Anda di halaman 1dari 8

Sekolah : SMPTN SATAP Kaili (SDN No.

16 Kaili)
Desa/Kelurahan : Kaili
Kecamatan : Suli

NO URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
1 Pek. Persiapan
2 Pemasangan Bouwplank
II PEKERJAAN TANAH/PONDASI
1 Galian Tanah Pondasi
2 Urugan Kembali Bekas Galian
3 Urugan Pasir Bawah Pondasi
4 Pasangan Batu Kosong
5 Pas. Pondasi Batu Gunung 1 : 4
6 Anti Rayap
III PEKERJAAN BETON/DINDING
1 Beton Sloof 1 : 2 : 3
2 Beton Kolom 1 : 2 : 3
3 Beton Ringbalk, konsol, latel
4 Bekisting beton
5 Pas. Dinding Batu Bata 1 : 4
6 Pas. Dinding Batu Bata 1 : 2
7 Plesteran Dinding 1 : 4
8 Plesteran Dinding 1 : 2
9 Pek. Acian
10 Rabat Beton 1 : 3 : 4
11 Pek. Saluran Keliling Bangunan
IV PEKERJAAN PINTU JENDELA
1 Pek. Kusen Pintu Dan Jendela Kayu Klas II
2 Pek. Pintu Panel Kayu Klas II
3 Pek. Pintu Trikpleks KM/WC
4 Pek. Jendela + Kaca
5 Pek. Jendela Kaca Mati
6 Pek. Jalusi Mati Kusen
7 Pek. Partisi
V PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Kuda-Kuda 8/12 Kayu Klas II
2 Pek. Rangka Atap Genteng Kayu klas II
3 Pek. List Plank Papan Kayu Klas I
4 Pek. Atap Genteng Metal
5 Pek. Nok Genteng Metal
6 Pek. Talang Jurai
VI PEKERJAAN LANTAI
VI
1 Urugan Tanah Bawah Lantai
2 Urugan Pasir Bawah Lantai
3 Bata Datar Bawah Lantai
4 pek. Lantai Keramik 30x30 cm
5 Pek. Dinding Keramik 20x20 cm
6 Pek. Lantai Keramik 20x20 cm
VII PEKERJAAN PLAFOND
1 Pek. Plafond Trikpleks + Rangka
2 Pek. List Plafond
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding dan Plafond
2 Pek. Cat Pintu Jendela Dan Ventilasi
3 Pek. Cat List Plank Papan
IX PEKERJAAN INSTALASI LISTRIK
X PEKERJAAN PENGGANTUNG,PENGUNCI
XI PEKERJAAN POMPA MENARA AIR DAN TIANG BENDERA
XII PEKERJAAN SANITASI AIR
XIII INSENTIF
XIV BIAYA BUKU DAN PERALATAN SEKOLAH
XV PELATIHAN GURU + ALAT KANTOR
XVI OPERASIONAL SEKOLAH + SITE DEVELOPMENT
XVII PEK. FURNITUR
XVIII BIAYA ADMINISTRASI

Jumlah Sebelum Dibulatkan


Progres Mingguan Rencana
PROGRAM GRANT Progres Mingguan Rencana Komulatif
PENGEMBANGAN SD-SMP SATU ATAP Progres Mingguan Realisasi
AIBEP 393 SULAWESI SELATAS DAN SULAWESI BARAT 2006 Progres Mingguan Realisasi Komulatif
DEVIASI
JADWAL PELAKSANAA (TIM

NOVEMBER
DATA SESUAI SPPB 2006 DESEMBER 2006 JANUARI
JUMLAH BOBOT 1 2 3 4 5 6
(Rp) (%)

6,000,000.00 1.35 1.35


150,000.00 0.03 0.03

512,960.00 0.12 0.06 0.06


61,555.20 0.01
1,413,504.00 0.32 0.064 0.064
3,695,724.00 0.83 0.166 0.166
16,418,321.70 3.69 0.738 0.738
5,732,694.00 1.29

6,241,311.60 1.40
4,859,647.20 1.09
7,622,976.00 1.71
14,697,751.00 3.30
11,475,057.38 2.58
2,228,402.29 0.50
7,779,454.02 1.75
1,910,577.40 0.43
310,774.19 0.07
1,593,271.65 0.36
3,952,257.60 0.89

6,806,160.00 1.53
2,764,800.00 0.62

3,553,340.00 0.80
968,898.00 0.22
2,582,824.00 0.58
5,158,500.00 1.16

14,107,688.00 3.17
13,383,760.00 3.01
1,221,865.60 0.27
30,332,250.00 6.81
1,490,900.00 0.33
5,341,828.50 1.20
2,501,539.20 0.56
3,901,416.75 0.88
17,921,907.00 4.03

26,221,738.40 5.89
1,476,787.20 0.33

5,789,561.94 1.30
1,940,731.20 0.44
505,997.40 0.11
6,077,521.43 1.37
1,579,200.00 0.35
10,687,145.05 2.40
33,651,613.73 7.56
44,100,000.00 9.91
47,972,000.00 10.78
2,300,000.00 0.52
7,255,945.00 1.63
32,455,626.23 7.29
14,425,000.00 3.24
100.00
445,132,783.86
an Rencana 1.35 0.03 0.06 0.06 0.97 0.97
an Rencana Komulatif 1.35 1.38 1.44 1.50 2.46 3.43
an Realisasi 1.35 0.03 0.06 0.06 0.97 0.97
an Realisasi Komulatif 1.35 1.38 1.44 1.50 2.46 3.43
0.00 0.00 0.00 0.00 0.00 0.00
SANAA (TIME SCHEDULE)

JANUARI 2007 FEBRUARI 2007 MARET 2007


7 8 9 10 11 12 13 14 15 16

0.01
0.064 0.064 0.064
0.166 0.166 0.166
0.738 0.738 0.738
1.29

0.70 0.70
0.55 0.55
0.86 0.86
1.65 1.65
1.29 1.29
0.50
0.87 0.87
0.43
0.07
0.36

0.76 0.76
0.62

0.58

1.06 1.06
1.20
0.56
0.88

0.65 0.65
0.22 0.22

0.35
1.20 1.20

0.97 0.97 0.97 3.30 7.15 6.78 4.45 2.69 1.06 1.06
4.40 5.37 6.33 9.63 16.77 23.55 28.00 30.69 31.74 32.80
0.97 0.97 0.97 3.30 7.15 6.78 4.45 2.69 1.06 1.06
4.40 5.37 6.33 9.63 16.77 23.55 28.00 30.69 31.74 32.80
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MARET 2007 APRIL 2007
17 18 19 20 21 22

0.44 0.44

0.80
0.22

0.58 0.58

1.06
1.50 1.50
0.27
3.41 3.41
0.33
4.03

2.95 2.95
0.33

0.11
1.37

7.56
9.91
3.59 3.59 3.59
0.26 0.26
0.33 0.33 0.33 0.33 0.33
3.65 3.65
3.24

1.06 2.27 5.87 11.14 23.79 23.07


33.86 36.13 42.00 53.13 76.93 100.00
1.06 2.27 5.87 11.14 23.79 23.07
33.86 36.13 42.00 53.13 76.93 100.00
0.00 0.00 0.00 0.00 0.00 0.00