BPDB Daily Generation Report of 22/06/2019

Dhaka Zone

SL Name OF Power Fuel Type Plant Type Installed Derated Actual Actual
NO. Station Capacity Capacity Peak Peak
Day Evenin
g

1 a) Ghorasal ST Unit-1 Natural Gas Steam Turbine 55.00 40.00 0.00 0.00

2 b) Ghorasal ST 2 Natural Gas Steam Turbine 55.00 45.00 35.00 35.00

3 Ghorasal ST :Unit-3 Natural Gas Steam Turbine 210.00 170.00 44.00 74.00

4 Ghorashal ST Unit-4 Natural Gas Steam Turbine 210.00 180.00 101.00 100.00

5 Ghorashal ST Unit-5 Natural Gas Steam Turbine 210.00 190.00 90.00 110.00

Ghorashal CCPP Unit CCPT


6 Natural Gas 365.00 365.00 210.00 280.00
-7

7 Ghorashal Regent Natural Gas Steam Turbine 108.00 108.00 0.00 0.00

Ghorashal 78.5MW Steam Turbine


8 Natural Gas 78.00 78.00 0.00 0.00
(MAX)

9 Tongi GT Natural Gas Steam Turbine 105.00 105.00 40.00 40.00

10 Horipur GT:Unit 1,2 Natural Gas Combined Cycle 64.00 40.00 40.00 40.00

11 Horipur NEPC (HFO) HFO Combined Cycle 110.00 110.00 0.00 0.00

12 Horippur Power CCPP Natural Gas Combined Cycle 360.00 360.00 211.00 355.00

13 Meghnaghat CCPP Natural Gas CCGT 450.00 450.00 300.00 400.00

14 Shiddirganj ST Natural Gas CCPP 210.00 115.00 0.00 0.00


Horipur 412 MW
15 Natural Gas CCPP 412.00 412.00 342.00 350.00
CCPP

16 Shiddirganj ST Natura Gas CCPT 210.00 210.00 0.00 0.00

Siddhirganj CCPP 335


17 Natural Gas CCPT 217.00 217.00 70.00 200.00
MW GT

18 Siddirgonj (Desh) Diesel CCPT 0.00 0.00 0.00 0.00

Siddhirganj (Dutch
19 HFO CCPT 100.00 100.00 0.00 0.00
Bangla)

Meghnaghat CCPP 280.0


20 Gas/RLNG CCGT 305.00 305.00 290.00
(Summit) 0
and HSD

21 Meghnaghat IEL HFO CCPT 100.00 100.00 0.00 0.00

Reciprocating
22 Madanganj (Summit) HFO 102.00 100.00 0.00 0.00
Engine

Reciprocating
23 Madanganj-55 HFO 55.00 55.00 0.00 0.00
Engine

Keraniganj Reciprocating
24 HFO 100.00 100.00 0.00 0.00
(Powerpac) 100 MW Engine

Reciprocating
25 Gagnagar (Orion) HFO 102.00 102.00 0.00 16.00
Engine

26 Narshingdi (Doreen) Gas CCGT 22.00 22.00 0.00 22.00

Summit Power Reciprocating


27 Natural Gas 80.00 80.00 54.00 53.00
(Madhbdi+ Ashulia) Engine

Summit Power Reciprocating


28 Natural Gas 33.00 33.00 17.00 33.00
(Maona) Engine

Summit Power, ReciprocatingEn


29 Natural Gas 33.00 33.00 8.00 25.00
Rupgonj gine

30 Gazipur RPCL HFO/Gas DFPP 52.00 52.00 4.00 24.00


31 Gazipur 100 MW HFO/Gas DFPP 105.00 105.00 53.00 72.00

Kodda 150 Power


32 HFO DFPP 149.00 149.00 0.00 98.00
Plant

33 Kathpotti 52 mw HFO CCPP 51.00 51.00 14.00 49.00

Kamalaghat
34 Munshigonj (Banco HFO CCPP 54.00 54.00 17.00 17.00
Energy 54 MW)

Reciprocating
35 Summit Gazipur-2 HFO 300.00 300.00 0.00 0.00
Engine

Summit Kodda 149 Reciprocating


36 HFO 149.00 149.00 0.00 22.00
MW Engine

APR Energy, Reciprocating


37 HFO 300.00 300.00 0.00 0.00
Keranigonj Engine

Aggreco Reciprocating
38 HFO 100.00 100.00 0.00 0.00
Bramhangoan Engine

Aggrako aurahati 100 Reciprocating


39 HFO 100.00 100.00 0.00 0.00
mw Engine

Reciprocating
40 Southern Power HFO 55.00 55.00 0.00 17.00
Engine

Reciprocating
41 Northen 55 MW HFO 55.00 55.00 0.00 18.00
Engine

Bosila 108 CLCPC Reciprocating


42 HFO 108.00 108.00 0.00 65.00
Keranigonj Engine

6039 5803 1930 2805


Total

Chittagong Zone
SL Name OF Power Station Fuel Installed Derated Actual Actual Peak
NO Type Capacity Capacity Peak Day Evening
.

1 Kaptai Hydro:Unit-1,2,3,4,5 Hydro 230.00 230.00 35.00 35.00

2 Chittagong RaozanST(Gas):Unit-1 Gas 210.00 180.00 100.00 100.00

3 Chittagong RaozanST(Gas):Unit-2 Gas 210.00 180.00 0.00 0.00

4 Kaptai Solar Solar 0.00 0.00 3.00 0.00

5 Raozan 25MW HFO 25.00 25.00 0.00 25.00

6 Teknaf Solartech 20MW Solar 20.00 20.00 17.00 0.00

7 Shikalbaha ST Gas 60.00 40.00 18.00 18.00

8 Patenga 50 MW HFO 50.00 50.00 12.00 46.00

9 Baraka Sikalbaha 105 PL HFO 105.00 105.00 0.00 0.00

10 b) Shikalbaha Peaking (GT) gas 150.00 150.00 130.00 131.00

11 Shikalbaha 225 MW GT GAS 225.00 225.00 229.00 231.00

12 Shikalbaha(Energis) HFO 51.00 51.00 16.00 24.00

13 Anwara united HFO 0.00 0.00 133.00 136.00

14 Julda HFO 100.00 100.00 10.00 10.00

15 Julda (Acon) Unit-3 HFO 100.00 100.00 40.00 100.00

16 Dohazari Sangu HFO 102.00 102.00 0.00 68.00

17 Hathazari HFO 98.00 98.00 0.00 84.00

18 Barabkunda (Regent) Gas 22.00 22.00 19.00 19.00

19 Malancha, Ctg.EPZ (United) Gas 0.00 0.00 2.00 42.00

20 Chittagong ECPV HFO 108.00 108.00 0.00 91.00


Total 1866 1786 764 1160

Comilla Zone

SL Name OF Power FUEL Plant Type Installed Derated Actual Actual


NO. Station Capacity Capacity Peak Day Peak
Evening

1 c) Ashuganj ST 3 Gas GT 150.00 135.00 0.00 0.00

2 Ashugonj ST 4 Gas GT 150.00 129.00 0.00 0.00

Gas
3 Ashugonj ST 5 GT 150.00 134.00 80.00 80.00

4 ASHUGONJ ENGINES Gas GT 53.00 45.00 0.00 0.00

c) Ashuganj CCPP- Gas


5 CCPP 221.00 221.00 185.00 194.00
225MW

6 Asuganj CCPP South Gas CCPP 360.00 360.00 235.00 300.00

7 Asugonj CCPP NORTH Gas CCPP 360.00 360.00 170.00 300.00

8 Ashuganj (Precision) Gas CCPP 55.00 55.00 5.00 56.00

9 d) Ashuganj (United) Gas CCPP 53.00 53.00 5.00 5.00

Ashuganj (Modular) Gas CCPP


10 195.00 195.00 16.00 8.00
195MW

11 Ashuganj (Midland) Gas CCPP 51.00 51.00 5.00 5.00

Brahmanbaria (Agrico)
12 Gas CCPP 0.00 0.00 0.00 0.00
(Gas)

13 Midland 150 MW Gas CCGT 150.00 150.00 0.00 0.00


Reciprocating
14 Titas(Dautkandi) HFO 52.00 52.00 0.00 0.00
Engine

15 Chandpur gas CCGT 163.00 163.00 100.00 100.00

Chandpur Desh 200 CCGT


16 gas 200.00 200.00 17.00 17.00
MW

17 Feni (Doreen) gas CCGT 22.00 22.00 0.00 22.00

18 Feni, Mahipal (Doreen) gas CCGT 11.00 11.00 11.00 11.00

Reciprocating
19 Jangalia (Summit) Gas 33.00 33.00 25.00 25.00
Engine

Reciprocating
20 Jangalia(Lakdamavi) HFO 52.00 52.00 0.00 16.00
Engine

21 Summit Power, Comilla gas CCPP 25.00 25.00 20.00 20.00

22 Daudkandi 200 MW gas CCPP 200.00 200.00 0.00 0.00

23 Tripura gas Imported 160.00 160.00 126.00 164.00

Total 2866 2806 1000 1323

Mymensingh Zone
SL NO. Name OF Power Installed Derated Actual Actual
Station Capacity Capacity Peak Day Peak
Evening
1 RPCL,CCPP, 210.00 202.00 148.00 147.00
Mymensingh GAS
2 Tangail (Doreen) GAS 22.00 22.00 0.00 20.00
3 Jamalpur RPP HFO 95.00 95.00 0.00 94.00
4 United Jamalpur HFO 115.00 115.00 0.00 97.00
PPL
5 Sarishabari Solar Solar Solar 3.00 3.00 0.00 170.00
Plant
6 Mymenshingh 200 GAS CCPP 200.00 200.00 0.00 0.00
mw
(United)
Total 645 637 148 528

Sylhet Zone

SL NO. Name OF Power Fuel Type Plant Type Installed Derated Actual Actual
Station Capacity Capacity Peak Day Peak
Evening

Fenchuganj CCPP-1
1 Gas CCGT 97.00 70.00 30.00 56.00
(Gas)

Fenchuganj CCPP- Gas CCGT


2 104.00 90.00 44.00 58.00
2(New)

Fenchuganj Gas CCGT


3 51.00 51.00 5.00 5.00
(Barakatullah)

Fenchuganj Gas CCGT


4 44.00 44.00 5.00 5.00
(Energyprima)

Kushiara 163 MW Gas CCGT


5 163.00 163.00 0.00 11.00
Fenchugonj

Hobiganj (Confidence- Gas CCGT


6 11.00 11.00 130.00 130.00
EP)

Shajibazar GT Unit-8, Gas CCGT


7 70.00 66.00 66.00 63.00
9

8 Shahjibazar 330 MW Gas CCGT 330.00 330.00 248.00 250.00

Shajibazar Gas CCGT


9 86.00 86.00 10.00 80.00
(Shajibazar )

Shajibazar(ENERGYPRI Gas CCGT


10 50.00 50.00 5.00 46.00
MA)

11 Sylhet 150MW GT Gas CCGT 142.00 142.00 74.00 120.00

12 Sylhet 20MW GT Gas CCGT 20.00 20.00 0.00 0.00

13 Sylhet (Energyprima) Gas CCGT 50.00 50.00 12.00 46.00


14 Sylhet(Desh) Gas CCGT 10.00 10.00 0.00 10.00

15 Shahjahanulla 25mw Gas CCGT 25.00 25.00 23.00 23.00

16 Summit Bibiana-2 Gas CCGT 341.00 341.00 250.00 255.00

17 Bibiana-3 Gas CCGT 0.00 0.00 120.00 249.00

Total 1549 1022 1407

Khulna Zone
SL Name OF Power Fuel Type Plant Type Installed Derated Actual Actual
NO. Station Capacity Capacity Peak Day Peak
Evening

Bheramara GT (Unit- GAS,HS


1 CCPP 60.00 46.00 0.00 0.00
1,2,3) D

2 Bherama 360 MW Gas CCPP 410.00 410.00 0.00 0.00

Reciprocating
3 Faridpur HFO 54.00 54.00 0.00 35.00
engine

Reciprocating
4 Gopalganj Peaking HFO 109.00 109.00 0.00 56.00
engine

5 Khulna CCPP HSD,GAS CCPP 230.00 230.00 120.00 120.00

6 Khulna (KPCL-2) HSD,GAS CCPP 115.00 115.00 0.00 32.00

Labon Chora 105


7 HSD,GAS CCPP 105.00 105.00 0.00 53.00
MW

8 Bangla Trac(Noapara) HSD,GAS CCPP 100.00 100.00 0.00 0.00

Noapara (khanjahan
9 HSD CCPP 40.00 40.00 0.00 32.00
ali)

Modhumati Power
10 HFO CCPP 105.00 105.00 17.00 53.00
Plant

11 Bheramara HVDC Import 1000.00 1000.00 788.00 923.00


Interconnector

Total 2328 2314 925 1304

Barishal Zone
SL NO. Name OF Power Fuel Plant Installed Derated Actual Actual
Station Capacity Capacity Peak Peak
Day Evening
1 Barishal GT-unit-1,2 Gas GT 40.00 30.00 0.00 0.00
Summit Barisal
2 GAS CCGT 110.00 110.00 0.00 64.00
110MW
3 Bhola Venture HFO CCGT 33.00 33.00 27.00 34.00
CCGT 173.0
4 Bhola CCPP GT-1,2,ST Gas 194.00 194.00 149.00
0
Bhola Agreeco 95 CCGT
5 HFO 95.00 95.00 32.00 85.0
mw
Total 472 462 232 332

Rajshahi Zone
SL NO. Name OF Power Fuel Type Plant Type Installed Derated Actual Actual Peak
Station Capacity Capacity Peak Evening
Day

1 a)Baghabari GT 1 GAS 71.00 71.00 50.00 50.00

2 a)Baghabari GT2 GAS 100.00 100.00 0.00 0.00

3 Baghabari Peaking HFO 52.00 52.00 0.00 50.00

4 Bera Peaking HFO 71.00 71.00 0.00 0.00

5 Paramount Baghabari HFO 200.00 200.00 0.00 0.00

6 Amnura HFO 50.00 50.00 0.00 12.00


Chapainawabgonj HFO
7 104.00 104.00 0.00 48.00
100 MW

8 Katakhali (Peaking) HFO 50.00 50.00 0.00 0.00

9 Khtakhali (Northern) HFO 50.00 50.00 0.00 0.00

10 Santahar Peaking HFO 50.00 50.00 0.00 0.00

166.0
11 Sirajganj CCPP1 GAS 210.00 210.00 168.00
0

145.0
12 Sirajgonj CCPP 2 GAS 220.00 220.00 176.00
0

165.0
13 Sirajganj CCPP-3 GT GAS 220.00 220.00 175.00
0

Sirajgonj-4 230.0
14 GAS 414.00 414.00 415.00
Unit4(Gas) 0

15 Bogra GBB GAS 22.00 22.00 0.00 22.00

16 Bogra(Energyprima) GAS 20.00 10.00 0.00 17.00

17 Ullapara (Summit) GAS 11.00 11.00 0.00 11.00

18 Rajlanka 52 MW HFO 52.00 52.00 0.00 16.00

19 Confidence CPBL-2 HFO 113.00 113.00 0.00 17.00

Total 2080 2070 756 1177

Rangpur Zone
SL NO. Name OF Power Station Fuel Plant Type Installed Derated Actual Actual
Capacity Capacity Peak Day Peak
Evening
1 Barupukuria ST 1 Coal ST 125.00 85.00 0.00 0.00

2 Barupukuria ST 2 Coal ST 125.00 85.00 68.00 69.00

3 Barapukuria ST Unit-3 Coal ST 274.00 274.00 149.00 149.00

4 Rangpur GT HSD GT 20.00 20.00 0.00 0.00


Reciprocating
5 Confidence Rangpur HFO 0.00 0.00 0.00 0.00
engine
6 Syedpur GT HSD GT 20.00 20.00 0.00 0.00

Total 564 484 217 218

Summation of total Data

Installed Capacity Derated Capacity Actual Peak Day Actual Peak Evening

18454 17911 6994 10254

Reference