68 0.00 0.00 127.80
03.01.05 ZOCALOS Y CONTRAZOCALOS 6,739.57 0.00 0.00
03.01.05.01 ZOCALOS 3,824.18 0.00 0.00
03.01.05.01.01 ZOCALO DE CERÁMICO DE 40X40CM m2 75.22 50.84 3,824.18 0.00 0.00 75.22
03.01.05.02 CONTRAZOCALOS 2,915.39 0.00 0.00
03.01.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO H=20CM m 89.34 14.30 1,277.56 0.00 0.00 89.34
03.01.05.02.02 CONTRAZÓCALO DE MADERA AGUANO DE 3/4" x H=10CM + ROD m 78.44 20.88 1,637.83 0.00 0.00 78.44
03.01.06 COBERTURAS 33,039.39 0.00 0.00
03.01.06.01 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 36X36CM m2 264.88 39.30 10,409.78 0.00 0.00 264.88
03.01.06.02 COBERTURA DE ESTRUCTURA METÁLICA CON POLICARBONATO ENm2 35.18 202.19 7,113.04 35.18 7,113.04
03.01.06.03 COBERTURA DE ESTRUCTURA METÁLICA CON POLICARBONATO ENm2 77.61 199.93 15,516.57 77.61 15,516.57
03.01.07 CARPINTERIA DE MADERA 20,867.97 0.00 0.00
03.01.07.01 PUERTAS 3,087.99 0.00 0.00
03.01.07.01.01 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA SIN REJILLA, m2 6.62 225.65 1,493.80 0.00 0.00 6.62
03.01.07.01.02 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA CON REJILLA, m2 4.41 236.91 1,044.77 0.00 0.00 4.41
03.01.07.01.03 PUERTA EN DUCHAS CON MELAMINA DE 18MM m2 3.21 171.16 549.42 0.00 0.00
03.01.07.02 VENTANAS 6,969.71 0.00 0.00
03.01.07.02.01 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y CRISTAL L m2 26.01 244.59 6,361.79 0.00 0.00 24.00
03.01.07.02.02 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y CRISTAL L m2 2.55 238.40 607.92 0.00 0.00 2.10
03.01.07.03 MUEBLES 7,342.31 0.00 0.00
03.01.07.03.01 CLOSET DE AULA m2 21.66 338.98 7,342.31 0.00 0.00
03.01.07.04 SEPARADORES DE CUBICULOS EN BAÑOS 3,467.96 0.00 0.00
03.01.07.04.01 SEPARADOR DE CUBICULOS DE INODOROS CON MELAMINA D m2 19.85 163.09 3,237.34 0.00 0.00
03.01.07.04.02 SEPARADORES DE CUBICULOS URINARIOS CON MELAMINA DE m2 0.43 536.32 230.62 0.00 0.00
03.01.08 CERRAJERIA 400.02 0.00 0.00
03.01.08.01 ACCESORIOS DE BAÑOS 400.02 0.00 0.00
03.01.08.01.01 COLGADORES EN BAÑO und 4.00 20.42 81.68 0.00 0.00
03.01.08.01.02 BARRA DE APOYO DE ACERO INOXIDABLE und 2.00 159.17 318.34 0.00 0.00
03.01.09 VIDRIOS, CRISTALES Y SIMILARES 201.70 0.00 0.00
03.01.09.01 ESPEJO BISELADO DE SOBREPONER m2 1.89 106.72 201.70 0.00 0.00
03.01.10 PINTURA 8,459.84 0.00 0.00
03.01.10.01 PINTURA LATEX EN INTERIORES MUROS 2 MANOS m2 557.12 10.06 5,604.63 0.00 0.00 557.12
03.01.10.02 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 62.47 11.05 690.29 0.00 0.00 62.47
03.01.10.03 PINTURA LATEX EN CIELORASOS m2 179.96 12.03 2,164.92 0.00 0.00 179.96
03.01.11 OTROS 947.78 0.00 0.00
03.01.11.01 MESA DE C°A° REVESTIDO CON CERÁMICO DE 40X40CM m2 4.10 210.00 861.00 0.00 0.00 4.10
03.01.11.02 LIMPIEZA DE VIDRIOS, CRISTALES Y SIMILARES m2 30.45 2.85 86.78 0.00 0.00
03.01.12 SEÑALIZACIÓN 1,100.88 0.00 0.00
03.01.12.01 SEÑALIZACIÓN Y EQUIPO DE SEGURIDAD PARA INFRAESTRUCTURglb 1.00 1,100.88 1,100.88 0.00 0.00
03.02 ARQUITECTURA - BLOQUE B 167,095.96 0.00 0.00
03.02.01 MUROS Y TABIQUES ALBAÑILERIA 22,532.75 0.00 0.00
03.02.01.01 MUROS DE LADRILLO 21,130.37 0.00 0.00
03.02.01.01.01 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE 9x14x24c m2 161.62 119.04 19,239.24 161.62 19,239.24
03.02.01.01.02 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE 9x14x24cmm2 13.46 79.08 1,064.42 13.46 1,064.42
03.02.01.01.03 MURO CARAVISTA DE SOGA (E=15CM) CON LADRILLO MECANIZADm2 11.80 70.06 826.71 11.80 826.71
03.02.01.02 MUROS CON SISTEMA DE CONSTRUCCION EN SECO (DRYWALL) 511.96 0.00 0.00
03.02.01.02.01 SISTEMA DRYWALL DE UNA CARA SB 10mm, E=4.50cm m2 9.05 56.57 511.96 0.00 0.00
03.02.01.03 JUNTAS EN MUROS 890.42 0.00 0.00
03.02.01.03.01 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZA (E=25cm) m 294.09 2.84 835.22 294.09 835.22
03.02.01.03.02 JUNTAS DE TECNOPORT DE E=1" - MURO DE SOGA (E=15cm) m 32.47 1.70 55.20 32.47 55.20
03.02.02 REVOQUES Y REVESTIMIENTOS 30,781.50 0.00 0.00
03.02.02.01 TARRAJEOS 30,781.50 0.00 0.00
03.02.02.01.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 69.37 18.60 1,290.28 69.37 1,290.28
03.02.02.01.02 TARRAJEO EN INTERIORES CON MORTERO CEMENTO-ARENA / 1:m2 255.55 22.88 5,846.98 255.55 5,846.98
03.02.02.01.03 TARRAJEO EN EXTERIORES CON MORTERO CEMENTO-ARENA / 1m2 73.64 45.30 3,335.89 73.64 3,335.89
03.02.02.01.04 TARRAJEO DE SUPERFICIE DE COLUMNAS-COLUMNETAS-PLACASm2
C 92.12 39.65 3,652.56 92.12 3,652.56
03.02.02.01.05 TARRAJEO DE SUPERFICIE DE VIGAS-CANALES-GARGOLAS C:A/1:m2 260.96 46.87 12,231.20 260.96 12,231.20
03.02.02.01.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 122.00 13.40 1,634.80 122.00 1,634.80
03.02.02.01.07 BRUÑAS m 542.76 5.14 2,789.79 542.76 2,789.79
03.02.03 CIELORRASOS 4,969.92 0.00 0.00
03.02.03.01 CIELORRASOS CON YESO m2 200.40 24.80 4,969.92 200.40 4,969.92
03.02.04 PISOS Y PAVIMENTOS 31,309.47 0.00 0.00
03.02.04.01 FALSO PISO 8,614.59 0.00 0.00
03.02.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 187.60 2.93 549.67 187.60 549.67
03.02.04.01.02 FALSO PISO MEZCLA C:H-1:6, E=8" (INCLUYE CAMA DE PIEDRA) m2 187.60 42.99 8,064.92 187.60 8,064.92
03.02.04.02 CONTRAPISO 7,863.52 0.00 0.00
03.02.04.02.01 CONTRAPISO DE 48 mm m2 291.89 26.94 7,863.52 291.89 7,863.52
03.02.04.03 PISOS 14,831.36 0.00 0.00
03.02.04.03.01 PISO DE CEMENTO PULIDO 1:2, E=1CM m2 19.23 48.49 932.46 19.23 932.46
03.02.04.03.02 PISO DE CERAMICO DE 40X40CM m2 33.87 49.84 1,688.08 0.00 0.00 33.87
03.02.04.03.03 PISO DE MADERA MACHIMBRADA DE 4"x1"x10' (INC. LACA SELLA m2 134.51 90.78 12,210.82 0.00 0.00 134.51
03.02.05 ZOCALOS Y CONTRAZOCALOS 6,624.29 0.00 0.00
03.02.05.01 ZOCALOS 3,526.77 0.00 0.00
03.02.05.01.01 ZOCALO DE CERÁMICO DE 40X40CM m2 69.37 50.84 3,526.77 0.00 0.00 69.37
03.02.05.02 CONTRAZOCALOS 3,097.52 0.00 0.00
03.02.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO H=20CM m 97.50 14.30 1,394.25 0.00 0.00 97.50
03.02.05.02.02 CONTRAZOCALO DE CERAMICO DE 40X40CM, H=10CM m 18.17 16.15 293.45 0.00 0.00 18.17
03.02.05.02.03 CONTRAZÓCALO DE MADERA AGUANO DE 3/4" x H=10CM + ROD m 67.52 20.88 1,409.82 0.00 0.00
03.02.06 COBERTURAS 37,953.95 0.00 0.00
03.02.06.01 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 36X36CM m2 291.89 39.30 11,471.28 0.00 0.00 291.89
03.02.06.02 COBERTURA DE ESTRUCTURA METÁLICA CON POLICARBONATO ENm2 61.80 151.37 9,354.67 50.00 7,568.50 11.80
03.02.06.03 COBERTURA DE ESTRUCTURA METÁLICA CON POLICARBONATO ENm2 85.67 199.93 17,128.00 68.00 13,595.24 17.67
03.02.07 CARPINTERIA DE MADERA 19,579.54 0.00 0.00
03.02.07.01 PUERTAS 5,045.08 0.00 0.00
03.02.07.01.01 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA SIN REJILLA, m2 6.62 225.65 1,493.80 0.00 0.00 6.62
03.02.07.01.02 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA CON REJILLA, m2 14.99 236.91 3,551.28 0.00 0.00 14.99
03.02.07.02 VENTANAS 7,848.15 0.00 0.00
03.02.07.02.01 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y CRISTAL L m2 30.43 244.59 7,442.87 0.00 0.00 28.00
03.02.07.02.02 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y CRISTAL L m2 1.70 238.40 405.28 0.00 0.00 1.50
03.02.07.03 MOBILIARIO 5,453.35 0.00 0.00
03.02.07.03.01 MUEBLES ALTOS - REPOSTEROS C/PUERTAS m2 3.07 338.98 1,040.67 0.00 0.00
03.02.07.03.02 SUBDIVISIONES Y PUERTAS PARA MUEBLES BAJOS m2 2.66 296.61 788.98 0.00 0.00
03.02.07.03.03 ARCHIVO OFICINA DIRECTOR m2 10.69 338.98 3,623.70 0.00 0.00
03.02.07.04 SEPARADORES DE CUBICULOS EN BAÑOS 1,232.96 0.00 0.00
03.02.07.04.01 SEPARADOR DE CUBICULOS DE INODOROS CON MELAMINA D m2 7.56 163.09 1,232.96 0.00 0.00
03.02.08 CERRAJERIA 359.18 0.00 0.00
03.02.08.01 ACCESORIOS DE BAÑOS 359.18 0.00 0.00
03.02.08.01.01 COLGADORES EN BAÑO und 2.00 20.42 40.84 0.00 0.00
03.02.08.01.02 BARRA DE APOYO DE ACERO INOXIDABLE und 2.00 159.17 318.34 0.00 0.00
03.02.09 VIDRIOS, CRISTALES Y SIMILARES 81.11 0.00 0.00
03.02.09.01 ESPEJO BISELADO DE SOBREPONER m2 0.76 106.72 81.11 0.00 0.00
03.02.10 PINTURA 9,341.31 0.00 0.00
03.02.10.01 PINTURA LATEX EN INTERIORES MUROS 2 MANOS m2 608.03 10.06 6,116.78 0.00 0.00 608.03
03.02.10.02 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 73.64 11.05 813.72 0.00 0.00 73.64
03.02.10.03 PINTURA LATEX EN CIELORASOS m2 200.40 12.03 2,410.81 0.00 0.00 200.40
03.02.11 OTROS 3,562.94 0.00 0.00
03.02.11.01 MESA DE C°A° REVESTIDO CON CERÁMICO DE 40X40CM m2 16.52 210.00 3,469.20 0.00 0.00 16.52
03.02.11.02 LIMPIEZA DE VIDRIOS, CRISTALES Y SIMILARES m2 32.89 2.85 93.74 0.00 0.00
03.03 ARQUITECTURA - BLOQUE C 54,439.45 0.00 0.00
03.03.01 MUROS Y TABIQUES ALBAÑILERIA 9,075.67 0.00 0.00
03.03.01.01 MUROS DE LADRILLO 8,559.26 0.00 0.00
03.03.01.01.01 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE 9x14x24c m2 27.66 119.04 3,292.65 27.66 3,292.65
03.03.01.01.02 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE 9x14x24cmm2 57.81 79.08 4,571.61 57.81 4,571.61
03.03.01.01.03 MURO CARAVISTA DE SOGA (E=15CM) CON LADRILLO MECANIZADm2 9.92 70.06 695.00 9.92 695.00
03.03.01.02 MUROS CON SISTEMA DE CONSTRUCCION EN SECO (DRYWALL) 128.41 0.00 0.00
03.03.01.02.01 SISTEMA DRYWALL DE UNA CARA SB 10mm, E=4.50cm m2 2.27 56.57 128.41 0.00 0.00
03.03.01.03 JUNTA MUROS 388.00 0.00 0.00
03.03.01.03.01 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZA (E=25cm) m 66.32 2.84 188.35 66.32 188.35
03.03.01.03.02 JUNTAS DE TECNOPORT DE E=1" - MURO DE SOGA (E=15cm) m 117.44 1.70 199.65 117.44 199.65
03.03.02 REVOQUES Y REVESTIMIENTOS 12,167.95 0.00 0.00
03.03.02.01 TARRAJEOS 12,167.95 0.00 0.00
03.03.02.01.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 49.95 18.60 929.07 49.95 929.07
03.03.02.01.02 TARRAJEO EN INTERIORES CON MORTERO CEMENTO-ARENA / 1:m2 122.60 22.88 2,805.09 122.60 2,805.09
03.03.02.01.03 TARRAJEO EN EXTERIORES CON MORTERO CEMENTO-ARENA / 1m2 27.66 45.30 1,253.00 27.66 1,253.00
03.03.02.01.04 TARRAJEO DE SUPERFICIE DE COLUMNAS-COLUMNETAS-PLACASm2
C 37.71 39.65 1,495.20 37.71 1,495.20
03.03.02.01.05 TARRAJEO DE SUPERFICIE DE VIGAS-CANALES-GARGOLAS C:A/1:m2 62.05 46.87 2,908.28 62.05 2,908.28
03.03.02.01.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 62.97 13.40 843.80 62.97 843.80
03.03.02.01.07 BRUÑAS m 376.17 5.14 1,933.51 376.17 1,933.51
03.03.03 CIELORRASOS 1,234.79 0.00 0.00
03.03.03.01 CIELORRASOS CON YESO m2 49.79 24.80 1,234.79 49.79 1,234.79
03.03.04 PISOS Y PAVIMENTOS 5,977.52 0.00 0.00
03.03.04.01 FALSO PISO 1,691.23 0.00 0.00
03.03.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 36.83 2.93 107.91 36.83 107.91
03.03.04.01.02 FALSO PISO MEZCLA C:H-1:6, E=8" (INCLUYE CAMA DE PIEDRA) m2 36.83 42.99 1,583.32 0.00 0.00 36.83
03.03.04.02 CONTRAPISO 1,851.86 0.00 0.00
03.03.04.02.01 CONTRAPISO DE 48 mm m2 68.74 26.94 1,851.86 68.74 1,851.86
03.03.04.03 PISOS 2,434.43 0.00 0.00
03.03.04.03.01 PISO DE CEMENTO PULIDO 1:2, E=1CM m2 4.04 48.49 195.90 4.04 195.90
03.03.04.03.02 PISO DE CERAMICO DE 40X40CM m2 18.03 49.84 898.62 0.00 0.00 18.03
03.03.04.03.03 PISO DE MADERA MACHIMBRADA DE 4"x1"x10' (INC. LACA SELLA m2 14.76 90.78 1,339.91 0.00 0.00 14.76
03.03.05 ZOCALOS Y CONTRAZOCALOS 3,595.56 0.00 0.00
03.03.05.01 ZOCALOS 2,539.46 0.00 0.00
03.03.05.01.01 ZOCALO DE CERÁMICO DE 40X40CM m2 49.95 50.84 2,539.46 0.00 0.00 49.95
03.03.05.02 CONTRAZOCALOS 1,056.10 0.00 0.00
03.03.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO H=20CM m 30.87 14.30 441.44 0.00 0.00 30.87
03.03.05.02.02 CONTRAZOCALO DE CERAMICO DE 40X40CM, H=10CM m 11.18 16.15 180.56 0.00 0.00 11.18
03.03.05.02.03 CONTRAZÓCALO DE MADERA AGUANO DE 3/4" x H=10CM + ROD m 20.79 20.88 434.10 0.00 0.00 20.79
03.03.06 COBERTURAS 2,701.48 0.00 0.00
03.03.06.01 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 36X36CM m2 68.74 39.30 2,701.48 0.00 0.00 68.74
03.03.07 CARPINTERIA DE MADERA 13,581.25 0.00 0.00
03.03.07.01 PUERTAS 4,728.15 0.00 0.00
03.03.07.01.01 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA SIN REJILLA, m2 3.97 225.65 895.83 0.00 0.00 3.97
03.03.07.01.02 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA CON REJILLA, m2 14.11 236.91 3,342.80 0.00 0.00 14.11
03.03.07.01.03 PUERTA EN DUCHAS CON MELAMINA DE 18MM m2 2.86 171.16 489.52 0.00 0.00
03.03.07.02 VENTANAS 3,002.71 0.00 0.00
03.03.07.02.01 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y CRISTAL L m2 5.21 244.59 1,274.31 0.00 0.00 4.80
03.03.07.02.02 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y CRISTAL L m2 7.25 238.40 1,728.40 0.00 0.00 6.90
03.03.07.03 MUEBLES 5,850.39 0.00 0.00
03.03.07.03.01 MUEBLES ALTOS - REPOSTEROS C/PUERTAS m2 6.46 338.98 2,189.81 0.00 0.00
03.03.07.03.02 SUBDIVISIONES Y PUERTAS PARA MUEBLES BAJOS m2 5.29 296.61 1,569.07 0.00 0.00
03.03.07.03.03 ROPERO VIVIENDA DOCENTES m2 6.17 338.98 2,091.51 0.00 0.00
03.03.08 CERRAJERIA 20.42 0.00 0.00
03.03.08.01 ACCESORIOS DE BAÑOS 20.42 0.00 0.00
03.03.08.01.01 COLGADORES EN BAÑO und 1.00 20.42 20.42 0.00 0.00
03.03.09 VIDRIOS, CRISTALES Y SIMILARES 81.11 0.00 0.00
03.03.09.01 ESPEJO BISELADO DE SOBREPONER m2 0.76 106.72 81.11 0.00 0.00
03.03.10 PINTURA 3,141.55 0.00 0.00
03.03.10.01 PINTURA LATEX EN INTERIORES MUROS 2 MANOS m2 222.36 10.06 2,236.94 0.00 0.00
03.03.10.02 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 27.66 11.05 305.64 0.00 0.00
03.03.10.03 PINTURA LATEX EN CIELORASOS m2 49.79 12.03 598.97 0.00 0.00
03.03.11 OTROS 2,862.15 0.00 0.00
03.03.11.01 MESA DE C°A° REVESTIDO CON CERÁMICO DE 40X40CM m2 13.45 210.00 2,824.50 0.00 0.00 13.45
03.03.11.02 LIMPIEZA DE VIDRIOS, CRISTALES Y SIMILARES m2 13.21 2.85 37.65 0.00 0.00
04 TRATAMIENTO EXTERIOR 458,731.55 0.00 0.00
04.01 MOVIMIENTO DE TIERRAS Y DEMOLICIONES 130,280.28 0.00 0.00
04.01.01 EXCAVACION 17,043.02 0.00 0.00
04.01.01.01 EXCAVACION A MAQUINA EN TERRENO NORMAL m3 3,926.99 2.67 10,485.06 3,926.99 10,485.06
04.01.01.02 EXCAVACION MANUAL DE TERRENO m3 206.68 31.73 6,557.96 206.68 6,557.96
04.01.02 RELLENO 6,860.74 0.00 0.00
04.01.02.01 RELLENO COMPACTADO CON MATERIAL PROPIO CON PLANCHA DEm3 867.35 7.91 6,860.74 867.35 6,860.74
04.01.03 ELIMINACION DE MATERIAL EXCEDENTE 106,376.52 0.00 0.00
04.01.03.01 ACARREO DE MATERIAL EXCEDENTE CON BUGUI (D<=100M) m3 258.35 18.33 4,735.56 258.35 4,735.56
04.01.03.02 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON EQUIPO 2 m3 4,041.39 25.15 101,640.96 4,041.39 101,640.96
04.02 SARDINELES Y GRADERIAS 16,101.57 0.00 0.00
04.02.01 SARDINELES 9,500.96 0.00 0.00
04.02.01.01 PERFILADO DE ZANJA PARA SARDINEL m2 24.56 1.70 41.75 24.56 41.75
04.02.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 147.35 39.33 5,795.28 147.35 5,795.28
04.02.01.03 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZCLADORA Y V m3 11.05 301.36 3,330.03 5.05 1,521.87 6.00
04.02.01.04 JUNTAS ASFALTICAS + TECNOPORT, E=1/2" m 55.65 6.00 333.90 0.00 0.00 55.65
04.02.02 GRADAS 6,600.61 0.00 0.00
04.02.02.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 76.36 2.93 223.73 76.36 223.73
04.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.07 39.33 2,165.90 55.07 2,165.90
04.02.02.03 EMPEDRADO DE PISO PARA VACIADO, E=6"/15CM m2 111.51 15.17 1,691.61 111.51 1,691.61
04.02.02.04 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZCLADORA Y V m3 8.36 301.36 2,519.37 8.36 2,519.37
04.03 RAMPAS, PISOS Y PAVIMENTOS 109,502.04 0.00 0.00
04.03.01 RAMPA CON PISO DE CONCRETO BRUÑADO 24,665.17 0.00 0.00
04.03.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 289.17 2.93 847.27 289.17 847.27
04.03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 223.82 39.33 8,802.84 223.82 8,802.84
04.03.01.03 EMPEDRADO DE VEREDAS 6" / 15CM m2 289.17 15.17 4,386.71 289.17 4,386.71
04.03.01.04 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZCLADORA Y V m3 24.58 301.36 7,407.43 24.58 7,407.43
04.03.01.05 BRUÑAS EN VEREDAS m 514.71 2.56 1,317.66 514.71 1,317.66
04.03.01.06 JUNTAS ASFALTICAS + TECNOPORT, E=1/2" m 317.21 6.00 1,903.26 317.21 1,903.26
04.03.02 PISO DE CONCRETO BRUÑADO 39,468.62 0.00 0.00
04.03.02.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 739.14 2.93 2,165.68 739.14 2,165.68
04.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 57.77 39.33 2,272.09 57.77 2,272.09
04.03.02.03 EMPEDRADO DE VEREDAS 6" / 15CM m2 739.14 15.17 11,212.75 739.14 11,212.75
04.03.02.04 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZCLADORA Y V m3 58.08 301.36 17,502.99 58.08 17,502.99
04.03.02.05 BRUÑAS EN VEREDAS m 1,865.01 2.56 4,774.43 0.00 0.00 1,865.01
04.03.02.06 JUNTAS ASFALTICAS + TECNOPORT, E=1/2" m 256.78 6.00 1,540.68 0.00 0.00 256.78
04.03.03 PISO DE CONFITILLO 2,847.19 0.00 0.00
04.03.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 311.85 2.93 913.72 0.00 0.00
04.03.03.02 PISO DE CONFITILLO E=2" (RIPIO/PIEDRA CHANCADA) m2 311.85 6.20 1,933.47 0.00 0.00
04.03.04 LOSA MULTIUSO 40,247.44 0.00 0.00
04.03.04.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 429.00 2.93 1,256.97 429.00 1,256.97
04.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 58.30 39.33 2,292.94 0.00 0.00 58.30
04.03.04.03 ACERO DE TEMPERATURA 1/4"MALLA DE 0.30X0.30M kg 716.38 4.29 3,073.27 0.00 0.00 716.38
04.03.04.04 PASADORES DE ACERO DE Ø 5/8" x 0.65M@0.50M kg 588.13 3.97 2,334.88 0.00 0.00 588.13
04.03.04.05 CONCRETO F'C=210 KG/CM2 (MEZCLA 1:5) CON MEZCLADORA Y V m3 85.80 325.03 27,887.57 0.00 0.00 85.80
04.03.04.06 JUNTAS ASFALTICAS + TECNOPORT, E=1" m 291.50 11.67 3,401.81 0.00 0.00 291.50
04.03.05 ÁREAS VERDES 2,273.62 0.00 0.00
04.03.05.01 CARGUIO Y TRANSPORTE DE TIERRA DE CULTIVO CON EQUIPO (*) m3 19.46 51.39 1,000.05 0.00 0.00
04.03.05.02 PREPARACION DEL TERRENO CON TIERRA VEGETAL m3 19.46 28.74 559.28 0.00 0.00
04.03.05.03 SEMBRADO DE GRASS m2 194.63 3.67 714.29 0.00 0.00
04.04 OBRAS DE CONCRETO 23,165.29 0.00 0.00
04.04.01 TRIBUNAS 23,029.90 0.00 0.00
04.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 55.13 2.93 161.53 55.13 161.53
04.04.01.02 CONCRETO CICLÓPEO F'C=140 KG/CM2 + 50% DE PIEDRA CON EQ m3 86.63 214.33 18,567.41 86.63 18,567.41
04.04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 37.80 39.33 1,486.67 37.80 1,486.67
04.04.01.04 CONCRETO F'C=175 KG/CM2 CON EQUIPO m3 4.73 342.91 1,621.96 4.73 1,621.96
04.04.01.05 EMBOQUILLADO CON CEMENTO/ARENA, 1:3, HASTA E=2" m2 37.80 16.88 638.06 37.80 638.06
04.04.01.06 BRUÑAS EN VEREDAS m 63.00 2.56 161.28 63.00 161.28
04.04.01.07 JUNTAS DE TECNOPORT DE E=1" - MUROS DE SOSTENIMIENTO m2 31.19 12.60 392.99 31.19 392.99
04.04.02 DADO DE CONCRETO - PLATO DE INTERNET 135.39 0.00 0.00
04.04.02.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 0.38 2.93 1.11 0.00 0.00
04.04.02.02 CONCRETO CICLÓPEO F'C=140 KG/CM2 + 50% DE PIEDRA CON EQ m3 0.38 214.33 81.45 0.00 0.00
04.04.02.03 CONCRETO F'C=175 KG/CM2 CON EQUIPO m3 0.03 342.91 10.29 0.00 0.00
04.04.02.04 EMBOQUILLADO CON CEMENTO/ARENA, 1:3, HASTA E=2" m2 2.52 16.88 42.54 0.00 0.00
04.05 PORTAL DE INGRESO 14,914.12 0.00 0.00
04.05.01 MOVIMIENTO DE TIERRAS 557.85 0.00 0.00
04.05.01.01 EXCAVACION MANUAL DE TERRENO m3 4.91 31.73 155.79 4.91 155.79
04.05.01.02 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLANCHA m2 3.07 2.93 9.00 3.07 9.00
04.05.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON PLANCHA m3 3.16 10.30 32.55 3.16 32.55
04.05.01.04 ACARREO DE MATERIAL EXCEDENTE CON BUGUI (D<=100M) m3 8.06 18.33 147.74 8.06 147.74
04.05.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON EQUIPO 2 m3 8.46 25.15 212.77 8.46 212.77
04.05.02 OBRAS DE CONCRETO ARMADO 6,714.47 0.00 0.00
04.05.02.01 SOLADO DE CONCRETO f'c=100 kg/cm2, E=4" / 10cm (Mezcla 1:8) m2 3.07 29.46 90.44 3.07 90.44
04.05.02.02 ACERO DE REFUERZO CORRUGADO Fy=4200 KG/CM2 - GRADO 60 kg 629.14 4.07 2,560.60 629.14 2,560.60
04.05.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 29.61 44.10 1,305.80 29.61 1,305.80
04.05.02.04 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA (INC. FRISOSm2 12.81 40.99 525.08 12.81 525.08
04.05.02.05 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H=15CM m 27.73 4.04 112.03 27.73 112.03
04.05.02.06 CONCRETO F'C=210 KG/CM2 (MEZCLA 1:5) CON MEZCLADORA Y V m3 5.95 356.39 2,120.52 5.95 2,120.52
04.05.03 MUROS DE LADRILLO 675.97 0.00 0.00
04.05.03.01 CIMIENTO CORRIDO 1:10 + 30% PIEDRA GRANDE m3 0.55 221.76 121.97 0.55 121.97
04.05.03.02 SOBRECIMIENTO 1:8 + 25% PIEDRA MEDIANA m3 0.14 246.07 34.45 0.14 34.45
04.05.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 1.10 42.12 46.33 1.10 46.33
04.05.03.04 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE 9x14x24cm, m2 3.81 119.04 453.54 3.81 453.54
04.05.03.05 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZA (E=25cm) m 6.93 2.84 19.68 6.93 19.68
04.05.04 ACABADOS 3,417.43 0.00 0.00
04.05.04.01 TARRAJEO EN EXTERIORES CON MORTERO CEMENTO-ARENA / 1:5m2 7.62 45.30 345.19 0.00 0.00 7.62
04.05.04.02 TARRAJEO DE COLUMNAS-COLUMNETAS-PLACAS C:A/1:5 (INC. ARI m2 22.05 39.65 874.28 0.00 0.00 22.05
04.05.04.03 TARRAJEO DE VIGAS-CANALES C:A/1:5 (INC. ARISTAS) m2 3.54 46.87 165.92 0.00 0.00 3.54
04.05.04.04 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 9.45 13.40 126.63 0.00 0.00 9.45
04.05.04.05 BRUÑAS m 22.42 5.14 115.24 0.00 0.00 22.42
04.05.04.06 CIELORRASO CON MEZCLA CEMENTO ARENA / 1:5 m2 12.81 44.24 566.71 0.00 0.00 12.81
04.05.04.07 CONTRAPISO DE 48 mm m2 12.81 26.94 345.10 0.00 0.00 12.81
04.05.04.08 CONTRAZOCALO DE CEMENTO PULIDO H=10CM m 9.98 13.69 136.63 0.00 0.00 9.98
04.05.04.09 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 36X36CM m2 12.81 39.30 503.43 0.00 0.00
04.05.04.10 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 7.62 11.05 84.20 0.00 0.00
04.05.04.11 PINTURA LATEX EN CIELORASOS m2 12.81 12.03 154.10 0.00 0.00
04.05.05 CARPINTERIA METALICA 3,548.40 0.00 0.00
04.05.05.01 PUERTA DE CERCO PERIMÉTRICO DE DOBLE HOJA DE H=3.00M, C/ und 1.00 3,548.40 3,548.40 0.00 0.00
04.06 CERCO PERIMETRICO 90,734.47 0.00 0.00
04.06.01 CERCO DE REJAS CON ANGULAR DE ACERO DE 1½" x 1½" x 1/8" DE m 96.59 483.65 46,715.75 66.79 32,302.98 15.00
04.06.02 CERCO DE MURO CARAVISTA DE CABEZA DE H=3.00M, CON LADRILLm 39.03 923.30 36,036.40 24.03 22,186.90 15.00
04.06.03 SUMIN. E INSTAL. CERCO VIVO H=2.00M (C/POSTES DE ROLLIZO Ø m 195.31 40.87 7,982.32 0.00 100.00
04.07 CARPINTERIA METALICA 49,220.15 0.00 0.00
04.07.01 BARANDA CON TUBO DE ACERO LAC Ø 1½"x2.00mm + Fe LISO Ø 5/8" m 476.72 65.07 31,020.17 0.00 0.00 120.00
04.07.02 BARANDA CON TUBO DE ACERO LAC Ø 1½"x2.00mm + Fe LISO Ø 5/8 m 70.07 46.73 3,274.37 0.00 30.00
04.07.03 TAPA DE REJILLA METÁLICA PARA CANAL DE EVACUACIÓN PLUVIAL, m 103.32 144.46 14,925.61 53.32 7,702.61 50.00
04.08 OTROS 24,813.63 0.00 0.00
04.08.01 ASTA DE BANDERA (INC. PEDESTAL) und 1.00 1,267.34 1,267.34 0.00 0.00
04.08.02 JUEGOS INFANTILES DE ACUERDO A PLANOS (INC. APOYOS Y PINTA glb 1.00 16,936.01 16,936.01 0.00 0.00 0.80
04.08.03 ARCO DE FULBITO CON TABLERO DE BASQUET (INC. APOYOS Y PINTund 2.00 1,694.91 3,389.82 0.00 0.00 1.50
04.08.04 NED DE VOLEY DE ACUERDO A PLANOS (INC. APOYOS Y PINTADO) und 1.00 1,017.07 1,017.07 0.00 0.00
04.08.05 LETRERO CON EL NOMBRE DE LA INSTITUCIÓN EDUCATIVA und 1.00 1,694.92 1,694.92 0.00 0.00
04.08.06 PLACA RECORDATORIA und 1.00 508.47 508.47 0.00 0.00
05 INSTALACIONES SANITARIAS 144,082.43 0.00 0.00
05.01 APARATOS Y ACCESORIOS SANITARIOS 8,688.00 0.00 0.00
05.01.01 URINARIOS 752.16 0.00 0.00
05.01.01.01 Urinario de losa pza 3.00 250.72 752.16 0.00 0.00
05.01.02 INODOROS 2,398.76 0.00 0.00
05.01.02.01 Inodoro tanque bajo pza 7.00 342.68 2,398.76 0.00 0.00
05.01.03 LAVATORIOS 2,737.28 0.00 0.00
05.01.03.01 Lavatorio ceramico vitrificado tipo Ovalin de 35 x 55 cm pza 4.00 236.34 945.36 0.00 0.00
05.01.03.02 Lavatorio ceramico vitrificado de 20"x18" con pedestal pza 3.00 290.61 871.83 0.00 0.00
05.01.03.03 Lavadero de acero Inox. de 18" x 20" de una poza (B-9) pza 2.00 319.46 638.92 0.00 0.00
05.01.03.04 Lavadero de acero Inox. de 80 x 50 CM de una poza con escurridor pza 1.00 281.17 281.17 0.00 0.00
05.01.04 GRIFERIA 2,256.69 0.00 0.00
05.01.04.01 Grifo para lavatorio de una llave pza 7.00 192.78 1,349.46 0.00 0.00
05.01.04.02 Grifo Cromado tipo cuello de ganso de una llave pza 3.00 186.35 559.05 0.00 0.00
05.01.04.03 Ducha cromada con llave mezcladora pza 3.00 116.06 348.18 0.00 0.00
05.01.05 ACCESORIOS SANITARIOS 543.11 0.00 0.00
05.01.05.01 Papelera de loza blanca de 0.13x0.15 pza 7.00 43.73 306.11 0.00 0.00
05.01.05.02 Toallera de gancho pza 3.00 39.50 118.50 0.00 0.00
05.01.05.03 Jabonera pza 3.00 39.50 118.50 0.00 0.00
05.02 SISTEMA DE DESAGUE Y VENTILACION 29,879.61 0.00 0.00
05.02.01 SISTEMA DE DESAGUE 1,813.32 0.00 0.00
05.02.01.01 Salida de desagüe inodoros 4" pto 7.00 47.97 335.79 0.00 0.00 7.00
05.02.01.02 Salida de desagüe urinarios pto 3.00 36.60 109.80 0.00 0.00 3.00
05.02.01.03 Salida de desagüe lavatorios 2" pto 10.00 34.52 345.20 0.00 0.00 10.00
05.02.01.04 Salida de desague Duchas 2" pto 3.00 34.58 103.74 0.00 0.00 3.00
05.02.01.05 Salida de desague sumideros 2" pto 9.00 33.42 300.78 0.00 0.00 9.00
05.02.01.06 Salida de desague sumideros 3" pto 3.00 61.94 185.82 0.00 0.00 3.00
05.02.01.07 Salida de desague para registro roscado de 4" pto 11.00 39.29 432.19 0.00 0.00 11.00
05.02.02 SISTEMA DE REDES DE DESAGUE 5,800.46 0.00 0.00
05.02.02.01 Red colectora PVC para desague de 6" m 15.00 25.13 376.95 0.00 0.00 15.00
05.02.02.02 Red colectora PVC para desagüe de 4" m 270.00 17.16 4,633.20 0.00 0.00 270.00
05.02.02.03 Red colectora PVC para desague de 3" m 13.13 10.11 132.74 0.00 0.00 13.13
05.02.02.04 Red colectora PVC para desague de 2" m 105.38 6.24 657.57 0.00 0.00 105.38
05.02.03 ACCESORIOS VARIOS 4,195.53 0.00 0.00
05.02.03.01 Sumidero cromado de 2" und 9.00 21.43 192.87 0.00 0.00 9.00
05.02.03.02 Sumidero cromado de 3" und 3.00 24.91 74.73 0.00 0.00 3.00
05.02.03.03 Registro roscado Ø 4" und 11.00 24.29 267.19 0.00 0.00 11.00
05.02.03.04 Uniones Yee de 2"x 2" und 16.00 17.45 279.20 0.00 0.00 16.00
05.02.03.05 Uniones Yee de 4"x 2" und 24.00 17.45 418.80 0.00 0.00 24.00
05.02.03.06 Uniones Yee de 4"x 3" und 12.00 17.88 214.56 0.00 0.00 12.00
05.02.03.07 Uniones Yee de 4"x 4" und 16.00 19.56 312.96 0.00 0.00 16.00
05.02.03.08 Codo PVC SAL 2"x2" a 45° und 8.00 14.31 114.48 0.00 0.00 8.00
05.02.03.09 Codo PVC SAL 3"x3" a 45° und 10.00 27.19 271.90 0.00 0.00 10.00
05.02.03.10 Codo PVC SAL 4"x4" a 45° und 32.00 30.26 968.32 0.00 0.00 32.00
05.02.03.11 Tee sanitario PVC sal 4"x4"x2" und 14.00 24.34 340.76 0.00 0.00 14.00
05.02.03.12 Codo PVC SAL 2"x2" a 90° und 12.00 13.88 166.56 0.00 0.00 12.00
05.02.03.13 Tee sanitario PVC sal 2"x2" und 12.00 22.22 266.64 0.00 0.00 12.00
05.02.03.14 Reducción PVC SAL 4" x 2" und 16.00 19.16 306.56 0.00 0.00 16.00
05.02.04 CAJAS DE INSPECCION Y CONEXIONES 3,950.69 0.00 0.00
05.02.04.01 Caja de registro de desagüe de 12" x 24" pza 30.00 100.48 3,014.40 0.00 0.00 30.00
05.02.04.02 Caja de registro de desagüe de 24" x 24" pza 7.00 103.49 724.43 0.00 0.00 7.00
05.02.04.03 Conexion a red interior und 1.00 211.86 211.86 0.00 0.00 1.00
05.02.05 VENTILACION 583.44 0.00 0.00
05.02.05.01 Sombrero de ventilación PVC SAL Ø 2" pza 11.00 15.89 174.79 0.00 0.00
05.02.05.02 Salidas PVC SAL para ventilacion de 2" h=2.60m pto 11.00 37.15 408.65 0.00 0.00
05.02.06 PRUEBAS HIDRAULICAS 854.70 0.00 0.00
05.02.06.01 Prueba hidraulica de desague y desinfeccion m 388.50 2.20 854.70 0.00 0.00
05.02.07 EXCAVACIONES RED DE DESAGUE 12,681.47 0.00 0.00
05.02.07.01 Trazo y replanteo preliminar m 298.13 1.95 581.35 98.13 191.35 200.00
05.02.07.02 Excavacion de zanja 0.45 x 0.80 m en terreno normal m3 107.33 37.03 3,974.43 37.33 1,382.33 70.00
05.02.07.03 Refine y nivelacion de zanja m 298.13 4.44 1,323.70 98.13 435.70 200.00
05.02.07.04 Preparacion y colocacion de cama de apoyo m 298.13 12.26 3,655.07 98.13 1,203.07 200.00
05.02.07.05 Relleno y apisonado con material propio m3 107.33 29.32 3,146.92 37.33 1,094.52 70.00
05.03 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 22,470.23 0.00 0.00
05.03.01 SALIDA PARA PUNTOS DE AGUA 871.31 0.00 0.00
05.03.01.01 Salida de agua para inodoros tanque bajo pto 7.00 36.89 258.23 0.00 0.00 7.00
05.03.01.02 Salida de agua en urinarios pto 3.00 40.36 121.08 0.00 0.00 3.00
05.03.01.03 Salida de agua para lavatorios pto 10.00 37.53 375.30 0.00 0.00 10.00
05.03.01.04 Salida de agua para Duchas pto 3.00 38.90 116.70 0.00 0.00 3.00
05.03.02 REDES DE DISTRIBUCION Y MONTAJE 3,332.55 0.00 0.00
05.03.02.01 Tuberia PVC SAP Ø 1 1/2" m 94.90 20.25 1,921.73 0.00 0.00 94.90
05.03.02.02 Tuberia PVC SAP Ø 1" m 80.40 6.78 545.11 0.00 0.00 80.40
05.03.02.03 Tuberia PVC SAP Ø 3/4" m 62.60 5.62 351.81 0.00 0.00 62.60
05.03.02.04 Tuberia PVC SAP Ø 1/2" m 103.40 4.97 513.90 0.00 0.00 103.40
05.03.03 ACCESORIOS VARIOS 2,034.65 0.00 0.00 0.00
05.03.03.01 Tee PVC-SAP Ø 1/2" und 10.00 15.79 157.90 0.00 0.00 10.00
05.03.03.02 Tee PVC-SAP Ø 3/4" und 10.00 18.71 187.10 0.00 0.00 10.00
05.03.03.03 Tee PVC-SAP 1" und 3.00 19.98 59.94 0.00 0.00 3.00
05.03.03.04 Tee PVC-SAP 1 1/2" und 6.00 26.91 161.46 0.00 0.00 6.00
05.03.03.05 Codo PVC SAP Ø 1/2" x90° und 15.00 18.29 274.35 0.00 0.00 15.00
05.03.03.06 Codo PVC SAP Ø 3/4" x90° und 7.00 18.71 130.97 0.00 0.00 7.00
05.03.03.07 Codo PVC SAP de 1" x 90º und 2.00 15.17 30.34 0.00 0.00 2.00
05.03.03.08 Codo PVC SAP de 1.1/2" x 90º und 2.00 16.68 33.36 0.00 0.00 2.00
05.03.03.09 REDUCCIONES PVC-SAP 1 1/2" a 1" und 3.00 14.90 44.70 0.00 0.00 3.00
05.03.03.10 REDUCCIONES PVC-SAP 1 1/2" A 3/4" und 2.00 14.87 29.74 0.00 0.00 2.00
05.03.03.11 REDUCCIONES PVC-SAP 1 1/2" A 1/2" und 1.00 25.18 25.18 0.00 0.00 1.00
05.03.03.12 REDUCCIONES PVC-SAP 1" a 3/4" und 5.00 13.97 69.85 0.00 0.00 5.00
05.03.03.13 REDUCCIONES PVC-SAP 1" A 1/2" und 4.00 23.65 94.60 0.00 0.00 4.00
05.03.03.14 REDUCCIONES PVC-SAP 3/4" a 1/2" und 9.00 14.39 129.51 0.00 0.00 9.00
05.03.03.15 Union universal PVC SAP 1/2" und 4.00 12.98 51.92 0.00 0.00 4.00
05.03.03.16 Union universal PVC SAP 3/4" und 8.00 13.21 105.68 0.00 0.00 8.00
05.03.03.17 Union universal PVC SAP 1" und 1.00 22.47 22.47 0.00 0.00 1.00
05.03.03.18 Union universal PVC SAP 1 1/2" und 1.00 22.47 22.47 0.00 0.00 1.00
05.03.03.19 Tapon de PVC SAP 1/2" und 13.00 17.96 233.48 0.00 0.00 13.00
05.03.03.20 Tapon de PVC SAP 3/4" und 4.00 17.96 71.84 0.00 0.00 4.00
05.03.03.21 Tapon de PVC SAP 1" und 4.00 18.80 75.20 0.00 0.00 4.00
05.03.03.22 Tapon de PVC SAP 1 1/2" und 1.00 22.59 22.59 0.00 0.00 1.00
05.03.04 LLAVES Y VALVULAS 1,718.67 0.00 0.00 0.00
05.03.04.01 Valvula de globo de 1 1/2" und 1.00 113.28 113.28 0.00 0.00 1.00
05.03.04.02 Valvula de globo de 1" und 1.00 87.84 87.84 0.00 0.00 1.00
05.03.04.03 Valvula de globo de 3/4" und 2.00 79.03 158.06 0.00 0.00 2.00
05.03.04.04 Valvula de globo de 1/2" und 8.00 65.65 525.20 0.00 0.00 8.00
05.03.04.05 Nicho para valvulas pza 10.00 59.30 593.00 0.00 0.00 10.00
05.03.04.06 Caja de valvula con tapa F°G° und 3.00 80.43 241.29 0.00 0.00 3.00
05.03.05 PRUEBAS HIDRAULICAS 645.06 0.00 0.00
05.03.05.01 Prueba hidráulica en red de agua y desinfeccion m 341.30 1.89 645.06 0.00 0.00 341.30
05.03.06 CONEXION A RED EXTERIOR 169.49 0.00 0.00
05.03.06.01 Conexion del sistema de agua a una red exterior und 1.00 169.49 169.49 0.00 0.00 1.00
05.03.07 EXCAVACIONES PARA REDES DE AGUA 8,698.50 0.00 0.00
05.03.07.01 Trazo y replanteo preliminar m 237.90 1.95 463.91 237.90 463.91
05.03.07.02 Excavacion de zanja 0.45 x 0.60 m m3 64.23 37.03 2,378.44 0.00 0.00 64.23
05.03.07.03 Refine y nivelacion de zanja m 237.90 4.44 1,056.28 0.00 0.00 237.90
05.03.07.04 Preparacion y colocacion de cama de apoyo m 237.90 12.26 2,916.65 0.00 0.00 237.90
05.03.07.05 Relleno y apisonado con material propio m3 64.23 29.32 1,883.22 0.00 0.00 64.23
05.03.08 INSTALACIONES ESPECIALES 5,000.00 0.00 0.00
05.03.08.01 Instalacion de Tanque Elevado de 5,000 Litros und 1.00 5,000.00 5,000.00 0.50 2,500.00 0.50
05.04 EVACUACION DE AGUAS PLUVIALES 59,807.20 0.00 0.00
05.04.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES AULAS 47,597.94 0.00 0.00
05.04.01.01 Canaleta de concreto m 382.00 112.95 43,146.90 0.00 0.00 382.00
05.04.01.02 Montante PVC Ø 3" (01 nivel) und 12.00 167.65 2,011.80 0.00 0.00 12.00
05.04.01.03 Columnetas para proteccion de montantes und 12.00 203.27 2,439.24 0.00 0.00 12.00
05.04.02 SISTEMA DE EVACUACION DE AGUAS PLUVIALES EXTERIOR 12,209.26 0.00 0.00
05.04.02.01 EXCAVACIONES AGUAS PLUVIALES CANALES 6,260.25 0.00 0.00
05.04.02.01.01 Trazo y replanteo preliminar m 382.00 1.95 744.90 0.00 0.00 382.00
05.04.02.01.02 Excavacion de zanja 0.45 x 0.60 m m3 103.14 37.03 3,819.27 0.00 0.00 103.14
05.04.02.01.03 Refine y nivelacion de zanja m 382.00 4.44 1,696.08 0.00 0.00 382.00
05.04.02.02 CAJAS DE INSPECCION 602.88 0.00 0.00
05.04.02.02.01 Caja de registro de desagüe de 12" x 24" pza 6.00 100.48 602.88 0.00 0.00 6.00
05.04.02.03 SISTEMA DE RED DE EVACUACION DE AGUAS PLUVIALES 2,307.95 0.00 0.00
05.04.02.03.01 Red colectora PVC para desague de 4" m 10.00 17.19 171.90 0.00 0.00 10.00
05.04.02.03.02 Red colectora PVC para desague de 6" m 85.00 25.13 2,136.05 0.00 0.00 85.00
05.04.02.04 EXCAVACIONES PARA RED DE EVACUACION DE AGUAS PLUVIALES TUBERIA 3,038.18 0.00 0.00
05.04.02.04.01 Trazo y replanteo preliminar m 95.00 1.95 185.25 0.00 0.00 95.00
05.04.02.04.02 Excavacion de zanja 0.45 x 0.80 m, terreno normal m3 34.20 37.03 1,266.43 0.00 0.00 34.20
05.04.02.04.03 Refine y nivelacion de zanja m 95.00 4.44 421.80 0.00 0.00 95.00
05.04.02.04.04 Preparacion y colocacion de cama de apoyo m 95.00 12.26 1,164.70 0.00 0.00 95.00
05.05 TRATAMIENTO DE AGUAS RESIDUALES 23,237.39 0.00 0.00
05.05.01 TRATAMIENTO PRIMARIO (BIODIGESTOR) 13,122.13 0.00 0.00
05.05.01.01 TRABAJOS PRELIMINARES 12.18 0.00 0.00
05.05.01.01.01 Limpieza de terreno manual m2 4.91 0.56 2.75 4.91 2.75
05.05.01.01.02 Trazo y replanteo preliminar m2 4.91 1.92 9.43 4.91 9.43
05.05.01.02 MOVIMIENTO DE TIERRAS 1,038.00 0.00 0.00
05.05.01.02.01 Excavacion manual en Terreno Normal m3 16.32 37.03 604.33 16.32 604.33
05.05.01.02.02 Relleno y apisonado con material propio m3 5.63 29.32 165.07 5.63 165.07
05.05.01.02.03 Eliminación de material excedente (5 km) m3 15.58 17.24 268.60 15.58 268.60
05.05.01.03 BIODIGESTOR 12,071.95 0.00 0.00
05.05.01.03.01 Instalación de Biodigestor prefabricado de 7000 lt und 1.00 12,071.95 12,071.95 1.00 12,071.95
05.05.02 TRATAMIENTO SECUNDARIO (POZO DE INFILTRACION) 10,115.26 0.00 0.00
05.05.02.01 TRABAJOS PRELIMINARES 35.07 0.00 0.00
05.05.02.01.01 Limpieza de terreno manual m2 14.14 0.56 7.92 14.14 7.92
05.05.02.01.02 Trazo y replanteo preliminar m2 14.14 1.92 27.15 14.14 27.15
05.05.02.02 MOVIMIENTO DE TIERRAS 1,604.93 0.00 0.00
05.05.02.02.01 Excavacion manual en Terreno Normal m3 27.00 37.03 999.81 27.00 999.81
05.05.02.02.02 Eliminación de material excedente (5 km) m3 35.10 17.24 605.12 35.10 605.12
05.05.02.03 OBRAS DE CONCRETO ARMADO 4,861.62 0.00 0.00
05.05.02.03.01 Concreto f'c= 210 kg/cm2 m3 4.26 385.56 1,642.49 2.26 871.37 2.00
05.05.02.03.02 Encofrado y desencofrado m2 41.14 37.22 1,531.23 41.14 1,531.23
05.05.02.03.03 Acero f'c=4200 kg/cm2 kg 428.40 3.94 1,687.90 428.40 1,687.90
05.05.02.04 MUROS 1,830.21 0.00 0.00
05.05.02.04.01 Muros de Ladrillo KK sin juntas, en Pozos m2 21.21 86.29 1,830.21 21.21 1,830.21
05.05.02.05 FILTROS 975.66 0.00 0.00
05.05.02.05.01 Piedra ø 6" para filtro m3 3.53 56.14 198.17 3.53 198.17
05.05.02.05.02 Sum. E Inst. Grava de rio Tam. Max. 1/2" - 3/4" (PARA POZO PERCO m3 10.80 71.99 777.49 10.80 777.49
05.05.02.06 OTROS 580.54 0.00 0.00
05.05.02.06.01 Tuberia de Ventilación Fº Gº ø 4" und 2.00 226.49 452.98 0.00 0.00 2.00
05.05.02.06.02 Codo PVC SAL Ø 4"X90° pza 4.00 31.89 127.56 0.00 0.00 4.00
05.05.02.07 CAJAS DE INSPECCION 227.23 0.00 0.00
05.05.02.07.01 Tapa de concreto para pozo percolador 650MM pza 2.00 61.87 123.74 0.00 0.00 2.00
05.05.02.07.02 Caja de registro de desagüe de 24" x 24" pza 1.00 103.49 103.49 0.00 0.00 1.00
06 INSTALACIONES ELECTRICAS 89,497.32 0.00 0.00
06.01 TABLEROS DE DISTRIBUCIÓN 4,810.38 0.00 0.00
06.01.01 TABLERO DE DISTRIBUCION GENERAL TDG Eqp 1.00 818.40 818.40 0.00 0.00 1.00
06.01.02 TABLERO DE DISTRIBUCION TD-11 (24 POLOS) pza 1.00 1,036.40 1,036.40 0.00 0.00 1.00
06.01.03 TABLERO DE DISTRIBUCION TD-12 (24 POLOS) pza 1.00 1,036.40 1,036.40 0.00 0.00 1.00
06.01.04 TABLERO DE DISTRIBUCION TD-13 (24 POLOS) pza 1.00 1,009.00 1,009.00 0.00 0.00 1.00
06.01.05 TABLERO DE DISTRIBUCION TD-IE (18 POLOS) pza 1.00 821.80 821.80 0.00 0.00 1.00
06.01.06 TABLERO DE DISTRIBUCION TD-DE (2 POLOS) pza 1.00 88.38 88.38 0.00 0.00 1.00
06.02 ALIMENTADORES 24,006.91 0.00 0.00
06.02.01 TENDIDO DE CABLE 2-1x16mm2 N2XH +1x10 mm2 N2XH (T) m 46.00 29.19 1,342.74 0.00 0.00 20.00
06.02.02 TENDIDO DE CABLE 2-1x10mm2 N2XH +1x10 mm2 N2XH (T) m 185.00 23.45 4,338.25 0.00 0.00 100.00
06.02.03 TENDIDO DE CABLE 2-1x6 mm2 N2XH m 217.00 13.30 2,886.10 0.00 0.00 150.00
06.02.04 INSTALACION DE DUCTO PVC DE 25mm m 8.00 11.33 90.64 0.00 0.00 8.00
06.02.05 INSTALACION DE DUCTO PVC DE 40mm m 231.00 14.35 3,314.85 0.00 0.00 231.00
06.02.06 KIT DE EMPALME 3M PARA CABLE SUBTERRANEO 3M-0, 6-10MM2 N2 Jgo 4.00 36.78 147.12 0.00 0.00
06.02.07 CAVADO DE ZANJA SEÑALIZACION, PROTECCIÓN Y RELLENO DE ZANJ
m 115.00 39.43 4,534.45 0.00 0.00 115.00
06.02.08 CAVADO, SEÑALIZACION, PROTECCION, RELLENO Y COMPACTACIONm 114.00 45.30 5,164.20 0.00 0.00 114.00
06.02.09 BUZON DE CONCRETO DE 0.60x0.60x0.75 CON TAPA DOBLE DE CO Unid 8.00 273.57 2,188.56 0.00 0.00 8.00
06.03 ARTEFACTOS DE ILUMINACION 36,626.57 0.00 0.00
06.03.01 ARTEFACTO MODELO RAS STD RAC 2TL36 EE, PARA ADOSAR CON 2Eqp 36.00 180.93 6,513.48 0.00 0.00
06.03.02 ARTEFACTO DE ILUMINACION, PARA ADOSAR CON 02 FLUORESCENTE
Eqp 10.00 94.63 946.30 0.00 0.00
06.03.03 ARTEFACTO DE ILUMINACION, PARA ADOSAR CON 01 FLUORESCENTES
Eqp 4.00 118.33 473.32 0.00 0.00
06.03.04 LUMINARIA TIPO LED PARA ADOSAR, DOWNLIGHT DE 18W, LUZ NEUTR
Eqp 4.00 133.65 534.60 0.00 0.00
06.03.05 LUMINARIA TIPO LED PARA ADOSAR, DOWNLIGHT DE 12W, LUZ NEUTRA
Eqp 3.00 143.65 430.95 0.00 0.00
06.03.06 LUMINARIA DE SUPERFICIE, CON 02 LAMPARAS AHORRADORAS DE Eqp 14.00 13.65 191.10 0.00 0.00
06.03.07 POSTE METÁLICO DE F° G° DE Ø 3" X 6 M CON 01 FAROLA ESFER Eqp 4.00 1,301.85 5,207.40 0.00 0.00
06.03.08 POSTE METÁLICO DE F° G° DE 12 M (TRES CUERPOS Ø 5" X 5 M, Ø Eqp 4.00 5,202.50 20,810.00 0.00 0.00 3.00
06.03.09 EQUIPO DE ILUMINACION DE EMERGENCIA CON BATERIA RECARGABUnid 14.00 108.53 1,519.42 0.00 0.00
06.04 SALIDAS DE LUZ, INTERRUPTORES, TOMACORRIENTES Y CAJAS 20,790.00 0.00 0.00
06.04.01 SALIDA PARA CENTRO DE LUZ pto 71.00 94.81 6,731.51 71.00 6,731.51
06.04.02 SALIDA PARA INTERRUPTOR SIMPLE pto 14.00 86.48 1,210.72 14.00 1,210.72
06.04.03 SALIDA PARA INTERRUPTOR DOBLE pto 6.00 93.77 562.62 6.00 562.62
06.04.04 SALIDA PARA INTERRUPTOR DE CONMUTACION SIMPLE pto 8.00 111.67 893.36 8.00 893.36
06.04.05 SALIDA PARA INTERRUPTOR DE CONMUTACION DOBLE pto 2.00 134.07 268.14 2.00 268.14
06.04.06 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA TIERRA pto 58.00 105.51 6,119.58 58.00 6,119.58
06.04.07 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA TIERRA (A PRU pto 18.00 157.63 2,837.34 18.00 2,837.34
06.04.08 SALIDAS DE FUERZA ELECTRICA MONOFASICA pto 1.00 139.20 139.20 1.00 139.20
06.04.09 SALIDA PARA TIMBRE pto 1.00 280.24 280.24 1.00 280.24
06.04.10 SALIDA PARA PULSADOR DE TIMBRE pto 1.00 86.83 86.83 1.00 86.83
06.04.11 SALIDA PARA LUZ DE EMERGENCIA pto 14.00 99.95 1,399.30 14.00 1,399.30
06.04.12 CAJA DE PASE OCTOGONAL DE F.G. CON TAPA CIEGA pto 1.00 85.45 85.45 1.00 85.45
06.04.13 CAJA DE PASE DE F.G.150x150x100 mm pto 1.00 54.17 54.17 1.00 54.17
06.04.14 CAJA DE PASE DE F.G.200x200x100 mm pto 2.00 60.77 121.54 2.00 121.54
06.05 SISTEMA DE PUESTA A TIERRA 3,263.46 0.00 0.00
06.05.01 PUESTA A TIERRA GENERAL (SISTEMA ELÉCTRICO - GENERAL) Jgo 1.00 1,113.62 1,113.62 0.00 0.00
06.05.02 PUESTA A TIERRA (SISTEMA ELECTRICO) Jgo 2.00 1,074.92 2,149.84 0.00 0.00
07 INSTALACIONES ESPECIALES 18,454.99 0.00 0.00
07.01 INSTALACIONES DE CABLEADO ESTRUCTURADO 18,454.99 0.00 0.00
07.01.01 CABLEADO HORIZONTAL 9,927.27 0.00 0.00
07.01.01.01 Salida para Red de Datos pto 11.00 73.81 811.91 0.00 0.00
07.01.01.02 Salida para red de datos Acces Point pto 4.00 73.81 295.24 0.00 0.00
07.01.01.03 Salida para HDMI pto 8.00 115.31 922.48 0.00 0.00
07.01.01.04 Suministro patch cord de 3.00 m para area de trabajo und 15.00 46.58 698.70 0.00 0.00
07.01.01.05 suministro cable hdmi x 3m para area de trabajo und 8.00 29.58 236.64 0.00 0.00
07.01.01.06 Suministro cable F/UTP Cat6A LSZH-3 m 859.46 7.29 6,265.46 0.00 0.00
07.01.01.07 suministro cable hdmi x 10m und 4.00 108.81 435.24 0.00 0.00
07.01.01.08 Certificacion de Puntos de Red en CAT6A pto 15.00 17.44 261.60 0.00 0.00
07.01.02 CABLEADO VERTICAL 2,466.82 0.00 0.00
07.01.02.01 PatchPanel Cat6 de 24 Puertos und 1.00 520.65 520.65 0.00 0.00
07.01.02.02 ordenador horizontal de 2 ru und 1.00 157.65 157.65 0.00 0.00
07.01.02.03 PatchCord para datos cat6A de 1.5 mt. LSZH und 8.00 65.06 520.48 0.00 0.00
07.01.02.04 PatchCord para datos POE cat6A de 1.5 mt. LSZH und 4.00 42.22 168.88 0.00 0.00
07.01.02.05 gabinete de comunicacion de pared 18 ru und 1.00 1,099.16 1,099.16 0.00 0.00
07.01.03 TUBERIAS 6,060.90 0.00 0.00
07.01.03.01 Tuberia PVC SAP Ø 3/4" m 46.44 6.14 285.14 0.00 0.00 46.44
07.01.03.02 Tuberia PVC SAP Ø 1" m 28.25 7.33 207.07 0.00 0.00 28.25
07.01.03.03 Tuberia PVC SAP Ø 1 1/2" m 8.23 8.33 68.56 0.00 0.00 8.23
07.01.03.04 Tuberia PVC SAP Ø 1 1/4" m 39.65 8.08 320.37 0.00 0.00 39.65
07.01.03.05 Tuberia PVC SAP de 2" ML 102.48 21.74 2,227.92 0.00 0.00 102.48
07.01.03.06 CAJA DE F. G. 300X300X150 mm. und 6.00 27.79 166.74 0.00 0.00 6.00
07.01.03.07 CAJA DE F. G. 150X150X100 mm. und 4.00 23.93 95.72 0.00 0.00 4.00
07.01.03.08 POZO DE CONCRETO DE 0.50X0.50X0.50 M" und 4.00 260.73 1,042.92 0.00 0.00 4.00
07.01.03.09 BASE DE CONCRETO PARA ANTENA VSAT (0.60X0.60X0.10 M)" und 1.00 234.83 234.83 0.00 0.00 1.00
07.01.03.10 Pozo puesta a tierra jgo 1.00 1,411.63 1,411.63 0.00 0.00 1.00
08 ACCIONES DE MITIGACIÓN DE IMPACTO AMBIENTAL 38,408.93 0.00 0.00
08.01 PLAN DE MANEJO AMBIENTAL 5,000.00 0.00 0.00
08.01.01 SENSIBILIZACIÓN EN TEMAS AMBIENTALES event 1.00 5,000.00 5,000.00 0.50 2,500.00 0.50
08.02 PLAN DE VIGILANCIA AMBIENTAL 12,550.00 0.00 0.00
08.02.01 MONITOREO DE LA CALIDAD DE AGUAS glb 1.00 2,950.00 2,950.00 0.00 0.00
08.02.02 MONITOREO DE LA CALIDAD DEL AIRE glb 1.00 3,200.00 3,200.00 0.00 0.00
08.02.03 MONITOREO DE NIVELES SONOROS glb 1.00 2,900.00 2,900.00 0.00 0.00
08.02.04 MONITOREO DE SUELOS glb 1.00 3,500.00 3,500.00 0.00 0.00
08.03 PLAN DE MANEJO DE RESIDUOS SÓLIDOS Y LÍQUIDOS 5,000.00 0.00 0.00
08.03.01 PLAN DE MANEJO DE RESIDUOS SÓLIDOS glb 1.00 5,000.00 5,000.00 0.50 2,500.00
08.04 PLAN DE SALUD Y SEGURIDAD OCUPACIONAL 4,502.92 0.00 0.00
08.04.01 CONSTRUCCIÓN Y MANTENIMIENTO DE LETRINAS SANITARIAS und 4.00 1,125.73 4,502.92 2.00 2,251.46 2.00
08.05 PROGRAMA DE CIERRE 11,356.01 0.00 0.00
08.05.01 RECUPERACIÓN DEL ENTORNO A MANO m2 1,500.00 2.62 3,930.00 0.00 0.00 1,500.00
08.05.02 RECUPERACIÓN DEL ENTORNO CON EQUIPO m2 500.00 2.67 1,335.00 0.00 0.00
08.05.03 DESMONTAJE DE INSTALACIONES PROVISIONALES glb 1.00 3,314.13 3,314.13 0.00 0.00 1.00
08.05.04 LIMPIEZA FINAL DE OBRA glb 1.00 2,776.88 2,776.88 0.00 0.00
09 COMPONENTE 02 102,394.21 0.00 0.00
MOBILIARIO glb 1.00 34,947.29 34,947.29 0.00 0.00 1.00
EQUIPAMIENTO glb 1.00 67,446.92 67,446.92 0.00 0.00 1.00
10 COMPONENTE 03 8,163.84 0.00 0.00
CAPACITACION DOCENTE Y SENSIBILIZACION A PADRES DE FAMIglb 1.00 8,163.84 8,163.84 0.00 0.00 0.50

COSTO DIRECTO S/. 1,949,351.77 1,251,912.52


GASTOS GENERALES (12%) 12.00% S/. 233,922.21 150,229.50
UTILIDAD (9.00%) 9.00% S/. 175,441.66 112,672.13
SUB TOTAL S/. 2,358,715.64 1,514,814.15
FACTOR DE RELACIÓN (FR) 1.0000 S/. 2,358,715.64 1,514,814.15
TOTAL DE OBRA S/. 2,358,715.64 1,514,814.15
I.G.V. 18.00% S/. 424,568.81 272,666.54
TOTAL DE PRESUPUESTO VALORIZADO S/. 2,783,284.45 1,787,480.70
5

74, EN LAS COMUNIDADES DE: MAYUMBAMBA; CUSIBAMBA Y MASKA DEL DISTRITO DE PARURO
SCO
CONTRATISTA: CONSORCIO WIRACOCHA

PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL

Sobre Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. %

0.00 1.00 1007.85 0.00 0.00 0%


0.00 120.00 10476.00 0.00 0.00 0%
0.00 30.00 1800.00 0.00 0.00 0%
0.00 60.00 3600.00 0.00 0.00 0%
0.00 100.00 6000.00 0.00 0.00 0%
2,400.00 60.00 3600.00 0.00 0.00 0%
600.00 10.00 600.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 2000.00 0.00 0.00 0%
0.00 1.00 1500.00 0.00 0.00 0%
0.00 1.00 1000.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 5,000.00 3800.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 7,000.00 18550.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 130000.00 0.00 0.00 0%
2,100.00 1.00 10500.00 0.00 0.00 0%
2,776.88 4.00 11107.52 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
4,000.00 0.60 6000.00 0.40 4,000.00 40%
1,000.00 1.00 2000.00 0.00 0.00 0%
2,000.00 50.00 10000.00 0.00 0.00 0%
357.30 50.00 1786.50 0.00 0.00 0%
226.20 50.00 1131.00 0.00 0.00 0%
2,181.30 10.00 2181.30 0.00 0.00 0%
608.80 8.00 608.80 2.00 152.20 20%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 61.57 164.39 0.00 0.00 0%
0.00 95.18 3020.06 0.00 0.00 0%
0.00 85.80 883.74 0.00 0.00 0%
0.00 38.48 112.75 0.00 0.00 0%
0.00 110.14 2770.02 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 38.48 1052.81 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 57.72 13648.47 0.00 0.00 0%
0.00 189.60 9079.94 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.50 10977.12 0.00 0.00 0%
0.00 50.06 1954.84 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 16.04 3946.96 0.00 0.00 0%
0.00 128.34 5405.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 19.24 6253.58 0.00 0.00 0%
0.00 618.81 2518.56 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 15.35 4989.21 0.00 0.00 0%
0.00 122.76 4702.94 0.00 0.00 0%
0.00 2,888.48 11756.11 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 12.88 4904.32 0.00 0.00 0%
0.00 147.80 6517.98 0.00 0.00 0%
0.00 3,471.94 14130.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.50 890.98 0.00 0.01 0%
0.00 52.36 2309.08 0.00 0.00 0%
0.00 252.41 1027.31 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 21.48 7675.88 0.00 0.00 0%
0.00 216.69 10977.52 0.00 0.00 0%
0.00 2,814.11 11453.43 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 13.60 4647.80 0.00 0.00 0%
0.00 161.04 6601.03 0.00 0.00 0%
0.00 1,200.47 4885.91 0.00 0.00 0%
0.00 422.40 1706.50 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 9.43 3369.81 0.00 0.00 0%
0.00 63.87 3235.65 0.00 0.00 0%
0.00 701.71 2855.96 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 78.67 210.05 0.00 0.00 0%
0.00 47.31 1501.15 0.00 0.00 0%
0.00 104.74 1078.82 0.00 0.00 0%
0.00 89.86 263.29 0.00 0.00 0%
0.00 52.73 1326.16 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.17 1345.29 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 24.28 5384.33 0.00 0.00 0%
0.00 144.80 5654.44 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.21 297.74 0.00 0.00 0%
0.00 28.67 1207.58 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 24.58 7989.24 0.00 0.00 0%
0.00 1,010.17 4111.39 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 16.99 5522.26 0.00 0.00 0%
0.00 135.90 5206.33 0.00 0.00 0%
0.00 3,369.94 13715.66 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 14.19 5403.13 0.00 0.00 0%
0.00 162.87 7182.57 0.00 0.00 0%
0.00 4,043.91 16458.71 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.55 908.79 0.00 0.00 0%
0.00 57.60 2540.16 0.00 0.00 0%
0.00 260.41 1059.87 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 22.44 8018.93 0.00 0.00 0%
0.00 206.84 10478.51 0.00 0.00 0%
0.00 2,878.14 11714.03 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 15.44 5276.62 0.00 0.00 0%
0.00 182.16 7466.74 0.00 0.00 0%
0.00 1,663.52 6770.53 0.00 0.00 0%
0.00 468.60 1893.14 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 10.44 3730.73 0.00 0.00 0%
0.00 70.54 3573.56 0.00 0.00 0%
0.00 775.92 3157.99 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 18.43 49.21 0.00 0.00 0%
0.00 15.65 496.57 0.00 0.00 0%
0.00 34.72 357.62 0.00 0.00 0%
0.00 22.80 66.80 0.00 0.00 0%
0.00 7.88 198.18 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 11.52 315.19 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 10.24 2270.82 0.00 0.00 0%
0.00 53.55 2091.13 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.80 196.86 0.00 0.00 0%
0.00 11.64 490.28 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 5.76 1872.17 0.00 0.00 0%
0.00 187.73 764.06 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 5.20 1690.16 0.00 0.00 0%
0.00 37.80 1448.12 0.00 0.00 0%
0.00 936.87 3813.06 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.63 1762.97 0.00 0.00 0%
0.00 53.04 2339.06 0.00 0.00 0%
0.00 1,204.89 4903.90 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.43 509.64 0.00 0.00 0%
0.00 33.66 1484.41 0.00 0.00 0%
0.00 158.01 643.10 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 6.36 2272.75 0.00 0.00 0%
0.00 69.43 3517.32 0.00 0.00 0%
0.00 1,177.31 4791.65 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3.39 1158.53 0.00 0.00 0%
0.00 38.85 1592.46 0.00 0.00 0%
0.00 356.44 1450.71 0.00 0.00 0%
0.00 105.82 427.51 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.06 736.14 0.00 0.00 0%
0.00 14.53 736.09 0.00 0.00 0%
0.00 157.16 639.64 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 400.47 1173.38 0.00 0.00 0%
0.00 400.47 5910.94 0.00 0.00 0%
0.00 392.39 84100.95 0.00 0.00 0%
0.00 406.50 6861.72 0.00 0.00 0%
0.00 111.96 1410.70 0.00 0.00 0%
0.00 337.05 1739.18 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.60 50.77 0.00 0.00 0%
0.00 1.04 10.71 0.00 0.00 0%
0.00 1.00 2.93 0.00 0.00 0%
0.00 0.96 24.14 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 27.36 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.60 195.02 0.00 0.00 0%
0.00 18.87 76.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.70 647.31 0.00 0.00 0%
0.00 27.20 1199.52 0.00 0.00 0%
0.00 225.23 916.69 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.56 557.47 0.00 0.00 0%
0.00 17.68 895.67 0.00 0.00 0%
0.00 77.10 313.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.57 194.80 0.00 0.00 0%
0.00 6.76 277.09 0.00 0.00 0%
0.00 31.66 128.86 0.00 0.00 0%
0.00 25.20 101.81 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
271.82 10.09 271.82 0.00 0.00 0%
446.38 10.09 446.38 0.00 0.00 0%
965.87 24.36 965.87 0.00 0.00 0%
1,342.36 28.64 1342.36 0.00 0.00 0%
90.67 17.64 90.67 0.00 0.00 0%
697.14 63.09 697.14 0.00 0.00 0%
0.00 0.00 0.00 1.00 1,500.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 145.78 17353.65 0.00 0.00 0%
0.00 1.39 109.92 0.00 0.00 0%
0.00 39.45 2763.87 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 4.53 256.26 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 60.11 170.71 0.00 0.00 0%
0.00 53.78 91.43 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 75.22 1399.09 0.00 0.00 0%
0.00 224.67 5140.45 0.00 0.00 0%
0.00 62.47 2829.89 0.00 0.00 0%
0.00 89.64 3554.23 0.00 0.00 0%
0.00 242.81 11380.50 0.00 0.00 0%
0.00 102.65 1375.51 0.00 0.00 0%
0.00 797.99 4101.67 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 10.21 537.96 0.00 0.00 0%
0.00 6.34 183.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 179.96 4463.01 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 175.10 513.04 0.00 0.00 0%
0.00 175.10 7527.55 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 264.88 7135.87 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 11.64 564.42 0.00 0.00 0%
1,777.29 35.66 1777.29 0.00 0.00 0%
11,601.68 127.80 11601.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
3,824.18 75.22 3824.18 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1,277.56 89.34 1277.56 0.00 0.00 0%
1,637.83 78.44 1637.83 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
10,409.78 264.88 10409.78 0.00 0.00 0%
0.00 35.18 7113.04 0.00 0.00 0%
0.00 77.61 15516.57 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
1,493.80 6.62 1493.80 0.00 0.00 0%
1,044.77 4.41 1044.77 0.00 0.00 0%
0.00 0.00 0.00 3.21 549.42 100%
0.00 0.00 0.00 0.00 0.00 100%
5,870.16 24.00 5870.16 2.01 491.63 8%
500.64 2.10 500.64 0.45 107.28 18%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 21.66 7,342.31 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 19.85 3,237.34 100%
0.00 0.00 0.00 0.43 230.62 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 4.00 81.68 100%
0.00 0.00 0.00 2.00 318.34 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.89 201.70 100%
0.00 0.00 0.00 0.00 0.00 100%
5,604.63 557.12 5604.63 0.00 0.00 0%
690.29 62.47 690.29 0.00 0.00 0%
2,164.92 179.96 2164.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
861.00 4.10 861.00 0.00 0.00 0%
0.00 0.00 0.00 30.45 86.78 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 1,100.88 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 161.62 19239.24 0.00 0.00 0%
0.00 13.46 1064.42 0.00 0.00 0%
0.00 11.80 826.71 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 9.05 511.96 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 294.09 835.22 0.00 0.00 0%
0.00 32.47 55.20 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 69.37 1290.28 0.00 0.00 0%
0.00 255.55 5846.98 0.00 0.00 0%
0.00 73.64 3335.89 0.00 0.00 0%
0.00 92.12 3652.56 0.00 0.00 0%
0.00 260.96 12231.20 0.00 0.00 0%
0.00 122.00 1634.80 0.00 0.00 0%
0.00 542.76 2789.79 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 200.40 4969.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 187.60 549.67 0.00 0.00 0%
0.00 187.60 8064.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 291.89 7863.52 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 19.23 932.46 0.00 0.00 0%
1,688.08 33.87 1688.08 0.00 0.00 0%
12,210.82 134.51 12210.82 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
3,526.77 69.37 3526.77 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1,394.25 97.50 1394.25 0.00 0.00 0%
293.45 18.17 293.45 0.00 0.00 0%
0.00 0.00 0.00 67.52 1,409.82 100%
0.00 0.00 0.00 0.00 0.00 100%
11,471.28 291.89 11471.28 0.00 0.00 0%
1,786.17 61.80 9354.67 0.00 0.00 0%
3,532.76 85.67 17128.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
1,493.80 6.62 1493.80 0.00 0.00 0%
3,551.28 14.99 3551.28 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
6,848.52 28.00 6848.52 2.43 594.35 8%
357.60 1.50 357.60 0.20 47.68 12%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 3.07 1,040.67 100%
0.00 0.00 0.00 2.66 788.98 100%
0.00 0.00 0.00 10.69 3,623.70 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.56 1,232.96 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 2.00 40.84 100%
0.00 0.00 0.00 2.00 318.34 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.76 81.11 100%
0.00 0.00 0.00 0.00 0.00 100%
6,116.78 608.03 6116.78 0.00 0.00 0%
813.72 73.64 813.72 0.00 0.00 0%
2,410.81 200.40 2410.81 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
3,469.20 16.52 3469.20 0.00 0.00 0%
0.00 0.00 0.00 32.89 93.74 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 27.66 3292.65 0.00 0.00 0%
0.00 57.81 4571.61 0.00 0.00 0%
0.00 9.92 695.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 2.27 128.41 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 66.32 188.35 0.00 0.00 0%
0.00 117.44 199.65 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.95 929.07 0.00 0.00 0%
0.00 122.60 2805.09 0.00 0.00 0%
0.00 27.66 1253.00 0.00 0.00 0%
0.00 37.71 1495.20 0.00 0.00 0%
0.00 62.05 2908.28 0.00 0.00 0%
0.00 62.97 843.80 0.00 0.00 0%
0.00 376.17 1933.51 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.79 1234.79 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 36.83 107.91 0.00 0.00 0%
1,583.32 36.83 1583.32 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 68.74 1851.86 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.04 195.90 0.00 0.00 0%
898.62 18.03 898.62 0.00 0.00 0%
1,339.91 14.76 1339.91 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
2,539.46 49.95 2539.46 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
441.44 30.87 441.44 0.00 0.00 0%
180.56 11.18 180.56 0.00 0.00 0%
434.10 20.79 434.10 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
2,701.48 68.74 2701.48 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
895.83 3.97 895.83 0.00 0.00 0%
3,342.80 14.11 3342.80 0.00 0.00 0%
0.00 0.00 0.00 2.86 489.52 100%
0.00 0.00 0.00 0.00 0.00 100%
1,174.03 4.80 1174.03 0.41 100.28 8%
1,644.96 6.90 1644.96 0.35 83.44 5%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 6.46 2,189.81 100%
0.00 0.00 0.00 5.29 1,569.07 100%
0.00 0.00 0.00 6.17 2,091.51 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 20.42 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.76 81.11 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 222.36 2,236.94 100%
0.00 0.00 0.00 27.66 305.64 100%
0.00 0.00 0.00 49.79 598.97 100%
0.00 0.00 0.00 0.00 0.00 100%
2,824.50 13.45 2824.50 0.00 0.00 0%
0.00 0.00 0.00 13.21 37.65 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3,926.99 10485.06 0.00 0.00 0%
0.00 206.68 6557.96 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 867.35 6860.74 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 258.35 4735.56 0.00 0.00 0%
0.00 4,041.39 101640.96 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 24.56 41.75 0.00 0.00 0%
0.00 147.35 5795.28 0.00 0.00 0%
1,808.16 11.05 3330.03 0.00 0.00 0%
333.90 55.65 333.90 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 76.36 223.73 0.00 0.00 0%
0.00 55.07 2165.90 0.00 0.00 0%
0.00 111.51 1691.61 0.00 0.00 0%
0.00 8.36 2519.37 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 289.17 847.27 0.00 0.00 0%
0.00 223.82 8802.84 0.00 0.00 0%
0.00 289.17 4386.71 0.00 0.00 0%
0.00 24.58 7407.43 0.00 0.00 0%
0.00 514.71 1317.66 0.00 0.00 0%
0.00 317.21 1903.26 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 739.14 2165.68 0.00 0.00 0%
0.00 57.77 2272.09 0.00 0.00 0%
0.00 739.14 11212.75 0.00 0.00 0%
0.00 58.08 17502.99 0.00 0.00 0%
4,774.43 1,865.01 4774.43 0.00 0.00 0%
1,540.68 256.78 1540.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 311.85 913.72 100%
0.00 0.00 0.00 311.85 1,933.47 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 429.00 1256.97 0.00 0.00 0%
2,292.94 58.30 2292.94 0.00 0.00 0%
3,073.27 716.38 3073.27 0.00 0.00 0%
2,334.88 588.13 2334.88 0.00 0.00 0%
27,887.57 85.80 27887.57 0.00 0.00 0%
3,401.81 291.50 3401.81 0.00 0.01 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 19.46 1,000.05 100%
0.00 0.00 0.00 19.46 559.28 100%
0.00 0.00 0.00 194.63 714.29 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 55.13 161.53 0.00 0.00 0%
0.00 86.63 18567.41 0.00 0.00 0%
0.00 37.80 1486.67 0.00 0.00 0%
0.00 4.73 1621.96 0.00 0.00 0%
0.00 37.80 638.06 0.00 0.00 0%
0.00 63.00 161.28 0.00 0.00 0%
0.00 31.19 392.99 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.38 1.11 100%
0.00 0.00 0.00 0.38 81.45 100%
0.00 0.00 0.00 0.03 10.29 100%
0.00 0.00 0.00 2.52 42.54 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.91 155.79 0.00 0.00 0%
0.00 3.07 9.00 0.00 0.00 0%
0.00 3.16 32.55 0.00 0.00 0%
0.00 8.06 147.74 0.00 0.00 0%
0.00 8.46 212.77 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3.07 90.44 0.00 0.00 0%
0.00 629.14 2560.60 0.00 0.00 0%
0.00 29.61 1305.80 0.00 0.00 0%
0.00 12.81 525.08 0.00 0.00 0%
0.00 27.73 112.03 0.00 0.00 0%
0.00 5.95 2120.52 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.55 121.97 0.00 0.00 0%
0.00 0.14 34.45 0.00 0.00 0%
0.00 1.10 46.33 0.00 0.00 0%
0.00 3.81 453.54 0.00 0.00 0%
0.00 6.93 19.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
345.19 7.62 345.19 0.00 0.00 0%
874.28 22.05 874.28 0.00 0.00 0%
165.92 3.54 165.92 0.00 0.00 0%
126.63 9.45 126.63 0.00 0.00 0%
115.24 22.42 115.24 0.00 0.00 0%
566.71 12.81 566.71 0.00 0.00 0%
345.10 12.81 345.10 0.00 0.00 0%
136.63 9.98 136.63 0.00 0.00 0%
0.00 0.00 0.00 12.81 503.43 100%
0.00 0.00 0.00 7.62 84.20 100%
0.00 0.00 0.00 12.81 154.10 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 3,548.40 100%
0.00 0.00 0.00 0.00 0.00 100%
7,254.75 81.79 39557.73 14.80 7,158.02 15%
13,849.50 39.03 36036.40 0.00 0.00 0%
4,087.00 100.00 4087.00 95.31 3,895.32 49%
0.00 0.00 0.00 0.00 0.00 100%
7,808.40 120.00 7808.40 356.72 23,211.77 75%
1,401.90 30.00 1401.90 40.07 1,872.47 57%
7,223.00 103.32 14925.61 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 1,267.34 100%
13,548.81 0.80 13548.81 0.20 3,387.20 20%
2,542.37 1.50 2542.37 0.50 847.46 25%
0.00 0.00 0.00 1.00 1,017.07 100%
0.00 0.00 0.00 1.00 1,694.92 100%
0.00 0.00 0.00 1.00 508.47 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 3.00 752.16 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.00 2,398.76 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 4.00 945.36 100%
0.00 0.00 0.00 3.00 871.83 100%
0.00 0.00 0.00 2.00 638.92 100%
0.00 0.00 0.00 1.00 281.17 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.00 1,349.46 100%
0.00 0.00 0.00 3.00 559.05 100%
0.00 0.00 0.00 3.00 348.18 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.00 306.11 100%
0.00 0.00 0.00 3.00 118.50 100%
0.00 0.00 0.00 3.00 118.50 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
335.79 7.00 335.79 0.00 0.00 0%
109.80 3.00 109.80 0.00 0.00 0%
345.20 10.00 345.20 0.00 0.00 0%
103.74 3.00 103.74 0.00 0.00 0%
300.78 9.00 300.78 0.00 0.00 0%
185.82 3.00 185.82 0.00 0.00 0%
432.19 11.00 432.19 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
376.95 15.00 376.95 0.00 0.00 0%
4,633.20 270.00 4633.20 0.00 0.00 0%
132.74 13.13 132.74 0.00 0.00 0%
657.57 105.38 657.57 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
192.87 9.00 192.87 0.00 0.00 0%
74.73 3.00 74.73 0.00 0.00 0%
267.19 11.00 267.19 0.00 0.00 0%
279.20 16.00 279.20 0.00 0.00 0%
418.80 24.00 418.80 0.00 0.00 0%
214.56 12.00 214.56 0.00 0.00 0%
312.96 16.00 312.96 0.00 0.00 0%
114.48 8.00 114.48 0.00 0.00 0%
271.90 10.00 271.90 0.00 0.00 0%
968.32 32.00 968.32 0.00 0.00 0%
340.76 14.00 340.76 0.00 0.00 0%
166.56 12.00 166.56 0.00 0.00 0%
266.64 12.00 266.64 0.00 0.00 0%
306.56 16.00 306.56 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
3,014.40 30.00 3014.40 0.00 0.00 0%
724.43 7.00 724.43 0.00 0.00 0%
211.86 1.00 211.86 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 11.00 174.79 100%
0.00 0.00 0.00 11.00 408.65 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 388.50 854.70 100%
0.00 0.00 0.00 0.00 0.00 100%
390.00 298.13 581.35 0.00 0.00 0%
2,592.10 107.33 3974.43 0.00 0.00 0%
888.00 298.13 1323.70 0.00 0.00 0%
2,452.00 298.13 3655.07 0.00 0.00 0%
2,052.40 107.33 3146.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
258.23 7.00 258.23 0.00 0.00 0%
121.08 3.00 121.08 0.00 0.00 0%
375.30 10.00 375.30 0.00 0.00 0%
116.70 3.00 116.70 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1,921.73 94.90 1921.73 0.00 0.00 0%
545.11 80.40 545.11 0.00 0.00 0%
351.81 62.60 351.81 0.00 0.00 0%
513.90 103.40 513.90 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
157.90 10.00 157.90 0.00 0.00 0%
187.10 10.00 187.10 0.00 0.00 0%
59.94 3.00 59.94 0.00 0.00 0%
161.46 6.00 161.46 0.00 0.00 0%
274.35 15.00 274.35 0.00 0.00 0%
130.97 7.00 130.97 0.00 0.00 0%
30.34 2.00 30.34 0.00 0.00 0%
33.36 2.00 33.36 0.00 0.00 0%
44.70 3.00 44.70 0.00 0.00 0%
29.74 2.00 29.74 0.00 0.00 0%
25.18 1.00 25.18 0.00 0.00 0%
69.85 5.00 69.85 0.00 0.00 0%
94.60 4.00 94.60 0.00 0.00 0%
129.51 9.00 129.51 0.00 0.00 0%
51.92 4.00 51.92 0.00 0.00 0%
105.68 8.00 105.68 0.00 0.00 0%
22.47 1.00 22.47 0.00 0.00 0%
22.47 1.00 22.47 0.00 0.00 0%
233.48 13.00 233.48 0.00 0.00 0%
71.84 4.00 71.84 0.00 0.00 0%
75.20 4.00 75.20 0.00 0.00 0%
22.59 1.00 22.59 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
113.28 1.00 113.28 0.00 0.00 0%
87.84 1.00 87.84 0.00 0.00 0%
158.06 2.00 158.06 0.00 0.00 0%
525.20 8.00 525.20 0.00 0.00 0%
593.00 10.00 593.00 0.00 0.00 0%
241.29 3.00 241.29 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
645.06 341.30 645.06 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
169.49 1.00 169.49 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 237.90 463.91 0.00 0.00 0%
2,378.44 64.23 2378.44 0.00 0.00 0%
1,056.28 237.90 1056.28 0.00 0.00 0%
2,916.65 237.90 2916.65 0.00 0.00 0%
1,883.22 64.23 1883.22 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
2,500.00 1.00 5000.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
43,146.90 382.00 43146.90 0.00 0.00 0%
2,011.80 12.00 2011.80 0.00 0.00 0%
2,439.24 12.00 2439.24 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
744.90 382.00 744.90 0.00 0.00 0%
3,819.27 103.14 3819.27 0.00 0.00 0%
1,696.08 382.00 1696.08 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
602.88 6.00 602.88 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
171.90 10.00 171.90 0.00 0.00 0%
2,136.05 85.00 2136.05 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
185.25 95.00 185.25 0.00 0.00 0%
1,266.43 34.20 1266.43 0.00 0.00 0%
421.80 95.00 421.80 0.00 0.00 0%
1,164.70 95.00 1164.70 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.91 2.75 0.00 0.00 0%
0.00 4.91 9.43 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 16.32 604.33 0.00 0.00 0%
0.00 5.63 165.07 0.00 0.00 0%
0.00 15.58 268.60 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 12071.95 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 14.14 7.92 0.00 0.00 0%
0.00 14.14 27.15 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 27.00 999.81 0.00 0.00 0%
0.00 35.10 605.12 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
771.12 4.26 1642.49 0.00 0.00 0%
0.00 41.14 1531.23 0.00 0.00 0%
0.00 428.40 1687.90 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 21.21 1830.21 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3.53 198.17 0.00 0.00 0%
0.00 10.80 777.49 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
452.98 2.00 452.98 0.00 0.00 0%
127.56 4.00 127.56 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
123.74 2.00 123.74 0.00 0.00 0%
103.49 1.00 103.49 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
818.40 1.00 818.40 0.00 0.00 0%
1,036.40 1.00 1036.40 0.00 0.00 0%
1,036.40 1.00 1036.40 0.00 0.00 0%
1,009.00 1.00 1009.00 0.00 0.00 0%
821.80 1.00 821.80 0.00 0.00 0%
88.38 1.00 88.38 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
583.80 20.00 583.80 26.00 758.94 57%
2,345.00 100.00 2345.00 85.00 1,993.25 46%
1,995.00 150.00 1995.00 67.00 891.10 31%
90.64 8.00 90.64 0.00 0.00 0%
3,314.85 231.00 3314.85 0.00 0.00 0%
0.00 0.00 0.00 4.00 147.12 100%
4,534.45 115.00 4534.45 0.00 0.00 0%
5,164.20 114.00 5164.20 0.00 0.00 0%
2,188.56 8.00 2188.56 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 36.00 6,513.48 100%
0.00 0.00 0.00 10.00 946.30 100%
0.00 0.00 0.00 4.00 473.32 100%
0.00 0.00 0.00 4.00 534.60 100%
0.00 0.00 0.00 3.00 430.95 100%
0.00 0.00 0.00 14.00 191.10 100%
0.00 0.00 0.00 4.00 5,207.40 100%
15,607.50 3.00 15607.50 1.00 5,202.50 25%
0.00 0.00 0.00 14.00 1,519.42 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 71.00 6731.51 0.00 0.00 0%
0.00 14.00 1210.72 0.00 0.00 0%
0.00 6.00 562.62 0.00 0.00 0%
0.00 8.00 893.36 0.00 0.00 0%
0.00 2.00 268.14 0.00 0.00 0%
0.00 58.00 6119.58 0.00 0.00 0%
0.00 18.00 2837.34 0.00 0.00 0%
0.00 1.00 139.20 0.00 0.00 0%
0.00 1.00 280.24 0.00 0.00 0%
0.00 1.00 86.83 0.00 0.00 0%
0.00 14.00 1399.30 0.00 0.00 0%
0.00 1.00 85.45 0.00 0.00 0%
0.00 1.00 54.17 0.00 0.00 0%
0.00 2.00 121.54 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 1,113.62 100%
0.00 0.00 0.00 2.00 2,149.84 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 11.00 811.91 100%
0.00 0.00 0.00 4.00 295.24 100%
0.00 0.00 0.00 8.00 922.48 100%
0.00 0.00 0.00 15.00 698.70 100%
0.00 0.00 0.00 8.00 236.64 100%
0.00 0.00 0.00 859.46 6,265.46 100%
0.00 0.00 0.00 4.00 435.24 100%
0.00 0.00 0.00 15.00 261.60 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 520.65 100%
0.00 0.00 0.00 1.00 157.65 100%
0.00 0.00 0.00 8.00 520.48 100%
0.00 0.00 0.00 4.00 168.88 100%
0.00 0.00 0.00 1.00 1,099.16 100%
0.00 0.00 0.00 0.00 0.00 100%
285.14 46.44 285.14 0.00 0.00 0%
207.07 28.25 207.07 0.00 0.00 0%
68.56 8.23 68.56 0.00 0.00 0%
320.37 39.65 320.37 0.00 0.00 0%
2,227.92 102.48 2227.92 0.00 0.00 0%
166.74 6.00 166.74 0.00 0.00 0%
95.72 4.00 95.72 0.00 0.00 0%
1,042.92 4.00 1042.92 0.00 0.00 0%
234.83 1.00 234.83 0.00 0.00 0%
1,411.63 1.00 1411.63 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
2,500.00 1.00 5000.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 2,950.00 100%
0.00 0.00 0.00 1.00 3,200.00 100%
0.00 0.00 0.00 1.00 2,900.00 100%
0.00 0.00 0.00 1.00 3,500.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.50 2500.00 0.50 2,500.00 50%
0.00 0.00 0.00 0.00 0.00 100%
2,251.46 4.00 4502.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
3,930.00 1,500.00 3930.00 0.00 0.00 0%
0.00 0.00 0.00 500.00 1,335.00 100%
3,314.13 1.00 3314.13 0.00 0.00 0%
0.00 0.00 0.00 1.00 2,776.88 100%
0.00 0.00 0.00 0.00 0.00 100%
34,947.29 1.00 34947.29 0.00 0.00 0%
67,446.92 1.00 67446.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
4,081.92 0.50 4081.92 0.50 4,081.92 50%

529,822.54 1,781,735.06 167,616.71


63,578.70 213,808.21 20,114.01
47,684.03 160,356.16 15,085.50
641,085.27 2,155,899.42 202,816.22
641,085.27 2,155,899.42 202,816.22
641,085.27 2,155,899.42 202,816.22
115,395.35 388,061.89 36,506.92
756,480.62 2,543,961.32 239,323.13
VALORIZACION N° 05
PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE NIVEL PRIMARIO DE LAS I.E. NRO 50346, 50372 y 50374, EN LAS COM
Subpresupuesto II.EE. NRO. 50346 - MAYUMBAMBA PARURO - CUSCO
CONTRATISTA:
FECHA DE INICIO 9/10/2018
PERIODO 12/1/2018 AL 12/31/2018
CONTRATO ACUMULADO ANTERIOR PRE
Item Descripción Und.
Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 248,901.17


01.01 OBRAS PRELIMINARES 27,083.85
01.01.01 CARTEL DE OBRA TIPO GIGANTOGRAFÍA 6.00x3.60m und 1.00 1,007.85 1,007.85 1.00 1007.85
01.01.02 CERCO PROVISIONAL DE CALAMINA, H=3.00m m 120.00 87.30 10,476.00 120.00 10476.00
01.01.03 OFICINAS m2 30.00 60.00 1,800.00 30.00 1800.00
01.01.04 COMEDOR m2 60.00 60.00 3,600.00 60.00 3600.00
01.01.05 ALMACÉN m2 100.00 60.00 6,000.00 100.00 6000.00
01.01.06 VESTUARIOS m2 60.00 60.00 3,600.00 60.00 3600.00
01.01.07 CASETA DE GUARDIANÍA m2 10.00 60.00 600.00 10.00 600.00
01.02 INSTALACIONES PROVISIONALES 4,500.00 0.00 0.00
01.02.01 INSTALACIONES PROVISIONALES DE AGUA Y DESAGÜE glb 1.00 2,000.00 2,000.00 1.00 2000.00
01.02.02 INSTALACIÓN PROVISIONAL DE ENERGÍA ELÉCTRICA glb 1.00 1,500.00 1,500.00 1.00 1500.00
01.02.03 INSTALACIÓN PROVISIONAL DE TELEFONÍA E INTERNET glb 1.00 1,000.00 1,000.00 1.00 1000.00
01.03 TRABAJOS PRELIMINARES 3,800.00 0.00 0.00
01.03.01 LIMPIEZA DE TERRENO MANUAL m2 5,000.00 0.76 3,800.00 5000.00 3800.00
01.04 TRAZO, NIVELES Y REPLANTEO 18,550.00 0.00 0.00
01.04.01 TRAZO Y REPLANTEO C/EQ. TOPOGRÁFICO* m2 7,000.00 2.65 18,550.00 7000.00 18550.00
01.05 TRANSPORTE DE MATERIALES, EQUIPO Y HERRAMIENTAS 167,107.52 0.00 0.00
01.05.01 FLETE TERRESTRE (TRANSPORTE DE MATERIALES).2 glb 1.00 140,000.00 140,000.00 0.90 126000.00 0.10
01.05.02 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO Y MAQUINglb 1.00 16,000.00 16,000.00 0.75 12000.00 0.25
01.05.03 MANIPULEO Y TRANSP. INTERNO DE MATERIALES, HERRAM
mes 4.00 2,776.88 11,107.52 3.00 8330.64 1.00
01.06 SEGURIDAD Y SALUD 27,859.80 0.00 0.00
01.06.01 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO (INC. EL glb 1.00 10,000.00 10,000.00 0.20 2000.00 0.40
01.06.02 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD glb 1.00 2,000.00 2,000.00 0.50 1000.00 0.50
01.06.03 VESTUARIO GENERAL und 50.00 200.00 10,000.00 40.00 8000.00 10.00
01.06.04 IMPLEMENTOS DE PROTECCIÓN DE MANOS Y PIES und 50.00 35.73 1,786.50 40.00 1429.20 10.00
01.06.05 IMPLEMENTOS DE PROTECCIÓN DE BOCA, OJOS Y OÍDOS und 50.00 22.62 1,131.00 40.00 904.80 10.00
01.06.06 IMPLEMENTOS DE SEGURIDAD PARA TRABAJOS EN ALTURund 10.00 218.13 2,181.30 0.00 0.00 10.00
01.06.07 IMPLEMENTOS DE SEGURIDAD PARA TRABAJOS ELÉCTRI und 10.00 76.10 761.00 0.00 0.00 8.00
02 ESTRUCTURAS 401,494.70 0.00 0.00
02.01 ESTRUCTURAS - BLOQUE A 147,698.73 0.00 0.00
02.01.01 MOVIMIENTO DE TIERRAS 6,950.96 0.00 0.00
02.01.01.01 EXCAVACION MASIVA EN TERRENO COMPACTO PARA C m3 61.57 2.67 164.39 61.57 164.39
02.01.01.02 EXCAVACION MANUAL DE TERRENO m3 95.18 31.73 3,020.06 95.18 3020.06
02.01.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON P m3 85.80 10.30 883.74 85.80 883.74
02.01.01.04 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 38.48 2.93 112.75 38.48 112.75
02.01.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON m3 110.14 25.15 2,770.02 110.14 2770.02
02.01.02 OBRAS DE CONCRETO SIMPLE 23,337.41 0.00 0.00
02.01.02.01 SOLADOS 1,052.81 0.00 0.00
02.01.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 38.48 27.36 1,052.81 38.48 1052.81
02.01.02.02 CIMIENTOS CORRIDOS 12,931.96 0.00 0.00
02.01.02.02.01 CIMIENTOS CORRIDOS 1:10+30% PG m3 49.50 221.76 10,977.12 49.50 10977.12
02.01.02.02.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORR m2 50.06 39.05 1,954.84 50.06 1954.84
02.01.02.03 SOBRECIMIENTOS 9,352.64 0.00 0.00
02.01.02.03.01 SOBRECIMIENTOS 1:8+25% PM m3 16.04 246.07 3,946.96 16.04 3946.96
02.01.02.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOSm2 128.34 42.12 5,405.68 128.34 5405.68
02.01.03 OBRAS DE CONCRETO ARMADO 117,410.36 0.00 0.00
02.01.03.01 ZAPATAS 8,772.14 0.00 0.00
02.01.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 19.24 325.03 6,253.58 19.24 6253.58
02.01.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 618.81 4.07 2,518.56 618.81 2518.56
02.01.03.02 VIGAS DE CONEXIÓN 21,448.26 0.00 0.00
02.01.03.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTAC m3 15.35 325.03 4,989.21 15.35 4989.21
02.01.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMEN m2 122.76 38.31 4,702.94 122.76 4702.94
02.01.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE kg 2888.48 4.07 11,756.11 2888.48 11756.11
02.01.03.03 COLUMNAS 25,553.10 0.00 0.00
02.01.03.03.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 12.88 380.77 4,904.32 12.88 4904.32
02.01.03.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 147.80 44.10 6,517.98 147.80 6517.98
02.01.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNASkg 3471.94 4.07 14,130.80 3471.94 14130.80
02.01.03.04 COLUMNETAS DE AMARRE 4,227.37 0.00 0.00
02.01.03.04.01 CONCRETO F'C=210 KG/CM2 PARA COLUMNETAS m3 2.50 356.39 890.98 2.50 890.98
02.01.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 52.36 44.10 2,309.08 52.36 2309.08
02.01.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETkg 252.41 4.07 1,027.31 252.41 1027.31
02.01.03.05 VIGAS 30,106.83 0.00 0.00
02.01.03.05.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 21.48 357.35 7,675.88 21.48 7675.88
02.01.03.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 216.69 50.66 10,977.52 216.69 10977.52
02.01.03.05.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 2814.11 4.07 11,453.43 2814.11 11453.43
02.01.03.06 LOSAS ALIGERADAS 17,841.24 0.00 0.00
02.01.03.06.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 13.60 341.75 4,647.80 13.60 4647.80
02.01.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS m2 161.04 40.99 6,601.03 161.04 6601.03
02.01.03.06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS AL kg 1200.47 4.07 4,885.91 1200.47 4885.91
02.01.03.06.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H m 422.40 4.04 1,706.50 422.40 1706.50
02.01.03.07 CANALETAS 9,461.42 0.00 0.00
02.01.03.07.01 CONCRETO f'c=210kg/cm2 PARA CANALETAS m3 9.43 357.35 3,369.81 9.43 3369.81
02.01.03.07.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS m2 63.87 50.66 3,235.65 63.87 3235.65
02.01.03.07.03 ACERO ESTRUCTURAL TRABAJADO PARA CANALETA kg 701.71 4.07 2,855.96 701.71 2855.96
02.02 ESTRUCTURAS - BLOQUE B 150,447.74 0.00 0.00
02.02.01 MOVIMIENTO DE TIERRAS 4,379.47 0.00 0.00
02.02.01.01 EXCAVACION MASIVA EN TERRENO COMPACTO PARA C m3 78.67 2.67 210.05 78.67 210.05
02.02.01.02 EXCAVACION MANUAL DE TERRENO m3 47.31 31.73 1,501.15 47.31 1501.15
02.02.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON m3 104.74 10.3 1,078.82 104.74 1078.82
02.02.01.04 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 89.86 2.93 263.29 89.86 263.29
02.02.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON m3 52.73 25.15 1,326.16 52.73 1326.16
02.02.02 OBRAS DE CONCRETO SIMPLE 13,889.38 0.00 0.00
02.02.02.01 SOLADOS 1,345.29 0.00 0.00
02.02.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 49.17 27.36 1,345.29 49.17 1345.29
02.02.02.02 CIMIENTOS CORRIDOS 11,038.77 0.00 0.00
02.02.02.02.01 CIMIENTOS CORRIDOS 1:10+30% PG m3 24.28 221.76 5,384.33 24.28 5384.33
02.02.02.02.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORR m2 144.80 39.05 5,654.44 144.80 5654.44
02.02.02.03 SOBRECIMIENTOS 1,505.32 0.00 0.00
02.02.02.03.01 SOBRECIMIENTOS 1:8+25% PM m3 1.21 246.07 297.74 1.21 297.74
02.02.02.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOSm2 28.67 42.12 1,207.58 28.67 1207.58
02.02.03 OBRAS DE CONCRETO ARMADO 132,178.89 0.00 0.00
02.02.03.01 ZAPATAS 12,100.63 0.00 0.00
02.02.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 24.58 325.03 7,989.24 24.58 7989.24
02.02.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 1010.17 4.07 4,111.39 1010.17 4111.39
02.02.03.02 VIGAS DE CONEXIÓN 24,444.25 0.00 0.00
02.02.03.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTAC m3 16.99 325.03 5,522.26 16.99 5522.26
02.02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMEN m2 135.90 38.31 5,206.33 135.90 5206.33
02.02.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE kg 3369.94 4.07 13,715.66 3369.94 13715.66
02.02.03.03 COLUMNAS 29,044.41 0.00 0.00
02.02.03.03.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 14.19 380.77 5,403.13 14.19 5403.13
02.02.03.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 162.87 44.10 7,182.57 162.87 7182.57
02.02.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNASkg 4043.91 4.07 16,458.71 4043.91 16458.71
02.02.03.04 COLUMNETAS DE AMARRE 4,508.82 0.00 0.00
02.02.03.04.01 CONCRETO F'C=210 KG/CM2 PARA COLUMNETAS m3 2.55 356.39 908.79 2.55 908.79
02.02.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 57.60 44.10 2,540.16 57.60 2540.16
02.02.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETkg 260.41 4.07 1,059.87 260.41 1059.87
02.02.03.05 VIGAS 30,211.47 0.00 0.00
02.02.03.05.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 22.44 357.35 8,018.93 22.44 8018.93
02.02.03.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 206.84 50.66 10,478.51 206.84 10478.51
02.02.03.05.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 2878.14 4.07 11,714.03 2878.14 11714.03
02.02.03.06 LOSAS ALIGERADAS 21,407.03 0.00 0.00
02.02.03.06.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 15.44 341.75 5,276.62 15.44 5276.62
02.02.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS m2 182.16 40.99 7,466.74 182.16 7466.74
02.02.03.06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS AL kg 1663.52 4.07 6,770.53 1663.52 6770.53
02.02.03.06.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H m 468.60 4.04 1,893.14 468.60 1893.14
02.02.03.07 CANALETAS 10,462.28 0.00 0.00
02.02.03.07.01 CONCRETO f'c=210kg/cm2 PARA CANALETAS m3 10.44 357.35 3,730.73 10.44 3730.73
02.02.03.07.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS m2 70.54 50.66 3,573.56 70.54 3573.56
02.02.03.07.03 ACERO ESTRUCTURAL TRABAJADO PARA CANALETA kg 775.92 4.07 3,157.99 775.92 3157.99
02.03 ESTRUCTURAS - BLOQUE C 45,086.11 0.00 0.00
02.03.01 MOVIMIENTO DE TIERRAS 1,168.38 0.00 0.00
02.03.01.01 EXCAVACION MASIVA EN TERRENO COMPACTO PARA C m3 18.43 2.67 49.21 18.43 49.21
02.03.01.02 EXCAVACION MANUAL DE TERRENO m3 15.65 31.73 496.57 15.65 496.57
02.03.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON m3 34.72 10.3 357.62 34.72 357.62
02.03.01.04 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 22.80 2.93 66.80 22.80 66.80
02.03.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON m3 7.88 25.15 198.18 7.88 198.18
02.03.02 OBRAS DE CONCRETO SIMPLE 5,364.28 0.00 0.00
02.03.02.01 SOLADOS 315.19 0.00 0.00
02.03.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 11.52 27.36 315.19 11.52 315.19
02.03.02.02 CIMIENTOS CORRIDOS 4,361.95 0.00 0.00
02.03.02.02.01 CIMIENTOS CORRIDOS 1:10+30% PG m3 10.24 221.76 2,270.82 10.24 2270.82
02.03.02.02.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORR m2 53.55 39.05 2,091.13 53.55 2091.13
02.03.02.03 SOBRECIMIENTOS 687.14 0.00 0.00
02.03.02.03.01 SOBRECIMIENTOS 1:8+25% PM m3 0.80 246.07 196.86 0.80 196.86
02.03.02.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOSm2 11.64 42.12 490.28 11.64 490.28
02.03.03 OBRAS DE CONCRETO ARMADO 38,553.45 0.00 0.00
02.03.03.01 ZAPATAS 2,636.23 0.00 0.00
02.03.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 5.76 325.03 1,872.17 5.76 1872.17
02.03.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 187.73 4.07 764.06 187.73 764.06
02.03.03.02 VIGAS DE CONEXIÓN 6,951.34 0.00 0.00
02.03.03.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTAC m3 5.20 325.03 1,690.16 5.20 1690.16
02.03.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMEN m2 37.80 38.31 1,448.12 37.80 1448.12
02.03.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE kg 936.87 4.07 3,813.06 936.87 3813.06
02.03.03.03 COLUMNAS 9,005.93 0.00 0.00
02.03.03.03.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 4.63 380.77 1,762.97 4.63 1762.97
02.03.03.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 53.04 44.10 2,339.06 53.04 2339.06
02.03.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNASkg 1204.89 4.07 4,903.90 1204.89 4903.90
02.03.03.04 COLUMNETAS DE AMARRE 2,637.15 0.00 0.00
02.03.03.04.01 CONCRETO F'C=210 KG/CM2 PARA COLUMNETAS m3 1.43 356.39 509.64 1.43 509.64
02.03.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 33.66 44.10 1,484.41 33.66 1484.41
02.03.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNETkg 158.01 4.07 643.10 158.01 643.10
02.03.03.05 VIGAS 10,581.72 0.00 0.00
02.03.03.05.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 6.36 357.35 2,272.75 6.36 2272.75
02.03.03.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 69.43 50.66 3,517.32 69.43 3517.32
02.03.03.05.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 1177.31 4.07 4,791.65 1177.31 4791.65
02.03.03.06 LOSAS ALIGERADAS 4,629.21 0.00 0.00
02.03.03.06.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 3.39 341.75 1,158.53 3.39 1158.53
02.03.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS m2 38.85 40.99 1,592.46 38.85 1592.46
02.03.03.06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS AL kg 356.44 4.07 1,450.71 356.44 1450.71
02.03.03.06.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H m 105.82 4.04 427.51 105.82 427.51
02.03.03.07 CANALETAS 2,111.87 0.00 0.00
02.03.03.07.01 CONCRETO f'c=210kg/cm2 PARA CANALETAS m3 2.06 357.35 736.14 2.06 736.14
02.03.03.07.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS m2 14.53 50.66 736.09 14.53 736.09
02.03.03.07.03 ACERO ESTRUCTURAL TRABAJADO PARA CANALETAS kg 157.16 4.07 639.64 157.16 639.64
02.04 MUROS DE SOSTENIMIENTO 47,327.13 0.00 0.00
02.04.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PLAN m2 181.96 2.93 533.14 181.96 533.14
02.04.02 SOLADO DE CONCRETO f'c=100 kg/cm2, E=2" / 5cm (Mezcla 1m2 181.96 14.76 2,685.73 181.96 2685.73
02.04.03 CONCRETO CICLÓPEO F'C=140 KG/CM2 + 50% DE PIEDRA m3 179.69 214.33 38,512.96 179.69 38512.96
02.04.04 EMBOQUILLADO CON CEMENTO/ARENA, 1:3, HASTA E=2" m2 209.21 16.88 3,531.46 167.37 2825.21 41.84
02.04.05 JUNTAS DE TECNOPORT DE E=1" - MUROS DE SOSTENIMI m2 71.99 12.60 907.07 71.99 907.07
02.04.06 SUMINISTRO E INSTALACIÓN DE LLORADEROS CON TUBER
m 224.18 5.16 1,156.77 224.18 1156.77
02.05 ESTRUCTURA - TANQUE ELEVADO DE AGUA 10,934.99 0.00 0.00
02.05.01 MOVIMIENTO DE TIERRAS 88.55 0.00 0.00
02.05.01.01 EXCAVACION MANUAL DE TERRENO m3 1.60 31.73 50.77 1.60 50.77
02.05.01.02 RELLENO CON MATERIAL PROPIO COMPACTADO CON P m3 1.04 10.30 10.71 1.04 10.71
02.05.01.03 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 1.00 2.93 2.93 1.00 2.93
02.05.01.04 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON m3 0.96 25.15 24.14 0.96 24.14
02.05.02 OBRAS DE CONCRETO SIMPLE 27.36 0.00 0.00
02.05.02.01 SOLADOS 27.36 0.00 0.00
02.05.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 1.00 27.36 27.36 1.00 27.36
02.05.03 OBRAS DE CONCRETO ARMADO 5,504.84 0.00 0.00
02.05.03.01 ZAPATAS 271.82 0.00 0.00
02.05.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 0.60 325.03 195.02 0.60 195.02
02.05.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 18.87 4.07 76.80 18.87 76.80
02.05.03.02 COLUMNAS 2,763.52 0.00 0.00
02.05.03.02.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 1.70 380.77 647.31 1.70 647.31
02.05.03.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 27.20 44.10 1,199.52 27.20 1199.52
02.05.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 225.23 4.07 916.69 225.23 916.69
02.05.03.03 VIGAS 1,766.94 0.00 0.00
02.05.03.03.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 1.56 357.35 557.47 1.56 557.47
02.05.03.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 17.68 50.66 895.67 17.68 895.67
02.05.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 77.10 4.07 313.80 77.10 313.80
02.05.03.04 LOSAS ALIGERADAS 702.56 0.00 0.00
02.05.03.04.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.57 341.75 194.80 0.57 194.80
02.05.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS m2 6.76 40.99 277.09 6.76 277.09
02.05.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIG kg 31.66 4.07 128.86 31.66 128.86
02.05.03.04.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H m 25.20 4.04 101.81 25.20 101.81
02.05.04 ACABADOS 5,314.24 0.00 0.00
02.05.04.01 CONTRAPISO DE 48 mm m2 10.09 26.94 271.82 10.09 271.82
02.05.04.02 CIELORRASO CON MEZCLA CEMENTO ARENA / 1:5 m2 10.09 44.24 446.38 10.09 446.38
02.05.04.03 TARRAJEO DE COLUMNAS-COLUMNETAS-PLACAS C:A/1:5m2 24.36 39.65 965.87 24.36 965.87
02.05.04.04 TARRAJEO DE VIGAS-CANALES C:A/1:5 (INC. ARISTAS) m2 28.64 46.87 1,342.36 28.64 1342.36
02.05.04.05 BRUÑAS m 17.64 5.14 90.67 17.64 90.67
02.05.04.06 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 63.09 11.05 697.14 63.09 697.14
02.05.04.07 ESCALERA METÁLICA TIPO GATO DE L=5.80m (INC. G und 1.00 1,500.00 1,500.00 1.00 1500.00
03 ARQUITECTURA 378,124.48 0.00 0.00
03.01 ARQUITECTURA - BLOQUE A 156,589.07 0.00 0.00
03.01.01 MUROS Y TABIQUES ALBAÑILERIA 20,745.84 0.00 0.00
03.01.01.01 MUROS DE LADRILLO 20,227.44 0.00 0.00
03.01.01.01.01 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE m2 145.78 119.04 17,353.65 145.78 17353.65
03.01.01.01.02 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE m2 1.39 79.08 109.92 1.39 109.92
03.01.01.01.03 MURO CARAVISTA DE SOGA (E=15CM) CON LADRILLO m2 39.45 70.06 2,763.87 39.45 2763.87
03.01.01.02 MUROS CON SISTEMA DE CONSTRUCCION EN SECO (DRYWALL) 256.26 0.00 0.00
03.01.01.02.01 SISTEMA DRYWALL DE UNA CARA SB 10mm, E=4.50cm m2 4.53 56.57 256.26 0.00 0.00 4.53
03.01.01.03 JUNTAS EN MUROS 262.14 0.00
03.01.01.03.01 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZA ( m 60.11 2.84 170.71 60.11 170.71
03.01.01.03.02 JUNTAS DE TECNOPORT DE E=1" - MURO DE SOGA (E= m 53.78 1.70 91.43 53.78 91.43
03.01.02 REVOQUES Y REVESTIMIENTOS 30,503.22 0.00 0.00
03.01.02.01 TARRAJEOS 29,781.34 0.00 0.00
03.01.02.01.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 75.22 18.60 1,399.09 75.22 1399.09
03.01.02.01.02 TARRAJEO EN INTERIORES CON MORTERO CEMENTO-A
m2 224.67 22.88 5,140.45 224.67 5140.45
03.01.02.01.03 TARRAJEO EN EXTERIORES CON MORTERO CEMENTO-m2 62.47 45.30 2,829.89 62.47 2829.89
03.01.02.01.04 TARRAJEO DE SUPERFICIE DE COLUMNAS-COLUMNETA
m2 89.64 39.65 3,554.23 89.64 3554.23
03.01.02.01.05 TARRAJEO DE SUPERFICIE DE VIGAS-CANALES-GARGOL
m2 242.81 46.87 11,380.50 242.81 11380.50
03.01.02.01.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y m 102.65 13.40 1,375.51 102.65 1375.51
03.01.02.01.07 BRUÑAS m 797.99 5.14 4,101.67 797.99 4101.67
03.01.02.02 JUNTAS DE CONSTRUCCIÓN 721.88 0.00 0.00
03.01.02.02.01 TAPAJUNTAS EN JUNTA DE DILATACIÓN DE TECHO (IN m 10.21 52.69 537.96 0.00 0.00 10.21
03.01.02.02.02 TAPAJUNTAS EN JUNTA DE DILATACIÓN VERTICAL (INC m 6.34 29.01 183.92 0.00 0.00 6.34
03.01.03 CIELORRASOS 4,463.01 0.00 0.00
03.01.03.01 CIELORRASOS CON YESO m2 179.96 24.80 4,463.01 179.96 4463.01
03.01.04 PISOS Y PAVIMENTOS 29,119.85 0.00 0.00
03.01.04.01 FALSO PISO 8,040.59 0.00 0.00
03.01.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON P m2 175.10 2.93 513.04 175.10 513.04
03.01.04.01.02 FALSO PISO MEZCLA C:H-1:6, E=8" (INCLUYE CAMA DE m2 175.10 42.99 7,527.55 175.10 7527.55
03.01.04.02 CONTRAPISO 7,135.87 0.00 0.00
03.01.04.02.01 CONTRAPISO DE 48 mm m2 264.88 26.94 7,135.87 264.88 7135.87
03.01.04.03 PISOS 13,943.39 0.00 0.00
03.01.04.03.01 PISO DE CEMENTO PULIDO 1:2, E=1CM m2 11.64 48.49 564.42 11.64 564.42
03.01.04.03.02 PISO DE CERAMICO DE 40X40CM m2 35.66 49.84 1,777.29 0.00 0.00 35.66
03.01.04.03.03 PISO DE MADERA MACHIMBRADA DE 4"x1"x10' (INC. L m2 127.80 90.78 11,601.68 0.00 0.00 127.80
03.01.05 ZOCALOS Y CONTRAZOCALOS 6,739.57 0.00 0.00
03.01.05.01 ZOCALOS 3,824.18 0.00 0.00
03.01.05.01.01 ZOCALO DE CERÁMICO DE 40X40CM m2 75.22 50.84 3,824.18 0.00 0.00 35.00
03.01.05.02 CONTRAZOCALOS 2,915.39 0.00 0.00
03.01.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO H=20CM m 89.34 14.30 1,277.56 0.00 0.00 89.34
03.01.05.02.02 CONTRAZÓCALO DE MADERA AGUANO DE 3/4" x H=1 m 78.44 20.88 1,637.83 0.00 0.00 36.00
03.01.06 COBERTURAS 33,039.39 0.00 0.00
03.01.06.01 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 36 m2 264.88 39.3 10,409.78 0.00 0.00 264.88
03.01.06.02 COBERTURA DE ESTRUCTURA METÁLICA CON POLICAR m2 35.18 202.19 7,113.04 0.00 0.00 30.00
03.01.06.03 COBERTURA DE ESTRUCTURA METÁLICA CON POLICARBm2 77.61 199.93 15,516.57 0.00 0.00 62.00
03.01.07 CARPINTERIA DE MADERA 20,867.97 0.00 0.00
03.01.07.01 PUERTAS 3,087.99 0.00 0.00
03.01.07.01.01 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA SI m2 6.62 225.65 1,493.80 0.00 0.00 6.62
03.01.07.01.02 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA CONm2 4.41 236.91 1,044.77 0.00 0.00 4.41
03.01.07.01.03 PUERTA EN DUCHAS CON MELAMINA DE 18MM m2 3.21 171.16 549.42 0.00 0.00 3.21
03.01.07.02 VENTANAS 6,969.71 0.00 0.00
03.01.07.02.01 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y m2 26.01 244.59 6,361.79 0.00 0.00 24.00
03.01.07.02.02 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y m2 2.55 238.40 607.92 0.00 0.00 2.30
03.01.07.03 MUEBLES 7,342.31 0.00 0.00
03.01.07.03.01 CLOSET DE AULA m2 21.66 338.98 7,342.31 0.00 0.00
03.01.07.04 SEPARADORES DE CUBICULOS EN BAÑOS 3,467.96 0.00 0.00
03.01.07.04.01 SEPARADOR DE CUBICULOS DE INODOROS CON ME m2 19.85 163.09 3,237.34 0.00 0.00
03.01.07.04.02 SEPARADORES DE CUBICULOS URINARIOS CON MEL m2 0.43 536.32 230.62 0.00 0.00
03.01.08 CERRAJERIA 400.02 0.00 0.00
03.01.08.01 ACCESORIOS DE BAÑOS 400.02 0.00 0.00
03.01.08.01.01 COLGADORES EN BAÑO und 4.00 20.42 81.68 0.00 0.00
03.01.08.01.02 BARRA DE APOYO DE ACERO INOXIDABLE und 2.00 159.17 318.34 0.00 0.00
03.01.09 VIDRIOS, CRISTALES Y SIMILARES 201.70 0.00 0.00
03.01.09.01 ESPEJO BISELADO DE SOBREPONER m2 1.89 106.72 201.70 0.00 0.00
03.01.10 PINTURA 8,459.84 0.00 0.00
03.01.10.01 PINTURA LATEX EN INTERIORES MUROS 2 MANOS m2 557.12 10.06 5,604.63 0.00 0.00 557.12
03.01.10.02 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 62.47 11.05 690.29 0.00 0.00 62.47
03.01.10.03 PINTURA LATEX EN CIELORASOS m2 179.96 12.03 2,164.92 0.00 0.00 179.96
03.01.11 OTROS 947.78 0.00 0.00
03.01.11.01 MESA DE C°A° REVESTIDO CON CERÁMICO DE 40X40CM m2 4.10 210.00 861.00 0.00 0.00 4.10
03.01.11.02 LIMPIEZA DE VIDRIOS, CRISTALES Y SIMILARES m2 30.45 2.85 86.78 0.00 0.00
03.01.12 SEÑALIZACIÓN 1,100.88 0.00 0.00
03.01.12.01 SEÑALIZACIÓN Y EQUIPO DE SEGURIDAD PARA INFRA glb 1 1100.88 1,100.88 0.00 0.00
03.02 ARQUITECTURA - BLOQUE B 167,095.96 0.00 0.00
03.02.01 MUROS Y TABIQUES ALBAÑILERIA 22,532.75 0.00 0.00
03.02.01.01 MUROS DE LADRILLO 21,130.37 0.00 0.00
03.02.01.01.01 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE m2 161.62 119.04 19,239.24 161.62 19239.24
03.02.01.01.02 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE m2 13.46 79.08 1,064.42 13.46 1064.42
03.02.01.01.03 MURO CARAVISTA DE SOGA (E=15CM) CON LADRILLO m2 11.8 70.06 826.71 11.80 826.71
03.02.01.02 MUROS CON SISTEMA DE CONSTRUCCION EN SECO (DRYWALL) 511.96 0.00 0.00
03.02.01.02.01 SISTEMA DRYWALL DE UNA CARA SB 10mm, E=4.50cm m2 9.05 56.57 511.96 0.00 0.00 9.05
03.02.01.03 JUNTAS EN MUROS 890.42 0.00 0.00
03.02.01.03.01 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZA ( m 294.09 2.84 835.22 294.09 835.22
03.02.01.03.02 JUNTAS DE TECNOPORT DE E=1" - MURO DE SOGA (E= m 32.47 1.7 55.20 32.47 55.20
03.02.02 REVOQUES Y REVESTIMIENTOS 30,781.50 0.00 0.00
03.02.02.01 TARRAJEOS 30,781.50 0.00 0.00
03.02.02.01.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 69.37 18.60 1,290.28 69.37 1290.28
03.02.02.01.02 TARRAJEO EN INTERIORES CON MORTERO CEMENTO-A
m2 255.55 22.88 5,846.98 255.55 5846.98
03.02.02.01.03 TARRAJEO EN EXTERIORES CON MORTERO CEMENTO-m2 73.64 45.3 3,335.89 73.64 3335.89
03.02.02.01.04 TARRAJEO DE SUPERFICIE DE COLUMNAS-COLUMNETA
m2 92.12 39.65 3,652.56 92.12 3652.56
03.02.02.01.05 TARRAJEO DE SUPERFICIE DE VIGAS-CANALES-GARGOL
m2 260.96 46.87 12,231.20 260.96 12231.20
03.02.02.01.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y m 122.00 13.40 1,634.80 122.00 1634.80
03.02.02.01.07 BRUÑAS m 542.76 5.14 2,789.79 542.76 2789.79
03.02.03 CIELORRASOS 4,969.92 0.00 0.00
03.02.03.01 CIELORRASOS CON YESO m2 200.40 24.80 4,969.92 160.40 3977.92 40.00
03.02.04 PISOS Y PAVIMENTOS 31,309.47 0.00 0.00
03.02.04.01 FALSO PISO 8,614.59 0.00 0.00
03.02.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 187.6 2.93 549.67 187.60 549.67
03.02.04.01.02 FALSO PISO MEZCLA C:H-1:6, E=8" (INCLUYE CAMA DE m2 187.60 42.99 8,064.92 187.60 8064.92
03.02.04.02 CONTRAPISO 7,863.52 0.00 0.00
03.02.04.02.01 CONTRAPISO DE 48 mm m2 291.89 26.94 7,863.52 291.89 7863.52
03.02.04.03 PISOS 14,831.36 0.00 0.00
03.02.04.03.01 PISO DE CEMENTO PULIDO 1:2, E=1CM m2 19.23 48.49 932.46 19.23 932.46
03.02.04.03.02 PISO DE CERAMICO DE 40X40CM m2 33.87 49.84 1,688.08 0.00 0.00 33.87
03.02.04.03.03 PISO DE MADERA MACHIMBRADA DE 4"x1"x10' (INC. L m2 134.51 90.78 12,210.82 0.00 0.00 134.51
03.02.05 ZOCALOS Y CONTRAZOCALOS 6,624.29 0.00 0.00
03.02.05.01 ZOCALOS 3,526.77 0.00 0.00
03.02.05.01.01 ZOCALO DE CERÁMICO DE 40X40CM m2 69.37 50.84 3,526.77 0.00 0.00 50.00
03.02.05.02 CONTRAZOCALOS 3,097.52 0.00 0.00
03.02.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO H=20CM m 97.5 14.3 1,394.25 0.00 0.00 97.50
03.02.05.02.02 CONTRAZOCALO DE CERAMICO DE 40X40CM, H=10CMm 18.17 16.15 293.45 0.00 0.00 18.17
03.02.05.02.03 CONTRAZÓCALO DE MADERA AGUANO DE 3/4" x H=1 m 67.52 20.88 1,409.82 0.00 0.00 47.00
03.02.06 COBERTURAS 37,953.95 0.00 0.00
03.02.06.01 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 36X m2 291.89 39.30 11,471.28 0.00 0.00 291.89
03.02.06.02 COBERTURA DE ESTRUCTURA METÁLICA CON POLICAR m2 61.80 151.37 9,354.67 31.80 4813.57 30.00
03.02.06.03 COBERTURA DE ESTRUCTURA METÁLICA CON POLICARBm2 85.67 199.93 17,128.00 45.67 9130.80 40.00
03.02.07 CARPINTERIA DE MADERA 19,579.54 0.00 0.00
03.02.07.01 PUERTAS 5,045.08 0.00 0.00
03.02.07.01.01 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA SI m2 6.62 225.65 1,493.80 0.00 0.00 6.62
03.02.07.01.02 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA COm2 14.99 236.91 3,551.28 0.00 0.00 14.99
03.02.07.02 VENTANAS 7,848.15 0.00 0.00
03.02.07.02.01 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y m2 30.43 244.59 7,442.87 0.00 0.00 15.00
03.02.07.02.02 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y m2 1.70 238.40 405.28 0.00 0.00 1.50
03.02.07.03 MOBILIARIO 5,453.35 0.00 0.00
03.02.07.03.01 MUEBLES ALTOS - REPOSTEROS C/PUERTAS m2 3.07 338.98 1,040.67 0.00 0.00
03.02.07.03.02 SUBDIVISIONES Y PUERTAS PARA MUEBLES BAJOS m2 2.66 296.61 788.98 0.00 0.00
03.02.07.03.03 ARCHIVO OFICINA DIRECTOR m2 10.69 338.98 3,623.70 0.00 0.00
03.02.07.04 SEPARADORES DE CUBICULOS EN BAÑOS 1,232.96 0.00 0.00
03.02.07.04.01 SEPARADOR DE CUBICULOS DE INODOROS CON ME m2 7.56 163.09 1,232.96 0.00 0.00
03.02.08 CERRAJERIA 359.18 0.00 0.00
03.02.08.01 ACCESORIOS DE BAÑOS 359.18 0.00 0.00
03.02.08.01.01 COLGADORES EN BAÑO und 2 20.42 40.84 0.00 0.00
03.02.08.01.02 BARRA DE APOYO DE ACERO INOXIDABLE und 2.00 159.17 318.34 0.00 0.00
03.02.09 VIDRIOS, CRISTALES Y SIMILARES 81.11 0.00 0.00
03.02.09.01 ESPEJO BISELADO DE SOBREPONER m2 0.76 106.72 81.11 0.00 0.00
03.02.10 PINTURA 9,341.31 0.00 0.00
03.02.10.01 PINTURA LATEX EN INTERIORES MUROS 2 MANOS m2 608.03 10.06 6,116.78 0.00 0.00 608.03
03.02.10.02 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 73.64 11.05 813.72 0.00 0.00 73.64
03.02.10.03 PINTURA LATEX EN CIELORASOS m2 200.40 12.03 2,410.81 0.00 0.00 200.40
03.02.11 OTROS 3,562.94 0.00 0.00
03.02.11.01 MESA DE C°A° REVESTIDO CON CERÁMICO DE 40X40CM m2 16.52 210.00 3,469.20 0.00 0.00 16.52
03.02.11.02 LIMPIEZA DE VIDRIOS, CRISTALES Y SIMILARES m2 32.89 2.85 93.74 0.00 0.00
03.03 ARQUITECTURA - BLOQUE C 54,439.45 0.00 0.00
03.03.01 MUROS Y TABIQUES ALBAÑILERIA 9,075.67 0.00 0.00
03.03.01.01 MUROS DE LADRILLO 8,559.26 0.00 0.00
03.03.01.01.01 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE m2 27.66 119.04 3,292.65 27.66 3292.65
03.03.01.01.02 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE m2 57.81 79.08 4,571.61 57.81 4571.61
03.03.01.01.03 MURO CARAVISTA DE SOGA (E=15CM) CON LADRILLO m2 9.92 70.06 695.00 9.92 695.00
03.03.01.02 MUROS CON SISTEMA DE CONSTRUCCION EN SECO (DRYWALL) 128.41 0.00 0.00
03.03.01.02.01 SISTEMA DRYWALL DE UNA CARA SB 10mm, E=4.50cm m2 2.27 56.57 128.41 0.00 0.00 2.27
03.03.01.03 JUNTA MUROS 388.00 0.00 0.00
03.03.01.03.01 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZA ( m 66.32 2.84 188.35 66.32 188.35
03.03.01.03.02 JUNTAS DE TECNOPORT DE E=1" - MURO DE SOGA (E= m 117.44 1.70 199.65 117.44 199.65
03.03.02 REVOQUES Y REVESTIMIENTOS 12,167.95 0.00 0.00
03.03.02.01 TARRAJEOS 12,167.95 0.00 0.00
03.03.02.01.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 49.95 18.60 929.07 49.95 929.07
03.03.02.01.02 TARRAJEO EN INTERIORES CON MORTERO CEMENTO-A
m2 122.60 22.88 2,805.09 122.60 2805.09
03.03.02.01.03 TARRAJEO EN EXTERIORES CON MORTERO CEMENTO-m2 27.66 45.30 1,253.00 27.66 1253.00
03.03.02.01.04 TARRAJEO DE SUPERFICIE DE COLUMNAS-COLUMNETA
m2 37.71 39.65 1,495.20 37.71 1495.20
03.03.02.01.05 TARRAJEO DE SUPERFICIE DE VIGAS-CANALES-GARGOL
m2 62.05 46.87 2,908.28 62.05 2908.28
03.03.02.01.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y m 62.97 13.40 843.80 62.97 843.80
03.03.02.01.07 BRUÑAS m 376.17 5.14 1,933.51 376.17 1933.51
03.03.03 CIELORRASOS 1,234.79 0.00 0.00
03.03.03.01 CIELORRASOS CON YESO m2 49.79 24.80 1,234.79 49.79 1234.79
03.03.04 PISOS Y PAVIMENTOS 5,977.52 0.00 0.00
03.03.04.01 FALSO PISO 1,691.23 0.00 0.00
03.03.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON P m2 36.83 2.93 107.91 36.83 107.91
03.03.04.01.02 FALSO PISO MEZCLA C:H-1:6, E=8" (INCLUYE CAMA DE m2 36.83 42.99 1,583.32 0.00 0.00 36.83
03.03.04.02 CONTRAPISO 1,851.86 0.00 0.00
03.03.04.02.01 CONTRAPISO DE 48 mm m2 68.74 26.94 1,851.86 68.74 1851.86
03.03.04.03 PISOS 2,434.43 0.00 0.00
03.03.04.03.01 PISO DE CEMENTO PULIDO 1:2, E=1CM m2 4.04 48.49 195.90 4.04 195.90
03.03.04.03.02 PISO DE CERAMICO DE 40X40CM m2 18.03 49.84 898.62 0.00 0.00 18.03
03.03.04.03.03 PISO DE MADERA MACHIMBRADA DE 4"x1"x10' (INC. L m2 14.76 90.78 1,339.91 0.00 0.00 14.76
03.03.05 ZOCALOS Y CONTRAZOCALOS 3,595.56 0.00 0.00
03.03.05.01 ZOCALOS 2,539.46 0.00 0.00
03.03.05.01.01 ZOCALO DE CERÁMICO DE 40X40CM m2 49.95 50.84 2,539.46 0.00 0.00 49.95
03.03.05.02 CONTRAZOCALOS 1,056.10 0.00 0.00
03.03.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO H=20CM m 30.87 14.30 441.44 0.00 0.00 30.87
03.03.05.02.02 CONTRAZOCALO DE CERAMICO DE 40X40CM, H=10CM m 11.18 16.15 180.56 0.00 0.00 11.18
03.03.05.02.03 CONTRAZÓCALO DE MADERA AGUANO DE 3/4" x H=1 m 20.79 20.88 434.10 0.00 0.00
03.03.06 COBERTURAS 2,701.48 0.00 0.00
03.03.06.01 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 36X m2 68.74 39.30 2,701.48 0.00 0.00 68.74
03.03.07 CARPINTERIA DE MADERA 13,581.25 0.00 0.00
03.03.07.01 PUERTAS 4,728.15 0.00 0.00
03.03.07.01.01 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA SIN m2 3.97 225.65 895.83 0.00 0.00 3.97
03.03.07.01.02 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA CONm2 14.11 236.91 3,342.80 0.00 0.00 14.11
03.03.07.01.03 PUERTA EN DUCHAS CON MELAMINA DE 18MM m2 2.86 171.16 489.52 0.00 0.00 2.86
03.03.07.02 VENTANAS 3,002.71 0.00 0.00
03.03.07.02.01 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y m2 5.21 244.59 1,274.31 0.00 0.00 5.00
03.03.07.02.02 VENTANA DE MADERA C/REJILLA DE PROTECIÓN Y m2 7.25 238.40 1,728.40 0.00 0.00 6.80
03.03.07.03 MUEBLES 5,850.39 0.00 0.00
03.03.07.03.01 MUEBLES ALTOS - REPOSTEROS C/PUERTAS m2 6.46 338.98 2,189.81 0.00 0.00
03.03.07.03.02 SUBDIVISIONES Y PUERTAS PARA MUEBLES BAJOS m2 5.29 296.61 1,569.07 0.00 0.00
03.03.07.03.03 ROPERO VIVIENDA DOCENTES m2 6.17 338.98 2,091.51 0.00 0.00
03.03.08 CERRAJERIA 20.42 0.00 0.00
03.03.08.01 ACCESORIOS DE BAÑOS 20.42 0.00 0.00
03.03.08.01.01 COLGADORES EN BAÑO und 1.00 20.42 20.42 0.00 0.00
03.03.09 VIDRIOS, CRISTALES Y SIMILARES 81.11 0.00 0.00
03.03.09.01 ESPEJO BISELADO DE SOBREPONER m2 0.76 106.72 81.11 0.00 0.00
03.03.10 PINTURA 3,141.55 0.00 0.00
03.03.10.01 PINTURA LATEX EN INTERIORES MUROS 2 MANOS m2 222.36 10.06 2,236.94 0.00 0.00 222.36
03.03.10.02 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 27.66 11.05 305.64 0.00 0.00 27.66
03.03.10.03 PINTURA LATEX EN CIELORASOS m2 49.79 12.03 598.97 0.00 0.00 49.79
03.03.11 OTROS 2,862.15 0.00 0.00
03.03.11.01 MESA DE C°A° REVESTIDO CON CERÁMICO DE 40X40CM m2 13.45 210.00 2,824.50 0.00 0.00 13.45
03.03.11.02 LIMPIEZA DE VIDRIOS, CRISTALES Y SIMILARES m2 13.21 2.85 37.65 0.00 0.00
04 TRATAMIENTO EXTERIOR 412,551.08 0.00 0.00
04.01 MOVIMIENTO DE TIERRAS Y DEMOLICIONES 59,859.81 0.00 0.00
04.01.01 DEMOLICIONES 34,225.52 0.00 0.00
04.01.01.01 DEMOLICIÓN DE EDIFICACIONES DE ALBAÑILERIA DE m2 403.27 34.57 13,941.04 403.27 13941.04
04.01.01.02 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON m3 806.54 25.15 20,284.48 806.54 20284.48
04.01.02 EXCAVACION 3,358.88 0.00
04.01.02.01 EXCAVACION A MAQUINA EN TERRENO NORMAL m3 316.8 2.67 845.86 316.80 845.86
04.01.02.02 EXCAVACION MANUAL DE TERRENO m3 79.20 31.73 2,513.02 79.20 2513.02
04.01.03 RELLENO 22,275.41 0.00 0.00
04.01.03.01 CARGUIO Y TRANSPORTE DE MATERIAL DE PRÉSTAMO m3 297.52 27.8 8,271.06 297.52 8271.06
04.01.03.02 RELLENO COMPACTADO CON MATERIAL PROPIO CON PLm3 495 7.91 3,915.45 495.00 3915.45
04.01.03.03 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAMO m3 297.52 33.91 10,088.90 297.52 10088.90
04.02 SARDINELES Y GRADERIAS 23,544.60 0.00 0.00
04.02.01 SARDINELES 20,591.70 0.00 0.00
04.02.01.01 PERFILADO DE ZANJA PARA SARDINEL m2 53.24 1.70 90.51 53.24 90.51
04.02.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 319.41 39.33 12,562.40 319.41 12562.40
04.02.01.03 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZCL m3 23.96 301.36 7,220.59 22.99 6928.27 0.97
04.02.01.04 JUNTAS ASFALTICAS + TECNOPORT, E=1/2" m 119.70 6.00 718.20 60.00 360.00 59.70
04.02.02 GRADAS 2,952.90 0.00 0.00
04.02.02.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 39.31 2.93 115.18 39.31 115.18
04.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 21.32 39.33 838.52 21.32 838.52
04.02.02.03 EMPEDRADO DE PISO PARA VACIADO, E=6"/15CM m2 52.92 15.17 802.80 52.92 802.80
04.02.02.04 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZCL m3 3.97 301.36 1,196.40 3.97 1196.40
04.03 RAMPAS, PISOS Y PAVIMENTOS 91,508.77 0.00 0.00
04.03.01 RAMPA CON PISO DE CONCRETO BRUÑADO 5,712.31 0.00 0.00
04.03.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 74.03 2.93 216.91 74.03 216.91
04.03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 41.72 39.33 1,640.85 41.72 1640.85
04.03.01.03 EMPEDRADO DE VEREDAS 6" / 15CM m2 74.03 15.17 1,123.04 74.03 1123.04
04.03.01.04 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZCL m3 6.29 301.36 1,895.55 6.29 1895.55
04.03.01.05 BRUÑAS EN VEREDAS m 133.35 2.56 341.38 133.35 341.38
04.03.01.06 JUNTAS ASFALTICAS + TECNOPORT, E=1/2" m 82.43 6.00 494.58 0.00 0.00 82.43
04.03.02 PISO DE CONCRETO BRUÑADO 41,393.95 0.00 0.00
04.03.02.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 774.68 2.93 2,269.81 774.68 2269.81
04.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 61.15 39.33 2,405.03 61.15 2405.03
04.03.02.03 EMPEDRADO DE VEREDAS 6" / 15CM m2 774.68 15.17 11,751.90 774.68 11751.90
04.03.02.04 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZCL m3 60.87 301.36 18,343.78 60.87 18343.78
04.03.02.05 BRUÑAS EN VEREDAS m 1,950.27 2.56 4,992.69 1950.27 4992.69
04.03.02.06 JUNTAS ASFALTICAS + TECNOPORT, E=1/2" m 271.79 6.00 1,630.74 0.00 0.00 271.79
04.03.03 PISO DE CONFITILLO 2,741.28 0.00 0.00
04.03.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 300.25 2.93 879.73 0.00 0.00 300.25
04.03.03.02 PISO DE CONFITILLO E=2" (RIPIO/PIEDRA CHANCADA) m2 300.25 6.20 1,861.55 0.00 0.00 300.25
04.03.04 LOSA MULTIUSO 40,247.44 0.00 0.00
04.03.04.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 429.00 2.93 1,256.97 429.00 1256.97
04.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 58.30 39.33 2,292.94 58.30 2292.94
04.03.04.03 ACERO DE TEMPERATURA 1/4"MALLA DE 0.30X0.30M kg 716.38 4.29 3,073.27 716.38 3073.27
04.03.04.04 PASADORES DE ACERO DE Ø 5/8" x 0.65M@0.50M kg 588.13 3.97 2,334.88 588.13 2334.88
04.03.04.05 CONCRETO F'C=210 KG/CM2 (MEZCLA 1:5) CON MEZCL m3 85.80 325.03 27,887.57 85.80 27887.57
04.03.04.06 JUNTAS ASFALTICAS + TECNOPORT, E=1" m 291.50 11.67 3,401.81 291.50 3401.81
04.03.05 ÁREAS VERDES 1,413.79 0.00 0.00
04.03.05.01 CARGUIO Y TRANSPORTE DE TIERRA DE CULTIVO CON Em3 12.1 51.39 621.82 0.00 0.00 12.10
04.03.05.02 PREPARACION DEL TERRENO CON TIERRA VEGETAL m3 12.1 28.74 347.75 0.00 0.00 12.10
04.03.05.03 SEMBRADO DE GRASS m2 121.04 3.67 444.22 0.00 0.00 80.00
04.04 OBRAS DE CONCRETO 17,572.44 0.00 0.00
04.04.01 TRIBUNAS 17,437.05 0.00 0.00
04.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 60.42 2.93 177.03 60.42 177.03
04.04.01.02 CONCRETO CICLÓPEO F'C=140 KG/CM2 + 50% DE PIED m3 63.87 214.33 13,689.26 63.87 13689.26
04.04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 32.22 39.33 1,267.21 32.22 1267.21
04.04.01.04 CONCRETO F'C=175 KG/CM2 CON EQUIPO m3 3.88 342.91 1,330.49 3.88 1330.49
04.04.01.05 EMBOQUILLADO CON CEMENTO/ARENA, 1:3, HASTA E=2"m2 32.22 16.88 543.87 32.22 543.87
04.04.01.06 BRUÑAS EN VEREDAS m 52.92 2.56 135.48 52.92 135.48
04.04.01.07 JUNTAS DE TECNOPORT DE E=1" - MUROS DE SOSTENI m2 23.31 12.60 293.71 23.31 293.71
04.04.02 DADO DE CONCRETO - PLATO DE INTERNET 135.39 0.00 0.00
04.04.02.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 0.38 2.93 1.11 0.00 0.00 0.38
04.04.02.02 CONCRETO CICLÓPEO F'C=140 KG/CM2 + 50% DE PIED m3 0.38 214.33 81.45 0.00 0.00 0.38
04.04.02.03 CONCRETO F'C=175 KG/CM2 CON EQUIPO m3 0.03 342.91 10.29 0.00 0.00 0.03
04.04.02.04 EMBOQUILLADO CON CEMENTO/ARENA, 1:3, HASTA E=2"m2 2.52 16.88 42.54 0.00 0.00 2.52
04.05 PORTAL DE INGRESO 14,914.12 0.00 0.00
04.05.01 MOVIMIENTO DE TIERRAS 557.85 0.00 0.00
04.05.01.01 EXCAVACION MANUAL DE TERRENO m3 4.91 31.73 155.79 4.91 155.79
04.05.01.02 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 3.07 2.93 9.00 3.07 9.00
04.05.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON P m3 3.16 10.3 32.55 3.16 32.55
04.05.01.04 ACARREO DE MATERIAL EXCEDENTE CON BUGUI (D<=10m3 8.06 18.33 147.74 8.06 147.74
04.05.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE CON m3 8.46 25.15 212.77 8.46 212.77
04.05.02 OBRAS DE CONCRETO ARMADO 6,714.47 0.00 0.00
04.05.02.01 SOLADO DE CONCRETO f'c=100 kg/cm2, E=4" / 10cm (Mezclm2 3.07 29.46 90.44 3.07 90.44
04.05.02.02 ACERO DE REFUERZO CORRUGADO Fy=4200 KG/CM2 - kg 629.14 4.07 2,560.60 629.14 2560.60
04.05.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 29.61 44.10 1,305.80 29.61 1305.80
04.05.02.04 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA (INm2 12.81 40.99 525.08 12.81 525.08
04.05.02.05 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H=1 m 27.73 4.04 112.03 27.73 112.03
04.05.02.06 CONCRETO F'C=210 KG/CM2 (MEZCLA 1:5) CON MEZCL m3 5.95 356.39 2,120.52 2.98 1062.04 2.97
04.05.03 MUROS DE LADRILLO 675.97 0.00 0.00
04.05.03.01 CIMIENTO CORRIDO 1:10 + 30% PIEDRA GRANDE m3 0.55 221.76 121.97 0.55 121.97
04.05.03.02 SOBRECIMIENTO 1:8 + 25% PIEDRA MEDIANA m3 0.14 246.07 34.45 0.14 34.45
04.05.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 1.1 42.12 46.33 1.10 46.33
04.05.03.04 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DE 9 m2 3.81 119.04 453.54 0.00 0.00 3.81
04.05.03.05 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZA (E=m 6.93 2.84 19.68 0.00 0.00 6.93
04.05.04 ACABADOS 3,417.43 0.00 0.00
04.05.04.01 TARRAJEO EN EXTERIORES CON MORTERO CEMENTO-AR
m2 7.62 45.30 345.19 0.00 0.00 7.62
04.05.04.02 TARRAJEO DE COLUMNAS-COLUMNETAS-PLACAS C:A/1:5m2 22.05 39.65 874.28 0.00 0.00 22.05
04.05.04.03 TARRAJEO DE VIGAS-CANALES C:A/1:5 (INC. ARISTAS) m2 3.54 46.87 165.92 0.00 0.00 3.54
04.05.04.04 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y m 9.45 13.40 126.63 0.00 0.00 9.45
04.05.04.05 BRUÑAS m 22.42 5.14 115.24 0.00 0.00 22.42
04.05.04.06 CIELORRASO CON MEZCLA CEMENTO ARENA / 1:5 m2 12.81 44.24 566.71 0.00 0.00 12.81
04.05.04.07 CONTRAPISO DE 48 mm m2 12.81 26.94 345.10 0.00 0.00 12.81
04.05.04.08 CONTRAZOCALO DE CEMENTO PULIDO H=10CM m 9.98 13.69 136.63 0.00 0.00 9.98
04.05.04.09 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 36X m2 12.81 39.3 503.43 0.00 0.00
04.05.04.10 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 7.62 11.05 84.20 0.00 0.00
04.05.04.11 PINTURA LATEX EN CIELORASOS m2 12.81 12.03 154.10 0.00 0.00
04.05.05 CARPINTERIA METALICA 3,548.40 0.00 0.00
04.05.05.01 PUERTA DE CERCO PERIMÉTRICO DE DOBLE HOJA DE H und 1.00 3,548.40 3,548.40 0.00 0.00
04.06 CERCO PERIMETRICO 160,538.90 0.00 0.00
04.06.01 CERCO DE REJAS CON ANGULAR DE ACERO DE 1½" x 1½"m 271.6 483.65 131,359.34 150.00 72547.50 121.60
04.06.02 CERCO DE MURO CARAVISTA DE CABEZA DE H=3.00M, CO m 21.40 923.30 19,758.62 0.00 0.00 21.40
04.06.03 SUMIN. E INSTAL. CERCO VIVO H=2.00M (C/POSTES DE R m 230.51 40.87 9,420.94 0.00 0.00 180.00
04.07 CARPINTERIA METALICA 19,798.81 0.00 0.00
04.07.01 BARANDA CON TUBO DE ACERO LAC Ø 1½"x2.00mm + Fe LIm 155.98 65.07 10,149.62 78.00 5075.46 55.00
04.07.02 BARANDA CON TUBO DE ACERO LAC Ø 1½"x2.00mm + Fe L m 33.00 46.73 1,542.09 17.00 794.41 10.00
04.07.03 TAPA DE REJILLA METÁLICA PARA CANAL DE EVACUACIÓN m 56.12 144.46 8,107.10 56.12 8107.10
04.08 OTROS 24,813.63 0.00 0.00
04.08.01 ASTA DE BANDERA (INC. PEDESTAL) und 1.00 1,267.34 1,267.34 0.00 0.00
04.08.02 JUEGOS INFANTILES DE ACUERDO A PLANOS (INC. APOYOglb 1.00 16,936.01 16,936.01 0.00 0.00 1.00
04.08.03 ARCO DE FULBITO CON TABLERO DE BASQUET (INC. APOYund 2.00 1,694.91 3,389.82 0.00 0.00 1.50
04.08.04 NED DE VOLEY DE ACUERDO A PLANOS (INC. APOYOS Y P und 1.00 1,017.07 1,017.07 0.00 0.00
04.08.05 LETRERO CON EL NOMBRE DE LA INSTITUCIÓN EDUCATIVund 1.00 1,694.92 1,694.92 0.00 0.00
04.08.06 PLACA RECORDATORIA und 1.00 508.47 508.47 0.00 0.00
05 INSTALACIONES SANITARIAS 131,843.21 0.00 0.00
05.01 APARATOS Y ACCESORIOS SANITARIOS 8,688.00 0.00 0.00
05.01.01 URINARIOS 752.16 0.00 0.00
05.01.01.01 Urinario de losa pza 3.00 250.72 752.16 0.00 0.00 1.00
05.01.02 INODOROS 2,398.76 0.00 0.00
05.01.02.01 Inodoro tanque bajo pza 7.00 342.68 2,398.76 0.00 0.00 3.00
05.01.03 LAVATORIOS 2,737.28 0.00 0.00
05.01.03.01 Lavatorio ceramico vitrificado tipo Ovalin de 35 x 55 cm pza 4.00 236.34 945.36 0.00 0.00 1.00
05.01.03.02 Lavatorio ceramico vitrificado de 20"x18" con pedestal pza 3.00 290.61 871.83 0.00 0.00 1.00
05.01.03.03 Lavadero de acero Inox. de 18" x 20" de una poza (B-9) pza 2.00 319.46 638.92 0.00 0.00 1.00
05.01.03.04 Lavadero de acero Inox. de 80 x 50 CM de una poza con escupza 1.00 281.17 281.17 0.00 0.00 1.00
05.01.04 GRIFERIA 2,256.69 0.00 0.00
05.01.04.01 Grifo para lavatorio de una llave pza 7.00 192.78 1,349.46 0.00 0.00
05.01.04.02 Grifo Cromado tipo cuello de ganso de una llave pza 3.00 186.35 559.05 0.00 0.00
05.01.04.03 Ducha cromada con llave mezcladora pza 3.00 116.06 348.18 0.00 0.00
05.01.05 ACCESORIOS SANITARIOS 543.11 0.00 0.00
05.01.05.01 Papelera de loza blanca de 0.13x0.15 pza 7.00 43.73 306.11 0.00 0.00
05.01.05.02 Toallera de gancho pza 3.00 39.50 118.50 0.00 0.00
05.01.05.03 Jabonera pza 3.00 39.50 118.50 0.00 0.00
05.02 SISTEMA DE DESAGUE Y VENTILACION 30,459.84 0.00 0.00
05.02.01 SISTEMA DE DESAGUE 1,813.32 0.00 0.00
05.02.01.01 Salida de desagüe inodoros 4" pto 7.00 47.97 335.79 7.00 335.79
05.02.01.02 Salida de desagüe urinarios pto 3.00 36.60 109.80 3.00 109.80
05.02.01.03 Salida de desagüe lavatorios 2" pto 10.00 34.52 345.20 10.00 345.20
05.02.01.04 Salida de desague Duchas 2" pto 3.00 34.58 103.74 3.00 103.74
05.02.01.05 Salida de desague sumideros 2" pto 9.00 33.42 300.78 9.00 300.78
05.02.01.06 Salida de desague sumideros 3" pto 3.00 61.94 185.82 3.00 185.82
05.02.01.07 Salida de desague para registro roscado de 4" pto 11.00 39.29 432.19 11.00 432.19
05.02.02 SISTEMA DE REDES DE DESAGUE 6,380.69 0.00 0.00
05.02.02.01 Red colectora PVC para desague de 6" m 16.50 25.13 414.65 0.00 0.00 16.50
05.02.02.02 Red colectora PVC para desagüe de 4" m 297.00 17.16 5,096.52 297.00 5096.52
05.02.02.03 Red colectora PVC para desague de 3" m 14.44 10.11 145.99 0.00 0.00 14.44
05.02.02.04 Red colectora PVC para desague de 2" m 115.95 6.24 723.53 115.95 723.53
05.02.03 ACCESORIOS VARIOS 4,195.53 0.00 0.00
05.02.03.01 Sumidero cromado de 2" und 9.00 21.43 192.87 0.00 0.00 9.00
05.02.03.02 Sumidero cromado de 3" und 3.00 24.91 74.73 0.00 0.00 3.00
05.02.03.03 Registro roscado Ø 4" und 11.00 24.29 267.19 0.00 0.00 11.00
05.02.03.04 Uniones Yee de 2"x 2" und 16.00 17.45 279.20 16.00 279.20
05.02.03.05 Uniones Yee de 4"x 2" und 24.00 17.45 418.80 24.00 418.80
05.02.03.06 Uniones Yee de 4"x 3" und 12.00 17.88 214.56 12.00 214.56
05.02.03.07 Uniones Yee de 4"x 4" und 16.00 19.56 312.96 16.00 312.96
05.02.03.08 Codo PVC SAL 2"x2" a 45° und 8.00 14.31 114.48 8.00 114.48
05.02.03.09 Codo PVC SAL 3"x3" a 45° und 10.00 27.19 271.90 10.00 271.90
05.02.03.10 Codo PVC SAL 4"x4" a 45° und 32.00 30.26 968.32 32.00 968.32
05.02.03.11 Tee sanitario PVC sal 4"x4"x2" und 14.00 24.34 340.76 14.00 340.76
05.02.03.12 Codo PVC SAL 2"x2" a 90° und 12.00 13.88 166.56 12.00 166.56
05.02.03.13 Tee sanitario PVC sal 2"x2" und 12.00 22.22 266.64 12.00 266.64
05.02.03.14 Reducción PVC SAL 4" x 2" und 16.00 19.16 306.56 16.00 306.56
05.02.04 CAJAS DE INSPECCION Y CONEXIONES 3,950.69 0.00 0.00
05.02.04.01 Caja de registro de desagüe de 12" x 24" pza 30.00 100.48 3,014.40 20.00 2009.60 10.00
05.02.04.02 Caja de registro de desagüe de 24" x 24" pza 7.00 103.49 724.43 7.00 724.43
05.02.04.03 Conexion a red interior und 1.00 211.86 211.86 0.00 0.00 1.00
05.02.05 VENTILACION 583.44 0.00 0.00
05.02.05.01 Sombrero de ventilación PVC SAL Ø 2" pza 11.00 15.89 174.79 0.00 0.00 11.00
05.02.05.02 Salidas PVC SAL para ventilacion de 2" h=2.60m pto 11.00 37.15 408.65 0.00 0.00 11.00
05.02.06 PRUEBAS HIDRAULICAS 854.70 0.00 0.00
05.02.06.01 Prueba hidraulica de desague y desinfeccion m 388.50 2.20 854.70 0.00 0.00 388.50
05.02.07 EXCAVACIONES RED DE DESAGUE 12,681.47 0.00 0.00
05.02.07.01 Trazo y replanteo preliminar m 298.13 1.95 581.35 298.13 581.35
05.02.07.02 Excavacion de zanja 0.45 x 0.80 m en terreno normal m3 107.33 37.03 3,974.43 107.33 3974.43
05.02.07.03 Refine y nivelacion de zanja m 298.13 4.44 1,323.70 298.13 1323.70
05.02.07.04 Preparacion y colocacion de cama de apoyo m 298.13 12.26 3,655.07 298.13 3655.07
05.02.07.05 Relleno y apisonado con material propio m3 107.33 29.32 3,146.92 107.33 3146.92
05.03 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 22,768.77 0.00 0.00
05.03.01 SALIDA PARA PUNTOS DE AGUA 871.31 0.00 0.00
05.03.01.01 Salida de agua para inodoros tanque bajo pto 7.00 36.89 258.23 0.00 0.00 7.00
05.03.01.02 Salida de agua en urinarios pto 3.00 40.36 121.08 0.00 0.00 3.00
05.03.01.03 Salida de agua para lavatorios pto 10.00 37.53 375.30 0.00 0.00 10.00
05.03.01.04 Salida de agua para Duchas pto 3.00 38.90 116.70 0.00 0.00 3.00
05.03.02 REDES DE DISTRIBUCION Y MONTAJE 3,631.09 0.00 0.00
05.03.02.01 Tuberia PVC SAP Ø 1 1/2" m 103.19 20.25 2,089.60 25.00 506.25 78.19
05.03.02.02 Tuberia PVC SAP Ø 1" m 87.94 6.78 596.23 22.00 149.16 65.94
05.03.02.03 Tuberia PVC SAP Ø 3/4" m 68.14 5.62 382.95 17.00 95.54 51.14
ip n{ Tuberia PVC SAP Ø 1/2" m 113.14 4.97 562.31 80.00 397.60 33.14
05.03.03 ACCESORIOS VARIOS 2,034.65 0.00 0.00
05.03.03.01 Tee PVC-SAP Ø 1/2" und 10.00 15.79 157.90 10.00 157.90
05.03.03.02 Tee PVC-SAP Ø 3/4" und 10.00 18.71 187.10 10.00 187.10
05.03.03.03 Tee PVC-SAP 1" und 3.00 19.98 59.94 3.00 59.94
05.03.03.04 Tee PVC-SAP 1 1/2" und 6.00 26.91 161.46 6.00 161.46
05.03.03.05 Codo PVC SAP Ø 1/2" x90° und 15.00 18.29 274.35 15.00 274.35
05.03.03.06 Codo PVC SAP Ø 3/4" x90° und 7.00 18.71 130.97 3.00 56.13 4.00
05.03.03.07 Codo PVC SAP de 1" x 90º und 2.00 15.17 30.34 2.00 30.34
05.03.03.08 Codo PVC SAP de 1.1/2" x 90º und 2.00 16.68 33.36 2.00 33.36
05.03.03.09 REDUCCIONES PVC-SAP 1 1/2" a 1" und 3.00 14.90 44.70 3.00 44.70
05.03.03.10 REDUCCIONES PVC-SAP 1 1/2" A 3/4" und 2.00 14.87 29.74 2.00 29.74
05.03.03.11 REDUCCIONES PVC-SAP 1 1/2" A 1/2" und 1.00 25.18 25.18 1.00 25.18
05.03.03.12 REDUCCIONES PVC-SAP 1" a 3/4" und 5.00 13.97 69.85 4.00 55.88 1.00
05.03.03.13 REDUCCIONES PVC-SAP 1" A 1/2" und 4.00 23.65 94.60 4.00 94.60
05.03.03.14 REDUCCIONES PVC-SAP 3/4" a 1/2" und 9.00 14.39 129.51 9.00 129.51
05.03.03.15 Union universal PVC SAP 1/2" und 4.00 12.98 51.92 4.00 51.92
05.03.03.16 Union universal PVC SAP 3/4" und 8.00 13.21 105.68 8.00 105.68
05.03.03.17 Union universal PVC SAP 1" und 1.00 22.47 22.47 1.00 22.47
05.03.03.18 Union universal PVC SAP 1 1/2" und 1.00 22.47 22.47 1.00 22.47
05.03.03.19 Tapon de PVC SAP 1/2" und 13.00 17.96 233.48 13.00 233.48
05.03.03.20 Tapon de PVC SAP 3/4" und 4.00 17.96 71.84 4.00 71.84
05.03.03.21 Tapon de PVC SAP 1" und 4.00 18.80 75.20 4.00 75.20
05.03.03.22 Tapon de PVC SAP 1 1/2" und 1.00 22.59 22.59 1.00 22.59
05.03.04 LLAVES Y VALVULAS 1,718.67 0.00 0.00
05.03.04.01 Valvula de globo de 1 1/2" und 1.00 113.28 113.28 1.00 113.28
05.03.04.02 Valvula de globo de 1" und 1.00 87.84 87.84 1.00 87.84
05.03.04.03 Valvula de globo de 3/4" und 2.00 79.03 158.06 2.00 158.06
05.03.04.04 Valvula de globo de 1/2" und 8.00 65.65 525.20 8.00 525.20
05.03.04.05 Nicho para valvulas pza 10.00 59.30 593.00 10.00 593.00
05.03.04.06 Caja de valvula con tapa F°G° und 3.00 80.43 241.29 3.00 241.29
05.03.05 PRUEBAS HIDRAULICAS 645.06 0.00 0.00
05.03.05.01 Prueba hidráulica en red de agua y desinfeccion m 341.30 1.89 645.06 0.00 0.00 341.30
05.03.06 CONEXION A RED EXTERIOR 169.49 0.00 0.00
05.03.06.01 Conexion del sistema de agua a una red exterior und 1.00 169.49 169.49 0.00 0.00 1.00
05.03.07 EXCAVACIONES PARA REDES DE AGUA 8,698.50 0.00 0.00
05.03.07.01 Trazo y replanteo preliminar m 237.90 1.95 463.91 118.35 230.78 119.55
05.03.07.02 Excavacion de zanja 0.45 x 0.60 m m3 64.23 37.03 2,378.44 32.12 1189.40 32.11
05.03.07.03 Refine y nivelacion de zanja m 237.90 4.44 1,056.28 118.00 523.92 119.90
05.03.07.04 Preparacion y colocacion de cama de apoyo m 237.90 12.26 2,916.65 36.00 441.36 201.90
05.03.07.05 Relleno y apisonado con material propio m3 64.23 29.32 1,883.22 10.00 293.20 54.23
05.03.08 INSTALACIONES ESPECIALES 5,000.00 0.00 0.00
05.03.08.01 Instalacion de Tanque Elevado de 5,000 Litros und 1.00 5,000.00 5,000.00 0.50 2500.00 0.50
05.04 EVACUACION DE AGUAS PLUVIALES 46,689.21 0.00 0.00
05.04.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES AULAS 38,561.94 0.00 0.00
05.04.01.01 Canaleta de concreto m 302.00 112.95 34,110.90 262.00 29592.90 40.00
05.04.01.02 Montante PVC Ø 3" (01 nivel) und 12.00 167.65 2,011.80 8.00 1341.20 4.00
05.04.01.03 Columnetas para proteccion de montantes und 12.00 203.27 2,439.24 6.00 1219.62 6.00
05.04.02 SISTEMA DE EVACUACION DE AGUAS PLUVIALES EXTERIOR 8,127.27 0.00 0.00
05.04.02.01 EXCAVACIONES AGUAS PLUVIALES CANALES 4,949.21 0.00 0.00
05.04.02.01.01 Trazo y replanteo preliminar m 302.00 1.95 588.90 302.00 588.90
05.04.02.01.02 Excavacion de zanja 0.45 x 0.60 m m3 81.54 37.03 3,019.43 81.54 3019.43
05.04.02.01.03 Refine y nivelacion de zanja m 302.00 4.44 1,340.88 302.00 1340.88
05.04.02.02 CAJAS DE INSPECCION 401.92 0.00 0.00
05.04.02.02.01 Caja de registro de desagüe de 12" x 24" pza 4.00 100.48 401.92 0.00 0.00 4.00
05.04.02.03 SISTEMA DE RED DE EVACUACION DE AGUAS PLUVIALES 1,177.10 0.00 0.00
05.04.02.03.01 Red colectora PVC para desague de 4" m 10.00 17.19 171.90 10.00 171.90
05.04.02.03.02 Red colectora PVC para desague de 6" m 40.00 25.13 1,005.20 0.00 0.00 40.00
05.04.02.04 EXCAVACIONES PARA RED DE EVACUACION DE AGUAS PLUVIALES TUBERIA 1,599.04 0.00 0.00
05.04.02.04.01 Trazo y replanteo preliminar m 50.00 1.95 97.50 50.00 97.50
05.04.02.04.02 Excavacion de zanja 0.45 x 0.80 m, terreno normal m3 18.00 37.03 666.54 18.00 666.54
05.04.02.04.03 Refine y nivelacion de zanja m 50.00 4.44 222.00 25.00 111.00 25.00
05.04.02.04.04 Preparacion y colocacion de cama de apoyo m 50.00 12.26 613.00 0.00 0.00 50.00
05.05 TRATAMIENTO DE AGUAS RESIDUALES 23,237.39 0.00 0.00
05.05.01 TRATAMIENTO PRIMARIO (BIODIGESTOR) 13,122.13 0.00 0.00
05.05.01.01 TRABAJOS PRELIMINARES 12.18 0.00 0.00
05.05.01.01.01 Limpieza de terreno manual m2 4.91 0.56 2.75 4.91 2.75
05.05.01.01.02 Trazo y replanteo preliminar m2 4.91 1.92 9.43 4.91 9.43
05.05.01.02 MOVIMIENTO DE TIERRAS 1,038.00 0.00 0.00
05.05.01.02.01 Excavacion manual en Terreno Normal m3 16.32 37.03 604.33 16.32 604.33
05.05.01.02.02 Relleno y apisonado con material propio m3 5.63 29.32 165.07 5.63 165.07
05.05.01.02.03 Eliminación de material excedente (5 km) m3 15.58 17.24 268.60 15.58 268.60
05.05.01.03 BIODIGESTOR 12,071.95 0.00 0.00
05.05.01.03.01 Instalación de Biodigestor prefabricado de 7000 lt und 1.00 12,071.95 12,071.95 1.00 12071.95
05.05.02 TRATAMIENTO SECUNDARIO (POZO DE INFILTRACION) 10,115.26 0.00 0.00
05.05.02.01 TRABAJOS PRELIMINARES 35.07 0.00 0.00
05.05.02.01.01 Limpieza de terreno manual m2 14.14 0.56 7.92 14.14 7.92
05.05.02.01.02 Trazo y replanteo preliminar m2 14.14 1.92 27.15 14.14 27.15
05.05.02.02 MOVIMIENTO DE TIERRAS 1,604.93 0.00 0.00
05.05.02.02.01 Excavacion manual en Terreno Normal m3 27.00 37.03 999.81 27.00 999.81
05.05.02.02.02 Eliminación de material excedente (5 km) m3 35.10 17.24 605.12 35.10 605.12
05.05.02.03 OBRAS DE CONCRETO ARMADO 4,861.62 0.00 0.00
05.05.02.03.01 Concreto f'c= 210 kg/cm2 m3 4.26 385.56 1,642.49 4.26 1642.49
05.05.02.03.02 Encofrado y desencofrado m2 41.14 37.22 1,531.23 41.14 1531.23
05.05.02.03.03 Acero f'c=4200 kg/cm2 kg 428.40 3.94 1,687.90 428.40 1687.90
05.05.02.04 MUROS 1,830.21 0.00 0.00
05.05.02.04.01 Muros de Ladrillo KK sin juntas, en Pozos m2 21.21 86.29 1,830.21 21.21 1830.21
05.05.02.05 FILTROS 975.66 0.00 0.00
05.05.02.05.01 Piedra ø 6" para filtro m3 3.53 56.14 198.17 3.53 198.17
05.05.02.05.02 Sum. E Inst. Grava de rio Tam. Max. 1/2" - 3/4" (PARA m3 10.80 71.99 777.49 10.80 777.49
05.05.02.06 OTROS 580.54 0.00 0.00
05.05.02.06.01 Tuberia de Ventilación Fº Gº ø 4" und 2.00 226.49 452.98 2.00 452.98
05.05.02.06.02 Codo PVC SAL Ø 4"X90° pza 4.00 31.89 127.56 4.00 127.56
05.05.02.07 CAJAS DE INSPECCION 227.23 0.00 0.00
05.05.02.07.01 Tapa de concreto para pozo percolador 650MM pza 2.00 61.87 123.74 2.00 123.74
05.05.02.07.02 Caja de registro de desagüe de 24" x 24" pza 1.00 103.49 103.49 1.00 103.49
06 INSTALACIONES ELECTRICAS 80,893.02 0.00 0.00
06.01 TABLEROS DE DISTRIBUCIÓN 4,810.38 0.00 0.00
06.01.01 TABLERO DE DISTRIBUCION GENERAL TDG Eqp 1.00 818.40 818.40 1.00 818.40
06.01.02 TABLERO DE DISTRIBUCION TD-11 (24 POLOS) pza 1.00 1,036.40 1,036.40 1.00 1036.40
06.01.03 TABLERO DE DISTRIBUCION TD-12 (24 POLOS) pza 1.00 1,036.40 1,036.40 1.00 1036.40
06.01.04 TABLERO DE DISTRIBUCION TD-13 (24 POLOS) pza 1.00 1,009.00 1,009.00 0.00 0.00 1.00
06.01.05 TABLERO DE DISTRIBUCION TD-IE (18 POLOS) pza 1.00 821.80 821.80 0.00 0.00 1.00
06.01.06 TABLERO DE DISTRIBUCION TD-DE (2 POLOS) pza 1.00 88.38 88.38 0.00 0.00 1.00
06.02 ALIMENTADORES 15,402.61 0.00 0.00
06.02.01 TENDIDO DE CABLE 2-1x16mm2 N2XH +1x10 mm2 N2XH (Tm 22.00 29.19 642.18 0.00 0.00 22.00
06.02.02 TENDIDO DE CABLE 2-1x10mm2 N2XH +1x10 mm2 N2XH (Tm 84.00 23.45 1,969.80 0.00 0.00 60.00
06.02.03 TENDIDO DE CABLE 2-1x6 mm2 N2XH m 234.00 13.30 3,112.20 0.00 0.00 180.00
06.02.04 INSTALACION DE DUCTO PVC DE 25mm m 12.00 11.33 135.96 0.00 0.00 12.00
06.02.05 INSTALACION DE DUCTO PVC DE 40mm m 106.00 14.35 1,521.10 0.00 0.00 106.00
06.02.06 KIT DE EMPALME 3M PARA CABLE SUBTERRANEO 3M-0, 6 Jgo 6.00 36.78 220.68 0.00 0.00 6.00
06.02.07 CAVADO DE ZANJA SEÑALIZACION, PROTECCIÓN Y RELLEN
m 108.00 39.43 4,258.44 0.00 0.00 108.00
06.02.08 CAVADO, SEÑALIZACION, PROTECCION, RELLENO Y COMPm 48.00 45.30 2,174.40 0.00 0.00 48.00
06.02.09 BUZON DE CONCRETO DE 0.60x0.60x0.75 CON TAPA DO Unid 5.00 273.57 1,367.85 0.00 0.00 5.00
06.03 ARTEFACTOS DE ILUMINACION 36,626.57 0.00 0.00
06.03.01 ARTEFACTO MODELO RAS STD RAC 2TL36 EE, PARA ADO Eqp 36.00 180.93 6,513.48 0.00 0.00
06.03.02 ARTEFACTO DE ILUMINACION, PARA ADOSAR CON 02 FLU Eqp 10.00 94.63 946.30 0.00 0.00
06.03.03 ARTEFACTO DE ILUMINACION, PARA ADOSAR CON 01 FLUOEqp 4.00 118.33 473.32 0.00 0.00
06.03.04 LUMINARIA TIPO LED PARA ADOSAR, DOWNLIGHT DE 18W, Eqp 4.00 133.65 534.60 0.00 0.00
06.03.05 LUMINARIA TIPO LED PARA ADOSAR, DOWNLIGHT DE 12W, Eqp 3.00 143.65 430.95 0.00 0.00
06.03.06 LUMINARIA DE SUPERFICIE, CON 02 LAMPARAS AHORRA Eqp 14.00 13.65 191.10 0.00 0.00
06.03.07 POSTE METÁLICO DE F° G° DE Ø 3" X 6 M CON 01 FAR Eqp 4.00 1,301.85 5,207.40 0.00 0.00
06.03.08 POSTE METÁLICO DE F° G° DE 12 M (TRES CUERPOS Ø 5" Eqp 4.00 5,202.50 20,810.00 0.00 0.00 3.00
06.03.09 EQUIPO DE ILUMINACION DE EMERGENCIA CON BATERIA Unid 14.00 108.53 1,519.42 0.00 0.00
06.04 SALIDAS DE LUZ, INTERRUPTORES, TOMACORRIENTES Y CAJAS 20,790.00 0.00 0.00
06.04.01 SALIDA PARA CENTRO DE LUZ pto 71.00 94.81 6,731.51 71.00 6731.51
06.04.02 SALIDA PARA INTERRUPTOR SIMPLE pto 14.00 86.48 1,210.72 14.00 1210.72
06.04.03 SALIDA PARA INTERRUPTOR DOBLE pto 6.00 93.77 562.62 6.00 562.62
06.04.04 SALIDA PARA INTERRUPTOR DE CONMUTACION SIMPLE pto 8.00 111.67 893.36 8.00 893.36
06.04.05 SALIDA PARA INTERRUPTOR DE CONMUTACION DOBLE pto 2.00 134.07 268.14 2.00 268.14
06.04.06 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA TIER pto 58.00 105.51 6,119.58 58.00 6119.58
06.04.07 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA TIER pto 18.00 157.63 2,837.34 18.00 2837.34
06.04.08 SALIDAS DE FUERZA ELECTRICA MONOFASICA pto 1.00 139.20 139.20 1.00 139.20
06.04.09 SALIDA PARA TIMBRE pto 1.00 280.24 280.24 1.00 280.24
06.04.10 SALIDA PARA PULSADOR DE TIMBRE pto 1.00 86.83 86.83 1.00 86.83
06.04.11 SALIDA PARA LUZ DE EMERGENCIA pto 14.00 99.95 1,399.30 14.00 1399.30
06.04.12 CAJA DE PASE OCTOGONAL DE F.G. CON TAPA CIEGA pto 1.00 85.45 85.45 1.00 85.45
06.04.13 CAJA DE PASE DE F.G.150x150x100 mm pto 1.00 54.17 54.17 1.00 54.17
06.04.14 CAJA DE PASE DE F.G.200x200x100 mm pto 2.00 60.77 121.54 2.00 121.54
06.05 SISTEMA DE PUESTA A TIERRA 3,263.46 0.00 0.00
06.05.01 PUESTA A TIERRA GENERAL (SISTEMA ELÉCTRICO - GENE Jgo 1.00 1,113.62 1,113.62 0.00 0.00 1.00
06.05.02 PUESTA A TIERRA (SISTEMA ELECTRICO) Jgo 2.00 1,074.92 2,149.84 0.00 0.00 2.00
07 INSTALACIONES ESPECIALES 18,454.99 0.00 0.00
07.01 INSTALACIONES DE CABLEADO ESTRUCTURADO 18,454.99 0.00 0.00
07.01.01 CABLEADO HORIZONTAL 9,927.27 0.00 0.00
07.01.01.01 Salida para Red de Datos pto 11.00 73.81 811.91 11.00 811.91
07.01.01.02 Salida para red de datos Acces Point pto 4.00 73.81 295.24 4.00 295.24
07.01.01.03 Salida para HDMI pto 8.00 115.31 922.48 8.00 922.48
07.01.01.04 Suministro patch cord de 3.00 m para area de trabajo und 15.00 46.58 698.70 0.00 0.00
07.01.01.05 suministro cable hdmi x 3m para area de trabajo und 8.00 29.58 236.64 0.00 0.00
07.01.01.06 Suministro cable F/UTP Cat6A LSZH-3 m 859.46 7.29 6,265.46 0.00 0.00
07.01.01.07 suministro cable hdmi x 10m und 4.00 108.81 435.24 0.00 0.00
07.01.01.08 Certificacion de Puntos de Red en CAT6A pto 15.00 17.44 261.60 0.00 0.00
07.01.02 CABLEADO VERTICAL 2,466.82 0.00 0.00
07.01.02.01 PatchPanel Cat6 de 24 Puertos und 1.00 520.65 520.65 0.00 0.00
07.01.02.02 ordenador horizontal de 2 ru und 1.00 157.65 157.65 0.00 0.00
07.01.02.03 PatchCord para datos cat6A de 1.5 mt. LSZH und 8.00 65.06 520.48 0.00 0.00
07.01.02.04 PatchCord para datos POE cat6A de 1.5 mt. LSZH und 4.00 42.22 168.88 0.00 0.00
07.01.02.05 gabinete de comunicacion de pared 18 ru und 1.00 1,099.16 1,099.16 0.00 0.00
07.01.03 TUBERIAS 6,060.90 0.00 0.00
07.01.03.01 Tuberia PVC SAP Ø 3/4" m 46.44 6.14 285.14 46.44 285.14
07.01.03.02 Tuberia PVC SAP Ø 1" m 28.25 7.33 207.07 28.25 207.07
07.01.03.03 Tuberia PVC SAP Ø 1 1/2" m 8.23 8.33 68.56 8.23 68.56
07.01.03.04 Tuberia PVC SAP Ø 1 1/4" m 39.65 8.08 320.37 39.65 320.37
07.01.03.05 Tuberia PVC SAP de 2" ML 102.48 21.74 2,227.92 102.48 2227.97
07.01.03.06 CAJA DE F. G. 300X300X150 mm. und 6.00 27.79 166.74 6.00 166.75
07.01.03.07 CAJA DE F. G. 150X150X100 mm. und 4.00 23.93 95.72 4.00 95.72
07.01.03.08 POZO DE CONCRETO DE 0.50X0.50X0.50 M" und 4.00 260.73 1,042.92 0.00 0.00 4.00
07.01.03.09 BASE DE CONCRETO PARA ANTENA VSAT (0.60X0.60X0.10und 1.00 234.83 234.83 0.00 0.00 1.00
07.01.03.10 Pozo puesta a tierra jgo 1.00 1,411.63 1,411.63 0.00 0.00 1.00
08 ACCIONES DE MITIGACIÓN DE IMPACTO AMBIENTAL 38,408.93 0.00 0.00
08.01 PLAN DE MANEJO AMBIENTAL 5,000.00 0.00 0.00
08.01.01 SENSIBILIZACIÓN EN TEMAS AMBIENTALES evento 1.00 5,000.00 5,000.00 0.50 2500.00
08.02 PLAN DE VIGILANCIA AMBIENTAL 12,550.00 0.00 0.00
08.02.01 MONITOREO DE LA CALIDAD DE AGUAS glb 1.00 2,950.00 2,950.00 0.00 0.00
08.02.02 MONITOREO DE LA CALIDAD DEL AIRE glb 1.00 3,200.00 3,200.00 0.00 0.00
08.02.03 MONITOREO DE NIVELES SONOROS glb 1.00 2,900.00 2,900.00 0.00 0.00
08.02.04 MONITOREO DE SUELOS glb 1.00 3,500.00 3,500.00 0.00 0.00
08.03 PLAN DE MANEJO DE RESIDUOS SÓLIDOS Y LÍQUIDOS 5,000.00 0.00 0.00
08.03.01 PLAN DE MANEJO DE RESIDUOS SÓLIDOS glb 1.00 5,000.00 5,000.00 0.00 0.00
08.04 PLAN DE SALUD Y SEGURIDAD OCUPACIONAL 4,502.92 0.00 0.00
08.04.01 CONSTRUCCIÓN Y MANTENIMIENTO DE LETRINAS SANITA und 4.00 1,125.73 4,502.92 2.00 2251.46
08.05 PROGRAMA DE CIERRE 11,356.01 0.00 0.00
08.05.01 RECUPERACIÓN DEL ENTORNO A MANO m2 1,500.00 2.62 3,930.00 0.00 0.00 1,500.00
08.05.02 RECUPERACIÓN DEL ENTORNO CON EQUIPO m2 500.00 2.67 1,335.00 0.00 0.00
08.05.03 DESMONTAJE DE INSTALACIONES PROVISIONALES glb 1.00 3,314.13 3,314.13 0.00 0.00 1.00
08.05.04 LIMPIEZA FINAL DE OBRA glb 1.00 2,776.88 2,776.88 0.00 0.00
09 COMPONENTE 02 102,394.21 0.00 0.00
MOBILIARIO glb 1.00 34,947.29 34,947.29 0.00 0.00 1.00
EQUIPAMIENTO glb 1.00 67,446.92 67,446.92 0.00 0.00 1.00
10 COMPONENTE 03 8,163.84 0.00 0.00
CAPACITACION DOCENTE Y SENSIBILIZACION A PADREglb 1.00 8,163.84 8,163.84 0.00 0.00 0.50

COSTO DIRECTO S/. 1,821,229.63 1,207,785.34


GASTOS GENERALES (12%) 12.00% S/. 218,547.56 144,934.24
UTILIDAD (9.00%) 9.00% S/. 163,910.67 108,700.68
SUB TOTAL S/. 2,203,687.85 1,461,420.26
FACTOR DE RELACIÓN (FR) 1.0000 S/. 2,203,687.85 1,461,420.26
TOTAL DE OBRA S/. 2,203,687.85 1,461,420.26
I.G.V. 18.00% S/. 396,663.81 263,055.65
TOTAL DE PRESUPUESTO VALORIZADO S/. 2,600,351.66 1,724,475.91
LAS COMUNIDADES DE: MAYUMBAMBA; CUSIBAMBA Y MASKA DEL DISTRITO DE PARURO -
CONSORCIO WIRACOCHA

PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL

Sobre Metrado Parcial S/. Metrado Parcial S/. Metrado Parcial S/. %

0.00 1.00 1007.85 0.00 0.00 0%


0.00 120.00 10476.00 0.00 0.00 0%
0.00 30.00 1800.00 0.00 0.00 0%
0.00 60.00 3600.00 0.00 0.00 0%
0.00 100.00 6000.00 0.00 0.00 0%
0.00 60.00 3600.00 0.00 0.00 0%
0.00 10.00 600.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 2000.00 0.00 0.00 0%
0.00 1.00 1500.00 0.00 0.00 0%
0.00 1.00 1000.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 5,000.00 3800.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 7,000.00 18550.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
14,000.00 1.00 140000.00 0.00 0.00 0%
4,000.00 1.00 16000.00 0.00 0.00 0%
2,776.88 4.00 11107.52 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
4,000.00 0.60 6000.00 0.40 4,000.00 40%
1,000.00 1.00 2000.00 0.00 0.00 0%
2,000.00 50.00 10000.00 0.00 0.00 0%
357.30 50.00 1786.50 0.00 0.00 0%
226.20 50.00 1131.00 0.00 0.00 0%
2,181.30 10.00 2181.30 0.00 0.00 0%
608.80 8.00 608.80 2.00 152.20 20%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 61.57 164.39 0.00 0.00 0%
0.00 95.18 3020.06 0.00 0.00 0%
0.00 85.80 883.74 0.00 0.00 0%
0.00 38.48 112.75 0.00 0.00 0%
0.00 110.14 2770.02 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 38.48 1052.81 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.50 10977.12 0.00 0.00 0%
0.00 50.06 1954.84 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 16.04 3946.96 0.00 0.00 0%
0.00 128.34 5405.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 19.24 6253.58 0.00 0.00 0%
0.00 618.81 2518.56 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 15.35 4989.21 0.00 0.00 0%
0.00 122.76 4702.94 0.00 0.00 0%
0.00 2,888.48 11756.11 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 12.88 4904.32 0.00 0.00 0%
0.00 147.80 6517.98 0.00 0.00 0%
0.00 3,471.94 14130.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.50 890.98 0.00 0.01 0%
0.00 52.36 2309.08 0.00 0.00 0%
0.00 252.41 1027.31 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 21.48 7675.88 0.00 0.00 0%
0.00 216.69 10977.52 0.00 0.00 0%
0.00 2,814.11 11453.43 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 13.60 4647.80 0.00 0.00 0%
0.00 161.04 6601.03 0.00 0.00 0%
0.00 1,200.47 4885.91 0.00 0.00 0%
0.00 422.40 1706.50 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 9.43 3369.81 0.00 0.00 0%
0.00 63.87 3235.65 0.00 0.00 0%
0.00 701.71 2855.96 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 78.67 210.05 0.00 0.00 0%
0.00 47.31 1501.15 0.00 0.00 0%
0.00 104.74 1078.82 0.00 0.00 0%
0.00 89.86 263.29 0.00 0.00 0%
0.00 52.73 1326.16 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.17 1345.29 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 24.28 5384.33 0.00 0.00 0%
0.00 144.80 5654.44 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.21 297.74 0.00 0.00 0%
0.00 28.67 1207.58 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 24.58 7989.24 0.00 0.00 0%
0.00 1,010.17 4111.39 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 16.99 5522.26 0.00 0.00 0%
0.00 135.90 5206.33 0.00 0.00 0%
0.00 3,369.94 13715.66 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 14.19 5403.13 0.00 0.00 0%
0.00 162.87 7182.57 0.00 0.00 0%
0.00 4,043.91 16458.71 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.55 908.79 0.00 0.00 0%
0.00 57.60 2540.16 0.00 0.00 0%
0.00 260.41 1059.87 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 22.44 8018.93 0.00 0.00 0%
0.00 206.84 10478.51 0.00 0.00 0%
0.00 2,878.14 11714.03 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 15.44 5276.62 0.00 0.00 0%
0.00 182.16 7466.74 0.00 0.00 0%
0.00 1,663.52 6770.53 0.00 0.00 0%
0.00 468.60 1893.14 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 10.44 3730.73 0.00 0.00 0%
0.00 70.54 3573.56 0.00 0.00 0%
0.00 775.92 3157.99 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 18.43 49.21 0.00 0.00 0%
0.00 15.65 496.57 0.00 0.00 0%
0.00 34.72 357.62 0.00 0.00 0%
0.00 22.80 66.80 0.00 0.00 0%
0.00 7.88 198.18 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 11.52 315.19 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 10.24 2270.82 0.00 0.00 0%
0.00 53.55 2091.13 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.80 196.86 0.00 0.00 0%
0.00 11.64 490.28 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 5.76 1872.17 0.00 0.00 0%
0.00 187.73 764.06 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 5.20 1690.16 0.00 0.00 0%
0.00 37.80 1448.12 0.00 0.00 0%
0.00 936.87 3813.06 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.63 1762.97 0.00 0.00 0%
0.00 53.04 2339.06 0.00 0.00 0%
0.00 1,204.89 4903.90 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.43 509.64 0.00 0.00 0%
0.00 33.66 1484.41 0.00 0.00 0%
0.00 158.01 643.10 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 6.36 2272.75 0.00 0.00 0%
0.00 69.43 3517.32 0.00 0.00 0%
0.00 1,177.31 4791.65 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3.39 1158.53 0.00 0.00 0%
0.00 38.85 1592.46 0.00 0.00 0%
0.00 356.44 1450.71 0.00 0.00 0%
0.00 105.82 427.51 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.06 736.14 0.00 0.00 0%
0.00 14.53 736.09 0.00 0.00 0%
0.00 157.16 639.64 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 181.96 533.14 0.00 0.00 0%
0.00 181.96 2685.73 0.00 0.00 0%
0.00 179.69 38512.96 0.00 0.00 0%
706.26 209.21 3531.46 0.00 0.00 0%
0.00 71.99 907.07 0.00 0.00 0%
0.00 224.18 1156.77 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.60 50.77 0.00 0.00 0%
0.00 1.04 10.71 0.00 0.00 0%
0.00 1.00 2.93 0.00 0.00 0%
0.00 0.96 24.14 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 27.36 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.60 195.02 0.00 0.00 0%
0.00 18.87 76.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.70 647.31 0.00 0.00 0%
0.00 27.20 1199.52 0.00 0.00 0%
0.00 225.23 916.69 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.56 557.47 0.00 0.00 0%
0.00 17.68 895.67 0.00 0.00 0%
0.00 77.10 313.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.57 194.80 0.00 0.00 0%
0.00 6.76 277.09 0.00 0.00 0%
0.00 31.66 128.86 0.00 0.00 0%
0.00 25.20 101.81 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 10.09 271.82 0.00 0.00 0%
0.00 10.09 446.38 0.00 0.00 0%
0.00 24.36 965.87 0.00 0.00 0%
0.00 28.64 1342.36 0.00 0.00 0%
0.00 17.64 90.67 0.00 0.00 0%
0.00 63.09 697.14 0.00 0.00 0%
0.00 1.00 1500.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 145.78 17353.65 0.00 0.00 0%
0.00 1.39 109.92 0.00 0.00 0%
0.00 39.45 2763.87 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
256.26 4.53 256.26 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 60.11 170.71 0.00 0.00 0%
0.00 53.78 91.43 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 75.22 1399.09 0.00 0.00 0%
0.00 224.67 5140.45 0.00 0.00 0%
0.00 62.47 2829.89 0.00 0.00 0%
0.00 89.64 3554.23 0.00 0.00 0%
0.00 242.81 11380.50 0.00 0.00 0%
0.00 102.65 1375.51 0.00 0.00 0%
0.00 797.99 4101.67 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
537.96 10.21 537.96 0.00 0.00 0%
183.92 6.34 183.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 179.96 4463.01 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 175.10 513.04 0.00 0.00 0%
0.00 175.10 7527.55 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 264.88 7135.87 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 11.64 564.42 0.00 0.00 0%
1,777.29 35.66 1777.29 0.00 0.00 0%
11,601.68 127.80 11601.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
1,779.40 35.00 1779.40 40.22 2,044.78 53%
0.00 0.00 0.00 0.00 0.00 100%
1,277.56 89.34 1277.56 0.00 0.00 0%
751.68 36.00 751.68 42.44 886.15 54%
0.00 0.00 0.00 0.00 0.00 100%
10,409.78 264.88 10409.78 0.00 0.00 0%
6,065.70 30.00 6065.70 5.18 1,047.34 15%
12,395.66 62.00 12395.66 15.61 3,120.91 20%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
1,493.80 6.62 1493.80 0.00 0.00 0%
1,044.77 4.41 1044.77 0.00 0.00 0%
549.42 3.21 549.42 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
5,870.16 24.00 5870.16 2.01 491.63 8%
548.32 2.30 548.32 0.25 59.60 10%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 21.66 7,342.31 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 19.85 3,237.34 100%
0.00 0.00 0.00 0.43 230.62 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 4.00 81.68 100%
0.00 0.00 0.00 2.00 318.34 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.89 201.70 100%
0.00 0.00 0.00 0.00 0.00 100%
5,604.63 557.12 5604.63 0.00 0.00 0%
690.29 62.47 690.29 0.00 0.00 0%
2,164.92 179.96 2164.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
861.00 4.10 861.00 0.00 0.00 0%
0.00 0.00 0.00 30.45 86.78 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 1,100.88 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 161.62 19239.24 0.00 0.00 0%
0.00 13.46 1064.42 0.00 0.00 0%
0.00 11.80 826.71 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
511.96 9.05 511.96 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 294.09 835.22 0.00 0.00 0%
0.00 32.47 55.20 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 69.37 1290.28 0.00 0.00 0%
0.00 255.55 5846.98 0.00 0.00 0%
0.00 73.64 3335.89 0.00 0.00 0%
0.00 92.12 3652.56 0.00 0.00 0%
0.00 260.96 12231.20 0.00 0.00 0%
0.00 122.00 1634.80 0.00 0.00 0%
0.00 542.76 2789.79 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
992.00 200.40 4969.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 187.60 549.67 0.00 0.00 0%
0.00 187.60 8064.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 291.89 7863.52 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 19.23 932.46 0.00 0.00 0%
1,688.08 33.87 1688.08 0.00 0.00 0%
12,210.82 134.51 12210.82 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
2,542.00 50.00 2542.00 19.37 984.77 28%
0.00 0.00 0.00 0.00 0.00 100%
1,394.25 97.50 1394.25 0.00 0.00 0%
293.45 18.17 293.45 0.00 0.00 0%
981.36 47.00 981.36 20.52 428.46 30%
0.00 0.00 0.00 0.00 0.00 100%
11,471.28 291.89 11471.28 0.00 0.00 0%
4,541.10 61.80 9354.67 0.00 0.00 0%
7,997.20 85.67 17128.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
1,493.80 6.62 1493.80 0.00 0.00 0%
3,551.28 14.99 3551.28 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
3,668.85 15.00 3668.85 15.43 3,774.02 51%
357.60 1.50 357.60 0.20 47.68 12%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 3.07 1,040.67 100%
0.00 0.00 0.00 2.66 788.98 100%
0.00 0.00 0.00 10.69 3,623.70 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.56 1,232.96 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 2.00 40.84 100%
0.00 0.00 0.00 2.00 318.34 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.76 81.11 100%
0.00 0.00 0.00 0.00 0.00 100%
6,116.78 608.03 6116.78 0.00 0.00 0%
813.72 73.64 813.72 0.00 0.00 0%
2,410.81 200.40 2410.81 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
3,469.20 16.52 3469.20 0.00 0.00 0%
0.00 0.00 0.00 32.89 93.74 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 27.66 3292.65 0.00 0.00 0%
0.00 57.81 4571.61 0.00 0.00 0%
0.00 9.92 695.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
128.41 2.27 128.41 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 66.32 188.35 0.00 0.00 0%
0.00 117.44 199.65 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.95 929.07 0.00 0.00 0%
0.00 122.60 2805.09 0.00 0.00 0%
0.00 27.66 1253.00 0.00 0.00 0%
0.00 37.71 1495.20 0.00 0.00 0%
0.00 62.05 2908.28 0.00 0.00 0%
0.00 62.97 843.80 0.00 0.00 0%
0.00 376.17 1933.51 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.79 1234.79 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 36.83 107.91 0.00 0.00 0%
1,583.32 36.83 1583.32 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 68.74 1851.86 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.04 195.90 0.00 0.00 0%
898.62 18.03 898.62 0.00 0.00 0%
1,339.91 14.76 1339.91 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
2,539.46 49.95 2539.46 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
441.44 30.87 441.44 0.00 0.00 0%
180.56 11.18 180.56 0.00 0.00 0%
0.00 0.00 0.00 20.79 434.10 100%
0.00 0.00 0.00 0.00 0.00 100%
2,701.48 68.74 2701.48 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
895.83 3.97 895.83 0.00 0.00 0%
3,342.80 14.11 3342.80 0.00 0.00 0%
489.52 2.86 489.52 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1,222.95 5.00 1222.95 0.21 51.36 4%
1,621.12 6.80 1621.12 0.45 107.28 6%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 6.46 2,189.81 100%
0.00 0.00 0.00 5.29 1,569.07 100%
0.00 0.00 0.00 6.17 2,091.51 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 20.42 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.76 81.11 100%
0.00 0.00 0.00 0.00 0.00 100%
2,236.94 222.36 2236.94 0.00 0.00 0%
305.64 27.66 305.64 0.00 0.00 0%
598.97 49.79 598.97 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
2,824.50 13.45 2824.50 0.00 0.00 0%
0.00 0.00 0.00 13.21 37.65 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 403.27 13941.04 0.00 0.00 0%
0.00 806.54 20284.48 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 316.80 845.86 0.00 0.00 0%
0.00 79.20 2513.02 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 297.52 8271.06 0.00 0.00 0%
0.00 495.00 3915.45 0.00 0.00 0%
0.00 297.52 10088.90 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 53.24 90.51 0.00 0.00 0%
0.00 319.41 12562.40 0.00 0.00 0%
292.32 23.96 7220.59 0.00 0.00 0%
358.20 119.70 718.20 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 39.31 115.18 0.00 0.00 0%
0.00 21.32 838.52 0.00 0.00 0%
0.00 52.92 802.80 0.00 0.00 0%
0.00 3.97 1196.40 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 74.03 216.91 0.00 0.00 0%
0.00 41.72 1640.85 0.00 0.00 0%
0.00 74.03 1123.04 0.00 0.00 0%
0.00 6.29 1895.55 0.00 0.00 0%
0.00 133.35 341.38 0.00 0.00 0%
494.58 82.43 494.58 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 774.68 2269.81 0.00 0.00 0%
0.00 61.15 2405.03 0.00 0.00 0%
0.00 774.68 11751.90 0.00 0.00 0%
0.00 60.87 18343.78 0.00 0.00 0%
0.00 1,950.27 4992.69 0.00 0.00 0%
1,630.74 271.79 1630.74 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
879.73 300.25 879.73 0.00 0.00 0%
1,861.55 300.25 1861.55 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 429.00 1256.97 0.00 0.00 0%
0.00 58.30 2292.94 0.00 0.00 0%
0.00 716.38 3073.27 0.00 0.00 0%
0.00 588.13 2334.88 0.00 0.00 0%
0.00 85.80 27887.57 0.00 0.00 0%
0.00 291.50 3401.81 0.00 0.01 0%
0.00 0.00 0.00 0.00 0.00 100%
621.82 12.10 621.82 0.00 0.00 0%
347.75 12.10 347.75 0.00 0.00 0%
293.60 80.00 293.60 41.04 150.62 34%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 60.42 177.03 0.00 0.00 0%
0.00 63.87 13689.26 0.00 0.00 0%
0.00 32.22 1267.21 0.00 0.00 0%
0.00 3.88 1330.49 0.00 0.00 0%
0.00 32.22 543.87 0.00 0.00 0%
0.00 52.92 135.48 0.00 0.00 0%
0.00 23.31 293.71 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1.11 0.38 1.11 0.00 0.00 0%
81.45 0.38 81.45 0.00 0.00 0%
10.29 0.03 10.29 0.00 0.00 0%
42.54 2.52 42.54 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.91 155.79 0.00 0.00 0%
0.00 3.07 9.00 0.00 0.00 0%
0.00 3.16 32.55 0.00 0.00 0%
0.00 8.06 147.74 0.00 0.00 0%
0.00 8.46 212.77 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3.07 90.44 0.00 0.00 0%
0.00 629.14 2560.60 0.00 0.00 0%
0.00 29.61 1305.80 0.00 0.00 0%
0.00 12.81 525.08 0.00 0.00 0%
0.00 27.73 112.03 0.00 0.00 0%
1,058.48 5.95 2120.52 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.55 121.97 0.00 0.00 0%
0.00 0.14 34.45 0.00 0.00 0%
0.00 1.10 46.33 0.00 0.00 0%
453.54 3.81 453.54 0.00 0.00 0%
19.68 6.93 19.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
345.19 7.62 345.19 0.00 0.00 0%
874.28 22.05 874.28 0.00 0.00 0%
165.92 3.54 165.92 0.00 0.00 0%
126.63 9.45 126.63 0.00 0.00 0%
115.24 22.42 115.24 0.00 0.00 0%
566.71 12.81 566.71 0.00 0.00 0%
345.10 12.81 345.10 0.00 0.00 0%
136.63 9.98 136.63 0.00 0.00 0%
0.00 0.00 0.00 12.81 503.43 100%
0.00 0.00 0.00 7.62 84.20 100%
0.00 0.00 0.00 12.81 154.10 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 3,548.40 100%
0.00 0.00 0.00 0.00 0.00 100%
58,811.84 271.60 131359.34 0.00 0.00 0%
19,758.62 21.40 19758.62 0.00 0.00 0%
7,356.60 180.00 7356.60 50.51 2,064.34 22%
0.00 0.00 0.00 0.00 0.00 100%
3,578.85 133.00 8654.31 22.98 1,495.31 15%
467.30 27.00 1261.71 6.00 280.38 18%
0.00 56.12 8107.10 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 1,267.34 100%
16,936.01 1.00 16936.01 0.00 0.00 0%
2,542.37 1.50 2542.37 0.50 847.46 25%
0.00 0.00 0.00 1.00 1,017.07 100%
0.00 0.00 0.00 1.00 1,694.92 100%
0.00 0.00 0.00 1.00 508.47 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
250.72 1.00 250.72 2.00 501.44 67%
0.00 0.00 0.00 0.00 0.00 100%
1,028.04 3.00 1028.04 4.00 1,370.72 57%
0.00 0.00 0.00 0.00 0.00 100%
236.34 1.00 236.34 3.00 709.02 75%
290.61 1.00 290.61 2.00 581.22 67%
319.46 1.00 319.46 1.00 319.46 50%
281.17 1.00 281.17 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.00 1,349.46 100%
0.00 0.00 0.00 3.00 559.05 100%
0.00 0.00 0.00 3.00 348.18 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.00 306.11 100%
0.00 0.00 0.00 3.00 118.50 100%
0.00 0.00 0.00 3.00 118.50 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 7.00 335.79 0.00 0.00 0%
0.00 3.00 109.80 0.00 0.00 0%
0.00 10.00 345.20 0.00 0.00 0%
0.00 3.00 103.74 0.00 0.00 0%
0.00 9.00 300.78 0.00 0.00 0%
0.00 3.00 185.82 0.00 0.00 0%
0.00 11.00 432.19 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
414.65 16.50 414.65 0.00 0.01 0%
0.00 297.00 5096.52 0.00 0.00 0%
145.99 14.44 145.99 0.00 0.00 0%
0.00 115.95 723.53 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
192.87 9.00 192.87 0.00 0.00 0%
74.73 3.00 74.73 0.00 0.00 0%
267.19 11.00 267.19 0.00 0.00 0%
0.00 16.00 279.20 0.00 0.00 0%
0.00 24.00 418.80 0.00 0.00 0%
0.00 12.00 214.56 0.00 0.00 0%
0.00 16.00 312.96 0.00 0.00 0%
0.00 8.00 114.48 0.00 0.00 0%
0.00 10.00 271.90 0.00 0.00 0%
0.00 32.00 968.32 0.00 0.00 0%
0.00 14.00 340.76 0.00 0.00 0%
0.00 12.00 166.56 0.00 0.00 0%
0.00 12.00 266.64 0.00 0.00 0%
0.00 16.00 306.56 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1,004.80 30.00 3014.40 0.00 0.00 0%
0.00 7.00 724.43 0.00 0.00 0%
211.86 1.00 211.86 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
174.79 11.00 174.79 0.00 0.00 0%
408.65 11.00 408.65 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
854.70 388.50 854.70 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 298.13 581.35 0.00 0.00 0%
0.00 107.33 3974.43 0.00 0.00 0%
0.00 298.13 1323.70 0.00 0.00 0%
0.00 298.13 3655.07 0.00 0.00 0%
0.00 107.33 3146.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
258.23 7.00 258.23 0.00 0.00 0%
121.08 3.00 121.08 0.00 0.00 0%
375.30 10.00 375.30 0.00 0.00 0%
116.70 3.00 116.70 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1,583.35 103.19 2089.60 0.00 0.00 0%
447.07 87.94 596.23 0.00 0.00 0%
287.41 68.14 382.95 0.00 0.00 0%
164.71 113.14 562.31 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 10.00 157.90 0.00 0.00 0%
0.00 10.00 187.10 0.00 0.00 0%
0.00 3.00 59.94 0.00 0.00 0%
0.00 6.00 161.46 0.00 0.00 0%
0.00 15.00 274.35 0.00 0.00 0%
74.84 7.00 130.97 0.00 0.00 0%
0.00 2.00 30.34 0.00 0.00 0%
0.00 2.00 33.36 0.00 0.00 0%
0.00 3.00 44.70 0.00 0.00 0%
0.00 2.00 29.74 0.00 0.00 0%
0.00 1.00 25.18 0.00 0.00 0%
13.97 5.00 69.85 0.00 0.00 0%
0.00 4.00 94.60 0.00 0.00 0%
0.00 9.00 129.51 0.00 0.00 0%
0.00 4.00 51.92 0.00 0.00 0%
0.00 8.00 105.68 0.00 0.00 0%
0.00 1.00 22.47 0.00 0.00 0%
0.00 1.00 22.47 0.00 0.00 0%
0.00 13.00 233.48 0.00 0.00 0%
0.00 4.00 71.84 0.00 0.00 0%
0.00 4.00 75.20 0.00 0.00 0%
0.00 1.00 22.59 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 113.28 0.00 0.00 0%
0.00 1.00 87.84 0.00 0.00 0%
0.00 2.00 158.06 0.00 0.00 0%
0.00 8.00 525.20 0.00 0.00 0%
0.00 10.00 593.00 0.00 0.00 0%
0.00 3.00 241.29 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
645.06 341.30 645.06 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
169.49 1.00 169.49 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
233.12 237.90 463.91 0.00 0.01 0%
1,189.03 64.23 2378.44 0.00 0.00 0%
532.36 237.90 1056.28 0.00 0.00 0%
2,475.29 237.90 2916.65 0.00 0.00 0%
1,590.02 64.23 1883.22 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
2,500.00 1.00 5000.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
4,518.00 302.00 34110.90 0.00 0.00 0%
670.60 12.00 2011.80 0.00 0.00 0%
1,219.62 12.00 2439.24 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 302.00 588.90 0.00 0.00 0%
0.00 81.54 3019.43 0.00 0.00 0%
0.00 302.00 1340.88 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
401.92 4.00 401.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 10.00 171.90 0.00 0.00 0%
1,005.20 40.00 1005.20 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 50.00 97.50 0.00 0.00 0%
0.00 18.00 666.54 0.00 0.00 0%
111.00 50.00 222.00 0.00 0.00 0%
613.00 50.00 613.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.91 2.75 0.00 0.00 0%
0.00 4.91 9.43 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 16.32 604.33 0.00 0.00 0%
0.00 5.63 165.07 0.00 0.00 0%
0.00 15.58 268.60 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 12071.95 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 14.14 7.92 0.00 0.00 0%
0.00 14.14 27.15 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 27.00 999.81 0.00 0.00 0%
0.00 35.10 605.12 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.26 1642.49 0.00 0.00 0%
0.00 41.14 1531.23 0.00 0.00 0%
0.00 428.40 1687.90 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 21.21 1830.21 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3.53 198.17 0.00 0.00 0%
0.00 10.80 777.49 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.00 452.98 0.00 0.00 0%
0.00 4.00 127.56 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.00 123.74 0.00 0.00 0%
0.00 1.00 103.49 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 818.40 0.00 0.00 0%
0.00 1.00 1036.40 0.00 0.00 0%
0.00 1.00 1036.40 0.00 0.00 0%
1,009.00 1.00 1009.00 0.00 0.00 0%
821.80 1.00 821.80 0.00 0.00 0%
88.38 1.00 88.38 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
642.18 22.00 642.18 0.00 0.00 0%
1,407.00 60.00 1407.00 24.00 562.80 29%
2,394.00 180.00 2394.00 54.00 718.20 23%
135.96 12.00 135.96 0.00 0.00 0%
1,521.10 106.00 1521.10 0.00 0.00 0%
220.68 6.00 220.68 0.00 0.00 0%
4,258.44 108.00 4258.44 0.00 0.00 0%
2,174.40 48.00 2174.40 0.00 0.00 0%
1,367.85 5.00 1367.85 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 36.00 6,513.48 100%
0.00 0.00 0.00 10.00 946.30 100%
0.00 0.00 0.00 4.00 473.32 100%
0.00 0.00 0.00 4.00 534.60 100%
0.00 0.00 0.00 3.00 430.95 100%
0.00 0.00 0.00 14.00 191.10 100%
0.00 0.00 0.00 4.00 5,207.40 100%
15,607.50 3.00 15607.50 1.00 5,202.50 25%
0.00 0.00 0.00 14.00 1,519.42 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 71.00 6731.51 0.00 0.00 0%
0.00 14.00 1210.72 0.00 0.00 0%
0.00 6.00 562.62 0.00 0.00 0%
0.00 8.00 893.36 0.00 0.00 0%
0.00 2.00 268.14 0.00 0.00 0%
0.00 58.00 6119.58 0.00 0.00 0%
0.00 18.00 2837.34 0.00 0.00 0%
0.00 1.00 139.20 0.00 0.00 0%
0.00 1.00 280.24 0.00 0.00 0%
0.00 1.00 86.83 0.00 0.00 0%
0.00 14.00 1399.30 0.00 0.00 0%
0.00 1.00 85.45 0.00 0.00 0%
0.00 1.00 54.17 0.00 0.00 0%
0.00 2.00 121.54 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1,113.62 1.00 1113.62 0.00 0.00 0%
2,149.84 2.00 2149.84 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 11.00 811.91 0.00 0.00 0%
0.00 4.00 295.24 0.00 0.00 0%
0.00 8.00 922.48 0.00 0.00 0%
0.00 0.00 0.00 15.00 698.70 100%
0.00 0.00 0.00 8.00 236.64 100%
0.00 0.00 0.00 859.46 6,265.46 100%
0.00 0.00 0.00 4.00 435.24 100%
0.00 0.00 0.00 15.00 261.60 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 520.65 100%
0.00 0.00 0.00 1.00 157.65 100%
0.00 0.00 0.00 8.00 520.48 100%
0.00 0.00 0.00 4.00 168.88 100%
0.00 0.00 0.00 1.00 1,099.16 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 46.44 285.14 0.00 0.00 0%
0.00 28.25 207.07 0.00 0.00 0%
0.00 8.23 68.56 0.00 0.00 0%
0.00 39.65 320.37 0.00 0.00 0%
0.00 102.48 2227.97 0.00 -0.05 0%
0.00 6.00 166.75 0.00 -0.01 0%
0.00 4.00 95.72 0.00 0.00 0%
1,042.92 4.00 1042.92 0.00 0.00 0%
234.83 1.00 234.83 0.00 0.00 0%
1,411.63 1.00 1411.63 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.50 2500.00 0.50 2,500.00 50%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 2,950.00 100%
0.00 0.00 0.00 1.00 3,200.00 100%
0.00 0.00 0.00 1.00 2,900.00 100%
0.00 0.00 0.00 1.00 3,500.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 5,000.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.00 2251.46 2.00 2,251.46 50%
0.00 0.00 0.00 0.00 0.00 100%
3,930.00 1,500.00 3930.00 0.00 0.00 0%
0.00 0.00 0.00 500.00 1,335.00 100%
3,314.13 1.00 3314.13 0.00 0.00 0%
0.00 0.00 0.00 1.00 2,776.88 100%
0.00 0.00 0.00 0.00 0.00 100%
34,947.29 1.00 34947.29 0.00 0.00 0%
67,446.92 1.00 67446.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
4,081.92 0.50 4081.92 0.50 4,081.92 50%

486,946.98 1,694,732.32 126,497.31


58,433.64 203,367.88 15,179.68
43,825.23 152,525.91 11,384.76
589,205.85 2,050,626.10 153,061.75
589,205.85 2,050,626.10 153,061.75
589,205.85 2,050,626.10 153,061.75
106,057.05 369,112.70 27,551.11
695,262.90 2,419,738.80 180,612.86
VALORIZACION N° 05

PROYECTO MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE NIVEL PRIMARIO DE LAS I.E. NRO 50346, 50372 y 50374, EN LAS COM
PARURO - PARURO - CUSCO
Subpresupue II.EE. NRO. 50372 - CUSIBAMBA CONTRATISTA: CONSORCIO WIRAC
sto
FECHA DE INICIO 9/10/2018
PERIODO 12/1/2018 AL 12/31/2018
CONTRATO ACUMULADO ANTERIOR PRESENTE PERIO
Item Descripción Und.
Metrado Precio S/. Parcial S/. Metrado Parcial S/. Metrado

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 170,017.67


01.01 OBRAS PRELIMINARES 25,283.85
01.01.01 CARTEL DE OBRA TIPO GIGANTOGRAFÍA 6.00x3.60m und 1.00 1,007.85 1,007.85 1.00 1007.85
01.01.02 CERCO PROVISIONAL DE CALAMINA, H=3.00m m 120.00 87.30 10,476.00 120.00 10476.00
01.01.03 OFICINAS m2 30.00 60.00 1,800.00 30.00 1800.00
01.01.04 COMEDOR m2 45.00 60.00 2,700.00 45.00 2700.00
01.01.05 ALMACÉN m2 100.00 60.00 6,000.00 100.00 6000.00
01.01.06 VESTUARIOS m2 45.00 60.00 2,700.00 45.00 2700.00
01.01.07 CASETA DE GUARDIANÍA m2 10.00 60.00 600.00 10.00 600.00
01.02 INSTALACIONES PROVISIONALES 4,500.00 0.00 0.00
01.02.01 INSTALACIONES PROVISIONALES DE AGUA Y DESAGÜE glb 1.00 2,000.00 2,000.00 1.00 2000.00
01.02.02 INSTALACIÓN PROVISIONAL DE ENERGÍA ELÉCTRICA glb 1.00 1,500.00 1,500.00 1.00 1500.00
01.02.03 INSTALACIÓN PROVISIONAL DE TELEFONÍA E INTERNETglb 1.00 1,000.00 1,000.00 1.00 1000.00
01.03 TRABAJOS PRELIMINARES 3,800.00 0.00 0.00
01.03.01 LIMPIEZA DE TERRENO MANUAL m2 5,000.00 0.76 3,800.00 5000.00 3800.00
01.04 TRAZO, NIVELES Y REPLANTEO 18,550.00 0.00 0.00
01.04.01 TRAZO Y REPLANTEO C/EQ. TOPOGRÁFICO* m2 7,000.00 2.65 18,550.00 7000.00 18550.00
01.05 TRANSPORTE DE MATERIALES, EQUIPO Y HERRAMIENTAS 92,607.52 0.00 0.00
01.05.01 FLETE TERRESTRE (TRANSPORTE DE MATERIALES).3 glb 1.00 75,000.00 75,000.00 1.00 75000.00
01.05.02 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO Y MAQUglb 1.00 6,500.00 6,500.00 0.90 5850.00 0.10
01.05.03 MANIPULEO Y TRANSP. INTERNO DE MATERIALES, HER mes 4.00 2,776.88 11,107.52 3.00 8330.64 1.00
01.06 SEGURIDAD Y SALUD 25,276.30 0.00 0.00
01.06.01 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO (INC. glb 1.00 10,000.00 10,000.00 0.20 2000.00 0.40
01.06.02 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD glb 1.00 2,000.00 2,000.00 0.75 1500.00 0.25
01.06.03 VESTUARIO GENERAL und 40.00 200.00 8,000.00 30.00 6000.00 10.00
01.06.04 IMPLEMENTOS DE PROTECCIÓN DE MANOS Y PIES und 40.00 35.73 1,429.20 30.00 1071.90 10.00
01.06.05 IMPLEMENTOS DE PROTECCIÓN DE BOCA, OJOS Y OÍD und 40.00 22.62 904.80 30.00 678.60 10.00
01.06.06 IMPLEMENTOS DE SEGURIDAD PARA TRABAJOS EN ALT und 10.00 218.13 2,181.30 5.00 1090.65 5.00
01.06.07 IMPLEMENTOS DE SEGURIDAD PARA TRABAJOS ELÉCT und 10.00 76.10 761.00 0.00 0.00 8.00
02 ESTRUCTURAS 271,237.60 0.00 0.00
02.01 ESTRUCTURAS - BLOQUE A 158,146.69 0.00 0.00
02.01.01 MOVIMIENTO DE TIERRAS 5,776.56 0.00 0.00
02.01.01.01 EXCAVACION MASIVA EN TERRENO COMPACTO PARA m3 72.45 2.67 193.44 72.45 193.44
02.01.01.02 EXCAVACION MANUAL DE TERRENO m3 74.42 31.73 2,361.35 74.42 2361.35
02.01.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON m3 112.54 10.30 1,159.16 112.54 1159.16
02.01.01.04 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 94.18 2.93 275.95 94.18 275.95
02.01.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE m3 71.04 25.15 1,786.66 71.04 1786.66
02.01.02 OBRAS DE CONCRETO SIMPLE 18,465.68 0.00 0.00
02.01.02.01 SOLADOS 1,238.86 0.00 0.00
02.01.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 45.28 27.36 1,238.86 45.28 1238.86
02.01.02.02 CIMIENTOS CORRIDOS 11,418.00 0.00 0.00
02.01.02.02.01 CIMIENTOS CORRIDOS 1:10+30% PG m3 32.03 221.76 7,102.97 32.03 7102.97
02.01.02.02.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CO m2 110.50 39.05 4,315.03 110.50 4315.03
02.01.02.03 SOBRECIMIENTOS 5,808.82 0.00 0.00
02.01.02.03.01 SOBRECIMIENTOS 1:8+25% PM m3 4.68 246.07 1,151.61 4.68 1151.61
02.01.02.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTm2 110.57 42.12 4,657.21 110.57 4657.21
02.01.03 OBRAS DE CONCRETO ARMADO 133,904.45 0.00 0.00
02.01.03.01 ZAPATAS 10,359.33 0.00 0.00
02.01.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 22.64 325.03 7,358.68 22.64 7358.68
02.01.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATASkg 737.26 4.07 3,000.65 737.26 3000.65
02.01.03.02 VIGAS DE CONEXIÓN 27,784.27 0.00 0.00
02.01.03.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENT m3 19.30 325.03 6,273.08 19.30 6273.08
02.01.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIM m2 154.38 38.31 5,914.30 154.38 5914.30
02.01.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 3832.16 4.07 15,596.89 3832.16 15596.89
02.01.03.03 COLUMNAS 28,213.50 0.00 0.00
02.01.03.03.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 13.13 380.77 4,999.51 13.13 4999.51
02.01.03.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 157.50 44.10 6,945.75 157.50 6945.75
02.01.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNkg 3997.11 4.07 16,268.24 3997.11 16268.24
02.01.03.04 COLUMNETAS DE AMARRE 5,667.60 0.00 0.00
02.01.03.04.01 CONCRETO F'C=210 KG/CM2 PARA COLUMNETAS m3 3.60 356.39 1,283.00 3.60 1283.00
02.01.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 71.81 44.10 3,166.82 71.81 3166.82
02.01.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNkg 299.21 4.07 1,217.78 299.21 1217.78
02.01.03.05 VIGAS 29,284.31 0.00 0.00
02.01.03.05.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 21.85 357.35 7,808.10 21.85 7808.10
02.01.03.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 203.28 50.66 10,298.16 203.28 10298.16
02.01.03.05.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 2746.45 4.07 11,178.05 2746.45 11178.05
02.01.03.06 LOSAS ALIGERADAS 21,604.19 0.00 0.00
02.01.03.06.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 15.44 341.75 5,276.62 15.44 5276.62
02.01.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA m2 178.20 40.99 7,304.42 178.20 7304.42
02.01.03.06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS kg 1725.64 4.07 7,023.35 1725.64 7023.35
02.01.03.06.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, m 495.00 4.04 1,999.80 495.00 1999.80
02.01.03.07 CANALETAS 10,991.25 0.00 0.00
02.01.03.07.01 CONCRETO f'c=210kg/cm2 PARA CANALETAS m3 10.98 357.35 3,923.70 0.00 0.00 10.98
02.01.03.07.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS m2 74.04 50.66 3,750.87 45.00 2279.70 29.04
02.01.03.07.03 ACERO ESTRUCTURAL TRABAJADO PARA CANALETAkg 814.91 4.07 3,316.68 0.00 0.00 814.91
02.02 ESTRUCTURAS - BLOQUE B 45,086.11 0.00 0.00
02.02.01 MOVIMIENTO DE TIERRAS 1,168.38 0.00 0.00
02.02.01.01 EXCAVACION MASIVA EN TERRENO COMPACTO PARA m3 18.43 2.67 49.21 18.43 49.21
02.02.01.02 EXCAVACION MANUAL DE TERRENO m3 15.65 31.73 496.57 15.65 496.57
02.02.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON m3 34.72 10.3 357.62 34.72 357.62
02.02.01.04 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 22.80 2.93 66.80 22.80 66.80
02.02.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE m3 7.88 25.15 198.18 7.88 198.18
02.02.02 OBRAS DE CONCRETO SIMPLE 5,364.28 0.00 0.00
02.02.02.01 SOLADOS 315.19 0.00 0.00
02.02.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 11.52 27.36 315.19 11.52 315.19
02.02.02.02 CIMIENTOS CORRIDOS 4,361.95 0.00 0.00
02.02.02.02.01 CIMIENTOS CORRIDOS 1:10+30% PG m3 10.24 221.76 2,270.82 10.24 2270.82
02.02.02.02.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CO m2 53.55 39.05 2,091.13 53.55 2091.13
02.02.02.03 SOBRECIMIENTOS 687.14 0.00 0.00
02.02.02.03.01 SOBRECIMIENTOS 1:8+25% PM m3 0.80 246.07 196.86 0.80 196.86
02.02.02.03.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTm2 11.64 42.12 490.28 11.64 490.28
02.02.03 OBRAS DE CONCRETO ARMADO 38,553.45 0.00 0.00
02.02.03.01 ZAPATAS 2,636.23 0.00 0.00
02.02.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 5.76 325.03 1,872.17 5.76 1872.17
02.02.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 187.73 4.07 764.06 187.73 764.06
02.02.03.02 VIGAS DE CONEXIÓN 6,951.34 0.00 0.00
02.02.03.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENT m3 5.20 325.03 1,690.16 5.20 1690.16
02.02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIM m2 37.80 38.31 1,448.12 37.80 1448.12
02.02.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS D kg 936.87 4.07 3,813.06 936.87 3813.06
02.02.03.03 COLUMNAS 9,005.93 0.00 0.00
02.02.03.03.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 4.63 380.77 1,762.97 4.63 1762.97
02.02.03.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 53.04 44.10 2,339.06 53.04 2339.06
02.02.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAkg 1204.89 4.07 4,903.90 1204.89 4903.90
02.02.03.04 COLUMNETAS DE AMARRE 2,637.15 0.00 0.00
02.02.03.04.01 CONCRETO F'C=210 KG/CM2 PARA COLUMNETAS m3 1.43 356.39 509.64 1.43 509.64
02.02.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 33.66 44.10 1,484.41 33.66 1484.41
02.02.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNEkg 158.01 4.07 643.10 158.01 643.10
02.02.03.05 VIGAS 10,581.72 0.00 0.00
02.02.03.05.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 6.36 357.35 2,272.75 6.36 2272.75
02.02.03.05.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 69.43 50.66 3,517.32 69.43 3517.32
02.02.03.05.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 1177.31 4.07 4,791.65 1177.31 4791.65
02.02.03.06 LOSAS ALIGERADAS 4,629.21 0.00 0.00
02.02.03.06.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 3.39 341.75 1,158.53 3.39 1158.53
02.02.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA m2 38.85 40.99 1,592.46 38.85 1592.46
02.02.03.06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS A kg 356.44 4.07 1,450.71 356.44 1450.71
02.02.03.06.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, m 105.82 4.04 427.51 105.82 427.51
02.02.03.07 CANALETAS 2,111.87 0.00 0.00
02.02.03.07.01 CONCRETO f'c=210kg/cm2 PARA CANALETAS m3 2.06 357.35 736.14 2.06 736.14
02.02.03.07.02 ENCOFRADO Y DESENCOFRADO DE CANALETAS m2 14.53 50.66 736.09 14.53 736.09
02.02.03.07.03 ACERO ESTRUCTURAL TRABAJADO PARA CANALETAkg 157.16 4.07 639.64 157.16 639.64
02.03 MUROS DE SOSTENIMIENTO 57,069.81 0.00 0.00
02.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON PL m2 269.65 2.93 790.07 269.65 790.07
02.03.02 SOLADO DE CONCRETO f'c=100 kg/cm2, E=2" / 5cm (Mezclm2 269.65 14.76 3,980.03 269.65 3980.03
02.03.03 CONCRETO CICLÓPEO F'C=140 KG/CM2 + 50% DE PIED m3 215.61 214.33 46,211.69 215.61 46211.69
02.03.04 EMBOQUILLADO CON CEMENTO/ARENA, 1:3, HASTA E=2m2 224.59 16.88 3,791.08 224.59 3791.08
02.03.05 JUNTAS DE TECNOPORT DE E=1" - MUROS DE SOSTENI m2 69.42 12.60 874.69 69.42 874.69
02.03.06 SUMINISTRO E INSTALACIÓN DE LLORADEROS CON TUBm 275.63 5.16 1,422.25 275.63 1422.25
02.04 ESTRUCTURA - TANQUE ELEVADO DE AGUA 10,934.99 0.00 0.00
02.04.01 MOVIMIENTO DE TIERRAS 88.55 0.00 0.00
02.04.01.01 EXCAVACION MANUAL DE TERRENO m3 1.60 31.73 50.77 1.60 50.77
02.04.01.02 RELLENO CON MATERIAL PROPIO COMPACTADO CON m3 1.04 10.3 10.71 1.04 10.71
02.04.01.03 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 1 2.93 2.93 1.00 2.93
02.04.01.04 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE m3 0.96 25.15 24.14 0.96 24.14
02.04.02 OBRAS DE CONCRETO SIMPLE 27.36 0.00 0.00
02.04.02.01 SOLADOS 27.36 0.00 0.00
02.04.02.01.01 SOLADOS CONCRETO E=10cm MEZCLA 1:10 m2 1.00 27.36 27.36 1.00 27.36
02.04.03 OBRAS DE CONCRETO ARMADO 5,504.84 0.00 0.00
02.04.03.01 ZAPATAS 271.82 0.00 0.00
02.04.03.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 0.60 325.03 195.02 0.60 195.02
02.04.03.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 18.87 4.07 76.80 18.87 76.80
02.04.03.02 COLUMNAS 2,763.52 0.00 0.00
02.04.03.02.01 CONCRETO f'c=210kg/cm2 PARA COLUMNAS m3 1.70 380.77 647.31 1.70 647.31
02.04.03.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 27.20 44.10 1,199.52 27.20 1199.52
02.04.03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAkg 225.23 4.07 916.69 225.23 916.69
02.04.03.03 VIGAS 1,766.94 0.00 0.00
02.04.03.03.01 CONCRETO f'c=210kg/cm2 PARA VIGAS m3 1.56 357.35 557.47 1.56 557.47
02.04.03.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 17.68 50.66 895.67 17.68 895.67
02.04.03.03.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 77.1 4.07 313.80 77.10 313.80
02.04.03.04 LOSAS ALIGERADAS 702.56 0.00 0.00
02.04.03.04.01 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 0.57 341.75 194.80 0.57 194.80
02.04.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA m2 6.76 40.99 277.09 6.76 277.09
02.04.03.04.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS A kg 31.66 4.07 128.86 31.66 128.86
02.04.03.04.04 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, m 25.20 4.04 101.81 25.20 101.81
02.04.04 ACABADOS 5,314.24 0.00 0.00
02.04.04.01 CONTRAPISO DE 48 mm m2 10.09 26.94 271.82 0.00 0.00 10.09
02.04.04.02 CIELORRASO CON MEZCLA CEMENTO ARENA / 1:5 m2 10.09 44.24 446.38 0.00 0.00 10.09
02.04.04.03 TARRAJEO DE COLUMNAS-COLUMNETAS-PLACAS C:A/1:
m2 24.36 39.65 965.87 0.00 0.00 24.36
02.04.04.04 TARRAJEO DE VIGAS-CANALES C:A/1:5 (INC. ARISTAS) m2 28.64 46.87 1,342.36 0.00 0.00 28.64
02.04.04.05 BRUÑAS m 17.64 5.14 90.67 0.00 0.00 17.64
02.04.04.06 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 63.09 11.05 697.14 0.00 0.00 63.09
02.04.04.07 ESCALERA METÁLICA TIPO GATO DE L=5.80m (INC. und 1.00 1,500.00 1,500.00 0.00 0.00
03 ARQUITECTURA 256,043.41 0.00 0.00
03.01 ARQUITECTURA - BLOQUE A 201,584.72 0.00 0.00
03.01.01 MUROS Y TABIQUES ALBAÑILERIA 32,220.07 0.00 0.00
03.01.01.01 MUROS DE LADRILLO 30,437.09 0.00 0.00
03.01.01.01.01 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. m2 229.06 119.04 27,267.30 229.06 27267.30
03.01.01.01.02 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. m2 16.42 79.08 1,298.49 16.42 1298.49
03.01.01.01.03 MURO CARAVISTA DE SOGA (E=15CM) CON LADRIL m2 26.71 70.06 1,871.30 26.71 1871.30
03.01.01.02 MUROS CON SISTEMA DE CONSTRUCCION EN SECO (DRYWALL) 511.96 0.00 0.00
03.01.01.02.01 SISTEMA DRYWALL DE UNA CARA SB 10mm, E=4.50c m2 9.05 56.57 511.96 0.00 0.00
03.01.01.03 JUNTAS EN MUROS 1,271.02 0.00 0.00
03.01.01.03.01 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZAm 412.26 2.84 1,170.82 412.26 1170.82
03.01.01.03.02 JUNTAS DE TECNOPORT DE E=1" - MURO DE SOGA ( m 58.94 1.70 100.20 58.94 100.20
03.01.02 REVOQUES Y REVESTIMIENTOS 39,228.26 0.00 0.00
03.01.02.01 TARRAJEOS 38,506.38 0.00 0.00
03.01.02.01.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENm2 103.26 18.60 1,920.64 103.26 1920.64
03.01.02.01.02 TARRAJEO EN INTERIORES CON MORTERO CEMENTO
m2 353.12 22.88 8,079.39 353.12 8079.39
03.01.02.01.03 TARRAJEO EN EXTERIORES CON MORTERO CEMENTm2 68.59 45.30 3,107.13 68.59 3107.13
03.01.02.01.04 TARRAJEO DE SUPERFICIE DE COLUMNAS-COLUMNE
m2 105.50 39.65 4,183.08 105.50 4183.08
03.01.02.01.05 TARRAJEO DE SUPERFICIE DE VIGAS-CANALES-GARm2 281.75 46.87 13,205.62 281.75 13205.62
03.01.02.01.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANA m 130.90 13.40 1,754.06 130.90 1754.06
03.01.02.01.07 BRUÑAS m 1,217.21 5.14 6,256.46 1217.21 6256.46
03.01.02.02 JUNTAS DE CONSTRUCCIÓN 721.88 0.00 0.00
03.01.02.02.01 TAPAJUNTAS EN JUNTA DE DILATACIÓN DE TECHO ( m 10.21 52.69 537.96 0.00 0.00
03.01.02.02.02 TAPAJUNTAS EN JUNTA DE DILATACIÓN VERTICAL ( m 6.34 29.01 183.92 0.00 0.00
03.01.03 CIELORRASOS 5,150.46 0.00 0.00
03.01.03.01 CIELORRASOS CON YESO m2 207.68 24.80 5,150.46 207.68 5150.46
03.01.04 PISOS Y PAVIMENTOS 31,216.16 0.00 0.00
03.01.04.01 FALSO PISO 9,079.30 0.00 0.00
03.01.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CO m2 197.72 2.93 579.32 197.72 579.32
03.01.04.01.02 FALSO PISO MEZCLA C:H-1:6, E=8" (INCLUYE CAMA m2 197.72 42.99 8,499.98 197.72 8499.98
03.01.04.02 CONTRAPISO 8,246.06 0.00 0.00
03.01.04.02.01 CONTRAPISO DE 48 mm m2 306.09 26.94 8,246.06 306.09 8246.06
03.01.04.03 PISOS 13,890.80 0.00 0.00
03.01.04.03.01 PISO DE CEMENTO PULIDO 1:2, E=1CM m2 28.63 48.49 1,388.27 28.63 1388.27
03.01.04.03.02 PISO DE CERAMICO DE 40X40CM m2 69.53 49.84 3,465.38 0.00 0.00 69.53
03.01.04.03.03 PISO DE MADERA MACHIMBRADA DE 4"x1"x10' (INC m2 99.55 90.78 9,037.15 0.00 0.00 99.55
03.01.05 ZOCALOS Y CONTRAZOCALOS 8,190.10 0.00 0.00
03.01.05.01 ZOCALOS 4,859.29 0.00 0.00
03.01.05.01.01 ZOCALO DE CERÁMICO DE 40X40CM m2 95.58 50.84 4,859.29 0.00 0.00 95.58
03.01.05.02 CONTRAZOCALOS 3,330.81 0.00 0.00
03.01.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO H=20CM m 115.71 14.30 1,654.65 0.00 0.00 115.71
03.01.05.02.02 CONTRAZOCALO DE CERAMICO DE 40X40CM, H=10 m 17.72 16.15 286.18 0.00 0.00 17.72
03.01.05.02.03 CONTRAZÓCALO DE MADERA AGUANO DE 3/4" x H m 66.57 20.88 1,389.98 0.00 0.00 66.57
03.01.06 COBERTURAS 42,269.92 0.00 0.00
03.01.06.01 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 3 m2 306.09 39.30 12,029.34 0.00 0.00 306.09
03.01.06.02 COBERTURA DE ESTRUCTURA METÁLICA CON POLIC m2 60.67 202.19 12,266.87 45.00 9098.55 15.67
03.01.06.03 COBERTURA DE ESTRUCTURA METÁLICA CON POLICAm2 89.90 199.93 17,973.71 70.00 13995.10 19.90
03.01.07 CARPINTERIA DE MADERA 27,956.09 0.00 0.00
03.01.07.01 PUERTAS 6,639.27 0.00 0.00
03.01.07.01.01 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA Sm2 6.62 225.65 1,493.80 0.00 0.00 6.62
03.01.07.01.02 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA Cm2 19.40 236.91 4,596.05 0.00 0.00 19.40
03.01.07.01.03 PUERTA EN DUCHAS CON MELAMINA DE 18MM m2 3.21 171.16 549.42 0.00 0.00
03.01.07.02 VENTANAS 6,062.19 0.00 0.00
03.01.07.02.01 VENTANA DE MADERA C/REJILLA DE PROTECIÓN m2 20.36 244.59 4,979.85 0.00 0.00 18.00
03.01.07.02.02 VENTANA DE MADERA C/REJILLA DE PROTECIÓN m2 4.54 238.40 1,082.34 0.00 0.00 3.80
03.01.07.03 MUEBLES 10,348.22 0.00 0.00
03.01.07.03.01 MUEBLES ALTOS - REPOSTEROS C/PUERTAS m2 3.07 338.98 1,040.67 0.00 0.00
03.01.07.03.02 SUBDIVISIONES Y PUERTAS PARA MUEBLES BAJOS m2 2.66 296.61 788.98 0.00 0.00
03.01.07.03.03 CLOSET DE AULA m2 14.44 338.98 4,894.87 0.00 0.00
03.01.07.03.04 ARCHIVO OFICINA DIRECTOR m2 10.69 338.98 3,623.70 0.00 0.00
03.01.07.04 SEPARADORES DE CUBICULOS EN BAÑOS 4,906.41 0.00 0.00
03.01.07.04.01 SEPARADOR DE CUBICULOS DE INODOROS CON m2 28.67 163.09 4,675.79 0.00 0.00
03.01.07.04.02 SEPARADORES DE CUBICULOS URINARIOS CON M m2 0.43 536.32 230.62 0.00 0.00
03.01.08 CERRAJERIA 759.20 0.00 0.00
03.01.08.01 ACCESORIOS DE BAÑOS 759.20 0.00 0.00
03.01.08.01.01 COLGADORES EN BAÑO und 6.00 20.42 122.52 0.00 0.00
03.01.08.01.02 BARRA DE APOYO DE ACERO INOXIDABLE und 4.00 159.17 636.68 0.00 0.00
03.01.09 VIDRIOS, CRISTALES Y SIMILARES 282.81 0.00 0.00
03.01.09.01 ESPEJO BISELADO DE SOBREPONER m2 2.65 106.72 282.81 0.00 0.00
03.01.10 PINTURA 10,704.43 0.00 0.00
03.01.10.01 PINTURA LATEX EN INTERIORES MUROS 2 MANOS m2 740.37 10.06 7,448.12 0.00 0.00 740.37
03.01.10.02 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 68.59 11.05 757.92 0.00 0.00 68.59
03.01.10.03 PINTURA LATEX EN CIELORASOS m2 207.68 12.03 2,498.39 0.00 0.00 207.68
03.01.11 OTROS 2,808.52 0.00 0.00
03.01.11.01 MESA DE C°A° REVESTIDO CON CERÁMICO DE 40X40 m2 13.00 210.00 2,730.00 0.00 0.00 13.00
03.01.11.02 LIMPIEZA DE VIDRIOS, CRISTALES Y SIMILARES m2 27.55 2.85 78.52 0.00 0.00
03.01.12 SEÑALIZACIÓN 798.70 0.00 0.00
03.01.12.01 SEÑALIZACIÓN Y EQUIPO DE SEGURIDAD PARA INF glb 1.00 798.70 798.70 0.00 0.00 1.00
03.02 ARQUITECTURA - BLOQUE B 54,458.69 0.00 0.00
03.02.01 MUROS Y TABIQUES ALBAÑILERIA 9,094.91 0.00 0.00
03.02.01.01 MUROS DE LADRILLO 8,559.26 0.00 0.00
03.02.01.01.01 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. m2 27.66 119.04 3,292.65 27.66 3292.65
03.02.01.01.02 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. m2 57.81 79.08 4,571.61 57.81 4571.61
03.02.01.01.03 MURO CARAVISTA DE SOGA (E=15CM) CON LADRIL m2 9.92 70.06 695.00 9.92 695.00
03.02.01.02 MUROS CON SISTEMA DE CONSTRUCCION EN SECO (DRYWALL) 147.65 0.00 0.00
03.02.01.02.01 SISTEMA DRYWALL DE UNA CARA SB 10mm, E=4.50c m2 2.61 56.57 147.65 0.00 0.00
03.02.01.03 JUNTA MUROS 388.00 0.00 0.00
03.02.01.03.01 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZAm 66.32 2.84 188.35 66.32 188.35
03.02.01.03.02 JUNTAS DE TECNOPORT DE E=1" - MURO DE SOGA ( m 117.44 1.70 199.65 117.44 199.65
03.02.02 REVOQUES Y REVESTIMIENTOS 12,167.95 0.00 0.00
03.02.02.01 TARRAJEOS 12,167.95 0.00 0.00
03.02.02.01.01 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENm2 49.95 18.60 929.07 49.95 929.07
03.02.02.01.02 TARRAJEO EN INTERIORES CON MORTERO CEMENTO
m2 122.60 22.88 2,805.09 122.60 2805.09
03.02.02.01.03 TARRAJEO EN EXTERIORES CON MORTERO CEMENTm2 27.66 45.30 1,253.00 27.66 1253.00
03.02.02.01.04 TARRAJEO DE SUPERFICIE DE COLUMNAS-COLUMNE
m2 37.71 39.65 1,495.20 37.71 1495.20
03.02.02.01.05 TARRAJEO DE SUPERFICIE DE VIGAS-CANALES-GARm2 62.05 46.87 2,908.28 62.05 2908.28
03.02.02.01.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANA m 62.97 13.40 843.80 62.97 843.80
03.02.02.01.07 BRUÑAS m 376.17 5.14 1,933.51 376.17 1933.51
03.02.03 CIELORRASOS 1,234.79 0.00 0.00
03.02.03.01 CIELORRASOS CON YESO m2 49.79 24.80 1,234.79 49.79 1234.79
03.02.04 PISOS Y PAVIMENTOS 5,977.52 0.00 0.00
03.02.04.01 FALSO PISO 1,691.23 0.00 0.00
03.02.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CO m2 36.83 2.93 107.91 36.83 107.91
03.02.04.01.02 FALSO PISO MEZCLA C:H-1:6, E=8" (INCLUYE CAMA m2 36.83 42.99 1,583.32 36.83 1583.32
03.02.04.02 CONTRAPISO 1,851.86 0.00 0.00
03.02.04.02.01 CONTRAPISO DE 48 mm m2 68.74 26.94 1,851.86 68.74 1851.86
03.02.04.03 PISOS 2,434.43 0.00 0.00
03.02.04.03.01 PISO DE CEMENTO PULIDO 1:2, E=1CM m2 4.04 48.49 195.90 4.04 195.90
03.02.04.03.02 PISO DE CERAMICO DE 40X40CM m2 18.03 49.84 898.62 0.00 0.00 18.03
03.02.04.03.03 PISO DE MADERA MACHIMBRADA DE 4"x1"x10' (INC m2 14.76 90.78 1,339.91 0.00 0.00 14.76
03.02.05 ZOCALOS Y CONTRAZOCALOS 3,595.56 0.00 0.00
03.02.05.01 ZOCALOS 2,539.46 0.00 0.00
03.02.05.01.01 ZOCALO DE CERÁMICO DE 40X40CM m2 49.95 50.84 2,539.46 0.00 0.00 49.95
03.02.05.02 CONTRAZOCALOS 1,056.10 0.00 0.00
03.02.05.02.01 CONTRAZOCALO DE CEMENTO PULIDO H=20CM m 30.87 14.30 441.44 0.00 0.00 30.87
03.02.05.02.02 CONTRAZOCALO DE CERAMICO DE 40X40CM, H=10 m 11.18 16.15 180.56 0.00 0.00 11.18
03.02.05.02.03 CONTRAZÓCALO DE MADERA AGUANO DE 3/4" x H m 20.79 20.88 434.10 0.00 0.00 20.79
03.02.06 COBERTURAS 2,701.48 0.00 0.00
03.02.06.01 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 3 m2 68.74 39.30 2,701.48 0.00 0.00 68.74
03.02.07 CARPINTERIA DE MADERA 13,581.25 0.00 0.00
03.02.07.01 PUERTAS 4,728.15 0.00 0.00
03.02.07.01.01 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA Sm2 3.97 225.65 895.83 0.00 0.00 3.97
03.02.07.01.02 PUERTA DE MADERA MACHIMBRADA DE UNA HOJA Cm2 14.11 236.91 3,342.80 0.00 0.00 14.11
03.02.07.01.03 PUERTA EN DUCHAS CON MELAMINA DE 18MM m2 2.86 171.16 489.52 0.00 0.00
03.02.07.02 VENTANAS 3,002.71 0.00 0.00
03.02.07.02.01 VENTANA DE MADERA C/REJILLA DE PROTECIÓN m2 5.21 244.59 1,274.31 0.00 0.00 4.90
03.02.07.02.02 VENTANA DE MADERA C/REJILLA DE PROTECIÓN m2 7.25 238.40 1,728.40 0.00 0.00 6.80
03.02.07.03 MUEBLES 5,850.39 0.00 0.00
03.02.07.03.01 MUEBLES ALTOS - REPOSTEROS C/PUERTAS m2 6.46 338.98 2,189.81 0.00 0.00
03.02.07.03.02 SUBDIVISIONES Y PUERTAS PARA MUEBLES BAJOS m2 5.29 296.61 1,569.07 0.00 0.00
03.02.07.03.03 ROPERO VIVIENDA DOCENTES m2 6.17 338.98 2,091.51 0.00 0.00
03.02.08 CERRAJERIA 20.42 0.00 0.00
03.02.08.01 ACCESORIOS DE BAÑOS 20.42 0.00 0.00
03.02.08.01.01 COLGADORES EN BAÑO und 1.00 20.42 20.42 0.00 0.00
03.02.09 VIDRIOS, CRISTALES Y SIMILARES 81.11 0.00 0.00
03.02.09.01 ESPEJO BISELADO DE SOBREPONER m2 0.76 106.72 81.11 0.00 0.00
03.02.10 PINTURA 3,141.55 0.00 0.00
03.02.10.01 PINTURA LATEX EN INTERIORES MUROS 2 MANOS m2 222.36 10.06 2,236.94 0.00 0.00 222.36
03.02.10.02 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 27.66 11.05 305.64 0.00 0.00 27.66
03.02.10.03 PINTURA LATEX EN CIELORASOS m2 49.79 12.03 598.97 0.00 0.00 49.79
03.02.11 OTROS 2,862.15 0.00 0.00 0.00
03.02.11.01 MESA DE C°A° REVESTIDO CON CERÁMICO DE 40X40 m2 13.45 210.00 2,824.50 0.00 0.00 13.45
03.02.11.02 LIMPIEZA DE VIDRIOS, CRISTALES Y SIMILARES m2 13.21 2.85 37.65 0.00 0.00
04 TRATAMIENTO EXTERIOR 362,891.12 0.00 0.00
04.01 MOVIMIENTO DE TIERRAS Y DEMOLICIONES 31,723.31 0.00 0.00
04.01.01 EXCAVACION 3,892.96 0.00 0.00
04.01.01.01 EXCAVACION A MAQUINA EN TERRENO NORMAL m3 897.00 2.67 2,394.99 897.00 2394.99
04.01.01.02 EXCAVACION MANUAL DE TERRENO m3 47.21 31.73 1,497.97 47.21 1497.97
04.01.02 RELLENO 27,830.35 0.00 0.00
04.01.02.01 CARGUIO Y TRANSPORTE DE MATERIAL DE PRÉSTA m3 299.7 27.8 8,331.66 299.70 8331.66
04.01.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO CON m3 1,180.26 7.91 9,335.86 1180.26 9335.86
04.01.02.03 RELLENO COMPACTADO CON MATERIAL DE PRÉSTAM m3 299.70 33.91 10,162.83 299.70 10162.83
04.02 SARDINELES Y GRADERIAS 19,347.27 0.00 0.00
04.02.01 SARDINELES 13,864.89 0.00 0.00
04.02.01.01 PERFILADO DE ZANJA PARA SARDINEL m2 35.84 1.70 60.93 35.84 60.93
04.02.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 215.05 39.33 8,457.92 215.05 8457.92
04.02.01.03 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZ m3 16.13 301.36 4,860.94 16.13 4860.94
04.02.01.04 JUNTAS ASFALTICAS + TECNOPORT, E=1/2" m 80.85 6.00 485.10 80.85 485.10
04.02.02 GRADAS 5,482.38 0.00 0.00
04.02.02.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 67.28 2.93 197.13 67.28 197.13
04.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 43.23 39.33 1,700.24 43.23 1700.24
04.02.02.03 EMPEDRADO DE PISO PARA VACIADO, E=6"/15CM m2 94.88 15.17 1,439.33 94.88 1439.33
04.02.02.04 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZ m3 7.12 301.36 2,145.68 4.12 1241.60 3.00
04.03 RAMPAS, PISOS Y PAVIMENTOS 90,726.18 0.00 0.00
04.03.01 RAMPA CON PISO DE CONCRETO BRUÑADO 16,533.61 0.00 0.00
04.03.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 198.45 2.93 581.46 198.45 581.46
04.03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 146.00 39.33 5,742.18 146.00 5742.18
04.03.01.03 EMPEDRADO DE VEREDAS 6" / 15CM m2 198.45 15.17 3,010.49 198.45 3010.49
04.03.01.04 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZ m3 16.87 301.36 5,083.94 16.87 5083.94
04.03.01.05 BRUÑAS EN VEREDAS m 346.50 2.56 887.04 346.50 887.04
04.03.01.06 JUNTAS ASFALTICAS + TECNOPORT, E=1/2" m 204.75 6.00 1,228.50 0.00 0.00 204.75
04.03.02 PISO DE CONCRETO BRUÑADO 29,558.56 0.00 0.00
04.03.02.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 550.45 2.93 1,612.82 550.45 1612.82
04.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 44.96 39.33 1,768.28 44.96 1768.28
04.03.02.03 EMPEDRADO DE VEREDAS 6" / 15CM m2 550.45 15.17 8,350.33 550.45 8350.33
04.03.02.04 CONCRETO F'C=175 KG/CM2 (MEZCLA 1:6) CON MEZ m3 43.25 301.36 13,033.82 43.25 13033.82
04.03.02.05 BRUÑAS EN VEREDAS m 1,404.06 2.56 3,594.39 0.00 0.00 1,404.06
04.03.02.06 JUNTAS ASFALTICAS + TECNOPORT, E=1/2" m 199.82 6.00 1,198.92 0.00 0.00 199.82
04.03.03 PISO DE CONFITILLO 2,425.11 0.00 0.00 0.00
04.03.03.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 265.62 2.93 778.27 193.00 565.49 72.62
04.03.03.02 PISO DE CONFITILLO E=2" (RIPIO/PIEDRA CHANCADA) m2 265.62 6.20 1,646.84 0.00 0.00 265.62
04.03.04 LOSA MULTIUSO 40,247.44 0.00 0.00
04.03.04.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 429.00 2.93 1,256.97 429.00 1256.97
04.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 58.30 39.33 2,292.94 58.30 2292.94
04.03.04.03 ACERO DE TEMPERATURA 1/4"MALLA DE 0.30X0.30M kg 716.38 4.29 3,073.27 716.38 3073.27
04.03.04.04 PASADORES DE ACERO DE Ø 5/8" x 0.65M@0.50M kg 588.13 3.97 2,334.88 588.13 2334.88
04.03.04.05 CONCRETO F'C=210 KG/CM2 (MEZCLA 1:5) CON MEZ m3 85.80 325.03 27,887.57 85.80 27887.57
04.03.04.06 JUNTAS ASFALTICAS + TECNOPORT, E=1" m 291.50 11.67 3,401.81 291.50 3401.81
04.03.05 ÁREAS VERDES 1,961.46 0.00 0.00
04.03.05.01 CARGUIO Y TRANSPORTE DE TIERRA DE CULTIVO CONm3 16.79 51.39 862.84 0.00 0.00
04.03.05.02 PREPARACION DEL TERRENO CON TIERRA VEGETAL m3 16.79 28.74 482.54 0.00 0.00
04.03.05.03 SEMBRADO DE GRASS m2 167.87 3.67 616.08 0.00 0.00
04.04 OBRAS DE CONCRETO 16,478.94 0.00 0.00
04.04.01 TRIBUNAS 16,343.55 0.00 0.00
04.04.01.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 56.67 2.93 166.04 56.67 166.04
04.04.01.02 CONCRETO CICLÓPEO F'C=140 KG/CM2 + 50% DE PI m3 59.91 214.33 12,840.51 59.91 12840.51
04.04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 30.22 39.33 1,188.55 30.22 1188.55
04.04.01.04 CONCRETO F'C=175 KG/CM2 CON EQUIPO m3 3.64 342.91 1,248.19 3.64 1248.19
04.04.01.05 EMBOQUILLADO CON CEMENTO/ARENA, 1:3, HASTA E=m2 30.22 16.88 510.11 30.22 510.11
04.04.01.06 BRUÑAS EN VEREDAS m 49.14 2.56 125.80 49.14 125.80
04.04.01.07 JUNTAS DE TECNOPORT DE E=1" - MUROS DE SOSTE m2 20.98 12.60 264.35 20.98 264.35
04.04.02 DADO DE CONCRETO - PLATO DE INTERNET 135.39 0.00 0.00
04.04.02.01 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 0.38 2.93 1.11 0.00 0.00
04.04.02.02 CONCRETO CICLÓPEO F'C=140 KG/CM2 + 50% DE PI m3 0.38 214.33 81.45 0.00 0.00
04.04.02.03 CONCRETO F'C=175 KG/CM2 CON EQUIPO m3 0.03 342.91 10.29 0.00 0.00
04.04.02.04 EMBOQUILLADO CON CEMENTO/ARENA, 1:3, HASTA E=m2 2.52 16.88 42.54 0.00 0.00
04.05 PORTAL DE INGRESO 14,914.12 0.00 0.00
04.05.01 MOVIMIENTO DE TIERRAS 557.85 0.00 0.00
04.05.01.01 EXCAVACION MANUAL DE TERRENO m3 4.91 31.73 155.79 4.91 155.79
04.05.01.02 PERFILADO Y COMPACTADO DE SUB RASANTE CON m2 3.07 2.93 9.00 3.07 9.00
04.05.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO CON m3 3.16 10.30 32.55 3.16 32.55
04.05.01.04 ACARREO DE MATERIAL EXCEDENTE CON BUGUI (D<=m3 8.06 18.33 147.74 8.06 147.74
04.05.01.05 CARGUIO Y ELIMINACIÍN DE MATERIAL EXCEDENTE m3 8.46 25.15 212.77 8.46 212.77
04.05.02 OBRAS DE CONCRETO ARMADO 6,714.47 0.00 0.00
04.05.02.01 SOLADO DE CONCRETO f'c=100 kg/cm2, E=4" / 10cm (Mem2 3.07 29.46 90.44 3.07 90.44
04.05.02.02 ACERO DE REFUERZO CORRUGADO Fy=4200 KG/CM2 kg 629.14 4.07 2,560.60 629.14 2560.60
04.05.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 29.61 44.10 1,305.80 29.61 1305.80
04.05.02.04 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADAm2 12.81 40.99 525.08 12.81 525.08
04.05.02.05 BLOQUES DE TECNOPORT PARA LOSA ALIGERADA, H m 27.73 4.04 112.03 27.73 112.03
04.05.02.06 CONCRETO F'C=210 KG/CM2 (MEZCLA 1:5) CON MEZ m3 5.95 356.39 2,120.52 5.95 2120.52
04.05.03 MUROS DE LADRILLO 675.97 0.00 0.00
04.05.03.01 CIMIENTO CORRIDO 1:10 + 30% PIEDRA GRANDE m3 0.55 221.76 121.97 0.00 0.00 0.55
04.05.03.02 SOBRECIMIENTO 1:8 + 25% PIEDRA MEDIANA m3 0.14 246.07 34.45 0.00 0.00 0.14
04.05.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 1.10 42.12 46.33 0.00 0.00 1.10
04.05.03.04 MURO DE LADRILLO MECANIZADO DE ARCILLA K.K. DEm2 3.81 119.04 453.54 0.00 0.00 3.81
04.05.03.05 JUNTAS DE TECNOPORT DE E=1" - MURO DE CABEZA m 6.93 2.84 19.68 0.00 0.00 6.93
04.05.04 ACABADOS 3,417.43 0.00 0.00 0.00
04.05.04.01 TARRAJEO EN EXTERIORES CON MORTERO CEMENTO-
m2 7.62 45.30 345.19 0.00 0.00 7.62
04.05.04.02 TARRAJEO DE COLUMNAS-COLUMNETAS-PLACAS C:A/1:
m2 22.05 39.65 874.28 0.00 0.00 22.05
04.05.04.03 TARRAJEO DE VIGAS-CANALES C:A/1:5 (INC. ARISTAS) m2 3.54 46.87 165.92 0.00 0.00 3.54
04.05.04.04 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS m 9.45 13.40 126.63 0.00 0.00 9.45
04.05.04.05 BRUÑAS m 22.42 5.14 115.24 0.00 0.00 22.42
04.05.04.06 CIELORRASO CON MEZCLA CEMENTO ARENA / 1:5 m2 12.81 44.24 566.71 0.00 0.00 12.81
04.05.04.07 CONTRAPISO DE 48 mm m2 12.81 26.94 345.10 0.00 0.00 12.81
04.05.04.08 CONTRAZOCALO DE CEMENTO PULIDO H=10CM m 9.98 13.69 136.63 0.00 0.00 9.98
04.05.04.09 RECUBRIMIENTO CON CERAMICOS COLOR TEJA DE 3 m2 12.81 39.30 503.43 0.00 0.00 12.81
04.05.04.10 PINTURA LATEX EN EXTERIORES MUROS 2 MANOS m2 7.62 11.05 84.20 0.00 0.00 7.62
04.05.04.11 PINTURA LATEX EN CIELORASOS m2 12.81 12.03 154.10 0.00 0.00 12.81
04.05.05 CARPINTERIA METALICA 3,548.40 0.00 0.00
04.05.05.01 PUERTA DE CERCO PERIMÉTRICO DE DOBLE HOJA DEund 1.00 3,548.40 3,548.40 0.00 0.00
04.06 CERCO PERIMETRICO 134,194.17 0.00 0.00
04.06.01 CERCO DE REJAS CON ANGULAR DE ACERO DE 1½" x 1 m 210.30 483.65 101,711.60 150.00 72547.50 60.30
04.06.02 CERCO DE MURO CARAVISTA DE CABEZA DE H=3.00M, m 14.02 923.30 12,944.67 0.00 0.00 14.02
04.06.03 SUMIN. E INSTAL. CERCO VIVO H=2.00M (C/POSTES DE m 478.05 40.87 19,537.90 0.00 0.00 478.05
04.07 CARPINTERIA METALICA 30,693.50 0.00 0.00
04.07.01 BARANDA CON TUBO DE ACERO LAC Ø 1½"x2.00mm + Fem 205.95 65.07 13,401.17 0.00 0.00 86.00
04.07.02 BARANDA CON TUBO DE ACERO LAC Ø 1½"x2.00mm + Fem 210.10 46.73 9,817.97 0.00 0.00 78.00
04.07.03 TAPA DE REJILLA METÁLICA PARA CANAL DE EVACUACI m 51.74 144.46 7,474.36 0.00 0.00 42.00
04.08 OTROS 24,813.63 0.00 0.00
04.08.01 ASTA DE BANDERA (INC. PEDESTAL) und 1.00 1,267.34 1,267.34 0.00 0.00
04.08.02 JUEGOS INFANTILES DE ACUERDO A PLANOS (INC. APO glb 1.00 16,936.01 16,936.01 0.00 0.00
04.08.03 ARCO DE FULBITO CON TABLERO DE BASQUET (INC. A und 2.00 1,694.91 3,389.82 0.00 0.00 1.50
04.08.04 NED DE VOLEY DE ACUERDO A PLANOS (INC. APOYOS Yund 1.00 1,017.07 1,017.07 0.00 0.00
04.08.05 LETRERO CON EL NOMBRE DE LA INSTITUCIÓN EDUCATund 1.00 1,694.92 1,694.92 0.00 0.00
04.08.06 PLACA RECORDATORIA und 1.00 508.47 508.47 0.00 0.00
05 INSTALACIONES SANITARIAS 78,976.18 0.00 0.00
05.01 APARATOS Y ACCESORIOS SANITARIOS 8,688.00 0.00 0.00
05.01.01 URINARIOS 752.16 0.00 0.00
05.01.01.01 Urinario de losa pza 3.00 250.72 752.16 0.00 0.00
05.01.02 INODOROS 2,398.76 0.00 0.00
05.01.02.01 Inodoro tanque bajo pza 7.00 342.68 2,398.76 0.00 0.00
05.01.03 LAVATORIOS 2,737.28 0.00 0.00
05.01.03.01 Lavatorio ceramico vitrificado tipo Ovalin de 35 x 55 cm pza 4.00 236.34 945.36 0.00 0.00
05.01.03.02 Lavatorio ceramico vitrificado de 20"x18" con pedestal pza 3.00 290.61 871.83 0.00 0.00
05.01.03.03 Lavadero de acero Inox. de 18" x 20" de una poza (B-9) pza 2.00 319.46 638.92 0.00 0.00
05.01.03.04 Lavadero de acero Inox. de 80 x 50 CM de una poza con espza 1.00 281.17 281.17 0.00 0.00
05.01.04 GRIFERIA 2,256.69 0.00 0.00
05.01.04.01 Grifo para lavatorio de una llave pza 7.00 192.78 1,349.46 0.00 0.00
05.01.04.02 Grifo Cromado tipo cuello de ganso de una llave pza 3.00 186.35 559.05 0.00 0.00
05.01.04.03 Ducha cromada con llave mezcladora pza 3.00 116.06 348.18 0.00 0.00
05.01.05 ACCESORIOS SANITARIOS 543.11 0.00 0.00
05.01.05.01 Papelera de loza blanca de 0.13x0.15 pza 7.00 43.73 306.11 0.00 0.00
05.01.05.02 Toallera de gancho pza 3.00 39.50 118.50 0.00 0.00
05.01.05.03 Jabonera pza 3.00 39.50 118.50 0.00 0.00
05.02 SISTEMA DE DESAGUE Y VENTILACION 21,161.23 0.00 0.00
05.02.01 SISTEMA DE DESAGUE 1,533.25 0.00 0.00
05.02.01.01 Salida de desagüe inodoros 4" pto 7.00 47.97 335.79 4.00 191.88
05.02.01.02 Salida de desagüe urinarios pto 3.00 36.60 109.80 2.00 73.20
05.02.01.03 Salida de desagüe lavatorios 2" pto 10.00 34.52 345.20 5.00 172.60
05.02.01.04 Salida de desague Duchas 2" pto 3.00 34.58 103.74 1.00 34.58
05.02.01.05 Salida de desague sumideros 2" pto 6.00 33.42 200.52 3.00 100.26
05.02.01.06 Salida de desague sumideros 3" pto 2.00 61.94 123.88 1.00 61.94
05.02.01.07 Salida de desague para registro roscado de 4" pto 8.00 39.29 314.32 4.00 157.16
05.02.02 SISTEMA DE REDES DE DESAGUE 3,866.92 0.00 0.00
05.02.02.01 Red colectora PVC para desague de 6" m 10.00 25.13 251.30 0.00 0.00 10.00
05.02.02.02 Red colectora PVC para desagüe de 4" m 180.00 17.16 3,088.80 0.00 0.00 180.00
05.02.02.03 Red colectora PVC para desague de 3" m 8.75 10.11 88.46 4.00 40.44 4.75
05.02.02.04 Red colectora PVC para desague de 2" m 70.25 6.24 438.36 30.25 188.76 40.00
05.02.03 ACCESORIOS VARIOS 2,203.09 0.00 0.00
05.02.03.01 Sumidero cromado de 2" und 6.00 21.43 128.58 0.00 0.00 6.00
05.02.03.02 Sumidero cromado de 3" und 2.00 24.91 49.82 0.00 0.00 2.00
05.02.03.03 Registro roscado Ø 4" und 8.00 24.29 194.32 0.00 0.00 8.00
05.02.03.04 Uniones Yee de 2"x 2" und 8.00 17.45 139.60 0.00 0.00 8.00
05.02.03.05 Uniones Yee de 4"x 2" und 12.00 17.45 209.40 12.00 209.40
05.02.03.06 Uniones Yee de 4"x 3" und 6.00 17.88 107.28 6.00 107.28
05.02.03.07 Uniones Yee de 4"x 4" und 8.00 19.56 156.48 8.00 156.48
05.02.03.08 Codo PVC SAL 2"x2" a 45° und 4.00 14.31 57.24 4.00 57.24
05.02.03.09 Codo PVC SAL 3"x3" a 45° und 5.00 27.19 135.95 5.00 135.95
05.02.03.10 Codo PVC SAL 4"x4" a 45° und 16.00 30.26 484.16 16.00 484.16
05.02.03.11 Tee sanitario PVC sal 4"x4"x2" und 7.00 24.34 170.38 7.00 170.38
05.02.03.12 Codo PVC SAL 2"x2" a 90° und 6.00 13.88 83.28 6.00 83.28
05.02.03.13 Tee sanitario PVC sal 2"x2" und 6.00 22.22 133.32 6.00 133.32
05.02.03.14 Reducción PVC SAL 4" x 2" und 8.00 19.16 153.28 8.00 153.28
05.02.04 CAJAS DE INSPECCION Y CONEXIONES 3,950.69 0.00 0.00
05.02.04.01 Caja de registro de desagüe de 12" x 24" pza 30.00 100.48 3,014.40 0.00 0.00 30.00
05.02.04.02 Caja de registro de desagüe de 24" x 24" pza 7.00 103.49 724.43 0.00 0.00 7.00
05.02.04.03 Conexion a red interior und 1.00 211.86 211.86 0.00 0.00 1.00
05.02.05 VENTILACION 583.44 0.00 0.00
05.02.05.01 Sombrero de ventilación PVC SAL Ø 2" pza 11.00 15.89 174.79 0.00 0.00
05.02.05.02 Salidas PVC SAL para ventilacion de 2" h=2.60m pto 11.00 37.15 408.65 11.00 408.65
05.02.06 PRUEBAS HIDRAULICAS 569.80 0.00 0.00
05.02.06.01 Prueba hidraulica de desague y desinfeccion m 259.00 2.20 569.80 0.00 0.00 259.00
05.02.07 EXCAVACIONES RED DE DESAGUE 8,454.04 0.00 0.00
05.02.07.01 Trazo y replanteo preliminar m 198.75 1.95 387.56 198.75 387.56
05.02.07.02 Excavacion de zanja 0.45 x 0.80 m en terreno normal m3 71.55 37.03 2,649.50 71.55 2649.50
05.02.07.03 Refine y nivelacion de zanja m 198.75 4.44 882.45 0.00 0.00 198.75
05.02.07.04 Preparacion y colocacion de cama de apoyo m 198.75 12.26 2,436.68 0.00 0.00 198.75
05.02.07.05 Relleno y apisonado con material propio m3 71.55 29.32 2,097.85 0.00 0.00 71.55
05.03 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 16,777.18 0.00 0.00
05.03.01 SALIDA PARA PUNTOS DE AGUA 871.31 0.00 0.00
05.03.01.01 Salida de agua para inodoros tanque bajo pto 7.00 36.89 258.23 7.00 258.23
05.03.01.02 Salida de agua en urinarios pto 3.00 40.36 121.08 3.00 121.08
05.03.01.03 Salida de agua para lavatorios pto 10.00 37.53 375.30 10.00 375.30
05.03.01.04 Salida de agua para Duchas pto 3.00 38.90 116.70 3.00 116.70
05.03.02 REDES DE DISTRIBUCION Y MONTAJE 1,839.87 0.00 0.00
05.03.02.01 Tuberia PVC SAP Ø 1 1/2" m 53.45 20.25 1,082.36 0.00 0.00 53.45
05.03.02.02 Tuberia PVC SAP Ø 1" m 42.70 6.78 289.51 0.00 0.00 42.70
05.03.02.03 Tuberia PVC SAP Ø 3/4" m 34.90 5.62 196.14 0.00 0.00 34.90
05.03.02.04 Tuberia PVC SAP Ø 1/2" m 54.70 4.97 271.86 0.00 0.00 54.70
05.03.03 ACCESORIOS VARIOS 2,034.65 0.00 0.00 0.00
05.03.03.01 Tee PVC-SAP Ø 1/2" und 10.00 15.79 157.90 5.00 78.95 5.00
05.03.03.02 Tee PVC-SAP Ø 3/4" und 10.00 18.71 187.10 5.00 93.55 5.00
05.03.03.03 Tee PVC-SAP 1" und 3.00 19.98 59.94 1.00 19.98 2.00
05.03.03.04 Tee PVC-SAP 1 1/2" und 6.00 26.91 161.46 2.00 53.82 4.00
05.03.03.05 Codo PVC SAP Ø 1/2" x90° und 15.00 18.29 274.35 7.00 128.03 8.00
05.03.03.06 Codo PVC SAP Ø 3/4" x90° und 7.00 18.71 130.97 2.00 37.42 5.00
05.03.03.07 Codo PVC SAP de 1" x 90º und 2.00 15.17 30.34 0.00 0.00 2.00
05.03.03.08 Codo PVC SAP de 1.1/2" x 90º und 2.00 16.68 33.36 0.00 0.00 2.00
05.03.03.09 REDUCCIONES PVC-SAP 1 1/2" a 1" und 3.00 14.90 44.70 0.00 0.00 3.00
05.03.03.10 REDUCCIONES PVC-SAP 1 1/2" A 3/4" und 2.00 14.87 29.74 0.00 0.00 2.00
05.03.03.11 REDUCCIONES PVC-SAP 1 1/2" A 1/2" und 1.00 25.18 25.18 0.00 0.00 1.00
05.03.03.12 REDUCCIONES PVC-SAP 1" a 3/4" und 5.00 13.97 69.85 0.00 0.00 5.00
05.03.03.13 REDUCCIONES PVC-SAP 1" A 1/2" und 4.00 23.65 94.60 0.00 0.00 4.00
05.03.03.14 REDUCCIONES PVC-SAP 3/4" a 1/2" und 9.00 14.39 129.51 0.00 0.00 9.00
05.03.03.15 Union universal PVC SAP 1/2" und 4.00 12.98 51.92 0.00 0.00 4.00
05.03.03.16 Union universal PVC SAP 3/4" und 8.00 13.21 105.68 0.00 0.00 8.00
05.03.03.17 Union universal PVC SAP 1" und 1.00 22.47 22.47 0.00 0.00 1.00
05.03.03.18 Union universal PVC SAP 1 1/2" und 1.00 22.47 22.47 0.00 0.00 1.00
05.03.03.19 Tapon de PVC SAP 1/2" und 13.00 17.96 233.48 0.00 0.00 13.00
05.03.03.20 Tapon de PVC SAP 3/4" und 4.00 17.96 71.84 0.00 0.00 4.00
05.03.03.21 Tapon de PVC SAP 1" und 4.00 18.80 75.20 0.00 0.00 4.00
05.03.03.22 Tapon de PVC SAP 1 1/2" und 1.00 22.59 22.59 0.00 0.00 1.00
05.03.04 LLAVES Y VALVULAS 1,718.67 0.00 0.00 0.00
05.03.04.01 Valvula de globo de 1 1/2" und 1.00 113.28 113.28 0.00 0.00 1.00
05.03.04.02 Valvula de globo de 1" und 1.00 87.84 87.84 0.00 0.00 1.00
05.03.04.03 Valvula de globo de 3/4" und 2.00 79.03 158.06 0.00 0.00 2.00
05.03.04.04 Valvula de globo de 1/2" und 8.00 65.65 525.20 0.00 0.00 8.00
05.03.04.05 Nicho para valvulas pza 10.00 59.30 593.00 0.00 0.00 10.00
05.03.04.06 Caja de valvula con tapa F°G° und 3.00 80.43 241.29 0.00 0.00 3.00
05.03.05 PRUEBAS HIDRAULICAS 351.07 0.00 0.00
05.03.05.01 Prueba hidráulica en red de agua y desinfeccion m 185.75 1.89 351.07 0.00 0.00 185.75
05.03.06 CONEXION A RED EXTERIOR 169.49 0.00 0.00
05.03.06.01 Conexion del sistema de agua a una red exterior und 1.00 169.49 169.49 0.00 0.00 1.00
05.03.07 EXCAVACIONES PARA REDES DE AGUA 4,792.12 0.00 0.00
05.03.07.01 Trazo y replanteo preliminar m 131.35 1.95 256.13 131.35 256.13
05.03.07.02 Excavacion de zanja 0.45 x 0.60 m m3 35.38 37.03 1,310.12 10.38 384.37 25.00
05.03.07.03 Refine y nivelacion de zanja m 131.05 4.44 581.86 0.00 0.00 131.05
05.03.07.04 Preparacion y colocacion de cama de apoyo m 131.05 12.26 1,606.67 0.00 0.00 131.05
05.03.07.05 Relleno y apisonado con material propio m3 35.38 29.32 1,037.34 0.00 0.00 35.38
05.03.08 INSTALACIONES ESPECIALES 5,000.00 0.00 0.00
05.03.08.01 Instalacion de Tanque Elevado de 5,000 Litros und 1.00 5,000.00 5,000.00 0.00 0.00 0.50
05.04 EVACUACION DE AGUAS PLUVIALES 32,349.77 0.00 0.00
05.04.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES AULAS 24,992.61 0.00 0.00
05.04.01.01 Canaleta de concreto m 195.00 112.95 22,025.25 0.00 0.00 195.00
05.04.01.02 Montante PVC Ø 3" (01 nivel) und 8.00 167.65 1,341.20 0.00 0.00 8.00
05.04.01.03 Columnetas para proteccion de montantes und 8.00 203.27 1,626.16 0.00 0.00 8.00
05.04.02 SISTEMA DE EVACUACION DE AGUAS PLUVIALES EXTERIOR 7,357.16 0.00 0.00
05.04.02.01 EXCAVACIONES AGUAS PLUVIALES CANALES 3,195.68 0.00 0.00
05.04.02.01.01 Trazo y replanteo preliminar m 195.00 1.95 380.25 155.00 302.25 40.00
05.04.02.01.02 Excavacion de zanja 0.45 x 0.60 m m3 52.65 37.03 1,949.63 42.65 1579.33 10.00
05.04.02.01.03 Refine y nivelacion de zanja m 195.00 4.44 865.80 155.00 688.20 40.00
05.04.02.02 CAJAS DE INSPECCION 401.92 0.00 0.00 0.00
05.04.02.02.01 Caja de registro de desagüe de 12" x 24" pza 4.00 100.48 401.92 0.00 0.00 4.00
05.04.02.03 SISTEMA DE RED DE EVACUACION DE AGUAS PLUVIALES 1,520.90 0.00 0.00 0.00
05.04.02.03.01 Red colectora PVC para desague de 4" m 30.00 17.19 515.70 0.00 0.00 30.00
05.04.02.03.02 Red colectora PVC para desague de 6" m 40.00 25.13 1,005.20 0.00 0.00 40.00
05.04.02.04 EXCAVACIONES PARA RED DE EVACUACION DE AGUAS PLUVIALES TUBERIA 2,238.66 0.00 0.00 0.00
05.04.02.04.01 Trazo y replanteo preliminar m 70.00 1.95 136.50 0.00 0.00 70.00
05.04.02.04.02 Excavacion de zanja 0.45 x 0.80 m, terreno normal m3 25.20 37.03 933.16 0.00 0.00 25.20
05.04.02.04.03 Refine y nivelacion de zanja m 70.00 4.44 310.80 0.00 0.00 70.00
05.04.02.04.04 Preparacion y colocacion de cama de apoyo m 70.00 12.26 858.20 0.00 0.00 70.00
06 INSTALACIONES ELECTRICAS 113,899.18 0.00 0.00
06.01 TABLEROS DE DISTRIBUCIÓN 3,773.98 0.00 0.00
06.01.01 TABLERO DE DISTRIBUCION GENERAL TDG Eqp 1.00 818.40 818.40 0.00 0.00 1.00
06.01.02 TABLERO DE DISTRIBUCION TD-11 (24 POLOS) pza 1.00 1,036.40 1,036.40 0.00 0.00 1.00
06.01.03 TABLERO DE DISTRIBUCION TD-12 (24 POLOS) pza 1.00 1,009.00 1,009.00 0.00 0.00 1.00
06.01.04 TABLERO DE DISTRIBUCION TD-IE (18 POLOS) pza 1.00 821.80 821.80 0.00 0.00 1.00
06.01.05 TABLERO DE DISTRIBUCION TD-DE (2 POLOS) pza 1.00 88.38 88.38 0.00 0.00 1.00
06.02 ALIMENTADORES 16,576.24 0.00 0.00
06.02.01 TENDIDO DE CABLE 2-1x16mm2 N2XH +1x10 mm2 N2XH
m 55 29.19 1,605.45 0.00 0.00 30.00
06.02.02 TENDIDO DE CABLE 2-1x10mm2 N2XH +1x10 mm2 N2XHm 27.00 23.45 633.15 0.00 0.00 20.00
06.02.03 TENDIDO DE CABLE 2-1x6 mm2 N2XH m 286.00 13.30 3,803.80 0.00 0.00 180.00
06.02.04 INSTALACION DE DUCTO PVC DE 25mm m 7.00 11.33 79.31 0.00 0.00 3.00
06.02.05 INSTALACION DE DUCTO PVC DE 40mm m 82.00 14.35 1,176.70 0.00 0.00
06.02.06 KIT DE EMPALME 3M PARA CABLE SUBTERRANEO 3M-0, Jgo 8.00 36.78 294.24 0.00 0.00
06.02.07 CAVADO DE ZANJA SEÑALIZACION, PROTECCIÓN Y REL m 138.00 39.43 5,441.34 0.00 0.00
06.02.08 CAVADO, SEÑALIZACION, PROTECCION, RELLENO Y CO m 48.00 45.30 2,174.40 0.00 0.00
06.02.09 BUZON DE CONCRETO DE 0.60x0.60x0.75 CON TAPA Unid 5.00 273.57 1,367.85 0.00 0.00
06.03 ARTEFACTOS DE ILUMINACION 34,313.32 0.00 0.00
06.03.01 ARTEFACTO MODELO RAS STD RAC 2TL36 EE, PARA Eqp 14 180.93 2,533.02 0.00 0.00
06.03.02 ARTEFACTO DE ILUMINACION, PARA ADOSAR CON 02 F Eqp 10.00 94.63 946.30 0.00 0.00
06.03.03 ARTEFACTO DE ILUMINACION, PARA ADOSAR CON 01 F Eqp 4.00 118.33 473.32 0.00 0.00
06.03.04 LUMINARIA TIPO LED PARA ADOSAR, DOWNLIGHT DE 18W
Eqp 4.00 133.65 534.60 0.00 0.00
06.03.05 LUMINARIA TIPO LED PARA ADOSAR, DOWNLIGHT DE 12W
Eqp 3.00 143.65 430.95 0.00 0.00
06.03.06 LUMINARIA DE SUPERFICIE, CON 02 LAMPARAS AHOR Eqp 9.00 13.65 122.85 0.00 0.00
06.03.07 POSTE METÁLICO DE F° G° DE Ø 3" X 6 M CON 01 F Eqp 6.00 1,301.85 7,811.10 0.00 0.00
06.03.08 POSTE METÁLICO DE F° G° DE 12 M (TRES CUERPOS Ø Eqp 4.00 5,202.50 20,810.00 0.00 0.00 3.00
06.03.09 EQUIPO DE ILUMINACION DE EMERGENCIA CON BATER Unid 6.00 108.53 651.18 0.00 0.00
06.04 SALIDAS DE LUZ, INTERRUPTORES, TOMACORRIENTES Y CAJAS 14,947.10 0.00 0.00
06.04.01 SALIDA PARA CENTRO DE LUZ pto 46 94.81 4,361.26 46.00 4361.26
06.04.02 SALIDA PARA INTERRUPTOR SIMPLE pto 14.00 86.48 1,210.72 14.00 1210.72
06.04.03 SALIDA PARA INTERRUPTOR DOBLE pto 5.00 93.77 468.85 5.00 468.85
06.04.04 SALIDA PARA INTERRUPTOR DE CONMUTACION SIMPLEpto 5.00 111.67 558.35 5.00 558.35
06.04.05 SALIDA PARA INTERRUPTOR DE CONMUTACION DOBLE pto 1.00 134.07 134.07 1.00 134.07
06.04.06 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA TI pto 38.00 105.51 4,009.38 38.00 4009.38
06.04.07 SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA TI pto 18.00 157.63 2,837.34 18.00 2837.34
06.04.08 SALIDAS DE FUERZA ELECTRICA MONOFASICA pto 1.00 139.20 139.20 1.00 139.20
06.04.09 SALIDA PARA TIMBRE pto 1.00 280.24 280.24 1.00 280.24
06.04.10 SALIDA PARA PULSADOR DE TIMBRE pto 1.00 86.83 86.83 1.00 86.83
06.04.11 SALIDA PARA LUZ DE EMERGENCIA pto 6.00 99.95 599.70 6.00 599.70
06.04.12 CAJA DE PASE OCTOGONAL DE F.G. CON TAPA CIEGA pto 1.00 85.45 85.45 1.00 85.45
06.04.13 CAJA DE PASE DE F.G.150x150x100 mm pto 1.00 54.17 54.17 1.00 54.17
06.04.14 CAJA DE PASE DE F.G.200x200x100 mm pto 2.00 60.77 121.54 2.00 121.54
06.05 SISTEMA DE PUESTA A TIERRA 2,188.54 0.00 0.00
06.05.01 PUESTA A TIERRA GENERAL (SISTEMA ELÉCTRICO - GE Jgo 1.00 1,113.62 1,113.62 0.00 0.00
06.05.02 PUESTA A TIERRA (SISTEMA ELECTRICO) Jgo 1.00 1,074.92 1,074.92 0.00 0.00
06.06 SISTEMA DE UTILIZACIÓN EN MEDIA TENSIÓN 42,100.00 0.00 0.00
06.06.01 SISTEMA DE UTILIZACION EN MEDIA TENSION glb 1.00 42,100.00 42,100.00 0.00 0.00
07 INSTALACIONES ESPECIALES 12,069.01 0.00 0.00
07.01 INSTALACIONES DE CABLEADO ESTRUCTURADO 12,069.01 0.00 0.00
07.01.01 CABLEADO HORIZONTAL 5,640.15 0.00 0.00
07.01.01.01 Salida para Red de Datos pto 7.00 73.81 516.67 0.00 0.00
07.01.01.02 Salida para red de datos Acces Point pto 2.00 73.81 147.62 0.00 0.00
07.01.01.03 Salida para HDMI pto 4.00 115.31 461.24 0.00 0.00
07.01.01.04 Suministro patch cord de 3.00 m para area de trabajo und 9.00 46.58 419.22 0.00 0.00
07.01.01.05 suministro cable hdmi x 3m para area de trabajo und 8.00 29.58 236.64 0.00 0.00
07.01.01.06 Suministro cable F/UTP Cat6A LSZH-3 477.94 7.29 3,484.18 0.00 0.00
07.01.01.07 suministro cable hdmi x 10m und 2.00 108.81 217.62 0.00 0.00
07.01.01.08 Certificacion de Puntos de Red en CAT6A pto 9.00 17.44 156.96 0.00 0.00
07.01.02 CABLEADO VERTICAL 2,317.32 0.00 0.00
07.01.02.01 PatchPanel Cat6 de 24 Puertos und 1.00 520.65 520.65 0.00 0.00
07.01.02.02 ordenador horizontal de 2 ru und 1.00 157.65 157.65 0.00 0.00
07.01.02.03 PatchCord para datos cat6A de 1.5 mt. LSZH und 7.00 65.06 455.42 0.00 0.00
07.01.02.04 PatchCord para datos POE cat6A de 1.5 mt. LSZH und 2.00 42.22 84.44 0.00 0.00
07.01.02.05 gabinete de comunicacion de pared 18 ru und 1.00 1,099.16 1,099.16 0.00 0.00
07.01.03 TUBERIAS 4,111.54 0.00 0.00
07.01.03.01 Tuberia PVC SAP Ø 3/4" m 30.24 6.14 185.67 0.00 0.00 30.24
07.01.03.02 Tuberia PVC SAP Ø 1" m 11.56 7.33 84.73 0.00 0.00 11.56
07.01.03.03 Tuberia PVC SAP Ø 1 1/2" m 8.23 8.33 68.56 0.00 0.00 8.23
07.01.03.04 Tuberia PVC SAP Ø 1 1/4" m 19.82 8.08 160.15 0.00 0.00 19.82
07.01.03.05 Tuberia PVC SAP de 2" ML 73.68 21.74 1,601.80 0.00 0.00 73.68
07.01.03.06 CAJA DE F. G. 300X300X150 mm. und 2.00 27.79 55.58 0.00 0.00 2.00
07.01.03.07 CAJA DE F. G. 150X150X100 mm. und 2.00 23.93 47.86 0.00 0.00 2.00
07.01.03.08 POZO DE CONCRETO DE 0.50X0.50X0.50 M" und 1.00 260.73 260.73 0.00 0.00 1.00
07.01.03.09 BASE DE CONCRETO PARA ANTENA VSAT (0.60X0.60X0.und 1.00 234.83 234.83 0.00 0.00 1.00
07.01.03.10 Pozo puesta a tierra jgo 1.00 1,411.63 1,411.63 0.00 0.00 1.00
08 ACCIONES DE MITIGACIÓN DE IMPACTO AMBIENTAL 38,408.93 0.00 0.00
08.01 PLAN DE MANEJO AMBIENTAL 5,000.00 0.00 0.00
08.01.01 SENSIBILIZACIÓN EN TEMAS AMBIENTALES evento 1.00 5,000.00 5,000.00 0.50 2500.00 0.30
08.02 PLAN DE VIGILANCIA AMBIENTAL 12,550.00 0.00 0.00
08.02.01 MONITOREO DE LA CALIDAD DE AGUAS glb 1.00 2,950.00 2,950.00 0.00 0.00
08.02.02 MONITOREO DE LA CALIDAD DEL AIRE glb 1.00 3,200.00 3,200.00 0.00 0.00
08.02.03 MONITOREO DE NIVELES SONOROS glb 1.00 2,900.00 2,900.00 0.00 0.00
08.02.04 MONITOREO DE SUELOS glb 1.00 3,500.00 3,500.00 0.00 0.00
08.03 PLAN DE MANEJO DE RESIDUOS SÓLIDOS Y LÍQUIDOS 5,000.00 0.00 0.00
08.03.01 PLAN DE MANEJO DE RESIDUOS SÓLIDOS glb 1.00 5,000.00 5,000.00 0.00 0.00 0.80
08.04 PLAN DE SALUD Y SEGURIDAD OCUPACIONAL 4,502.92 0.00 0.00
08.04.01 CONSTRUCCIÓN Y MANTENIMIENTO DE LETRINAS SANI und 4.00 1,125.73 4,502.92 2.00 2251.46 2.00
08.05 PROGRAMA DE CIERRE 11,356.01 0.00 0.00
08.05.01 RECUPERACIÓN DEL ENTORNO A MANO m2 1,500.00 2.62 3,930.00 0.00 0.00 1,500.00
08.05.02 RECUPERACIÓN DEL ENTORNO CON EQUIPO m2 500.00 2.67 1,335.00 0.00 0.00
08.05.03 DESMONTAJE DE INSTALACIONES PROVISIONALES glb 1.00 3,314.13 3,314.13 0.00 0.00 1.00
08.05.04 LIMPIEZA FINAL DE OBRA glb 1.00 2,776.88 2,776.88 0.00 0.00
09 COMPONENTE 02 73,405.57 0.00 0.00
MOBILIARIO glb 1.00 20,620.17 20,620.17 0.00 0.00 1.00
EQUIPAMIENTO glb 1.00 52,785.40 52,785.40 0.00 0.00 1.00
10 COMPONENTE 03 8,163.84 0.00 0.00
CAPACITACION DOCENTE Y SENSIBILIZACION A PADglb 1.00 8,163.84 8,163.84 0.00 0.00 0.50

COSTO DIRECTO S/. 1,385,112.51 811,691.00


GASTOS GENERALES (12%) 12.00% S/. 166,213.50 97,402.92
UTILIDAD (9.00%) 9.00% S/. 124,660.13 73,052.19
SUB TOTAL S/. 1,675,986.14 982,146.11
FACTOR DE RELACIÓN (FR) 1.0000 S/. 1,675,986.14 982,146.11
TOTAL DE OBRA S/. 1,675,986.14 982,146.11
I.G.V. 18.00% S/. 301,677.51 176,786.30
TOTAL DE PRESUPUESTO VALORIZADO S/. 1,977,663.65 1,158,932.41
EN LAS COMUNIDADES DE: MAYUMBAMBA; CUSIBAMBA Y MASKA DEL DISTRITO DE

RCIO WIRACOCHA

PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL

Parcial S/. Metrado Parcial S/. Metrado Parcial S/. %

0.00 1.00 1007.85 0.00 0.00 0%


0.00 120.00 10476.00 0.00 0.00 0%
0.00 30.00 1800.00 0.00 0.00 0%
0.00 45.00 2700.00 0.00 0.00 0%
0.00 100.00 6000.00 0.00 0.00 0%
0.00 45.00 2700.00 0.00 0.00 0%
0.00 10.00 600.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 2000.00 0.00 0.00 0%
0.00 1.00 1500.00 0.00 0.00 0%
0.00 1.00 1000.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 5,000.00 3800.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 7,000.00 18550.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 75000.00 0.00 0.00 0%
650.00 1.00 6500.00 0.00 0.00 0%
2,776.88 4.00 11107.52 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
4,000.00 0.60 6000.00 0.40 4,000.00 40%
500.00 1.00 2000.00 0.00 0.00 0%
2,000.00 40.00 8000.00 0.00 0.00 0%
357.30 40.00 1429.20 0.00 0.00 0%
226.20 40.00 904.80 0.00 0.00 0%
1,090.65 10.00 2181.30 0.00 0.00 0%
608.80 8.00 608.80 2.00 152.20 20%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 72.45 193.44 0.00 0.00 0%
0.00 74.42 2361.35 0.00 0.00 0%
0.00 112.54 1159.16 0.00 0.00 0%
0.00 94.18 275.95 0.00 0.00 0%
0.00 71.04 1786.66 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 45.28 1238.86 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 32.03 7102.97 0.00 0.00 0%
0.00 110.50 4315.03 0.00 0.01 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.68 1151.61 0.00 0.00 0%
0.00 110.57 4657.21 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 22.64 7358.68 0.00 0.00 0%
0.00 737.26 3000.65 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 19.30 6273.08 0.00 0.00 0%
0.00 154.38 5914.30 0.00 0.00 0%
0.00 3,832.16 15596.89 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 13.13 4999.51 0.00 0.00 0%
0.00 157.50 6945.75 0.00 0.00 0%
0.00 3,997.11 16268.24 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3.60 1283.00 0.00 0.00 0%
0.00 71.81 3166.82 0.00 0.00 0%
0.00 299.21 1217.78 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 21.85 7808.10 0.00 0.00 0%
0.00 203.28 10298.16 0.00 0.00 0%
0.00 2,746.45 11178.05 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 15.44 5276.62 0.00 0.00 0%
0.00 178.20 7304.42 0.00 0.00 0%
0.00 1,725.64 7023.35 0.00 0.00 0%
0.00 495.00 1999.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
3,923.70 10.98 3923.70 0.00 0.00 0%
1,471.17 74.04 3750.87 0.00 0.00 0%
3,316.68 814.91 3316.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 18.43 49.21 0.00 0.00 0%
0.00 15.65 496.57 0.00 0.00 0%
0.00 34.72 357.62 0.00 0.00 0%
0.00 22.80 66.80 0.00 0.00 0%
0.00 7.88 198.18 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 11.52 315.19 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 10.24 2270.82 0.00 0.00 0%
0.00 53.55 2091.13 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.80 196.86 0.00 0.00 0%
0.00 11.64 490.28 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 5.76 1872.17 0.00 0.00 0%
0.00 187.73 764.06 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 5.20 1690.16 0.00 0.00 0%
0.00 37.80 1448.12 0.00 0.00 0%
0.00 936.87 3813.06 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.63 1762.97 0.00 0.00 0%
0.00 53.04 2339.06 0.00 0.00 0%
0.00 1,204.89 4903.90 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.43 509.64 0.00 0.00 0%
0.00 33.66 1484.41 0.00 0.00 0%
0.00 158.01 643.10 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 6.36 2272.75 0.00 0.00 0%
0.00 69.43 3517.32 0.00 0.00 0%
0.00 1,177.31 4791.65 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3.39 1158.53 0.00 0.00 0%
0.00 38.85 1592.46 0.00 0.00 0%
0.00 356.44 1450.71 0.00 0.00 0%
0.00 105.82 427.51 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 2.06 736.14 0.00 0.00 0%
0.00 14.53 736.09 0.00 0.00 0%
0.00 157.16 639.64 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 269.65 790.07 0.00 0.00 0%
0.00 269.65 3980.03 0.00 0.00 0%
0.00 215.61 46211.69 0.00 0.00 0%
0.00 224.59 3791.08 0.00 0.00 0%
0.00 69.42 874.69 0.00 0.00 0%
0.00 275.63 1422.25 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.60 50.77 0.00 0.00 0%
0.00 1.04 10.71 0.00 0.00 0%
0.00 1.00 2.93 0.00 0.00 0%
0.00 0.96 24.14 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.00 27.36 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.60 195.02 0.00 0.00 0%
0.00 18.87 76.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.70 647.31 0.00 0.00 0%
0.00 27.20 1199.52 0.00 0.00 0%
0.00 225.23 916.69 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 1.56 557.47 0.00 0.00 0%
0.00 17.68 895.67 0.00 0.00 0%
0.00 77.10 313.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.57 194.80 0.00 0.00 0%
0.00 6.76 277.09 0.00 0.00 0%
0.00 31.66 128.86 0.00 0.00 0%
0.00 25.20 101.81 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
271.82 10.09 271.82 0.00 0.00 0%
446.38 10.09 446.38 0.00 0.00 0%
965.87 24.36 965.87 0.00 0.00 0%
1,342.36 28.64 1342.36 0.00 0.00 0%
90.67 17.64 90.67 0.00 0.00 0%
697.14 63.09 697.14 0.00 0.00 0%
0.00 0.00 0.00 1.00 1,500.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 229.06 27267.30 0.00 0.00 0%
0.00 16.42 1298.49 0.00 0.00 0%
0.00 26.71 1871.30 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 9.05 511.96 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 412.26 1170.82 0.00 0.00 0%
0.00 58.94 100.20 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 103.26 1920.64 0.00 0.00 0%
0.00 353.12 8079.39 0.00 0.00 0%
0.00 68.59 3107.13 0.00 0.00 0%
0.00 105.50 4183.08 0.00 0.01 0%
0.00 281.75 13205.62 0.00 0.00 0%
0.00 130.90 1754.06 0.00 0.00 0%
0.00 1,217.21 6256.46 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 10.21 537.96 100%
0.00 0.00 0.00 6.34 183.92 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 207.68 5150.46 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 197.72 579.32 0.00 0.00 0%
0.00 197.72 8499.98 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 306.09 8246.06 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 28.63 1388.27 0.00 0.00 0%
3465.38 69.53 3465.38 0.00 0.00 0%
9,037.15 99.55 9037.15 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
4,859.29 95.58 4859.29 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1,654.65 115.71 1654.65 0.00 0.00 0%
286.18 17.72 286.18 0.00 0.00 0%
1,389.98 66.57 1389.98 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
12029.34 306.09 12029.34 0.00 0.00 0%
3,168.32 60.67 12266.87 0.00 0.00 0%
3,978.61 89.90 17973.71 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
1493.80 6.62 1493.80 0.00 0.00 0%
4,596.05 19.40 4596.05 0.00 0.00 0%
0.00 0.00 0.00 3.21 549.42 100%
0.00 0.00 0.00 0.00 0.00 100%
4,402.62 18.00 4402.62 2.36 577.23 12%
905.92 3.80 905.92 0.74 176.42 16%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 3.07 1,040.67 100%
0.00 0.00 0.00 2.66 788.98 100%
0.00 0.00 0.00 14.44 4,894.87 100%
0.00 0.00 0.00 10.69 3,623.70 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 28.67 4,675.79 100%
0.00 0.00 0.00 0.43 230.62 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 6.00 122.52 100%
0.00 0.00 0.00 4.00 636.68 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 2.65 282.81 100%
0.00 0.00 0.00 0.00 0.00 100%
7,448.12 740.37 7448.12 0.00 0.00 0%
757.92 68.59 757.92 0.00 0.00 0%
2,498.39 207.68 2498.39 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
2,730.00 13.00 2730.00 0.00 0.00 0%
0.00 0.00 0.00 27.55 78.52 100%
0.00 0.00 0.00 0.00 0.00 100%
798.70 1.00 798.70 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 27.66 3292.65 0.00 0.00 0%
0.00 57.81 4571.61 0.00 0.00 0%
0.00 9.92 695.00 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 2.61 147.65 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 66.32 188.35 0.00 0.00 0%
0.00 117.44 199.65 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.95 929.07 0.00 0.00 0%
0.00 122.60 2805.09 0.00 0.00 0%
0.00 27.66 1253.00 0.00 0.00 0%
0.00 37.71 1495.20 0.00 0.00 0%
0.00 62.05 2908.28 0.00 0.00 0%
0.00 62.97 843.80 0.00 0.00 0%
0.00 376.17 1933.51 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 49.79 1234.79 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 36.83 107.91 0.00 0.00 0%
0.00 36.83 1583.32 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 68.74 1851.86 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.04 195.90 0.00 0.00 0%
898.62 18.03 898.62 0.00 0.00 0%
1,339.91 14.76 1339.91 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
2,539.46 49.95 2539.46 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
441.44 30.87 441.44 0.00 0.00 0%
180.56 11.18 180.56 0.00 0.00 0%
434.10 20.79 434.10 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
2,701.48 68.74 2701.48 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
895.83 3.97 895.83 0.00 0.00 0%
3,342.80 14.11 3342.80 0.00 0.00 0%
0.00 0.00 0.00 2.86 489.52 100%
0.00 0.00 0.00 0.00 0.00 100%
1198.49 4.90 1198.49 0.31 75.82 6%
1,621.12 6.80 1621.12 0.45 107.28 6%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 6.46 2,189.81 100%
0.00 0.00 0.00 5.29 1,569.07 100%
0.00 0.00 0.00 6.17 2,091.51 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 20.42 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.76 81.11 100%
0.00 0.00 0.00 0.00 0.00 100%
2,236.94 222.36 2236.94 0.00 0.00 0%
305.64 27.66 305.64 0.00 0.00 0%
598.97 49.79 598.97 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
2,824.50 13.45 2824.50 0.00 0.00 0%
0.00 0.00 0.00 13.21 37.65 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 897.00 2394.99 0.00 0.00 0%
0.00 47.21 1497.97 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 299.70 8331.66 0.00 0.00 0%
0.00 1,180.26 9335.86 0.00 0.00 0%
0.00 299.70 10162.83 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 35.84 60.93 0.00 0.00 0%
0.00 215.05 8457.92 0.00 0.00 0%
0.00 16.13 4860.94 0.00 0.00 0%
0.00 80.85 485.10 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 67.28 197.13 0.00 0.00 0%
0.00 43.23 1700.24 0.00 0.00 0%
0.00 94.88 1439.33 0.00 0.00 0%
904.08 7.12 2145.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 198.45 581.46 0.00 0.00 0%
0.00 146.00 5742.18 0.00 0.00 0%
0.00 198.45 3010.49 0.00 0.00 0%
0.00 16.87 5083.94 0.00 0.00 0%
0.00 346.50 887.04 0.00 0.00 0%
1,228.50 204.75 1228.50 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 550.45 1612.82 0.00 0.00 0%
0.00 44.96 1768.28 0.00 0.00 0%
0.00 550.45 8350.33 0.00 0.00 0%
0.00 43.25 13033.82 0.00 0.00 0%
3,594.39 1,404.06 3594.39 0.00 0.00 0%
1,198.92 199.82 1198.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
212.78 265.62 778.27 0.00 0.00 0%
1,646.84 265.62 1646.84 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 429.00 1256.97 0.00 0.00 0%
0.00 58.30 2292.94 0.00 0.00 0%
0.00 716.38 3073.27 0.00 0.00 0%
0.00 588.13 2334.88 0.00 0.00 0%
0.00 85.80 27887.57 0.00 0.00 0%
0.00 291.50 3401.81 0.00 0.01 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 16.79 862.84 100%
0.00 0.00 0.00 16.79 482.54 100%
0.00 0.00 0.00 167.87 616.08 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 56.67 166.04 0.00 0.00 0%
0.00 59.91 12840.51 0.00 0.00 0%
0.00 30.22 1188.55 0.00 0.00 0%
0.00 3.64 1248.19 0.00 0.00 0%
0.00 30.22 510.11 0.00 0.00 0%
0.00 49.14 125.80 0.00 0.00 0%
0.00 20.98 264.35 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.38 1.11 100%
0.00 0.00 0.00 0.38 81.45 100%
0.00 0.00 0.00 0.03 10.29 100%
0.00 0.00 0.00 2.52 42.54 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.91 155.79 0.00 0.00 0%
0.00 3.07 9.00 0.00 0.00 0%
0.00 3.16 32.55 0.00 0.00 0%
0.00 8.06 147.74 0.00 0.00 0%
0.00 8.46 212.77 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 3.07 90.44 0.00 0.00 0%
0.00 629.14 2560.60 0.00 0.00 0%
0.00 29.61 1305.80 0.00 0.00 0%
0.00 12.81 525.08 0.00 0.00 0%
0.00 27.73 112.03 0.00 0.00 0%
0.00 5.95 2120.52 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
121.97 0.55 121.97 0.00 0.00 0%
34.45 0.14 34.45 0.00 0.00 0%
46.33 1.10 46.33 0.00 0.00 0%
453.54 3.81 453.54 0.00 0.00 0%
19.68 6.93 19.68 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
345.19 7.62 345.19 0.00 0.00 0%
874.28 22.05 874.28 0.00 0.00 0%
165.92 3.54 165.92 0.00 0.00 0%
126.63 9.45 126.63 0.00 0.00 0%
115.24 22.42 115.24 0.00 0.00 0%
566.71 12.81 566.71 0.00 0.00 0%
345.10 12.81 345.10 0.00 0.00 0%
136.63 9.98 136.63 0.00 0.00 0%
503.43 12.81 503.43 0.00 0.00 0%
84.20 7.62 84.20 0.00 0.00 0%
154.10 12.81 154.10 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 3,548.40 100%
0.00 0.00 0.00 0.00 0.00 100%
29,164.10 210.30 101711.60 0.00 0.01 0%
12,944.67 14.02 12944.67 0.00 0.00 0%
19537.90 478.05 19537.90 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
5,596.02 86.00 5596.02 119.95 7,805.15 58%
3,644.94 78.00 3644.94 132.10 6,173.03 63%
6,067.32 42.00 6067.32 9.74 1,407.04 19%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 1,267.34 100%
0.00 0.00 0.00 1.00 16,936.01 100%
2,542.37 1.50 2542.37 0.50 847.46 25%
0.00 0.00 0.00 1.00 1,017.07 100%
0.00 0.00 0.00 1.00 1,694.92 100%
0.00 0.00 0.00 1.00 508.47 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 3.00 752.16 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.00 2,398.76 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 4.00 945.36 100%
0.00 0.00 0.00 3.00 871.83 100%
0.00 0.00 0.00 2.00 638.92 100%
0.00 0.00 0.00 1.00 281.17 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.00 1,349.46 100%
0.00 0.00 0.00 3.00 559.05 100%
0.00 0.00 0.00 3.00 348.18 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.00 306.11 100%
0.00 0.00 0.00 3.00 118.50 100%
0.00 0.00 0.00 3.00 118.50 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 4.00 191.88 3.00 143.91 43%
0.00 2.00 73.20 1.00 36.60 33%
0.00 5.00 172.60 5.00 172.60 50%
0.00 1.00 34.58 2.00 69.16 67%
0.00 3.00 100.26 3.00 100.26 50%
0.00 1.00 61.94 1.00 61.94 50%
0.00 4.00 157.16 4.00 157.16 50%
0.00 0.00 0.00 0.00 0.00 100%
251.30 10.00 251.30 0.00 0.00 0%
3,088.80 180.00 3088.80 0.00 0.00 0%
48.02 8.75 88.46 0.00 0.00 0%
249.60 70.25 438.36 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
128.58 6.00 128.58 0.00 0.00 0%
49.82 2.00 49.82 0.00 0.00 0%
194.32 8.00 194.32 0.00 0.00 0%
139.60 8.00 139.60 0.00 0.00 0%
0.00 12.00 209.40 0.00 0.00 0%
0.00 6.00 107.28 0.00 0.00 0%
0.00 8.00 156.48 0.00 0.00 0%
0.00 4.00 57.24 0.00 0.00 0%
0.00 5.00 135.95 0.00 0.00 0%
0.00 16.00 484.16 0.00 0.00 0%
0.00 7.00 170.38 0.00 0.00 0%
0.00 6.00 83.28 0.00 0.00 0%
0.00 6.00 133.32 0.00 0.00 0%
0.00 8.00 153.28 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
3014.40 30.00 3014.40 0.00 0.00 0%
724.43 7.00 724.43 0.00 0.00 0%
211.86 1.00 211.86 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 11.00 174.79 100%
0.00 11.00 408.65 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
569.80 259.00 569.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 198.75 387.56 0.00 0.00 0%
0.00 71.55 2649.50 0.00 0.00 0%
882.45 198.75 882.45 0.00 0.00 0%
2,436.68 198.75 2436.68 0.00 0.00 0%
2,097.85 71.55 2097.85 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 7.00 258.23 0.00 0.00 0%
0.00 3.00 121.08 0.00 0.00 0%
0.00 10.00 375.30 0.00 0.00 0%
0.00 3.00 116.70 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
1,082.36 53.45 1082.36 0.00 0.00 0%
289.51 42.70 289.51 0.00 0.00 0%
196.14 34.90 196.14 0.00 0.00 0%
271.86 54.70 271.86 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
78.95 10.00 157.90 0.00 0.00 0%
93.55 10.00 187.10 0.00 0.00 0%
39.96 3.00 59.94 0.00 0.00 0%
107.64 6.00 161.46 0.00 0.00 0%
146.32 15.00 274.35 0.00 0.00 0%
93.55 7.00 130.97 0.00 0.00 0%
30.34 2.00 30.34 0.00 0.00 0%
33.36 2.00 33.36 0.00 0.00 0%
44.70 3.00 44.70 0.00 0.00 0%
29.74 2.00 29.74 0.00 0.00 0%
25.18 1.00 25.18 0.00 0.00 0%
69.85 5.00 69.85 0.00 0.00 0%
94.60 4.00 94.60 0.00 0.00 0%
129.51 9.00 129.51 0.00 0.00 0%
51.92 4.00 51.92 0.00 0.00 0%
105.68 8.00 105.68 0.00 0.00 0%
22.47 1.00 22.47 0.00 0.00 0%
22.47 1.00 22.47 0.00 0.00 0%
233.48 13.00 233.48 0.00 0.00 0%
71.84 4.00 71.84 0.00 0.00 0%
75.20 4.00 75.20 0.00 0.00 0%
22.59 1.00 22.59 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
113.28 1.00 113.28 0.00 0.00 0%
87.84 1.00 87.84 0.00 0.00 0%
158.06 2.00 158.06 0.00 0.00 0%
525.20 8.00 525.20 0.00 0.00 0%
593.00 10.00 593.00 0.00 0.00 0%
241.29 3.00 241.29 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
351.07 185.75 351.07 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
169.49 1.00 169.49 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 131.35 256.13 0.00 0.00 0%
925.75 35.38 1310.12 0.00 0.00 0%
581.86 131.05 581.86 0.00 0.00 0%
1,606.67 131.05 1606.67 0.00 0.00 0%
1037.34 35.38 1037.34 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
2,500.00 0.50 2500.00 0.50 2,500.00 50%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
22025.25 195.00 22025.25 0.00 0.00 0%
1,341.20 8.00 1341.20 0.00 0.00 0%
1,626.16 8.00 1626.16 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
78.00 195.00 380.25 0.00 0.00 0%
370.30 52.65 1949.63 0.00 0.00 0%
177.60 195.00 865.80 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
401.92 4.00 401.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
515.70 30.00 515.70 0.00 0.00 0%
1005.20 40.00 1005.20 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
136.50 70.00 136.50 0.00 0.00 0%
933.16 25.20 933.16 0.00 0.00 0%
310.80 70.00 310.80 0.00 0.00 0%
858.20 70.00 858.20 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
818.40 1.00 818.40 0.00 0.00 0%
1,036.40 1.00 1036.40 0.00 0.00 0%
1009.00 1.00 1009.00 0.00 0.00 0%
821.80 1.00 821.80 0.00 0.00 0%
88.38 1.00 88.38 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
875.70 30.00 875.70 25.00 729.75 45%
469.00 20.00 469.00 7.00 164.15 26%
2,394.00 180.00 2394.00 106.00 1,409.80 37%
33.99 3.00 33.99 4.00 45.32 57%
0.00 0.00 0.00 82.00 1,176.70 100%
0.00 0.00 0.00 8.00 294.24 100%
0.00 0.00 0.00 138.00 5,441.34 100%
0.00 0.00 0.00 48.00 2,174.40 100%
0.00 0.00 0.00 5.00 1,367.85 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 14.00 2,533.02 100%
0.00 0.00 0.00 10.00 946.30 100%
0.00 0.00 0.00 4.00 473.32 100%
0.00 0.00 0.00 4.00 534.60 100%
0.00 0.00 0.00 3.00 430.95 100%
0.00 0.00 0.00 9.00 122.85 100%
0.00 0.00 0.00 6.00 7,811.10 100%
15,607.50 3.00 15607.50 1.00 5,202.50 25%
0.00 0.00 0.00 6.00 651.18 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 46.00 4361.26 0.00 0.00 0%
0.00 14.00 1210.72 0.00 0.00 0%
0.00 5.00 468.85 0.00 0.00 0%
0.00 5.00 558.35 0.00 0.00 0%
0.00 1.00 134.07 0.00 0.00 0%
0.00 38.00 4009.38 0.00 0.00 0%
0.00 18.00 2837.34 0.00 0.00 0%
0.00 1.00 139.20 0.00 0.00 0%
0.00 1.00 280.24 0.00 0.00 0%
0.00 1.00 86.83 0.00 0.00 0%
0.00 6.00 599.70 0.00 0.00 0%
0.00 1.00 85.45 0.00 0.00 0%
0.00 1.00 54.17 0.00 0.00 0%
0.00 2.00 121.54 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 1,113.62 100%
0.00 0.00 0.00 1.00 1,074.92 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 42,100.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 7.00 516.67 100%
0.00 0.00 0.00 2.00 147.62 100%
0.00 0.00 0.00 4.00 461.24 100%
0.00 0.00 0.00 9.00 419.22 100%
0.00 0.00 0.00 8.00 236.64 100%
0.00 0.00 0.00 477.94 3,484.18 100%
0.00 0.00 0.00 2.00 217.62 100%
0.00 0.00 0.00 9.00 156.96 100%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 520.65 100%
0.00 0.00 0.00 1.00 157.65 100%
0.00 0.00 0.00 7.00 455.42 100%
0.00 0.00 0.00 2.00 84.44 100%
0.00 0.00 0.00 1.00 1,099.16 100%
0.00 0.00 0.00 0.00 0.00 100%
185.69 30.24 185.69 0.00 -0.02 0%
84.73 11.56 84.73 0.00 0.00 0%
68.56 8.23 68.56 0.00 0.00 0%
160.15 19.82 160.15 0.00 0.00 0%
1,601.80 73.68 1601.80 0.00 0.00 0%
55.58 2.00 55.58 0.00 0.00 0%
47.86 2.00 47.86 0.00 0.00 0%
260.73 1.00 260.73 0.00 0.00 0%
234.83 1.00 234.83 0.00 0.00 0%
1,411.63 1.00 1411.63 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 0.00 0.00 100%
1,500.00 0.80 4000.00 0.20 1,000.00 20%
0.00 0.00 0.00 0.00 0.00 100%
0.00 0.00 0.00 1.00 2,950.00 100%
0.00 0.00 0.00 1.00 3,200.00 100%
0.00 0.00 0.00 1.00 2,900.00 100%
0.00 0.00 0.00 1.00 3,500.00 100%
0.00 0.00 0.00 0.00 0.00 100%
4,000.00 0.80 4000.00 0.20 1,000.00 20%
0.00 0.00 0.00 0.00 0.00 100%
2,251.46 4.00 4502.92 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
3,930.00 1,500.00 3930.00 0.00 0.00 0%
0.00 0.00 0.00 500.00 1,335.00 100%
3314.13 1.00 3314.13 0.00 0.00 0%
0.00 0.00 0.00 1.00 2,776.88 100%
0.00 0.00 0.00 0.00 0.00 100%
20,620.17 1.00 20620.17 0.00 0.00 0%
52,785.40 1.00 52785.40 0.00 0.00 0%
0.00 0.00 0.00 0.00 0.00 100%
4,081.92 0.50 4081.92 0.50 4,081.92 50%

380,142.07 1,191,833.07 193,279.44


45,617.05 143,019.97 23,193.53
34,212.79 107,264.98 17,395.15
459,971.91 1,442,118.02 233,868.12
459,971.91 1,442,118.02 233,868.12
459,971.91 1,442,118.02 233,868.12
82,794.94 259,581.24 42,096.26
542,766.85 1,701,699.26 275,964.38