1M:2015
C-6. Inspection
C-6.1 Scope
fabrication/erection inspection
Part C
Acceptance Criteria
C-6.12 RT
C-6.12.1 Discontinuity Acceptance Criteria for Stati-
cally Loaded Nontubular Connections.
C-Tables 6.1 and 9.16, Item 8—Piping Porosity. C-6.12.2.1 Cyclically Loaded Nontubular Connec-
tions in Tension.
C-6.13 UT
C-6.13.1 Acceptance Criteria for Statically Loaded
Nontubular Connections.
C-6.11 NDT
COMMENTARY AWS D1.1/D1.1M:2015
Part E
Radiographic Testing
C-6.13.2 Acceptance Criteria for Cyclically Loaded C-6.16 RT of Groove Welds in Butt
Nontubular Connections. Joints
C-6.16.1 Procedures and Standards (RT).
Boiler and
Pressure Vessel Code
C-6.17 RT Procedure
Part D
NDT Procedures
C-6.14 Procedures
C-6.17.3 Removal of Reinforcement.
C-6.17.3.1 Tabs.