Dhaka Zone
SL Name OF Power Fuel Type Plant Type Installed Derated Actual Actual
NO. Station Capacity Capacity Peak Peak
Day Evenin
g
1 a) Ghorasal ST Unit-1 Natural Gas Steam Turbine 55.00 40.00 0.00 0.00
3 Ghorasal ST :Unit-3 Natural Gas Steam Turbine 210.00 170.00 44.00 74.00
4 Ghorashal ST Unit-4 Natural Gas Steam Turbine 210.00 180.00 101.00 100.00
5 Ghorashal ST Unit-5 Natural Gas Steam Turbine 210.00 190.00 90.00 110.00
7 Ghorashal Regent Natural Gas Steam Turbine 108.00 108.00 0.00 0.00
10 Horipur GT:Unit 1,2 Natural Gas Combined Cycle 64.00 40.00 40.00 40.00
11 Horipur NEPC (HFO) HFO Combined Cycle 110.00 110.00 0.00 0.00
12 Horippur Power CCPP Natural Gas Combined Cycle 360.00 360.00 211.00 355.00
Siddhirganj (Dutch
19 HFO CCPT 100.00 100.00 0.00 0.00
Bangla)
Reciprocating
22 Madanganj (Summit) HFO 102.00 100.00 0.00 0.00
Engine
Reciprocating
23 Madanganj-55 HFO 55.00 55.00 0.00 0.00
Engine
Keraniganj Reciprocating
24 HFO 100.00 100.00 0.00 0.00
(Powerpac) 100 MW Engine
Reciprocating
25 Gagnagar (Orion) HFO 102.00 102.00 0.00 16.00
Engine
Kamalaghat
34 Munshigonj (Banco HFO CCPP 54.00 54.00 17.00 17.00
Energy 54 MW)
Reciprocating
35 Summit Gazipur-2 HFO 300.00 300.00 0.00 0.00
Engine
Aggreco Reciprocating
38 HFO 100.00 100.00 0.00 0.00
Bramhangoan Engine
Reciprocating
40 Southern Power HFO 55.00 55.00 0.00 17.00
Engine
Reciprocating
41 Northen 55 MW HFO 55.00 55.00 0.00 18.00
Engine
Chittagong Zone
SL Name OF Power Station Fuel Installed Derated Actual Actual Peak
NO Type Capacity Capacity Peak Day Evening
.
Comilla Zone
Gas
3 Ashugonj ST 5 GT 150.00 134.00 80.00 80.00
Brahmanbaria (Agrico)
12 Gas CCPP 0.00 0.00 0.00 0.00
(Gas)
Reciprocating
19 Jangalia (Summit) Gas 33.00 33.00 25.00 25.00
Engine
Reciprocating
20 Jangalia(Lakdamavi) HFO 52.00 52.00 0.00 16.00
Engine
Mymensingh Zone
SL NO. Name OF Power Installed Derated Actual Actual
Station Capacity Capacity Peak Day Peak
Evening
1 RPCL,CCPP, 210.00 202.00 148.00 147.00
Mymensingh GAS
2 Tangail (Doreen) GAS 22.00 22.00 0.00 20.00
3 Jamalpur RPP HFO 95.00 95.00 0.00 94.00
4 United Jamalpur HFO 115.00 115.00 0.00 97.00
PPL
5 Sarishabari Solar Solar Solar 3.00 3.00 0.00 170.00
Plant
6 Mymenshingh 200 GAS CCPP 200.00 200.00 0.00 0.00
mw
(United)
Total 645 637 148 528
Sylhet Zone
SL NO. Name OF Power Fuel Type Plant Type Installed Derated Actual Actual
Station Capacity Capacity Peak Day Peak
Evening
Fenchuganj CCPP-1
1 Gas CCGT 97.00 70.00 30.00 56.00
(Gas)
Khulna Zone
SL Name OF Power Fuel Type Plant Type Installed Derated Actual Actual
NO. Station Capacity Capacity Peak Day Peak
Evening
Reciprocating
3 Faridpur HFO 54.00 54.00 0.00 35.00
engine
Reciprocating
4 Gopalganj Peaking HFO 109.00 109.00 0.00 56.00
engine
Noapara (khanjahan
9 HSD CCPP 40.00 40.00 0.00 32.00
ali)
Modhumati Power
10 HFO CCPP 105.00 105.00 17.00 53.00
Plant
Barishal Zone
SL NO. Name OF Power Fuel Plant Installed Derated Actual Actual
Station Capacity Capacity Peak Peak
Day Evening
1 Barishal GT-unit-1,2 Gas GT 40.00 30.00 0.00 0.00
Summit Barisal
2 GAS CCGT 110.00 110.00 0.00 64.00
110MW
3 Bhola Venture HFO CCGT 33.00 33.00 27.00 34.00
CCGT 173.0
4 Bhola CCPP GT-1,2,ST Gas 194.00 194.00 149.00
0
Bhola Agreeco 95 CCGT
5 HFO 95.00 95.00 32.00 85.0
mw
Total 472 462 232 332
Rajshahi Zone
SL NO. Name OF Power Fuel Type Plant Type Installed Derated Actual Actual Peak
Station Capacity Capacity Peak Evening
Day
166.0
11 Sirajganj CCPP1 GAS 210.00 210.00 168.00
0
145.0
12 Sirajgonj CCPP 2 GAS 220.00 220.00 176.00
0
165.0
13 Sirajganj CCPP-3 GT GAS 220.00 220.00 175.00
0
Sirajgonj-4 230.0
14 GAS 414.00 414.00 415.00
Unit4(Gas) 0
Rangpur Zone
SL NO. Name OF Power Station Fuel Plant Type Installed Derated Actual Actual
Capacity Capacity Peak Day Peak
Evening
1 Barupukuria ST 1 Coal ST 125.00 85.00 0.00 0.00
Installed Capacity Derated Capacity Actual Peak Day Actual Peak Evening
Reference
http://www.bpdb.gov.bd