ACTION PLAN

NAMA : SATRIANI
POSISI : KONSULTAN INDIVIDU AHLI PENGEMBANGAN WILAYAH

WAKTU
NO KEGIATAN ACTION KETERANGAN
RENCANA REALISASI
1 LAPORAN KINERJA
LAPORAN 2 MINGGUAN (1) 14 FEBRUARI 2019 14 FEBRUARI 2019
LAPORAN 2 MINGGUAN (2) 28 FEBRUARI 2019
LAPORAN 2 MINGGUAN (3) 14 MARET 2019
LAPORAN 2 MINGGUAN (4) 28 MARET 2019
LAPORAN 2 MINGGUAN (5) 11 APRIL 2019
LAPORAN 2 MINGGUAN (6) 25 APRIL 2019
LAPORAN 2 MINGGUAN (7) 9 MEI 2019
LAPORAN 2 MINGGUAN (8) 23 MEI 2019
LAPORAN 2 MINGGUAN (9) 6 JUNI 2019
LAPORAN 2 MINGGUAN (10) 20 JUNI 2019
LAPORAN 2 MINGGUAN (11) 4 JULI 2019
LAPORAN 2 MINGGUAN (12) 18 JULI 2019
LAPORAN 2 MINGGUAN (13) 1 AGUSTUS 2019
LAPORAN 2 MINGGUAN (14) 15 AGUSTUS 2019
LAPORAN 2 MINGGUAN (15) 29 AGUSTUS 2019
LAPORAN 2 MINGGUAN (16) 12 SEPTEMBER 2019
LAPORAN 2 MINGGUAN (17) 26 SEPTEMBER 2019
LAPORAN 2 MINGGUAN (18) 10 OKTOBER 2019
LAPORAN 2 MINGGUAN (19) 24 OKTOBER 2019
LAPORAN 2 MINGGUAN (20) 7 NOVEMBER 2019
LAPORAN 2 MINGGUAN (21) 21 NOVEMBER 2019
LAPORAN 2 MINGGUAN (22) 5 DESEMBER 2019
LAPORAN 2 MINGGUAN (23) 19 DESEMBER 2019
LAPORAN 2 MINGGUAN (24) 31 DESEMBER 2019

LAPORAN 2 BULANAN (1) 28 MARET 2019


LAPORAN 2 BULANAN (2) 23 MEI 2019
LAPORAN 2 BULANAN (3) 18 JULI 2019
LAPORAN 2 BULANAN (4) 12 SEPTEMBER 2019
LAPORAN 2 BULANAN (5) 7 NOVEMBER 2019
LAPORAN 2 BULANAN (6) 31 DESEMBER 2019
2 LEGALISASI DOKUMEN KPPN PROVINSI GORONTALO
2.1 Dokumen KPPN Kab Gorontalo
2.1.1 Presentasi Produk DED KPPN Kab Gorontalo
2.1.2 Perbaikan Hasil Presentasi di daerah
2.1.3 Penandatanganan dan Penyerahan Dokumen
2.2 Dokumen KPPN Kab Gorontalo Utara
2.2.1 Presentasi Produk DED KPPN Kab Gorontalo
2.2.2 Perbaikan Hasil Presentasi di daerah
2.2.3 Penandatanganan dan Penyerahan Dokumen
3 PEMANTAUAN PELAKSANAAN KEGIATAN REGULER TA. 2019
3.1 Peningkatan Jalan Akses Desa & Jalan Usaha Tani Dalam Mendukung KPPN Wonosari
KPPN Boalemo
3.1.1 Pre Award Meeting (PAM)
3.1.2 Pre Construction Meeting (PCM)
3.1.3 MC 0
3.1.4 Pelaksanaan Pemantauan dan Evaluasi
25%
Pemantauan dan Evaluasi

50%
100%
3.1.5 Provisional Hand Over (PHO)
3.2 Infrastruktur Skala Kawasan Limba B Kota Gorontalo
3.2.1 Pre Award Meeting (PAM)
3.2.2 Pre Construction Meeting (PCM)
3.2.3 MC 0
3.2.4 Pelaksanaan
Pemantauan dan Evaluasi
25%
50%
100%
3.2.5 Provisional Hand Over (PHO)
4 INFRASTRUKTUR BERBASIS MASYARAKAT
4.1 Program PISEW
4.1.1 Persiapan Peta Lokasi PISEW 2019
4.1.2 Kompilasi Data Perencanaan Penanganan Infrastruktur TA 2019
4.1.3 Kompilasi Data Hasil Penanganan Infrastruktur TA 2019
4.2 Program KOTAKU
4.2.1 Kompilasi Data Perencanaan Penanganan Infrastruktur TA 2019
4.2.2 Kompilasi Data Hasil Penanganan Infrastruktur TA 2019
5 PENYUSUNAN DATA BASE KUMUH KABUPATEN DI PROV GORONTALO
5.1 Persiapan Data Awal
5.2 Koordinasi Data Kumuh dengan Pokja PKP per Kabupaten
5.3 Survey Identifikasi Kumuh
5.4 Penyusunan Hasil Identifikasi Kumuh (BA Kesepakatan)
6 PENYUSUNAN DATA BASE CAPAIAN PROGRAM PENINGKATAN KUALITAS SATKER PKP
2015-2019
6.1 Pembuatan Album Peta
6.2 Rekapitulasi Kegiatan
7 PENYUSUNAN DOKUMEN TA 2019
7.1 Dokumen Evaluasi 2019
7.2 Dokumen Perencanaan 2020
7.3 Dokumen Rencana Kerja 2020
ACTION PLAN
NAMA : ANING ABDULLAH
POSISI : KONSULTAN INDIVIDU AHLI INFRASTRUKTUR
WAKTU
NO KEGIATAN ACTION KETERANGAN
RENCANA REALISASI

PENINGKATAN JALAN AKSES DESA


DAN JALAN USAHA TANI DALAM
MENDUKUNG KPPN WONOSARI
KABUPATEN BOALEMO

IDENTIFIKASI RENCANA MUTU KONTRAK (RMK) PENYEDIA


1 PCM
PEKERJAAN KONSTRUKSI (KONTRAKTOR)
IDENTIFIKASI RENCANA MUTU KONTRAK (RMK) PENYEDIA JASA
KONSULTASI (KONSULTAN SUPERVISI)
IDENTIFIKASI RENCANA K3 PENYEDIA PEKERJAAN KONSTRUKSI
(KONTRAKTOR)
IDENTIFIKASI RENCANA K3 PENYEDIA JASA KONSULTASI
(KONSULTAN SUPERVISI)
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
2 FIELD ENGINEERING (MC 0)
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
3 CCO - SCM
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
4 PROGRES 25
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
5 PROGRES 50
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
6 PROGRES 75
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
7 MC 100
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
8 PHO
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
9 PEMELIHARAAN
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
10 FHO
EVALUASI KESESUAIAN DAN AKURASI DESAIN
WAKTU
NO KEGIATAN ACTION KETERANGAN
RENCANA REALISASI
INFRASTRUKTUR SKALA KAWASAN
(LIMBA B)
IDENTIFIKASI RENCANA MUTU KONTRAK (RMK) PENYEDIA
1 PCM
PEKERJAAN KONSTRUKSI (KONTRAKTOR)
IDENTIFIKASI RENCANA MUTU KONTRAK (RMK) PENYEDIA JASA
KONSULTASI (KONSULTAN SUPERVISI)
IDENTIFIKASI RENCANA K3 PENYEDIA PEKERJAAN KONSTRUKSI
(KONTRAKTOR)
IDENTIFIKASI RENCANA K3 PENYEDIA JASA KONSULTASI
(KONSULTAN SUPERVISI)
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
2 FIELD ENGINEERING (MC 0)
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
3 CCO - SCM
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
4 PROGRES 25
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
5 PROGRES 50
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
6 PROGRES 75
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
7 MC 100
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
8 PHO
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
9 PEMELIHARAAN
EVALUASI KESESUAIAN DAN AKURASI DESAIN
MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,
10 FHO
EVALUASI KESESUAIAN DAN AKURASI DESAIN
WAKTU
NO KEGIATAN ACTION KETERANGAN
RENCANA REALISASI
KAWASAN PERDESAAN PRIORITAS
NASIONAL (KPPN)

LEGALISASI DOKUMEN KPPN


1 EVALUASI KESESUAIAN DAN AKURASI DESAIN
KABUPATEN GORONTALO UTARA

2 LEGALISASI DOKUMEN KPPN EVALUASI KESESUAIAN DAN AKURASI DESAIN


KABUPATEN GORONTALO
WAKTU
NO KEGIATAN ACTION KETERANGAN
RENCANA REALISASI
PROGRAM INFRASTRUKTUR
SOSIAL EKONOMI WILAYAH
(PISEW)
BERKOORDINASI DENGAN STAKEHOLDER TERKAIT DETAIL
IDENTIFIKASI/ PEMBENTUKAN
1 PENGEMBANGAN INFRASTRUKTUR PADA KEGIATAN
LEMBAGA PELAKSANA
PENGEMBANGAN KAWASAN PERMUKIMAN
BERKOORDINASI DENGAN STAKEHOLDER TERKAIT DETAIL
PERTEMUAN KECAMATAN I
2 PENGEMBANGAN INFRASTRUKTUR PADA KEGIATAN
(MERENCANAKAN KEGIATAN)
PENGEMBANGAN KAWASAN PERMUKIMAN
MERUMUSKAN STRATEGI PEMBANGUNAN INFRASTRUKTUR YANG
SURVEY BERSAMA LOKASI TEPAT TERHADAP KRITERIA KEGIATAN PENGEMBANGAN
3
RENCANA PEMBANGUNAN KAWASAN PERMUKIMAN SESUAI DENGAN KARAKTERISTIK
LOKAL
IDENTIFIKASI DAN ANALISIS KONSEP DAN DETAIL
PENYUSUNAN DOKUMEN INFRASTRUKTUR YANG DIRENCANAKAN (DED, RAB) SESUAI
4
PERENCANAAN TEKNIS (DED-RAB) SPESIFIKASI TEKNIS, SESUAI DENGAN ARAHAN YANG TELAH
DITENTUKAN

IDENTIFIKASI DAN ANALISIS KEBUTUHAN INFRASTRUKTUR


KAWASAN SESUAI KONSEP PERENCANAAN KAWASAN

PEMBANGUNAN INFRASTRUKTUR MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,


5
OLEH MASYARAKAT EVALUASI KESESUAIAN DAN AKURASI DESAIN

BERKOORDINASI DENGAN STAKEHOLDER TERKAIT DETAIL


6 PERTEMUAN KECAMATAN II PENGEMBANGAN INFRASTRUKTUR PADA KEGIATAN
PENGEMBANGAN KAWASAN PERMUKIMAN

MELAKUKAN PEMANTAUAN PEMBANGUNAN INFRASTRUKTUR,


7 SERAH TERIMA HASIL PELAKSANAAN
EVALUASI KESESUAIAN DAN AKURASI DESAIN
WAKTU
NO KEGIATAN ACTION KETERANGAN
RENCANA REALISASI
KOMPILASI DATA PERENCANAAN
1 PENANGANAN INFRASTRUKTUR TA. EVALUASI KESESUAIAN DAN AKURASI DESAIN
2019
KOMPILASI DATA HASIL
2 PENANGANAN INFRASTRUKTUR TA. EVALUASI KESESUAIAN DAN AKURASI DESAIN
2019
WAKTU
NO KEGIATAN ACTION KETERANGAN
RENCANA REALISASI
LAPORAN KINERJA LAPORAN 2 MINGGUAN (1) 14 FEBRUARI 2019

LAPORAN 2 MINGGUAN (2) 28 FEBRUARI 2019


LAPORAN 2 MINGGUAN (3) 14 MARET 2019
LAPORAN 2 MINGGUAN (4) 28 MARET 2019
LAPORAN 2 MINGGUAN (5) 11 APRIL 2019
LAPORAN 2 MINGGUAN (6) 25 APRIL 2019
LAPORAN 2 MINGGUAN (7) 9 MEI 2019
LAPORAN 2 MINGGUAN (8) 23 MEI 2019
LAPORAN 2 MINGGUAN (9) 6 JUNI 2019
LAPORAN 2 MINGGUAN (10) 20 JUNI 2019
LAPORAN 2 MINGGUAN (11) 4 JULI 2019
LAPORAN 2 MINGGUAN (12) 18 JULI 2019
LAPORAN 2 MINGGUAN (13) 1 AGUSTUS 2019
LAPORAN 2 MINGGUAN (14) 15 AGUSTUS 2019
LAPORAN 2 MINGGUAN (15) 29 AGUSTUS 2019
LAPORAN 2 MINGGUAN (16) 12 SEPTEMBER 2019
LAPORAN 2 MINGGUAN (17) 26 SEPTEMBER 2019
LAPORAN 2 MINGGUAN (18) 10 OKTOBER 2019
LAPORAN 2 MINGGUAN (19) 24 OKTOBER 2019
LAPORAN 2 MINGGUAN (20) 7 NOVEMBER 2019
LAPORAN 2 MINGGUAN (21) 21 NOVEMBER 2019
LAPORAN 2 MINGGUAN (22) 5 DESEMBER 2019
LAPORAN 2 MINGGUAN (23) 19 DESEMBER 2019
LAPORAN 2 MINGGUAN (24) 31 DESEMBER 2019

LAPORAN 2 BULANAN (1) 28 MARET 2019


LAPORAN 2 BULANAN (2) 23 MEI 2019
LAPORAN 2 BULANAN (3) 18 JULI 2019
LAPORAN 2 BULANAN (4) 12 SEPTEMBER 2019
LAPORAN 2 BULANAN (5) 7 NOVEMBER 2019
LAPORAN 2 BULANAN (6) 31 DESEMBER 2019
DOKUMEN PEMANTAUAN 2019 LAPORAN PEMANTAUAN 2019 31 DESEMBER 2019
DOKUMEN PERENCANAAN 2020 LAPORAN PERENCANAAN 2020 31 DESEMBER 2019
WAKTU
NO KEGIATAN ACTION KETERANGAN
RENCANA REALISASI

PENINGKATAN JALAN AKSES DESA DAN JALAN


A. USAHA TANI DALAM MENDUKUNG KPPN
WONOSARI KABUPATEN BOALEMO

IDENTIFIKASI RENCANA MUTU KONTRAK (RMK)


1. PCM PENYEDIA PEKERJAAN KONSTRUKSI (KONTRAKTOR)

IDENTIFIKASI RENCANA MUTU KONTRAK (RMK)


PENYEDIA JASA KONSULTASI (KONSULTAN
SUPERVISI)
MENGANALISIS MUATAN ANGGARAN DAN BIAYA
DETAIL INFRASTRUKTUR
IDENTIFIKASI METODE PELAKSANAAN PEKERJAAN,
TEMPAT PENGAMBILAN MATERIAL SERTA LOKASI
BASE CAMP
MELAKUKAN PEMANTAUAN DAN PENGECEKAN
KESESUAIAN LOKASI PEKERJAAN BERDASARKAN
2. FIELD ENGINEERING (MC 0) JENIS PEKERJAAN, HARGA MAUPUN VOLUME
PEKERJAAN SESUAI PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
3. CCO - SCM VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
4. MC 25 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
5. MC 50 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
6. MC 75 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
7. MC 100 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
8. PHO VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
9. PEMELIHARAAN VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
10. FHO VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
SUPERVISI PENINGKATAN JALAN AKSES DESA
B. DAN JALAN USAHA TANI DALAM MENDUKUNG
KPPN WONOSARI KABUPATEN BOALEMO

IDENTIFIKASI RENCANA MUTU KONTRAK (RMK)


1. PCM PENYEDIA PEKERJAAN KONSTRUKSI (KONTRAKTOR)

IDENTIFIKASI RENCANA MUTU KONTRAK (RMK)


PENYEDIA JASA KONSULTASI (KONSULTAN
SUPERVISI)
MENGANALISIS MUATAN ANGGARAN DAN BIAYA
DETAIL INFRASTRUKTUR
IDENTIFIKASI METODE PELAKSANAAN PEKERJAAN,
TEMPAT PENGAMBILAN MATERIAL SERTA LOKASI
BASE CAMP
MELAKUKAN PEMANTAUAN DAN PENGECEKAN
KESESUAIAN LOKASI PEKERJAAN BERDASARKAN
2. FIELD ENGINEERING (MC 0) JENIS PEKERJAAN, HARGA MAUPUN VOLUME
PEKERJAAN SESUAI PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
3. CCO - SCM VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
4. MC 25 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
5. MC 50 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
6. MC 75 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
7. MC 100 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
8. PHO VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
9. PEMELIHARAAN VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
10. FHO VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
C. INFRASTRUKTUR SKALA KAWASAN (LIMBA B)

IDENTIFIKASI RENCANA MUTU KONTRAK (RMK)


1. PCM PENYEDIA PEKERJAAN KONSTRUKSI (KONTRAKTOR)

IDENTIFIKASI RENCANA MUTU KONTRAK (RMK)


PENYEDIA JASA KONSULTASI (KONSULTAN
SUPERVISI)
MENGANALISIS MUATAN ANGGARAN DAN BIAYA
DETAIL INFRASTRUKTUR
IDENTIFIKASI METODE PELAKSANAAN PEKERJAAN,
TEMPAT PENGAMBILAN MATERIAL SERTA LOKASI
BASE CAMP
MELAKUKAN PEMANTAUAN DAN PENGECEKAN
KESESUAIAN LOKASI PEKERJAAN BERDASARKAN
2. FIELD ENGINEERING (MC 0) JENIS PEKERJAAN, HARGA MAUPUN VOLUME
PEKERJAAN SESUAI PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
3. CCO - SCM VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
4. MC 25 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
5. MC 50 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
6. MC 75 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
7. MC 100 VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN DAN JADWAL KEGIATAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
8. PHO VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
9. PEMELIHARAAN VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
10. FHO VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
LEGALISASI DOKUMEN KPPN KABUPATEN
D.
GORONTALO
PEMAPARAN DAN ASISTENSI DETAIL JENIS
1. PEKERJAAN, ANGGARAN BIAYA (RAB) DAN JADWAL
KEGIATAN PEMBANGUNAN RENCANA
LEGALISASI DOKUMEN KPPN KABUPATEN
E.
GORONTALO UTARA
PEMAPARAN DAN ASISTENSI DETAIL JENIS
1. PEKERJAAN, ANGGARAN BIAYA (RAB) DAN JADWAL
KEGIATAN PEMBANGUNAN RENCANA
PROGRAM INFRASTRUKTUR SOSIAL EKONOMI
F.
WILAYAH (PISEW)
BERKOORDINASI DENGAN STAKEHOLDER TERKAIT
IDENTIFIKASI/ PEMBENTUKAN LEMBAGA DETAIL PENGEMBANGAN INFRASTRUKTUR PADA
1.
PELAKSANA KEGIATAN PENGEMBANGAN KAWASAN
PERMUKIMAN
BERKOORDINASI DENGAN STAKEHOLDER TERKAIT
PERTEMUAN KECAMATAN I (MERENCANAKAN DETAIL PENGEMBANGAN INFRASTRUKTUR PADA
2.
KEGIATAN) KEGIATAN PENGEMBANGAN KAWASAN
PERMUKIMAN
IDENTIFIKASI PENENTUAN JENIS PEKERJAAN DAN
METODE PEMBANGUNAN INFRASTRUKTUR YANG
SURVEY BERSAMA LOKASI RENCANA
3. TEPAT TERHADAP KRITERIA KEGIATAN
PEMBANGUNAN PENGEMBANGAN KAWASAN PERMUKIMAN SESUAI
DENGAN KARAKTERISTIK LOKAL
MEMBERIKAN BANTUAN TEKNIS TERUTAMA PADA
PENYUSUNAN DOKUMEN PERENCANAAN
4. MUATAN ANALISIS ANGGARAN DAN BIAYA DETAIL
TEKNIS (DED-RAB) INFRASTRUKTUR
MELAKUKAN PEMANTAUAN DAN PENGECEKAN
PEMBANGUNAN INFRASTRUKTUR OLEH KESESUAIAN LOKASI PEKERJAAN BERDASARKAN
5. JENIS PEKERJAAN, HARGA MAUPUN VOLUME
MASYARAKAT
PEKERJAAN SESUAI PERENCANAAN
EVALUASI KEMAJUAN KEGIATAN PEMBANGUNAN,
PENYERAPAN ANGGARAN DAN KESESUAIAN
6. PERTEMUAN KECAMATAN II PEKERJAAN BERDASARKAN JADWAL KEGIATAN
YANG DI BUAT
EVALUASI KENDALA-KENDALA YANG DIALAMI
SELAMA KEGIATAN PELAKSANAAN DAN CARA
PENYESELESAIANNYA
MELAKUKAN PEMANTAUAN/PENGECEKAN DAN
KESESUAIAN JENIS PEKERJAAN, HARGA MAUPUN
7. SERAH TERIMA HASIL PELAKSANAAN VOLUME PEKERJAAN BERDASARKAN
PERENCANAAN
G. PROGRAM KOTAKU
KOMPILASI DATA PERENCANAAN PENANGANAN PEMAPARAN DAN ASISTENSI DETAIL JENIS
1. PEKERJAAN, ANGGARAN BIAYA (RAB) DAN JADWAL
INFRASTRUKTUR TA. 2019 KEGIATAN PEMBANGUNAN RENCANA
PEMAPARAN DAN ASISTENSI DETAIL JENIS
KOMPILASI DATA HASIL PENANGANAN
2. PEKERJAAN, ANGGARAN BIAYA (RAB) DAN JADWAL
INFRASTRUKTUR TA. 2019 KEGIATAN PEMBANGUNAN RENCANA
H. LAPORAN KINERJA LAPORAN 2 MINGGUAN (1) 14 FEBRUARI 2019
LAPORAN 2 MINGGUAN (2) 28 FEBRUARI 2019
LAPORAN 2 MINGGUAN (3) 14 MARET 2019
LAPORAN 2 MINGGUAN (4) 28 MARET 2019
LAPORAN 2 MINGGUAN (5) 11 APRIL 2019
LAPORAN 2 MINGGUAN (6) 25 APRIL 2019
LAPORAN 2 MINGGUAN (7) 9 MEI 2019
LAPORAN 2 MINGGUAN (8) 23 MEI 2019
LAPORAN 2 MINGGUAN (9) 6 JUNI 2019
LAPORAN 2 MINGGUAN (10) 20 JUNI 2019
LAPORAN 2 MINGGUAN (11) 4 JULI 2019
LAPORAN 2 MINGGUAN (12) 18 JULI 2019
LAPORAN 2 MINGGUAN (13) 1 AGUSTUS 2019
LAPORAN 2 MINGGUAN (14) 15 AGUSTUS 2019
LAPORAN 2 MINGGUAN (15) 29 AGUSTUS 2019
LAPORAN 2 MINGGUAN (16) 12 SEPTEMBER 2019
LAPORAN 2 MINGGUAN (17) 26 SEPTEMBER 2019
LAPORAN 2 MINGGUAN (18) 10 OKTOBER 2019
LAPORAN 2 MINGGUAN (19) 24 OKTOBER 2019
LAPORAN 2 MINGGUAN (20) 7 NOVEMBER 2019
LAPORAN 2 MINGGUAN (21) 21 NOVEMBER 2019
LAPORAN 2 MINGGUAN (22) 5 DESEMBER 2019
LAPORAN 2 MINGGUAN (23) 19 DESEMBER 2019
LAPORAN 2 MINGGUAN (24) 31 DESEMBER 2019

LAPORAN 2 BULANAN (1) 28 MARET 2019


LAPORAN 2 BULANAN (2) 23 MEI 2019
LAPORAN 2 BULANAN (3) 18 JULI 2019
LAPORAN 2 BULANAN (4) 12 SEPTEMBER 2019
LAPORAN 2 BULANAN (5) 7 NOVEMBER 2019
LAPORAN 2 BULANAN (6) 31 DESEMBER 2019
DOKUMEN PEMANTAUAN 2019 LAPORAN PEMANTAUAN 2019 31 DESEMBER 2019
DOKUMEN PERENCANAAN 2020 LAPORAN PERENCANAAN 2020 31 DESEMBER 2019