BE Form 07

Republic of the Philippines


Department of Education
Negros Island Region
Division of Cadiz City
SICABA NATIONAL HIGH SCHOOL
Brgy. Sicaba, Cadiz City
Mobile no.09173206752

BRIGADA ESWKELA 2018


SCHOOL ACCOMPLISHMENT REPORT
(To be accomplished by the School Head)

DIVISION: CADIZ CITY REGION: VI

SCHOOL: SICABA NATIONAL HIGH SCHOOL SCHOOL I.D.: 302727

SCHOOL ADDRESS: BRGY. SICABA NATIONAL HIGH SCHOOL

(Please check appropriate box)

Level: Type of School:


Elementary Central School
/ High School / Non-Central School
/
Multi-Grade
Primary School/Incomplete
Integrated School

SCHOOL HEAD: FRANCISCO C. DELAPEÑA CONTACT NO.: 09293682591

PTCA PRESIDENT: BENNY HOFILEÑA CONTACT NO.:

A. SCOPE AND MAINTENANCE WORK COMPLETED (Please check appropriate


column)
What was done?
Scope of Work
Repaired Repainted Replaced (Others- Give brief description))

1. Roofs/gutters a. repair of leaking roofs/gutters


b. repainting of roof/gutter
/ /
c. pruning of trees beside
roofs/gutters
2. Ceilings a. repair of ceiling outside of
Room 1 building 10
/ /
b. repainting of ceiling outside of
Room 1 building 10
3. Entrance Gate a. repainting of Entrance gate arc
/
b. installation of Entrance gate arc
4. Walls a. repainting of walls in Building 2
/ / b. repainting of walls in Building 10
& 12
5. Blackboards a. cleaning of chalkboards in
/ /
Room 1 Building 7
6. Chairs/desks/tables a. hauling and arranging of
/
armchairs on various classrooms
7. Water facilities/Drainage a. putting-up of improvised water
System tank system at the
Gulayan sa Paaralan site
b. opening of water connection from
the Brgy. Water-lines system
c. installation of water faucets
WATSAN AREAS
d. conversion of down spouts to
/ /
alternative water source
(Rain-Water Harvester)
e. cleaning & declogging of
drainage system
f. installation of washing area
alongside the wall of 3 storey
building (Building 2)
and building 1
8. Signage’s a. framing, posting and putting-up
/ / of signage’s on various locations
of the school
9. School Garden a. weeding and cultivating activities
/ / done by parents on the School
Garden (Gulayan sa Paaralan)
10. Lighting a. pruning of trees along electrical
/
lines
11. Windows a. construction and installation of
window grills for Room 2 & 3 of
Bldg. 1
b. painting & installation of window
grills for Room 2 & 3 of Bldg. 1
12. Doors a. installation of padlocks to doors
in rooms 101, 201, 201, 203, 301,
/ /
302, 303 of bldg. 2 as replacement
to damage door knobs.
13. Room Partition a. construction of room partitions in
Room 2, bldg. 1 for Supply
Room and Accounting Office
14. Comfort Rooms a. cleaned the comfort rooms in
bldg. 2
15. School Grounds a. cleaning of school grounds
16. Plant boxes / / / a. renovations on plant boxes
17. Library a. transfer of books and
cabinets/book shelves from
3rd floor bldg. 2 to Room 3 of
bldg.1.
18. School Fence / a. construction of school fence
19. School Guard House a. improvisation of School Guard
/ /
House
20. Foot walks a. construction of Foot walks
21. Installation and Fixtures of
CCTVs
22. Landscape Areas a. upgrading of Landscape areas
23. School Landmark a. construction of School Landmark
in front of Bldg. 1 & 2
B. DONATIONS/ MATERIAL RESOURCES GENERATED (Use separate sheets if
needed)

Type of Donations Source Estimated Costs

2 burner La Germania Gas


Marlo B. Alba 3,000.00
Stove
CASH Rodrigo “Booy” Balagosa 300.00
CASH Cecilia F. Umban 1,500.00
cement JPAC Construction & Supplies, Inc. 5,000.00
Tarpaulin (Signage) Alvin B. Lorena 10,000. 00
1 set Encyclopedia Mr. & Mrs. Daves Rama 30,000.00
Americana

CASH Kgd. Arnold “Boy” Bermeo 200.00


CASH Run Jun Dechimo 500.00
CASH Sicaba-Martesan Driver’s Association 300.00
CASH Councilor Marcelo Metoda 2,000.00
School Unit Supplies Rose Ann Arida Stump 1,500.00
Paint Mrs. Anadel P. Ramas/Senior Citizens 500.00
Pails Grade 12 Class 500.00

TShirts/Sweatshirts Saint Peregrine Church 3,000.00


Construction Supplies Punong KO 20,000.00
Saint Peregrine Church through Fr. Joven Opalda 25,000.00
1 set Encyclopedia
Britannica
CASH Kgd. Razel Dela Peña 100.00
cement Kitchie Ramas 1,000.00
1 complete set CCTV Lebrica Families 15,000.00
CASH Christian Perlado 500.00
10 gal. paint Sicaba Barangay Council 6,000.00
School Fence LGU/ Hon. Patrick Escalante 300,000.00
Door Lock/Padlocks Alrich Abunin/Alma A. Dela Peña 2,000.00
Cash LGU 50,000.00
10 set Barrel bolt Kitchie P. Ramas 1,000.00
Fire Extinguisher Alumni 1,000.00
TOTAL 479,900.00
C. VOLUNTEER SERVICES
Name of Number of Volunteers
Type of Individuals/
Organization Day Day Day Day Day Day
Volunteer (Use separate sheets 1 2 3 4 5 6
Total
if needed)

1. PTCA Members 4 6 3 13

2. Barangay
6 6 12
Officials

5. NGOs/ Civic
22 18 23 21 20 5 109
Organizations

6. Private
Organizations
7. Private
Companies/Corporat 5 2 1 1 13 22
ions
8. Other government
46 48 3 3 5 105
offices

9. Parents 90 65 61 55 49 59 379

10. Teachers 22 22 22 22 22 22 132

11. Students 106 85 82 78 76 69 496

14. Religious
11 3 2 16
Sectors

15. 4Ps beneficiaries 58 51 47 49 47 56 308

370 297 248 232 234 211 1592


TOTAL

TOTAL PARENTS = 700


D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED. Refer to Guide for
Computing Labor Cost. (Use separate sheets if needed)

Total Number of Total Number of Total Estimated


Type of Service
Volunteers Hours Rendered Costs
Masonry 5 20 750
Carpentry 54 216 8,100
Plumbing 17 68 2,550
Electrical/Electronic 24 96 3,600
Landscaping/Gardening 892 3,568 133,800
Painting 79 316 11,850
Ordinary Labor 400 1,600 60,000
Others
Labor rendered by
12 48 1,800
Barangay Council

NGO’s 109 436 16,350

Total 1592 6368 238,800.00


479,900.00
Php 718,700.00

E. SIGNIFICANT EVENTS/EXPERIENCES (Use separate sheets if needed)

What is/ are its important


contribution to the
What happened? Who were involved? When? operation of the school or
to the existing needs of the
school?
F. ISSUES AND CONCERNS. Describe briefly problems encountered and how resolved.

Brigada Eskwela Caravan from Division Office should be organized next year.

G. LESSONS LEARNED/ BEST PRACTICES

Tap every potential stakeholders or donors of materials needed

H. SUGGESTIONS TO STRENGTHEN BRIGADA ESKWELA PROJECT


(Include support needed from Central, Region, and Division Office that can increase the impact
of Brigada Eskwela Project in your school.)

I. EVIDENCES/ATTACHMENTS
a. Photos (before, during and after)
b. Photocopy of all completed BE Forms (check if attached)

_______ Form 01
_______ Form 02
_______ Form 03
_______ Form 04
_______ Form 05
_______ Form 06

Prepared by:

EMELDA V. BRITANIA
Brigada Eskwela Coordinator

Noted by:

FRANCISCO C. DELA PEÑA JR.


Principal I

Date Submitted: July 12, 2018